Traffic Impact Analysis
For the Truck Stop Center
In County of San Bernardino
September 29, 2016
Prepared for:
Mr. Ravinder Grewal
Hapy Highway, Inc.
PO Box 729
Baker, California 92309
Prepared by:
2141 W. Orangewood Avenue
Orange, California 92868
Telephone: (714) 573-0317
Job No: JB63072
Proposed Truck Stop Center
County of San Bernardino
ii Traffic Study
Table of Contents
1. INTRODUCTION ................................................................................................................................................ 6
PROJECT LOCATION ................................................................................................................................................... 6
PROJECT DESCRIPTION ................................................................................................................................................ 6
2. PROJECT STUDY METHODOLOGY ............................................................................................................. 9
STUDY TIMEFRAMES ..................................................................................................................................................... 9
PROJECT STUDY AREA ................................................................................................................................................. 9
ANALYSIS METHODOLOGIES ...................................................................................................................................... 10
INTERSECTION LEVEL OF SERVICE ANALYSIS ................................................................................................................ 11
EXISTING YEAR (2016) TRAFFIC COUNT DATA .......................................................................................................... 11
OPENING YEAR (2018) TRAFFIC VOLUMES ................................................................................................................. 11
BUILD OUT YEAR (2040) TRAFFIC VOLUMES .............................................................................................................. 11
3. EXISTING YEAR (2016) CONDITIONS ...................................................................................................... 12
EXISTING CIRCULATION NETWORK .......................................................................................................................... 12
PEAK HOUR INTERSECTION LEVEL OF SERVICE ............................................................................................................ 14
4. CUMULATIVE PROJECT INFORMATION ................................................................................................. 16
5. OPENING YEAR (2018) WITHOUT PROJECT CONDITIONS ............................................................ 21
OPENING YEAR (2018) GROWTH ............................................................................................................................. 21
PEAK-HOUR INTERSECTION LEVEL-OF-SERVICE ........................................................................................................... 21
6. BUILD OUT YEAR (2040) CONDITIONS WITHOUT PROJECT ........................................................ 25
BUILD-OUT GROWTH ............................................................................................................................................... 25
FUTURE IMPROVEMENTS ............................................................................................................................................ 25
PEAK HOUR INTERSECTION LEVEL OF SERVICE ............................................................................................................ 25
7. PROJECT TRIPS ................................................................................................................................................. 29
EXISTING LAND USE TRAFFIC .................................................................................................................................... 29
PROJECT TRIP GENERATION ...................................................................................................................................... 29
EFFECT OF HEAVY VEHICLES ...................................................................................................................................... 30
PROJECT TRIP DISTRIBUTION ..................................................................................................................................... 31
8. OPENING YEAR (2018) CONDITIONS WITH PROJECT ...................................................................... 35
OPENING YEAR (2018) PEAK HOUR INTERSECTION LEVEL OF SERVICE ........................................................................ 35
9. BUILD OUT YEAR (2040) WITH PROJECT CONDITIONS .................................................................. 38
BUILD OUT YEAR (2040) PEAK HOUR INTERSECTION LEVEL OF SERVICE ..................................................................... 38
10. DETERMINATION OF SIGNIFICANT IMPACT ..................................................................................... 41
PROJECT IMPACTS – OPENING YEAR (2018) WITH CUMULATIVE PROJECT, WITH PROJECT ........................................... 41
PROJECT IMPACTS – BUILD OUT YEAR (2040) WITH CUMULATIVE PROJECT, WITH PROJECT ........................................ 42
Proposed Truck Stop Center
County of San Bernardino
iii Traffic Study
11. INTERSTATE 15 RAMP INTERSECTION QUEUING ANALYSIS .................................................... 44
OPENING YEAR (2018) QUEUING ANALYSIS .............................................................................................................. 44
BUILD OUT YEAR (2040) QUEUING ANALYSIS ........................................................................................................... 45
12. MITIGATION AND PROJECT RECOMMENDATIONS ........................................................................ 47
13. INTERSTATE 15 RAMPS SIGNAL WARRANT ANALYSIS ................................................................. 48
14. COST ESTIMATES AND COST SHARING .............................................................................................. 49
BUILD OUT YEAR (2040) INTERSECTION IMPROVEMENT COSTS .................................................................................. 49
Interstate 15 Westbound/Eastbound Ramps at Afton Road .................................................................................... 49
14. PROJECT ACCESS AND INTERNAL CIRCULATION .......................................................................... 51
15. CONCLUSIONS ............................................................................................................................................... 52
List of Figures
FIGURE 1.1 - VICINITY MAP 7
FIGURE 1.2 - PROJECT SITE PLAN 8
FIGURE 3.1 - EXISTING YEAR (2016) LANE GEOMETRIES AND INTERSECTION CONTROLS 13
FIGURE 3.2 - EXISTING YEAR (2016) TRAFFIC VOLUMES – FRIDAY/SUNDAY PEAK HOURS 15
FIGURE 4.1 – CUMULATIVE PROJECT LOCATION 18
FIGURE 4.2 – CUMULATIVE PROJECT INBOUND/OUTBOUND TRIP DISTRIBUTION 19
FIGURE 4.3 – CUMULATIVE PROJECT TRIPS 20
FIGURE 5.1 – OPENING YEAR (2018) WITHOUT CUMULATIVE PROJECT WITHOUT PROJECT TRAFFIC
VOLUMES – FRIDAY/SUNDAY PEAK HOURS 23 FIGURE 5.2 – OPENING YEAR (2018) WITH CUMULATIVE PROJECT WITHOUT PROJECT TRAFFIC
VOLUMES – FRIDAY/SUNDAY PEAK HOURS 24 FIGURE 6.1 – BUILD OUT YEAR (2040) WITHOUT CUMULATIVE PROJECTS, WITHOUT PROJECT TRAFFIC
VOLUMES – FRIDAY/SUNDAY PEAK HOURS 27
FIGURE 6.2 – BUILD OUT YEAR (2040) WITH CUMULATIVE PROJECT, WITHOUT PROJECT TRAFFIC
VOLUMES – FRIDAY/SUNDAY PEAK HOURS 28
FIGURE 7.1 - AUTO TRAFFIC TRIP DISTRIBUTION – FRIDAY/SUNDAY PEAK HOURS 32
FIGURE 7.2 - TRUCK TRAFFIC TRIP DISTRIBUTION – FRIDAY/SUNDAY PEAK HOURS 33
FIGURE 7.3 – PROJECT TRIPS DURING FRIDAY/SUNDAY PEAK HOURS 34 FIGURE 8.1- OPENING YEAR (2018) CONDITIONS WITHOUT CUMULATIVE PROJECT, WITH PROJECT
TRAFFIC VOLUMES – FRIDAY/SUNDAY PEAK HOURS 36 FIGURE 8.2- OPENING YEAR (2018) CONDITIONS WITH CUMULATIVE PROJECT, WITH PROJECT TRAFFIC
VOLUMES – FRIDAY/SUNDAY PEAK HOURS 37
FIGURE 9.1 – BUILD OUT YEAR (2040) WITHOUT CUMULATIVE PROJECT, WITH PROJECT TRAFFIC
VOLUMES FRIDAY/SUNDAY PEAK HOURS 39 FIGURE 9.2 - BUILD OUT YEAR (2040) WITH CUMULATIVE PROJECT, WITH PROJECT TRAFFIC VOLUMES –
FRIDAY/SUNDAY PEAK HOURS 40
Proposed Truck Stop Center
County of San Bernardino
iv Traffic Study
Tables
TABLE 2.1 LEVEL OF SERVICE DEFINITIONS 10
TABLE 3.1 - FRIDAY/SUNDAY PEAK HOUR INTERSECTION PERFORMANCE EXISTING YEAR (2016)
CONDITIONS 14
TABLE 4.1 - CUMULATIVE PROJECT INFORMATION 16
TABLE 4.2 - CUMULATIVE PROJECT TRIP GENERATION 16
TABLE 4.3 - CUMULATIVE PROJECT TRIP GENERATION 17 TABLE 5.1 - FRIDAY/SUNDAY PEAK HOUR INTERSECTION PERFORMANCE OPENING YEAR (2018)
CONDITIONS WITHOUT CUMULATIVE PROJECT, WITHOUT PROJECT 21
TABLE 6.1 - FRIDAY/SUNDAY PEAK HOUR INTERSECTION PERFORMANCE 25
BUILD OUT YEAR (2040) WITHOUT CUMULATIVE PROJECT, WITHOUT PROJECT CONDITIONS 25
TABLE 6.2 - FRIDAY/SUNDAY PEAK HOUR INTERSECTION PERFORMANCE 26
BUILD OUT YEAR (2040) WITH CUMULATIVE PROJECT, WITHOUT PROJECT CONDITIONS 26
TABLE 7.1 - PROJECT TRIP GENERATION RATES 30
TABLE 7.2 -TRIP GENERATION RATES – ADJUSTMENT TO PCE’S 30
TABLE 7.3 - PROJECT TRIP GENERATION 30
TABLE 8.1 – FRIDAY/SUNDAY PEAK HOUR INTERSECTION PERFORMANCE 35
OPENING YEAR (2018) WITHOUT CUMULATIVE PROJECT, WITH PROJECT CONDITIONS 35
TABLE 8.2 – FRIDAY/SUNDAY PEAK HOUR INTERSECTION PERFORMANCE 35
OPENING YEAR (2018) WITH CUMULATIVE PROJECT, WITH PROJECT CONDITIONS 35
TABLE 9.1 – FRIDAY/SUNDAY PEAK HOUR INTERSECTION PERFORMANCE BUILD OUT YEAR (2040)
WITHOUT CUMULATIVE PROJECT, WITH PROJECT CONDITIONS 38 TABLE 9.2 – FRIDAY/SUNDAY PEAK HOUR INTERSECTION PERFORMANCE BUILD OUT YEAR (2040)
WITH CUMULATIVE PROJECT, WITH PROJECT CONDITIONS 38 TABLE 10.1 - LEVEL OF SERVICE ANALYSIS /DETERMINATION OF IMPACTS FOR OPENING YEAR (2018)
CONDITIONS 42
TABLE 10.2 - LEVEL OF SERVICE ANALYSIS /DETERMINATION OF IMPACTS FOR BUILD OUT YEAR (2040)
CONDITIONS 43
TABLE 11.1 – OPENING YEAR (2018) QUEUE ANALYSIS WITHOUT PROJECT 45
TABLE 11.2 – OPENING YEAR (2018) QUEUE ANALYSIS WITH PROJECT 45
TABLE 11.3 - BUILD OUT YEAR (2040) QUEUE ANALYSIS WITHOUT PROJECT 46
TABLE 11.4 – BUILD OUT YEAR (2040) QUEUE ANALYSIS WITH PROJECT 46
TABLE 12.1 - LEVEL-OF-SERVICE ANALYSIS OF MITIGATION FOR OPENING YEAR (2018) CONDITIONS 47
TABLE 12.2 - LEVEL-OF-SERVICE ANALYSIS OF MITIGATION FOR BUILD OUT YEAR (2040) CONDITIONS47
TABLE 13.1 – 1NTERSTATE 15 RAMPS SIGNAL WARRANT RESULTS 48
TABLE 14.1 – BUILD OUT YEAR (2040) FAIR SHARE COST – SIGNALIZED INTERSECTIONS 49
SUNDAY PEAK HOUR (WORST CASE SCENARIO) 49
TABLE 14.2 – BUILD OUT YEAR (2040) FAIR SHARE COST – ROUNDABOUTS 50
Appendices
Appendix A - Traffic Count Data (August 2016)
Appendix B - Intersection Level of Service Worksheets Existing Conditions (2016)
Appendix C - Cumulative Project Information
Appendix D - Intersection Level of Service Worksheets Opening Year (2018) Conditions
Proposed Truck Stop Center
County of San Bernardino
v Traffic Study
Appendix E - Intersection Level of Service Worksheets Build Out Year (2040) Conditions
Appendix F - Trip Generation Data
Appendix G - Queuing Analysis
Appendix H - Mitigation Measures for Opening Year (2018) and Build Out Year (2040) Project Conditions
Appendix I - Traffic Signal Warrant Worksheets
Proposed Truck Stop Center
County of San Bernardino
6 Traffic Study
1. Introduction
Hapy Highway, Inc. is providing engineering services for a property on the west side of Afton Road,
southeast of the Interstate 15 Freeway in the unincorporated community of Baker within the County of
San Bernardino. The project address is 45101 Afton Road, San Bernardino County, CA. The proposed
truck stop will include an auto repair shop with two bays, an auto fuel canopy with 12 fueling stations,
and a truck fueling canopy with 8 stations. The project is expected to open in 2018.
The appendices of this report contain background materials for this study. These materials include
manual traffic counts, analysis worksheets and other details.
Project Location
The project is located on the west side of Afton Road, southeast of the Interstate 15 Freeway in the
County of San Bernardino. The following intersections within the project vicinity could be affected by
the project:
• Interstate 15 Westbound Ramps
• Interstate 15 Eastbound Ramps
• Project Driveway #1
• Project Driveway #2
The study intersections are shown in Figure 1.1.
Project Description
The proposed project will add a one story truck stop building (7,000 square feet) for retail services to
include an office, fast food restaurant and a retail/lounge area, a one story auto repair building with two
bays (2,950 square feet), an auto fuel canopy with 12 fueling stations (5,376 square feet), and a truck
fueling canopy with 8 fueling stations (1,800 square feet). The project will connect to the surrounding
street system at two access points, both of which are along Afton Road. The project will supply 111
total parking spaces for those utilizing the project facilities. 108 of these parking spaces are regular
parking spaces, while the remaining 8 spaces are for trucks. The project site plan is shown in Figure 1.2.
Figure 1.1
Vicinity MapCounty of San Bernardino
Traffic Impact Analysis for the Truck Stop Center in San Bernardino County
Traffic Impact Analysis for the Truck Stop Center in San Bernardino County Figure 1.2
Project Site PlanCounty of San Bernardino
Proposed Truck Stop Center
County of San Bernardino
9 Traffic Study
2. Project Study Methodology
This chapter documents the methodologies and assumptions used to conduct the traffic impact analysis
for this proposed project. This section contains the following background information:
Study timeframes
Study area description
County analysis methodologies
Study Timeframes
This report presents an analysis of the intersection operating conditions during the peak periods, which
were selected in consultation with County staff for the following anticipated timeframes:
Existing Year (2016)
Opening Year (2018)
Build Out Year (2040)
The County selected the following peak periods for analysis:
Weekday Friday (peak hour between 12:00 PM and 3:00 PM)
Weekend Sunday (peak hour between 2:00PM and 5:00PM)
These peak hours correspond to peak hour traffic coming to/from the Los Angeles region and Las
Vegas, Nevada. For the timeframes chosen, the following scenarios will be studied during each peak
hour period:
Existing Year (2016) Conditions
Project Opening Year (2018) with Ambient Traffic
Project Opening Year (2018) with Ambient Traffic and Proposed Project
Project Opening Year (2018) with Ambient Traffic, Cumulative Traffic, and Proposed Project
Project Opening Year (2018) with Ambient Traffic, Cumulative Traffic, and Proposed Project with
Mitigation (if necessary)
Build Out Year (2040) with Ambient Traffic
Build Out Year (2040) with Ambient Traffic and Proposed Project
Build Out Year (2040) with Ambient Traffic, Cumulative Traffic, and Proposed Project
Build Out Year (2040) with Ambient Traffic, Cumulative Traffic, and Proposed Project with Mitigation (if
necessary)
Project Study Area
The study area intersections were determined through consultation with various County of San
Bernardino Department staff and in compliance with the San Bernardino Associated Governments
(SANBAG) Congestion Management Plan (CMP). The study area consists of the following intersections:
Project Study Methodology
Proposed Truck Stop Center
County of San Bernardino
10 Traffic Study
Interstate 15 Westbound Ramps
Interstate 15 Eastbound Ramps
Proposed Project Driveway #1 (along Afton Road)
Proposed Project Driveway #2 (along Afton Road)
Analysis Methodologies
This section presents a brief overview of traffic analysis methodologies and concepts used in this study.
These methodologies are found in the Highway Capacity Manual (HCM), a federally supported standard
for analysis of transportation performance. Intersection operating conditions are typically described in
terms of “level of service.” Level of service is a report-card scale used to indicate the quality of traffic
flow on roadway segments and at intersections. Level of service (LOS) ranges from Level of Service A
(free flow, little congestion) to Level of Service F (forced flow, extreme congestion).
Level of Service for signalized intersections is based upon the average time (seconds) that vehicles
approaching an intersection are delayed. There is a specific delay and level of service associated with
each approach and an overall average delay for all movements. The overall level of service for the
intersection is based upon the average control delay per vehicle. For this project, there are no signalized
intersections to be analyzed.
Unsignalized intersection level of service is also based upon the control delay, but delay is only assessed
for those traffic movements that are stopped or must yield to through traffic. Some movements,
including cross traffic on the minor street or left turns onto the major street, can be subject to long
delays, however through traffic and right turns from the major street will not experience any delays at
stopped intersections. When delay for cross traffic is severe (Level of Service F) the intersection should
be evaluated further for possible improvement with traffic signals. In some cases, this analysis determines
that the delay is being experienced by a very low number of vehicles and traffic signals are not
warranted. In other cases when the number of stopped vehicles is substantial and traffic signals may be
justified as a mitigation measure, additional analysis is required to determine the need and justification
for the installation of a traffic signal.
Table 1 shows the relationship between level of service and the performance measures for signalized
and unsignalized intersections and lists the HCM delay criteria for signalized intersections.
Table 2.1
Level of Service Definitions
Level of Service Signalized Intersection
Control Delay (in sec/veh)
Unsignalized Intersection
Control Delay (in sec/veh)
A 0 – 10 0 – 10
B 10.1 – 20 10.1 – 15
C 20.1 – 35 15.1 – 25
D 35.1 – 55 25.1 – 35
E 55.1 – 80 35.1 – 50
F 80.1 or more* 50.1 or more*
* When delay becomes excessively high, delay would be shown as >120.0
Project Study Methodology
Proposed Truck Stop Center
County of San Bernardino
11 Traffic Study
The County of San Bernardino has identified Level of Service D as the minimum allowable service level
during peak hours. Mitigation measures should be considered when traffic conditions are forecasted to
decline to poorer levels of service.
Intersection Level of Service Analysis
The analysis of peak hour intersection conditions was conducted using the PTV Vistro® software
program developed by the PTV Group. PTV Vistro utilizes HCM 2010 for Intersection Capacity and
LOS Calculation within the comprehensive traffic engineering and transportation planning analysis tool.
In addition, peak hour factors were applied to all of the volumes to analyze the peak hour. Traffic
volumes may fluctuate from minute to minute within the peak periods, so a peak hour factor increases
the hourly volume to simulate the higher 15-minute peak period for the entire peak period. The default
HCM peak hour factor of 0.95 was applied to all movements for the Opening Year (2018) and Build
Out Year (2040) analysis. The actual peak hour factors for each approach as shown in the traffic count
data was used for the Existing Year (2016).
Existing Year (2016) Traffic Count Data
Existing weekday evening and weekend peak hour traffic counts were collected for this traffic study in
August 2016. These peak-hour traffic volumes reflect typical Friday evening and Sunday afternoon
operations during current 2016 conditions. All traffic count data used in this study is compiled in
Appendix A.
Opening Year (2018) Traffic Volumes
The Opening Year (2018) was selected for analysis since it corresponds to the projected project
completion date. Peak hour intersection volumes under near-term conditions were forecast based on
existing peak hour intersection volumes and adjusted by a compounded growth rate of 2% per year
(4.04%) to reflect anticipated growth in the County. One cumulative development project was added
on top of this background base.
Build Out Year (2040) Traffic Volumes
There is no regional travel forecast model for this study area. Based upon discussion with the County, a
compounded growth rate of 2% per year (57.7% total) between the Existing Year (2016) and Build Out
Year (2040) was assumed. In addition, cumulative project traffic that may be developed in the next 5-10
years was also assumed to generate buildout traffic volumes to be conservative.
Proposed Truck Stop Center
County of San Bernardino
12 Traffic Study
3. Existing Year (2016) Conditions
This section documents the existing traffic conditions within the study area. The discussion presented
here is limited to specific roadways in the project’s vicinity.
Existing Circulation Network
Streets in the site vicinity that could be affected by the proposed project include Afton Road,
Arrowhead Trail, 20866 County Road, and Interstate 15.
Figure 2.1 shows the existing roadway classifications/circulation network and intersection
configurations/control in the project vicinity.
Afton Road is a two-lane roadway running on a north/south alignment located adjacent to and east of the
project site. The roadway provides one travel lane in each direction and is mostly divided by double
yellow centerlines. It does, however, turn into a dirt road (unpaved) near the project site. From edge of
pavement to edge of pavement, Afton Road is roughly 28 feet wide. Near the project site, there are no
signals or stop signs that control traffic along Afton Road. Additionally, there are no posted speed limit
signs along the roadway near the project site. Both Project Driveways, #1 and #2, are located along
Afton Road.
Arrowhead Trail is a two-lane roadway running on an east/west alignment located north of the project
site. Arrowhead Trail, about 32 feet in width, is an unmarked roadway that provides one travel lane in
each direction. There is no posted speed limit along the roadway. Arrowhead Trail is currently stop
controlled at the intersection with Afton Road.
20866 County Road is a two-lane arterial roadway running on an east/west alignment located just north
of the project site. The roadway provides one travel lane in each. The roadway begins at a T-
intersection with Afton Road in the east, where it is stop controlled, and continues westward. The
roadway is about 30 feet wide, and no speed limit signage is present near the project site along this
roadway.
Interstate 15 is a four lane interstate highway running east and west. Two travel lanes are provided for
each direction. The directional traffic is separated by 85 feet of median. Each lane is about 12 feet wide,
therefore accounting for 48 feet of width for the four total travel lanes.
Traffic Impact Analysis for the Truck Stop Center in San Bernardino County
LEGEND
Project Site
Study Intersection
Unsignalized Intersection
Lane Geometry
Stop Control
#
U
1
U U U U
2 3 4
Figure 3.1
Existing Year (2016) Lane Geometries and Intersection ControlsCounty of San Bernardino
3
4
1
2
Existing Year (2016) Conditions
Proposed Truck Stop Center
County of San Bernardino
14 Traffic Study
Peak Hour Intersection Level of Service
Figure 3.2 illustrates the existing peak hour traffic volumes during the Friday PM peak hour, as well as
the Sunday PM peak hour volumes. Table 3.1 summarizes the results of the level of service analysis for
the existing conditions.
The study area was observed during both peak hours. The indicated Levels of Service shown in Table
3.1 are representative of observed traffic conditions in the study area. The existing traffic condition
counts were recently conducted in August of 2016.
Table 3.1 - Friday/Sunday Peak Hour Intersection Performance
Existing Year (2016) Conditions
# Intersection Friday Peak Hour Sunday Peak Hour
Delay1 (s) LOS Delay1 (s) LOS
1 Interstate 15 Westbound Ramps 9.33 A 9.92 A
2 Interstate 15 Eastbound Ramps 9.19 A 10.44 B
3 Proposed Project Driveway #1 8.55 A 8.57 A
4 Proposed Project Driveway #2 8.55 A 8.57 A
Note 1: Delay for unsignalized intersection taken to be delay of poorest movement.
As shown in Table 3.1, all of the intersections are forecast to operate at Level of Service D or better
during the Friday and Sunday peak hours.
Appendix B contains the analysis worksheets for Existing Year (2016) Conditions.
Traffic Impact Analysis for the Truck Stop Center in San Bernardino County Figure 3.2
Existing Year (2016) Traffic Volumes - Friday/Sunday Peak HoursCounty of San Bernardino
3
4
1
2
LEGEND
Project Site
Study Intersection
Friday(Sunday) Peak
Hour Volumes
XX(XX)
#
Proposed Truck Stop Center
County of San Bernardino
16 Traffic Study
4. Cumulative Project Information
Future traffic increases can also be forecast by considering additional traffic that may be generated by
other developments that have been approved in the area. There is one project near the site that will
add cumulative traffic to the intersections analyzed in the study as shown in Table 4.1. The project sites
are shown on Figure 4.1.
Table 4.1 - Cumulative Project Information
Land Use Size
Apartment 5 Dwelling Units
Fast Food Restaurant with
Drive Thru Window 3,600 TSF
Fast Food Drive In Stalls 10 Stalls
Gasoline/Service Station with
Convenience Market - Trucks 6 Fueling Positions
Gasoline/Service Station with
Convenience Market - Cars 24 Fueling Positions
Alternative Fuel Station 15 Charging Stations
The trips generated by cumulative projects are applied in the Opening Year (2018) and Build Out Year
(2040) scenarios. The trip generation rates are shown in Table 4.2. The trip distribution and project-
related traffic volumes for each cumulative project is shown in Appendix C.
Table 4.2 - Cumulative Project Trip Generation
Land Use Units Daily Friday Peak Hour Sunday Peak Hour
Total In Out Total In Out
Apartments DU 6.65 0.51 0.10 0.41 1.02 0.40 0.62
Fast-Food Restaurant with
Drive Through Window TSF 496.12 47.30 24.60 22.70 107.66 34.92 72.74
Fast Food Drive In Stalls ST 60.00 6.00 3.00 3.00 9.00 3.00 6.00
Gasoline Service Station
with Convenience Market FP 162.78 13.57 6.79 6.78 20.36 6.79 13.57
Alternative Fuel Station CS 20.00 2.00 1.00 1.00 3.00 1.00 2.00
The trips generated by the cumulative project was applied in the Opening Year (2018) and Build Out
Year (2040) scenarios. The resultant traffic generation, based upon the trip generation rates shown in
Table 4.2, is shown in Table 4.3. The cumulative project trip distribution is shown in Figure 4.2, and the
project trips are shown in Figure 4.3.
Cumulative Project Information
Proposed Truck Stop Center
County of San Bernardino
17 Traffic Study
Table 4.3 - Cumulative Project Trip Generation
Land Use Daily Friday Peak Hour Sunday Peak Hour
Total In Out Total In Out
Apartments 33 3 1 2 3 2 1
Fast-Food Restaurant with
Drive Through Window 1,786 171 89 82 262 126 136
Fast Food Drive In Stalls 600 60 30 30 60 30 30
Gasoline Service Station with
Convenience Market - Trucks 977 82 41 41 82 41 41
Gasoline Service Station with
Convenience Market - Cars 3,907 326 163 163 326 163 163
Alternative Fuel Station 300 30 15 15 30 15 15
TOTAL TRIPS 7603 672 339 333 763 377 386
Traffic Impact Analysis for the Truck Stop Center in San Bernardino County
3
4
1
2
Figure 4.1
Cumulative Project LocationCounty of San Bernardino
LEGEND
Project Site
Study Intersection
Cumulative Project
Locations
#
Traffic Impact Analysis for the Truck Stop Center in San Bernardino County
3
4
1
2
Figure 4.2
Cumulative Project Inbound/Outbound Trip DistributionCounty of San Bernardino
LEGEND
Project Site
Study Intersection
Cumulative Project
Locations
Outbound Trip
Distribution
Inbound Trip
Distribution
#
xx%
xx%
50%
50%
50%
50%
1
2
3
4
1
2
LEGEND
Project Site
Study Intersection
Cumulative Project
Location
#
Figure 4.3
Cumulative Project Trip DistributionCounty of San Bernardino
Traffic Impact Analysis for the Truck Stop Center in San Bernardino County
Proposed Truck Stop Center
County of San Bernardino
21 Traffic Study
5. Opening Year (2018) Without Project Conditions
This section develops near term traffic conditions in the study area with ambient growth but without
the proposed project forecast traffic. 2018 is selected as the opening year to coincide with the
completion of the project.
Opening Year (2018) Growth
Based on discussions with San Bernardino County staff, it has been established that ambient traffic in the
study area has historically increased at a rate of about 2% per year compounded. Future increases in
the background traffic volumes due to local and regional growth are expected to continue at this rate in
the vicinity of the project. The existing 2016 traffic volumes were adjusted upward by a compounded
growth rate of 2.02% per year (4.04%) to reflect area-wide growth.
Peak-Hour Intersection Level-of-Service
To forecast the Opening Year (2018) Growth Conditions, the peak hour volumes in Figure 3.2 were
increased by a compounded growth rate of 2.02% per year (4.04%). Figure 5.1 illustrates the Friday and
Sunday peak hour volumes. Table 5.1 summarizes the results of the LOS analysis for this scenario. The
LOS worksheets are provided in Appendix D.
Table 5.1 - Friday/Sunday Peak Hour Intersection Performance
Opening Year (2018) Conditions Without Cumulative Project, Without Project
# Intersection Friday Peak Hour Sunday Peak Hour
Delay (s) LOS Delay (s) LOS
1 Interstate 15 Westbound Ramps 9.23 A 9.74 A
2 Interstate 15 Eastbound Ramps 9.09 A 10.03 B
3 Proposed Project Driveway #1 8.54 A 8.54 A
4 Proposed Project Driveway #2 8.54 A 8.54 A
Note 1: Delay for unsignalized intersection taken to be delay of poorest movement.
As shown in Table 5.1, all study intersections are forecasted to operate at Level of Service D or better.
Table 5.2 and Figure 5.2 show Opening Year (2018) Conditions with the cumulative project data
included.
Opening Year (2018) without Project Conditions
Proposed Truck Stop Center
County of San Bernardino
22 Traffic Study
Table 5.2 - Friday/Sunday Peak Hour Intersection Performance
Opening Year (2018) Conditions with Cumulative Project, without Project
# Intersection Friday Peak Hour Sunday Peak Hour
Delay1 (s) LOS Delay1 (s) LOS
1 Interstate 15 Westbound Ramps 14.65 B 17.05 C
2 Interstate 15 Eastbound Ramps 15.40 C 26.99 D
3 Proposed Project Driveway #1 8.54 A 8.54 A
4 Proposed Project Driveway #2 8.54 A 8.54 A
Note 1: Delay for unsignalized intersection taken to be delay of poorest movement.
Table 5.2 shows that all intersections operate at an acceptable level of service.
Traffic Impact Analysis for the Truck Stop Center in San Bernardino County Figure 5.1
Opening Year (2018) without CP without Project Traffic Volumes - Friday/Sunday Peak HrsCounty of San Bernardino
3
4
1
2
LEGEND
Project Site
Study Intersection
Friday(Sunday) Peak
Hour Volumes
XX(XX)
#
Traffic Impact Analysis for the Truck Stop Center in San Bernardino County Figure 5.2
Opening Year (2018) with CP without Project Traffic Volumes - Friday/Sunday Peak HrsCounty of San Bernardino
3
4
1
2
LEGEND
Project Site
Study Intersection
Friday(Sunday) Peak
Hour Volumes
XX(XX)
#
Proposed Truck Stop Center
County of San Bernardino
25 Traffic Study
6. Build Out Year (2040) Conditions Without Project
This section documents expected Build Out Year (2040) traffic conditions in the study. The Build Out
Year (2040) is the year of completion of all land uses designated on the County’s and nearby
jurisdictions’ general plans. Typically a forecast year of 2040 is used to designate the build-out year for
planning purposes.
Build-out Growth
There is no regional travel forecast model for this study area so a 2% compounded growth rate (57.7%)
plus cumulative project traffic was assumed to generate Build Out Year (2040) traffic volumes to be
conservative. The forecasted volumes are shown in Figure 6.1.
Future Improvements
Although it is likely that many improvements to the area roadways would be constructed by private
developments that abut the frontages to General Plan roadways, the San Bernardino County Congestion
Management Program (CMP) guidelines generally do not allow a traffic impact study to assume that any
non-committed or undisclosed improvements or roadway widening are constructed for the purpose of
assessing preliminary impacts. Therefore, only existing or committed highway geometries are assumed
for the Build Out Year (2040).
Peak Hour Intersection Level of Service
Figure 6.1 illustrates the Friday and Sunday peak hour volumes without additional volumes. Table 6.1
summarizes the results of the LOS analysis for the General Plan Build-out scenario for traffic volumes
and existing geometrics. The LOS worksheets are provided in Appendix E.
Table 6.1 - Friday/Sunday Peak Hour Intersection Performance
Build Out Year (2040) Without Cumulative Project, Without Project Conditions
# Intersection Friday Peak Hour Sunday Peak Hour
Delay1 (s) LOS Delay1 (s) LOS
1 Interstate 15 Westbound Ramps 9.35 A 10.19 B
2 Interstate 15 Eastbound Ramps 9.15 A 10.76 B
3 Proposed Project Driveway #1 8.55 A 8.56 A
4 Proposed Project Driveway #2 8.55 A 8.56 A
Note 1: Delay for unsignalized intersection taken to be delay of poorest movement.
As shown in Table 6.1, all intersections and on/off ramps operate at acceptable levels of service or have
Build Out Year (2040) Conditions without Project
Proposed Truck Stop Center
County of San Bernardino
26 Traffic Study
adequate average delays. No mitigation is necessary at this point and time.
Similarly, Figure 6.2 and Table 6.2 show the Build Out Year (2040) peak hour volumes with the inclusion
of the cumulative project trips, but without the project trips. This table shows an unacceptable level of
service at the Interstate 15 Eastbound Ramps during the Sunday peak hour.
Table 6.2 - Friday/Sunday Peak Hour Intersection Performance
Build Out Year (2040) With Cumulative Project, Without Project Conditions
# Intersection Friday Peak Hour Sunday Peak Hour
Delay1 (s) LOS Delay1 (s) LOS
1 Interstate 15 Westbound Ramps 15.07 C 18.32 C
2 Interstate 15 Eastbound Ramps 15.63 C 39.37 E
3 Proposed Project Driveway #1 8.55 A 8.56 A
4 Proposed Project Driveway #2 8.55 A 8.56 A
Note 1: Delay for unsignalized intersection taken to be delay of poorest movement.
Traffic Impact Analysis for the Truck Stop Center in San Bernardino County Figure 6.1
Build Out Year (2040) without CP without Project Traffic Volumes - Friday/Sunday Peak HrsCounty of San Bernardino
3
4
1
2
LEGEND
Project Site
Study Intersection
Friday(Sunday) Peak
Hour Volumes
XX(XX)
#
Traffic Impact Analysis for the Truck Stop Center in San Bernardino County Figure 6.2
Build Out Year (2040) with CP without Project Traffic Volumes - Friday/Sunday Peak HrsCounty of San Bernardino
3
4
1
2
LEGEND
Project Site
Study Intersection
Friday(Sunday) Peak
Hour Volumes
XX(XX)
#
Proposed Truck Stop Center
County of San Bernardino
29 Traffic Study
7. Project Trips
Project-related traffic consists of trips on any portion of the street system that will begin or end on the
project site as a result of the development of the proposed project. Project-related traffic is a function
of the extent and type of development proposed for the site. This information is used to establish
traffic generation for the site.
The current site has no existing infrastructure. Everything included within the project will be new and
will be the only infrastructure at the site. The project will add a one story truck stop building (7,000
square feet) for retail services to include an office, fast food restaurant and a retail/lounge area, a one
story auto repair building with two bays (2,950 square feet), an auto fuel canopy with 12 fueling stations
(5,376 square feet), and a truck fueling canopy with 8 fueling stations (1,800 square feet).
Existing Land Use Traffic
There is no existing development at the site, and therefore the site does not contribute to the existing
traffic conditions.
Project Trip Generation
Trip generation is a measure or forecast of the number of trips that will be made to or from the project.
It is generally equal to the traffic volume expected at the project entrances.
Trip generation characteristics for projects are normally estimated based on rates published in Trip
Generation, 9th Edition, published by the Institute of Transportation Engineers (ITE). This document is
widely used in Southern California and indicates the probable traffic generation rates for various land
uses based upon studies of existing developments in comparable settings throughout the nation. ITE
does not have published rates for truck stop facilities. The primary function of a truck stop is to provide
fueling for truckers. In order to come up with a trip generation for the proposed project, three similar
sites were surveyed and data was collected. The three sites are the following:
1. Flying J Travel Plaza: 2611 Fisher Boulevard, Barstow, CA 92311
2. Pilot Travel Center: 2591 Commerce Parkway, Barstow, CA 92311
3. Pilot Travel Center: 8701 US Hwy 395, Oak Hills, CA
Truck AADT (Annual Average Daily Traffic) volumes on adjacent streets were also obtained from
Caltrans. KOA Corporation evaluated the data collected and the truck AADT volumes and estimated
the percentage of vehicle and truck traffic that was captured per each surveyed site. (http://traffic-
counts.dot.ca.gov/2006truck.xls)
The resultant traffic generation for the site based upon the surveyed sites is shown in Table 7.1. This
shows the trip generation rates for the site, for all vehicles classes.
Project Trips
Proposed Truck Stop Center County of San Bernardino
30 Traffic Study
Table 7.1 - Project Trip Generation Rates
Vehicle Type Friday Peak Hour Sunday Peak Hour
Total In Out Total In Out
Autos 0.40 0.19 0.21 0.70 0.33 0.37
Trucks (2-axle) 0.03 0.01 0.02 0.04 0.02 0.02
Trucks (3-axle) 0.02 0.01 0.01 0.02 0.01 0.01
Trucks (4-axle +) 0.47 0.22 0.25 0.38 0.19 0.19
Trucks (Total) 0.53 0.25 0.28 0.45 0.23 0.22
Total Site 0.93 0.44 0.49 1.14 0.55 0.59
Effect of Heavy Vehicles
The traffic impacts of heavy trucks at intersections are normally addressed by converting heavy vehicles into “passenger car equivalents’ (PCE’s). It was assumed that the percentage of trucks in the mix is as follows: 19% 2-axle trucks, 5% 3-axle trucks, and 76% 4-5 axle trucks. Also, studies have indicated that each truck has a similar traffic impact that ranges between 1.5 to 3 passenger vehicles at intersections. The truck percentages listed above and a PCE factor of 3.0 for 4-5 axle trucks, 2.0 for 3 -axle trucks, and 1.5 for 2-axle trucks was applied to the to the rates listed in Table 6. The results are indicated in Table 7.3.
Table 7.2 -Trip Generation Rates – Adjustment to PCE’s PCE Factors
2-axle Trucks (19% X 1.5) 3-axle Trucks (5% X 2.0) 4-axle Trucks (76% X 3.0)
Table 7.3 summarizes the traffic generation expected from project, based on the generation rates shown in Table 7.1 with the PCE factors applied from Table 7.2. The trip information used to obtain the trip generation for the proposed facility can be found in Appendix F.
Project Trips
Proposed Truck Stop Center County of San Bernardino
31 Traffic Study
Table 7.3 - Project Trip Generation
Vehicle Type Friday Peak Hour Sunday Peak Hour
Total In Out Total In Out
Autos 49 24 25 86 40 46
Trucks (2-axle) 6 3 3 10 5 5
Trucks (3-axle) 6 4 2 4 2 2
Trucks (4-axle +) 177 84 93 141 72 69
Trucks (Total) 189 91 98 155 79 76
TOTAL SITE 238 115 123 240 119 122
DAILY 2400
The project will generate a total of 2,400 daily trips, including 238 trips during the Friday peak hour and 240 trips during the Sunday peak hour.
Project Trip Distribution
Trip distribution is the process of identifying the probable destinations, directions or traffic routes that will be utilized by project traffic. The potential interaction between the proposed land use and surrounding regional access routes are considered to identify the route where the project traffic will distribute. The anticipated trip distributions for the proposed development are presented on Figures 7.1. Figure 7.1 indicate the proportion of project auto traffic that will use the street segments and turning movements indicated during Friday and Sunday. Figure 7.2 indicates the proportion of project truck traffic that will use the street segments and turning movements indicated during Friday and Sunday. The truck trip distribution reflects the heavy traffic peaks on I-15 freeway. It is based upon the relative existing traffic volumes on Afton Road and Interstate 15 interchange. Additionally, Figure 7.3 shows the trips associated with the development of the project.
3
4
1
2
Figure 7.1
Auto Traffic Trip Distribution - Friday/Sunday Peak HoursCounty of San Bernardino
LEGEND
Project Site
Study Intersection
Friday(Sunday)
Outbound Trip
Distribution
Friday(Sunday)
Inbound Trip
Distribution
#
xx%(xx%)
xx%(xx%)
20%(80
%)
80%(20%) 3
80%(20
%)80%(20%)
1
2
Traffic Impact Analysis for the Truck Stop Center in San Bernardino County
3
4
1
2
Figure 7.2
Truck Traffic Trip Distribution - Friday/Sunday Peak HoursCounty of San Bernardino
LEGEND
Project Site
Study Intersection
Outbound Trip
Distribution
Inbound Trip
Distribution
#xx%
xx%
50%
50% 3
50%
50%
1
2
Traffic Impact Analysis for the Truck Stop Center in San Bernardino County
Traffic Impact Analysis for the Truck Stop Center in San Bernardino County Figure 7.3
Project Trips During Friday/Sunday Peak HoursCounty of San Bernardino
3
4
1
2
LEGEND
Project Site
Study Intersection
Friday(Sunday) Peak
Hour Volumes
XX(XX)
#
Proposed Truck Stop Center
County of San Bernardino
35 Traffic Study
8. Opening Year (2018) Conditions with Project
This section documents the expected effect of project traffic upon near-term conditions in the study
area, with the addition of the proposed development to the surrounding street system.
Opening Year (2018) Peak Hour Intersection Level of Service
The Opening Year (2018) with Project traffic volumes were derived by adding the project trips shown in
Figures 8.1 and 8.2 to the Opening Year (2018) traffic volumes. Figure 8.1 does not include Cumulative
Project traffic volumes, while Figure 8.2 does include such volumes. Tables 8.1 and 8.2 summarize the
results of the Level of Service analysis for the respective Opening Year (2018) conditions.
Table 8.1 – Friday/Sunday Peak Hour Intersection Performance
Opening Year (2018) Without Cumulative Project, With Project Conditions
# Intersection Friday Peak Hour Sunday Peak Hour
Delay1 (s) LOS Delay1 (s) LOS
1 Interstate 15 Westbound Ramps 9.70 A 12.84 B
2 Interstate 15 Eastbound Ramps 10.32 B 12.06 B
3 Proposed Project Driveway #1 9.55 A 9.56 A
4 Proposed Project Driveway #2 8.69 A 8.69 A
Note 1: Delay for unsignalized intersection taken to be delay of poorest movement.
While this scenario is intact, all intersections and on/off ramps display acceptable delays and levels of
service.
Table 8.2 – Friday/Sunday Peak Hour Intersection Performance
Opening Year (2018) With Cumulative Project, With Project Conditions
# Intersection Friday Peak Hour Sunday Peak Hour
Delay1 (s) LOS Delay1 (s) LOS
1 Interstate 15 Westbound Ramps 16.09 C 33.52 D
2 Interstate 15 Eastbound Ramps 19.69 C 68.27 F
3 Proposed Project Driveway #1 9.55 A 9.56 A
4 Proposed Project Driveway #2 8.69 A 8.69 A
Note 1: Delay for unsignalized intersection taken to be delay of poorest movement.
Once the cumulative project trips are added, the delay for the Interstate 15 Eastbound Ramps creates
an unacceptable level of service. Mitigation will have to be conducted for this scenario (discussed in
Chapter 11).
Traffic Impact Analysis for the Truck Stop Center in San Bernardino County Figure 8.1
Opening Year (2018) Conditions w/o CP, w/ Project Traffic Volumes - Friday/Sunday Peak HrsCounty of San Bernardino
3
4
1
2
LEGEND
Project Site
Study Intersection
Friday(Sunday) Peak
Hour Volumes
XX(XX)
#
Traffic Impact Analysis for the Truck Stop Center in San Bernardino County Figure 8.2
Opening Year (2018) Conditions w/ CP, w/ Project Traffic Volumes - Friday/Sunday Peak HrsCounty of San Bernardino
3
4
1
2
LEGEND
Project Site
Study Intersection
Friday(Sunday) Peak
Hour Volumes
XX(XX)
#
Proposed Truck Stop Center
County of San Bernardino
38 Traffic Study
9. Build Out Year (2040) with Project Conditions
This section documents the expected effect of project traffic upon build-out year conditions in the study
area. The Build Out Year (2040) is the year of completion of all land uses designated on the County’s
and nearby jurisdictions’ general plans. The year 2040 is used to designate the County’s Build Out Year
for planning purposes.
Build Out Year (2040) Peak Hour Intersection Level of Service
The Build Out Year (2040) traffic volumes were derived by adding the project trips shown in Figures 9.1
and 9.2 to the Build Out Year (2040) traffic volumes. Figure 9.1 does not include cumulative volumes,
while Figure 9.2 does. Tables 9.1 and 9.2 display the corresponding results.
Table 9.1 – Friday/Sunday Peak Hour Intersection Performance
Build Out Year (2040) Without Cumulative Project, With Project Conditions
# Intersection Friday Peak Hour Sunday Peak Hour
Delay1 (s) LOS Delay1 (s) LOS
1 Interstate 15 Westbound Ramps 9.85 A 13.81 B
2 Interstate 15 Eastbound Ramps 10.40 B 13.31 B
3 Proposed Project Driveway #1 9.57 A 9.58 A
4 Proposed Project Driveway #2 8.71 A 8.71 A
Note 1: Delay for unsignalized intersection taken to be delay of poorest movement.
As shown in Table 9.1, all intersections still operate at acceptable average delays and levels of service.
No issues need to be addressed through the mitigation process.
Table 9.2 – Friday/Sunday Peak Hour Intersection Performance
Build Out Year (2040) With Cumulative Project, With Project Conditions
# Intersection Friday Peak Hour Sunday Peak Hour
Delay1 (s) LOS Delay1 (s) LOS
1 Interstate 15 Westbound Ramps 16.63 C 40.39 E
2 Interstate 15 Eastbound Ramps 20.12 C 129.22 F
3 Proposed Project Driveway #1 9.57 A 9.58 A
4 Proposed Project Driveway #2 8.71 A 8.71 A
Note 1: Delay for unsignalized intersection taken to be delay of poorest movement.
The addition of cumulative project trips to the Sunday Peak Hour creates high levels of service at the
westbound and eastbound ramps of Interstate 15 near the project site. This will be addressed in
Chapter 11.
Traffic Impact Analysis for the Truck Stop Center in San Bernardino County Figure 9.1
Build Out Year (2040) without CP with Project Traffic Volumes - Friday/Sunday Peak HrsCounty of San Bernardino
3
4
1
2
LEGEND
Project Site
Study Intersection
Friday(Sunday) Peak
Hour Volumes
XX(XX)
#
Traffic Impact Analysis for the Truck Stop Center in San Bernardino County Figure 9.2
Build Out Year (2040) with CP with Project Traffic Volumes - Friday/Sunday Peak HrsCounty of San Bernardino
3
4
1
2
LEGEND
Project Site
Study Intersection
Friday(Sunday) Peak
Hour Volumes
XX(XX)
#
Proposed Truck Stop Center
County of San Bernardino
41 Traffic Study
10. Determination of Significant Impact
Traffic impacts are identified if the proposed project will result in a significant change in traffic conditions
on a roadway or intersection. A significant impact is normally defined when project related traffic would
cause level of service to deteriorate to below the minimum acceptable level by a measurable amount. A
cumulative impact may also be significant if the location is forecast to fill below the minimum acceptable
level due to cumulative traffic and project related traffic causes a further decline.
Level of Service (LOS) C is identified as the minimum allowable “Standard” service level during peak
hours for intersections within unincorporated areas in County of San Bernardino and an average delay
less than 45 seconds for the I-15 ramps. Mitigation measures should be considered when traffic
conditions are forecasted to decline to poorer levels of service.
Unsignalized intersections are considered to be impacted if the level of service is poor, traffic signals are
warranted, and delay is increased significantly. If signals are not warranted, mitigation measures other
than signalization may be considered to improve stop control operation.
Project Impacts – Opening Year (2018) with Cumulative Project, with Project
Table 10.1 displays a comparison of Opening Year (2018) study scenarios. Traffic impacts created by
the project can be calculated by comparing the “Without Project” scenarios to “With Project”
scenarios, with the Cumulative Project trips.
As shown in the Table 10.1 below, the project will contribute to a cumulative impact during the
Friday and/or Sunday peak hour at the following study intersection:
Interstate 15 Eastbound Ramps at Afton Road (Sunday Peak Hour)
Determination of Significant Impacts
Proposed Truck Stop Center
County of San Bernardino
42 Traffic Study
Table 10.1 - Level of Service Analysis /Determination of Impacts
for Opening Year (2018) Conditions
# Increase? Impact Increase? Impact
1 9.23 A 9.7 A 0.47 NO 14.65 B 16.09 C 1.44 NO
2 9.09 A 10.32 B 1.23 NO 15.4 C 19.69 C 4.29 NO
3 8.54 A 9.55 A 1.01 NO 8.54 A 9.55 A 1.01 NO
4 8.54 A 8.69 A 0.15 NO 8.54 A 8.69 A 0.15 NO
1 9.74 A 12.84 B 3.1 NO 17.05 C 33.52 D 16.47 NO
2 10.03 B 12.06 B 2.03 NO 26.99 D 68.27 F 41.28 YES
3 8.54 A 9.56 A 1.02 NO 8.54 A 9.56 A 1.02 NO
4 8.54 A 8.69 A 0.15 NO 8.54 A 8.69 A 0.15 YES
Interstate 15 Eastbound Ramps
Proposed Project Driveway #1
Proposed Project Driveway #2
Opening Year with
CP with P
Interstate 15 Westbound Ramps
Interstate 15 Westbound Ramps
IntersectionOpening Year without
CP without P
Opening Year
without CP with P
Opening Year with
CP without P
Interstate 15 Eastbound Ramps
Proposed Project Driveway #1
Proposed Project Driveway #2
Friday Peak Hour (Delay/Level of Service)
Sunday Peak Hour (Delay/Level of Service)
Project Impacts – Build Out Year (2040) with Cumulative Project, with Project
Table 10.2 shows a comparison of the build-out study scenarios. Traffic impacts created by the project
in the build-out year can be calculated by comparing the “Without Project” scenarios to the “With
Project” scenarios, pending the inclusion of Cumulative Project trips.
As shown in the Table 10.2 below, the project will contribute to a cumulative impact during the
Sunday peak hour at the following study intersections:
Interstate 15 Westbound Ramps at Afton Road
Interstate 15 Eastbound Ramps at Afton Road
Determination of Significant Impacts
Proposed Truck Stop Center
County of San Bernardino
43 Traffic Study
Table 10.2 - Level of Service Analysis /Determination of Impacts
for Build Out Year (2040) Conditions
# Increase? Impact Increase? Impact
1 9.35 A 9.85 A 0.5 NO 15.07 C 16.63 C 1.56 NO
2 9.15 A 10.4 B 1.25 NO 15.63 C 20.12 C 4.49 NO
3 8.55 A 9.57 A 1.02 NO 8.55 A 9.57 A 1.02 NO
4 8.55 A 8.71 A 0.16 NO 8.55 A 8.71 A 0.16 NO
1 10.19 B 13.81 B 3.62 NO 18.32 C 40.39 E 22.07 YES
2 10.76 B 13.31 B 2.55 NO 39.37 E 129.22 F 89.85 YES
3 8.56 A 9.58 A 1.02 NO 8.56 A 9.58 A 1.02 NO
4 8.56 A 8.71 A 0.15 NO 8.56 A 8.71 A 0.15 NOProposed Project Driveway #2
Build Out Year with
CP without P
Build Out Year with
CP with P
Friday Peak Hour (Delay/Level of Service)
Interstate 15 Westbound Ramps
Interstate 15 Eastbound Ramps
Proposed Project Driveway #1
Build Out Year
without CP with P
Proposed Project Driveway #2
Sunday Peak Hour (Delay/Level of Service)
Interstate 15 Westbound Ramps
Interstate 15 Eastbound Ramps
Proposed Project Driveway #1
IntersectionBuild Out Year without
CP without P
Proposed Truck Stop Center
County of San Bernardino
44 Traffic Study
11. Interstate 15 Ramp Intersection Queuing Analysis
In order to provide guidelines for future intersection improvements, KOA Corporation performed an
analysis to calculate the design queue length (calculated to accommodate the 95th percentile queue
lengths) for the following key intersections in the project vicinity:
Interstate 15 Westbound Ramps at Afton Road
Interstate 15 Eastbound Ramps at Afton Road
The queuing analysis was performed for the two intersections that feed into the Interstate 15 freeway,
in each of the scenarios addressed below. The two intersections with the Interstate 15 Ramps are
currently unsignalized.
The back of queue is the distance per lane that is queued depending on arrival patterns of vehicles and
vehicles that do not clear the intersection during a given green phase. The queue values produced by
this estimation procedure may be higher than those from other procedures, especially at high degrees of
saturation or high percentiles. The results were reported in terms of distance of queue by lane group.
A length of 25 feet per car length was used as a default and can be used as a reference to calculate the
number of cars involved in the queue.
This model for predicting queue lengths is described in the HCM 2010. The results are found within the
PTV Vistro reports included in the appendices following this report. The 95th-percentile queue is
defined to be the queue length (in feet) that has only a 5-percent probability of being exceeded during
the analysis time period. It is a useful parameter for determining the appropriate length of turn pockets,
but it is not typical of what an average driver would experience.
Opening Year (2018) Queuing Analysis
Back of queue calculations were performed for the two intersections using the Opening Year (2018)
forecast volumes. Tables 11.1 and 11.2 show the results of the queue analysis performed at the key
intersections with the cumulative project, as well as with and without the project.
Interstate 15 Ramp Intersection Queueing Analysis
Proposed Truck Stop Project
Baker, California
45 Traffic Study
Table 11.1 – Opening Year (2018) Queue Analysis Without Project
Intersection NB SB EB WB
Friday Peak Hour (Design Queue Length - feet)
L T R L T R L T R L T R
Interstate 15 Westbound Ramps 13.42 13.42 x x 0.00 0.00 x x x 25.68 25.68 25.68
Interstate 15 Eastbound Ramps x 0.00 0.00 9.15 9.15 x 37.24 37.24 37.24 x x x
Sunday Peak Hour (Design Queue Length - feet)
L T R L T R L T R L T R
Interstate 15 Westbound Ramps 22.37 22.37 x x 0.00 0.00 x x x 1.14 1.14 1.14
Interstate 15 Eastbound Ramps x 0.00 0.00 13.98 13.98 x 100.27 100.27 100.27 x x x
Note: x = queue does not exist for that movement
Table 11.2 – Opening Year (2018) Queue Analysis With Project
Intersection NB SB EB WB
Friday Peak Hour (Design Queue Length - feet)
L T R L T R L T R L T R
Interstate 15 Westbound Ramps 15.73 15.73 x x 0.00 0.00 x x x 33.38 33.38 33.38
Interstate 15 Eastbound Ramps x 0.00 0.00 11.97 11.97 x 67.72 67.72 67.72 x x x
Sunday Peak Hour (Design Queue Length - feet)
L T R L T R L T R L T R
Interstate 15 Westbound Ramps 35.68 35.68 x x 0.00 0.00 x x x 117.42 117.42 117.42
Interstate 15 Eastbound Ramps x 0.00 0.00 24.05 24.05 x 215.49 215.49 215.49 x x x
Note: x = queue does not exist for that movement
Build Out Year (2040) Queuing Analysis
Back of queue calculations were performed for the unsignalized study intersections using the Build Out
Year (2040) forecast volumes. Tables 11.3 and 11.4 show the results of the queue analysis performed at
the key intersections with the cumulative project, as well as with and without the project.
Interstate 15 Ramp Intersection Queueing Analysis
Proposed Truck Stop Project
Baker, California
46 Traffic Study
Table 11.3 - Build Out Year (2040) Queue Analysis Without Project
Intersection NB SB EB WB
Friday Peak Hour (Design Queue Length - feet)
L T R L T R L T R L T R
Interstate 15 Westbound Ramps 13.72 13.72 x x 0.00 0.00 x x x 29.40 29.40 29.40
Interstate 15 Eastbound Ramps x 0.00 0.00 9.25 9.25 x 38.89 38.89 38.89 x x x
Sunday Peak Hour (Design Queue Length - feet)
L T R L T R L T R L T R
Interstate 15 Westbound Ramps 26.80 26.80 x x 0.00 0.00 x x x 32.34 32.34 32.34
Interstate 15 Eastbound Ramps x 0.00 0.00 15.79 15.79 x 153.78 153.78 153.78 x x x
Note: x = queue does not exist for that movement
Table 11.4 – Build Out Year (2040) Queue Analysis With Project
Intersection NB SB EB WB
Friday Peak Hour (Design Queue Length - feet)
L T R L T R L T R L T R
Interstate 15 Westbound Ramps 16.06 16.06 x x 0.00 0.00 x x x 38.06 38.06 38.06
Interstate 15 Eastbound Ramps x 0.00 0.00 12.10 12.10 x 70.80 70.80 70.80 x x x
Sunday Peak Hour (Design Queue Length - feet)
L T R L T R L T R L T R
Interstate 15 Westbound Ramps 41.85 41.85 x x 0.00 0.00 x x x 144.80 144.80 144.80
Interstate 15 Eastbound Ramps x 0.00 0.00 26.60 26.60 x 326.63 326.63 326.63 x x x
Note: x = queue does not exist for that movement
In the build-out conditions, queue lengths for both westbound and eastbound ramps of Interstate 15 can
be accommodated, since the ramps at these locations are both relatively long.
Design queue length calculations are provided in Appendix G of this report.
Proposed Truck Stop Center
County of San Bernardino
47 Traffic Study
12. Mitigation and Project Recommendations
Mitigation measures are required if approval and construction of the project will result in or significantly
increase unacceptable traffic conditions. They are also appropriate if cumulative traffic conditions of
approved projects will result in an unsatisfactory level-of-service and the proposed development
contributes to these conditions significantly.
For both the Opening Year (2018) and the Build Out Year (2040), the intersection between the
Interstate 15 eastbound ramps and Afton Road has a delay greater than 45 seconds during the Sunday
Peak Hour, which is the threshold set by the County of San Bernardino. Two options were provided
regarding mitigation:
Installation of a traffic signal
Implementation of a roundabout
These mitigation options meet the satisfaction of Caltrans standards, however will be determined
through a review under the I.C.E. Policy. Tables 12.1 and 12.2 below show the levels of service for these
impacted intersections when either of the above mitigations are implemented.
Table 12.1 - Level-of-Service Analysis of Mitigation for Opening Year (2018) Conditions
Intersection Without Project With Project Signalized Roundabout Impact?
Friday Peak Hour (Delay/Level of Service)
Interstate 15 Eastbound Ramps 15.40 C 19.69 C 19.27 B 6.40 A NO
Sunday Peak Hour (Delay/Level of Service)
Interstate 15 Eastbound Ramps 26.99 D 68.27 F 19.48 B 7.65 A NO
As shown in Table 12.1, the intersections of Interstate 15 Westbound and Eastbound Ramps at Afton
Road will operate at an acceptable level of service if either of the proposed improvements are provided.
Table 12.2 - Level-of-Service Analysis of Mitigation for Build Out Year (2040) Conditions
Intersection Without Project With Project Signalized Roundabout Impact?
Friday Peak Hour (Delay/Level of Service)
Interstate 15 Eastbound Ramps 15.63 C 20.12 C 19.41 B 6.47 A NO
Sunday Peak Hour (Delay/Level of Service)
Interstate 15 Eastbound Ramps 39.37 E 129.22 F 20.72 C 8.33 A NO
As shown in Table 12.2, all the intersections will operate at acceptable levels of service if either of the
proposed improvements are provided.
Appendix H contains the analysis reports for the mitigations.
Proposed Truck Stop Center
County of San Bernardino
48 Traffic Study
13. Interstate 15 Ramps Signal Warrant Analysis
The purpose of this analysis is to explore and determine the possibility of installing a traffic signal at both
Interstate 15 on/off ramps at Afton Road (westbound and eastbound). Consideration of traffic signal
controls will be based on the guidelines and recommendations found in the latest version of the Manual
on Uniform Traffic Control Devices.
In order to determine if the proposed traffic signals are justified, a traffic signal warrant number 3, Peak
Hour Warrant was applied. Table 13.1 shows the results of the analysis. The intersections were
analyzed as a two-way stop with existing geometric configurations for Opening Year (2018) and Build
Out Year (2040). Refer to Figure 3.1, which shows the lane configurations.
Table 13.1 – 1nterstate 15 Ramps Signal Warrant Results
Intersection
Friday Peak Hour Sunday Peak Hour
Peak Hour Signal Warrant Met Peak Hour Signal Warrant Met
Yes No Yes No
Interstate 15 Westbound Ramps
Opening Year (2018) X X
Build Out Year (2040) X X
Interstate 15 Eastbound Ramps
Opening Year (2018) X X
Build Out Year (2040) X X
Note: Delay based on seconds per vehicle average. LOS = Level of Service
As shown in Table 13.1, the both intersections at Afton Road meet signal warrants for the Sunday Peak
Hour during the Build Out Year (2040). All other scenarios do not meet the warrant requirements.
Appendix I contains the Opening Year (2018) and Build Out Year (2040) signal warrant printouts.
Proposed Truck Stop Center
County of San Bernardino
49 Traffic Study
14. Cost Estimates and Cost Sharing
Improvements are required to accommodate forecast future traffic at several study intersections where
the project must construct improvements that may benefit other projects and at other locations where
the project does not solely cause the impact but contributes to the impact caused by cumulative traffic
growth.
The fair share is calculated by comparing the relative amount of traffic increase at the location for the
proposed project with the traffic increase indicated in the analysis. This number is compared to the
cost of mitigation to provide a fair share. These calculations are shown below:
Build Out Year (2040) Intersection Improvement Costs
Improvements are required to accommodate forecast Build Out Year (2040) traffic at two of the study
intersections for the Build Out Year (2040), where the project contributes significantly to the impact
caused by cumulative traffic growth. Below is a discussion of the mitigation measure needed at the
intersections:
Interstate 15 Westbound/Eastbound Ramps at Afton Road
Signalization: $400,000 per intersection
OR
Roundabout: $150,000 per intersection
Tables 14.1 and 14.2 show the fair share for both mitigation options. This represents the project’s fair
share towards funding of improvements to meet long-term future traffic demands.
Table 14.1 – Build Out Year (2040) Fair Share Cost – Signalized Intersections
Intersection Total Cost
- Signalized
Existing
Year
(2016)
Build
Out
Year
(2040)
with
Project
Difference Project % Total Fair
Share Cost
Interstate 15 Westbound Ramps $400,000.00 122 1154 1032 193 18.70% $74,806.20
Interstate 15 Eastbound Ramps $400,000.00 104 789 685 241 35.18% $140,729.93
TOTAL $800,000.00 $215,536.13
Sunday Peak Hour (worst case scenario)
The proposed projects fair share improvements for the Build Out Year (2040) for the installation of
signals at both ramps is $215,536.13.
Cost Estimates and Cost Sharing
Proposed Truck Stop Project
Baker, California
50 Traffic Study
Table 14.2 – Build Out Year (2040) Fair Share Cost – Roundabouts
Intersection Total Cost -
Roundabout
Existing
Year
(2016)
Build
Out
Year
(2040)
with
Project
Difference Project %
Total Fair
Share
Cost
Interstate 15 Westbound Ramps $150,000.00 122 1154 1032 193 18.70% $28,052.33
Interstate 15 Eastbound Ramps $150,000.00 104 789 685 241 35.18% $52,773.72
TOTAL $300,000.00 $80,826.05
Sunday Peak Hour (worst case scenario)
The proposed projects fair share improvements for the Build Out Year (2040) for the installation of
roundabouts are estimated to cost $80,826.05.
Proposed Truck Stop Center
County of San Bernardino
51 Traffic Study
14. Project Access and Internal Circulation
The project takes access to the roadway system at two locations, both of which are along Afton Road,
just south of Interstate 15. Both driveways along Afton Road provide adequate width for one inbound
and one outbound lane (left and right turn lane).
Traffic counts were taken at the nearby intersection of Afton Road and 20866 County Road to account
for traffic going to and from the project site. These existing counts were used to determine if there is
need for signalization. Since volumes are low, the accepted traffic signal warrants are not met for either
site entrance along Afton Road.
The project site plan was briefly reviewed for internal circulation. All parking areas comply with
accepted design standards for stall and aisle width. Also, all parking stalls are accessible. We have no
major concerns over the existing site plan.
The proposed project will be submitted to the County of San Bernardino, who will review the plan for
compliance with applicable County standards. We anticipate that any minor internal circulation or
parking issues will be addressed in conjunction with this review.
Proposed Truck Stop Center
County of San Bernardino
52 Traffic Study
15. Conclusions
Hapy Highway, Inc. is providing engineering services for a property on the southwest side of Afton Road,
southeast of Interstate 15 in the unincorporated area in the County of San Bernardino. The proposed
project will add a one story truck stop building (7,000 square feet) for retail services to include an office,
fast food restaurant and a retail/lounge area, a one story auto repair building with two bays (2,950
square feet), an auto fuel canopy with 12 fueling stations (5,376 square feet), and a truck fueling canopy
with 8 fueling stations (1,800 square feet).
Mitigation measures are required if approval and construction of the project will result in or significantly
increase unacceptable traffic conditions. These conditions occur at two intersections in the project
study area due to traffic from cumulative project and further development growth. A description of the
necessary improvements can be found in the Mitigation and Project Recommendation Section of the
report.
KOA Corporation recommends that the County San Bernardino find that the traffic impact of the
project has no adverse effect on the surrounding street system as long as all of the recommended
mitigation measures or suitable alternative measures are incorporated in the future.
APPENDIX A
Traffic Count Data (2016)
DATE: LOCATION: PROJECT #: SC1609Sun, Aug 28, 16 NORTH & SOUTH: LOCATION #: 1
EAST & WEST: CONTROL: STOP W
NOTES: AM ▲PM NMD ◄ W E ►
OTHER SOTHER ▼
NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND
NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTLLANES: 0 1 X X 1 0 X X X 0 1 0 X X X X
12:00 PM 0 0 0 0 0 3 0 0 0 1 1 2 7 0 0 0 0 012:15 PM 1 2 0 0 0 3 0 0 0 0 4 4 14 0 0 0 0 012:30 PM 0 0 0 0 0 3 0 0 0 0 3 2 8 0 0 0 0 012:45 PM 0 0 0 0 1 2 0 0 0 0 2 2 7 0 0 0 0 01:00 PM 0 0 0 0 0 4 0 0 0 0 5 3 12 0 0 0 0 01:15 PM 0 0 0 0 0 3 0 0 0 0 3 3 9 0 0 0 0 01:30 PM 0 1 0 0 0 1 0 0 0 0 2 0 4 0 0 0 0 01:45 PM 0 0 0 0 1 2 0 0 0 0 4 2 9 0 0 0 0 02:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 02:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 02:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 02:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
VOLUMES 1 3 0 0 2 21 0 0 0 1 24 18 70 0 0 0 0 0APPROACH % 25% 75% 0% 0% 9% 91% 0% 0% 0% 2% 56% 42%APP/DEPART 4 / 21 23 / 3 0 / 0 43 / 46 0 BEGIN PEAK HRVOLUMES 1 2 0 0 1 12 0 0 0 0 14 11 41 APPROACH % 33% 67% 0% 0% 8% 92% 0% 0% 0% 0% 56% 44%PEAK HR FACTOR 0.250 0.813 0.000 0.781 0.732 APP/DEPART 3 / 13 13 / 1 0 / 0 25 / 27 0
03:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 05:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 05:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 05:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 05:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
VOLUMES 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0APPROACH % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%APP/DEPART 0 / 0 0 / 0 0 / 0 0 / 0 0 BEGIN PEAK HRVOLUMES 0 0 0 0 0 0 0 0 0 0 0 0 0 APPROACH % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%PEAK HR FACTOR 0.000 0.000 0.000 0.000 0.000 APP/DEPART 0 / 0 0 / 0 0 / 0 0 / 0 0
Afton
NORTH SIDE
I-15 WB Ramp WEST SIDE EAST SIDE I-15 WB Ramp
SOUTH SIDE
Afton
U-TURNSAfton Afton I-15 WB Ramp I-15 WB Ramp
INTERSECTION TURNING MOVEMENT COUNTSPREPARED BY: AimTD LLC. tel: 714 253 7888 [email protected]
BakerAftonI-15 WB Ramp
AM
12:15 PM
PM
3:00 PM
Add U-Turns to Left Turns
DATE: LOCATION: PROJECT #: SC1609Sun, Aug 28, 16 NORTH & SOUTH: LOCATION #: 2
EAST & WEST: CONTROL: STOP E
NOTES: AM ▲PM NMD ◄ W E ►
OTHER SOTHER ▼
NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND
NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTLLANES: X 1 0 0 1 X 0 1 0 X X X X X X X
12:00 PM 0 0 0 0 1 0 0 1 1 0 0 0 3 0 0 0 0 012:15 PM 0 1 0 0 0 0 2 1 1 0 0 0 5 0 0 0 0 012:30 PM 0 0 1 0 0 0 0 1 1 0 0 0 3 0 0 0 0 012:45 PM 0 0 1 1 0 0 0 1 1 0 0 0 4 0 0 0 0 01:00 PM 0 0 3 0 0 0 0 0 1 0 0 0 4 0 0 0 0 01:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 01:30 PM 0 0 1 0 0 0 1 1 1 0 0 0 4 0 0 0 0 01:45 PM 0 0 0 1 0 0 0 1 1 0 0 0 3 0 0 0 0 02:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 02:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 02:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 02:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
VOLUMES 0 1 6 2 1 0 3 6 7 0 0 0 26 0 0 0 0 0APPROACH % 0% 14% 86% 67% 33% 0% 19% 38% 44% 0% 0% 0%APP/DEPART 7 / 4 3 / 8 16 / 14 0 / 0 0 BEGIN PEAK HRVOLUMES 0 1 5 1 0 0 2 3 4 0 0 0 16 APPROACH % 0% 17% 83% 100% 0% 0% 22% 33% 44% 0% 0% 0%PEAK HR FACTOR 0.500 0.250 0.563 0.000 0.800 APP/DEPART 6 / 3 1 / 4 9 / 9 0 / 0 0
03:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 05:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 05:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 05:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 05:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
VOLUMES 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0APPROACH % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%APP/DEPART 0 / 0 0 / 0 0 / 0 0 / 0 0 BEGIN PEAK HRVOLUMES 0 0 0 0 0 0 0 0 0 0 0 0 0 APPROACH % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%PEAK HR FACTOR 0.000 0.000 0.000 0.000 0.000 APP/DEPART 0 / 0 0 / 0 0 / 0 0 / 0 0
Afton
NORTH SIDE
I-15 EB Ramp WEST SIDE EAST SIDE I-15 EB Ramp
SOUTH SIDE
Afton
U-TURNSAfton Afton I-15 EB Ramp I-15 EB Ramp
INTERSECTION TURNING MOVEMENT COUNTSPREPARED BY: AimTD LLC. tel: 714 253 7888 [email protected]
BakerAftonI-15 EB Ramp
AM
12:15 PM
PM
3:00 PM
Add U-Turns to Left Turns
DATE: LOCATION: PROJECT #: SC1609Sun, Aug 28, 16 NORTH & SOUTH: LOCATION #: 3
EAST & WEST: CONTROL: SIGNAL
NOTES: AM ▲PM NMD ◄ W E ►
OTHER SOTHER ▼
NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND
NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTLLANES: 0 1 X X 1 0 0.5 X 0.5 X X X X X X X
12:00 PM 0 0 0 1 1 0 0 0 0 0 0 0 2 0 1 0 0 112:15 PM 0 0 0 0 1 0 0 0 0 0 0 0 1 0 0 0 0 012:30 PM 0 1 0 1 0 0 0 0 0 0 0 0 2 0 1 0 0 112:45 PM 0 1 0 0 1 0 0 0 0 0 0 0 2 0 0 0 0 01:00 PM 0 1 0 1 0 0 0 0 0 0 0 0 2 0 1 0 0 11:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 01:30 PM 0 0 0 1 0 0 0 0 0 0 0 0 1 0 1 0 0 11:45 PM 0 0 0 1 0 0 0 0 0 0 0 0 1 0 1 0 0 12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 02:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 02:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 02:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
VOLUMES 0 3 0 5 3 0 0 0 0 0 0 0 11 0 5 0 0 5APPROACH % 0% 100% 0% 63% 38% 0% 0% 0% 0% 0% 0% 0%APP/DEPART 3 / 8 8 / 3 0 / 0 0 / 0 0 BEGIN PEAK HRVOLUMES 0 3 0 2 2 0 0 0 0 0 0 0 7 APPROACH % 0% 100% 0% 50% 50% 0% 0% 0% 0% 0% 0% 0%PEAK HR FACTOR 0.750 0.500 0.000 0.000 0.875 APP/DEPART 3 / 5 4 / 2 0 / 0 0 / 0 0
03:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 05:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 05:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 05:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 05:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
VOLUMES 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0APPROACH % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%APP/DEPART 0 / 0 0 / 0 0 / 0 0 / 0 0 BEGIN PEAK HRVOLUMES 0 0 0 0 0 0 0 0 0 0 0 0 0 APPROACH % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%PEAK HR FACTOR 0.000 0.000 0.000 0.000 0.000 APP/DEPART 0 / 0 0 / 0 0 / 0 0 / 0 0
Afton
NORTH SIDE
20866 County WEST SIDE EAST SIDE 20866 County
SOUTH SIDE
Afton
AM
12:00 PM
PM
3:00 PM
INTERSECTION TURNING MOVEMENT COUNTSPREPARED BY: AimTD LLC. tel: 714 253 7888 [email protected]
BakerAfton20866 County
U-TURNSAfton Afton 20866 County 20866 County
Add U-Turns to Left Turns
DATE: LOCATION: PROJECT #: SC1609Fri, Aug 26, 16 NORTH & SOUTH: LOCATION #: 1
EAST & WEST: CONTROL: STOP W
NOTES: AM ▲PM NMD ◄ W E ►
OTHER SOTHER ▼
NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND
NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTLLANES: 0 1 X X 1 0 X X X 0 1 0 X X X X
2:00 PM 1 18 0 0 12 5 0 0 0 0 1 3 40 0 0 0 0 02:15 PM 0 15 0 0 16 1 0 0 0 0 3 2 37 0 0 0 0 02:30 PM 0 12 0 0 11 2 0 0 0 0 0 3 28 0 0 0 0 02:45 PM 0 2 0 0 7 5 0 0 0 0 0 3 17 0 0 0 0 03:00 PM 0 1 0 0 0 1 0 0 0 0 2 0 4 0 0 0 0 03:15 PM 1 0 0 0 1 6 0 0 0 0 1 7 16 0 0 0 0 03:30 PM 0 0 0 0 0 2 0 0 0 0 0 3 5 0 0 0 0 03:45 PM 0 0 0 0 0 3 0 0 0 0 0 1 4 0 0 0 0 04:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
VOLUMES 2 48 0 0 47 25 0 0 0 0 7 22 151 0 0 0 0 0APPROACH % 4% 96% 0% 0% 65% 35% 0% 0% 0% 0% 24% 76%APP/DEPART 50 / 70 72 / 47 0 / 0 29 / 34 0 BEGIN PEAK HRVOLUMES 1 47 0 0 46 13 0 0 0 0 4 11 122 APPROACH % 2% 98% 0% 0% 78% 22% 0% 0% 0% 0% 27% 73%PEAK HR FACTOR 0.632 0.868 0.000 0.750 0.763 APP/DEPART 48 / 58 59 / 46 0 / 0 15 / 18 0
03:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 05:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 05:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 05:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 05:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
VOLUMES 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0APPROACH % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%APP/DEPART 0 / 0 0 / 0 0 / 0 0 / 0 0 BEGIN PEAK HRVOLUMES 0 0 0 0 0 0 0 0 0 0 0 0 0 APPROACH % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%PEAK HR FACTOR 0.000 0.000 0.000 0.000 0.000 APP/DEPART 0 / 0 0 / 0 0 / 0 0 / 0 0
Afton
NORTH SIDE
I-15 WB Ramp WEST SIDE EAST SIDE I-15 WB Ramp
SOUTH SIDE
Afton
U-TURNSAfton Afton I-15 WB Ramp I-15 WB Ramp
INTERSECTION TURNING MOVEMENT COUNTSPREPARED BY: AimTD LLC. tel: 714 253 7888 [email protected]
BakerAftonI-15 WB Ramp
AM
2:00 PM
PM
3:00 PM
Add U-Turns to Left Turns
DATE: LOCATION: PROJECT #: SC1609Fri, Aug 26, 16 NORTH & SOUTH: LOCATION #: 2
EAST & WEST: CONTROL: STOP E
NOTES: AM ▲PM NMD ◄ W E ►
OTHER SOTHER ▼
NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND
NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTLLANES: X 1 0 0 1 X 0 1 0 X X X X X X X
2:00 PM 0 0 0 12 0 0 20 1 0 0 0 0 33 0 0 0 0 02:15 PM 0 0 0 15 1 0 15 0 0 0 0 0 31 0 0 0 0 02:30 PM 0 0 1 12 0 0 11 2 0 0 0 0 26 0 0 0 0 02:45 PM 0 0 2 6 1 0 2 1 2 0 0 0 14 0 0 0 0 03:00 PM 0 1 1 0 0 0 0 0 0 0 0 0 2 0 0 0 0 03:15 PM 0 1 2 0 1 0 0 0 2 0 0 0 6 0 0 0 0 03:30 PM 0 0 1 0 0 0 0 1 1 0 0 0 3 0 0 0 0 03:45 PM 0 0 0 0 0 0 0 1 0 0 0 0 1 0 0 0 0 04:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
VOLUMES 0 2 7 45 3 0 48 6 5 0 0 0 116 0 0 0 0 0APPROACH % 0% 22% 78% 94% 6% 0% 81% 10% 8% 0% 0% 0%APP/DEPART 9 / 50 48 / 8 59 / 58 0 / 0 0 BEGIN PEAK HRVOLUMES 0 0 3 45 2 0 48 4 2 0 0 0 104 APPROACH % 0% 0% 100% 96% 4% 0% 89% 7% 4% 0% 0% 0%PEAK HR FACTOR 0.375 0.734 0.643 0.000 0.788 APP/DEPART 3 / 48 47 / 4 54 / 52 0 / 0 0
03:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 05:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 05:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 05:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 05:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
VOLUMES 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0APPROACH % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%APP/DEPART 0 / 0 0 / 0 0 / 0 0 / 0 0 BEGIN PEAK HRVOLUMES 0 0 0 0 0 0 0 0 0 0 0 0 0 APPROACH % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%PEAK HR FACTOR 0.000 0.000 0.000 0.000 0.000 APP/DEPART 0 / 0 0 / 0 0 / 0 0 / 0 0
Afton
NORTH SIDE
I-15 EB Ramp WEST SIDE EAST SIDE I-15 EB Ramp
SOUTH SIDE
Afton
U-TURNSAfton Afton I-15 EB Ramp I-15 EB Ramp
INTERSECTION TURNING MOVEMENT COUNTSPREPARED BY: AimTD LLC. tel: 714 253 7888 [email protected]
BakerAftonI-15 EB Ramp
AM
2:00 PM
PM
3:00 PM
Add U-Turns to Left Turns
DATE: LOCATION: PROJECT #: SC1609Fri, Aug 26, 16 NORTH & SOUTH: LOCATION #: 3
EAST & WEST: CONTROL: SIGNAL
NOTES: AM ▲PM NMD ◄ W E ►
OTHER SOTHER ▼
NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND
NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTLLANES: 0 1 X X 1 0 0.5 X 0.5 X X X X X X X
2:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 02:15 PM 0 0 0 1 0 0 0 0 0 0 0 0 1 0 1 0 0 12:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 02:45 PM 0 1 0 2 1 0 0 0 0 0 0 0 4 0 2 0 0 23:00 PM 0 0 0 0 0 0 1 0 0 0 0 0 1 0 0 0 0 03:15 PM 0 1 0 1 0 2 1 0 0 0 0 0 5 0 1 0 0 13:30 PM 0 0 0 1 0 0 0 0 0 0 0 0 1 0 1 0 0 13:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
VOLUMES 0 2 0 5 1 2 2 0 0 0 0 0 12 0 5 0 0 5APPROACH % 0% 100% 0% 63% 13% 25% 100% 0% 0% 0% 0% 0%APP/DEPART 2 / 9 8 / 1 2 / 0 0 / 2 0 BEGIN PEAK HRVOLUMES 0 2 0 4 1 2 2 0 0 0 0 0 11 APPROACH % 0% 100% 0% 57% 14% 29% 100% 0% 0% 0% 0% 0%PEAK HR FACTOR 0.500 0.583 0.500 0.000 0.550 APP/DEPART 2 / 8 7 / 1 2 / 0 0 / 2 0
03:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 05:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 05:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 05:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 05:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
VOLUMES 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0APPROACH % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%APP/DEPART 0 / 0 0 / 0 0 / 0 0 / 0 0 BEGIN PEAK HRVOLUMES 0 0 0 0 0 0 0 0 0 0 0 0 0 APPROACH % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%PEAK HR FACTOR 0.000 0.000 0.000 0.000 0.000 APP/DEPART 0 / 0 0 / 0 0 / 0 0 / 0 0
Afton
NORTH SIDE
20866 County WEST SIDE EAST SIDE 20866 County
SOUTH SIDE
Afton
U-TURNSAfton Afton 20866 County 20866 County
INTERSECTION TURNING MOVEMENT COUNTSPREPARED BY: AimTD LLC. tel: 714 253 7888 [email protected]
BakerAfton20866 County
AM
2:45 PM
PM
3:00 PM
Add U-Turns to Left Turns
APPENDIX B
Intersection Level of Service Worksheets
Existing Conditions (August 2016)
Existing (2016) FridayVersion 4.00-03
Generated with
0.021Volume to Capacity (v/c):
ALevel Of Service:
9.3Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 1: Afton Road / I-15 WB Ramp
Intersection Level Of Service Report
NoNoNoNoCrosswalk
0.000.000.000.00Grade [%]
30.0030.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Name
Intersection Setup
0000Pedestrian Volume [ped/h]
141800001510084Total Analysis Volume [veh/h]
440000400021Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.78100.78100.78101.00001.00001.00000.81300.81301.00001.00000.25000.2500Peak Hour Factor
111400001210021Total Hourly Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
000000000000Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
111400001210021Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop1KOA Corporation
Existing (2016) FridayVersion 4.00-03
Generated with
AIntersection LOS
5.26d_I, Intersection Delay [s/veh]
AAAAApproach LOS
8.960.000.002.42d_A, Approach Delay [s/veh]
2.642.642.640.000.000.000.000.000.000.000.570.5795th-Percentile Queue Length [ft]
0.110.110.110.000.000.000.000.000.000.000.020.0295th-Percentile Queue Length [veh]
AAAAAAAMovement LOS
8.499.338.790.000.000.000.000.000.000.000.007.25d_M, Delay for Movement [s/veh]
0.010.020.000.000.000.000.000.000.000.000.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
0000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
0000Storage Area [veh]
NoFlared Lane
StopStopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop2KOA Corporation
Existing (2016) FridayVersion 4.00-03
Generated with
0.006Volume to Capacity (v/c):
ALevel Of Service:
9.2Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 2: Afton Road / I-15 EB Ramp
Intersection Level Of Service Report
NoNoNoNoCrosswalk
0.000.000.000.00Grade [%]
30.0030.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Name
Intersection Setup
0000Pedestrian Volume [ped/h]
0007540041020Total Analysis Volume [veh/h]
000211001310Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
1.00001.00001.00000.56300.56300.56301.00000.25000.25000.50000.50001.0000Peak Hour Factor
000432001510Total Hourly Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
000000000000Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
000432001510Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop3KOA Corporation
Existing (2016) FridayVersion 4.00-03
Generated with
AIntersection LOS
5.26d_I, Intersection Delay [s/veh]
AAAAApproach LOS
0.008.707.250.00d_A, Approach Delay [s/veh]
0.000.000.001.231.231.230.000.190.190.000.000.0095th-Percentile Queue Length [ft]
0.000.000.000.050.050.050.000.010.010.000.000.0095th-Percentile Queue Length [veh]
AAAAAAAMovement LOS
0.000.000.008.389.198.660.000.007.250.000.000.00d_M, Delay for Movement [s/veh]
0.000.000.000.010.010.000.000.000.000.000.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
0000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
0000Storage Area [veh]
NoFlared Lane
StopStopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop4KOA Corporation
Existing (2016) FridayVersion 4.00-03
Generated with
0.000Volume to Capacity (v/c):
ALevel Of Service:
8.6Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 3: Afton Road / Project Driveway 1
Intersection Level Of Service Report
NoNoNoCrosswalk
0.000.000.00Grade [%]
30.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.00Lane Width [ft]
RightLeftRightThruThruLeftTurning Movement
Lane Configuration
EastboundSouthboundNorthboundApproach
Name
Intersection Setup
000Pedestrian Volume [ped/h]
000440Total Analysis Volume [veh/h]
000110Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.0000Other Adjustment Factor
1.00001.00000.50000.50000.75000.7500Peak Hour Factor
000230Total Hourly Volume [veh/h]
000000Other Volume [veh/h]
000000Existing Site Adjustment Volume [veh/h]
000000Pass-by Trips [veh/h]
000000Diverted Trips [veh/h]
000000Site-Generated Trips [veh/h]
000000In-Process Volume [veh/h]
1.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
000230Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop5KOA Corporation
Existing (2016) FridayVersion 4.00-03
Generated with
AIntersection LOS
0.00d_I, Intersection Delay [s/veh]
AAAApproach LOS
8.440.000.00d_A, Approach Delay [s/veh]
0.000.000.000.000.000.0095th-Percentile Queue Length [ft]
0.000.000.000.000.000.0095th-Percentile Queue Length [veh]
AAAAAAMovement LOS
8.338.550.000.000.007.23d_M, Delay for Movement [s/veh]
0.000.000.000.000.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
000Storage Area [veh]
NoFlared Lane
StopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop6KOA Corporation
Existing (2016) FridayVersion 4.00-03
Generated with
0.000Volume to Capacity (v/c):
ALevel Of Service:
8.6Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 4: Afton Road / Project Driveway 2
Intersection Level Of Service Report
NoNoNoCrosswalk
0.000.000.00Grade [%]
30.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.00Lane Width [ft]
RightLeftRightThruThruLeftTurning Movement
Lane Configuration
EastboundSouthboundNorthboundApproach
Name
Intersection Setup
000Pedestrian Volume [ped/h]
000440Total Analysis Volume [veh/h]
000110Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.0000Other Adjustment Factor
1.00001.00000.50000.50000.75000.7500Peak Hour Factor
000230Total Hourly Volume [veh/h]
000000Other Volume [veh/h]
000000Existing Site Adjustment Volume [veh/h]
000000Pass-by Trips [veh/h]
000000Diverted Trips [veh/h]
000000Site-Generated Trips [veh/h]
000000In-Process Volume [veh/h]
1.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
000230Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop7KOA Corporation
Existing (2016) FridayVersion 4.00-03
Generated with
AIntersection LOS
0.00d_I, Intersection Delay [s/veh]
AAAApproach LOS
8.440.000.00d_A, Approach Delay [s/veh]
0.000.000.000.000.000.0095th-Percentile Queue Length [ft]
0.000.000.000.000.000.0095th-Percentile Queue Length [veh]
AAAAAAMovement LOS
8.338.550.000.000.007.23d_M, Delay for Movement [s/veh]
0.000.000.000.000.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
000Storage Area [veh]
NoFlared Lane
StopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop8KOA Corporation
Existing (2016) SundayVersion 4.00-03
Generated with
0.007Volume to Capacity (v/c):
ALevel Of Service:
9.9Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 1: Afton Road / I-15 WB Ramp
Intersection Level Of Service Report
NoNoNoNoCrosswalk
0.000.000.000.00Grade [%]
30.0030.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Name
Intersection Setup
0000Pedestrian Volume [ped/h]
1550000155300742Total Analysis Volume [veh/h]
41000041300190Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.75000.75000.75001.00001.00001.00000.86800.86801.00001.00000.63200.6320Peak Hour Factor
1140000134600471Total Hourly Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
000000000000Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
1140000134600471Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop1KOA Corporation
Existing (2016) SundayVersion 4.00-03
Generated with
AIntersection LOS
1.19d_I, Intersection Delay [s/veh]
AAAAApproach LOS
9.030.000.000.19d_A, Approach Delay [s/veh]
1.681.681.680.000.000.000.000.000.000.003.913.9195th-Percentile Queue Length [ft]
0.070.070.070.000.000.000.000.000.000.000.160.1695th-Percentile Queue Length [veh]
AAAAAAAMovement LOS
8.739.929.420.000.000.000.000.000.000.000.007.35d_M, Delay for Movement [s/veh]
0.020.010.000.000.000.000.000.000.000.000.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
0000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
0000Storage Area [veh]
NoFlared Lane
StopStopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop2KOA Corporation
Existing (2016) SundayVersion 4.00-03
Generated with
0.008Volume to Capacity (v/c):
BLevel Of Service:
10.4Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 2: Afton Road / I-15 EB Ramp
Intersection Level Of Service Report
NoNoNoNoCrosswalk
0.000.000.000.00Grade [%]
30.0030.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Name
Intersection Setup
0000Pedestrian Volume [ped/h]
00036750361800Total Analysis Volume [veh/h]
00012190115200Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
1.00001.00001.00000.64300.64300.64301.00000.73400.73400.37500.37501.0000Peak Hour Factor
00024480245300Total Hourly Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
000000000000Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
00024480245300Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop3KOA Corporation
Existing (2016) SundayVersion 4.00-03
Generated with
BIntersection LOS
8.19d_I, Intersection Delay [s/veh]
AAAAApproach LOS
0.009.906.980.00d_A, Approach Delay [s/veh]
0.000.000.008.548.548.540.003.103.100.000.000.0095th-Percentile Queue Length [ft]
0.000.000.000.340.340.340.000.120.120.000.000.0095th-Percentile Queue Length [veh]
ABAAAAAMovement LOS
0.000.000.008.8310.449.890.000.007.320.000.000.00d_M, Delay for Movement [s/veh]
0.000.000.000.000.010.090.000.000.040.000.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
0000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
0000Storage Area [veh]
NoFlared Lane
StopStopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop4KOA Corporation
Existing (2016) SundayVersion 4.00-03
Generated with
0.004Volume to Capacity (v/c):
ALevel Of Service:
8.6Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 3: Afton Road / Project Driveway 1
Intersection Level Of Service Report
NoNoNoCrosswalk
0.000.000.00Grade [%]
30.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.00Lane Width [ft]
RightLeftRightThruThruLeftTurning Movement
Lane Configuration
EastboundSouthboundNorthboundApproach
Name
Intersection Setup
000Pedestrian Volume [ped/h]
043240Total Analysis Volume [veh/h]
011010Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.50000.50000.58300.58300.50000.5000Peak Hour Factor
022120Total Hourly Volume [veh/h]
000000Other Volume [veh/h]
000000Existing Site Adjustment Volume [veh/h]
000000Pass-by Trips [veh/h]
000000Diverted Trips [veh/h]
000000Site-Generated Trips [veh/h]
000000In-Process Volume [veh/h]
1.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
022120Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop5KOA Corporation
Existing (2016) SundayVersion 4.00-03
Generated with
AIntersection LOS
2.64d_I, Intersection Delay [s/veh]
AAAApproach LOS
8.570.000.00d_A, Approach Delay [s/veh]
0.300.300.000.000.000.0095th-Percentile Queue Length [ft]
0.010.010.000.000.000.0095th-Percentile Queue Length [veh]
AAAAAAMovement LOS
8.358.570.000.000.007.23d_M, Delay for Movement [s/veh]
0.000.000.000.000.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
000Storage Area [veh]
NoFlared Lane
StopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop6KOA Corporation
Existing (2016) SundayVersion 4.00-03
Generated with
0.004Volume to Capacity (v/c):
ALevel Of Service:
8.6Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 4: Afton Road / Project Driveway 2
Intersection Level Of Service Report
NoNoNoCrosswalk
0.000.000.00Grade [%]
30.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.00Lane Width [ft]
RightLeftRightThruThruLeftTurning Movement
Lane Configuration
EastboundSouthboundNorthboundApproach
Name
Intersection Setup
000Pedestrian Volume [ped/h]
043240Total Analysis Volume [veh/h]
011010Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.50000.50000.58300.58300.50000.5000Peak Hour Factor
022120Total Hourly Volume [veh/h]
000000Other Volume [veh/h]
000000Existing Site Adjustment Volume [veh/h]
000000Pass-by Trips [veh/h]
000000Diverted Trips [veh/h]
000000Site-Generated Trips [veh/h]
000000In-Process Volume [veh/h]
1.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
022120Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop7KOA Corporation
Existing (2016) SundayVersion 4.00-03
Generated with
AIntersection LOS
2.64d_I, Intersection Delay [s/veh]
AAAApproach LOS
8.570.000.00d_A, Approach Delay [s/veh]
0.300.300.000.000.000.0095th-Percentile Queue Length [ft]
0.010.010.000.000.000.0095th-Percentile Queue Length [veh]
AAAAAAMovement LOS
8.358.570.000.000.007.23d_M, Delay for Movement [s/veh]
0.000.000.000.000.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
000Storage Area [veh]
NoFlared Lane
StopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop8KOA Corporation
APPENDIX C
Cumulative Project Information
APPENDIX D
Intersection Level-of- Service Worksheets
Opening Year (2018) Conditions
Opening Year (2018) w/o CP w/o PVersion 4.00-03
Generated with
0.018Volume to Capacity (v/c):
ALevel Of Service:
9.2Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 1: Afton Road / I-15 WB Ramp
Intersection Level Of Service Report
NoNoNoNoCrosswalk
0.000.000.000.00Grade [%]
30.0030.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Name
Intersection Setup
0000Pedestrian Volume [ped/h]
121600001310021Total Analysis Volume [veh/h]
340000300010Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.95000.95000.95001.00001.00001.00000.95000.95001.00001.00000.95000.9500Peak Hour Factor
111500001210021Total Hourly Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
000000000000Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
111500001210021Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop1KOA Corporation
Opening Year (2018) w/o CP w/o PVersion 4.00-03
Generated with
AIntersection LOS
5.69d_I, Intersection Delay [s/veh]
AAAAApproach LOS
8.890.000.002.42d_A, Approach Delay [s/veh]
2.272.272.270.000.000.000.000.000.000.000.140.1495th-Percentile Queue Length [ft]
0.090.090.090.000.000.000.000.000.000.000.010.0195th-Percentile Queue Length [veh]
AAAAAAAMovement LOS
8.449.238.690.000.000.000.000.000.000.000.007.25d_M, Delay for Movement [s/veh]
0.010.020.000.000.000.000.000.000.000.000.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
0000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
0000Storage Area [veh]
NoFlared Lane
StopStopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop2KOA Corporation
Opening Year (2018) w/o CP w/o PVersion 4.00-03
Generated with
0.003Volume to Capacity (v/c):
ALevel Of Service:
9.1Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 2: Afton Road / I-15 EB Ramp
Intersection Level Of Service Report
NoNoNoNoCrosswalk
0.000.000.000.00Grade [%]
30.0030.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Name
Intersection Setup
0000Pedestrian Volume [ped/h]
000432001510Total Analysis Volume [veh/h]
000111000100Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
1.00001.00001.00000.95000.95000.95001.00000.95000.95000.95000.95001.0000Peak Hour Factor
000432001510Total Hourly Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
000000000000Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
000432001510Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop3KOA Corporation
Opening Year (2018) w/o CP w/o PVersion 4.00-03
Generated with
AIntersection LOS
5.32d_I, Intersection Delay [s/veh]
AAAAApproach LOS
0.008.657.230.00d_A, Approach Delay [s/veh]
0.000.000.000.680.680.680.000.050.050.000.000.0095th-Percentile Queue Length [ft]
0.000.000.000.030.030.030.000.000.000.000.000.0095th-Percentile Queue Length [veh]
AAAAAAAMovement LOS
0.000.000.008.359.098.580.000.007.230.000.000.00d_M, Delay for Movement [s/veh]
0.000.000.000.000.000.000.000.000.000.000.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
0000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
0000Storage Area [veh]
NoFlared Lane
StopStopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop4KOA Corporation
Opening Year (2018) w/o CP w/o PVersion 4.00-03
Generated with
0.000Volume to Capacity (v/c):
ALevel Of Service:
8.5Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 3: Afton Road / Project Driveway 1
Intersection Level Of Service Report
NoNoNoCrosswalk
0.000.000.00Grade [%]
30.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.00Lane Width [ft]
RightLeftRightThruThruLeftTurning Movement
Lane Configuration
EastboundSouthboundNorthboundApproach
Name
Intersection Setup
000Pedestrian Volume [ped/h]
000230Total Analysis Volume [veh/h]
000110Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.95000.95000.95000.95000.95000.9500Peak Hour Factor
000230Total Hourly Volume [veh/h]
000000Other Volume [veh/h]
000000Existing Site Adjustment Volume [veh/h]
000000Pass-by Trips [veh/h]
000000Diverted Trips [veh/h]
000000Site-Generated Trips [veh/h]
000000In-Process Volume [veh/h]
1.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
000230Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop5KOA Corporation
Opening Year (2018) w/o CP w/o PVersion 4.00-03
Generated with
AIntersection LOS
0.00d_I, Intersection Delay [s/veh]
AAAApproach LOS
8.430.000.00d_A, Approach Delay [s/veh]
0.000.000.000.000.000.0095th-Percentile Queue Length [ft]
0.000.000.000.000.000.0095th-Percentile Queue Length [veh]
AAAAAAMovement LOS
8.338.540.000.000.007.22d_M, Delay for Movement [s/veh]
0.000.000.000.000.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
000Storage Area [veh]
NoFlared Lane
StopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop6KOA Corporation
Opening Year (2018) w/o CP w/o PVersion 4.00-03
Generated with
0.000Volume to Capacity (v/c):
ALevel Of Service:
8.5Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 4: Afton Road / Project Driveway 2
Intersection Level Of Service Report
NoNoNoCrosswalk
0.000.000.00Grade [%]
30.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.00Lane Width [ft]
RightLeftRightThruThruLeftTurning Movement
Lane Configuration
EastboundSouthboundNorthboundApproach
Name
Intersection Setup
000Pedestrian Volume [ped/h]
000230Total Analysis Volume [veh/h]
000110Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.95000.95000.95000.95000.95000.9500Peak Hour Factor
000230Total Hourly Volume [veh/h]
000000Other Volume [veh/h]
000000Existing Site Adjustment Volume [veh/h]
000000Pass-by Trips [veh/h]
000000Diverted Trips [veh/h]
000000Site-Generated Trips [veh/h]
000000In-Process Volume [veh/h]
1.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
000230Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop7KOA Corporation
Opening Year (2018) w/o CP w/o PVersion 4.00-03
Generated with
AIntersection LOS
0.00d_I, Intersection Delay [s/veh]
AAAApproach LOS
8.430.000.00d_A, Approach Delay [s/veh]
0.000.000.000.000.000.0095th-Percentile Queue Length [ft]
0.000.000.000.000.000.0095th-Percentile Queue Length [veh]
AAAAAAMovement LOS
8.338.540.000.000.007.22d_M, Delay for Movement [s/veh]
0.000.000.000.000.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
000Storage Area [veh]
NoFlared Lane
StopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop8KOA Corporation
Opening Year (2018) Friday w/ CP w/o PVersion 4.00-03
Generated with
0.036Volume to Capacity (v/c):
BLevel Of Service:
14.7Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 1: Afton Road / I-15 WB Ramp
Intersection Level Of Service Report
NoNoNoNoCrosswalk
0.000.000.000.00Grade [%]
30.0030.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Name
Intersection Setup
0000Pedestrian Volume [ped/h]
191160000188176001811Total Analysis Volume [veh/h]
4840000474400450Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.95000.95000.95001.00001.00001.00000.95000.95001.00001.00000.95000.9500Peak Hour Factor
181150000179167001721Total Hourly Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
17000000167166001700Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
111500001210021Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop1KOA Corporation
Opening Year (2018) Friday w/ CP w/o PVersion 4.00-03
Generated with
BIntersection LOS
3.04d_I, Intersection Delay [s/veh]
BAAAApproach LOS
11.030.000.000.04d_A, Approach Delay [s/veh]
25.6825.6825.680.000.000.000.000.000.000.0013.4213.4295th-Percentile Queue Length [ft]
1.031.031.030.000.000.000.000.000.000.000.540.5495th-Percentile Queue Length [veh]
BBBAAAAMovement LOS
10.7314.6513.520.000.000.000.000.000.000.000.008.02d_M, Delay for Movement [s/veh]
0.220.040.000.000.000.000.000.000.000.000.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
0000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
0000Storage Area [veh]
NoFlared Lane
StopStopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop2KOA Corporation
Opening Year (2018) Friday w/ CP w/o PVersion 4.00-03
Generated with
0.006Volume to Capacity (v/c):
CLevel Of Service:
15.4Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 2: Afton Road / I-15 EB Ramp
Intersection Level Of Service Report
NoNoNoNoCrosswalk
0.000.000.000.00Grade [%]
30.0030.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Name
Intersection Setup
0000Pedestrian Volume [ped/h]
0004318100176510Total Analysis Volume [veh/h]
00011450044100Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
1.00001.00001.00000.95000.95000.95001.00000.95000.95000.95000.95001.0000Peak Hour Factor
0004317200167510Total Hourly Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
0000017000166000Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
000432001510Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop3KOA Corporation
Opening Year (2018) Friday w/ CP w/o PVersion 4.00-03
Generated with
CIntersection LOS
11.08d_I, Intersection Delay [s/veh]
ABAAApproach LOS
0.0014.787.500.00d_A, Approach Delay [s/veh]
0.000.000.0037.2437.2437.240.009.159.150.000.000.0095th-Percentile Queue Length [ft]
0.000.000.001.491.491.490.000.370.370.000.000.0095th-Percentile Queue Length [veh]
BCBAAAAMovement LOS
0.000.000.0011.6115.4014.840.000.007.500.000.000.00d_M, Delay for Movement [s/veh]
0.000.000.000.000.010.330.000.000.110.000.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
0000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
0000Storage Area [veh]
NoFlared Lane
StopStopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop4KOA Corporation
Opening Year (2018) Friday w/ CP w/o PVersion 4.00-03
Generated with
0.000Volume to Capacity (v/c):
ALevel Of Service:
8.5Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 3: Afton Road / Project Driveway 1
Intersection Level Of Service Report
NoNoNoCrosswalk
0.000.000.00Grade [%]
30.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.00Lane Width [ft]
RightLeftRightThruThruLeftTurning Movement
Lane Configuration
EastboundSouthboundNorthboundApproach
Name
Intersection Setup
000Pedestrian Volume [ped/h]
000230Total Analysis Volume [veh/h]
000110Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.95000.95000.95000.95000.95000.9500Peak Hour Factor
000230Total Hourly Volume [veh/h]
000000Other Volume [veh/h]
000000Existing Site Adjustment Volume [veh/h]
000000Pass-by Trips [veh/h]
000000Diverted Trips [veh/h]
000000Site-Generated Trips [veh/h]
000000In-Process Volume [veh/h]
1.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
000230Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop5KOA Corporation
Opening Year (2018) Friday w/ CP w/o PVersion 4.00-03
Generated with
AIntersection LOS
0.00d_I, Intersection Delay [s/veh]
AAAApproach LOS
8.430.000.00d_A, Approach Delay [s/veh]
0.000.000.000.000.000.0095th-Percentile Queue Length [ft]
0.000.000.000.000.000.0095th-Percentile Queue Length [veh]
AAAAAAMovement LOS
8.338.540.000.000.007.22d_M, Delay for Movement [s/veh]
0.000.000.000.000.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
000Storage Area [veh]
NoFlared Lane
StopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop6KOA Corporation
Opening Year (2018) Friday w/ CP w/o PVersion 4.00-03
Generated with
0.000Volume to Capacity (v/c):
ALevel Of Service:
8.5Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 4: Afton Road / Project Driveway 2
Intersection Level Of Service Report
NoNoNoCrosswalk
0.000.000.00Grade [%]
30.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.00Lane Width [ft]
RightLeftRightThruThruLeftTurning Movement
Lane Configuration
EastboundSouthboundNorthboundApproach
Name
Intersection Setup
000Pedestrian Volume [ped/h]
000230Total Analysis Volume [veh/h]
000110Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.95000.95000.95000.95000.95000.9500Peak Hour Factor
000230Total Hourly Volume [veh/h]
000000Other Volume [veh/h]
000000Existing Site Adjustment Volume [veh/h]
000000Pass-by Trips [veh/h]
000000Diverted Trips [veh/h]
000000Site-Generated Trips [veh/h]
000000In-Process Volume [veh/h]
1.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
000230Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop7KOA Corporation
Opening Year (2018) Friday w/ CP w/o PVersion 4.00-03
Generated with
AIntersection LOS
0.00d_I, Intersection Delay [s/veh]
AAAApproach LOS
8.430.000.00d_A, Approach Delay [s/veh]
0.000.000.000.000.000.0095th-Percentile Queue Length [ft]
0.000.000.000.000.000.0095th-Percentile Queue Length [veh]
AAAAAAMovement LOS
8.338.540.000.000.007.22d_M, Delay for Movement [s/veh]
0.000.000.000.000.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
000Storage Area [veh]
NoFlared Lane
StopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop8KOA Corporation
Opening Year (2018) w/o CP w/ PVersion 4.00-03
Generated with
0.020Volume to Capacity (v/c):
ALevel Of Service:
9.7Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 1: Afton Road / I-15 WB Ramp
Intersection Level Of Service Report
NoNoNoNoCrosswalk
0.000.000.000.00Grade [%]
30.0030.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Name
Intersection Setup
0000Pedestrian Volume [ped/h]
12162400013100227Total Analysis Volume [veh/h]
346000300017Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.95000.95000.95001.00001.00001.00000.95000.95001.00001.00000.95000.9500Peak Hour Factor
11152300012100226Total Hourly Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
00230000000025Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
111500001210021Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop1KOA Corporation
Opening Year (2018) w/o CP w/ PVersion 4.00-03
Generated with
AIntersection LOS
7.10d_I, Intersection Delay [s/veh]
AAAAApproach LOS
9.190.000.006.78d_A, Approach Delay [s/veh]
4.534.534.530.000.000.000.000.000.000.001.381.3895th-Percentile Queue Length [ft]
0.180.180.180.000.000.000.000.000.000.000.060.0695th-Percentile Queue Length [veh]
AAAAAAAMovement LOS
8.579.709.160.000.000.000.000.000.000.000.007.28d_M, Delay for Movement [s/veh]
0.010.020.030.000.000.000.000.000.000.000.000.02V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
0000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
0000Storage Area [veh]
NoFlared Lane
StopStopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop2KOA Corporation
Opening Year (2018) w/o CP w/ PVersion 4.00-03
Generated with
0.004Volume to Capacity (v/c):
BLevel Of Service:
10.3Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 2: Afton Road / I-15 EB Ramp
Intersection Level Of Service Report
NoNoNoNoCrosswalk
0.000.000.000.00Grade [%]
30.0030.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Name
Intersection Setup
0000Pedestrian Volume [ped/h]
000101320241108270Total Analysis Volume [veh/h]
00025110602770Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
1.00001.00001.00000.95000.95000.95001.00000.95000.95000.95000.95001.0000Peak Hour Factor
00096320231103260Total Hourly Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
0009200023098250Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
000432001510Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop3KOA Corporation
Opening Year (2018) w/o CP w/ PVersion 4.00-03
Generated with
BIntersection LOS
3.56d_I, Intersection Delay [s/veh]
AAAAApproach LOS
0.008.870.300.00d_A, Approach Delay [s/veh]
0.000.000.008.538.538.530.001.321.320.000.000.0095th-Percentile Queue Length [ft]
0.000.000.000.340.340.340.000.050.050.000.000.0095th-Percentile Queue Length [veh]
ABAAAAAMovement LOS
0.000.000.008.8210.329.530.000.007.490.000.000.00d_M, Delay for Movement [s/veh]
0.000.000.000.100.000.000.000.000.000.000.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
0000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
0000Storage Area [veh]
NoFlared Lane
StopStopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop4KOA Corporation
Opening Year (2018) w/o CP w/ PVersion 4.00-03
Generated with
0.115Volume to Capacity (v/c):
ALevel Of Service:
9.5Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 3: Afton Road / Project Driveway 1
Intersection Level Of Service Report
NoNoNoCrosswalk
0.000.000.00Grade [%]
30.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.00Lane Width [ft]
RightLeftRightThruThruLeftTurning Movement
Lane Configuration
EastboundSouthboundNorthboundApproach
Name
Intersection Setup
000Pedestrian Volume [ped/h]
01039726290Total Analysis Volume [veh/h]
02624770Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.95000.95000.95000.95000.95000.9500Peak Hour Factor
0989225280Total Hourly Volume [veh/h]
000000Other Volume [veh/h]
000000Existing Site Adjustment Volume [veh/h]
000000Pass-by Trips [veh/h]
000000Diverted Trips [veh/h]
0989223250Site-Generated Trips [veh/h]
000000In-Process Volume [veh/h]
1.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
000230Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop5KOA Corporation
Opening Year (2018) w/o CP w/ PVersion 4.00-03
Generated with
AIntersection LOS
3.86d_I, Intersection Delay [s/veh]
AAAApproach LOS
9.550.000.00d_A, Approach Delay [s/veh]
9.729.720.000.000.000.0095th-Percentile Queue Length [ft]
0.390.390.000.000.000.0095th-Percentile Queue Length [veh]
AAAAAAMovement LOS
9.179.550.000.000.007.46d_M, Delay for Movement [s/veh]
0.000.120.000.000.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
000Storage Area [veh]
NoFlared Lane
StopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop6KOA Corporation
Opening Year (2018) w/o CP w/ PVersion 4.00-03
Generated with
0.026Volume to Capacity (v/c):
ALevel Of Service:
8.7Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 4: Afton Road / Project Driveway 2
Intersection Level Of Service Report
NoNoNoCrosswalk
0.000.000.00Grade [%]
30.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.00Lane Width [ft]
RightLeftRightThruThruLeftTurning Movement
Lane Configuration
EastboundSouthboundNorthboundApproach
Name
Intersection Setup
000Pedestrian Volume [ped/h]
02624230Total Analysis Volume [veh/h]
076110Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.95000.95000.95000.95000.95000.9500Peak Hour Factor
02523230Total Hourly Volume [veh/h]
000000Other Volume [veh/h]
000000Existing Site Adjustment Volume [veh/h]
000000Pass-by Trips [veh/h]
000000Diverted Trips [veh/h]
02523000Site-Generated Trips [veh/h]
000000In-Process Volume [veh/h]
1.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
000230Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop7KOA Corporation
Opening Year (2018) w/o CP w/ PVersion 4.00-03
Generated with
AIntersection LOS
4.11d_I, Intersection Delay [s/veh]
AAAApproach LOS
8.690.000.00d_A, Approach Delay [s/veh]
2.002.000.000.000.000.0095th-Percentile Queue Length [ft]
0.080.080.000.000.000.0095th-Percentile Queue Length [veh]
AAAAAAMovement LOS
8.478.690.000.000.007.27d_M, Delay for Movement [s/veh]
0.000.030.000.000.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
000Storage Area [veh]
NoFlared Lane
StopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop8KOA Corporation
Opening Year (2018) Friday w/ CP w/ PVersion 4.00-03
Generated with
0.040Volume to Capacity (v/c):
CLevel Of Service:
16.1Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 1: Afton Road / I-15 WB Ramp
Intersection Level Of Service Report
NoNoNoNoCrosswalk
0.000.000.000.00Grade [%]
30.0030.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Name
Intersection Setup
0000Pedestrian Volume [ped/h]
19116240001881760018127Total Analysis Volume [veh/h]
4846000474400457Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.95000.95000.95001.00001.00001.00000.95000.95001.00001.00000.95000.9500Peak Hour Factor
18115230001791670017226Total Hourly Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
1700230001671660017025Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
111500001210021Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop1KOA Corporation
Opening Year (2018) Friday w/ CP w/ PVersion 4.00-03
Generated with
CIntersection LOS
3.74d_I, Intersection Delay [s/veh]
BAAAApproach LOS
12.070.000.001.05d_A, Approach Delay [s/veh]
33.3833.3833.380.000.000.000.000.000.000.0015.7315.7395th-Percentile Queue Length [ft]
1.341.341.340.000.000.000.000.000.000.000.630.6395th-Percentile Queue Length [veh]
BCBAAAAMovement LOS
11.3816.0914.880.000.000.000.000.000.000.000.008.08d_M, Delay for Movement [s/veh]
0.220.040.050.000.000.000.000.000.000.000.000.02V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
0000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
0000Storage Area [veh]
NoFlared Lane
StopStopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop2KOA Corporation
Opening Year (2018) Friday w/ CP w/ PVersion 4.00-03
Generated with
0.007Volume to Capacity (v/c):
CLevel Of Service:
19.7Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 2: Afton Road / I-15 EB Ramp
Intersection Level Of Service Report
NoNoNoNoCrosswalk
0.000.000.000.00Grade [%]
30.0030.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Name
Intersection Setup
0000Pedestrian Volume [ped/h]
0001013181024176108270Total Analysis Volume [veh/h]
0002514506442770Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
1.00001.00001.00000.95000.95000.95001.00000.95000.95000.95000.95001.0000Peak Hour Factor
000963172023167103260Total Hourly Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
00092017002316698250Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
000432001510Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop3KOA Corporation
Opening Year (2018) Friday w/ CP w/ PVersion 4.00-03
Generated with
CIntersection LOS
10.08d_I, Intersection Delay [s/veh]
ACAAApproach LOS
0.0017.106.890.00d_A, Approach Delay [s/veh]
0.000.000.0067.7267.7267.720.0011.9711.970.000.000.0095th-Percentile Queue Length [ft]
0.000.000.002.712.712.710.000.480.480.000.000.0095th-Percentile Queue Length [veh]
BCCAAAAMovement LOS
0.000.000.0014.3019.6918.610.000.007.830.000.000.00d_M, Delay for Movement [s/veh]
0.000.000.000.100.010.390.000.000.120.000.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
0000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
0000Storage Area [veh]
NoFlared Lane
StopStopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop4KOA Corporation
Opening Year (2018) Friday w/ CP w/ PVersion 4.00-03
Generated with
0.115Volume to Capacity (v/c):
ALevel Of Service:
9.5Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 3: Afton Road / Project Driveway 1
Intersection Level Of Service Report
NoNoNoCrosswalk
0.000.000.00Grade [%]
30.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.00Lane Width [ft]
RightLeftRightThruThruLeftTurning Movement
Lane Configuration
EastboundSouthboundNorthboundApproach
Name
Intersection Setup
000Pedestrian Volume [ped/h]
01039726290Total Analysis Volume [veh/h]
02624770Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.95000.95000.95000.95000.95000.9500Peak Hour Factor
0989225280Total Hourly Volume [veh/h]
000000Other Volume [veh/h]
000000Existing Site Adjustment Volume [veh/h]
000000Pass-by Trips [veh/h]
000000Diverted Trips [veh/h]
0989223250Site-Generated Trips [veh/h]
000000In-Process Volume [veh/h]
1.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
000230Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop5KOA Corporation
Opening Year (2018) Friday w/ CP w/ PVersion 4.00-03
Generated with
AIntersection LOS
3.86d_I, Intersection Delay [s/veh]
AAAApproach LOS
9.550.000.00d_A, Approach Delay [s/veh]
9.729.720.000.000.000.0095th-Percentile Queue Length [ft]
0.390.390.000.000.000.0095th-Percentile Queue Length [veh]
AAAAAAMovement LOS
9.179.550.000.000.007.46d_M, Delay for Movement [s/veh]
0.000.120.000.000.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
000Storage Area [veh]
NoFlared Lane
StopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop6KOA Corporation
Opening Year (2018) Friday w/ CP w/ PVersion 4.00-03
Generated with
0.026Volume to Capacity (v/c):
ALevel Of Service:
8.7Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 4: Afton Road / Project Driveway 2
Intersection Level Of Service Report
NoNoNoCrosswalk
0.000.000.00Grade [%]
30.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.00Lane Width [ft]
RightLeftRightThruThruLeftTurning Movement
Lane Configuration
EastboundSouthboundNorthboundApproach
Name
Intersection Setup
000Pedestrian Volume [ped/h]
02624230Total Analysis Volume [veh/h]
076110Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.95000.95000.95000.95000.95000.9500Peak Hour Factor
02523230Total Hourly Volume [veh/h]
000000Other Volume [veh/h]
000000Existing Site Adjustment Volume [veh/h]
000000Pass-by Trips [veh/h]
000000Diverted Trips [veh/h]
02523000Site-Generated Trips [veh/h]
000000In-Process Volume [veh/h]
1.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
000230Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop7KOA Corporation
Opening Year (2018) Friday w/ CP w/ PVersion 4.00-03
Generated with
AIntersection LOS
4.11d_I, Intersection Delay [s/veh]
AAAApproach LOS
8.690.000.00d_A, Approach Delay [s/veh]
2.002.000.000.000.000.0095th-Percentile Queue Length [ft]
0.080.080.000.000.000.0095th-Percentile Queue Length [veh]
AAAAAAMovement LOS
8.478.690.000.000.007.27d_M, Delay for Movement [s/veh]
0.000.030.000.000.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
000Storage Area [veh]
NoFlared Lane
StopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop8KOA Corporation
Opening Year (2018) w/o CP w/o PVersion 4.00-03
Generated with
0.005Volume to Capacity (v/c):
ALevel Of Service:
9.7Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 1: Afton Road / I-15 WB Ramp
Intersection Level Of Service Report
NoNoNoNoCrosswalk
0.000.000.000.00Grade [%]
30.0030.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Name
Intersection Setup
0000Pedestrian Volume [ped/h]
1240000155100521Total Analysis Volume [veh/h]
31000041300130Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.95000.95000.95001.00001.00001.00000.95000.95001.00001.00000.95000.9500Peak Hour Factor
1140000144800491Total Hourly Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
000000000000Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
1140000144800491Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop1KOA Corporation
Opening Year (2018) w/o CP w/o PVersion 4.00-03
Generated with
AIntersection LOS
1.11d_I, Intersection Delay [s/veh]
AAAAApproach LOS
8.890.000.000.14d_A, Approach Delay [s/veh]
1.301.301.300.000.000.000.000.000.000.002.682.6895th-Percentile Queue Length [ft]
0.050.050.050.000.000.000.000.000.000.000.110.1195th-Percentile Queue Length [veh]
AAAAAAAMovement LOS
8.619.749.230.000.000.000.000.000.000.000.007.35d_M, Delay for Movement [s/veh]
0.010.010.000.000.000.000.000.000.000.000.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
0000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
0000Storage Area [veh]
NoFlared Lane
StopStopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop2KOA Corporation
Opening Year (2018) w/o CP w/o PVersion 4.00-03
Generated with
0.005Volume to Capacity (v/c):
BLevel Of Service:
10.0Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 2: Afton Road / I-15 EB Ramp
Intersection Level Of Service Report
NoNoNoNoCrosswalk
0.000.000.000.00Grade [%]
30.0030.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Name
Intersection Setup
0000Pedestrian Volume [ped/h]
00024530249300Total Analysis Volume [veh/h]
00011130112100Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
1.00001.00001.00000.95000.95000.95001.00000.95000.95000.95000.95001.0000Peak Hour Factor
00024500247300Total Hourly Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
000000000000Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
00024500247300Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop3KOA Corporation
Opening Year (2018) w/o CP w/o PVersion 4.00-03
Generated with
BIntersection LOS
8.13d_I, Intersection Delay [s/veh]
AAAAApproach LOS
0.009.517.010.00d_A, Approach Delay [s/veh]
0.000.000.005.535.535.530.002.442.440.000.000.0095th-Percentile Queue Length [ft]
0.000.000.000.220.220.220.000.100.100.000.000.0095th-Percentile Queue Length [veh]
ABAAAAAMovement LOS
0.000.000.008.6410.039.500.000.007.290.000.000.00d_M, Delay for Movement [s/veh]
0.000.000.000.000.010.060.000.000.030.000.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
0000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
0000Storage Area [veh]
NoFlared Lane
StopStopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop4KOA Corporation
Opening Year (2018) w/o CP w/o PVersion 4.00-03
Generated with
0.002Volume to Capacity (v/c):
ALevel Of Service:
8.5Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 3: Afton Road / Project Driveway 1
Intersection Level Of Service Report
NoNoNoCrosswalk
0.000.000.00Grade [%]
30.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.00Lane Width [ft]
RightLeftRightThruThruLeftTurning Movement
Lane Configuration
EastboundSouthboundNorthboundApproach
Name
Intersection Setup
000Pedestrian Volume [ped/h]
022120Total Analysis Volume [veh/h]
011010Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.95000.95000.95000.95000.95000.9500Peak Hour Factor
022120Total Hourly Volume [veh/h]
000000Other Volume [veh/h]
000000Existing Site Adjustment Volume [veh/h]
000000Pass-by Trips [veh/h]
000000Diverted Trips [veh/h]
000000Site-Generated Trips [veh/h]
000000In-Process Volume [veh/h]
1.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
022120Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop5KOA Corporation
Opening Year (2018) w/o CP w/o PVersion 4.00-03
Generated with
AIntersection LOS
2.44d_I, Intersection Delay [s/veh]
AAAApproach LOS
8.540.000.00d_A, Approach Delay [s/veh]
0.150.150.000.000.000.0095th-Percentile Queue Length [ft]
0.010.010.000.000.000.0095th-Percentile Queue Length [veh]
AAAAAAMovement LOS
8.338.540.000.000.007.22d_M, Delay for Movement [s/veh]
0.000.000.000.000.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
000Storage Area [veh]
NoFlared Lane
StopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop6KOA Corporation
Opening Year (2018) w/o CP w/o PVersion 4.00-03
Generated with
0.002Volume to Capacity (v/c):
ALevel Of Service:
8.5Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 4: Afton Road / Project Driveway 2
Intersection Level Of Service Report
NoNoNoCrosswalk
0.000.000.00Grade [%]
30.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.00Lane Width [ft]
RightLeftRightThruThruLeftTurning Movement
Lane Configuration
EastboundSouthboundNorthboundApproach
Name
Intersection Setup
000Pedestrian Volume [ped/h]
022120Total Analysis Volume [veh/h]
011010Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.95000.95000.95000.95000.95000.9500Peak Hour Factor
022120Total Hourly Volume [veh/h]
000000Other Volume [veh/h]
000000Existing Site Adjustment Volume [veh/h]
000000Pass-by Trips [veh/h]
000000Diverted Trips [veh/h]
000000Site-Generated Trips [veh/h]
000000In-Process Volume [veh/h]
1.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
022120Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop7KOA Corporation
Opening Year (2018) w/o CP w/o PVersion 4.00-03
Generated with
AIntersection LOS
2.44d_I, Intersection Delay [s/veh]
AAAApproach LOS
8.540.000.00d_A, Approach Delay [s/veh]
0.150.150.000.000.000.0095th-Percentile Queue Length [ft]
0.010.010.000.000.000.0095th-Percentile Queue Length [veh]
AAAAAAMovement LOS
8.338.540.000.000.007.22d_M, Delay for Movement [s/veh]
0.000.000.000.000.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
000Storage Area [veh]
NoFlared Lane
StopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop8KOA Corporation
Opening Year (2018) Sunday w/ CP w/o PVersion 4.00-03
Generated with
0.011Volume to Capacity (v/c):
CLevel Of Service:
17.1Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 1: Afton Road / I-15 WB Ramp
Intersection Level Of Service Report
NoNoNoNoCrosswalk
0.000.000.000.00Grade [%]
30.0030.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Name
Intersection Setup
0000Pedestrian Volume [ped/h]
21140000218254002511Total Analysis Volume [veh/h]
5310000546300630Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.95000.95000.95001.00001.00001.00000.95000.95001.00001.00000.95000.9500Peak Hour Factor
20040000207241002381Total Hourly Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
18900000193193001890Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
1140000144800491Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop1KOA Corporation
Opening Year (2018) Sunday w/ CP w/o PVersion 4.00-03
Generated with
CIntersection LOS
2.64d_I, Intersection Delay [s/veh]
BAAAApproach LOS
11.480.000.000.03d_A, Approach Delay [s/veh]
28.5928.5928.590.000.000.000.000.000.000.0022.3722.3795th-Percentile Queue Length [ft]
1.141.141.140.000.000.000.000.000.000.000.890.8995th-Percentile Queue Length [veh]
BCCAAAAMovement LOS
11.3717.0515.750.000.000.000.000.000.000.000.008.31d_M, Delay for Movement [s/veh]
0.270.010.000.000.000.000.000.000.000.000.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
0000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
0000Storage Area [veh]
NoFlared Lane
StopStopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop2KOA Corporation
Opening Year (2018) Sunday w/ CP w/o PVersion 4.00-03
Generated with
0.010Volume to Capacity (v/c):
DLevel Of Service:
27.0Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 2: Afton Road / I-15 EB Ramp
Intersection Level Of Service Report
NoNoNoNoCrosswalk
0.000.000.000.00Grade [%]
30.0030.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Name
Intersection Setup
0000Pedestrian Volume [ped/h]
0002425202253300Total Analysis Volume [veh/h]
00011630163100Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
1.00001.00001.00000.95000.95000.95001.00000.95000.95000.95000.95001.0000Peak Hour Factor
0002423902240300Total Hourly Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
0000018900193000Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
00024500247300Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop3KOA Corporation
Opening Year (2018) Sunday w/ CP w/o PVersion 4.00-03
Generated with
DIntersection LOS
16.95d_I, Intersection Delay [s/veh]
ADAAApproach LOS
0.0026.427.580.00d_A, Approach Delay [s/veh]
0.000.000.00100.27100.27100.270.0013.9813.980.000.000.0095th-Percentile Queue Length [ft]
0.000.000.004.014.014.010.000.560.560.000.000.0095th-Percentile Queue Length [veh]
CDDAAAAMovement LOS
0.000.000.0021.1526.9926.460.000.007.630.000.000.00d_M, Delay for Movement [s/veh]
0.000.000.000.000.010.600.000.000.160.000.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
0000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
0000Storage Area [veh]
NoFlared Lane
StopStopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop4KOA Corporation
Opening Year (2018) Sunday w/ CP w/o PVersion 4.00-03
Generated with
0.002Volume to Capacity (v/c):
ALevel Of Service:
8.5Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 3: Afton Road / Project Driveway 1
Intersection Level Of Service Report
NoNoNoCrosswalk
0.000.000.00Grade [%]
30.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.00Lane Width [ft]
RightLeftRightThruThruLeftTurning Movement
Lane Configuration
EastboundSouthboundNorthboundApproach
Name
Intersection Setup
000Pedestrian Volume [ped/h]
022120Total Analysis Volume [veh/h]
011010Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.95000.95000.95000.95000.95000.9500Peak Hour Factor
022120Total Hourly Volume [veh/h]
000000Other Volume [veh/h]
000000Existing Site Adjustment Volume [veh/h]
000000Pass-by Trips [veh/h]
000000Diverted Trips [veh/h]
000000Site-Generated Trips [veh/h]
000000In-Process Volume [veh/h]
1.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
022120Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop5KOA Corporation
Opening Year (2018) Sunday w/ CP w/o PVersion 4.00-03
Generated with
AIntersection LOS
2.44d_I, Intersection Delay [s/veh]
AAAApproach LOS
8.540.000.00d_A, Approach Delay [s/veh]
0.150.150.000.000.000.0095th-Percentile Queue Length [ft]
0.010.010.000.000.000.0095th-Percentile Queue Length [veh]
AAAAAAMovement LOS
8.338.540.000.000.007.22d_M, Delay for Movement [s/veh]
0.000.000.000.000.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
000Storage Area [veh]
NoFlared Lane
StopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop6KOA Corporation
Opening Year (2018) Sunday w/ CP w/o PVersion 4.00-03
Generated with
0.002Volume to Capacity (v/c):
ALevel Of Service:
8.5Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 4: Afton Road / Project Driveway 2
Intersection Level Of Service Report
NoNoNoCrosswalk
0.000.000.00Grade [%]
30.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.00Lane Width [ft]
RightLeftRightThruThruLeftTurning Movement
Lane Configuration
EastboundSouthboundNorthboundApproach
Name
Intersection Setup
000Pedestrian Volume [ped/h]
022120Total Analysis Volume [veh/h]
011010Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.95000.95000.95000.95000.95000.9500Peak Hour Factor
022120Total Hourly Volume [veh/h]
000000Other Volume [veh/h]
000000Existing Site Adjustment Volume [veh/h]
000000Pass-by Trips [veh/h]
000000Diverted Trips [veh/h]
000000Site-Generated Trips [veh/h]
000000In-Process Volume [veh/h]
1.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
022120Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop7KOA Corporation
Opening Year (2018) Sunday w/ CP w/o PVersion 4.00-03
Generated with
AIntersection LOS
2.44d_I, Intersection Delay [s/veh]
AAAApproach LOS
8.540.000.00d_A, Approach Delay [s/veh]
0.150.150.000.000.000.0095th-Percentile Queue Length [ft]
0.010.010.000.000.000.0095th-Percentile Queue Length [veh]
AAAAAAMovement LOS
8.338.540.000.000.007.22d_M, Delay for Movement [s/veh]
0.000.000.000.000.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
000Storage Area [veh]
NoFlared Lane
StopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop8KOA Corporation
Opening Year (2018) w/o CP w/ PVersion 4.00-03
Generated with
0.007Volume to Capacity (v/c):
BLevel Of Service:
12.8Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 1: Afton Road / I-15 WB Ramp
Intersection Level Of Service Report
NoNoNoNoCrosswalk
0.000.000.000.00Grade [%]
30.0030.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Name
Intersection Setup
0000Pedestrian Volume [ped/h]
12410000015510052104Total Analysis Volume [veh/h]
3125000413001326Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.95000.95000.95001.00001.00001.00000.95000.95001.00001.00000.95000.9500Peak Hour Factor
114950001448004999Total Hourly Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
00950000000098Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
1140000144800491Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop1KOA Corporation
Opening Year (2018) w/o CP w/ PVersion 4.00-03
Generated with
BIntersection LOS
6.45d_I, Intersection Delay [s/veh]
BAAAApproach LOS
12.070.000.005.01d_A, Approach Delay [s/veh]
16.9216.9216.920.000.000.000.000.000.000.008.468.4695th-Percentile Queue Length [ft]
0.680.680.680.000.000.000.000.000.000.000.340.3495th-Percentile Queue Length [veh]
ABBAAAAMovement LOS
9.8512.8412.300.000.000.000.000.000.000.000.007.51d_M, Delay for Movement [s/veh]
0.010.010.170.000.000.000.000.000.000.000.000.07V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
0000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
0000Storage Area [veh]
NoFlared Lane
StopStopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop2KOA Corporation
Opening Year (2018) w/o CP w/ PVersion 4.00-03
Generated with
0.007Volume to Capacity (v/c):
BLevel Of Service:
12.1Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 2: Afton Road / I-15 EB Ramp
Intersection Level Of Service Report
NoNoNoNoCrosswalk
0.000.000.000.00Grade [%]
30.0030.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Name
Intersection Setup
0000Pedestrian Volume [ped/h]
00027453010249281030Total Analysis Volume [veh/h]
0007113026127260Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
1.00001.00001.00000.95000.95000.95001.00000.95000.95000.95000.95001.0000Peak Hour Factor
000264500974727980Total Hourly Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
0002400095024980Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
00024500247300Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop3KOA Corporation
Opening Year (2018) w/o CP w/ PVersion 4.00-03
Generated with
BIntersection LOS
3.51d_I, Intersection Delay [s/veh]
ABAAApproach LOS
0.0010.902.450.00d_A, Approach Delay [s/veh]
0.000.000.0010.2810.2810.280.008.678.670.000.000.0095th-Percentile Queue Length [ft]
0.000.000.000.410.410.410.000.350.350.000.000.0095th-Percentile Queue Length [veh]
ABBAAAAMovement LOS
0.000.000.009.4912.0611.540.000.007.560.000.000.00d_M, Delay for Movement [s/veh]
0.000.000.000.030.010.090.000.000.030.000.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
0000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
0000Storage Area [veh]
NoFlared Lane
StopStopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop4KOA Corporation
Opening Year (2018) w/o CP w/ PVersion 4.00-03
Generated with
0.117Volume to Capacity (v/c):
ALevel Of Service:
9.6Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 3: Afton Road / Project Driveway 1
Intersection Level Of Service Report
NoNoNoCrosswalk
0.000.000.00Grade [%]
30.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.00Lane Width [ft]
RightLeftRightThruThruLeftTurning Movement
Lane Configuration
EastboundSouthboundNorthboundApproach
Name
Intersection Setup
000Pedestrian Volume [ped/h]
010510226270Total Analysis Volume [veh/h]
02626770Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.95000.95000.95000.95000.95000.9500Peak Hour Factor
01009725260Total Hourly Volume [veh/h]
000000Other Volume [veh/h]
000000Existing Site Adjustment Volume [veh/h]
000000Pass-by Trips [veh/h]
000000Diverted Trips [veh/h]
0989524240Site-Generated Trips [veh/h]
000000In-Process Volume [veh/h]
1.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
022120Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop5KOA Corporation
Opening Year (2018) w/o CP w/ PVersion 4.00-03
Generated with
AIntersection LOS
3.86d_I, Intersection Delay [s/veh]
AAAApproach LOS
9.560.000.00d_A, Approach Delay [s/veh]
9.949.940.000.000.000.0095th-Percentile Queue Length [ft]
0.400.400.000.000.000.0095th-Percentile Queue Length [veh]
AAAAAAMovement LOS
9.199.560.000.000.007.47d_M, Delay for Movement [s/veh]
0.000.120.000.000.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
000Storage Area [veh]
NoFlared Lane
StopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop6KOA Corporation
Opening Year (2018) w/o CP w/ PVersion 4.00-03
Generated with
0.027Volume to Capacity (v/c):
ALevel Of Service:
8.7Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 4: Afton Road / Project Driveway 2
Intersection Level Of Service Report
NoNoNoCrosswalk
0.000.000.00Grade [%]
30.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.00Lane Width [ft]
RightLeftRightThruThruLeftTurning Movement
Lane Configuration
EastboundSouthboundNorthboundApproach
Name
Intersection Setup
000Pedestrian Volume [ped/h]
02727120Total Analysis Volume [veh/h]
077010Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.95000.95000.95000.95000.95000.9500Peak Hour Factor
02626120Total Hourly Volume [veh/h]
000000Other Volume [veh/h]
000000Existing Site Adjustment Volume [veh/h]
000000Pass-by Trips [veh/h]
000000Diverted Trips [veh/h]
02424000Site-Generated Trips [veh/h]
000000In-Process Volume [veh/h]
1.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
022120Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop7KOA Corporation
Opening Year (2018) w/o CP w/ PVersion 4.00-03
Generated with
AIntersection LOS
4.12d_I, Intersection Delay [s/veh]
AAAApproach LOS
8.690.000.00d_A, Approach Delay [s/veh]
2.082.080.000.000.000.0095th-Percentile Queue Length [ft]
0.080.080.000.000.000.0095th-Percentile Queue Length [veh]
AAAAAAMovement LOS
8.488.690.000.000.007.27d_M, Delay for Movement [s/veh]
0.000.030.000.000.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
000Storage Area [veh]
NoFlared Lane
StopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop8KOA Corporation
Opening Year (2018) Sunday w/ CP w/ PVersion 4.00-03
Generated with
0.017Volume to Capacity (v/c):
DLevel Of Service:
33.5Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 1: Afton Road / I-15 WB Ramp
Intersection Level Of Service Report
NoNoNoNoCrosswalk
0.000.000.000.00Grade [%]
30.0030.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Name
Intersection Setup
0000Pedestrian Volume [ped/h]
211410000021825400251104Total Analysis Volume [veh/h]
531250005463006326Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.95000.95000.95001.00001.00001.00000.95000.95001.00001.00000.95000.9500Peak Hour Factor
2004950002072410023899Total Hourly Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
1890950001931930018998Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
1140000144800491Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop1KOA Corporation
Opening Year (2018) Sunday w/ CP w/ PVersion 4.00-03
Generated with
DIntersection LOS
7.92d_I, Intersection Delay [s/veh]
DAAAApproach LOS
25.850.000.002.53d_A, Approach Delay [s/veh]
117.42117.42117.420.000.000.000.000.000.000.0035.6835.6895th-Percentile Queue Length [ft]
4.704.704.700.000.000.000.000.000.000.001.431.4395th-Percentile Queue Length [veh]
CDDAAAAMovement LOS
22.9033.5231.770.000.000.000.000.000.000.000.008.65d_M, Delay for Movement [s/veh]
0.270.020.370.000.000.000.000.000.000.000.000.10V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
0000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
0000Storage Area [veh]
NoFlared Lane
StopStopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop2KOA Corporation
Opening Year (2018) Sunday w/ CP w/ PVersion 4.00-03
Generated with
0.014Volume to Capacity (v/c):
FLevel Of Service:
68.3Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 2: Afton Road / I-15 EB Ramp
Intersection Level Of Service Report
NoNoNoNoCrosswalk
0.000.000.000.00Grade [%]
30.0030.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Name
Intersection Setup
0000Pedestrian Volume [ped/h]
0002742520102253281030Total Analysis Volume [veh/h]
0007163026637260Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
1.00001.00001.00000.95000.95000.95001.00000.95000.95000.95000.95001.0000Peak Hour Factor
00026423909724027980Total Hourly Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
00024018909519324980Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
00024500247300Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop3KOA Corporation
Opening Year (2018) Sunday w/ CP w/ PVersion 4.00-03
Generated with
FIntersection LOS
27.28d_I, Intersection Delay [s/veh]
AFAAApproach LOS
0.0066.995.700.00d_A, Approach Delay [s/veh]
0.000.000.00215.49215.49215.490.0024.0524.050.000.000.0095th-Percentile Queue Length [ft]
0.000.000.008.628.628.620.000.960.960.000.000.0095th-Percentile Queue Length [veh]
FFFAAAAMovement LOS
0.000.000.0059.2468.2767.800.000.008.000.000.000.00d_M, Delay for Movement [s/veh]
0.000.000.000.030.010.860.000.000.170.000.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
0000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
0000Storage Area [veh]
NoFlared Lane
StopStopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop4KOA Corporation
Opening Year (2018) Sunday w/ CP w/ PVersion 4.00-03
Generated with
0.117Volume to Capacity (v/c):
ALevel Of Service:
9.6Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 3: Afton Road / Project Driveway 1
Intersection Level Of Service Report
NoNoNoCrosswalk
0.000.000.00Grade [%]
30.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.00Lane Width [ft]
RightLeftRightThruThruLeftTurning Movement
Lane Configuration
EastboundSouthboundNorthboundApproach
Name
Intersection Setup
000Pedestrian Volume [ped/h]
010510226270Total Analysis Volume [veh/h]
02626770Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.95000.95000.95000.95000.95000.9500Peak Hour Factor
01009725260Total Hourly Volume [veh/h]
000000Other Volume [veh/h]
000000Existing Site Adjustment Volume [veh/h]
000000Pass-by Trips [veh/h]
000000Diverted Trips [veh/h]
0989524240Site-Generated Trips [veh/h]
000000In-Process Volume [veh/h]
1.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
022120Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop5KOA Corporation
Opening Year (2018) Sunday w/ CP w/ PVersion 4.00-03
Generated with
AIntersection LOS
3.86d_I, Intersection Delay [s/veh]
AAAApproach LOS
9.560.000.00d_A, Approach Delay [s/veh]
9.949.940.000.000.000.0095th-Percentile Queue Length [ft]
0.400.400.000.000.000.0095th-Percentile Queue Length [veh]
AAAAAAMovement LOS
9.199.560.000.000.007.47d_M, Delay for Movement [s/veh]
0.000.120.000.000.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
000Storage Area [veh]
NoFlared Lane
StopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop6KOA Corporation
Opening Year (2018) Sunday w/ CP w/ PVersion 4.00-03
Generated with
0.027Volume to Capacity (v/c):
ALevel Of Service:
8.7Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 4: Afton Road / Project Driveway 2
Intersection Level Of Service Report
NoNoNoCrosswalk
0.000.000.00Grade [%]
30.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.00Lane Width [ft]
RightLeftRightThruThruLeftTurning Movement
Lane Configuration
EastboundSouthboundNorthboundApproach
Name
Intersection Setup
000Pedestrian Volume [ped/h]
02727120Total Analysis Volume [veh/h]
077010Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.95000.95000.95000.95000.95000.9500Peak Hour Factor
02626120Total Hourly Volume [veh/h]
000000Other Volume [veh/h]
000000Existing Site Adjustment Volume [veh/h]
000000Pass-by Trips [veh/h]
000000Diverted Trips [veh/h]
02424000Site-Generated Trips [veh/h]
000000In-Process Volume [veh/h]
1.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
022120Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop7KOA Corporation
Opening Year (2018) Sunday w/ CP w/ PVersion 4.00-03
Generated with
AIntersection LOS
4.12d_I, Intersection Delay [s/veh]
AAAApproach LOS
8.690.000.00d_A, Approach Delay [s/veh]
2.082.080.000.000.000.0095th-Percentile Queue Length [ft]
0.080.080.000.000.000.0095th-Percentile Queue Length [veh]
AAAAAAMovement LOS
8.488.690.000.000.007.27d_M, Delay for Movement [s/veh]
0.000.030.000.000.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
000Storage Area [veh]
NoFlared Lane
StopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop8KOA Corporation
Build Out Year (2040) Conditions
APPENDIX E
Intersection Level- of- Service Worksheets
Build Out (2040) w/o CP w/o PVersion 4.00-03
Generated with
0.028Volume to Capacity (v/c):
ALevel Of Service:
9.4Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 1: Afton Road / I-15 WB Ramp
Intersection Level Of Service Report
NoNoNoNoCrosswalk
0.000.000.000.00Grade [%]
30.0030.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Name
Intersection Setup
0000Pedestrian Volume [ped/h]
192400002020032Total Analysis Volume [veh/h]
560000510011Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.95000.95000.95001.00001.00001.00000.95000.95001.00001.00000.95000.9500Peak Hour Factor
182300001920032Total Hourly Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
000000000000Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
182300001920032Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop1KOA Corporation
Build Out (2040) w/o CP w/o PVersion 4.00-03
Generated with
AIntersection LOS
5.72d_I, Intersection Delay [s/veh]
AAAAApproach LOS
8.980.000.002.90d_A, Approach Delay [s/veh]
3.563.563.560.000.000.000.000.000.000.000.240.2495th-Percentile Queue Length [ft]
0.140.140.140.000.000.000.000.000.000.000.010.0195th-Percentile Queue Length [veh]
AAAAAAAMovement LOS
8.519.358.800.000.000.000.000.000.000.000.007.26d_M, Delay for Movement [s/veh]
0.020.030.000.000.000.000.000.000.000.000.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
0000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
0000Storage Area [veh]
NoFlared Lane
StopStopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop2KOA Corporation
Build Out (2040) w/o CP w/o PVersion 4.00-03
Generated with
0.006Volume to Capacity (v/c):
ALevel Of Service:
9.1Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 2: Afton Road / I-15 EB Ramp
Intersection Level Of Service Report
NoNoNoNoCrosswalk
0.000.000.000.00Grade [%]
30.0030.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Name
Intersection Setup
0000Pedestrian Volume [ped/h]
000653002820Total Analysis Volume [veh/h]
000211001210Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
1.00001.00001.00000.95000.95000.95001.00000.95000.95000.95000.95001.0000Peak Hour Factor
000653002820Total Hourly Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
000000000000Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
000653002820Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop3KOA Corporation
Build Out (2040) w/o CP w/o PVersion 4.00-03
Generated with
AIntersection LOS
5.24d_I, Intersection Delay [s/veh]
AAAAApproach LOS
0.008.707.240.00d_A, Approach Delay [s/veh]
0.000.000.001.081.081.080.000.090.090.000.000.0095th-Percentile Queue Length [ft]
0.000.000.000.040.040.040.000.000.000.000.000.0095th-Percentile Queue Length [veh]
AAAAAAAMovement LOS
0.000.000.008.379.158.630.000.007.240.000.000.00d_M, Delay for Movement [s/veh]
0.000.000.000.010.010.000.000.000.000.000.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
0000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
0000Storage Area [veh]
NoFlared Lane
StopStopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop4KOA Corporation
Build Out (2040) w/o CP w/o PVersion 4.00-03
Generated with
0.000Volume to Capacity (v/c):
ALevel Of Service:
8.6Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 3: Afton Road / Project Driveway 1
Intersection Level Of Service Report
NoNoNoCrosswalk
0.000.000.00Grade [%]
30.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.00Lane Width [ft]
RightLeftRightThruThruLeftTurning Movement
Lane Configuration
EastboundSouthboundNorthboundApproach
Name
Intersection Setup
000Pedestrian Volume [ped/h]
000350Total Analysis Volume [veh/h]
000110Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.95000.95000.95000.95000.95000.9500Peak Hour Factor
000350Total Hourly Volume [veh/h]
000000Other Volume [veh/h]
000000Existing Site Adjustment Volume [veh/h]
000000Pass-by Trips [veh/h]
000000Diverted Trips [veh/h]
000000Site-Generated Trips [veh/h]
000000In-Process Volume [veh/h]
1.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
000350Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop5KOA Corporation
Build Out (2040) w/o CP w/o PVersion 4.00-03
Generated with
AIntersection LOS
0.00d_I, Intersection Delay [s/veh]
AAAApproach LOS
8.440.000.00d_A, Approach Delay [s/veh]
0.000.000.000.000.000.0095th-Percentile Queue Length [ft]
0.000.000.000.000.000.0095th-Percentile Queue Length [veh]
AAAAAAMovement LOS
8.338.550.000.000.007.22d_M, Delay for Movement [s/veh]
0.000.000.000.000.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
000Storage Area [veh]
NoFlared Lane
StopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop6KOA Corporation
Build Out (2040) w/o CP w/o PVersion 4.00-03
Generated with
0.000Volume to Capacity (v/c):
ALevel Of Service:
8.6Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 4: Afton Road / Project Driveway 2
Intersection Level Of Service Report
NoNoNoCrosswalk
0.000.000.00Grade [%]
30.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.00Lane Width [ft]
RightLeftRightThruThruLeftTurning Movement
Lane Configuration
EastboundSouthboundNorthboundApproach
Name
Intersection Setup
000Pedestrian Volume [ped/h]
000350Total Analysis Volume [veh/h]
000110Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.95000.95000.95000.95000.95000.9500Peak Hour Factor
000350Total Hourly Volume [veh/h]
000000Other Volume [veh/h]
000000Existing Site Adjustment Volume [veh/h]
000000Pass-by Trips [veh/h]
000000Diverted Trips [veh/h]
000000Site-Generated Trips [veh/h]
000000In-Process Volume [veh/h]
1.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
000350Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop7KOA Corporation
Build Out (2040) w/o CP w/o PVersion 4.00-03
Generated with
AIntersection LOS
0.00d_I, Intersection Delay [s/veh]
AAAApproach LOS
8.440.000.00d_A, Approach Delay [s/veh]
0.000.000.000.000.000.0095th-Percentile Queue Length [ft]
0.000.000.000.000.000.0095th-Percentile Queue Length [veh]
AAAAAAMovement LOS
8.338.550.000.000.007.22d_M, Delay for Movement [s/veh]
0.000.000.000.000.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
000Storage Area [veh]
NoFlared Lane
StopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop8KOA Corporation
Build Out Year (2040) Friday w/ CP w/o PVersion 4.00-03
Generated with
0.055Volume to Capacity (v/c):
CLevel Of Service:
15.1Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 1: Afton Road / I-15 WB Ramp
Intersection Level Of Service Report
NoNoNoNoCrosswalk
0.000.000.000.00Grade [%]
30.0030.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Name
Intersection Setup
0000Pedestrian Volume [ped/h]
198240000196177001822Total Analysis Volume [veh/h]
4960000494400461Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.95000.95000.95001.00001.00001.00000.95000.95001.00001.00000.95000.9500Peak Hour Factor
188230000186168001732Total Hourly Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
17000000167166001700Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
182300001920032Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop1KOA Corporation
Build Out Year (2040) Friday w/ CP w/o PVersion 4.00-03
Generated with
CIntersection LOS
3.28d_I, Intersection Delay [s/veh]
BAAAApproach LOS
11.450.000.000.09d_A, Approach Delay [s/veh]
29.4029.4029.400.000.000.000.000.000.000.0013.7213.7295th-Percentile Queue Length [ft]
1.181.181.180.000.000.000.000.000.000.000.550.5595th-Percentile Queue Length [veh]
BCBAAAAMovement LOS
11.0215.0713.890.000.000.000.000.000.000.000.008.04d_M, Delay for Movement [s/veh]
0.230.050.000.000.000.000.000.000.000.000.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
0000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
0000Storage Area [veh]
NoFlared Lane
StopStopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop2KOA Corporation
Build Out Year (2040) Friday w/ CP w/o PVersion 4.00-03
Generated with
0.010Volume to Capacity (v/c):
CLevel Of Service:
15.6Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 2: Afton Road / I-15 EB Ramp
Intersection Level Of Service Report
NoNoNoNoCrosswalk
0.000.000.000.00Grade [%]
30.0030.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Name
Intersection Setup
0000Pedestrian Volume [ped/h]
0006518200177820Total Analysis Volume [veh/h]
00021460044210Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
1.00001.00001.00000.95000.95000.95001.00000.95000.95000.95000.95001.0000Peak Hour Factor
0006517300168820Total Hourly Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
0000017000166000Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
000653002820Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop3KOA Corporation
Build Out Year (2040) Friday w/ CP w/o PVersion 4.00-03
Generated with
CIntersection LOS
11.10d_I, Intersection Delay [s/veh]
ABAAApproach LOS
0.0014.977.510.00d_A, Approach Delay [s/veh]
0.000.000.0038.8938.8938.890.009.259.250.000.000.0095th-Percentile Queue Length [ft]
0.000.000.001.561.561.560.000.370.370.000.000.0095th-Percentile Queue Length [veh]
BCCAAAAMovement LOS
0.000.000.0011.7715.6315.050.000.007.510.000.000.00d_M, Delay for Movement [s/veh]
0.000.000.000.010.010.330.000.000.110.000.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
0000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
0000Storage Area [veh]
NoFlared Lane
StopStopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop4KOA Corporation
Build Out Year (2040) Friday w/ CP w/o PVersion 4.00-03
Generated with
0.000Volume to Capacity (v/c):
ALevel Of Service:
8.6Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 3: Afton Road / Project Driveway 1
Intersection Level Of Service Report
NoNoNoCrosswalk
0.000.000.00Grade [%]
30.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.00Lane Width [ft]
RightLeftRightThruThruLeftTurning Movement
Lane Configuration
EastboundSouthboundNorthboundApproach
Name
Intersection Setup
000Pedestrian Volume [ped/h]
000350Total Analysis Volume [veh/h]
000110Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.95000.95000.95000.95000.95000.9500Peak Hour Factor
000350Total Hourly Volume [veh/h]
000000Other Volume [veh/h]
000000Existing Site Adjustment Volume [veh/h]
000000Pass-by Trips [veh/h]
000000Diverted Trips [veh/h]
000000Site-Generated Trips [veh/h]
000000In-Process Volume [veh/h]
1.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
000350Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop5KOA Corporation
Build Out Year (2040) Friday w/ CP w/o PVersion 4.00-03
Generated with
AIntersection LOS
0.00d_I, Intersection Delay [s/veh]
AAAApproach LOS
8.440.000.00d_A, Approach Delay [s/veh]
0.000.000.000.000.000.0095th-Percentile Queue Length [ft]
0.000.000.000.000.000.0095th-Percentile Queue Length [veh]
AAAAAAMovement LOS
8.338.550.000.000.007.22d_M, Delay for Movement [s/veh]
0.000.000.000.000.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
000Storage Area [veh]
NoFlared Lane
StopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop6KOA Corporation
Build Out Year (2040) Friday w/ CP w/o PVersion 4.00-03
Generated with
0.000Volume to Capacity (v/c):
ALevel Of Service:
8.6Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 4: Afton Road / Project Driveway 2
Intersection Level Of Service Report
NoNoNoCrosswalk
0.000.000.00Grade [%]
30.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.00Lane Width [ft]
RightLeftRightThruThruLeftTurning Movement
Lane Configuration
EastboundSouthboundNorthboundApproach
Name
Intersection Setup
000Pedestrian Volume [ped/h]
000350Total Analysis Volume [veh/h]
000110Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.95000.95000.95000.95000.95000.9500Peak Hour Factor
000350Total Hourly Volume [veh/h]
000000Other Volume [veh/h]
000000Existing Site Adjustment Volume [veh/h]
000000Pass-by Trips [veh/h]
000000Diverted Trips [veh/h]
000000Site-Generated Trips [veh/h]
000000In-Process Volume [veh/h]
1.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
000350Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop7KOA Corporation
Build Out Year (2040) Friday w/ CP w/o PVersion 4.00-03
Generated with
AIntersection LOS
0.00d_I, Intersection Delay [s/veh]
AAAApproach LOS
8.440.000.00d_A, Approach Delay [s/veh]
0.000.000.000.000.000.0095th-Percentile Queue Length [ft]
0.000.000.000.000.000.0095th-Percentile Queue Length [veh]
AAAAAAMovement LOS
8.338.550.000.000.007.22d_M, Delay for Movement [s/veh]
0.000.000.000.000.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
000Storage Area [veh]
NoFlared Lane
StopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop8KOA Corporation
Build Out (2040) w/o CP w/ PVersion 4.00-03
Generated with
0.030Volume to Capacity (v/c):
ALevel Of Service:
9.8Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 1: Afton Road / I-15 WB Ramp
Intersection Level Of Service Report
NoNoNoNoCrosswalk
0.000.000.000.00Grade [%]
30.0030.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Name
Intersection Setup
0000Pedestrian Volume [ped/h]
19242400020200328Total Analysis Volume [veh/h]
566000510017Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.95000.95000.95001.00001.00001.00000.95000.95001.00001.00000.95000.9500Peak Hour Factor
18232300019200327Total Hourly Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
00230000000025Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
182300001920032Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop1KOA Corporation
Build Out (2040) w/o CP w/ PVersion 4.00-03
Generated with
AIntersection LOS
6.90d_I, Intersection Delay [s/veh]
AAAAApproach LOS
9.310.000.006.59d_A, Approach Delay [s/veh]
6.006.006.000.000.000.000.000.000.000.001.491.4995th-Percentile Queue Length [ft]
0.240.240.240.000.000.000.000.000.000.000.060.0695th-Percentile Queue Length [veh]
AAAAAAAMovement LOS
8.659.859.280.000.000.000.000.000.000.000.007.30d_M, Delay for Movement [s/veh]
0.020.030.030.000.000.000.000.000.000.000.000.02V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
0000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
0000Storage Area [veh]
NoFlared Lane
StopStopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop2KOA Corporation
Build Out (2040) w/o CP w/ PVersion 4.00-03
Generated with
0.007Volume to Capacity (v/c):
BLevel Of Service:
10.4Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 2: Afton Road / I-15 EB Ramp
Intersection Level Of Service Report
NoNoNoNoCrosswalk
0.000.000.000.00Grade [%]
30.0030.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Name
Intersection Setup
0000Pedestrian Volume [ped/h]
000103530242112280Total Analysis Volume [veh/h]
00026110612870Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
1.00001.00001.00000.95000.95000.95001.00000.95000.95000.95000.95001.0000Peak Hour Factor
00098530232106270Total Hourly Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
0009200023098250Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
000653002820Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop3KOA Corporation
Build Out (2040) w/o CP w/ PVersion 4.00-03
Generated with
BIntersection LOS
3.64d_I, Intersection Delay [s/veh]
AAAAApproach LOS
0.008.940.580.00d_A, Approach Delay [s/veh]
0.000.000.009.079.079.070.001.381.380.000.000.0095th-Percentile Queue Length [ft]
0.000.000.000.360.360.360.000.060.060.000.000.0095th-Percentile Queue Length [veh]
ABAAAAAMovement LOS
0.000.000.008.8510.409.590.000.007.500.000.000.00d_M, Delay for Movement [s/veh]
0.000.000.000.100.010.000.000.000.000.000.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
0000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
0000Storage Area [veh]
NoFlared Lane
StopStopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop4KOA Corporation
Build Out (2040) w/o CP w/ PVersion 4.00-03
Generated with
0.116Volume to Capacity (v/c):
ALevel Of Service:
9.6Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 3: Afton Road / Project Driveway 1
Intersection Level Of Service Report
NoNoNoCrosswalk
0.000.000.00Grade [%]
30.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.00Lane Width [ft]
RightLeftRightThruThruLeftTurning Movement
Lane Configuration
EastboundSouthboundNorthboundApproach
Name
Intersection Setup
000Pedestrian Volume [ped/h]
01039727320Total Analysis Volume [veh/h]
02624780Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.95000.95000.95000.95000.95000.9500Peak Hour Factor
0989226300Total Hourly Volume [veh/h]
000000Other Volume [veh/h]
000000Existing Site Adjustment Volume [veh/h]
000000Pass-by Trips [veh/h]
000000Diverted Trips [veh/h]
0989223250Site-Generated Trips [veh/h]
000000In-Process Volume [veh/h]
1.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
000350Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop5KOA Corporation
Build Out (2040) w/o CP w/ PVersion 4.00-03
Generated with
AIntersection LOS
3.81d_I, Intersection Delay [s/veh]
AAAApproach LOS
9.570.000.00d_A, Approach Delay [s/veh]
9.789.780.000.000.000.0095th-Percentile Queue Length [ft]
0.390.390.000.000.000.0095th-Percentile Queue Length [veh]
AAAAAAMovement LOS
9.189.570.000.000.007.46d_M, Delay for Movement [s/veh]
0.000.120.000.000.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
000Storage Area [veh]
NoFlared Lane
StopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop6KOA Corporation
Build Out (2040) w/o CP w/ PVersion 4.00-03
Generated with
0.026Volume to Capacity (v/c):
ALevel Of Service:
8.7Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 4: Afton Road / Project Driveway 2
Intersection Level Of Service Report
NoNoNoCrosswalk
0.000.000.00Grade [%]
30.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.00Lane Width [ft]
RightLeftRightThruThruLeftTurning Movement
Lane Configuration
EastboundSouthboundNorthboundApproach
Name
Intersection Setup
000Pedestrian Volume [ped/h]
02624350Total Analysis Volume [veh/h]
076110Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.95000.95000.95000.95000.95000.9500Peak Hour Factor
02523350Total Hourly Volume [veh/h]
000000Other Volume [veh/h]
000000Existing Site Adjustment Volume [veh/h]
000000Pass-by Trips [veh/h]
000000Diverted Trips [veh/h]
02523000Site-Generated Trips [veh/h]
000000In-Process Volume [veh/h]
1.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
000350Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop7KOA Corporation
Build Out (2040) w/o CP w/ PVersion 4.00-03
Generated with
AIntersection LOS
3.90d_I, Intersection Delay [s/veh]
AAAApproach LOS
8.710.000.00d_A, Approach Delay [s/veh]
2.012.010.000.000.000.0095th-Percentile Queue Length [ft]
0.080.080.000.000.000.0095th-Percentile Queue Length [veh]
AAAAAAMovement LOS
8.488.710.000.000.007.27d_M, Delay for Movement [s/veh]
0.000.030.000.000.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
000Storage Area [veh]
NoFlared Lane
StopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop8KOA Corporation
Build Out Year (2040) Friday w/ CP w/ PVersion 4.00-03
Generated with
0.060Volume to Capacity (v/c):
CLevel Of Service:
16.6Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 1: Afton Road / I-15 WB Ramp
Intersection Level Of Service Report
NoNoNoNoCrosswalk
0.000.000.000.00Grade [%]
30.0030.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Name
Intersection Setup
0000Pedestrian Volume [ped/h]
19824240001961770018228Total Analysis Volume [veh/h]
4966000494400467Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.95000.95000.95001.00001.00001.00000.95000.95001.00001.00000.95000.9500Peak Hour Factor
18823230001861680017327Total Hourly Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
1700230001671660017025Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
182300001920032Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop1KOA Corporation
Build Out Year (2040) Friday w/ CP w/ PVersion 4.00-03
Generated with
CIntersection LOS
4.01d_I, Intersection Delay [s/veh]
BAAAApproach LOS
12.590.000.001.08d_A, Approach Delay [s/veh]
38.0638.0638.060.000.000.000.000.000.000.0016.0616.0695th-Percentile Queue Length [ft]
1.521.521.520.000.000.000.000.000.000.000.640.6495th-Percentile Queue Length [veh]
BCCAAAAMovement LOS
11.7716.6315.370.000.000.000.000.000.000.000.008.11d_M, Delay for Movement [s/veh]
0.230.060.050.000.000.000.000.000.000.000.000.02V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
0000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
0000Storage Area [veh]
NoFlared Lane
StopStopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop2KOA Corporation
Build Out Year (2040) Friday w/ CP w/ PVersion 4.00-03
Generated with
0.012Volume to Capacity (v/c):
CLevel Of Service:
20.1Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 2: Afton Road / I-15 EB Ramp
Intersection Level Of Service Report
NoNoNoNoCrosswalk
0.000.000.000.00Grade [%]
30.0030.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Name
Intersection Setup
0000Pedestrian Volume [ped/h]
0001035182024177112280Total Analysis Volume [veh/h]
0002614606442870Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
1.00001.00001.00000.95000.95000.95001.00000.95000.95000.95000.95001.0000Peak Hour Factor
000985173023168106270Total Hourly Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
00092017002316698250Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
000653002820Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop3KOA Corporation
Build Out Year (2040) Friday w/ CP w/ PVersion 4.00-03
Generated with
CIntersection LOS
10.23d_I, Intersection Delay [s/veh]
ACAAApproach LOS
0.0017.486.910.00d_A, Approach Delay [s/veh]
0.000.000.0070.8070.8070.800.0012.1012.100.000.000.0095th-Percentile Queue Length [ft]
0.000.000.002.832.832.830.000.480.480.000.000.0095th-Percentile Queue Length [veh]
BCCAAAAMovement LOS
0.000.000.0014.6320.1219.020.000.007.840.000.000.00d_M, Delay for Movement [s/veh]
0.000.000.000.100.010.390.000.000.120.000.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
0000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
0000Storage Area [veh]
NoFlared Lane
StopStopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop4KOA Corporation
Build Out Year (2040) Friday w/ CP w/ PVersion 4.00-03
Generated with
0.116Volume to Capacity (v/c):
ALevel Of Service:
9.6Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 3: Afton Road / Project Driveway 1
Intersection Level Of Service Report
NoNoNoCrosswalk
0.000.000.00Grade [%]
30.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.00Lane Width [ft]
RightLeftRightThruThruLeftTurning Movement
Lane Configuration
EastboundSouthboundNorthboundApproach
Name
Intersection Setup
000Pedestrian Volume [ped/h]
01039727320Total Analysis Volume [veh/h]
02624780Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.95000.95000.95000.95000.95000.9500Peak Hour Factor
0989226300Total Hourly Volume [veh/h]
000000Other Volume [veh/h]
000000Existing Site Adjustment Volume [veh/h]
000000Pass-by Trips [veh/h]
000000Diverted Trips [veh/h]
0989223250Site-Generated Trips [veh/h]
000000In-Process Volume [veh/h]
1.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
000350Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop5KOA Corporation
Build Out Year (2040) Friday w/ CP w/ PVersion 4.00-03
Generated with
AIntersection LOS
3.81d_I, Intersection Delay [s/veh]
AAAApproach LOS
9.570.000.00d_A, Approach Delay [s/veh]
9.789.780.000.000.000.0095th-Percentile Queue Length [ft]
0.390.390.000.000.000.0095th-Percentile Queue Length [veh]
AAAAAAMovement LOS
9.189.570.000.000.007.46d_M, Delay for Movement [s/veh]
0.000.120.000.000.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
000Storage Area [veh]
NoFlared Lane
StopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop6KOA Corporation
Build Out Year (2040) Friday w/ CP w/ PVersion 4.00-03
Generated with
0.026Volume to Capacity (v/c):
ALevel Of Service:
8.7Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 4: Afton Road / Project Driveway 2
Intersection Level Of Service Report
NoNoNoCrosswalk
0.000.000.00Grade [%]
30.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.00Lane Width [ft]
RightLeftRightThruThruLeftTurning Movement
Lane Configuration
EastboundSouthboundNorthboundApproach
Name
Intersection Setup
000Pedestrian Volume [ped/h]
02624350Total Analysis Volume [veh/h]
076110Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.95000.95000.95000.95000.95000.9500Peak Hour Factor
02523350Total Hourly Volume [veh/h]
000000Other Volume [veh/h]
000000Existing Site Adjustment Volume [veh/h]
000000Pass-by Trips [veh/h]
000000Diverted Trips [veh/h]
02523000Site-Generated Trips [veh/h]
000000In-Process Volume [veh/h]
1.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
000350Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop7KOA Corporation
Build Out Year (2040) Friday w/ CP w/ PVersion 4.00-03
Generated with
AIntersection LOS
3.90d_I, Intersection Delay [s/veh]
AAAApproach LOS
8.710.000.00d_A, Approach Delay [s/veh]
2.012.010.000.000.000.0095th-Percentile Queue Length [ft]
0.080.080.000.000.000.0095th-Percentile Queue Length [veh]
AAAAAAMovement LOS
8.488.710.000.000.007.27d_M, Delay for Movement [s/veh]
0.000.030.000.000.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
000Storage Area [veh]
NoFlared Lane
StopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop8KOA Corporation
Build Out (2040) without CP without PVersion 4.00-03
Generated with
0.008Volume to Capacity (v/c):
BLevel Of Service:
10.2Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 1: Afton Road / I-15 WB Ramp
Intersection Level Of Service Report
NoNoNoNoCrosswalk
0.000.000.000.00Grade [%]
30.0030.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Name
Intersection Setup
0000Pedestrian Volume [ped/h]
1960000227800802Total Analysis Volume [veh/h]
52000061900201Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.95000.95000.95001.00001.00001.00000.95000.95001.00001.00000.95000.9500Peak Hour Factor
1860000217400762Total Hourly Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
000000000000Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
1860000217400762Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop1KOA Corporation
Build Out (2040) without CP without PVersion 4.00-03
Generated with
BIntersection LOS
1.17d_I, Intersection Delay [s/veh]
AAAAApproach LOS
9.120.000.000.18d_A, Approach Delay [s/veh]
2.152.152.150.000.000.000.000.000.000.004.364.3695th-Percentile Queue Length [ft]
0.090.090.090.000.000.000.000.000.000.000.170.1795th-Percentile Queue Length [veh]
ABAAAAAMovement LOS
8.7910.199.680.000.000.000.000.000.000.000.007.42d_M, Delay for Movement [s/veh]
0.020.010.000.000.000.000.000.000.000.000.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
0000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
0000Storage Area [veh]
NoFlared Lane
StopStopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop2KOA Corporation
Build Out (2040) without CP without PVersion 4.00-03
Generated with
0.009Volume to Capacity (v/c):
BLevel Of Service:
10.8Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 2: Afton Road / I-15 EB Ramp
Intersection Level Of Service Report
NoNoNoNoCrosswalk
0.000.000.000.00Grade [%]
30.0030.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Name
Intersection Setup
0000Pedestrian Volume [ped/h]
00036810376500Total Analysis Volume [veh/h]
00012200119100Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
1.00001.00001.00000.95000.95000.95001.00000.95000.95000.95000.95001.0000Peak Hour Factor
00036770372500Total Hourly Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
000000000000Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
00036770372500Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop3KOA Corporation
Build Out (2040) without CP without PVersion 4.00-03
Generated with
BIntersection LOS
8.49d_I, Intersection Delay [s/veh]
ABAAApproach LOS
0.0010.217.060.00d_A, Approach Delay [s/veh]
0.000.000.009.739.739.730.003.853.850.000.000.0095th-Percentile Queue Length [ft]
0.000.000.000.390.390.390.000.150.150.000.000.0095th-Percentile Queue Length [veh]
ABBAAAAMovement LOS
0.000.000.008.9310.7610.220.000.007.340.000.000.00d_M, Delay for Movement [s/veh]
0.000.000.000.000.010.100.000.000.050.000.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
0000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
0000Storage Area [veh]
NoFlared Lane
StopStopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop4KOA Corporation
Build Out (2040) without CP without PVersion 4.00-03
Generated with
0.003Volume to Capacity (v/c):
ALevel Of Service:
8.6Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 3: Afton Road / Project Driveway 1
Intersection Level Of Service Report
NoNoNoCrosswalk
0.000.000.00Grade [%]
30.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.00Lane Width [ft]
RightLeftRightThruThruLeftTurning Movement
Lane Configuration
EastboundSouthboundNorthboundApproach
Name
Intersection Setup
000Pedestrian Volume [ped/h]
033230Total Analysis Volume [veh/h]
011110Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.95000.95000.95000.95000.95000.9500Peak Hour Factor
033230Total Hourly Volume [veh/h]
000000Other Volume [veh/h]
000000Existing Site Adjustment Volume [veh/h]
000000Pass-by Trips [veh/h]
000000Diverted Trips [veh/h]
000000Site-Generated Trips [veh/h]
000000In-Process Volume [veh/h]
1.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
033230Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop5KOA Corporation
Build Out (2040) without CP without PVersion 4.00-03
Generated with
AIntersection LOS
2.33d_I, Intersection Delay [s/veh]
AAAApproach LOS
8.560.000.00d_A, Approach Delay [s/veh]
0.220.220.000.000.000.0095th-Percentile Queue Length [ft]
0.010.010.000.000.000.0095th-Percentile Queue Length [veh]
AAAAAAMovement LOS
8.348.560.000.000.007.23d_M, Delay for Movement [s/veh]
0.000.000.000.000.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
000Storage Area [veh]
NoFlared Lane
StopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop6KOA Corporation
Build Out (2040) without CP without PVersion 4.00-03
Generated with
0.003Volume to Capacity (v/c):
ALevel Of Service:
8.6Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 4: Afton Road / Project Driveway 2
Intersection Level Of Service Report
NoNoNoCrosswalk
0.000.000.00Grade [%]
30.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.00Lane Width [ft]
RightLeftRightThruThruLeftTurning Movement
Lane Configuration
EastboundSouthboundNorthboundApproach
Name
Intersection Setup
000Pedestrian Volume [ped/h]
033230Total Analysis Volume [veh/h]
011110Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.95000.95000.95000.95000.95000.9500Peak Hour Factor
033230Total Hourly Volume [veh/h]
000000Other Volume [veh/h]
000000Existing Site Adjustment Volume [veh/h]
000000Pass-by Trips [veh/h]
000000Diverted Trips [veh/h]
000000Site-Generated Trips [veh/h]
000000In-Process Volume [veh/h]
1.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
033230Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop7KOA Corporation
Build Out (2040) without CP without PVersion 4.00-03
Generated with
AIntersection LOS
2.33d_I, Intersection Delay [s/veh]
AAAApproach LOS
8.560.000.00d_A, Approach Delay [s/veh]
0.220.220.000.000.000.0095th-Percentile Queue Length [ft]
0.010.010.000.000.000.0095th-Percentile Queue Length [veh]
AAAAAAMovement LOS
8.348.560.000.000.007.23d_M, Delay for Movement [s/veh]
0.000.000.000.000.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
000Storage Area [veh]
NoFlared Lane
StopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop8KOA Corporation
Build Out Year (2040) w/ CP w/o PVersion 4.00-03
Generated with
0.019Volume to Capacity (v/c):
CLevel Of Service:
18.3Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 1: Afton Road / I-15 WB Ramp
Intersection Level Of Service Report
NoNoNoNoCrosswalk
0.000.000.000.00Grade [%]
30.0030.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Name
Intersection Setup
0000Pedestrian Volume [ped/h]
21860000225281002792Total Analysis Volume [veh/h]
5420000567000701Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.95000.95000.95001.00001.00001.00000.95000.95001.00001.00000.95000.9500Peak Hour Factor
20760000214267002652Total Hourly Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
18900000193193001890Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
1860000217400762Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop1KOA Corporation
Build Out Year (2040) w/ CP w/o PVersion 4.00-03
Generated with
CIntersection LOS
2.69d_I, Intersection Delay [s/veh]
BAAAApproach LOS
12.060.000.000.06d_A, Approach Delay [s/veh]
32.3432.3432.340.000.000.000.000.000.000.0026.8026.8095th-Percentile Queue Length [ft]
1.291.291.290.000.000.000.000.000.000.001.071.0795th-Percentile Queue Length [veh]
BCCAAAAMovement LOS
11.8818.3216.970.000.000.000.000.000.000.000.008.41d_M, Delay for Movement [s/veh]
0.290.020.000.000.000.000.000.000.000.000.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
0000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
0000Storage Area [veh]
NoFlared Lane
StopStopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop2KOA Corporation
Build Out Year (2040) w/ CP w/o PVersion 4.00-03
Generated with
0.017Volume to Capacity (v/c):
ELevel Of Service:
39.4Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 2: Afton Road / I-15 EB Ramp
Intersection Level Of Service Report
NoNoNoNoCrosswalk
0.000.000.000.00Grade [%]
30.0030.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Name
Intersection Setup
0000Pedestrian Volume [ped/h]
0003628003279500Total Analysis Volume [veh/h]
00012700170100Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
1.00001.00001.00000.95000.95000.95001.00000.95000.95000.95000.95001.0000Peak Hour Factor
0003626603265500Total Hourly Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
0000018900193000Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
00036770372500Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop3KOA Corporation
Build Out Year (2040) w/ CP w/o PVersion 4.00-03
Generated with
EIntersection LOS
23.18d_I, Intersection Delay [s/veh]
AEAAApproach LOS
0.0038.787.610.00d_A, Approach Delay [s/veh]
0.000.000.00153.78153.78153.780.0015.7915.790.000.000.0095th-Percentile Queue Length [ft]
0.000.000.006.156.156.150.000.630.630.000.000.0095th-Percentile Queue Length [veh]
DEEAAAAMovement LOS
0.000.000.0032.6639.3738.840.000.007.690.000.000.00d_M, Delay for Movement [s/veh]
0.000.000.000.000.020.740.000.000.170.000.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
0000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
0000Storage Area [veh]
NoFlared Lane
StopStopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop4KOA Corporation
Build Out Year (2040) w/ CP w/o PVersion 4.00-03
Generated with
0.003Volume to Capacity (v/c):
ALevel Of Service:
8.6Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 3: Afton Road / Project Driveway 1
Intersection Level Of Service Report
NoNoNoCrosswalk
0.000.000.00Grade [%]
30.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.00Lane Width [ft]
RightLeftRightThruThruLeftTurning Movement
Lane Configuration
EastboundSouthboundNorthboundApproach
Name
Intersection Setup
000Pedestrian Volume [ped/h]
033230Total Analysis Volume [veh/h]
011110Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.95000.95000.95000.95000.95000.9500Peak Hour Factor
033230Total Hourly Volume [veh/h]
000000Other Volume [veh/h]
000000Existing Site Adjustment Volume [veh/h]
000000Pass-by Trips [veh/h]
000000Diverted Trips [veh/h]
000000Site-Generated Trips [veh/h]
000000In-Process Volume [veh/h]
1.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
033230Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop5KOA Corporation
Build Out Year (2040) w/ CP w/o PVersion 4.00-03
Generated with
AIntersection LOS
2.33d_I, Intersection Delay [s/veh]
AAAApproach LOS
8.560.000.00d_A, Approach Delay [s/veh]
0.220.220.000.000.000.0095th-Percentile Queue Length [ft]
0.010.010.000.000.000.0095th-Percentile Queue Length [veh]
AAAAAAMovement LOS
8.348.560.000.000.007.23d_M, Delay for Movement [s/veh]
0.000.000.000.000.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
000Storage Area [veh]
NoFlared Lane
StopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop6KOA Corporation
Build Out Year (2040) w/ CP w/o PVersion 4.00-03
Generated with
0.003Volume to Capacity (v/c):
ALevel Of Service:
8.6Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 4: Afton Road / Project Driveway 2
Intersection Level Of Service Report
NoNoNoCrosswalk
0.000.000.00Grade [%]
30.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.00Lane Width [ft]
RightLeftRightThruThruLeftTurning Movement
Lane Configuration
EastboundSouthboundNorthboundApproach
Name
Intersection Setup
000Pedestrian Volume [ped/h]
033230Total Analysis Volume [veh/h]
011110Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.95000.95000.95000.95000.95000.9500Peak Hour Factor
033230Total Hourly Volume [veh/h]
000000Other Volume [veh/h]
000000Existing Site Adjustment Volume [veh/h]
000000Pass-by Trips [veh/h]
000000Diverted Trips [veh/h]
000000Site-Generated Trips [veh/h]
000000In-Process Volume [veh/h]
1.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
033230Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop7KOA Corporation
Build Out Year (2040) w/ CP w/o PVersion 4.00-03
Generated with
AIntersection LOS
2.33d_I, Intersection Delay [s/veh]
AAAApproach LOS
8.560.000.00d_A, Approach Delay [s/veh]
0.220.220.000.000.000.0095th-Percentile Queue Length [ft]
0.010.010.000.000.000.0095th-Percentile Queue Length [veh]
AAAAAAMovement LOS
8.348.560.000.000.007.23d_M, Delay for Movement [s/veh]
0.000.000.000.000.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
000Storage Area [veh]
NoFlared Lane
StopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop8KOA Corporation
Build Out (2040) without CP with PVersion 4.00-03
Generated with
0.012Volume to Capacity (v/c):
BLevel Of Service:
13.8Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 1: Afton Road / I-15 WB Ramp
Intersection Level Of Service Report
NoNoNoNoCrosswalk
0.000.000.000.00Grade [%]
30.0030.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Name
Intersection Setup
0000Pedestrian Volume [ped/h]
19610000022780080105Total Analysis Volume [veh/h]
5225000619002026Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.95000.95000.95001.00001.00001.00000.95000.95001.00001.00000.95000.9500Peak Hour Factor
1869500021740076100Total Hourly Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
00950000000098Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
1860000217400762Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop1KOA Corporation
Build Out (2040) without CP with PVersion 4.00-03
Generated with
BIntersection LOS
5.86d_I, Intersection Delay [s/veh]
BAAAApproach LOS
12.850.000.004.31d_A, Approach Delay [s/veh]
20.1920.1920.190.000.000.000.000.000.000.0010.5810.5895th-Percentile Queue Length [ft]
0.810.810.810.000.000.000.000.000.000.000.420.4295th-Percentile Queue Length [veh]
BBBAAAAMovement LOS
10.3513.8113.270.000.000.000.000.000.000.000.007.59d_M, Delay for Movement [s/veh]
0.020.010.180.000.000.000.000.000.000.000.000.07V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
0000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
0000Storage Area [veh]
NoFlared Lane
StopStopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop2KOA Corporation
Build Out (2040) without CP with PVersion 4.00-03
Generated with
0.012Volume to Capacity (v/c):
BLevel Of Service:
13.3Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 2: Afton Road / I-15 EB Ramp
Intersection Level Of Service Report
NoNoNoNoCrosswalk
0.000.000.000.00Grade [%]
30.0030.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Name
Intersection Setup
0000Pedestrian Volume [ped/h]
00028681010376311030Total Analysis Volume [veh/h]
0007220026198260Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
1.00001.00001.00000.95000.95000.95001.00000.95000.95000.95000.95001.0000Peak Hour Factor
000276770987229980Total Hourly Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
0002400095024980Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
00036770372500Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop3KOA Corporation
Build Out (2040) without CP with PVersion 4.00-03
Generated with
BIntersection LOS
4.62d_I, Intersection Delay [s/veh]
ABAAApproach LOS
0.0012.153.230.00d_A, Approach Delay [s/veh]
0.000.000.0016.9616.9616.960.0010.5310.530.000.000.0095th-Percentile Queue Length [ft]
0.000.000.000.680.680.680.000.420.420.000.000.0095th-Percentile Queue Length [veh]
BBBAAAAMovement LOS
0.000.000.0010.1113.3112.770.000.007.620.000.000.00d_M, Delay for Movement [s/veh]
0.000.000.000.030.010.140.000.000.050.000.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
0000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
0000Storage Area [veh]
NoFlared Lane
StopStopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop4KOA Corporation
Build Out (2040) without CP with PVersion 4.00-03
Generated with
0.119Volume to Capacity (v/c):
ALevel Of Service:
9.6Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 3: Afton Road / Project Driveway 1
Intersection Level Of Service Report
NoNoNoCrosswalk
0.000.000.00Grade [%]
30.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.00Lane Width [ft]
RightLeftRightThruThruLeftTurning Movement
Lane Configuration
EastboundSouthboundNorthboundApproach
Name
Intersection Setup
000Pedestrian Volume [ped/h]
010610327280Total Analysis Volume [veh/h]
02726770Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.95000.95000.95000.95000.95000.9500Peak Hour Factor
01019826270Total Hourly Volume [veh/h]
000000Other Volume [veh/h]
000000Existing Site Adjustment Volume [veh/h]
000000Pass-by Trips [veh/h]
000000Diverted Trips [veh/h]
0989524240Site-Generated Trips [veh/h]
000000In-Process Volume [veh/h]
1.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
033230Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop5KOA Corporation
Build Out (2040) without CP with PVersion 4.00-03
Generated with
AIntersection LOS
3.85d_I, Intersection Delay [s/veh]
AAAApproach LOS
9.580.000.00d_A, Approach Delay [s/veh]
10.0810.080.000.000.000.0095th-Percentile Queue Length [ft]
0.400.400.000.000.000.0095th-Percentile Queue Length [veh]
AAAAAAMovement LOS
9.219.580.000.000.007.47d_M, Delay for Movement [s/veh]
0.000.120.000.000.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
000Storage Area [veh]
NoFlared Lane
StopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop6KOA Corporation
Build Out (2040) without CP with PVersion 4.00-03
Generated with
0.028Volume to Capacity (v/c):
ALevel Of Service:
8.7Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 4: Afton Road / Project Driveway 2
Intersection Level Of Service Report
NoNoNoCrosswalk
0.000.000.00Grade [%]
30.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.00Lane Width [ft]
RightLeftRightThruThruLeftTurning Movement
Lane Configuration
EastboundSouthboundNorthboundApproach
Name
Intersection Setup
000Pedestrian Volume [ped/h]
02828230Total Analysis Volume [veh/h]
077110Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.95000.95000.95000.95000.95000.9500Peak Hour Factor
02727230Total Hourly Volume [veh/h]
000000Other Volume [veh/h]
000000Existing Site Adjustment Volume [veh/h]
000000Pass-by Trips [veh/h]
000000Diverted Trips [veh/h]
02424000Site-Generated Trips [veh/h]
000000In-Process Volume [veh/h]
1.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
033230Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop7KOA Corporation
Build Out (2040) without CP with PVersion 4.00-03
Generated with
AIntersection LOS
4.00d_I, Intersection Delay [s/veh]
AAAApproach LOS
8.710.000.00d_A, Approach Delay [s/veh]
2.162.160.000.000.000.0095th-Percentile Queue Length [ft]
0.090.090.000.000.000.0095th-Percentile Queue Length [veh]
AAAAAAMovement LOS
8.498.710.000.000.007.27d_M, Delay for Movement [s/veh]
0.000.030.000.000.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
000Storage Area [veh]
NoFlared Lane
StopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop8KOA Corporation
Build Out Year (2040) w/ CP w/ PVersion 4.00-03
Generated with
0.028Volume to Capacity (v/c):
ELevel Of Service:
40.4Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 1: Afton Road / I-15 WB Ramp
Intersection Level Of Service Report
NoNoNoNoCrosswalk
0.000.000.000.00Grade [%]
30.0030.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Name
Intersection Setup
0000Pedestrian Volume [ped/h]
218610000022528100279105Total Analysis Volume [veh/h]
542250005670007026Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.95000.95000.95001.00001.00001.00000.95000.95001.00001.00000.95000.9500Peak Hour Factor
20769500021426700265100Total Hourly Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
1890950001931930018998Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
1860000217400762Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop1KOA Corporation
Build Out Year (2040) w/ CP w/ PVersion 4.00-03
Generated with
EIntersection LOS
9.24d_I, Intersection Delay [s/veh]
DAAAApproach LOS
31.780.000.002.40d_A, Approach Delay [s/veh]
144.80144.80144.800.000.000.000.000.000.000.0041.8541.8595th-Percentile Queue Length [ft]
5.795.795.790.000.000.000.000.000.000.001.671.6795th-Percentile Queue Length [veh]
DEEAAAAMovement LOS
28.4440.3938.560.000.000.000.000.000.000.000.008.77d_M, Delay for Movement [s/veh]
0.290.030.410.000.000.000.000.000.000.000.000.10V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
0000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
0000Storage Area [veh]
NoFlared Lane
StopStopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop2KOA Corporation
Build Out Year (2040) w/ CP w/ PVersion 4.00-03
Generated with
0.024Volume to Capacity (v/c):
FLevel Of Service:
129.2Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 2: Afton Road / I-15 EB Ramp
Intersection Level Of Service Report
NoNoNoNoCrosswalk
0.000.000.000.00Grade [%]
30.0030.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Name
Intersection Setup
0000Pedestrian Volume [ped/h]
0002862800103279311030Total Analysis Volume [veh/h]
0007270026708260Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
1.00001.00001.00000.95000.95000.95001.00000.95000.95000.95000.95001.0000Peak Hour Factor
00027626609826529980Total Hourly Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
00024018909519324980Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
00036770372500Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop3KOA Corporation
Build Out Year (2040) w/ CP w/ PVersion 4.00-03
Generated with
FIntersection LOS
51.09d_I, Intersection Delay [s/veh]
AFAAApproach LOS
0.00127.875.900.00d_A, Approach Delay [s/veh]
0.000.000.00326.63326.63326.630.0026.6026.600.000.000.0095th-Percentile Queue Length [ft]
0.000.000.0013.0713.0713.070.001.061.060.000.000.0095th-Percentile Queue Length [veh]
FFFAAAAMovement LOS
0.000.000.00118.87129.22128.750.000.008.070.000.000.00d_M, Delay for Movement [s/veh]
0.000.000.000.030.021.060.000.000.190.000.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
0000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
0000Storage Area [veh]
NoFlared Lane
StopStopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop4KOA Corporation
Build Out Year (2040) w/ CP w/ PVersion 4.00-03
Generated with
0.119Volume to Capacity (v/c):
ALevel Of Service:
9.6Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 3: Afton Road / Project Driveway 1
Intersection Level Of Service Report
NoNoNoCrosswalk
0.000.000.00Grade [%]
30.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.00Lane Width [ft]
RightLeftRightThruThruLeftTurning Movement
Lane Configuration
EastboundSouthboundNorthboundApproach
Name
Intersection Setup
000Pedestrian Volume [ped/h]
010610327280Total Analysis Volume [veh/h]
02726770Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.95000.95000.95000.95000.95000.9500Peak Hour Factor
01019826270Total Hourly Volume [veh/h]
000000Other Volume [veh/h]
000000Existing Site Adjustment Volume [veh/h]
000000Pass-by Trips [veh/h]
000000Diverted Trips [veh/h]
0989524240Site-Generated Trips [veh/h]
000000In-Process Volume [veh/h]
1.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
033230Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop5KOA Corporation
Build Out Year (2040) w/ CP w/ PVersion 4.00-03
Generated with
AIntersection LOS
3.85d_I, Intersection Delay [s/veh]
AAAApproach LOS
9.580.000.00d_A, Approach Delay [s/veh]
10.0810.080.000.000.000.0095th-Percentile Queue Length [ft]
0.400.400.000.000.000.0095th-Percentile Queue Length [veh]
AAAAAAMovement LOS
9.219.580.000.000.007.47d_M, Delay for Movement [s/veh]
0.000.120.000.000.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
000Storage Area [veh]
NoFlared Lane
StopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop6KOA Corporation
Build Out Year (2040) w/ CP w/ PVersion 4.00-03
Generated with
0.028Volume to Capacity (v/c):
ALevel Of Service:
8.7Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 4: Afton Road / Project Driveway 2
Intersection Level Of Service Report
NoNoNoCrosswalk
0.000.000.00Grade [%]
30.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.00Lane Width [ft]
RightLeftRightThruThruLeftTurning Movement
Lane Configuration
EastboundSouthboundNorthboundApproach
Name
Intersection Setup
000Pedestrian Volume [ped/h]
02828230Total Analysis Volume [veh/h]
077110Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.95000.95000.95000.95000.95000.9500Peak Hour Factor
02727230Total Hourly Volume [veh/h]
000000Other Volume [veh/h]
000000Existing Site Adjustment Volume [veh/h]
000000Pass-by Trips [veh/h]
000000Diverted Trips [veh/h]
02424000Site-Generated Trips [veh/h]
000000In-Process Volume [veh/h]
1.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
033230Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop7KOA Corporation
Build Out Year (2040) w/ CP w/ PVersion 4.00-03
Generated with
AIntersection LOS
4.00d_I, Intersection Delay [s/veh]
AAAApproach LOS
8.710.000.00d_A, Approach Delay [s/veh]
2.162.160.000.000.000.0095th-Percentile Queue Length [ft]
0.090.090.000.000.000.0095th-Percentile Queue Length [veh]
AAAAAAMovement LOS
8.498.710.000.000.007.27d_M, Delay for Movement [s/veh]
0.000.030.000.000.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
000Storage Area [veh]
NoFlared Lane
StopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop8KOA Corporation
APPENDIX F
Trip Generation Data
Flying J Travel Plaza2611 Fisher Blvd, Barstow, CA
Thursday, May 01, 2008
Time In Out In Out In Out In Out Time In Out In Out In Out In Out7:00 0 0 0 0 0 0 21 23 16:00 0 0 0 0 1 0 20 177:15 1 1 0 0 1 0 10 12 16:15 0 0 0 0 1 0 16 187:30 0 0 0 1 0 1 11 20 16:30 0 0 0 0 0 1 14 147:45 0 0 0 1 0 0 8 14 16:45 0 0 0 0 0 0 10 188:00 0 0 0 0 0 1 10 16 17:00 1 0 0 0 0 1 22 148:15 1 1 0 0 0 0 13 17 17:15 0 0 0 0 0 0 28 218:30 0 0 0 0 0 0 18 16 17:30 0 0 0 0 0 0 16 188:45 0 0 0 0 0 0 17 16 17:45 0 0 0 0 1 0 20 12Total 2 2 0 2 1 2 108 134 Total 1 0 0 0 3 2 146 132
Time In Out In Out In Out In Out Time In Out In Out In Out In Out7:00 10 10 0 1 1 0 0 0 16:00 16 14 1 1 0 0 0 07:15 6 7 5 1 0 1 0 1 16:15 12 15 3 1 1 0 0 17:30 7 6 0 3 0 0 0 0 16:30 12 10 2 2 1 0 0 07:45 6 4 0 3 2 0 0 0 16:45 11 14 2 4 1 0 0 08:00 7 4 2 4 0 0 0 1 17:00 20 14 1 0 0 0 0 08:15 7 8 0 1 0 0 0 0 17:15 17 16 1 4 0 0 0 08:30 7 10 0 0 0 0 0 0 17:30 14 14 4 1 0 1 0 08:45 3 5 1 0 0 0 0 0 17:45 16 22 2 2 0 0 0 0Total 53 54 8 13 3 1 0 2 Total 118 119 16 15 3 1 0 1
Time In Out In Out In Out In Out Time In Out In Out In Out In Out7:00 4 3 0 0 0 0 0 0 16:00 5 2 0 0 0 1 0 07:15 3 3 0 0 0 0 1 0 16:15 2 2 0 0 0 0 0 07:30 2 5 0 0 0 0 0 0 16:30 5 4 0 0 0 0 0 07:45 4 2 0 0 0 0 0 0 16:45 1 4 1 1 0 0 0 08:00 1 4 0 0 0 0 2 1 17:00 3 5 0 0 0 0 0 08:15 1 5 0 0 0 0 0 0 17:15 4 5 0 0 0 0 0 08:30 4 2 0 0 0 0 1 0 17:30 1 4 1 3 0 0 0 08:45 2 5 0 0 0 0 0 0 17:45 7 7 1 0 0 0 0 0Total 21 29 0 0 0 0 4 1 Total 28 33 3 4 0 1 0 0
AM PMDriveway In Out In Out In Out In Out Driveway In Out In Out In Out In Out
1 2 2 0 2 1 2 108 134 1 1 0 0 0 3 2 146 1322 53 54 8 13 3 1 0 2 2 118 119 16 15 3 1 0 13 21 5 0 0 0 0 0 0 3 28 33 3 4 0 1 0 0
Sub-Total 76 61 8 15 4 3 108 136 Sub-Total 147 152 19 19 6 4 146 133Flying Total Total
acres 15square feet 653.4 per 1000 sqft
1 acre = 43560 square feet
Total In Out Total In OutAutos 0.21 0.12 0.09 0.46 0.22 0.23Trucks (2 axle) 0.04 0.01 0.02 0.06 0.03 0.03Trucks (3 axle) 0.01 0.01 0.00 0.02 0.01 0.01Trucks (4 axle) 0.37 0.17 0.21 0.43 0.22 0.20Total Trucks 0.42 0.18 0.24 0.50 0.26 0.24Total 0.63 0.30 0.33 0.96 0.49 0.47
Flying JAM Peak Hour PM Peak Hour
3 Axle Vehicles4+ Axle Trucks
4+ Axle Trucks
Passenger Vehicles
Large 2 Axle Vehicles
3 Axle Vehicles
Flying J Driveway Totals
4+ Axle Trucks
Passenger Vehicles
Large 2 Axle Vehicles
3 Axle Vehicles
137 23 7 244
Passenger VehiclesLarge 2 Axle
Vehicles
Passenger VehiclesLarge 2 Axle
Vehicles 3 Axle Vehicles4+ Axle Trucks
Passenger Vehicles
Driveway 1
4+ Axle Trucks
Large 2 Axle Vehicles
3 Axle Vehicles
4+ Axle Trucks
Passenger VehiclesLarge 2 Axle
Vehicles 3 Axle Vehicles4+ Axle Trucks
Large 2 Axle Vehicles
3 Axle Vehicles
Driveway 3
299 38 10 279
Driveway 2
4+ Axle Trucks
Passenger VehiclesLarge 2 Axle
Vehicles 3 Axle Vehicles
Passenger Vehicles
Pilot Travel Center 2591 Commerce Parkway Barstow, CA
Thursday, May 01, 2008
Time In Out In Out In Out In Out Time In Out In Out In Out In Out7:00 3 1 0 0 0 0 0 0 16:00 13 1 1 0 0 0 0 07:15 3 0 0 0 0 0 0 0 16:15 6 1 0 0 0 0 0 07:30 0 0 0 0 0 0 0 0 16:30 9 1 0 1 0 0 0 07:45 1 0 0 0 0 0 0 0 16:45 4 1 0 0 0 0 0 08:00 1 0 0 0 0 0 0 0 17:00 6 0 0 0 0 0 0 08:15 4 0 0 0 1 0 1 0 17:15 10 1 0 0 0 0 0 08:30 5 0 0 0 0 0 0 0 17:30 4 1 1 0 0 0 0 08:45 5 0 0 0 0 0 0 0 17:45 7 2 1 1 0 0 0 0Total 22 1 0 0 1 0 1 0 Total 59 8 3 2 0 0 0 0
Time In Out In Out In Out In Out Time In Out In Out In Out In Out7:00 4 7 1 2 0 0 0 0 16:00 3 18 0 0 0 0 0 07:15 2 7 0 0 0 0 0 0 16:15 3 8 1 1 0 0 0 07:30 1 2 0 0 1 0 0 0 16:30 3 13 0 0 0 0 0 07:45 5 7 0 0 0 0 0 0 16:45 4 9 0 0 0 0 0 08:00 3 7 0 0 0 0 0 0 17:00 1 7 0 0 0 0 0 08:15 0 7 0 0 0 1 0 0 17:15 2 17 0 0 0 0 0 08:30 3 6 0 0 0 0 0 0 17:30 1 14 0 0 0 0 0 08:45 1 4 0 0 0 0 0 0 17:45 1 4 0 0 0 0 0 0Total 19 47 1 2 1 1 0 0 Total 18 90 1 1 0 0 0 0
Time In Out In Out In Out In Out Time In Out In Out In Out In Out7:00 0 0 0 1 0 0 7 6 16:00 0 0 0 0 0 0 5 67:15 0 0 0 0 0 0 8 8 16:15 0 0 0 0 0 2 3 107:30 0 0 0 0 0 0 7 5 16:30 0 0 0 0 0 0 3 67:45 0 0 0 0 0 0 5 10 16:45 0 0 0 0 1 0 8 58:00 0 0 0 0 0 0 9 6 17:00 0 0 0 0 0 0 3 68:15 0 0 0 0 0 0 8 9 17:15 0 0 0 0 0 0 3 18:30 0 0 0 0 1 0 9 7 17:30 0 0 0 0 0 0 7 28:45 0 0 1 0 0 1 5 8 17:45 0 0 0 0 0 0 3 4Total 0 0 1 1 1 1 58 59 Total 0 0 0 0 1 2 35 40
AM PMDriveway In Out In Out In Out In Out Driveway In Out In Out In Out In Out
1 22 1 0 0 1 0 1 0 1 59 8 3 2 0 0 0 02 19 47 1 2 1 1 0 0 2 18 90 1 1 0 0 0 03 0 0 1 1 1 1 58 59 3 0 0 0 0 1 2 35 40
Total 41 48 2 3 3 2 59 59 Total 77 98 4 3 1 2 35 40Sum Sum
1 acre = 43560 square feet acres 3.8square feet 165.528 per 1000
Total In Out Total In OutAutos 0.54 0.25 0.29 1.06 0.47 0.59Trucks (2 axle) 0.03 0.01 0.02 0.04 0.02 0.02Trucks (3 axle) 0.03 0.02 0.01 0.02 0.01 0.01Trucks (4 axle) 0.71 0.36 0.36 0.45 0.21 0.24Total Trucks 0.77 0.39 0.39 0.51 0.24 0.27Total 1.31 0.63 0.68 1.57 0.71 0.86
89 5 75
4+ Axle Trucks
175 7 35 118
Pilot Driveway Totals
Passenger Vehicles
Large 2 Axle Vehicles 3 Axle Vehicles
4+ Axle TrucksPassenger Vehicles
Large 2 Axle Vehicles 3 Axle Vehicles
4+ Axle Trucks
Passenger Vehicles
4+ Axle Trucks 3 Axle Vehicles
4+ Axle Trucks
Large 2 Axle Vehicles
Driveway 1
3 Axle Vehicles
Driveway 2
Large 2 Axle Vehicles
Large 2 Axle Vehicles 3 Axle Vehicles
4+ Axle Trucks
Passenger VehiclesPassenger Vehicles
Large 2 Axle Vehicles 3 Axle VehiclesPassenger Vehicles
Large 2 Axle Vehicles 3 Axle Vehicles
PilotAM Peak Hour PM Peak Hour
4+ Axle Trucks
Driveway 3
Passenger VehiclesLarge 2 Axle
Vehicles 3 Axle Vehicles4+ Axle Trucks
Passenger Vehicles
Pilot Travel Center 8701 US Hwy 395, Oak Hills, CA
Thursday, May 01, 2008
Time In Out In Out In Out In Out Time In Out In Out In Out In Out7:00 28 32 1 2 2 3 6 9 16:00 32 36 1 0 0 1 5 37:15 30 26 3 1 1 1 6 5 16:15 26 28 1 3 0 0 6 27:30 34 30 0 3 1 3 4 7 16:30 20 34 2 3 1 0 6 27:45 15 23 0 0 1 0 5 5 16:45 38 29 1 2 0 1 9 18:00 20 25 2 1 2 0 3 2 17:00 35 34 1 1 0 0 11 68:15 28 29 1 1 0 2 3 4 17:15 29 32 4 2 0 0 6 28:30 17 25 2 3 1 0 7 5 17:30 35 35 1 1 0 0 4 48:45 14 17 1 2 1 1 8 5 17:45 35 25 1 2 4 1 4 1Total 186 207 10 13 9 10 42 42 Total 250 253 12 14 5 3 51 21
Time In Out In Out In Out In Out Time In Out In Out In Out In Out7:00 1 1 0 0 2 1 13 14 16:00 2 2 1 1 0 2 16 77:15 0 1 1 0 0 1 9 24 16:15 3 3 1 0 1 0 9 117:30 3 1 0 0 0 1 10 19 16:30 4 3 0 1 1 2 19 137:45 2 1 0 0 1 0 18 12 16:45 5 2 0 0 0 1 13 118:00 6 7 0 0 0 0 8 23 17:00 5 1 0 1 1 0 10 148:15 0 5 0 0 0 4 10 15 17:15 0 1 0 0 1 1 11 198:30 0 0 0 0 0 0 16 11 17:30 2 4 1 1 0 0 8 78:45 2 4 1 0 3 0 7 17 17:45 2 0 0 0 0 0 3 5Total 14 20 2 0 6 7 91 135 Total 23 16 3 4 4 6 89 87
Time In Out In Out In Out In Out Time In Out In Out In Out In Out7:00 1 1 0 0 1 0 2 2 16:00 3 0 0 0 0 0 0 37:15 0 0 0 0 0 0 0 5 16:15 2 2 0 0 0 0 3 17:30 2 4 0 0 1 1 1 4 16:30 1 2 0 1 0 1 1 07:45 2 1 0 0 0 0 1 4 16:45 1 0 0 0 0 0 1 08:00 3 0 0 0 0 0 1 0 17:00 1 0 0 0 0 0 0 08:15 2 1 0 0 0 0 1 0 17:15 1 5 0 0 1 0 1 18:30 2 0 0 0 0 0 0 0 17:30 0 0 0 0 0 0 0 18:45 1 0 0 1 0 0 1 3 17:45 0 2 0 0 0 0 0 2Total 13 7 0 1 2 1 7 18 Total 9 11 0 1 1 1 6 8
Time In Out In Out In Out In Out Time In Out In Out In Out In Out7:00 1 0 0 0 0 0 0 0 16:00 1 0 0 0 0 0 0 07:15 0 0 0 0 0 0 1 0 16:15 0 0 0 0 0 0 0 07:30 0 0 0 0 0 0 0 0 16:30 0 0 0 0 0 0 0 07:45 0 0 0 0 0 0 0 0 16:45 0 0 0 0 0 0 0 08:00 0 0 0 0 0 0 1 1 17:00 1 0 0 0 0 0 0 18:15 0 0 0 0 0 0 1 0 17:15 0 0 0 0 0 0 1 08:30 0 0 0 0 0 0 0 1 17:30 1 0 0 0 0 0 0 18:45 0 0 0 0 0 0 0 0 17:45 0 0 0 0 0 0 0 0Total 1 0 0 0 0 0 3 2 Total 3 0 0 0 0 0 1 2
AM PMDriveway In Out In Out In Out In Out Driveway In Out In Out In Out In Out
1 186 207 10 13 9 10 42 42 1 250 253 12 14 5 3 51 212 14 20 2 0 6 7 91 135 2 23 16 3 4 4 6 89 873 13 7 0 1 2 1 7 18 3 9 11 0 1 1 1 6 84 1 0 0 0 0 0 3 2 4 3 0 0 0 0 0 1 2
Total 214 234 12 14 17 18 143 197 Total 285 280 15 19 10 10 147 118sum sum
acres 22.831 acre = 43560 square feet square feet 994.4748 per 1000
Total In Out Total In OutAutos 0.450 0.215 0.235 0.568 0.287 0.282Trucks (2 axle) 0.026 0.012 0.014 0.034 0.015 0.019Trucks (3 axle) 0.035 0.017 0.018 0.020 0.010 0.010Trucks (4 axle) 0.342 0.144 0.198 0.266 0.148 0.119Total Trucks 0.403 0.173 0.230 0.321 0.173 0.148Total 0.854 0.388 0.466 0.889 0.460 0.429
265448 26 35 340 565 34 20
Oak Hills Trip Generation
Passenger Vehicles
Large 2 Axle Vehicles
3 Axle Vehicles 4+ Axle TrucksPassenger Vehicles
Large 2 Axle Vehicles 3 Axle Vehicles
4+ Axle Trucks
Passenger Vehicles
4+ Axle Trucks4+ Axle Trucks
Passenger Vehicles
Large 2 Axle Vehicles
3 Axle Vehicles
Passenger Vehicles
Large 2 Axle Vehicles
Large 2 Axle Vehicles
3 Axle Vehicles
3 Axle Vehicles 4+ Axle Trucks
Large 2 Axle Vehicles
Large 2 Axle Vehicles 3 Axle Vehicles
3 Axle Vehicles
Driveway 1
4+ Axle Trucks
Driveway 2
4+ Axle TrucksPassenger VehiclesLarge 2 Axle
Vehicles 3 Axle Vehicles4+ Axle Trucks
4+ Axle Trucks
Passenger Vehicles 4+ Axle Trucks
Driveway 3
Passenger Vehicles
Oak HillsAM Peak Hour PM Peak Hour
Passenger Vehicles
Large 2 Axle Vehicles
3 Axle Vehicles
Driveway 4
Passenger VehiclesLarge 2 Axle
Vehicles 3 Axle Vehicles
Total In Out Total In Out
Autos 0.21 0.12 0.09 0.46 0.22 0.23
Trucks (2 axle) 0.04 0.01 0.02 0.06 0.03 0.03
Trucks (3 axle) 0.01 0.01 0.00 0.02 0.01 0.01
Trucks (4 axle) 0.37 0.17 0.21 0.43 0.22 0.20
Total Trucks 0.42 0.18 0.24 0.50 0.26 0.24
Total 0.63 0.30 0.33 0.96 0.49 0.47
Total In Out Total In Out
Autos 0.54 0.25 0.29 1.06 0.47 0.59
Trucks (2 axle) 0.03 0.01 0.02 0.04 0.02 0.02
Trucks (3 axle) 0.03 0.02 0.01 0.02 0.01 0.01
Trucks (4 axle) 0.71 0.36 0.36 0.45 0.21 0.24
Total Trucks 0.77 0.39 0.39 0.51 0.24 0.27
Total 1.31 0.63 0.68 1.57 0.71 0.86
Total In Out Total In Out
Autos 0.45 0.22 0.24 0.57 0.29 0.28
Trucks (2 axle) 0.03 0.01 0.01 0.03 0.02 0.02
Trucks (3 axle) 0.04 0.02 0.02 0.02 0.01 0.01
Trucks (4 axle) 0.34 0.14 0.20 0.27 0.15 0.12
Total Trucks 0.40 0.17 0.23 0.32 0.17 0.15
Total 0.85 0.39 0.47 0.89 0.46 0.43
Total IN OUT Total IN OUT
Autos 0.40 0.19 0.21 0.69 0.33 0.37 Trucks (2 axle) 0.03 0.01 0.02 0.04 0.02 0.02
Trucks (3 axle) 0.03 0.01 0.01 0.02 0.01 0.01
Trucks (4 axle) 0.48 0.22 0.25 0.38 0.19 0.19
Total Trucks 0.53 0.25 0.28 0.44 0.23 0.22 Total 0.93 0.44 0.49 1.14 0.55 0.59
Truck Stop
123,424 sf
Project sq.ft 123.424
Averages
Total IN OUT Total IN OUT
Autos 49 24 25 86 40 46 Trucks (2 axle) 4 1 2 6 3 3 Trucks (3 axle) 3 2 1 2 1 1 Trucks (4 axle) 59 28 31 47 24 23 Total Trucks 66 31 35 55 28 27 Total 115 55 61 141 68 73
*****Daily will be10 times the PM
PM Peak Hour
PM Peak Hour
3 Site Trip Generation (Average)
Pilot
Flying J
Oak Hills
AM Peak Hour
PM Peak HourAM Peak Hour
AM Peak Hour
AM Peak Hour PM Peak Hour
Truck Stop Trip Generation
Friday Peak Hour Sunday Peak Hour
Averages
per 1000 sf
Project sq.ft 123.424 per 1000
Averages
Total IN OUT Total IN OUT
Autos 49 24 25 86 40 46 Trucks (2 axle) 4 2 2 6 3 3 Trucks (3 axle) 3 2 1 2 1 1 Trucks (4 axle) 59.0 28.0 31.0 47 24 23 Total Trucks 66 32 34 55 28 27 Total 115 56 59 141 68 73
Total In Out Total In Out
Autos 49 24 25 86 40 46
Trucks (2 ax - 1.5 PCE) 6 3 3 9 5 5
Trucks (3 ax - 2.0 PCE) 6 4 2 4 2 2
Trucks (4 ax - 3.0 PCE) 177 84 93 141 72 69
Total Trucks 189 91 98 154 79 76
Total 238 115 123 240 119 122
Daily 2400
Type
New Trip Rates for our Project, Modified for PCEs
Friday Peak Hour Sunday Peak Hour
Friday Peak Hour Sunday Peak Hour
*****Daily will be10 times the PM
Rounding adjustment
APPENDIX G
Queuing Analysis
Opening Year (2018) Friday w/ CP w/o PVersion 4.00-03
Generated with
0.036Volume to Capacity (v/c):
BLevel Of Service:
14.7Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 1: Afton Road / I-15 WB Ramp
Intersection Level Of Service Report
NoNoNoNoCrosswalk
0.000.000.000.00Grade [%]
30.0030.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Name
Intersection Setup
0000Pedestrian Volume [ped/h]
191160000188176001811Total Analysis Volume [veh/h]
4840000474400450Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.95000.95000.95001.00001.00001.00000.95000.95001.00001.00000.95000.9500Peak Hour Factor
181150000179167001721Total Hourly Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
17000000167166001700Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
111500001210021Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop1KOA Corporation
Opening Year (2018) Friday w/ CP w/o PVersion 4.00-03
Generated with
BIntersection LOS
3.04d_I, Intersection Delay [s/veh]
BAAAApproach LOS
11.030.000.000.04d_A, Approach Delay [s/veh]
25.6825.6825.680.000.000.000.000.000.000.0013.4213.4295th-Percentile Queue Length [ft]
1.031.031.030.000.000.000.000.000.000.000.540.5495th-Percentile Queue Length [veh]
BBBAAAAMovement LOS
10.7314.6513.520.000.000.000.000.000.000.000.008.02d_M, Delay for Movement [s/veh]
0.220.040.000.000.000.000.000.000.000.000.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
0000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
0000Storage Area [veh]
NoFlared Lane
StopStopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop2KOA Corporation
Opening Year (2018) Friday w/ CP w/o PVersion 4.00-03
Generated with
0.006Volume to Capacity (v/c):
CLevel Of Service:
15.4Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 2: Afton Road / I-15 EB Ramp
Intersection Level Of Service Report
NoNoNoNoCrosswalk
0.000.000.000.00Grade [%]
30.0030.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Name
Intersection Setup
0000Pedestrian Volume [ped/h]
0004318100176510Total Analysis Volume [veh/h]
00011450044100Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
1.00001.00001.00000.95000.95000.95001.00000.95000.95000.95000.95001.0000Peak Hour Factor
0004317200167510Total Hourly Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
0000017000166000Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
000432001510Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop3KOA Corporation
Opening Year (2018) Friday w/ CP w/o PVersion 4.00-03
Generated with
CIntersection LOS
11.08d_I, Intersection Delay [s/veh]
ABAAApproach LOS
0.0014.787.500.00d_A, Approach Delay [s/veh]
0.000.000.0037.2437.2437.240.009.159.150.000.000.0095th-Percentile Queue Length [ft]
0.000.000.001.491.491.490.000.370.370.000.000.0095th-Percentile Queue Length [veh]
BCBAAAAMovement LOS
0.000.000.0011.6115.4014.840.000.007.500.000.000.00d_M, Delay for Movement [s/veh]
0.000.000.000.000.010.330.000.000.110.000.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
0000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
0000Storage Area [veh]
NoFlared Lane
StopStopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop4KOA Corporation
Opening Year (2018) Friday w/ CP w/o PVersion 4.00-03
Generated with
0.000Volume to Capacity (v/c):
ALevel Of Service:
8.5Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 3: Afton Road / Project Driveway 1
Intersection Level Of Service Report
NoNoNoCrosswalk
0.000.000.00Grade [%]
30.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.00Lane Width [ft]
RightLeftRightThruThruLeftTurning Movement
Lane Configuration
EastboundSouthboundNorthboundApproach
Name
Intersection Setup
000Pedestrian Volume [ped/h]
000230Total Analysis Volume [veh/h]
000110Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.95000.95000.95000.95000.95000.9500Peak Hour Factor
000230Total Hourly Volume [veh/h]
000000Other Volume [veh/h]
000000Existing Site Adjustment Volume [veh/h]
000000Pass-by Trips [veh/h]
000000Diverted Trips [veh/h]
000000Site-Generated Trips [veh/h]
000000In-Process Volume [veh/h]
1.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
000230Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop5KOA Corporation
Opening Year (2018) Friday w/ CP w/o PVersion 4.00-03
Generated with
AIntersection LOS
0.00d_I, Intersection Delay [s/veh]
AAAApproach LOS
8.430.000.00d_A, Approach Delay [s/veh]
0.000.000.000.000.000.0095th-Percentile Queue Length [ft]
0.000.000.000.000.000.0095th-Percentile Queue Length [veh]
AAAAAAMovement LOS
8.338.540.000.000.007.22d_M, Delay for Movement [s/veh]
0.000.000.000.000.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
000Storage Area [veh]
NoFlared Lane
StopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop6KOA Corporation
Opening Year (2018) Friday w/ CP w/o PVersion 4.00-03
Generated with
0.000Volume to Capacity (v/c):
ALevel Of Service:
8.5Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 4: Afton Road / Project Driveway 2
Intersection Level Of Service Report
NoNoNoCrosswalk
0.000.000.00Grade [%]
30.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.00Lane Width [ft]
RightLeftRightThruThruLeftTurning Movement
Lane Configuration
EastboundSouthboundNorthboundApproach
Name
Intersection Setup
000Pedestrian Volume [ped/h]
000230Total Analysis Volume [veh/h]
000110Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.95000.95000.95000.95000.95000.9500Peak Hour Factor
000230Total Hourly Volume [veh/h]
000000Other Volume [veh/h]
000000Existing Site Adjustment Volume [veh/h]
000000Pass-by Trips [veh/h]
000000Diverted Trips [veh/h]
000000Site-Generated Trips [veh/h]
000000In-Process Volume [veh/h]
1.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
000230Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop7KOA Corporation
Opening Year (2018) Friday w/ CP w/o PVersion 4.00-03
Generated with
AIntersection LOS
0.00d_I, Intersection Delay [s/veh]
AAAApproach LOS
8.430.000.00d_A, Approach Delay [s/veh]
0.000.000.000.000.000.0095th-Percentile Queue Length [ft]
0.000.000.000.000.000.0095th-Percentile Queue Length [veh]
AAAAAAMovement LOS
8.338.540.000.000.007.22d_M, Delay for Movement [s/veh]
0.000.000.000.000.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
000Storage Area [veh]
NoFlared Lane
StopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop8KOA Corporation
Opening Year (2018) Friday w/ CP w/ PVersion 4.00-03
Generated with
0.040Volume to Capacity (v/c):
CLevel Of Service:
16.1Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 1: Afton Road / I-15 WB Ramp
Intersection Level Of Service Report
NoNoNoNoCrosswalk
0.000.000.000.00Grade [%]
30.0030.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Name
Intersection Setup
0000Pedestrian Volume [ped/h]
19116240001881760018127Total Analysis Volume [veh/h]
4846000474400457Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.95000.95000.95001.00001.00001.00000.95000.95001.00001.00000.95000.9500Peak Hour Factor
18115230001791670017226Total Hourly Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
1700230001671660017025Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
111500001210021Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop1KOA Corporation
Opening Year (2018) Friday w/ CP w/ PVersion 4.00-03
Generated with
CIntersection LOS
3.74d_I, Intersection Delay [s/veh]
BAAAApproach LOS
12.070.000.001.05d_A, Approach Delay [s/veh]
33.3833.3833.380.000.000.000.000.000.000.0015.7315.7395th-Percentile Queue Length [ft]
1.341.341.340.000.000.000.000.000.000.000.630.6395th-Percentile Queue Length [veh]
BCBAAAAMovement LOS
11.3816.0914.880.000.000.000.000.000.000.000.008.08d_M, Delay for Movement [s/veh]
0.220.040.050.000.000.000.000.000.000.000.000.02V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
0000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
0000Storage Area [veh]
NoFlared Lane
StopStopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop2KOA Corporation
Opening Year (2018) Friday w/ CP w/ PVersion 4.00-03
Generated with
0.007Volume to Capacity (v/c):
CLevel Of Service:
19.7Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 2: Afton Road / I-15 EB Ramp
Intersection Level Of Service Report
NoNoNoNoCrosswalk
0.000.000.000.00Grade [%]
30.0030.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Name
Intersection Setup
0000Pedestrian Volume [ped/h]
0001013181024176108270Total Analysis Volume [veh/h]
0002514506442770Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
1.00001.00001.00000.95000.95000.95001.00000.95000.95000.95000.95001.0000Peak Hour Factor
000963172023167103260Total Hourly Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
00092017002316698250Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
000432001510Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop3KOA Corporation
Opening Year (2018) Friday w/ CP w/ PVersion 4.00-03
Generated with
CIntersection LOS
10.08d_I, Intersection Delay [s/veh]
ACAAApproach LOS
0.0017.106.890.00d_A, Approach Delay [s/veh]
0.000.000.0067.7267.7267.720.0011.9711.970.000.000.0095th-Percentile Queue Length [ft]
0.000.000.002.712.712.710.000.480.480.000.000.0095th-Percentile Queue Length [veh]
BCCAAAAMovement LOS
0.000.000.0014.3019.6918.610.000.007.830.000.000.00d_M, Delay for Movement [s/veh]
0.000.000.000.100.010.390.000.000.120.000.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
0000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
0000Storage Area [veh]
NoFlared Lane
StopStopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop4KOA Corporation
Opening Year (2018) Friday w/ CP w/ PVersion 4.00-03
Generated with
0.115Volume to Capacity (v/c):
ALevel Of Service:
9.5Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 3: Afton Road / Project Driveway 1
Intersection Level Of Service Report
NoNoNoCrosswalk
0.000.000.00Grade [%]
30.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.00Lane Width [ft]
RightLeftRightThruThruLeftTurning Movement
Lane Configuration
EastboundSouthboundNorthboundApproach
Name
Intersection Setup
000Pedestrian Volume [ped/h]
01039726290Total Analysis Volume [veh/h]
02624770Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.95000.95000.95000.95000.95000.9500Peak Hour Factor
0989225280Total Hourly Volume [veh/h]
000000Other Volume [veh/h]
000000Existing Site Adjustment Volume [veh/h]
000000Pass-by Trips [veh/h]
000000Diverted Trips [veh/h]
0989223250Site-Generated Trips [veh/h]
000000In-Process Volume [veh/h]
1.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
000230Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop5KOA Corporation
Opening Year (2018) Friday w/ CP w/ PVersion 4.00-03
Generated with
AIntersection LOS
3.86d_I, Intersection Delay [s/veh]
AAAApproach LOS
9.550.000.00d_A, Approach Delay [s/veh]
9.729.720.000.000.000.0095th-Percentile Queue Length [ft]
0.390.390.000.000.000.0095th-Percentile Queue Length [veh]
AAAAAAMovement LOS
9.179.550.000.000.007.46d_M, Delay for Movement [s/veh]
0.000.120.000.000.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
000Storage Area [veh]
NoFlared Lane
StopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop6KOA Corporation
Opening Year (2018) Friday w/ CP w/ PVersion 4.00-03
Generated with
0.026Volume to Capacity (v/c):
ALevel Of Service:
8.7Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 4: Afton Road / Project Driveway 2
Intersection Level Of Service Report
NoNoNoCrosswalk
0.000.000.00Grade [%]
30.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.00Lane Width [ft]
RightLeftRightThruThruLeftTurning Movement
Lane Configuration
EastboundSouthboundNorthboundApproach
Name
Intersection Setup
000Pedestrian Volume [ped/h]
02624230Total Analysis Volume [veh/h]
076110Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.95000.95000.95000.95000.95000.9500Peak Hour Factor
02523230Total Hourly Volume [veh/h]
000000Other Volume [veh/h]
000000Existing Site Adjustment Volume [veh/h]
000000Pass-by Trips [veh/h]
000000Diverted Trips [veh/h]
02523000Site-Generated Trips [veh/h]
000000In-Process Volume [veh/h]
1.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
000230Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop7KOA Corporation
Opening Year (2018) Friday w/ CP w/ PVersion 4.00-03
Generated with
AIntersection LOS
4.11d_I, Intersection Delay [s/veh]
AAAApproach LOS
8.690.000.00d_A, Approach Delay [s/veh]
2.002.000.000.000.000.0095th-Percentile Queue Length [ft]
0.080.080.000.000.000.0095th-Percentile Queue Length [veh]
AAAAAAMovement LOS
8.478.690.000.000.007.27d_M, Delay for Movement [s/veh]
0.000.030.000.000.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
000Storage Area [veh]
NoFlared Lane
StopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop8KOA Corporation
Opening Year (2018) Sunday w/ CP w/o PVersion 4.00-03
Generated with
0.011Volume to Capacity (v/c):
CLevel Of Service:
17.1Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 1: Afton Road / I-15 WB Ramp
Intersection Level Of Service Report
NoNoNoNoCrosswalk
0.000.000.000.00Grade [%]
30.0030.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Name
Intersection Setup
0000Pedestrian Volume [ped/h]
21140000218254002511Total Analysis Volume [veh/h]
5310000546300630Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.95000.95000.95001.00001.00001.00000.95000.95001.00001.00000.95000.9500Peak Hour Factor
20040000207241002381Total Hourly Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
18900000193193001890Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
1140000144800491Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop1KOA Corporation
Opening Year (2018) Sunday w/ CP w/o PVersion 4.00-03
Generated with
CIntersection LOS
2.64d_I, Intersection Delay [s/veh]
BAAAApproach LOS
11.480.000.000.03d_A, Approach Delay [s/veh]
28.5928.5928.590.000.000.000.000.000.000.0022.3722.3795th-Percentile Queue Length [ft]
1.141.141.140.000.000.000.000.000.000.000.890.8995th-Percentile Queue Length [veh]
BCCAAAAMovement LOS
11.3717.0515.750.000.000.000.000.000.000.000.008.31d_M, Delay for Movement [s/veh]
0.270.010.000.000.000.000.000.000.000.000.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
0000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
0000Storage Area [veh]
NoFlared Lane
StopStopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop2KOA Corporation
Opening Year (2018) Sunday w/ CP w/o PVersion 4.00-03
Generated with
0.010Volume to Capacity (v/c):
DLevel Of Service:
27.0Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 2: Afton Road / I-15 EB Ramp
Intersection Level Of Service Report
NoNoNoNoCrosswalk
0.000.000.000.00Grade [%]
30.0030.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Name
Intersection Setup
0000Pedestrian Volume [ped/h]
0002425202253300Total Analysis Volume [veh/h]
00011630163100Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
1.00001.00001.00000.95000.95000.95001.00000.95000.95000.95000.95001.0000Peak Hour Factor
0002423902240300Total Hourly Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
0000018900193000Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
00024500247300Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop3KOA Corporation
Opening Year (2018) Sunday w/ CP w/o PVersion 4.00-03
Generated with
DIntersection LOS
16.95d_I, Intersection Delay [s/veh]
ADAAApproach LOS
0.0026.427.580.00d_A, Approach Delay [s/veh]
0.000.000.00100.27100.27100.270.0013.9813.980.000.000.0095th-Percentile Queue Length [ft]
0.000.000.004.014.014.010.000.560.560.000.000.0095th-Percentile Queue Length [veh]
CDDAAAAMovement LOS
0.000.000.0021.1526.9926.460.000.007.630.000.000.00d_M, Delay for Movement [s/veh]
0.000.000.000.000.010.600.000.000.160.000.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
0000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
0000Storage Area [veh]
NoFlared Lane
StopStopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop4KOA Corporation
Opening Year (2018) Sunday w/ CP w/o PVersion 4.00-03
Generated with
0.002Volume to Capacity (v/c):
ALevel Of Service:
8.5Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 3: Afton Road / Project Driveway 1
Intersection Level Of Service Report
NoNoNoCrosswalk
0.000.000.00Grade [%]
30.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.00Lane Width [ft]
RightLeftRightThruThruLeftTurning Movement
Lane Configuration
EastboundSouthboundNorthboundApproach
Name
Intersection Setup
000Pedestrian Volume [ped/h]
022120Total Analysis Volume [veh/h]
011010Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.95000.95000.95000.95000.95000.9500Peak Hour Factor
022120Total Hourly Volume [veh/h]
000000Other Volume [veh/h]
000000Existing Site Adjustment Volume [veh/h]
000000Pass-by Trips [veh/h]
000000Diverted Trips [veh/h]
000000Site-Generated Trips [veh/h]
000000In-Process Volume [veh/h]
1.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
022120Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop5KOA Corporation
Opening Year (2018) Sunday w/ CP w/o PVersion 4.00-03
Generated with
AIntersection LOS
2.44d_I, Intersection Delay [s/veh]
AAAApproach LOS
8.540.000.00d_A, Approach Delay [s/veh]
0.150.150.000.000.000.0095th-Percentile Queue Length [ft]
0.010.010.000.000.000.0095th-Percentile Queue Length [veh]
AAAAAAMovement LOS
8.338.540.000.000.007.22d_M, Delay for Movement [s/veh]
0.000.000.000.000.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
000Storage Area [veh]
NoFlared Lane
StopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop6KOA Corporation
Opening Year (2018) Sunday w/ CP w/o PVersion 4.00-03
Generated with
0.002Volume to Capacity (v/c):
ALevel Of Service:
8.5Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 4: Afton Road / Project Driveway 2
Intersection Level Of Service Report
NoNoNoCrosswalk
0.000.000.00Grade [%]
30.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.00Lane Width [ft]
RightLeftRightThruThruLeftTurning Movement
Lane Configuration
EastboundSouthboundNorthboundApproach
Name
Intersection Setup
000Pedestrian Volume [ped/h]
022120Total Analysis Volume [veh/h]
011010Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.95000.95000.95000.95000.95000.9500Peak Hour Factor
022120Total Hourly Volume [veh/h]
000000Other Volume [veh/h]
000000Existing Site Adjustment Volume [veh/h]
000000Pass-by Trips [veh/h]
000000Diverted Trips [veh/h]
000000Site-Generated Trips [veh/h]
000000In-Process Volume [veh/h]
1.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
022120Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop7KOA Corporation
Opening Year (2018) Sunday w/ CP w/o PVersion 4.00-03
Generated with
AIntersection LOS
2.44d_I, Intersection Delay [s/veh]
AAAApproach LOS
8.540.000.00d_A, Approach Delay [s/veh]
0.150.150.000.000.000.0095th-Percentile Queue Length [ft]
0.010.010.000.000.000.0095th-Percentile Queue Length [veh]
AAAAAAMovement LOS
8.338.540.000.000.007.22d_M, Delay for Movement [s/veh]
0.000.000.000.000.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
000Storage Area [veh]
NoFlared Lane
StopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop8KOA Corporation
Opening Year (2018) Sunday w/ CP w/ PVersion 4.00-03
Generated with
0.017Volume to Capacity (v/c):
DLevel Of Service:
33.5Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 1: Afton Road / I-15 WB Ramp
Intersection Level Of Service Report
NoNoNoNoCrosswalk
0.000.000.000.00Grade [%]
30.0030.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Name
Intersection Setup
0000Pedestrian Volume [ped/h]
211410000021825400251104Total Analysis Volume [veh/h]
531250005463006326Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.95000.95000.95001.00001.00001.00000.95000.95001.00001.00000.95000.9500Peak Hour Factor
2004950002072410023899Total Hourly Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
1890950001931930018998Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
1140000144800491Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop1KOA Corporation
Opening Year (2018) Sunday w/ CP w/ PVersion 4.00-03
Generated with
DIntersection LOS
7.92d_I, Intersection Delay [s/veh]
DAAAApproach LOS
25.850.000.002.53d_A, Approach Delay [s/veh]
117.42117.42117.420.000.000.000.000.000.000.0035.6835.6895th-Percentile Queue Length [ft]
4.704.704.700.000.000.000.000.000.000.001.431.4395th-Percentile Queue Length [veh]
CDDAAAAMovement LOS
22.9033.5231.770.000.000.000.000.000.000.000.008.65d_M, Delay for Movement [s/veh]
0.270.020.370.000.000.000.000.000.000.000.000.10V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
0000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
0000Storage Area [veh]
NoFlared Lane
StopStopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop2KOA Corporation
Opening Year (2018) Sunday w/ CP w/ PVersion 4.00-03
Generated with
0.014Volume to Capacity (v/c):
FLevel Of Service:
68.3Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 2: Afton Road / I-15 EB Ramp
Intersection Level Of Service Report
NoNoNoNoCrosswalk
0.000.000.000.00Grade [%]
30.0030.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Name
Intersection Setup
0000Pedestrian Volume [ped/h]
0002742520102253281030Total Analysis Volume [veh/h]
0007163026637260Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
1.00001.00001.00000.95000.95000.95001.00000.95000.95000.95000.95001.0000Peak Hour Factor
00026423909724027980Total Hourly Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
00024018909519324980Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
00024500247300Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop3KOA Corporation
Opening Year (2018) Sunday w/ CP w/ PVersion 4.00-03
Generated with
FIntersection LOS
27.28d_I, Intersection Delay [s/veh]
AFAAApproach LOS
0.0066.995.700.00d_A, Approach Delay [s/veh]
0.000.000.00215.49215.49215.490.0024.0524.050.000.000.0095th-Percentile Queue Length [ft]
0.000.000.008.628.628.620.000.960.960.000.000.0095th-Percentile Queue Length [veh]
FFFAAAAMovement LOS
0.000.000.0059.2468.2767.800.000.008.000.000.000.00d_M, Delay for Movement [s/veh]
0.000.000.000.030.010.860.000.000.170.000.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
0000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
0000Storage Area [veh]
NoFlared Lane
StopStopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop4KOA Corporation
Opening Year (2018) Sunday w/ CP w/ PVersion 4.00-03
Generated with
0.117Volume to Capacity (v/c):
ALevel Of Service:
9.6Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 3: Afton Road / Project Driveway 1
Intersection Level Of Service Report
NoNoNoCrosswalk
0.000.000.00Grade [%]
30.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.00Lane Width [ft]
RightLeftRightThruThruLeftTurning Movement
Lane Configuration
EastboundSouthboundNorthboundApproach
Name
Intersection Setup
000Pedestrian Volume [ped/h]
010510226270Total Analysis Volume [veh/h]
02626770Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.95000.95000.95000.95000.95000.9500Peak Hour Factor
01009725260Total Hourly Volume [veh/h]
000000Other Volume [veh/h]
000000Existing Site Adjustment Volume [veh/h]
000000Pass-by Trips [veh/h]
000000Diverted Trips [veh/h]
0989524240Site-Generated Trips [veh/h]
000000In-Process Volume [veh/h]
1.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
022120Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop5KOA Corporation
Opening Year (2018) Sunday w/ CP w/ PVersion 4.00-03
Generated with
AIntersection LOS
3.86d_I, Intersection Delay [s/veh]
AAAApproach LOS
9.560.000.00d_A, Approach Delay [s/veh]
9.949.940.000.000.000.0095th-Percentile Queue Length [ft]
0.400.400.000.000.000.0095th-Percentile Queue Length [veh]
AAAAAAMovement LOS
9.199.560.000.000.007.47d_M, Delay for Movement [s/veh]
0.000.120.000.000.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
000Storage Area [veh]
NoFlared Lane
StopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop6KOA Corporation
Opening Year (2018) Sunday w/ CP w/ PVersion 4.00-03
Generated with
0.027Volume to Capacity (v/c):
ALevel Of Service:
8.7Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 4: Afton Road / Project Driveway 2
Intersection Level Of Service Report
NoNoNoCrosswalk
0.000.000.00Grade [%]
30.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.00Lane Width [ft]
RightLeftRightThruThruLeftTurning Movement
Lane Configuration
EastboundSouthboundNorthboundApproach
Name
Intersection Setup
000Pedestrian Volume [ped/h]
02727120Total Analysis Volume [veh/h]
077010Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.95000.95000.95000.95000.95000.9500Peak Hour Factor
02626120Total Hourly Volume [veh/h]
000000Other Volume [veh/h]
000000Existing Site Adjustment Volume [veh/h]
000000Pass-by Trips [veh/h]
000000Diverted Trips [veh/h]
02424000Site-Generated Trips [veh/h]
000000In-Process Volume [veh/h]
1.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
022120Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop7KOA Corporation
Opening Year (2018) Sunday w/ CP w/ PVersion 4.00-03
Generated with
AIntersection LOS
4.12d_I, Intersection Delay [s/veh]
AAAApproach LOS
8.690.000.00d_A, Approach Delay [s/veh]
2.082.080.000.000.000.0095th-Percentile Queue Length [ft]
0.080.080.000.000.000.0095th-Percentile Queue Length [veh]
AAAAAAMovement LOS
8.488.690.000.000.007.27d_M, Delay for Movement [s/veh]
0.000.030.000.000.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
000Storage Area [veh]
NoFlared Lane
StopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop8KOA Corporation
Build Out Year (2040) Friday w/ CP w/o PVersion 4.00-03
Generated with
0.055Volume to Capacity (v/c):
CLevel Of Service:
15.1Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 1: Afton Road / I-15 WB Ramp
Intersection Level Of Service Report
NoNoNoNoCrosswalk
0.000.000.000.00Grade [%]
30.0030.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Name
Intersection Setup
0000Pedestrian Volume [ped/h]
198240000196177001822Total Analysis Volume [veh/h]
4960000494400461Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.95000.95000.95001.00001.00001.00000.95000.95001.00001.00000.95000.9500Peak Hour Factor
188230000186168001732Total Hourly Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
17000000167166001700Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
182300001920032Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop1KOA Corporation
Build Out Year (2040) Friday w/ CP w/o PVersion 4.00-03
Generated with
CIntersection LOS
3.28d_I, Intersection Delay [s/veh]
BAAAApproach LOS
11.450.000.000.09d_A, Approach Delay [s/veh]
29.4029.4029.400.000.000.000.000.000.000.0013.7213.7295th-Percentile Queue Length [ft]
1.181.181.180.000.000.000.000.000.000.000.550.5595th-Percentile Queue Length [veh]
BCBAAAAMovement LOS
11.0215.0713.890.000.000.000.000.000.000.000.008.04d_M, Delay for Movement [s/veh]
0.230.050.000.000.000.000.000.000.000.000.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
0000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
0000Storage Area [veh]
NoFlared Lane
StopStopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop2KOA Corporation
Build Out Year (2040) Friday w/ CP w/o PVersion 4.00-03
Generated with
0.010Volume to Capacity (v/c):
CLevel Of Service:
15.6Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 2: Afton Road / I-15 EB Ramp
Intersection Level Of Service Report
NoNoNoNoCrosswalk
0.000.000.000.00Grade [%]
30.0030.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Name
Intersection Setup
0000Pedestrian Volume [ped/h]
0006518200177820Total Analysis Volume [veh/h]
00021460044210Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
1.00001.00001.00000.95000.95000.95001.00000.95000.95000.95000.95001.0000Peak Hour Factor
0006517300168820Total Hourly Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
0000017000166000Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
000653002820Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop3KOA Corporation
Build Out Year (2040) Friday w/ CP w/o PVersion 4.00-03
Generated with
CIntersection LOS
11.10d_I, Intersection Delay [s/veh]
ABAAApproach LOS
0.0014.977.510.00d_A, Approach Delay [s/veh]
0.000.000.0038.8938.8938.890.009.259.250.000.000.0095th-Percentile Queue Length [ft]
0.000.000.001.561.561.560.000.370.370.000.000.0095th-Percentile Queue Length [veh]
BCCAAAAMovement LOS
0.000.000.0011.7715.6315.050.000.007.510.000.000.00d_M, Delay for Movement [s/veh]
0.000.000.000.010.010.330.000.000.110.000.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
0000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
0000Storage Area [veh]
NoFlared Lane
StopStopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop4KOA Corporation
Build Out Year (2040) Friday w/ CP w/o PVersion 4.00-03
Generated with
0.000Volume to Capacity (v/c):
ALevel Of Service:
8.6Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 3: Afton Road / Project Driveway 1
Intersection Level Of Service Report
NoNoNoCrosswalk
0.000.000.00Grade [%]
30.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.00Lane Width [ft]
RightLeftRightThruThruLeftTurning Movement
Lane Configuration
EastboundSouthboundNorthboundApproach
Name
Intersection Setup
000Pedestrian Volume [ped/h]
000350Total Analysis Volume [veh/h]
000110Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.95000.95000.95000.95000.95000.9500Peak Hour Factor
000350Total Hourly Volume [veh/h]
000000Other Volume [veh/h]
000000Existing Site Adjustment Volume [veh/h]
000000Pass-by Trips [veh/h]
000000Diverted Trips [veh/h]
000000Site-Generated Trips [veh/h]
000000In-Process Volume [veh/h]
1.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
000350Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop5KOA Corporation
Build Out Year (2040) Friday w/ CP w/o PVersion 4.00-03
Generated with
AIntersection LOS
0.00d_I, Intersection Delay [s/veh]
AAAApproach LOS
8.440.000.00d_A, Approach Delay [s/veh]
0.000.000.000.000.000.0095th-Percentile Queue Length [ft]
0.000.000.000.000.000.0095th-Percentile Queue Length [veh]
AAAAAAMovement LOS
8.338.550.000.000.007.22d_M, Delay for Movement [s/veh]
0.000.000.000.000.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
000Storage Area [veh]
NoFlared Lane
StopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop6KOA Corporation
Build Out Year (2040) Friday w/ CP w/o PVersion 4.00-03
Generated with
0.000Volume to Capacity (v/c):
ALevel Of Service:
8.6Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 4: Afton Road / Project Driveway 2
Intersection Level Of Service Report
NoNoNoCrosswalk
0.000.000.00Grade [%]
30.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.00Lane Width [ft]
RightLeftRightThruThruLeftTurning Movement
Lane Configuration
EastboundSouthboundNorthboundApproach
Name
Intersection Setup
000Pedestrian Volume [ped/h]
000350Total Analysis Volume [veh/h]
000110Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.95000.95000.95000.95000.95000.9500Peak Hour Factor
000350Total Hourly Volume [veh/h]
000000Other Volume [veh/h]
000000Existing Site Adjustment Volume [veh/h]
000000Pass-by Trips [veh/h]
000000Diverted Trips [veh/h]
000000Site-Generated Trips [veh/h]
000000In-Process Volume [veh/h]
1.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
000350Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop7KOA Corporation
Build Out Year (2040) Friday w/ CP w/o PVersion 4.00-03
Generated with
AIntersection LOS
0.00d_I, Intersection Delay [s/veh]
AAAApproach LOS
8.440.000.00d_A, Approach Delay [s/veh]
0.000.000.000.000.000.0095th-Percentile Queue Length [ft]
0.000.000.000.000.000.0095th-Percentile Queue Length [veh]
AAAAAAMovement LOS
8.338.550.000.000.007.22d_M, Delay for Movement [s/veh]
0.000.000.000.000.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
000Storage Area [veh]
NoFlared Lane
StopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop8KOA Corporation
Build Out Year (2040) Friday w/ CP w/ PVersion 4.00-03
Generated with
0.060Volume to Capacity (v/c):
CLevel Of Service:
16.6Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 1: Afton Road / I-15 WB Ramp
Intersection Level Of Service Report
NoNoNoNoCrosswalk
0.000.000.000.00Grade [%]
30.0030.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Name
Intersection Setup
0000Pedestrian Volume [ped/h]
19824240001961770018228Total Analysis Volume [veh/h]
4966000494400467Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.95000.95000.95001.00001.00001.00000.95000.95001.00001.00000.95000.9500Peak Hour Factor
18823230001861680017327Total Hourly Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
1700230001671660017025Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
182300001920032Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop1KOA Corporation
Build Out Year (2040) Friday w/ CP w/ PVersion 4.00-03
Generated with
CIntersection LOS
4.01d_I, Intersection Delay [s/veh]
BAAAApproach LOS
12.590.000.001.08d_A, Approach Delay [s/veh]
38.0638.0638.060.000.000.000.000.000.000.0016.0616.0695th-Percentile Queue Length [ft]
1.521.521.520.000.000.000.000.000.000.000.640.6495th-Percentile Queue Length [veh]
BCCAAAAMovement LOS
11.7716.6315.370.000.000.000.000.000.000.000.008.11d_M, Delay for Movement [s/veh]
0.230.060.050.000.000.000.000.000.000.000.000.02V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
0000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
0000Storage Area [veh]
NoFlared Lane
StopStopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop2KOA Corporation
Build Out Year (2040) Friday w/ CP w/ PVersion 4.00-03
Generated with
0.012Volume to Capacity (v/c):
CLevel Of Service:
20.1Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 2: Afton Road / I-15 EB Ramp
Intersection Level Of Service Report
NoNoNoNoCrosswalk
0.000.000.000.00Grade [%]
30.0030.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Name
Intersection Setup
0000Pedestrian Volume [ped/h]
0001035182024177112280Total Analysis Volume [veh/h]
0002614606442870Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
1.00001.00001.00000.95000.95000.95001.00000.95000.95000.95000.95001.0000Peak Hour Factor
000985173023168106270Total Hourly Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
00092017002316698250Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
000653002820Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop3KOA Corporation
Build Out Year (2040) Friday w/ CP w/ PVersion 4.00-03
Generated with
CIntersection LOS
10.23d_I, Intersection Delay [s/veh]
ACAAApproach LOS
0.0017.486.910.00d_A, Approach Delay [s/veh]
0.000.000.0070.8070.8070.800.0012.1012.100.000.000.0095th-Percentile Queue Length [ft]
0.000.000.002.832.832.830.000.480.480.000.000.0095th-Percentile Queue Length [veh]
BCCAAAAMovement LOS
0.000.000.0014.6320.1219.020.000.007.840.000.000.00d_M, Delay for Movement [s/veh]
0.000.000.000.100.010.390.000.000.120.000.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
0000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
0000Storage Area [veh]
NoFlared Lane
StopStopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop4KOA Corporation
Build Out Year (2040) Friday w/ CP w/ PVersion 4.00-03
Generated with
0.116Volume to Capacity (v/c):
ALevel Of Service:
9.6Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 3: Afton Road / Project Driveway 1
Intersection Level Of Service Report
NoNoNoCrosswalk
0.000.000.00Grade [%]
30.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.00Lane Width [ft]
RightLeftRightThruThruLeftTurning Movement
Lane Configuration
EastboundSouthboundNorthboundApproach
Name
Intersection Setup
000Pedestrian Volume [ped/h]
01039727320Total Analysis Volume [veh/h]
02624780Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.95000.95000.95000.95000.95000.9500Peak Hour Factor
0989226300Total Hourly Volume [veh/h]
000000Other Volume [veh/h]
000000Existing Site Adjustment Volume [veh/h]
000000Pass-by Trips [veh/h]
000000Diverted Trips [veh/h]
0989223250Site-Generated Trips [veh/h]
000000In-Process Volume [veh/h]
1.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
000350Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop5KOA Corporation
Build Out Year (2040) Friday w/ CP w/ PVersion 4.00-03
Generated with
AIntersection LOS
3.81d_I, Intersection Delay [s/veh]
AAAApproach LOS
9.570.000.00d_A, Approach Delay [s/veh]
9.789.780.000.000.000.0095th-Percentile Queue Length [ft]
0.390.390.000.000.000.0095th-Percentile Queue Length [veh]
AAAAAAMovement LOS
9.189.570.000.000.007.46d_M, Delay for Movement [s/veh]
0.000.120.000.000.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
000Storage Area [veh]
NoFlared Lane
StopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop6KOA Corporation
Build Out Year (2040) Friday w/ CP w/ PVersion 4.00-03
Generated with
0.026Volume to Capacity (v/c):
ALevel Of Service:
8.7Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 4: Afton Road / Project Driveway 2
Intersection Level Of Service Report
NoNoNoCrosswalk
0.000.000.00Grade [%]
30.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.00Lane Width [ft]
RightLeftRightThruThruLeftTurning Movement
Lane Configuration
EastboundSouthboundNorthboundApproach
Name
Intersection Setup
000Pedestrian Volume [ped/h]
02624350Total Analysis Volume [veh/h]
076110Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.95000.95000.95000.95000.95000.9500Peak Hour Factor
02523350Total Hourly Volume [veh/h]
000000Other Volume [veh/h]
000000Existing Site Adjustment Volume [veh/h]
000000Pass-by Trips [veh/h]
000000Diverted Trips [veh/h]
02523000Site-Generated Trips [veh/h]
000000In-Process Volume [veh/h]
1.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
000350Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop7KOA Corporation
Build Out Year (2040) Friday w/ CP w/ PVersion 4.00-03
Generated with
AIntersection LOS
3.90d_I, Intersection Delay [s/veh]
AAAApproach LOS
8.710.000.00d_A, Approach Delay [s/veh]
2.012.010.000.000.000.0095th-Percentile Queue Length [ft]
0.080.080.000.000.000.0095th-Percentile Queue Length [veh]
AAAAAAMovement LOS
8.488.710.000.000.007.27d_M, Delay for Movement [s/veh]
0.000.030.000.000.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
000Storage Area [veh]
NoFlared Lane
StopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop8KOA Corporation
Build Out Year (2040) w/ CP w/o PVersion 4.00-03
Generated with
0.019Volume to Capacity (v/c):
CLevel Of Service:
18.3Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 1: Afton Road / I-15 WB Ramp
Intersection Level Of Service Report
NoNoNoNoCrosswalk
0.000.000.000.00Grade [%]
30.0030.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Name
Intersection Setup
0000Pedestrian Volume [ped/h]
21860000225281002792Total Analysis Volume [veh/h]
5420000567000701Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.95000.95000.95001.00001.00001.00000.95000.95001.00001.00000.95000.9500Peak Hour Factor
20760000214267002652Total Hourly Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
18900000193193001890Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
1860000217400762Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop1KOA Corporation
Build Out Year (2040) w/ CP w/o PVersion 4.00-03
Generated with
CIntersection LOS
2.69d_I, Intersection Delay [s/veh]
BAAAApproach LOS
12.060.000.000.06d_A, Approach Delay [s/veh]
32.3432.3432.340.000.000.000.000.000.000.0026.8026.8095th-Percentile Queue Length [ft]
1.291.291.290.000.000.000.000.000.000.001.071.0795th-Percentile Queue Length [veh]
BCCAAAAMovement LOS
11.8818.3216.970.000.000.000.000.000.000.000.008.41d_M, Delay for Movement [s/veh]
0.290.020.000.000.000.000.000.000.000.000.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
0000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
0000Storage Area [veh]
NoFlared Lane
StopStopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop2KOA Corporation
Build Out Year (2040) w/ CP w/o PVersion 4.00-03
Generated with
0.017Volume to Capacity (v/c):
ELevel Of Service:
39.4Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 2: Afton Road / I-15 EB Ramp
Intersection Level Of Service Report
NoNoNoNoCrosswalk
0.000.000.000.00Grade [%]
30.0030.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Name
Intersection Setup
0000Pedestrian Volume [ped/h]
0003628003279500Total Analysis Volume [veh/h]
00012700170100Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
1.00001.00001.00000.95000.95000.95001.00000.95000.95000.95000.95001.0000Peak Hour Factor
0003626603265500Total Hourly Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
0000018900193000Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
00036770372500Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop3KOA Corporation
Build Out Year (2040) w/ CP w/o PVersion 4.00-03
Generated with
EIntersection LOS
23.18d_I, Intersection Delay [s/veh]
AEAAApproach LOS
0.0038.787.610.00d_A, Approach Delay [s/veh]
0.000.000.00153.78153.78153.780.0015.7915.790.000.000.0095th-Percentile Queue Length [ft]
0.000.000.006.156.156.150.000.630.630.000.000.0095th-Percentile Queue Length [veh]
DEEAAAAMovement LOS
0.000.000.0032.6639.3738.840.000.007.690.000.000.00d_M, Delay for Movement [s/veh]
0.000.000.000.000.020.740.000.000.170.000.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
0000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
0000Storage Area [veh]
NoFlared Lane
StopStopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop4KOA Corporation
Build Out Year (2040) w/ CP w/o PVersion 4.00-03
Generated with
0.003Volume to Capacity (v/c):
ALevel Of Service:
8.6Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 3: Afton Road / Project Driveway 1
Intersection Level Of Service Report
NoNoNoCrosswalk
0.000.000.00Grade [%]
30.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.00Lane Width [ft]
RightLeftRightThruThruLeftTurning Movement
Lane Configuration
EastboundSouthboundNorthboundApproach
Name
Intersection Setup
000Pedestrian Volume [ped/h]
033230Total Analysis Volume [veh/h]
011110Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.95000.95000.95000.95000.95000.9500Peak Hour Factor
033230Total Hourly Volume [veh/h]
000000Other Volume [veh/h]
000000Existing Site Adjustment Volume [veh/h]
000000Pass-by Trips [veh/h]
000000Diverted Trips [veh/h]
000000Site-Generated Trips [veh/h]
000000In-Process Volume [veh/h]
1.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
033230Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop5KOA Corporation
Build Out Year (2040) w/ CP w/o PVersion 4.00-03
Generated with
AIntersection LOS
2.33d_I, Intersection Delay [s/veh]
AAAApproach LOS
8.560.000.00d_A, Approach Delay [s/veh]
0.220.220.000.000.000.0095th-Percentile Queue Length [ft]
0.010.010.000.000.000.0095th-Percentile Queue Length [veh]
AAAAAAMovement LOS
8.348.560.000.000.007.23d_M, Delay for Movement [s/veh]
0.000.000.000.000.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
000Storage Area [veh]
NoFlared Lane
StopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop6KOA Corporation
Build Out Year (2040) w/ CP w/o PVersion 4.00-03
Generated with
0.003Volume to Capacity (v/c):
ALevel Of Service:
8.6Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 4: Afton Road / Project Driveway 2
Intersection Level Of Service Report
NoNoNoCrosswalk
0.000.000.00Grade [%]
30.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.00Lane Width [ft]
RightLeftRightThruThruLeftTurning Movement
Lane Configuration
EastboundSouthboundNorthboundApproach
Name
Intersection Setup
000Pedestrian Volume [ped/h]
033230Total Analysis Volume [veh/h]
011110Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.95000.95000.95000.95000.95000.9500Peak Hour Factor
033230Total Hourly Volume [veh/h]
000000Other Volume [veh/h]
000000Existing Site Adjustment Volume [veh/h]
000000Pass-by Trips [veh/h]
000000Diverted Trips [veh/h]
000000Site-Generated Trips [veh/h]
000000In-Process Volume [veh/h]
1.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
033230Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop7KOA Corporation
Build Out Year (2040) w/ CP w/o PVersion 4.00-03
Generated with
AIntersection LOS
2.33d_I, Intersection Delay [s/veh]
AAAApproach LOS
8.560.000.00d_A, Approach Delay [s/veh]
0.220.220.000.000.000.0095th-Percentile Queue Length [ft]
0.010.010.000.000.000.0095th-Percentile Queue Length [veh]
AAAAAAMovement LOS
8.348.560.000.000.007.23d_M, Delay for Movement [s/veh]
0.000.000.000.000.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
000Storage Area [veh]
NoFlared Lane
StopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop8KOA Corporation
Build Out Year (2040) w/ CP w/ PVersion 4.00-03
Generated with
0.028Volume to Capacity (v/c):
ELevel Of Service:
40.4Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 1: Afton Road / I-15 WB Ramp
Intersection Level Of Service Report
NoNoNoNoCrosswalk
0.000.000.000.00Grade [%]
30.0030.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Name
Intersection Setup
0000Pedestrian Volume [ped/h]
218610000022528100279105Total Analysis Volume [veh/h]
542250005670007026Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.95000.95000.95001.00001.00001.00000.95000.95001.00001.00000.95000.9500Peak Hour Factor
20769500021426700265100Total Hourly Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
1890950001931930018998Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
1860000217400762Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop1KOA Corporation
Build Out Year (2040) w/ CP w/ PVersion 4.00-03
Generated with
EIntersection LOS
9.24d_I, Intersection Delay [s/veh]
DAAAApproach LOS
31.780.000.002.40d_A, Approach Delay [s/veh]
144.80144.80144.800.000.000.000.000.000.000.0041.8541.8595th-Percentile Queue Length [ft]
5.795.795.790.000.000.000.000.000.000.001.671.6795th-Percentile Queue Length [veh]
DEEAAAAMovement LOS
28.4440.3938.560.000.000.000.000.000.000.000.008.77d_M, Delay for Movement [s/veh]
0.290.030.410.000.000.000.000.000.000.000.000.10V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
0000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
0000Storage Area [veh]
NoFlared Lane
StopStopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop2KOA Corporation
Build Out Year (2040) w/ CP w/ PVersion 4.00-03
Generated with
0.024Volume to Capacity (v/c):
FLevel Of Service:
129.2Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 2: Afton Road / I-15 EB Ramp
Intersection Level Of Service Report
NoNoNoNoCrosswalk
0.000.000.000.00Grade [%]
30.0030.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Name
Intersection Setup
0000Pedestrian Volume [ped/h]
0002862800103279311030Total Analysis Volume [veh/h]
0007270026708260Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor
1.00001.00001.00000.95000.95000.95001.00000.95000.95000.95000.95001.0000Peak Hour Factor
00027626609826529980Total Hourly Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
00024018909519324980Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]
1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
00036770372500Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop3KOA Corporation
Build Out Year (2040) w/ CP w/ PVersion 4.00-03
Generated with
FIntersection LOS
51.09d_I, Intersection Delay [s/veh]
AFAAApproach LOS
0.00127.875.900.00d_A, Approach Delay [s/veh]
0.000.000.00326.63326.63326.630.0026.6026.600.000.000.0095th-Percentile Queue Length [ft]
0.000.000.0013.0713.0713.070.001.061.060.000.000.0095th-Percentile Queue Length [veh]
FFFAAAAMovement LOS
0.000.000.00118.87129.22128.750.000.008.070.000.000.00d_M, Delay for Movement [s/veh]
0.000.000.000.030.021.060.000.000.190.000.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
0000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
0000Storage Area [veh]
NoFlared Lane
StopStopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop4KOA Corporation
Build Out Year (2040) w/ CP w/ PVersion 4.00-03
Generated with
0.119Volume to Capacity (v/c):
ALevel Of Service:
9.6Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 3: Afton Road / Project Driveway 1
Intersection Level Of Service Report
NoNoNoCrosswalk
0.000.000.00Grade [%]
30.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.00Lane Width [ft]
RightLeftRightThruThruLeftTurning Movement
Lane Configuration
EastboundSouthboundNorthboundApproach
Name
Intersection Setup
000Pedestrian Volume [ped/h]
010610327280Total Analysis Volume [veh/h]
02726770Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.95000.95000.95000.95000.95000.9500Peak Hour Factor
01019826270Total Hourly Volume [veh/h]
000000Other Volume [veh/h]
000000Existing Site Adjustment Volume [veh/h]
000000Pass-by Trips [veh/h]
000000Diverted Trips [veh/h]
0989524240Site-Generated Trips [veh/h]
000000In-Process Volume [veh/h]
1.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
033230Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop5KOA Corporation
Build Out Year (2040) w/ CP w/ PVersion 4.00-03
Generated with
AIntersection LOS
3.85d_I, Intersection Delay [s/veh]
AAAApproach LOS
9.580.000.00d_A, Approach Delay [s/veh]
10.0810.080.000.000.000.0095th-Percentile Queue Length [ft]
0.400.400.000.000.000.0095th-Percentile Queue Length [veh]
AAAAAAMovement LOS
9.219.580.000.000.007.47d_M, Delay for Movement [s/veh]
0.000.120.000.000.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
000Storage Area [veh]
NoFlared Lane
StopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop6KOA Corporation
Build Out Year (2040) w/ CP w/ PVersion 4.00-03
Generated with
0.028Volume to Capacity (v/c):
ALevel Of Service:
8.7Delay (sec / veh):
15 minutesAnalysis Period:
HCM 2010Analysis Method:
Two-way stopControl Type:
Intersection 4: Afton Road / Project Driveway 2
Intersection Level Of Service Report
NoNoNoCrosswalk
0.000.000.00Grade [%]
30.0030.0030.00Speed [mph]
100.00100.00100.00100.00100.00100.00Pocket Length [ft]
000000No. of Lanes in Pocket
12.0012.0012.0012.0012.0012.00Lane Width [ft]
RightLeftRightThruThruLeftTurning Movement
Lane Configuration
EastboundSouthboundNorthboundApproach
Name
Intersection Setup
000Pedestrian Volume [ped/h]
02828230Total Analysis Volume [veh/h]
077110Total 15-Minute Volume [veh/h]
1.00001.00001.00001.00001.00001.0000Other Adjustment Factor
0.95000.95000.95000.95000.95000.9500Peak Hour Factor
02727230Total Hourly Volume [veh/h]
000000Other Volume [veh/h]
000000Existing Site Adjustment Volume [veh/h]
000000Pass-by Trips [veh/h]
000000Diverted Trips [veh/h]
02424000Site-Generated Trips [veh/h]
000000In-Process Volume [veh/h]
1.001.001.001.001.001.00Growth Rate
2.002.002.002.002.002.00Heavy Vehicles Percentage [%]
1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor
033230Base Volume Input [veh/h]
Name
Volumes
TIA for Baker Truck Stop7KOA Corporation
Build Out Year (2040) w/ CP w/ PVersion 4.00-03
Generated with
AIntersection LOS
4.00d_I, Intersection Delay [s/veh]
AAAApproach LOS
8.710.000.00d_A, Approach Delay [s/veh]
2.162.160.000.000.000.0095th-Percentile Queue Length [ft]
0.090.090.000.000.000.0095th-Percentile Queue Length [veh]
AAAAAAMovement LOS
8.498.710.000.000.007.27d_M, Delay for Movement [s/veh]
0.000.030.000.000.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
000Storage Area [veh]
NoFlared Lane
StopFreeFreePriority Scheme
Intersection Settings
TIA for Baker Truck Stop8KOA Corporation
APPENDIX H
Mitigation Measures for Opening Year (2018) and Build Out Year (2040)
Project Conditions
Opening Year (2018) Friday MitigationVersion 4.00-03
Generated with
Unmitigated
CIntersection LOS
10.08d_I, Intersection Delay [s/veh]
19.69d_I, Worst Movement Control Delay [s/veh]
0.01V/C_I, Worst Movement V/C Ratio
ACAAApproach LOS
0.0017.106.890.00d_A, Approach Delay [s/veh]
0.000.000.0067.7267.7267.720.0011.9711.970.000.000.0095th-Percentile Queue Length [ft]
0.000.000.002.712.712.710.000.480.480.000.000.0095th-Percentile Queue Length [veh]
NoYesNoNoNoNoNoCritical Movement
BCCAAAAMovement LOS
0.000.000.0014.3019.6918.610.000.007.830.000.000.00d_M, Delay for Movement [s/veh]
0.000.000.000.100.010.390.000.000.120.000.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
0001052409465010000014491000001000000c_T, Total Capacity [veh/h]
000000000000c_m,x, Stage 2 [veh/h]
000000000000c_m,x, Stage 1 [veh/h]
0001052409465010000014491000001000000c_m,x, Movement Capacity [veh/h]
0001085785927001623000c_p,x, Stage 2 [veh/h]
0001097616645001690000c_p,x, Stage 1 [veh/h]
0001052466514001449000c_p,x, Potential Capacity [veh/h]
000013581000000v_c, Stage 2 [veh/h]
0002437637600135000v_c, Stage 1 [veh/h]
0002451145700135000v_c, Conflicting Flow Rate [veh/h]
000234012110Calculated Rank
Capacity Analysis
0000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
0000Storage Area [veh]
NoFlared Lane
StopStopFreeFreePriority Scheme
Intersection Settings
0001013181024176108270Total Analysis Volume [veh/h]
000432001510Base Volume Input [veh/h]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Name
HCM 2010Analysis Method
Two-way stopControl Type
Afton Road / I-15 EB RampIntersection
2Number
TIA for Baker Truck Stop1KOA Corporation
Opening Year (2018) Friday MitigationVersion 4.00-03
Generated with
Option 1: Signalized
5.172.581.3250th-Percentile Queue Length [veh]
YesYesNoCritical Lane Group
CBBLane Group LOS
26.5315.0410.22d, Delay for Lane Group [s/veh]
0.520.310.17X, volume / capacity
545652816c, Capacity [veh/h]
153210381469s, saturation flow rate [veh/h]
3333Arrival type
190019001900so, Base Saturation Flow per Lane [veh/h/ln]
0.190.190.09(v / s)_i Volume / Saturation Flow Rate
0.360.560.56g / C, Green / Cycle
Lane Group Calculations
0Pedestrian Clearance [s]
0Pedestrian Walk [s]
0Pedestrian Signal Group
NoNoNoPedestrian Recall
NoNoNoMaximum Recall
NoNoNoMinimum Recall
0.00.00.00.02.00.00.02.00.00.02.00.0l1, Start-Up Lost Time [s]
000000000000Pedestrian Clearance [s]
000000000000Walk [s]
000036005400540Split [s]
0.00.00.00.01.00.00.01.00.00.01.00.0All red [s]
0.00.00.00.03.00.00.03.00.00.03.00.0Amber [s]
000030003000300Maximum Green [s]
000050050050Minimum Green [s]
------------Lead / Lag
Auxiliary Signal Groups
000040060020Signal group
PermissPermissPermissPermissPermissPermissPermissPermissPermissPermissPermissPermissControl Type
0.00Lost time [s]
Fixed timeActuation Type
Time of Day Pattern CoordinatedCoordination Type
90Cycle Length [s]
Intersection Settings
0001013181024176108270Total Analysis Volume [veh/h]
000432001510Base Volume Input [veh/h]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Name
HCM 2010Analysis Method
SignalizedControl Type
Afton Road / I-15 EB RampIntersection
2Number
TIA for Baker Truck Stop2KOA Corporation
Opening Year (2018) Friday MitigationVersion 4.00-03
Generated with
0.379Intersection V/C
BIntersection LOS
19.27d_I, Intersection Delay [s/veh]
ACBBApproach LOS
0.0026.5315.0410.22d_A, Approach Delay [s/veh]
NoNoYesNoNoNoNoCritical Movement
CCCBBBBMovement LOS
0.000.000.0026.5326.5326.530.0015.0415.0410.2210.220.00d_M, Delay for Movement [s/veh]
Movement, Approach, & Intersection Results
222.51116.2759.4995th-Percentile Queue Length [ft]
8.904.652.3895th-Percentile Queue Length [veh]
129.2764.6033.0550th-Percentile Queue Length [ft]
TIA for Baker Truck Stop3KOA Corporation
Opening Year (2018) Friday MitigationVersion 4.00-03
Generated with
Option 2: Roundabout
AIntersection LOS
6.40Intersection Delay [s/veh]
AAAAApproach LOS
0.007.394.876.57Approach Delay [s/veh]
33.9716.4315.8895th-Percentile Queue Length [ft]
1.360.660.6495th-Percentile Queue Length [veh]
AAALane LOS
7.394.876.57Average Lane Delay [s/veh]
Movement, Approach, & Intersection Results
0.320.180.18X, volume / capacity
9041108768Capacity per Entry Lane [veh/h]
1.001.001.00Pedestrian Impedance
9221130783Capacity of Entry and Bypass Lanes [veh/h]
291205138Entry Flow Rate [veh/h]
0.980.980.98HV Adjustment Factor
0.001000.001000.00100B (coefficient)
1130.001130.001130.00A (intercept)
3.003.003.00User-Defined Follow-Up Time [s]
NoNoNoOverwrite Calculated Follow-Up Time
4.004.004.00User-Defined Critical Headway [s]
NoNoNoOverwrite Calculated Critical Headway
Lanes
0001013181024176108270Adjusted Demand Flow Rate [veh/h]
000963172023167103260Demand Flow Rate [veh/h]
212240183Exiting Flow Rate [veh/h]
2122040367Circulating Flow Rate [veh/h]
1111Number of Conflicting Circulating Lanes
Intersection Settings
0001013181024176108270Total Analysis Volume [veh/h]
000432001510Base Volume Input [veh/h]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Name
HCMAnalysis Method
RoundaboutControl Type
Afton Road / I-15 EB RampIntersection
2Number
TIA for Baker Truck Stop4KOA Corporation
Opening Year (2018) Sunday MitigationVersion 4.00-03
Generated with
Unmitigated
FIntersection LOS
27.28d_I, Intersection Delay [s/veh]
68.27d_I, Worst Movement Control Delay [s/veh]
0.01V/C_I, Worst Movement V/C Ratio
AFAAApproach LOS
0.0066.995.700.00d_A, Approach Delay [s/veh]
0.000.000.00215.49215.49215.490.0024.0524.050.000.000.0095th-Percentile Queue Length [ft]
0.000.000.008.628.628.620.000.960.960.000.000.0095th-Percentile Queue Length [veh]
NoYesNoNoNoNoNoCritical Movement
FFFAAAAMovement LOS
0.000.000.0059.2468.2767.800.000.008.000.000.000.00d_M, Delay for Movement [s/veh]
0.000.000.000.030.010.860.000.000.170.000.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
000953281292010000014541000001000000c_T, Total Capacity [veh/h]
000000000000c_m,x, Stage 2 [veh/h]
000000000000c_m,x, Stage 1 [veh/h]
000953281292010000014541000001000000c_m,x, Movement Capacity [veh/h]
0001085788888001623000c_p,x, Stage 2 [veh/h]
0001136486483001688000c_p,x, Stage 1 [veh/h]
000953345340001454000c_p,x, Potential Capacity [veh/h]
0000131117000000v_c, Stage 2 [veh/h]
00010260860800131000v_c, Stage 1 [veh/h]
00010273972500131000v_c, Conflicting Flow Rate [veh/h]
000234012110Calculated Rank
Capacity Analysis
0000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
0000Storage Area [veh]
NoFlared Lane
StopStopFreeFreePriority Scheme
Intersection Settings
0002742520102253281030Total Analysis Volume [veh/h]
00024500247300Base Volume Input [veh/h]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Name
HCM 2010Analysis Method
Two-way stopControl Type
Afton Road / I-15 EB RampIntersection
2Number
TIA for Baker Truck Stop1KOA Corporation
Opening Year (2018) Sunday MitigationVersion 4.00-03
Generated with
Option 1: Signalized
5.065.211.2650th-Percentile Queue Length [veh]
YesYesNoCritical Lane Group
CBBLane Group LOS
25.9817.7810.02d, Delay for Lane Group [s/veh]
0.500.510.15X, volume / capacity
562699898c, Capacity [veh/h]
158011351616s, saturation flow rate [veh/h]
3333Arrival type
190019001900so, Base Saturation Flow per Lane [veh/h/ln]
0.180.310.08(v / s)_i Volume / Saturation Flow Rate
0.360.560.56g / C, Green / Cycle
Lane Group Calculations
0Pedestrian Clearance [s]
0Pedestrian Walk [s]
0Pedestrian Signal Group
NoNoNoPedestrian Recall
NoNoNoMaximum Recall
NoYesYesMinimum Recall
0.00.00.00.02.00.00.02.00.00.02.00.0l1, Start-Up Lost Time [s]
000000000000Pedestrian Clearance [s]
000000000000Walk [s]
000036005400540Split [s]
0.00.00.00.01.00.00.01.00.00.01.00.0All red [s]
0.00.00.00.03.00.00.03.00.00.03.00.0Amber [s]
000030003000300Maximum Green [s]
000050050050Minimum Green [s]
------------Lead / Lag
Auxiliary Signal Groups
000040060020Signal group
PermissPermissPermissPermissPermissPermissPermissPermissPermissPermissPermissPermissControl Type
0.00Lost time [s]
Fixed timeActuation Type
Time of Day Pattern CoordinatedCoordination Type
90Cycle Length [s]
Intersection Settings
0002742520102253281030Total Analysis Volume [veh/h]
00024500247300Base Volume Input [veh/h]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Name
HCM 2010Analysis Method
SignalizedControl Type
Afton Road / I-15 EB RampIntersection
2Number
TIA for Baker Truck Stop2KOA Corporation
Opening Year (2018) Sunday MitigationVersion 4.00-03
Generated with
0.492Intersection V/C
BIntersection LOS
19.48d_I, Intersection Delay [s/veh]
ACBBApproach LOS
0.0025.9817.7810.02d_A, Approach Delay [s/veh]
NoNoYesNoNoNoNoCritical Movement
CCCBBBBMovement LOS
0.000.000.0025.9825.9825.980.0017.7817.7810.0210.020.00d_M, Delay for Movement [s/veh]
Movement, Approach, & Intersection Results
218.76223.7656.6295th-Percentile Queue Length [ft]
8.758.952.2695th-Percentile Queue Length [veh]
126.52130.2031.4650th-Percentile Queue Length [ft]
TIA for Baker Truck Stop3KOA Corporation
Opening Year (2018) Sunday MitigationVersion 4.00-03
Generated with
Option 2: Roundabout
AIntersection LOS
7.65Intersection Delay [s/veh]
AAAAApproach LOS
0.009.186.387.80Approach Delay [s/veh]
42.3034.8518.4095th-Percentile Queue Length [ft]
1.691.390.7495th-Percentile Queue Length [veh]
AAALane LOS
9.186.387.80Average Lane Delay [s/veh]
Movement, Approach, & Intersection Results
0.370.320.20X, volume / capacity
7721108660Capacity per Entry Lane [veh/h]
1.001.001.00Pedestrian Impedance
7871130673Capacity of Entry and Bypass Lanes [veh/h]
289363134Entry Flow Rate [veh/h]
0.980.980.98HV Adjustment Factor
0.001000.001000.00100B (coefficient)
1130.001130.001130.00A (intercept)
3.003.003.00User-Defined Follow-Up Time [s]
NoNoNoOverwrite Calculated Follow-Up Time
4.004.004.00User-Defined Critical Headway [s]
NoNoNoOverwrite Calculated Critical Headway
Lanes
0002742520102253281030Adjusted Demand Flow Rate [veh/h]
00026423909724027980Demand Flow Rate [veh/h]
3621040262Exiting Flow Rate [veh/h]
3623620519Circulating Flow Rate [veh/h]
1111Number of Conflicting Circulating Lanes
Intersection Settings
0002742520102253281030Total Analysis Volume [veh/h]
00024500247300Base Volume Input [veh/h]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Name
HCMAnalysis Method
RoundaboutControl Type
Afton Road / I-15 EB RampIntersection
2Number
TIA for Baker Truck Stop4KOA Corporation
Build Out Year (2040) Friday MitigationVersion 4.00-03
Generated with
Unmitigated
CIntersection LOS
10.23d_I, Intersection Delay [s/veh]
20.12d_I, Worst Movement Control Delay [s/veh]
0.01V/C_I, Worst Movement V/C Ratio
ACAAApproach LOS
0.0017.486.910.00d_A, Approach Delay [s/veh]
0.000.000.0070.8070.8070.800.0012.1012.100.000.000.0095th-Percentile Queue Length [ft]
0.000.000.002.832.832.830.000.480.480.000.000.0095th-Percentile Queue Length [veh]
NoYesNoNoNoNoNoCritical Movement
BCCAAAAMovement LOS
0.000.000.0014.6320.1219.020.000.007.840.000.000.00d_M, Delay for Movement [s/veh]
0.000.000.000.100.010.390.000.000.120.000.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
0001052404461010000014431000001000000c_T, Total Capacity [veh/h]
000000000000c_m,x, Stage 2 [veh/h]
000000000000c_m,x, Stage 1 [veh/h]
0001052404461010000014431000001000000c_m,x, Movement Capacity [veh/h]
0001085781924001623000c_p,x, Stage 2 [veh/h]
0001097615644001693000c_p,x, Stage 1 [veh/h]
0001052462510001443000c_p,x, Potential Capacity [veh/h]
000014084000000v_c, Stage 2 [veh/h]
0002437837800140000v_c, Stage 1 [veh/h]
0002451846200140000v_c, Conflicting Flow Rate [veh/h]
000234012110Calculated Rank
Capacity Analysis
0000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
0000Storage Area [veh]
NoFlared Lane
StopStopFreeFreePriority Scheme
Intersection Settings
0001035182024177112280Total Analysis Volume [veh/h]
000653002820Base Volume Input [veh/h]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Name
HCM 2010Analysis Method
Two-way stopControl Type
Afton Road / I-15 EB RampIntersection
2Number
TIA for Baker Truck Stop1KOA Corporation
Build Out Year (2040) Friday MitigationVersion 4.00-03
Generated with
Option 1: Signalized
5.292.621.3850th-Percentile Queue Length [veh]
YesYesNoCritical Lane Group
CBBLane Group LOS
26.7515.2010.28d, Delay for Lane Group [s/veh]
0.530.310.17X, volume / capacity
545647816c, Capacity [veh/h]
153210301469s, saturation flow rate [veh/h]
3333Arrival type
190019001900so, Base Saturation Flow per Lane [veh/h/ln]
0.190.200.10(v / s)_i Volume / Saturation Flow Rate
0.360.560.56g / C, Green / Cycle
Lane Group Calculations
0Pedestrian Clearance [s]
0Pedestrian Walk [s]
0Pedestrian Signal Group
NoNoNoPedestrian Recall
NoNoNoMaximum Recall
NoNoNoMinimum Recall
0.00.00.00.02.00.00.02.00.00.02.00.0l1, Start-Up Lost Time [s]
000000000000Pedestrian Clearance [s]
000000000000Walk [s]
000036005400540Split [s]
0.00.00.00.01.00.00.01.00.00.01.00.0All red [s]
0.00.00.00.03.00.00.03.00.00.03.00.0Amber [s]
000030003000300Maximum Green [s]
000050050050Minimum Green [s]
------------Lead / Lag
Auxiliary Signal Groups
000040060020Signal group
PermissPermissPermissPermissPermissPermissPermissPermissPermissPermissPermissPermissControl Type
0.00Lost time [s]
Fixed timeActuation Type
Time of Day Pattern CoordinatedCoordination Type
90Cycle Length [s]
Intersection Settings
0001035182024177112280Total Analysis Volume [veh/h]
000653002820Base Volume Input [veh/h]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Name
HCM 2010Analysis Method
SignalizedControl Type
Afton Road / I-15 EB RampIntersection
2Number
TIA for Baker Truck Stop2KOA Corporation
Build Out Year (2040) Friday MitigationVersion 4.00-03
Generated with
0.384Intersection V/C
BIntersection LOS
19.41d_I, Intersection Delay [s/veh]
ACBBApproach LOS
0.0026.7515.2010.28d_A, Approach Delay [s/veh]
NoNoYesNoNoNoNoCritical Movement
CCCBBBBMovement LOS
0.000.000.0026.7526.7526.750.0015.2015.2010.2810.280.00d_M, Delay for Movement [s/veh]
Movement, Approach, & Intersection Results
226.56117.6961.9495th-Percentile Queue Length [ft]
9.064.712.4895th-Percentile Queue Length [veh]
132.2665.3834.4150th-Percentile Queue Length [ft]
TIA for Baker Truck Stop3KOA Corporation
Build Out Year (2040) Friday MitigationVersion 4.00-03
Generated with
Option 2: Roundabout
AIntersection LOS
6.47Intersection Delay [s/veh]
AAAAApproach LOS
0.007.474.886.68Approach Delay [s/veh]
34.8816.5316.6895th-Percentile Queue Length [ft]
1.400.660.6795th-Percentile Queue Length [veh]
AAALane LOS
7.474.886.68Average Lane Delay [s/veh]
Movement, Approach, & Intersection Results
0.320.180.18X, volume / capacity
9031108765Capacity per Entry Lane [veh/h]
1.001.001.00Pedestrian Impedance
9211130780Capacity of Entry and Bypass Lanes [veh/h]
296206143Entry Flow Rate [veh/h]
0.980.980.98HV Adjustment Factor
0.001000.001000.00100B (coefficient)
1130.001130.001130.00A (intercept)
3.003.003.00User-Defined Follow-Up Time [s]
NoNoNoOverwrite Calculated Follow-Up Time
4.004.004.00User-Defined Critical Headway [s]
NoNoNoOverwrite Calculated Critical Headway
Lanes
0001035182024177112280Adjusted Demand Flow Rate [veh/h]
000985173023168106270Demand Flow Rate [veh/h]
214240186Exiting Flow Rate [veh/h]
2142050371Circulating Flow Rate [veh/h]
1111Number of Conflicting Circulating Lanes
Intersection Settings
0001035182024177112280Total Analysis Volume [veh/h]
000653002820Base Volume Input [veh/h]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Name
HCMAnalysis Method
RoundaboutControl Type
Afton Road / I-15 EB RampIntersection
2Number
TIA for Baker Truck Stop4KOA Corporation
Build Out Year (2040) Sunday MitigationVersion 4.00-03
Generated with
Unmitigated
FIntersection LOS
51.09d_I, Intersection Delay [s/veh]
129.22d_I, Worst Movement Control Delay [s/veh]
0.02V/C_I, Worst Movement V/C Ratio
AFAAApproach LOS
0.00127.875.900.00d_A, Approach Delay [s/veh]
0.000.000.00326.63326.63326.630.0026.6026.600.000.000.0095th-Percentile Queue Length [ft]
0.000.000.0013.0713.0713.070.001.061.060.000.000.0095th-Percentile Queue Length [veh]
NoYesNoNoNoNoNoCritical Movement
FFFAAAAMovement LOS
0.000.000.00118.87129.22128.750.000.008.070.000.000.00d_M, Delay for Movement [s/veh]
0.000.000.000.030.021.060.000.000.190.000.000.00V/C, Movement V/C Ratio
Movement, Approach, & Intersection Results
000952255264010000014511000001000000c_T, Total Capacity [veh/h]
000000000000c_m,x, Stage 2 [veh/h]
000000000000c_m,x, Stage 1 [veh/h]
000952255264010000014511000001000000c_m,x, Movement Capacity [veh/h]
0001085785886001623000c_p,x, Stage 2 [veh/h]
0001137460452001690000c_p,x, Stage 1 [veh/h]
000952320313001451000c_p,x, Potential Capacity [veh/h]
0000134119000000v_c, Stage 2 [veh/h]
00010366166100134000v_c, Stage 1 [veh/h]
00010379578000134000v_c, Conflicting Flow Rate [veh/h]
000234012110Calculated Rank
Capacity Analysis
0000Number of Storage Spaces in Median
NoTwo-Stage Gap Acceptance
0000Storage Area [veh]
NoFlared Lane
StopStopFreeFreePriority Scheme
Intersection Settings
0002862800103279311030Total Analysis Volume [veh/h]
00036770372500Base Volume Input [veh/h]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Name
HCM 2010Analysis Method
Two-way stopControl Type
Afton Road / I-15 EB RampIntersection
2Number
TIA for Baker Truck Stop1KOA Corporation
Build Out Year (2040) Sunday MitigationVersion 4.00-03
Generated with
Option 1: Signalized
5.805.881.2950th-Percentile Queue Length [veh]
YesYesNoCritical Lane Group
CBBLane Group LOS
27.2919.0610.05d, Delay for Lane Group [s/veh]
0.560.550.15X, volume / capacity
562691895c, Capacity [veh/h]
158111191611s, saturation flow rate [veh/h]
3333Arrival type
190019001900so, Base Saturation Flow per Lane [veh/h/ln]
0.200.340.08(v / s)_i Volume / Saturation Flow Rate
0.360.560.56g / C, Green / Cycle
Lane Group Calculations
0Pedestrian Clearance [s]
0Pedestrian Walk [s]
0Pedestrian Signal Group
NoNoNoPedestrian Recall
NoNoNoMaximum Recall
NoYesYesMinimum Recall
0.00.00.00.02.00.00.02.00.00.02.00.0l1, Start-Up Lost Time [s]
000000000000Pedestrian Clearance [s]
000000000000Walk [s]
000036005400540Split [s]
0.00.00.00.01.00.00.01.00.00.01.00.0All red [s]
0.00.00.00.03.00.00.03.00.00.03.00.0Amber [s]
000030003000300Maximum Green [s]
000050050050Minimum Green [s]
------------Lead / Lag
Auxiliary Signal Groups
000040060020Signal group
PermissPermissPermissPermissPermissPermissPermissPermissPermissPermissPermissPermissControl Type
0.00Lost time [s]
Fixed timeActuation Type
Time of Day Pattern CoordinatedCoordination Type
90Cycle Length [s]
Intersection Settings
0002862800103279311030Total Analysis Volume [veh/h]
00036770372500Base Volume Input [veh/h]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Name
HCM 2010Analysis Method
SignalizedControl Type
Afton Road / I-15 EB RampIntersection
2Number
TIA for Baker Truck Stop2KOA Corporation
Build Out Year (2040) Sunday MitigationVersion 4.00-03
Generated with
0.540Intersection V/C
CIntersection LOS
20.72d_I, Intersection Delay [s/veh]
ACBBApproach LOS
0.0027.2919.0610.05d_A, Approach Delay [s/veh]
NoNoYesNoNoNoNoCritical Movement
CCCBBBBMovement LOS
0.000.000.0027.2927.2927.290.0019.0619.0610.0510.050.00d_M, Delay for Movement [s/veh]
Movement, Approach, & Intersection Results
243.83246.3358.0795th-Percentile Queue Length [ft]
9.759.852.3295th-Percentile Queue Length [veh]
145.07146.9332.2650th-Percentile Queue Length [ft]
TIA for Baker Truck Stop3KOA Corporation
Build Out Year (2040) Sunday MitigationVersion 4.00-03
Generated with
Option 2: Roundabout
AIntersection LOS
8.33Intersection Delay [s/veh]
ABAAApproach LOS
0.0010.306.678.44Approach Delay [s/veh]
51.9938.8120.3095th-Percentile Queue Length [ft]
2.081.550.8195th-Percentile Queue Length [veh]
BAALane LOS
10.306.678.44Average Lane Delay [s/veh]
Movement, Approach, & Intersection Results
0.420.340.22X, volume / capacity
7511108623Capacity per Entry Lane [veh/h]
1.001.001.00Pedestrian Impedance
7661130636Capacity of Entry and Bypass Lanes [veh/h]
321390137Entry Flow Rate [veh/h]
0.980.980.98HV Adjustment Factor
0.001000.001000.00100B (coefficient)
1130.001130.001130.00A (intercept)
3.003.003.00User-Defined Follow-Up Time [s]
NoNoNoOverwrite Calculated Follow-Up Time
4.004.004.00User-Defined Critical Headway [s]
NoNoNoOverwrite Calculated Critical Headway
Lanes
0002862800103279311030Adjusted Demand Flow Rate [veh/h]
00027626609826529980Demand Flow Rate [veh/h]
3911050291Exiting Flow Rate [veh/h]
3913900576Circulating Flow Rate [veh/h]
1111Number of Conflicting Circulating Lanes
Intersection Settings
0002862800103279311030Total Analysis Volume [veh/h]
00036770372500Base Volume Input [veh/h]
RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement
Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Name
HCMAnalysis Method
RoundaboutControl Type
Afton Road / I-15 EB RampIntersection
2Number
TIA for Baker Truck Stop4KOA Corporation
APPENDIX I
Traffic Signal Warrant Worksheets