TRACTION ORGANISATION OF GUNTAKAL DIVISION
SOUTH CENTRAL RAILWAY
INTRODUCTION:
First Electrification work in Guntakal Division was taken up between
GDR-TPTY via Renigunta Railway junction in the year 1984. Renigunta is a
gateway to world famous pilgrim centre of Lord Sri. Venkateswara swamy of
Tirumala. Renigunta is connecting Railway link to Tirupati, Katpadi &
Kanyakumari in the one direction, Chennai in the second direction, Gun-
takal & Mumbai in the third direction & Gudur, Vijayawada, Kolkata & New
Delhi in the fourth direction. GDR- RU- TPTY section is one that connects
Vijayawada Division with Guntakal Division and forms a by pass line for
South bound trains from north, and eastern parts of the country.
Profile Details:
In the year 1984 GDR- RU - TPTY section about 150 TKM (Single line)
was electrified making Guntakal Division to occupy a place in the Electrifica-
tion map of Indian Railways.
Subsequently the Electrification is rapidly expanding in the Division as
follows:
TRACTION ORGANISATION GUNTAKAL
Section Electrified Date GDR-RU-TPTY (Single line) 11.11.1984
RU-NRE (Single line) 11.09.2004
GDR-RU-TPTY (Double line) 15.12.2004
TPTY-KPD (Single line) 08.12.2007
RU-NRE (Double line) 30.07.2008
NRE-KKM (Double line) 29.12.2010
KKM-MOO (Double line) 31.12.2011
SOUTH CENTRAL RAILWAY
The electrification of double lines between Renigunta and Moodunoor was
completed in the end of Dec-2011, serving four sidings, two at Yerraguntla, one at
Kallamala, and one at Moodunoor. Its is expected electrification will be completed
up to Guntakal by the end of Dec-2012.
Infrastructure was created for maintaining this mighty electrified sec-
tion at various stations with latest facilities to maintain reliability & tackle
break downs at shortest time. Equipments at Railway Traction Substations
are being controlled remotely from Remote Control Centre at Guntakal.
Status of equipment and parameters at all Remote terminal units will be
monitored from Remote Control Centre. Electric Loco shed is being con-
structed at Guntakal to cater Electric engines to coaching and passenger
trains. Un-interrupted power supply to run trains is taken at 132 kV high
voltage supply from DISCOMs at various stations.
Self propelled OHE inspection Cars and Road vehicles are equipped at
various maintenance depots all along electrified route of Guntakal Divi-
sion. Electrification work will be taken up on other sections i.e Guntakal-
Wadi & Gooty-Bangalore shortly to cover 85% of route kilometers of Gun-
takal Division.
The monthly average electrical consumption towards Electrical Trac-
tion is 11.3million units, billing to 06.10 Crores (approx.).
Tariff: Rs.5.43 /unit (with effect from 01.04.2012) (Billing as per KVAH)
TRACTION ORGANISATION GUNTAKAL
SOUTH CENTRAL RAILWAY
Duties of Senior Divisional Electrical Engineer (Tr) :
Senior Divisional Electrical Engineer – Traction of Guntakal Divisional is the
over all incharge of the Traction Distribution and Traction Operations. He is
responsible for all technical and organizational matters connected with the ef-
ficient maintenance and operation of the power supply installations, Over
Head Equipment, Remote control centre in the traction distribution, Electrical
train operations in the division.
Duties of Assistant Divisional Electrical Engineer(TrD) :
Assistant Divisional Electrical Engineer – Traction Distribution in RU and HX
will assist the Sr DEE/Tr in the maintenance of PSI, OHE in their respective
jurisdictions.
Assistant Divisional Electrical Engineer – Operations will assist the Sr DEE/Tr
in the matters of train operations, Crew Management etc stationed at RU.
Manuals:
Alternating Current Traction Manual (ACTM), which can be accessed at
http://www.indianrailways.gov.in/railwayboard/uploads/codesmanual/ACTr
action-II-P-II/AcTractionII_index.htm
http://www.indianrailways.gov.in/railwayboard/uploads/codesmanual/ACTr
action-I/AcTractionICh2.htm
http://www.indianrailways.gov.in/railwayboard/uploads/codesmanual/ACTr
action-II-P-I/ACTractionIIVolI_index.htm
Powers:
Schedule of Powers, South Central Railway ,which can be accessed at
http://203.153.33.93:7070/SOP/index.html
TRACTION ORGANISATION GUNTAKAL
ORGANISATION CHART
SOUTH CENTRAL RAILWAY
TRACTION ORGANISATION GUNTAKAL
ADEE/TrD/HX (G. Sreenivasulu)
ADEE/OP/RU (Rajeev Kumar)
SSE/OHE/RU CC/IC/RU
SSE/OHE&PSI/PAK
SSE/OHE&PSI/VKI
SSE/PSI/RU SSE/OHE & PSI/HX
SSE/OHE & PSI/RJP
SSE/OP/RU
CLIs/RU
ADEE/TrD/RU (Sk. Abdul Hussain)
Sr. DEE/Tr/GTL (A. Koteswara Rao)
SSE/OHE & PSI/KDP
SSE/TS/RU
RUNNING ROOM/RU
CTPC/GTL
SSE/TrD/GY
CTLC/GTL
Ch.OS/TR/GTL
CLI/HQ/GTL
PTA/TrD/GTL
SSE/DRG/GTL
SSE/RC/GTL
TRACTION ROLLING STOCK & OPERATION
SOUTH CENTRAL RAILWAY
Electric Loco Trip shed is a situated at Renigunta junction to carry out re-
pairs and trip attention to Electric locos. Staff of Trip shed are attending to Locos
arriving at Renigunta from various sheds on Indian Railways and also on line
failures in the section with least time.
A cell consists of Chief Traction Loco Controller and his staff located at Gun-
takal Control Room to monitor movement of Electric Locos in the division. He is
responsible for smooth running of trains and to take timely action in case of
need.
Air conditioned Crew control Lobby is situated at Renigunta, where Loco pi-
lots are being booked for various train services. A Running room is available at
Renigunta for taking rest for Out Station Loco pilots. Well maintained with clean
& green Running room is provided with facilities like cots with foam beds& bed
rolls, mattresses Solar heater hot water, R.O Drinking water & water cooler , win-
dow type coolers, washing machine, shoe polishing machine, news papers & mag-
azines of Telugu, Tamil , Hindi & English. Messing facility at subsidized rate.
Loco pilots are being periodically examined for healthiness and up to date
knowledge in driving of various types of Locos and safety aspects by Loco Inspec-
tors.
TRACTION ORGANISATION GUNTAKAL
SOUTH CENTRAL RAILWAY
EVENTS IN THE HISTORY OF ELECTRIFICATION OF GUNTAKAL DIVISION
TRACTION ORGANISATION GUNTAKAL
SOUTH CENTRAL RAILWAY
SALIENT FEATURES
Route KMs Electrified: 387
Track Kms Electrified: 901
GDR- RU- TPTY Double line (RKM/TKM)
94/268
TPTY-KPD Single line (RKM/TKM)
104/122
RU-MOO Double line (RKM/TKM)
189/512
Sections Electrified:
Power Supply arrangement :
Power supply to Traction Sub-station availed from SPDCL at
220/132 kV through 6 Traction Sub-stations at Renigunta, Venkatagiri,
Rajampeta, Pakala , Kadapa & Muddanuru.
Location of OHE/PSI depots :
a) Renigunta b) Venkatagiri c) Rajampet d) Pakala e) Kadapa f) Kondapuram
TRACTION ORGANISATION GUNTAKAL
SOUTH CENTRAL RAILWAY
SALIENT FEATURES
GDR- RU section (6 Nos.) KQA,VDD,NDZ, YLK, RCG & YPD.
RU– MOO section (12 Nos.) MRM, SF, KOU, OBVP, PMT, NRE, VNM, BKPT, KNLP, GPY, KKM & YA.
TPTY- KPD section (6 Nos.) TPW, KEN, PAM, PTT, SIE & BUM.
Location of Switching Stations :
GDR- RU– TPTY section VKI, RU
TPTY-KPD section PAK
RU-HX section RJP & HX
Location of Tower wagons :
TRACTION ORGANISATION GUNTAKAL
SOUTH CENTRAL RAILWAY
OHE INSPECTION CAR
TRACTION ORGANISATION GUNTAKAL
SOUTH CENTRAL RAILWAY
TRACTION OFFICERS & STAFF AT WORK
TRACTION ORGANISATION GUNTAKAL
SOUTH CENTRAL RAILWAY
TRACTION SUBSTATION UNDER CONSTRUCTION
TRACTION ORGANISATION GUNTAKAL
SOUTH CENTRAL RAILWAY
SEMINORS AND INSPECTIONS CARRIED OUT BY OFFICERS AT LOBBY/RENIGUNTA
TRACTION ORGANISATION GUNTAKAL
SAFETY SEMINAR
SOUTH CENTRAL RAILWAY
TRACTION ORGANISATION GUNTAKAL