tracking new coal-fired power plants · pdf fileadditions in the u.s. and coal-fired power...

24
Tracking New Coal-Fired Power Plants (data update 12/13/2010) January 14, 2011 b National Energy Technology Laboratory Office of Strategic Energy Analysis & Planning Erik Shuster

Upload: vuquynh

Post on 17-Mar-2018

217 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: Tracking New Coal-Fired Power Plants · PDF fileadditions in the U.S. and coal-fired power plant activity in China. Experience has shown that public announcements of power ... Tracking

Tracking New Coal-Fired Power Plants(data update 12/13/2010)

January 14, 2011b

National Energy Technology LaboratoryOffice of Strategic Energy Analysis & Planning

Erik Shuster

Page 2: Tracking New Coal-Fired Power Plants · PDF fileadditions in the U.S. and coal-fired power plant activity in China. Experience has shown that public announcements of power ... Tracking

2

Tracking New Coal-Fired Power Plants

This report is intended to provide an overview of proposed new coal-firedpower plants that are under development. This report may not representall possible plants under consideration but is intended to illustrate thepotential that exists for installation of new coal-fired power plants.Additional perspective has been added for non-coal-fired generationadditions in the U.S. and coal-fired power plant activity in China.

Experience has shown that public announcements of power plantdevelopments do not provide an accurate representation of eventuallycommissioned power plants. Actual plant capacity commissioned hashistorically been significantly less then new capacity announced.

The report focuses on those coal-fired power plant projects that haveachieved significant progress toward completion, to provide a moreaccurate assessment of the ability of this segment of the power generationindustry to support demand for new electricity capacity in various regionsof the United States.

The Department of Energy does not warrant the accuracy or suitability of this information.

Page 3: Tracking New Coal-Fired Power Plants · PDF fileadditions in the U.S. and coal-fired power plant activity in China. Experience has shown that public announcements of power ... Tracking

3

Tracking New Coal-Fired Power Plants

• This report provides a perspective of coal-fired power plants that are currently under development, with a focus on those having made significant progress toward achieving commercial operation

• The status of projects identified varies from project announcements to those under construction

• Announced projects are not necessarily strong indicators of commitment of capital and human resources to actual development and follow-through to actual capacity additions is highly dependent on the market environment

• Plants that are permitted or under construction (“Progressing Projects”) reflect a more significant financial and human resource commitment to completion and offer a better perspective of the new generation capacity that may be forthcoming

Page 4: Tracking New Coal-Fired Power Plants · PDF fileadditions in the U.S. and coal-fired power plant activity in China. Experience has shown that public announcements of power ... Tracking

4

Past Capacity Announcements vs. ActualFigure 1

Source: 2007 & 2010 data Ventyx – Velocity Suite 2002 – 2005 data – Previous NETL Tracking New Coal-Fired Power Plants Reports

02468

101214161820

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018

Cap

acity

(GW

)

Actual 2002 Report 2005 Report 2007 Report 2010 Report

Delays in Implementation

Actual capacity completed has been shown to be significantly less than proposed capacity;the 2002 report listed 11,455 MW of proposed capacity for the year 2005 when only 329 MW were constructed.

Page 5: Tracking New Coal-Fired Power Plants · PDF fileadditions in the U.S. and coal-fired power plant activity in China. Experience has shown that public announcements of power ... Tracking

5Source: Ventyx – Velocity Suite

2010 data – 12/13/2010

02468

101214161820

2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018

Cap

acity

(GW

)

Actual 2010 2009 2008 200772 GW49 GW32 GW 64 GW8 GW

Latest Capacity Announcements vs. ActualFigure 1a

Totals →

Total Identified Capacity Declines Due to Commissioning, Cancelations, and Fewer Postponements

Page 6: Tracking New Coal-Fired Power Plants · PDF fileadditions in the U.S. and coal-fired power plant activity in China. Experience has shown that public announcements of power ... Tracking

6

Current Coal-Fired Capacity Projects (Annual Change)

Table 1

Status Listing Description

Under Construction Project is under construction.

Near Construction Project has been approved; majority or all permits are obtained. Sponsor is contracting vendors and Engineering, Procurement and Construction (EPC) contractors. Site preparation has begun.

Permitted In the permitting phase. Two or more permits approved or fuel or power contracts have been negotiated.

Announced Early stages of development to filing for permits. May include a feasibility study.

Progressing Projects

Uncertain Potential and

Timing

Source: Ventyx – Velocity SuiteData reflects change between 1/8/2010 and 12/13/2010

Number of Plants Capacity (MW)

General Status Jan2010

Dec2010

NetChange

Jan2010

Dec2010

NetChange

Under Construction 22 12 -10 13,755 7,619 -6,136

Near Construction 1 1 0 320 320 0

Permitted 8 8 0 3,280 6,446 +3,166

SUB TOTAL 31 21 -10 17,355 14,385 -2,970

Announced (early stages of development) 46 36 -10 26,233 17,385 -8,848

TOTAL 77 57 -20 43,588 32,259 -11,329

Commissioned this Period - 11 +11 - 6,682 +6,682

TOTAL December 2010 Progressing and Commissioned 32 +1 21,067 +3,712

Page 7: Tracking New Coal-Fired Power Plants · PDF fileadditions in the U.S. and coal-fired power plant activity in China. Experience has shown that public announcements of power ... Tracking

7

Current Capacity Additions by YearsRefer to Table 1

• Table 1 reflects the current status of coal-fired plant development activity as of December 13, 2010 (January 8, 2010 through December 13, 2010)

• “Progressing” plants represent projects with status indicating permitted,near construction, or under construction

• “Progressing” plants have attained a higher likelihood of advancing toward commercial operation; however, regulatory uncertainty, market perception and industry cost increases continue to impact development decisions for all projects

• 6,682 MW (11 plants) have become operational during 2010 as of December 2010; this is the highest level of coal-fired plant Commissioned in 25 years (since 1985)

• There has been a net increase of 3,712 MW (+21%) of total Progressing and/or Commissioned projects through 2010 over Progressing projects in January

Page 8: Tracking New Coal-Fired Power Plants · PDF fileadditions in the U.S. and coal-fired power plant activity in China. Experience has shown that public announcements of power ... Tracking

8

Current Coal Capacity Additions by YearsFigure 2

Source: Ventyx – Velocity Suite (12/13/2010)

0

1

2

3

4

5

6

7

8

9

10

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018

Capa

city

(GW

)

AnnouncedPermittedNear ConstructionUnder ConstructionActual

Commissioned in 2010• Rodemacher (Brame) (700 MW)• Comanche (850 MW)• Iatan (850 MW)• J K Spruce (820 MW)• Oak Creek-Unit 1 (615 MW)• Oak Grove (879 MW)• Plumb Point (720 MW)• Southwest (300 MW)• Trimble (834 MW)• Willmar (4 MW)• Wygen III (110 MW)

Operational DatesProposedActual

Page 9: Tracking New Coal-Fired Power Plants · PDF fileadditions in the U.S. and coal-fired power plant activity in China. Experience has shown that public announcements of power ... Tracking

9

Currently Proposed and ForecastedCoal-Fired Capacity

0

1

2

3

4

5

6

7

8

9

10

Cap

acity

(GW

)

Proposed-Progressing Proposed-Announced EIA AEO 2011 er

Virtually No New Coal in Reference case Following

Several CCS Demos

Source: Ventyx – Velocity Suite (12/13/2010)

EIA – AEO 2011 early release, Reference Case

Figure 3

Page 10: Tracking New Coal-Fired Power Plants · PDF fileadditions in the U.S. and coal-fired power plant activity in China. Experience has shown that public announcements of power ... Tracking

10

Last 50 Years of New Coal Capacity

0

2

4

6

8

10

12

14

16

18

GW

’s o

f New

Cap

acity

Largest Build Since 1985

Source: Ventyx– Velocity Suite (12/13/2010)

Figure 4

Page 11: Tracking New Coal-Fired Power Plants · PDF fileadditions in the U.S. and coal-fired power plant activity in China. Experience has shown that public announcements of power ... Tracking

11

Net Capacity Changes (Removed and Added Opportunities)

-7

-6

-5

-4

-3

-2

-1

0

1

2010 2011 2012 2013 2014 2015 2016 2017

Capa

city

(GW

)

Proposed Online Year

Under Construction Near Construction Permitted Announced Added Announcements

Capacity Change Breakdown

6,267 MW operational now removed from the list

6,418 MW canceled

• 935 MW permitted cancelled

• 22 MW construction cancelled

• 5,461 MW announcements cancelled

1,599 MW of new announcements added

Removed Capacity

43% of MWs removed represent “Announced” projects49% of MWs removed due to Commissioned plants

Rem

oved Capacity

Source: Ventyx– Velocity Suite (1/8/2010 and 12/13/2010)

Total Net Reductions (less operating) -4,647 MW

Figure 5

Commissioned in 2010 (as of December)• Rodemacher (Brame) (700 MW)• Comanche (850 MW)• Iatan (850 MW)• J K Spruce (820 MW)• Oak Creek-Unit 1 (615 MW)• Oak Grove (879 MW)• Plumb Point (720 MW)• Southwest (300 MW)• Trimble (834 MW)• Willmar (4 MW)• Wygen III (110 MW)

Page 12: Tracking New Coal-Fired Power Plants · PDF fileadditions in the U.S. and coal-fired power plant activity in China. Experience has shown that public announcements of power ... Tracking

12

Technology Listings

Operational(Since 2000)

Progressing(Permitted, Near-, and Under

Construction)

Announced TotalProposed

January2010

Dec 2010(Change)

January2010

Dec 2010(Change)

January2010

Dec 2010(Change)

PC Subcritical 31 11 5 (-6) 13 10 (-3) 24 15 (-9)

CFB 12 6 4 (-2) 11 9 (-2) 17 13 (-4)

PC Supercritical 7 8 7 (-1) 7 4 (-3) 15 11 (-4)

IGCC 1 6 5 (-1) 15 13 (-2) 21 18 (-3)

Source: Ventyx – Velocity SuiteData collected (1/8/2010); Current Report data collected (12/13/2010)

Proposed Technologies of New Plants(with Annual change)

Figure 6

Table 2

0

10

20

5 4 7 5

10 9 413

Num

ber o

f Pla

nts

AnnouncedProgressing

Page 13: Tracking New Coal-Fired Power Plants · PDF fileadditions in the U.S. and coal-fired power plant activity in China. Experience has shown that public announcements of power ... Tracking

13

Geographical location by State: Coal-Fired Plants(Permitted, Near Construction, and Under Construction)

Figure 7

Source: Ventyx – Velocity Suite (12/13/2010)

Page 14: Tracking New Coal-Fired Power Plants · PDF fileadditions in the U.S. and coal-fired power plant activity in China. Experience has shown that public announcements of power ... Tracking

14

Location by NERC Regions: Coal-Fired Plants(Permitted, Near Construction, and Under Construction)

Source: Ventyx – Velocity Suite (12/13/2010)

Figure 8

Page 15: Tracking New Coal-Fired Power Plants · PDF fileadditions in the U.S. and coal-fired power plant activity in China. Experience has shown that public announcements of power ... Tracking

15

Specified Coal RanksAll Proposed Plants

Figure 9

Source: Ventyx – Velocity Suite (12/13/2010)

0

1,000

2,000

3,000

4,000

5,000

Prop

osed

Pla

nt C

apac

ities

(MW

)

19,779 MW “Generic Coal”not shown on chart

Page 16: Tracking New Coal-Fired Power Plants · PDF fileadditions in the U.S. and coal-fired power plant activity in China. Experience has shown that public announcements of power ... Tracking

16

Coal-Fired Build RateChina and United States

0102030405060708090

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016

Cap

acity

(GW

)

Figure 10

Source: USA data - Ventyx – Velocity Suite (12/13/2010)

China data – Platts - UDI WEPPDB 2010

Online Year

Results are Stacked

209 GW of Undetermined Dates

of Chinese Plants

Planned no date (evenly distributed over 4 years)

Page 17: Tracking New Coal-Fired Power Plants · PDF fileadditions in the U.S. and coal-fired power plant activity in China. Experience has shown that public announcements of power ... Tracking

17

Other Generation Development Activity

Page 18: Tracking New Coal-Fired Power Plants · PDF fileadditions in the U.S. and coal-fired power plant activity in China. Experience has shown that public announcements of power ... Tracking

18

Proposed U.S. New CapacityCoal, Natural Gas, Wind, and Nuclear

0

5

10

15

20

25

30

35

40

45

2010 2011 2012 2013 2014 2015 2016 2017 2018

Prop

osed

Nam

epla

te C

apac

ity (G

W)

Coal NG Wind Nuclear

Source: Ventyx – Velocity Suite 12/13/2010

Figure 12

Page 19: Tracking New Coal-Fired Power Plants · PDF fileadditions in the U.S. and coal-fired power plant activity in China. Experience has shown that public announcements of power ... Tracking

19

Status of Proposed New U.S. CapacityCoal, Natural Gas, Wind, and Nuclear

05

1015202530354045

Coa

lN

GW

ind

Nuc

Coa

lN

GW

ind

Nuc

Coa

lN

GW

ind

Nuc

Coa

lN

GW

ind

Nuc

Coa

lN

GW

ind

Nuc

Coa

lN

GW

ind

Nuc

Coa

lN

GW

ind

Nuc

Coa

lN

GW

ind

Nuc

Coa

lN

GW

ind

Nuc

2010 2011 2012 2013 2014 2015 2016 2017 2018

Prop

osed

Nam

epla

te C

apac

ity (G

W)

Under Construction Near Construction Permitted Announced

Source: Ventyx – Velocity Suite 12/13/2010

Figure 13

Page 20: Tracking New Coal-Fired Power Plants · PDF fileadditions in the U.S. and coal-fired power plant activity in China. Experience has shown that public announcements of power ... Tracking

20

Current Wind Capacity Additions by YearsFigure 14

0

5

10

15

20

25

30

35

40

45

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

Capa

city

(GW

)

AnnouncedPermittedNear ConstructionUnder ConstructionActual

Source: Ventyx – Velocity Suite (12/13/2010)

Operational DatesProposedActual

Page 21: Tracking New Coal-Fired Power Plants · PDF fileadditions in the U.S. and coal-fired power plant activity in China. Experience has shown that public announcements of power ... Tracking

21

Current NGCC Capacity Additions by YearsFigure 15

0

5

10

15

20

25

30

35

40

45

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022

Capa

city

(GW

)

AnnouncedPermittedNear ConstructionUnder ConstructionActual

ProposedActualOperational Dates

Source: Ventyx – Velocity Suite (12/13/2010)

Page 22: Tracking New Coal-Fired Power Plants · PDF fileadditions in the U.S. and coal-fired power plant activity in China. Experience has shown that public announcements of power ... Tracking

22

Current NG-GT Capacity Additions by YearsFigure 16

0

5

10

15

20

25

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022

Capa

city

(GW

)

AnnouncedPermittedNear ConstructionUnder ConstructionActual

ProposedActualOperational Dates

Source: Ventyx – Velocity Suite (12/13/2010)

Page 23: Tracking New Coal-Fired Power Plants · PDF fileadditions in the U.S. and coal-fired power plant activity in China. Experience has shown that public announcements of power ... Tracking

23

Current Nuclear Capacity Additions by YearsFigure 17

0

2

4

6

8

10

12

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027

Capa

city

(GW

)

AnnouncedPermittedNear ConstructionUnder ConstructionActual

ProposedActual

Watts Bar Unit 2Construction begun in the 1970s, suspended in 1988 at 80% complete, currently revived with completion due 2012.

Operational Dates

Source: Ventyx – Velocity Suite (12/13/2010)

Page 24: Tracking New Coal-Fired Power Plants · PDF fileadditions in the U.S. and coal-fired power plant activity in China. Experience has shown that public announcements of power ... Tracking

24

U.S. Coal-Fired Power Plant Summary – Year 2010 1/8/2010 – 12/13/2010

• Eleven new coal-plants totaling 6,682 MW were Commissioned in 2010; the most in 25 years

• Progressing/Commissioned projects by December 2010 have had a net increase of 1 plant; a net change in capacity of 3,712 MW (+21%) over Progressing projects in January 2010

• 1,599 MW of new capacity has been Announced and6,418 MW have been canceled– Of 6,418 MW canceled plants, 85% were Announced phase and 15% were

Progressing• Compared to previous years, fewer projects are being Announced

to offset recent Commissioning