Tracker Subsystem 1
GLAST LAT Project GLAST Collaboration Workshop, Castelfalfi, 9/23/2005
GLAST LAT TrackerGLAST LAT Tracker
Tower 11, 12, 13 Pre-Ship Tower 11, 12, 13 Pre-Ship ReviewReview
INFN-Pisa
Tracker Subsystem 2
GLAST LAT Project GLAST Collaboration Workshop, Castelfalfi, 9/23/2005
Towers Assembly and test flowchart highlightsTowers Assembly and test flowchart highlights
• July 29 - August 16, 2005 (INFN-Pisa) : – assembly of complete tray stack
– incomplete cable set• tower 11: non-flight C1,C2• tower 12: missing C5• tower 13: missing C2, C5
– Functional and performance tests
– Sidewalls, alignment
• September 1-14, 2005 (Alenia-Roma)– X-Y-Z vibrations
– Thermal-Vacuum cycles
• September 16-21, 2005 (INFN-Pisa) : – Missing cables installation and
replacements
– Solithane, EMI taping
– Alignment verification, final CPT
• Full EIDP details (soon) at: – http://glast.pi.infn.it
Tower 11, 12, 13 finalization + tower 15 assembly made the clean room VERY
crowded this week!
Tracker Subsystem 3
GLAST LAT Project GLAST Collaboration Workshop, Castelfalfi, 9/23/2005
Towers – Delivery configurationsTowers – Delivery configurations
Tracker Subsystem 4
GLAST LAT Project GLAST Collaboration Workshop, Castelfalfi, 9/23/2005
Towers – Delivery configurationsTowers – Delivery configurations
Tower PN: LAT-DS-00722 (rev3)Tower SN: 11, 12, 13
Environmental test performed with following configuration variations:
Tower 11: C1-001 non-flight installed in place of C1-P-004C2-008 non-flight installed in place of C2-018
Tower 12: C5 missing
Tower 13: C2 missingC5 missing
Note: 16 cables over 24 came from Pioneer
Tracker Subsystem 5
GLAST LAT Project GLAST Collaboration Workshop, Castelfalfi, 9/23/2005
Towers configuration and mechanical verificationsTowers configuration and mechanical verifications
Alignment, Mass, COG:
• All towers well aligned and inside stayclear
• Masses and CG near estimated values (when used real masses)
• Full data available from EIDP and INFN-PISA web site
Configuration:• Kapton tape and foam applied on the flex
cables as per LAT-DS-00722• 4 layers of Poron foam 0.037 THK used on
Bottom and Top Tray (–X) side (in place of 5 layers)
• Base Plate assembly:•Torque of nuts 5.4 Nm, spec is (5.08 +0.56/-0 Nm)
Tracker Subsystem 6
GLAST LAT Project GLAST Collaboration Workshop, Castelfalfi, 9/23/2005
Towers 11, 12, 13 – Open NCRsTowers 11, 12, 13 – Open NCRs
• Environmental test in non-flight configuration– INFN/PI-NCRs: 568 (twr11), 575 (twr12), 569(twr13)– environmental test runs were performed with missing or non-flight cables, as agreed by an MRB– the NCR can be closedthe NCR can be closed
• Hot/cold power off/on not performed– INFN/PI-NCRs: 578 (twr12), 574 (twr13)– The problem is due to a known and documented issue with resetting MCM (NCR 417) with
missing cables– To avoid the many and unknown number of power cycle needed to re-establish a good
configuration with as many readable layers as possible, hot/cold switch on and off were not performed
– SLAC has requested waiver LAT-XR-07340 on this issue relative to towers 7,9,10,12,13– the NCR can be closedthe NCR can be closed
• Vacuum level out of specification– INFN/PI-NCRs: 581 (twr11), 583 (twr12), 582 (twr13)– The situation is similar to earlier TVAC tests and the proposal is to accept the test as for
previous MRBs– the NCR can be closedthe NCR can be closed
• INFN/PI-573(twr11): some screws out of torque on sidewall +X– ~20% of the +X sidewall screws found out of torque after Z-axis vibration– All screws were re-torqued to spec, X-Y axis vibrations were performed, all screws torque were
checked and no change was found– the NCR can be closedthe NCR can be closed
Tracker Subsystem 7
GLAST LAT Project GLAST Collaboration Workshop, Castelfalfi, 9/23/2005
TVAC – vacuum level out of specTVAC – vacuum level out of spec
Same behaviour as previous tests – the proposal is to accept the test:
•Vacuum slightly higher than spec (~> 10-4 vs 5x10-5 Torr) only during hot soaks•Vacuum level improving with time
Tracker Subsystem 8
GLAST LAT Project GLAST Collaboration Workshop, Castelfalfi, 9/23/2005
Towers EfficiencyTowers Efficiency
Tower 11, 12, 13 layers efficiency
0
10
20
30
40
50
60
98 98.2 98.4 98.6 98.8 99 99.2 99.4 99.6 99.8 100
efficiency (%)
specEfficiency – bad channels correlation
ConclusionsConclusions
The clean room is sadly empty and people The clean room is sadly empty and people are looking for things to do (maybe)are looking for things to do (maybe)
butbut
3 excellent towers are on their way to the 3 excellent towers are on their way to the LAT GRID at SLACLAT GRID at SLAC