tqm & hr - final
DESCRIPTION
TQM & HR assignmentsTRANSCRIPT
TQM & HR
1. The hard side of TQM involves: interpretation of data2. Multi-disciplinary approach means: people from different discipline in organization; people from different department having diff skill3. The environmental management system followed by organization is ISO-14000.
4. The objective of ISO-9000 customer satisfaction.
5. ISO-14001 is: powerful management tool to be used by an organization to control the environmental hazardous.
6. The role of management is: to provide resources; to define EMS, to monitor the effectiveness of the system7. TQM & ISO both focuses on employee. False8. Circle represents beginning or end of operation while plotting few charts.
9. Record may be: procedure to control its use10. Dr. Deming believes that: quality & productivity walk in hands11. Environmental impact is: any change to environment resulting from organization activity12. Response is speed.
Match the following:
TQM approach is
employee participationTQM & ISO both focuses on
customer satisfactionWhich tool is used in implementing ISO-9000P-D-C-AQuality approach is
potential failure prevention13. Quality approach is potential failure prevention. True14. Which are pillar of TQM: morale; delivery15. Malcolm Baldrige national quality award is for (MBNQA): total quality management16. Dr. Demings contribution is in the field of: Quality17. Cost of poor quality comprises: cost of internal failure; cost of external failure18. Diamond represents decision point while plotting flow chart.
19. Type of waste are: waiting time; transport; processing waste20. Corrective action means: action taken on detecting NC; action taken on observed NC21. In quality assurance primary concern is: co-ordination22. Continual improvement is in: environmental objective; audit result; corrective action23. Reputation means past performance.
24. If some activity are outsourced: vendors are assessed on predetermined criteria; procedure to be followed for assessing vendor25. The benefit of ISO 14001 are applicable to: the organization which adopts it; adjacent property owner & environment26. Vendor assessment is: appraisal cost27. Cause & effect diagram used to: identity & organize possible causes of problem; identify possible causes of problem & determining its relation28. Continual improvement which focuses on the improvement of the EMS, must be reviewed every month for any changed aspects and impacts. False29. ISO-9000-1994 is model for quality assurance. True30. Any process is to be controllable.
31. The quality approach is potential failure prevention.
32. Value is for which customer is paying. True33. Business objectives are derived from mission statement. True34. Process capability is only calculated when it qualify Bell shape curve. True35. Quality circle encourages employee participation. True36. The documents of external origin: should be controlled separatelyMatch the following:
Critical process maturity concept include
process capabilityManaged level of process
process is controlledCMM is
capability maturityProcess is managed level
performance is model respectable37. Product planning quality should address capability & qualification of equipment. True38. By adopting TQM philosophy, it benefits to: organization & employee39. Quality means fitness for use.
40. Working together for excellence is team work.
41. Waste is the machine down time.
42. Dimensions of quality are: performance; feature; reliability43. CMM is applicable to: software industry44. The forms of histogram are: scatter; normal; skewed45. A standard assures quality to customers.
46. Drive out fear so that everyone may work effectively for the company. (A point I Demings 14 point program).
47. Management is a science as well as an art. True48. The core processes are those which have a Direct contribution to the business of an organization.
49. Like you have internal customers there are internal suppliers too. True50. The control objectives and controls in ISO 17799:2005 is intended as a common basis and practical guidelines for developing: organizational security standard; effective security management practices; build confidence in inter-organizational operations51. Organization thinking is revolutionary as has been the thinking on quality.52. Soft domain consists of Software for using the machines and facilities to achieve business objectives.
53. QMS documentation includes: processes and guidelines; manual; forms54. Strategy formation starts with strategic goals. True55. Each process area has expected components that describes what an organization will: specific properties; generic properties; defining properties56. Quality is not an act, but a habit. True57. Quality costs or cost of quality or cost of poor quality are all: almost synonyms58. Quality of offering means: QA department is aware of the inspection process for each offering59. ISO means international standards organization. True60. TQM demands that it is for: change in the organizational culture and institutionalization of quality61. Management process can ignore planning. False62. In degree of institutionalization a process that accomplishes work to produce work products is the meaning of the term performed processes.
63. ISO 27001 comprises of 115 pages.
64. Quality culture is: a need65. Papio Food Pvt Ltd is a vegetable processing plant located 20 km from Mahabaleshwar in Maharashtra. False66. TQM is: is a system of educating people on quality67. The process is ingrained in the way work is performed and there is commitment and thus consistency to perform the process that way only is termed as: InstitutionalizationMatch the following:
Integrated supplier management
process managementOrganization innovation and deployment
project managementConfiguration management
technical purposeTechnical solution
engineeringMatch the following:
Tangible attribute
quality attributeIntangible attributeproduction attributeTo measure courtesyefforts, courtesy, quality, timeTo measure qualityprocess, product, service, people68. Business operations rotates: production, growth69. Each plan contributes to Vision.
70. Number of ISO members countries are: 17671. Planning is a part of: QMS72. To challenges you need to focus on the future.
73. A live vision prompts people: to act proactively in a problem situation in face of customer, keeping intact the image of the organization74. The rework product needs to be once gain tested if it is conforming to specifications and then only it could be shipped to the customer. True75. Planning process defines: responsibility76. The success of HR process is demonstrated when the sub processes add up to make it a reality which includes which of the following? Gathering data on the performance of people; motivating people to perform to its objectives; enabling people to be over prepared for future77. Deming aims to improve quality and productivity.
78. The optimizing level is where the predictability is attained, as the maturity is at the lowest level. True79. External environment consists of: land, water, air; natural resources, flora, fauna80. Being capable is the quality of process and means that the process is able to deliver the desired outcome.
81. Select the contains required for relational data base for key measurements: product; core or support behaviour; quality82. Annexure C of ISO 14001 deals with how to go about hazard identification and the assessment and control of risk. True83. A knowledgeable operator may have to be vigilant with each output produced to be sure it meets quality expectation level of being vigilant gets influenced by: boredom; machine downtime; apprehension on job description84. Two headings under failure costs are, as in ASQC 1986 are: internal failure costs; external failure costs85. Purpose of business met by: customers86. In ISO 14001 in paragraph of standard the requirement for checking are: consists of monitoring and measurement; examining compliance reporting; taking actions on nonconformities87. One of the main use of SPC is to provide information.88. ISO 17799:2005 contains the best practices for control objectives and control in the following areas of information security management: security policy; organization of information security89. TQM: is vision of top management90. Building quality into a product means: quality of design; quality of processes; quality of tools91. Leadership is at the root of cultural management and brings about a change in culture. True92. TQM should be managed: as a process and not as a program93. Leaders must be: alive; always right; models of behaviour94. Leadership is: personality95. Internalization must keep following with the changes.
96. Leaders must be models of behaviour.
97. The power base is not relevant in deciding the ability to take decisions and lead the organization towards the desired change. True98. Quality is not an act, it is a habit, the statement was made by: AristotleMatch the following:
Leadership
is learnt by attending trainingLanguage of qualityan obstacle to learning andBureaucracy
must percolate all through theAn outstanding businessenvisioning the future for the99. Quality management: a practice as per international standards; is as a process or set of actions on quality meaning managing quality; means quality of the management process itself100. Designing organizational culture: is a proactive and strategic activity101. Bureaucracy is an obstacle to learning and innovation. True102. An adjustment to account for changes is inherent in process concept.
103. Designing the organization culture is a management responsibility. True104. Design of culture in an organization: has far reaching implications; is required when organizational performance stagnates; is a normal step when the top management change takes place105. Dimensions of culture are: goal orientation; motivation; organization structure, the relationship that is defined106. Creativity is an indication of the quality of the working environment. True107. Quality planning begins at: top management of organization108. The way people get led is the relationship between culture and leadership.
109. The quality gurus have given an interpretation of TQM as: philosophy from a specific angle; per ones experience in guiding organizations; standardMatch the following:
Leadership attributes
is the most powerful instrumentInternalization of culture beliefs and valuesmean a pattern forAttitudes
enables a person to shape, formTeam culture
means team has ability to110. Mistakes are learning opportunities. Analysis of mistakes must lead to learning. True111. People carry patterns because of: the variety of experiences they accumulate112. A concept is: an idea113. Business is enabled by: its culture114. A primary product characteristic is performance.
115. Plan takes into account quality and time aspects for customer.
116. The process means a sequence of activities for transforming input into output.
117. A widely accepted categorization and definition of quality costs is what Feiganbaum had put forth in 1956. True118. The common theme in quality are: quality is free, quality is in the process; quality management itself is a process119. Corrective action means: action taken on detecting NC, action taken on observed NC120. outstanding business performance is: through strategic quality121. quality is responsible of leadership.
122. for leadership process the main resource is people.
123. planning decreases time span to lead in competition. False124. planning and organizing for TQM includes: developing a clear long term strategy for TQM process; developing prevention based activities; defining an approach for developing a quality management system as a tool to operate business with reference to strategy for business125. in ISO 14001 in paragraph of standard the requirement for planning the stages are: identify environmental aspects; determine those that can have a significant impact; understand the legal and other requirements126. SPC is conducive to the pursuit of: continual improvement127. the core processes are those which have a direct contribution to the business of an organisation.
128. Feigenbaum asks management to commit themselves to: understand quality issues; commit to improve quality; incorporate quality into management practices129. planning has direct impact on the overall organisation. True130. Feigenbaum = takes a very serious financial
131. for successes Feigenbaum demands that = senior management should
132. communication systems are of paramount importance = to communicate requirements
133. fire fighting of quality problems = has to be replaced with a very
134. language is very important: to establish a culture in an organisation135. ISO revision is planned in 2008. False136. a practice of familiarizing all personnel with organisational communication guideline helps in defining a communication guideline for the organisation as a part of the business systems helps people in: better communication137. achievement of process improvement within an individual process area, is termed as: capability level138. the scope of audit during the audit of sales could be to examine: the customer satisfaction; market research; contribution to the turnover139. an organisation is the culture in it.
140. assigning responsibility for review strategy defined is equally important. True141. while designing an organisation consider: quality of management; quality of processes; quality of communication142. the intention of self assessment is to evaluate organisational performance.
143. managing continual improvement is: a process subsequent to defining strategies144. change the business with time.
145. SMART objectives: Specific; Measurable; Realistic146. in hierarchy of human needs the need and desire for self-fulfillment, becoming everything one is capable of becoming comes under self actualization.
147. a model is conceptualized by the people in the organisation. True148. in ISO 14001 in paragraph of standard the requirement for planning the stages are: define target to be achieved to meet policy; assign responsibilities and resources too; state clearly the time frame for achieving149. quality is not an act, but an habit. True150. Sun Tzu explains the strategy formation with four principles.
151. each process area has components under three headings that is: required; expected; informative152. surroundings in which organisations operate, including air, land, water, natural resources, flora, fauna, humans and their interaction is known as: Environment153. the management practices on the appraisal results are very important on the three aspects at the organisational level which are: retaining people with skills and competencies; reinforcing values and thus a work culture of quality performance; maintaining a high motivation at all levels in that organisation154. measurements helps increase satisfaction level of customer.
155. Quality culture is: an idea156. each process area has required components that describes what an organisation must achieve to: satisfy process area; visibility; evaluation157. the use of a CMMI model for the purpose of making it suitable for a specific application. To align application of a model to an organisations business is termed as: CMMI model tailoring158. TQM believes and propagates that quality, like the business process, is in sequence form.
159. Deming is known world over for his PDCA cycle.
160. SA should be considered as an alternative to internal or external audit. True161. the rework product needs to be once again tested if it is conforming to specifications and then only it could be shipped to the customer. True162. design verification = product design is right
163. design validation = comparison with easier design
164. design output = customers
165. design input = right product is design
166. Crosby introduced the idea of The quality management grid: this is one of his 14 point program167. supplier agreement management comes under category of: project management168. structure is an important component as it decides the methods for decision- making.
169. in attaining quality, Taguchi stages are = system design, parameter
170. quality leadership is essential = to a companys success in the
171. failure costs are incurred because = the defects are removed by way
172. Poka Yoke means = to manage quality all through the
173. assessment of effectiveness of organisational design is always in relation to the goals that are to be attained.
174. defects equals to: rework; loss of productivity; people in the organisation are not motivated175. implementing strategy means leadership aligned to customer: and ensuring that employees are aligned to the leaders vision to attain customer loyalty176. each activity should have vision.
177. advantage of planning is seen in: product; order; design178. verification of inspections are non-value adding activities. True179. building quality into a product means: quality of design; quality of processes; quality of tools180. organisations culture and leadership: are closely related181. for service organisation the support processes are: administration of offices; HR management; marketing182. effective customer relationship process is the key to the success of an organisation. True183. culture is a way of organisational life and it is the image of an organisation.
184. BIS means: Bureau of Indian Standards185. Auditor communicates their observations in a closing meeting.
186. global business solutions is a ISO 9001 certified organisation. True187. it is possible that a leader emerges: naturally depending upon the purpose or vision for which the organisation gets created188. Appraisal costs: are those incurred on verification or inspection or reviews from design to delivery189. there is no standard definition of TQM. False190. creativity is an indication of the quality of the working environment. True191. business needs following criteria as performance assessment: standing in the market; quality culture in the organization; cost reduction192. the business is likely to ignore local concerns such as: political scenario; the environment; the culture193. QMS is = defined by the top management194. each process captures measurements = that have direct as well as195. starting from organizational strategy the organizational objectives are = defined every time the CEO196. the measurement plan must address all the processes = and reports as in MIS defined for197. third party audit is conducted by the certifying agency. True198. TQM is a function in an organizations culture.
199. each plan contributes to vision.
200. for an organization, environmental imperative means: organization has work environment that encourages people to perform quality201. the future picture in the vision: demands that the organization moves towards it202. because there are levels of processes, there are levels in the organization or management. True203. quality leadership is demonstrated by the way: the publicity made204. cause effect diagram is known as fish bone diagram.
205. planning impacts which of the following Future.206. guideline to be followed for preparing the flow charts is to involve people who carry out parts.
207. top management of Karnataka Steel Ltd. Being concerned about the welfare of workers.
208. in hierarchy of human needs food and shelter are essential needs.
209. you walk the talk and: people demonstrate alignment to what you ask for a define indication to high morale; create an organizational culture; you are instrumental in establishing a behaviour pattern210. process for planning creation of new plans.
211. Pareto analysis is used for: quality; production plan; stock control212. in India Six sigma is implemented by mostly: software companies213. some areas for which management needs decisions are: range of product and service; finance, pricing214. organisation thinking is revolutionary as has been the thinking on quality.
215. planning has direct impact on: Quality; Customer Satisfaction; Production216. EEP stands for Effort Estimation Process. True217. the quality gurus have given an interpretation of TQM as: philosophy from a specific angle; per ones experience in guiding organisations; standard218. the sum of total of behaviors is: Culture219. Organisational culture: is a set of policies in an organisation220. the first step in understanding the intervention by HR processes in organisational operatives including the business system or quality management system includes: awareness of vision; awareness of strategies; awareness of goal221. mistakes are learning opportunities, analysis of mistakes must lead to learning. True222. the four elements of PDCA cycle are a closed loop. True223. During the 1960s the concept of quality costs emerged. True224. Internalization is a summation of the Psychological characteristics of organisational culture.
225. Auditor communicates their Observations in a closing meeting.
226. In ISO 14001 in paragraph of standard the requirement for implement planning the stages are: make resources available; assign responsibility; ensure that the programs are implemented and maintained227. an organisation plan the activities to attain policy and objectives towards sustaining the environment while implementing this standard an organisation needs to consider the implementation of the: best appropriate practices and techniques; cost effectiveness; legal requirement228. Deming advocates measurement of quality by: having a detailed measures and metrics of performance of process and people229. For leadership process the main resource people.
Match the following:
Question
correct answer
In business variation has
an impact on business performanceThe measurements for process performance capturedis used to adjust the productionThe knowledge of measurements on process
is used to adjust the control onStatistical analysis enables taking decisions
in a systematic manner230. Managers are experienced who take pride in what they do.
231. In ISO 14001 in paragraph of standard the requirement for checking the: internal audits; control of records; external audits232. Time required to complete on order or one production lot or one project for design, after which the next similar set of activities can start is termed as Cycle time.
233. Planning impacts on: Future234. Business operations rotates: Production; Growth235. the constraints business can encounter can be summarized into 7 Ms. True236. Dr. Peter Drucker says on organisation design that how the culture is built depends upon what results are needed.
237. Process for planning Educating.
238. the result of failure is waste of efforts. False239. Audit is carried out to operate the business in a proactive manner. True240. Mount Consulting Service Pvt. Ltd provides process consultancy for quality models like ISO 9001 and CMMI.
241. Culture is: an evolutionary process242. Planning has direct impact on: quality; customer satisfaction; production243. Quality planning begins at: top management of organisation244. ISO revision is planned in 2008. False245. Management is a science as well as an art. True246. Standard contents: Definitions; Concepts; Foreign Collaboration247. Quality manual is a: Document248. The statistical tools have the roles: data collection; data processing; summarizing of data249. War and business are names of the same conflict operations. True250. From quality management view and from the point of excelling in business, before deciding to launch product/service any analysis of process must result in providing information on: our capacity to provide the output required; efforts and time required; knowledge of competency251. Your thinking and ideas need to be developed as the subject of quality: has a strategic impact on business performanceMatch the following:
Question
correct answer
QMS
Quality management systemsSWOT
Strength, weakness, opportunity, threatISO
International Standard organisationsTop management
Managing Director252. While designing an organisation: there should be focus on current business; without losing the sight of the future of business
253. Every activity one must Sequence.
254. Standards help to assess performance of: Organisations255. QMS documentation includes: processes and guidelines; manual; forms256. Customer is: one who pays for product or service; an end user; internal257. Planning can be at any level. True258. Mind patterns are created: over a period of time259. Bureaucracy in QMS meads people are made to comply processes.
260. Quality management is all about Focus on customer.
261. Reliability, defects and defect removal efficiency are examples of: Process Measures262. Good quality product/service gets marketed by its qualities such as: Strategies; Advertisement/ Publicity; Planning263. Like you have internal customers there are internal suppliers too. True264. How many level of plans are there: 4265. People do not have capabilities to respond to a range of situations. False266. Shigeo Shingo introduced concept of Poka-Yoke for mistake-proofing.
267. Business is enables by: its cultureTrue/False
QuestionISO is Quality management system.
Correct AnswerTrue
Multiple Choice Single Answer
QuestionEvolution of quality concept. Current era is
Correct AnswerContinual Improvement
Multiple Choice Multiple Answer
QuestionService Assurance is :-
Correct AnswerConfidence with customer , Customer have trust , Employee have knowledge
Multiple Choice Single Answer
QuestionTQM is a:-
Correct AnswerPhilosophy
Multiple Choice Multiple Answer
QuestionCause & Effect diagram used to :-
Correct AnswerIdentify & organize possible causes of problem , Identify possible causes of problem & determining its relation
Select The Blank
Question________ helps organization reduce employee turnover and absenteeism.
Correct AnswerTraining & development
Multiple Choice Single Answer
QuestionIn statistical quality control, primary concern is :-
Correct AnswerControl
Multiple Choice Single Answer
QuestionThe management review is carried :-
Correct AnswerTo ensure effectiveness Of QMS
Select The Blank
QuestionWhile calculating PPK standard deviation is________.
Correct AnswerCalculated
True/False
QuestionQuality circle benefit to Employee.
Correct AnswerTrue
Select The Blank
QuestionWhile calculating CPK standard deviation is________.
Correct AnswerEstimated
Multiple Choice Multiple Answer
QuestionHow TQM helps in reducing cost?
Correct AnswerBy reducing internal failure , By reducing external failure cost
Select The Blank
QuestionWorking together for excellence is ________.
Correct AnswerTeam work
True/False
QuestionTQM & ISO both focuses on employee.
Correct AnswerFalse
Match The Following
Question
Correct Answer
Your Answer
How TQM helps in reducing cost
By reducing external sale
By increasing sale
Calibration activity carried in company is
Appraisal cost
Overhead
Quality planning is
Prevention cost
Prevention cost
Vender assessment is
Appraisal cost
Appraisal cost
True/False
QuestionThe need for TQM is due to Cut throat competition.
Correct AnswerTrue
Multiple Choice Multiple Answer
QuestionMulti- disciplinary approach means :-
Correct AnswerPeople from different discipline in organization , People from different department having diff skill
Select The Blank
QuestionArrow indicates ________.
Correct AnswerDirection of flow
Select The Blank
QuestionThe TQM approach is based on employee's ________.
Correct AnswerParticipation
Multiple Choice Single Answer
QuestionIn ISO the focus is on :-
Correct AnswerEnhancing customer satisfaction
Multiple Choice Multiple Answer
QuestionReliability of product means :-
Correct AnswerConsistency of performance , Performance over period
Multiple Choice Multiple Answer
QuestionCurrent quality concept is :-
Correct AnswerContinual improvement , Prevention of defect
Multiple Choice Multiple Answer
QuestionIn inspection primary concern is :-
Correct AnswerDetection of Defect , Action on only detected defect
Select The Blank
QuestionResponse is________.
Correct AnswerSpeed
True/False
QuestionThe European award uses the criteria of efficiency & effectiveness.
Correct AnswerTrue
Select The Blank
QuestionProcess Quality planning means ________.
Correct AnswerBuilding quality into processes
Multiple Choice Multiple Answer
QuestionDoes TQM approach have relevance to Indian industry in context to
Correct AnswerPeople involvement , Customer satisfaction
Multiple Choice Multiple Answer
QuestionProcess evaluation is to identify :-
Correct AnswerPotential failure prevention , Correctness of product
Select The Blank
QuestionThe planning & implementing Enviromental policy is responsibility of________
Correct AnswerManagement representative.
Multiple Choice Single Answer
QuestionThe management review to be conducted :-
Correct AnswerAs & when required
Multiple Choice Multiple Answer
QuestionThe evaluation & selection of vendor :-
Correct AnswerMust have predetermined procedure , Must be assessed
Multiple Choice Single Answer
QuestionThe evaluation & selection of vendor :-
Correct AnswerMust have procedure for it
Multiple Choice Single Answer
QuestionEnvironment policy must contain :-
Correct AnswerMission & core values with respect to the enviroment
Multiple Choice Single Answer
QuestionAccording to traditional thinking, quality improvement leads to :-
Correct AnswerLower productivity
Multiple Choice Multiple Answer
QuestionThe mean is :-
Correct AnswerCenter of process , Target of process
Multiple Choice Single Answer
QuestionTQM approach is:-
Correct AnswerCentered on quality
True/False
QuestionLeadership from top should be totally honest & transparent in dealing .
Correct AnswerTrue
True/False
QuestionQuality approach is potential failure prevention.
Correct AnswerTrue
Multiple Choice Single Answer
QuestionAccording to Deming quality improvement is analogous :-
Correct AnswerTo reduction of Variation
True/False
QuestionThe ISO is based on Plan - do - check- Act.
Correct AnswerTrue
Select The Blank
QuestionThe Design & Development Review to be carried ________
Correct AnswerTo evaluate ability of product to meet requirements
Multiple Choice Multiple Answer
QuestionWhich are pillar of Tqm :-
Correct AnswerMorale , Delivery
Select The Blank
QuestionTQM emphasises on ________.
Correct AnswerSmall improvement
Multiple Choice Single Answer
QuestionIn Quality circle, which problems are solved?
Correct AnswerWork related
Multiple Choice Multiple Answer
QuestionFollowing are the phases of intervention:-
Correct AnswerFormulation stage , Maintenance stage , Implementation stage
Multiple Choice Multiple Answer
QuestionLeadership style from top to bottom is :-
Correct AnswerTotally honest & transparent , Providing consistent vision / direction
Multiple Choice Multiple Answer
QuestionTqm focus on :-
Correct AnswerEmployee , Customer
Multiple Choice Multiple Answer
QuestionWhile recruiting person he should
Correct AnswerCompetent to perform job , Trained to perform specified job
Multiple Choice Multiple Answer
QuestionCurrent quality concept is :-
Correct AnswerContinual improvement , Prevention of defect
Match The Following
QuestionCorrect AnswerYour Answer
MBQA is eligible forManufacturing organizationManufacturing organization
Malcolm baldring award seeks improvement inQuality & productivityQuality & productivity
European quality award is forImproving efficiencySoftware organization
Common elements of winners areSenior management was activity involvedCost reduction
Multiple Choice Multiple Answer
QuestionIn ISO the focus is on :-
Correct AnswerEnhancing customer satisfaction , Delighting customer
Multiple Choice Single Answer
QuestionStrategic quality management means :-
Correct AnswerStrategic Improvement
Multiple Choice Multiple Answer
QuestionProcess evaluation is to identify :-
Correct AnswerPotential failure prevention , Correctness of product
True/False
QuestionCPK is 1' 33 means 64 PPM.
Correct AnswerTrue
True/False
QuestionTQM & ISO both focuses on employee.
Correct AnswerFalse
Select The Blank
QuestionWhile setting Quality objective, ________ to be considered.
Correct AnswerCustomer need
Select The Blank
Question________ helps organization reduce employee turnover and absenteeism.
Correct AnswerTraining & development
Multiple Choice Single Answer
QuestionThe management review is carried :-
Correct AnswerTo ensure effectiveness Of QMS
Multiple Choice Single Answer
QuestionWhile setting Quality objective, What is to be consider :-
Correct AnswerCustomer need
True/False
QuestionBy Applying basic principle, the process improvement will be in organization's focuses on work process.
Correct AnswerTrue
Multiple Choice Single Answer
QuestionISO - 14001 is :-
Correct AnswerPowerful management tool to be used by an organisation to control the environmental hazards.
Select The Blank
Question________ is responsible for quality objective.
Correct AnswerTop management
Multiple Choice Single Answer
QuestionWhat is CMM ?
Correct AnswerCapability maturity model
Multiple Choice Single Answer
QuestionAccording to Deming, Quality problems are :-
Correct AnswerDue to management
Select The Blank
Question________organisations are not eligible for MBNQA.
Correct AnswerSoftware
Multiple Choice Single Answer
QuestionISO 14001 is the management representative, responsible for :-
Correct AnswerPlanning and implementing policy
Multiple Choice Multiple Answer
QuestionDoes TQM approach have relevance to Indian industry in context to
Correct AnswerCustomer satisfaction , People involvement
Multiple Choice Single Answer
QuestionMalcolm Baldrige national quality award is for ( MBNQA ) :-
Correct AnswerTotal quality management
True/False
QuestionBusiness objectives are derived from mission statement.
Correct AnswerTrue
Multiple Choice Multiple Answer
QuestionBy Applying basic principle the process improvement will be in organization's :-
Correct AnswerFocus on work process , Maintain self esteem of other
True/False
QuestionThe European award uses the criteria of efficiency & effectiveness.
Correct AnswerTrue
Select The Blank
QuestionReputation means________.
Correct AnswerPast performance
Multiple Choice Multiple Answer
QuestionWhile setting Goal ,following things to be consider.
Correct AnswerMarketability of product , Organization need
Multiple Choice Single Answer
QuestionIntegrity means :-
Correct AnswerTrue to our words
Multiple Choice Single Answer
QuestionDocuments in company are controlled by :-
Correct AnswerManagement Representative.
Multiple Choice Multiple Answer
QuestionPP & PPK is calculated for :-
Correct AnswerInitial production run , Initial process setting
Select The Blank
QuestionTQM promotes________
Correct AnswerTeam work
Select The Blank
QuestionThe planning & implementing Enviromental policy is responsibility of________
Correct AnswerManagement representative.
Multiple Choice Single Answer
QuestionIn Quality circle, which problems are solved?
Correct AnswerWork related
Select The Blank
QuestionPayment Against warranty is________.
Correct AnswerExternal failure cost
True/False
QuestionThe role of management in QMS is to provide resources.
Correct AnswerTrue
True/False
QuestionPhysical facilities is tangible dimension.
Correct AnswerTrue
Select The Blank
QuestionQuality means________.
Correct AnswerFitness for use
True/False
QuestionZero Deviation means product is set on mean.
Correct AnswerTrue
Multiple Choice Multiple Answer
QuestionThe competence of the employee means :-
Correct AnswerCompetence of personnel performing work affective quality , Evaluale the effectiveness of action taken , Maintain appropriate Record
Multiple Choice Multiple Answer
QuestionEmployee should be involved in :-
Correct AnswerDecision making , Participation
Select The Blank
QuestionThe supplier must provided ________ information to management.
Correct AnswerAdequate
True/False
QuestionQuality approach is continual improvement.
Correct AnswerTrue
Select The Blank
QuestionTQM emphasises on ________.
Correct AnswerSmall improvement
True/False
QuestionValue is for which customer is paying.
Correct AnswerTrue
Multiple Choice Single Answer
QuestionWhat is quality policy?
Correct AnswerOverall intention & direction of organization towards quality
Multiple Choice Multiple Answer
QuestionSpecial characteristic means :-
Correct AnswerProduct characteristic which affect fit/ function / Regulation , Characteristic of product which are regulatory requirement.
True/False
QuestionRecruitment & Selection are critical HR issue.
Correct AnswerTrue
True/False
QuestionEnviromental impact is any change to the environment, whether adverse or beneficial.
Correct AnswerTrue
Multiple Choice Multiple Answer
QuestionLead assessor is :-
Correct AnswerQualified personnel , Leading team of auditor
Select The Blank
QuestionThe documents of external origin ________
Correct AnswerShould be controlled separately
True/False
QuestionThe soft side of TQM include Training on job
Correct AnswerTrue
Multiple Choice Single Answer
QuestionTQM is aiming :-
Correct AnswerLong term success
Select The Blank
QuestionIn ISO the focus on customer is ________
Correct AnswerIn Enhancing customer satisfaction
True/False
QuestionTraining helps organization Reduces employee' turnover.
Correct AnswerTrue
Multiple Choice Single Answer
QuestionCMM is use for :-
Correct AnswerManaging software project
Multiple Choice Single Answer
QuestionIn business, vision involve :-
Correct AnswerMission statement
Multiple Choice Single Answer
QuestionWhich is not part of cost of poor quality ?
Correct AnswerAppraisal cost
Multiple Choice Single Answer
QuestionDr. Deming Believes that :-
Correct AnswerQuality & Productivity walk in hands
Select The Blank
QuestionThe non conforming products are ________.
Correct AnswerIdentified & controlled
Select The Blank
QuestionPlanning of internal hazardous material & its disposal________.
Correct AnswerContains Planing aspect
Multiple Choice Multiple Answer
QuestionBy adopting Tqm philosophy, it benefit to :-
Correct AnswerOrganisation , Employee
True/False
QuestionFailure mode & effect Analysis is prevention tool.
Correct AnswerTrue
Select The Blank
QuestionWhile setting Quality objective, ________ to be considered.
Correct AnswerCustomer need
Select The Blank
Question________ is responsible for quality objective.
Correct AnswerTop management
Select The Blank
QuestionQuality approach is________
Correct AnswerPotential failure prevention
True/False
QuestionISO calls for Product approach.
Correct AnswerFalse
True/False
QuestionEnviroment indudes natural resources.
Correct AnswerTrue
True/False
QuestionISO - 9000 -2000 this revision of ISO is currently in use.
Correct AnswerTrue
Select The Blank
QuestionModel used in software industry to check the quality is called________
Correct AnswerCapability maturity model
Multiple Choice Multiple Answer
QuestionNeed for Tqm is due :-
Correct AnswerCut throat competition , Customer requirement
Multiple Choice Single Answer
QuestionWhat is quality policy?
Correct AnswerOverall intention & direction of organization towards quality
Match The Following
Question
Correct Answer
Your Answer
Dr. Deming believes
To prevent defect
Quality improves productivity decreases
Ishikawa development
Cause & effect diagram
Histogram
Type of variation is due to
Common causes
Common causes
Crosby's objective of quality
Histogram
Quality & productivity work together
Select The Blank
QuestionRectangle represent ________ While plotting flow chart.
Correct AnswerSteps in Activity
Select The Blank
Question________ is important in providing some underpinning of the sense of shared responsibility.
Correct AnswerSingle status
Multiple Choice Single Answer
QuestionPlan aspect contains :-
Correct AnswerPlanning of internal hazard & its disposal
Multiple Choice Multiple Answer
QuestionThe inviromental policy must :-
Correct AnswerCommits to prevention of pollution , Be Relevant to the activity , Comply with legislation
Multiple Choice Single Answer
QuestionTally chart is :-
Correct AnswerData collection tool
True/False
QuestionEuropean award is given to any country.
Correct AnswerFalse
Multiple Choice Single Answer
QuestionWhat is environment?
Correct AnswerSurrounding in which an organization operates.
Multiple Choice Single Answer
QuestionWhat is EMS?
Correct AnswerEnviromentel management system
Multiple Choice Multiple Answer
QuestionPP & PPK is calculated for :-
Correct AnswerInitial production run , Initial process setting
Match The Following
Question
Correct Answer
Your Answer
Dimension
Physical facility
Vary from time to time .
Service characteristic
Vary from time to time .
Physical facility
Customer satisfaction survey
To assess customer satisfaction level
To assess customer satisfaction level
Poor service is due to
Inadequate resource
Unskilled manpower
True/False
QuestionIn TQM "Total" means Total Organization.
Correct AnswerTrue
Multiple Choice Multiple Answer
QuestionThe inviromental policy must contain & communicate the :-
Correct AnswerMission & value with respect to enviroment , Control & improve enviroment , Enviromental impact
Multiple Choice Multiple Answer
QuestionThe Quality problems arises :-
Correct AnswerDue to management , Due to Employee
Multiple Choice Multiple Answer
QuestionBar chart is :-
Correct AnswerFrequency Distribution tool , Data analysis tool
Multiple Choice Multiple Answer
QuestionCompetitive advantage will be achieved by :-
Correct AnswerServing customer in excellent fashion , Get in pat from customer & convert in service , Technological improvement
Select The Blank
QuestionDiamond represent ________ while plotting flow chart.
Correct AnswerDecision point
Multiple Choice Multiple Answer
QuestionThe role of management in QMS is :-
Correct AnswerTo provide resources , To provide support
Multiple Choice Single Answer
QuestionWhich of the following is not process input?
Correct AnswerTesting
Multiple Choice Single Answer
QuestionBefore Accepting the order :-
Correct AnswerIt should be reviewed
Multiple Choice Multiple Answer
QuestionThe role of management is :-
Correct AnswerTo provide Resources , To define EMS , To monitor the effectiveness of the system
Multiple Choice Multiple Answer
QuestionCost of poor quality comprises :-
Correct AnswerCost of internal failure , Cost of external failure
Multiple Choice Single Answer
QuestionThe quality manual have :-
Correct AnswerLevel 3
True/False
QuestionISO 9000 & TQM are supportive to each other.
Correct AnswerTrue
Multiple Choice Multiple Answer
QuestionCause & Effect diagram used to :-
Correct AnswerIdentify & organize possible causes of problem , Identify possible causes of problem & determining its relation
True/False
QuestionEuropean award is given to any country.
Correct AnswerFalse
Multiple Choice Single Answer
QuestionTQM focuses on :-
Correct AnswerCustomer
True/False
QuestionThe quality manual have one Level.
Correct AnswerFalse
Select The Blank
QuestionThe planning & implementing Enviromental policy is responsibility of________
Correct AnswerManagement representative.
Select The Blank
QuestionThe documents of external origin ________
Correct AnswerShould be controlled separately
True/False
QuestionQuality is fitness for Purpose
Correct AnswerTrue
Select The Blank
QuestionRectangle represent ________ While plotting flow chart.
Correct AnswerSteps in Activity
True/False
QuestionFailure mode & effect Analysis is prevention tool.
Correct AnswerTrue
Select The Blank
QuestionResponse is________.
Correct AnswerSpeed
Multiple Choice Multiple Answer
QuestionThe role of management in QMS is :-
Correct AnswerTo provide resources , To provide support
Select The Blank
QuestionIn ISO the focus on customer is ________
Correct AnswerIn Enhancing customer satisfaction
Match The Following
QuestionCorrect AnswerYour Answer
Quality approchContiniual improvement managementProductivity quality - cost -Delivery
Pillor of TQMProductivity quality - cost -DeliveryContiniual improvement management
Need for TQM is dueCut throat competitionInspection
TQM focusses onEmployeeCut throat competition
True/False
QuestionThe performance of process is in controlled condition then it is called process at managed level.
Correct AnswerFalse
Multiple Choice Single Answer
QuestionWhat is part of cost of poor quality?
Correct AnswerExternal failure cost
Select The Blank
Question________ provides the competitive advantage.
Correct AnswerServing customer in excellent fashion
Multiple Choice Multiple Answer
QuestionFollowing are the phases of intervention:-
Correct AnswerFormulation stage , Maintenance stage , Implementation stage
Multiple Choice Single Answer
QuestionIn ISO the focus is on :-
Correct AnswerEnhancing customer satisfaction
Multiple Choice Single Answer
QuestionThe variability in process is reduced, then the process become more :--
Correct AnswerPredictable
Multiple Choice Single Answer
QuestionWhat is document control?
Correct AnswerDocument Required by EMS to be controlled
True/False
QuestionISO - 9000 -2000 this revision of ISO is currently in use.
Correct AnswerTrue
Multiple Choice Multiple Answer
QuestionCMM is nothing but :-
Correct AnswerUse of process means , Capability maturity model
True/False
QuestionQuality circle benefit to Employee.
Correct AnswerTrue
Multiple Choice Multiple Answer
QuestionCP & CPK is calculated :-
Correct AnswerTo predict future process , To predict future product performance
Select The Blank
QuestionThe quality approach is ________
Correct AnswerPotential failure prevention
Select The Blank
Question________ helps organization reduce employee turnover and absenteeism.
Correct AnswerTraining & development
Multiple Choice Single Answer
QuestionISO 14001 is the management representative, responsible for :-
Correct AnswerPlanning and implementing policy
Multiple Choice Single Answer
QuestionThe human Resource :-
Correct AnswerMust be competent
Multiple Choice Multiple Answer
QuestionCommon elements of winners are :-
Correct AnswerSenior management was actively involved , Control of overall process , Focus on customer
Multiple Choice Multiple Answer
QuestionReliability of product means :-
Correct AnswerConsistency of performance , Performance over period
Multiple Choice Single Answer
QuestionWhat CPL indicates ?
Correct AnswerProcess capability relative to lower specification limit
Match The Following
QuestionCorrect AnswerYour Answer
Circle symbolBinging or end of operationTransportation
Pareto analysis isData analysis toldBinging or end of operation
X bar meansAverage of readingData analysis told
LCT meansLower control limitDelay in Activity
Multiple Choice Multiple Answer
QuestionWhen cpk is less than one, :-
Correct AnswerProcess is not capable , Process is volatile
Select The Blank
QuestionTQM promotes________
Correct AnswerTeam work
Multiple Choice Multiple Answer
QuestionIn parato Analysis, we have to focus on problem which contribute :-
Correct Answer80 % Of total problem , 80 % Of causes.
Multiple Choice Single Answer
QuestionThe operational control in EMS is :-
Correct AnswerThe process of controlling environment
Multiple Choice Single Answer
QuestionBy adopting TQM philosophy, it benefits to :-
Correct AnswerOrganisation & employee
Multiple Choice Multiple Answer
QuestionTqm focus on :-
Correct AnswerEmployee , Customer
Select The Blank
QuestionReputation means________.
Correct AnswerPast performance
True/False
QuestionIn TQM, approach to employee is to involve people.
Correct AnswerTrue
Multiple Choice Single Answer
QuestionWhen the process is called under control?
Correct AnswerWhen it is within specification
True/False
QuestionRecruitment & Selection are critical HR issue.
Correct AnswerTrue
Multiple Choice Multiple Answer
QuestionBenefit of model based improvement are :-
Correct AnswerEstablish common language , Models are comprehensive
Multiple Choice Multiple Answer
QuestionCommon features of CMM is how to produce software product which are :-
Correct AnswerConsistence , Repeatable , Predictable
Select The Blank
QuestionThe base of Tqm is________
Correct AnswerEmployee involvement
True/False
QuestionEach Environmental objective must be traceable back to the Environmental Policy statement.
Correct AnswerTrue
Multiple Choice Single Answer
QuestionWhat is environment?
Correct AnswerSurrounding in which an organization operates.
Multiple Choice Single Answer
QuestionMalcolm Baldrige national quality award is for ( MBNQA ) :-
Correct AnswerTotal quality management
Match The Following
QuestionCorrect AnswerYour Answer
ISO emphasis onPreventionPrevention
ISOInternational organization far standardInspection
Lead assessorQualified personnelQualified personnel
ISO currently in useISO - 9000 -2000ISO - 9000 -2000
Multiple Choice Multiple Answer
QuestionCurrent quality concept is :-
Correct AnswerContinual improvement , Prevention of defect
True/False
QuestionZero Deviation means product is set on mean.
Correct AnswerTrue
Multiple Choice Single Answer
QuestionIn control chart, X bar means :-
Correct AnswerAverage of Reading
Multiple Choice Single Answer
QuestionIn ISO - 90001Quality policy declare by management. Similarly what is specified in ISO - 14001?
Correct AnswerEnviromrntal Policy
Select The Blank
QuestionISO - 9000- 1994 is ________
Correct AnswerModel for quality Assurance
True/False
QuestionHistogram is used to compare data.
Correct AnswerTrue
Multiple Choice Multiple Answer
QuestionDimensions of quality are :-
Correct AnswerPerformance , Feature , Reliability
Select The Blank
QuestionDiamond represent ________ while plotting flow chart.
Correct AnswerDecision point
True/False
QuestionVenders are assessed on predefined criteria if some activity are outsourced.
Correct AnswerTrue
Select The Blank
Question________ is important in providing some underpinning of the sense of shared responsibility.
Correct AnswerSingle status
Multiple Choice Single Answer
QuestionISO emphasis on :-
Correct AnswerPrevention
Select The Blank
Question________ is a strategic effort, directed at attaining business objective, through preventive action.
Correct AnswerQuality
Multiple Choice Multiple Answer
QuestionIn ISO the focus is on :-
Correct AnswerEnhancing customer satisfaction , Delighting customer
Multiple Choice Multiple Answer
QuestionISO - 14001 gives stress on :-
Correct AnswerPlan - Do -check -Act , Enviromental protection , Prevention rather than detection
Multiple Choice Single Answer
QuestionWhich is not Business objectivity?
Correct AnswerSupplier satisfaction
True/False
QuestionThe soft side of TQM include Training on job
Correct AnswerTrue
Select The Blank
QuestionTool is used in TQM implementation is ________.
Correct AnswerP -D - C - A
Select The Blank
QuestionKnowing capability of any process is required to ________.
Correct AnswerPredict the behavior of process
Select The Blank
Question________ is the machine down time.
Correct AnswerWaste
Multiple Choice Single Answer
QuestionBefore Accepting the order :-
Correct AnswerIt should be reviewed
True/False
QuestionThe European award uses the criteria of efficiency & effectiveness.
Correct AnswerTrue
Select The Blank
QuestionWhen the process is ________ then it is under control.
Correct AnswerWithin specification
True/False
QuestionThe main business process objective is to serve the customer in excellent manner.
Correct AnswerTrue
Select The Blank
QuestionThe supplier must provided ________ information to management.
Correct AnswerAdequate
Multiple Choice Multiple Answer
QuestionThe inviromental policy must contain & communicate the :-
Correct AnswerMission & value with respect to enviroment , Control & improve enviroment , Enviromental impact
Multiple Choice Multiple Answer
QuestionQuality circle encourage :-
Correct AnswerTem work , Participation
Multiple Choice Multiple Answer
QuestionService Assurance is :-
Correct AnswerConfidence with customer , Customer have trust , Employee have knowledge
Select The Blank
QuestionThe non conforming products are ________.
Correct AnswerIdentified & controlled
Multiple Choice Multiple Answer
QuestionThe management review to be conducted :-
Correct AnswerAt predetermined Interval , As & when required
Multiple Choice Single Answer
QuestionProcess Quality planning means :-
Correct AnswerBuilding quality into processes
Multiple Choice Single Answer
QuestionControl chart shows :-
Correct AnswerPerformance of process
Multiple Choice Multiple Answer
QuestionWhich are pillar of Tqm :-
Correct AnswerMorale , Delivery
Multiple Choice Multiple Answer
QuestionZone in Tolerance means :-
Correct AnswerGap between adequate service & desired service , Gap between min & max expectation
True/False
QuestionQuality policy is defined by employee of organisation
Correct AnswerFalse
Multiple Choice Single Answer
QuestionIn inspection primary concern is :-
Correct AnswerDetection of Defect
Multiple Choice Single Answer
QuestionWho is responsible for Deploying quality policy?
Correct AnswerTop management
Multiple Choice Multiple Answer
QuestionDoes TQM approach have relevance to Indian industry in context to
Correct AnswerCustomer satisfaction , People involvement
True/False
QuestionTQM approach is based on Participation.
Correct AnswerTrue
Multiple Choice Single Answer
QuestionISO 9000 & TQM are :-
Correct AnswerSupportive to each other
Select The Blank
QuestionWhile calculating CPK standard deviation is________.
Correct AnswerEstimated
True/False
QuestionBar chart shows how data is spread across the range.
Correct AnswerTrue
Multiple Choice Multiple Answer
QuestionLead assessor is :-
Correct AnswerQualified personnel , Leading team of auditor
True/False
QuestionThere is a growing awareness by employers of the value of the employer `Brand'.
Correct AnswerTrue
Your AnswerTrue
Multiple Choice Single Answer
QuestionThe following personality holds the view that HRD is a developmental oriented planned effort in the personnel area :-
Correct AnswerC S Sanker
Multiple Choice Single Answer
QuestionHRD is a total system with various :-
Correct AnswerSub systems
Select The Blank
QuestionOccasionally, learning curves show ________, which are the areas in the learning curve which indicate no progress in learning.
Correct AnswerPlateaus
Multiple Choice Single Answer
QuestionOne of the advantages of 360 degree appraisals is that :-
Correct AnswerIt reduces bias / prejudice
Multiple Choice Multiple Answer
QuestionThe model of planning as a people process has benefits to :-
Correct AnswerGroups , Divisions , Constituent companies
Multiple Choice Single Answer
QuestionThe following is not an essential objective of HRD :-
Correct AnswerTo minimize the utilization of human resources for the achievement of individual
True/False
QuestionDifferent application forms may be necessary for different kinds of work.
Correct AnswerTrue
Multiple Choice Single Answer
QuestionThe very purpose of worker being at workplace is his :-
Correct AnswerWork
Multiple Choice Multiple Answer
QuestionIn Results Method to appraisals, Manager can consider results in form of :-
Correct AnswerSales figures , Production output
Match The Following
Question
Correct Answer
Your Answer
Forecasts
Based on measures of productivity
Based on measures of productivity
Estimate made by management
Simplest method of assessment
Simplest method of assessment
Statistical method
Vary in their degree of sophistication
Vary in their degree of sophistication
Work study method
Systematic analysis of work
Systematic analysis of work
Multiple Choice Multiple Answer
QuestionM. M. Khan remarks that HRD is the process of :-
Correct AnswerIncreasing knowledge , Capabilities , Positive work attitudes
Multiple Choice Single Answer
QuestionTraining needs may be assessed by identifying :-
Correct AnswerThe gap between skills possessed by employee and those required for the job
Select The Blank
QuestionA key issue in planning for action is how to motivate ________ to organisational change.
Correct AnswerCommitment
True/False
QuestionLecture courses is often an "In-house" activity in any organisation.
Correct AnswerTrue
Select The Blank
QuestionIf proper ________ activities have been conducted, there should be no need to masquerade the salary.
Correct AnswerHRM
Select The Blank
QuestionIf there is no ________ the organisational tasks may not be done at all or are done at a slow pace.
Correct AnswerCommitment
True/False
QuestionEmployees of an organisation cannot participate in HRD audit. It is concerned only with top management's views and goals.
Correct AnswerFalse
True/False
QuestionOrganisational change through continuous learning is necessary for organisations to survive in today's world.
Correct AnswerTrue
Select The Blank
QuestionPerformance Ratings must be ________.
Correct AnswerJob related
Multiple Choice Multiple Answer
QuestionJob data on features of the job can be collected from :-
Correct AnswerEmployees who perform the job , Other employees who watch the workers , Trade job analysts
True/False
QuestionOne of the reasons for delayed improvement of QWL is lack of consciousness among employees.
Correct AnswerTrue
Multiple Choice Multiple Answer
QuestionHRD at organisational level talks of :-
Correct AnswerOrganisation's manpower planning , Training , Performance appraisal
True/False
QuestionA trainer should concentrate developmental activities on category of "Problem Children" to get best results.
Correct AnswerTrue
Multiple Choice Single Answer
QuestionHRD has become a popular concept now, particularly in the :-
Correct AnswerBusiness world
Multiple Choice Single Answer
QuestionHR Manager has to consider these dimensions while planning for career developmental activities:-
Correct AnswerAge & Performance
Multiple Choice Single Answer
QuestionBalancing the cost between the utilization of plant & work force is especially important :-
Correct AnswerWhen costing projects
Match The Following
Question
Correct Answer
Your Answer
Simulated decision games
Acting out managerial problems
Acting out managerial problems
Coaching
Guidance through advice / suggestions
Guidance through advice / suggestions
Committee assignment
Study of specific organisational problem
Study of specific organisational problem
Sensitivity training
Unstructured group interaction
Unstructured group interaction
Multiple Choice Multiple Answer
QuestionActive participation of employees in Appraisal interviews helps :-
Correct AnswerTo identify root causes & obstacles to performance , To generate constructive ideas for improvement
Multiple Choice Multiple Answer
QuestionQuality control is a management process which consists of :-
Correct AnswerEvaluate actual quality performance , Compare actual performance to quality goals , Take action on the difference
Select The Blank
Question________ are those people who have great potential and genuine capacities but not utilising it at all.
Correct AnswerProblem children
Multiple Choice Multiple Answer
QuestionThe following tamper the constitutionalism of an organisation :-
Correct AnswerBias on part of management , Lack of privacy , Improper process of discipline
Select The Blank
Question________ gives the employees a feeling of gaining something extra.
Correct AnswerFringe benefits
True/False
QuestionSome of the competencies like attitudes, skills, perspectives etc may cut across all levels and departments in the company.
Correct AnswerTrue
Multiple Choice Single Answer
QuestionIn today's competitive business environment, the most important resource is considered to be :-
Correct AnswerHuman resources
True/False
QuestionIn sensitivity training, the interaction of participants is facilitated by a professional behaviour scientist.
Correct AnswerTrue
Multiple Choice Single Answer
QuestionGenerally, for immediate future, succession plans are prepared for :-
Correct AnswerIndividuals
Select The Blank
QuestionThe opportunities are for new ________.
Correct AnswerVentures
Multiple Choice Multiple Answer
QuestionWhile examining top management's style of managing people, HRD consultants examine :-
Correct AnswerThe leadership styles of managers , Human relation skills of managers , Attempts to create a learning environment in company
Select The Blank
QuestionThere has been a general feeling that quality control concepts are applicable to ________ only.
Correct AnswerManufacturing processes
Select The Blank
QuestionOrganizations should take positive measures to facilitate ________ of new employees through Induction.
Correct AnswerSocial adaptation
Multiple Choice Single Answer
QuestionManagement succession is a direct responsibility of :-
Correct AnswerCEO & Top Management
Multiple Choice Multiple Answer
QuestionIf Appraisals are not conducted properly, it can lead to :-
Correct AnswerWastage of time , Feeling of frustration , Strategic failure
Multiple Choice Single Answer
QuestionA well designed training programme :-
Correct AnswerIs planned in logical manner
True/False
QuestionGood HRD practices do not make any difference on many counts.
Correct AnswerFalse
Multiple Choice Single Answer
QuestionThe Personnel needs of an organisation are identified in :-
Correct AnswerHuman resource planning
Select The Blank
QuestionThe drawbacks of skill-based pay schemes are ________ and the lack of performance contingency.
Correct AnswerTendency to "Top out"
True/False
QuestionTraining helps organization Reduces employee' turnover.
Correct AnswerTrue
Multiple Choice Multiple Answer
QuestionThe customer requirement to be reviewed :-
Correct AnswerBefore supply of product , Before commitment of supply of product
Match The Following
Question
Correct Answer
Your Answer
Dimension
Physical facility
Physical facility
Service characteristic
Vary from time to time .
To assess customer satisfaction level
Customer satisfaction survey
To assess customer satisfaction level
To assess competitors Strength
Poor service is due to
Inadequate resource
Unskilled manpower
Multiple Choice Single Answer
QuestionPoor service is due to :-
Correct AnswerInadequate Resources
Multiple Choice Single Answer
QuestionDr. Deming worked in which country ?
Correct AnswerJapan
True/False
QuestionThe European award uses the criteria of efficiency & effectiveness.
Correct AnswerTrue
True/False
QuestionQuality is fitness for Purpose
Correct AnswerTrue
Select The Blank
Question________ is important in providing some underpinning of the sense of shared responsibility.
Correct AnswerSingle status
Multiple Choice Single Answer
QuestionVender Assessment is :-
Correct AnswerAppraisal cost
Multiple Choice Multiple Answer
QuestionContinual improvement is in :-
Correct AnswerEnviromental objective , Audit Result , Corrective action
True/False
QuestionPrevention of pollution is prevention of cause of pollution.
Correct AnswerTrue
True/False
QuestionISO - 9000 -2000 this revision of ISO is currently in use.
Correct AnswerTrue
Select The Blank
QuestionThe primary responsibility of human Resource is ________
Correct AnswerTo provide competent person
Select The Blank
QuestionISO - 9000- 1994 is ________
Correct AnswerModel for quality Assurance
Select The Blank
QuestionWhile setting Quality objective, ________ to be considered.
Correct AnswerCustomer need
True/False
QuestionContinious improvement is improvement of inviromental system.
Correct AnswerTrue
Multiple Choice Single Answer
QuestionThe documents of external origin :-
Correct AnswerShould be controlled separately
Multiple Choice Multiple Answer
QuestionEmployee should be involved in :-
Correct AnswerDecision making , Participation
Match The Following
Question
Correct Answer
Your Answer
The management representative is responsible far
Establishment & implementation of QMS
Enhancing customer satisfaction
The management review conducted
As & when required
As & when required
In ISO the focus on customer
Enhancing customer satisfaction
Supplier satisfaction
Responsibility for quality objective
Top management
Establishment & implementation of QMS
True/False
QuestionContinual improvement which focusses on the improvement of of the EMS, must be reviewed every monthefor any changed aspects and impacts.
Correct AnswerFalse
Select The Blank
QuestionThe evaluation & selection of vendor ________.
Correct AnswerMust have procedure for selection
Multiple Choice Single Answer
QuestionWhat is document control?
Correct AnswerDocument Required by EMS to be controlled
Multiple Choice Multiple Answer
QuestionWhat are critical HR issue ?
Correct AnswerRecruitment & Selection , Training & development , Appraisal
Multiple Choice Multiple Answer
QuestionThe management review to be conducted :-
Correct AnswerAt predetermined Interval , As & when required
Multiple Choice Multiple Answer
QuestionZone in Tolerance means :-
Correct AnswerGap between adequate service & desired service , Gap between min & max expectation
Multiple Choice Single Answer
QuestionISO calls far :-
Correct AnswerProduct approach
True/False
QuestionIn TQM "Total" means Total Organization.
Correct AnswerTrue
Select The Blank
QuestionThe TQM approach is based on employee's ________.
Correct AnswerParticipation
Multiple Choice Single Answer
QuestionIn quality Assurance primary concern is:-
Correct AnswerCo-ordination
Select The Blank
QuestionKnowing capability of any process is required to ________.
Correct AnswerPredict the behavior of process
Multiple Choice Multiple Answer
QuestionCompetitive advantage will be achieved by :-
Correct AnswerServing customer in excellent fashion , Get in pat from customer & convert in service , Technological improvement
Multiple Choice Single Answer
QuestionThe need fore CMM is :-
Correct AnswerTo ensure that the product is consistent
Multiple Choice Multiple Answer
QuestionMulti- disciplinary approach means :-
Correct AnswerPeople from different discipline in organization , People from different department having diff skill
Multiple Choice Multiple Answer
QuestionThe competence of the employee means :-
Correct AnswerCompetence of personnel performing work affective quality , Evaluale the effectiveness of action taken , Maintain appropriate Record
Multiple Choice Single Answer
QuestionWhat is core value?
Correct AnswerExcellence
Multiple Choice Single Answer
QuestionCalibration Activity in company is :-
Correct AnswerAppraisal cost
Select The Blank
Question________organisations are not eligible for MBNQA.
Correct AnswerSoftware
Multiple Choice Multiple Answer
QuestionThe role of management is :-
Correct AnswerTo provide Resources , To define EMS , To monitor the effectiveness of the system
Multiple Choice Single Answer
QuestionProcess capability is :-
Correct AnswerLong term performance of process
Multiple Choice Multiple Answer
QuestionWhile setting Goal ,following things to be consider.
Correct AnswerMarketability of product , Organization need
True/False
QuestionFinance is pillar of TQM.
Correct AnswerFalse
Multiple Choice Single Answer
QuestionTQM approach is:-
Correct AnswerCentered on quality
Select The Blank
Question________ provides the competitive advantage.
Correct AnswerServing customer in excellent fashion
Select The Blank
QuestionArrow indicates ________.
Correct AnswerDirection of flow
True/False
QuestionTQM & ISO both focuses on employee.
Correct AnswerFalse
Select The Blank
QuestionThe supplier must provided ________ information to management.
Correct AnswerAdequate
Multiple Choice Multiple Answer
QuestionCurrent quality concept is :-
Correct AnswerContinual improvement , Prevention of defect
Select The Blank
QuestionWhile calculating CPK standard deviation is________.
Correct AnswerEstimated
Select The Blank
QuestionQuality approach is________
Correct AnswerPotential failure prevention
Multiple Choice Single Answer
QuestionIn TQM "Total" refers to :-
Correct AnswerTotal organisation
True/False
QuestionCPK is 1' 33 means four sigma process.
Correct AnswerTrue
Select The Blank
QuestionThe base of Tqm is________
Correct AnswerEmployee involvement
Multiple Choice Multiple Answer
QuestionThe benefits of Quality circle can be experienced by :-
Correct AnswerEmployees , Organization
Select The Blank
QuestionThe management review to be conducted ________.
Correct AnswerAt predetermined interval
True/False
QuestionThe control of enviromental aspect Life side analysis.
Correct AnswerTrue
Multiple Choice Multiple Answer
QuestionThe inviromental policy must :-
Correct AnswerBe Relevant to the activity , Comply with legislation , Commits to prevention of pollution
True/False
QuestionPoor service is due to Poor people.
Correct AnswerFalse
True/False
QuestionEnviromental impact is any change to the environment, whether adverse or beneficial.
Correct AnswerTrue
Multiple Choice Single Answer
QuestionWhich is not pillar of TQM
Correct AnswerFinance
Multiple Choice Multiple Answer
QuestionIf some activity are outsourced :-
Correct AnswerVendors are assessed on predetermined criteria , Procedure to be followed for assessing vendor
Select The Blank
QuestionThe documents of external origin ________
Correct AnswerShould be controlled separately
Multiple Choice Single Answer
QuestionThe management review is carried :-
Correct AnswerTo ensure effectiveness Of QMS
Multiple Choice Multiple Answer
QuestionISO - 14001 gives stress on :-
Correct AnswerPlan - Do -check -Act , Enviromental protection , Prevention rather than detection
True/False
QuestionSignificant aspect means Perceived Risk.
Correct AnswerTrue
Select The Blank
Question________ is a strategic effort, directed at attaining business objective, through preventive action.
Correct AnswerQuality
True/False
QuestionThe process mapping means sequence & interaction of process.
Correct AnswerTrue
Multiple Choice Single Answer
QuestionEvolution of quality concept. Current era is
Correct AnswerContinual Improvement
Match The Following
Question
Correct Answer
Your Answer
Process is managed level
Performance is model respectable
Process is controlled
Critical process maturity concept include
Process capability
Performance is model respectable
Managed level of process
Process is controlled
Process capability
CMM is
Capability maturity
Capability maturity
Multiple Choice Single Answer
QuestionRecord may be :-
Correct AnswerProcedure to control its use.
Multiple Choice Multiple Answer
QuestionThe ISO is based on :-
Correct AnswerPlan - Do - check - Act , Continual improvement
True/False
QuestionISO - 9000- 1994 is Model for quality Assurance.
Correct AnswerTrue
Multiple Choice Multiple Answer
QuestionBy Applying basic principle the process improvement will be in organization's :-
Correct AnswerFocus on work process , Maintain self esteem of other
Multiple Choice Single Answer
QuestionISO emphasis on :-
Correct AnswerPrevention
Match The Following
Question
Correct Answer
Your Answer
How TQM helps in reducing cost
By reducing external sale
By reducing external sale
Calibration activity carried in company is
Appraisal cost
Appraisal cost
Quality planning is
Prevention cost
Prevention cost
Vender assessment is
Appraisal cost
Appraisal cost
Multiple Choice Single Answer
QuestionControl chart shows :-
Correct AnswerPerformance of process
Select The Blank
QuestionTQM promotes________
Correct AnswerTeam work
Multiple Choice Single Answer
QuestionWho is responsible for Deploying quality policy?
Correct AnswerTop management
Select The Blank
QuestionThe enviromental management system followed by organisation is ________.
Correct AnswerIS0-14001
Multiple Choice Single Answer
QuestionISO 9000 & TQM are :-
Correct AnswerSupportive to each other
True/False
QuestionISO calls for Product approach.
Correct AnswerFalse
Multiple Choice Multiple Answer
QuestionMeasuring instrument should be :-
Correct AnswerCalibrated , Adjested & Re-Adjested , Properly located
Select The Blank
QuestionIn ISO the focus on customer is ________
Correct AnswerIn Enhancing customer satisfaction
True/False
QuestionCause & effect diagram shows relation between causes & its effect.
Correct AnswerTrue
Multiple Choice Multiple Answer
QuestionThe evaluation & selection of vendor :-
Correct AnswerMust have predetermined procedure , Must be assessed
True/False
QuestionIn TQM - M stands for Money.
Correct AnswerFalse
Multiple Choice Single Answer
QuestionTQM is a:-
Correct AnswerPhilosophy
Multiple Choice Multiple Answer
QuestionWhich are pillar of Tqm :-
Correct AnswerMorale , Delivery
Multiple Choice Single Answer
QuestionThe Enviromental policy contains :-
Correct AnswerCommitment to prevention of pollution
Multiple Choice Multiple Answer
QuestionDoes TQM approach have relevance to Indian industry in context to
Correct AnswerCustomer satisfaction , People involvement
Multiple Choice Multiple Answer
QuestionThe Quality problems arises :-
Correct AnswerDue to management , Due to Employee
Select The Blank
QuestionWhen the process is in mature stage, it means ________.
Correct AnswerProcess is defined
Multiple Choice Single Answer
QuestionThe ISO is based on :-
Correct AnswerPlan - do - check- Act
Multiple Choice Multiple Answer
QuestionIn parato Analysis, we have to focus on problem which contribute :-
Correct Answer80 % Of total problem , 80 % Of causes.
Select The Blank
Question________ is the machine down time.
Correct AnswerWaste
Select The Blank
QuestionWhen the process is ________ then it is under control.
Correct AnswerWithin specification
Multiple Choice Single Answer
QuestionThe human Resource :-
Correct AnswerMust be competent
Select The Blank
QuestionPayment Against warranty is________.
Correct AnswerExternal failure cost
Select The Blank
QuestionThe quality approach is ________
Correct AnswerPotential failure prevention
Select The Blank
QuestionReputation means________.
Correct AnswerPast performance
Select The Blank
Question________ is responsible for quality objective.
Correct AnswerTop management
Multiple Choice Multiple Answer
QuestionType of waste are :-
Correct AnswerWaiting time , Transport , Processing waste
Multiple Choice Single Answer
QuestionBefore Accepting the order :-
Correct AnswerIt should be reviewed
Select The Blank
Question________ brings cultural change.
Correct AnswerSmall improvement
Select The Blank
QuestionModel used in software industry to check the quality is called________
Correct AnswerCapability maturity model
True/False
QuestionEnviroment indudes natural resources.
Correct AnswerTrue
Multiple Choice Multiple Answer
QuestionThe role of management in QMS is :-
Correct AnswerTo provide resources , To provide support
Select The Blank
QuestionWhile calculating PPK standard deviation is________.
Correct AnswerCalculated
Multiple Choice Multiple Answer
QuestionThe company collect document to :-
Correct AnswerDemonstrate effectiveness of system , Requirement of QMS
Multiple Choice Single Answer
QuestionTotal points in MBNQA is :-
Correct Answer1000
True/False
QuestionTQM approach centered on quality.
Correct AnswerTrue
Match The Following
Question
Correct Answer
Your Answer
Quality is
As per manufacturer
Fitness for use
Dr. Deming's contribution is in
Japan
Japan
According to Deming every employee should involve in
Decision making
Quality improves productivity decreases
Quality is
Fitness for use
Decision making
Multiple Choice Multiple Answer
QuestionCommon features of CMM is how to produce software product which are :-
Correct AnswerConsistence , Repeatable , Predictable
True/False
QuestionWhen process improvements are institutionlized, the process is optimized level
Correct AnswerFalse
True/False
QuestionQuality policy is defined by employee of organisation
Correct AnswerFalse
Multiple Choice Multiple Answer
QuestionIn inspection primary concern is :-
Correct AnswerDetection of Defect , Action on only detected defect
Multiple Choice Multiple Answer
QuestionCorrective action means :-
Correct AnswerAction taken on detecting NC , Action taken on observed NC
Select The Blank
QuestionTQM promotes________
Correct AnswerTeam work
Multiple Choice Single Answer
QuestionWhich is not part of cost of poor quality ?
Correct AnswerAppraisal cost
Multiple Choice Single Answer
QuestionWhat is CMM ?
Correct AnswerCapability maturity model
Select The Blank
QuestionQuality approach is________
Correct AnswerPotential failure prevention
True/False
QuestionThe performance of process is in controlled condition then it is called process at managed level.
Correct AnswerFalse
True/False
QuestionPhysical facilities is tangible dimension.
Correct AnswerTrue
Multiple Choice Single Answer
QuestionWhile setting Quality objective, What is to be consider :-
Correct AnswerCustomer need
Multiple Choice Single Answer
QuestionIn Quality circle, which problems are solved?
Correct AnswerWork related
True/False
QuestionQuality approach is continual improvement.
Correct AnswerTrue
True/False
QuestionQuality circle benefit to Employee.
Correct AnswerTrue
Multiple Choice Multiple Answer
QuestionWhat are main business process objective
Correct AnswerCustomer service , Profit & loss
Multiple Choice Single Answer
QuestionISO - 140001 is built upon which of the following?
Correct AnswerPlan - Do - check - Act
Multiple Choice Multiple Answer
QuestionCost of poor quality comprises :-
Correct AnswerCost of internal failure , Cost of external failure
Multiple Choice Multiple Answer
QuestionValidation of process is required to demonstrate :-
Correct AnswerPlanned results , To verify result
Select The Blank
QuestionWorking together for excellence is ________.
Correct AnswerTeam work
Multiple Choice Multiple Answer
QuestionThe benefite of ISO 14001 are applicable to :-
Correct AnswerThe organisation which adopts it , Adjacent property owner & enviroment
Multiple Choice Multiple Answer
QuestionService Assurance is :-
Correct AnswerConfidence with customer , Customer have trust , Employee have knowledge
Select The Blank
QuestionThe non conforming products are ________.
Correct AnswerIdentified & controlled
True/False
QuestionBar chart shows how data is spread across the range.
Correct AnswerTrue
Multiple Choice Single Answer
QuestionIf TQM done properly :-
Correct AnswerIt brings significant organisational changes
Multiple Choice Multiple Answer
QuestionWhile recruiting person he should
Correct AnswerCompetent to perform job , Trained to perform specified job
True/False
QuestionValue is for which customer is paying.
Correct AnswerTrue
Multiple Choice Multiple Answer
QuestionReliability of product means :-
Correct AnswerConsistency of performance , Performance over period
Select The Blank
QuestionQuality means________.
Correct AnswerFitness for use
Multiple Choice Multiple Answer
Question The benefits of Quality circle can be experienced by :-
Correct Answer Employees , Organization
True/False
Question Product quality planning should address capability & qualification of equipment.
Correct Answer True
Multiple Choice Multiple Answer
Question In inspection primary concern is :-
Correct Answer Detection of Defect , Action on only detected defect
True/False
Question CPK is 1' 33 means four sigma process.
Correct Answer True
Multiple Choice Multiple Answer
Question By Applying basic principle the process improvement will be in organization's :-
Correct Answer Focus on work process , Maintain self esteem of other
Select The Blank
Question The supplier must provided ________ information to management.
Correct Answer Adequate
Multiple Choice Multiple Answer
Question Following are the phases of intervention:-
Correct Answer Formulation stage , Maintenance stage , Implementation stage
Select The Blank
Question ________ is important in providing some underpinning of the sense of shared responsibility.
Correct Answer Single status
Select The Blank
Question In ISO the focus on customer is ________
Correct Answer In Enhancing customer satisfaction
Multiple Choice Single Answer
Question Tally chart shows the :-
Correct Answer Frequency of event
Multiple Choice Single Answer
Question Gap 5 is :-
Correct Answer Gap between expectation & perceived service
True/False
Question TQM focuses on customer by Delighting customer.
Correct Answer True
Select The Blank
Question TQM promotes__