![Page 1: TPEA COMPANY BACKGROUND ShopDetailing.pdf · • Design & Detailing of SK316 –Product Water Package Module (1,500t) 2015 • Detailing for Structure of Smelting Plant (10,000t)](https://reader034.vdocuments.mx/reader034/viewer/2022051815/6040b05c1ec9ed52e735967b/html5/thumbnails/1.jpg)
TPEA
COMPANY
BACKGROUND
![Page 2: TPEA COMPANY BACKGROUND ShopDetailing.pdf · • Design & Detailing of SK316 –Product Water Package Module (1,500t) 2015 • Detailing for Structure of Smelting Plant (10,000t)](https://reader034.vdocuments.mx/reader034/viewer/2022051815/6040b05c1ec9ed52e735967b/html5/thumbnails/2.jpg)
ORGANISATION
STRUCTURE
Director
Australia
Technical Manager
Australia
Technical Manager
Malaysia
Project Team Alpha
Malaysia
15 Detailers
Structural Detailing
Project Team Bravo
Malaysia
15 Detailers
Structural Detailing
Project Team Charlie
Malaysia
2 Detailers
Civil / Structural Detailing
Project Team Delta
Malaysia
1 Detailer
Structural Detailing
Project Manager
Malaysia
![Page 3: TPEA COMPANY BACKGROUND ShopDetailing.pdf · • Design & Detailing of SK316 –Product Water Package Module (1,500t) 2015 • Detailing for Structure of Smelting Plant (10,000t)](https://reader034.vdocuments.mx/reader034/viewer/2022051815/6040b05c1ec9ed52e735967b/html5/thumbnails/3.jpg)
PROJECT HISTORY
Our experienced project teams are highly experience Civil / Structural Detailers who have worked on
such projects as:
• Design & Detailing of Bumi Armada – Fine Filter Unit (500t) 2015
• Design & Detailing of FPSO – Induction Gas Floatation Unit (750t) 2015
• Design & Detailing of SHELL Brunei – Fuel Gas Package Module (500t) 2015
• Design & Detailing of MALIKAI - Fine Filter Package Module (1,000t) 2015
• Design & Detailing of SK316 – Product Water Package Module (1,500t) 2015
• Detailing for Structure of Smelting Plant (10,000t) 2015
• Detailing for Structure of Factory Workshop (5,000t) 2016
• Detailing for Structure of Commercial Building (4,500t) 2017
• Design & Detailing of Power Plant Structure (1,200t) 2018
• Design & Detailing of Smelting Plant Structure (500t) 2018
![Page 4: TPEA COMPANY BACKGROUND ShopDetailing.pdf · • Design & Detailing of SK316 –Product Water Package Module (1,500t) 2015 • Detailing for Structure of Smelting Plant (10,000t)](https://reader034.vdocuments.mx/reader034/viewer/2022051815/6040b05c1ec9ed52e735967b/html5/thumbnails/4.jpg)
PROJECT HISTORY
• Design & Detailing of EFB Fiber Processing Plant (2000t) 2019
• Design & Detailing of Sludge Pre-Treatment Plant (350t) 2019
• Design & Detailing of Oil Treatment Plant (750t) 2019
• Design & Detailing of Boiler Roof Structure (150t) 2019
• Fabrication work shop detailing Ongoing
PRODUCTION CAPABILITIES
• ALPHA TEAM are able to produce an average between 250 to 450 tonne per week
• BRAVO TEAM are able to produce an average between 250 to 450 tonne per week
• ALPHA TEAM are able to produce an average between 50 to 80 tonne per week
• ALPHA TEAM are able to produce an average up to 50 tonne per week
![Page 5: TPEA COMPANY BACKGROUND ShopDetailing.pdf · • Design & Detailing of SK316 –Product Water Package Module (1,500t) 2015 • Detailing for Structure of Smelting Plant (10,000t)](https://reader034.vdocuments.mx/reader034/viewer/2022051815/6040b05c1ec9ed52e735967b/html5/thumbnails/5.jpg)
SOFTWARE
Depending on client requirements TPEA are able to provide the right advise and software that best suits your needs. Our team and partners are skilled in such software as:
• TEKLA: Which is used to provide structure 3D modelling and shop drawing detailing.
• AUTOCAD: Which is used to further develop shop drawings in details.
• REVIT for BIM, the intelligent model-based process used to plan, design, construct, and manage buildings and infrastructure.
• SOLID WORKS : IF required can be used to develop mechanical modelling for industrial purpose such as vessels and tanks.
DOCUMENT CONTROL
Document control is key to our success as company and in delivering our projects successfully, we at TPEA take pride ourselves in making this process as easy and efficient for both parties. All files, drawings and documents will be issued with:
• Transmittal outlining all files, document, revisions contained within the distributed files.
• Document master register updated with all latest information and revision to date.
• TPEA can provide and internet based document management system with 24hr accessibility subject to project requirements.
![Page 6: TPEA COMPANY BACKGROUND ShopDetailing.pdf · • Design & Detailing of SK316 –Product Water Package Module (1,500t) 2015 • Detailing for Structure of Smelting Plant (10,000t)](https://reader034.vdocuments.mx/reader034/viewer/2022051815/6040b05c1ec9ed52e735967b/html5/thumbnails/6.jpg)
UNDERSTAING ON CONTRACT &
AGREEMENT BY TP MANAGEMENT
INCOMING DOCUMENTS/DATA TO
BE ANALYSED BY ENGINEERS
DISTRIBUTION OF WORK TO PROJECT
TEAMS BY TECH.MANAGER
CHECKING AND UNDERSTANDING THE SCOPE OF WORKS BY
PROJECT TEAMS
3D MODELLING BY PROJECT TEAMS
CHECK 3D MODELLING BY CLIENT
PRELIMINARY PRODUCTION OF
DETAIL DRAWINGS
DETAIL DRAWINGS CHECKING BY ENGINEERS
FULL DETAIL DRAWINGS FOR
FABRICATION
TIME/SCHEDULING
![Page 7: TPEA COMPANY BACKGROUND ShopDetailing.pdf · • Design & Detailing of SK316 –Product Water Package Module (1,500t) 2015 • Detailing for Structure of Smelting Plant (10,000t)](https://reader034.vdocuments.mx/reader034/viewer/2022051815/6040b05c1ec9ed52e735967b/html5/thumbnails/7.jpg)
CONTACT USABN: 71 630 539 730
Address: Unit 6, 1329 Hay St, West Perth
Mobile Number: 0409 940 949
Email: [email protected]