    Adani Abbot Point Terminal

    Townsville Indust ry Breakf ast

    Presentation

    6 August 2013

    Townsville

  • 8/13/2019 Townsville Industry Breakfast Presentation - 05082013

    2/20

    2

    The information cont ained in this presentation may have been sourced from t hird part ysources. Adani Abbot Point Terminal Pty Ltd (Adani) has prepared this presentat ion in

    good faith relying on such informat ion and has not undertaken steps or enquiries toindependent ly verif y the accuracy, reasonableness or completeness of t he information

    Except for t he statut ory liabilit y which cannot be excluded, the recipient of thispresentation acknowledges that Adani and it s related bodies corporate do not assumeany responsibilit y whatever to t he recipient or any other recipient of this document forloss or damage of any kind arising as a use of, or reliance on, the inf ormat ion in t hispresentation for any purpose

    No representat ion or warrant y is given as to, as the recipient must not rely on, anyinformat ion, statement or opinion contained in t his document, or it s accuracy,reasonableness or completeness

    This presentat ion may cont ain projections, forecasts and forward looking statements(project ions) which may or may not prove to be correct . These project ions are

    speculat ive and actual future result s may vary from t he projections

    The recipient may not disclose the information in t his presentat ion to any other partywithout t he prior writt en consent of Adani.

    Disclaimer

  • 8/13/2019 Townsville Industry Breakfast Presentation - 05082013

    3/20

    3

    Presentat ion Plan

    Presentation

    agenda

    Adani Group

    Adani Australia

    Abbot Point Coal Terminal 1

    Proposed Abbot Point Coal Terminal 0 Project

    Adani Australia -Pit to Port Project

  • 8/13/2019 Townsville Industry Breakfast Presentation - 05082013

    4/20

    Adani Group An Overview

    4

    Mundra Port the largest port in India (Q2 2013)

    Largest private sector power generator in India

    Largest importer of coal in India with consistent market share of over 50 %

    Annual turnover of over USD 8 Billion

    Market capitalisation of USD 30 Billion

    Projected investment of USD 25 Billion in next 5 years

    Current ly employs 10 ,400 world-wide. Projected to increase to 20,0 00 in next 5 years

    Building an energysufficient INDIA

    withworld class

    Infrastructure andintegrated valuechain

    Coal

    Mining

    Sourcing

    Coal

    Mining

    Sourcing

    Resources

    Sea Ports

    Railways

    Shipping

    Logistics Power

    Generation

    Transmission

    Trading

    Power

    Generation

    Transmission

    Trading

    Energy

  • 8/13/2019 Townsville Industry Breakfast Presentation - 05082013

    5/20

    Adani Group Diversif ied Port folio

    5

    Energy Ports & Logist ics

    Mundra Port & SEZHazira

    Dahej

    GoaVizag

    Inland Container DepotsRail LogisticsAuto Logisti cs

    Shipping andShip ow ning

    Oil & Gas

    GasDistribution

    Special Economic Zoneat Mundra

    Real EstateShantigramAhmedabad

    BKCMumbai

    KhatauMumbai

    CASF fo r Fruit s &Vegetables

    Grain Silos

    Edible Oil & Agri Trading

    Trading(Coal & Power)

    Integrat ed Coal Management(AGFZE, Dubai &

    AGPTE, Singapore)

    Power Generation

    Bunkering

    Ports &Logistics

    Energy

    Key StrategicInitiatives

    Abbot Point inQueensland, Australia

    Dudgeon Point, Australia

    Note1. AGFZE - Adani Global Free Zone, Jebel Ali Free Zone, Emirates - UAE2. AGPTE - Adani Global Pte. Ltd., Singapore3. CASF - Controlled Atmospheric Storage Facility

    4. MDO - Mine Developer cum Operator5. BKC Bandra Kurla Complex, Mumbai6. Chateau MA kanji Spinning & Weaving Mills property was

    acquired t hrough BIFR.Some of t he ventures listed above are jointl y owned/operated/developed by oth er relevant f irm(s)

  • 8/13/2019 Townsville Industry Breakfast Presentation - 05082013

    6/20

    Development andoperat ion of coalblocks in the Indianstates ofChhatt isgarh andOdisa

    Coal miningconcessions in Bunyuisland, Indonesia

    Coal mining interestin Galilee basin,Queensland, Australia

    Presence across theentire energy valuechain offering end-to-end solut ions inintegrated coalmanagement

    Developer andoperator of t helargest port (2Q 2013)at Mundra in India

    Terminals in India andAustralia

    Synergy betweenports, SpecialEconomic Zones(SEZs) and logistics

    Currently developingpower projects acrossIndia

    Thermal power plants

    already underoperation

    Operat ional andplanned powertransmission network

    Adani Group - Integrated Presence Across the EnergyValue Chain

    6

    Coal MiningPorts andLogistics

    Power Generation

    and Transmission

    Integrated Coal

    Management

  • 8/13/2019 Townsville Industry Breakfast Presentation - 05082013

    7/20

    Adani Group Focus on Ports

    7

    Mundra

    Cargo Bulk/Container/Crude Bulk Bulk Bulk/Container Coal Coal Coal

    Capacity (MMT) 20 0 UD 20 70 UD UD 50

    Berth (meters) 6490 60 0 520 1594 30 0 280 860Draft 17.5 23.0 15.1 16 .2 15.0 15.0 15.0 16.1 19.0

    Expansion Yes No No Yes No Yes Yes

    Connectivity Rai l/ Road /Pipe/ Ai r Rai l/ Road R ai l/ Ro ad Rai l/ Ro ad Rai l/ Ro ad Rai l/ Ro ad Rai l/ Road

    DahejMundra Hazira Mormugao VizagKandla Abbot Point

    Abbot Point

    AUSTRALIA

    Operational

    Under Construction

    Regions Serviced

    Trial / Planning

    Hazira

    Vizag

    Dahej

    Kishanghar

    Patli

    Mormugao

    INDIAKandla

    Qila Raipur

    Taloje

    Sanand

    Asouti, Chwapail & Palwal

    32 berths

    9,464 mts berth length 2 Single Point Moorings 519,500 KL Liquid Tank Farm 150 kms of privat e railway line

    Inland Container Depots (ICDs)

    License t o operate cont ainer railacross India

    Proposed ICD

    Existing ICD

    Not e: Maps depicted in t his slide are not to scale and are for representat ion purpose only.

  • 8/13/2019 Townsville Industry Breakfast Presentation - 05082013

    8/20

    Adani Aust ralia Overview

    8

    2009DudgeonPoint

    PreferredProponent

    2010Carmichael

    Coal MineAcquisition ofCoal Tenement

    2011Abbot Point

    Coal TerminalAcquired T1,T0 proposed

    Canberra

    Source: Map - Wikipedia

    Carmichael Coal Mine Capacit y to produce 60 MTPA

    Const ruct ion st art 20 14; f irst coal 2016

    Rail Greenfield line from Carmichael Mine t o

    Moranbah (190 km) Const ruct ion start 2014; commissioning by

    20 16 Greenfield line to Abbot Pt from the Galilee

    Basin

    TerminalsAbbot Point 99 year lease on exist ing operat ional

    Terminal 1 wit h capacit y of up to 50 MTPA Terminal 0 (proposed) t o export up t o 70

    MTPA in two stages

    Dudgeon Point Adani preferred proponent to develop

    Dudgeon Point ~ 9 0 MTPA in t hree stages

  • 8/13/2019 Townsville Industry Breakfast Presentation - 05082013

    9/20

    Project Overview

    9

    Carmichael Mine Carmichael Rail North GalileeBasin Rail

    Abbot PointTerminal 0

    Galilee BasinTransmission

    60 mtpa thermalcoal mine largestin Australia

    189 km multiuser greenfieldcoal line dualgauge andnarrow gauge

    300 km multi usergreenfield coal line standard gauge

    New stand aloneterminal,adjacent toexisting AdaniGroup ow ned T 1

    240 km t ransmissionline originati ng fromPowerlinksStrathmoresubstation

    6 open cut mines(40 mt pa)

    5 undergroundmines (20 mtpa)

    100 mtpacapacity west(dual gauge)

    60 mtpacapacity east

    (narrow gauge)

    100 mtpaoperationalcapacity

    Export capacit yof up to 70 mtpa

    A double circuit , 275kV, transmission li neand 275/66 kVsubstat ion at theCarmichael Coal

    Mine

    60 year project lif e,supported by ow nvillage, airport andindustrial area

    ConnectsCarmich ael coalmine to existingrail systems

    Connect Northernand Central GalileeBasin to AbbotPoint via StandardGauge Railway

    Multi-userterminal

    Adani to establishfi rst QLD privateelectricitydistribution entit y

    EIS submit ted:21/11/12;

    Public exhibit ion:

    14/ 11/12 11/0 2/13; Supplementary EIS

    (SEIS) requested; SEIS submission:

    08/13

    SupplementaryEIS underpreparation f or

    submission Q32013

    EIS underpreparation f orsubmission Q3

    2013

    EIS finalised,with Minister forApproval

    Pre EIS act ivit iesunder preparation

  • 8/13/2019 Townsville Industry Breakfast Presentation - 05082013

    10/20

    Carmichael Coal Mine: Proposed

    10

    Total resource ~ 10 bn tonnes

    Expectedproduction

    60 MTPA Ramp up in 7 Years

    Miningtechnology

    Opencut and undergroundconcurrently

    Milestones

    Acquisit ion of EPC August 20 10

    MLA November 20 10

    IAS issued November 20 10

    ToR issued by Coordinat or GeneralMay 2011

    Mine Exploration in Progress

    EIS submit t ed 2012

    o Supplementary inf ormation t o EIS currently

    in progress

    CHMP Agreement signed by 3 claimants

  • 8/13/2019 Townsville Industry Breakfast Presentation - 05082013

    11/20

    North Galilee Basin Rail (NGBR): Proposed

    11

    Status

    Declared a coordinated

    project; Govt has accepted

    corridor application, now open

    to public review

    Route length ~300 Km

    Gauge Standard Gauge

    Maximum section

    capacity10 0 mt pa

    Maximum speedLoaded 80 km/hr,

    Unloaded 10 0/hr

    Designed axle load 32.5 Tonne

    Design life

    Rail Track - 50 years

    Drainage St ruct ures - 50 years

    Bridge St ructures - 100 years

    Train consist3 Locos (dist ributed power),

    220 wagons

    Nominal gross

    weight per wagon130 t on

    Nominal payload

    per wagon10 8 t on

    Payload per

    consist23,760 ton

  • 8/13/2019 Townsville Industry Breakfast Presentation - 05082013

    12/20

    Abbot Point Terminal 1

    12

  • 8/13/2019 Townsville Industry Breakfast Presentation - 05082013

    13/20

    Abbot Point Terminal 1: Exist ing Operat ions

    13

    An overview

    Nameplate capacity: 50 Mtpa Mult i-user port operation st rategy Rail connect ivit y to Bowen Basin exists Long-term Take-or-Pay cont racts in place Majorit y of Users in close proximit y

    Terminal :o 198 4 Commenced operations for NCAo 2007 X21 commissionedo 200 9 X25 commissionedo 2011 X50 commissionedo 20 11 GAPE completed

  • 8/13/2019 Townsville Industry Breakfast Presentation - 05082013

    14/20

    After int roduction of GAPE

    1.884 1.914

    0.00

    0.50

    1.00

    1.50

    2.00

    2.50

    Jul-09

    Oct-09

    Jan-10

    Apr-10

    Jul-10

    Oct-10

    Jan-11

    Apr-11

    Jul-11

    Oct-11

    Jan-12

    Apr-12

    Jul-12

    Oct-12

    Jan-13

    Apr-13

    Jul-13

    Adani Abbot Point Terminal T1: Actual monthly throughput

    Abbot Point Terminal 1 Exist ing Operat ions

    14

    FY 2013:17.74 mn tonnes

    FY 2012:13.60 mn t onnes

    FY 20 11:15.06 mn t onnes

    FY 2010:16.93 mn tonnes

    July 20 13witnessed 1.914 mtexport all timemonthly record,surpassing the lastrecord ~ 1.884 mt

    in Aug10.

    FY 2013 has beenthe best so far in the

    last 4 years.

    GAPEintroduced

    Trend line

  • 8/13/2019 Townsville Industry Breakfast Presentation - 05082013

    15/20

    Proposed Abbot Point Coal Terminal 0 Project

    15

  • 8/13/2019 Townsville Industry Breakfast Presentation - 05082013

    16/20

    Proposed Abbot Point Coal Terminal 0 Project

    16

    Salient features

    Capacit y~ 70 Mt pa (35 Mtpa X 2 Stages) 2 in/out loading systems, 3 bunds, 6 yard machinesStatus Basic engineering completed. Detailed engineering in progress EIS

    Draft EIS submitt ed: November 2012 Draft EIS for public consultat ion: Feb 2013

    Final EIS submitt ed: June 2013 EIS decision: With the Federal Minister

    Public Environment Report (PER) PER submitt ed: May 2013 PER decision: with t he Federal Minister

    Construct ion pending receipt of Federal and Stateapprovals

    Dredging t o be conduct ed by NQBPTimeline Delivery: 2016 (Stage 1)

  • 8/13/2019 Townsville Industry Breakfast Presentation - 05082013

    17/20

    Abbot Point Terminal 0 : Proposed

    17

    An overview

    Mult i-user facilit y, wit h Adani Mining asmajor customer

    Ongoing discussions wit h ot her potentialUsers for ToP cont racts

    Cost-eff ect ive procurement strat egy,based on overseas sourc ing usingAdanis own MOF at Abbot Point

    Capacit y: 70 mn t onnes (35 mn t onnes X2 phases)

    Ability to t ake coal from either gauge standard or narrow

    2 berths each with 1 ship loader (10 ,0 00

    tph) Draft : 19.7 m*

    Note: * As per current ly proposed design

  • 8/13/2019 Townsville Industry Breakfast Presentation - 05082013

    18/20

    Benef it s Employment

    18

    The larger region will benefit from much needed employment boost from theproject development.

    Project segments Construction Operations

    Abbot Point Terminal 0 760 300

    Carmichael mine and rail 13,260 6,675

    Total (includes direct andindirect)

    14,020 6,975

    Providing jobs in the order of 22,000+

  • 8/13/2019 Townsville Industry Breakfast Presentation - 05082013

    19/20

    Carmichael

    Laura basin

    Adani Aust ralia Project : Opportunit ies

    19

    Note: The informat ion in the above image is for indicat ive purpose only.Source: Presentat ion by Queensland resources Council on Qld resourcessector briefin g at Bowen Business Informati on Forum held on 30.0 5.13;Adani input s

    Opportunities

    Requirement for port f aciliti es andlaydown / staging areas.

    Logistics from laydown / st aging areasto sites

    Tankages and liquid t ransportat ion

    Fabricat ion, const ruct ion & assembly

    Accommodat ion - short and long term.