Kendal Special Economic Zone & Morotai Special Economic Zone
Township Developments in Indonesia
Jababeka Group
3 Pillars of Jababeka• Land & Township Development
• Infrastructure
• Hospitality & Leisure
19891994
1995
2001
2010
2011
2013
2017
Jababeka Group established and started development of the industrial estate
IPO on Jakarta and Surabaya Stock Exchange
Jababeka Golf & Country Club
Inauguration of Education Park, including President University
Cikarang Dry Port commenced operations
Acquisition of 1,500 ha land in Tanjung Lesung, Banten
BekasiPower Plantcommencedoperations
Mayfair PlazaIndonesiaJababekaDevelopment
MorotaiSpecialEconomicZone
2015
Overview of Jababeka Group
6th Property Indonesia Awards 2018
The RecomendedCondominium Development
in Cikarang - Kawana Golf Residence
Indonesia Property Watch 2015
Best Township Development Project
Consumer Choice Awards 2017
The Most Popular Apartment in Cikarang
Karawang.
Green Property Awards 2017Green water management
residential category township
Indonesia WOW Brand 2015
Gold Champion in Category Residential Property
Developer
SELECTED AWARDS
2016
KendalIndustrial Park
1
234
5
6
Established Track Record in Large-scale Townships and
Infrastructure
INDONESIA
Menara Batavia, Jakarta
Kota Jababeka, Cikarang (5,600 Ha)
SPECIAL ECONOMIC ZONETanjung Lesung (1,500 Ha)
SPECIAL ECONOMIC ZONEKendal Industrial Park (2,700 Ha)
Borobudur Golf, Magelang
SPECIAL ECONOMIC ZONEJababeka Morotai(17,000 Ha)
1
2
3 4
5
6
• Sizeable land bank in strategic locations with upside potential
1 2
Jababeka – Creating New Cities
INDONESIA
Kota Jababeka, Cikarang (5,600 Ha)
SPECIAL ECONOMIC ZONEKendal Industrial Park (2,700 Ha)
1
2
SPECIAL ECONOMIC ZONEJababeka Morotai (17,000 Ha)
3
Kota Jababeka as Flagship Development to be replicated to other cities all over Indonesia
3
JAKARTA KOTA JABABEKA
Kota Jababeka Flagship Development Strategic Location with Excellent Accessibility
• Surrounded by 16 Million Population
• High percapita income (IDR 146 Million)
• About 35 KM from Jakarta City
• Close to International Airports & Seaport
• Accessible by toll road and railway
Proposed MRT Station
Tranportation infrastructure(Proposed / Under Construction)
High Speed TrainLRT Track
Elevated Toll Road
MRT Track
Double-double track Railway
KM 29
KM 31
KM 34
Jakarta 2nd Outer Ring (JORR) Road
• Kota Jababeka has 3 Exit Toll Accesses.
Lemah AbangTrain Station
CikarangTrain Station
Kota Jababeka Flagship DevelopmentIntegrated Township with Full Facilities
5,600 Ha Fully Integrated Township
Jababeka Golf City
Senior LivingD’Khayangan
Plaza Indonesia Jababeka
80,000 Residential
1,200,000 Population
730,000 Manpower
> 2,000 National & Multinational Company
10,000 Expatriate
Cikarang Dry PortBekasi PowerWaste & WaterTreatment Plant
Established Mixed Use Commercial Development in Kota Jababeka
MIXED USE COMMERCIAL DEVELOPMENT
Plaza Indonesia Jababeka, Little Tokyo Jababeka, Hollywood
Junction
Hospitality & Leisure Development in Kota Jababeka
Jababeka Golf & Country ClubJababeka Stadium
HOLIDAY INN CELECTON GRAND ZURI JAVA PALACEANTERO METRO SUITE
Education & Medical Development in Kota Jababeka
HEALTHCARE FACILITIES
(Mitra Keluarga Hospital, Permata Keluarga Hospital,
Harapan Keluarga Hospital)
EDUCATION FACILITIES
(President University, Al-Azhar, BPK
Penabur, Santo Leo, President School)
Industrial & Infrastructure Development in Kota Jababeka
INDUSTRIAL PARK
(Jababeka Industrial Estate)
INFRASTRUCTURE
(Bekasi Power Plant, Cikarang Dry Port)
5 hours
From
Jakarta To
Kendal
470 km toJakarta
3 hours
From
Surabaya
ToKendal
300 km to Surabaya Tanjung Perak
3.2 Mio TEU/annum
Tanjung Priok7 Mio TEU/annum
Tanjung Mas800Thousand
TEUs/annum
Jakarta
West Java
1 hour
From Surabaya
To Semarang
1 hour From
Jakarta to
Semarang
Surakarta
KENDAL
Surabaya
East Java
Central Java
Yogyakarta
A Joint Venture :
Park By The BayA Cost-Competitive Location for Global Market
Strongly Supported by Indonesia and Singapore Governments
High level JV between two most prominent Industrial Developers in South East Asia
Monthly Meetings by both Governments Bodies to accelerate macro
infrastructure
IE Singapore has setup a special Agency to assist KIP calledISBC
Kendal SEZ
November 2016
Kendal Industrial Park was
officially launched.
Premier Li delivered a speech at
the opening ceremony and said
that this project is a win-win result
for both parties. “Our economy is
closely linked. If Indonesia does a
good job, Singapore will do well.
This is why Singapore wants
Indonesia to succeed.”
September 2017
• Establishing industrial
training workers
• The memorandum of
understanding covers the
fields of education, higher
education, vocational
education and industrial
training.
October 2018
In the development of the
Kendal Industrial Park,
Premier Li asked
President Joko Widodo to
facilitate financial
incentives such as tax
holidays.
Kendal SEZ
Kendal SEZ
Advantages of Kendal Industrial Park :
1. Kendal International Seaport (with Bonded
Logistic Zone)
2. Competitive Manpower Cost
3. Human Resource Education & Training
Center (Universities, Polytechnic, School)
4. One Stop Solution
Phase 1 : 1000 HA
Kendal SEZ Master Plan – Phase I
2,315
42%
80
42
170
KEY FACTS & FIGURESSQ KILOMETERS
FOREST AREA
KILOMETERS NORTH
SOUTH KILOMETERS WIDE
SQ KILOMETERS AREA SUITABLE FOR INDUSTRY
Morotai SEZ Introduction – 1 out of 10 newBali
Morotai SEZ Permit : PP No. 50 Year 2014
Officially inaugurated by President of Republic
of Indonesia, Mr. Joko Widodo on 1 April 2019
Morotai
Gen. MacArthur’s WW II commandbase.
1944/9 - Gen. MacArthur invadedMorotaiTokyo
Hong Kong
Singapore
2732 km
3 hours
MoSEZ – Strategic Position to Control Pacific Ocean
The hiding place of Nakamura,The
Japanese Soldier during WW II
Morotai SEZ Introduction
The abundant natural resources
Groper Napoleon Tuna
Clove Coconut Oil Nutmeg
Diving Heaven
544 types of coral reef & WW II relics under the sea
Rich Tourism Potency
Its surroundings have 32 small islands
29
Morotai SEZ Introduction – VisionPlanning
30
Morotai SEZ Introduction – Phase I & PhaseII
• Indonesian Minister of Transportation has
committed to develop Morotai airport becoming
Morotai International airport and it will be ready
by the year of 2020, so that the Airbus 320 with
±180 seats can land at Morotai island
NEW INTERNATIONAL AIRPORT TERMINAL & RUNWAY RENOVATION• The 1,840 m2 of Morotai new airport
terminal is expected to be finished before
December 2019
• The runway’s width has been widened
from 30 m to 45 m and will be
strengthened with the Pavement
Classification Number increased from 36
to 50
Morotai SEZ Introduction – Phase I & PhaseII
Morotai SEZ Intro – InvestmentOpportunities
The islands are the new
thriving tourism destination
in Morotai for nature and
serenity lovers
For Tourism Industry
Education & healthcare will
be the new economic catalyst
for Morotai with the
development of world class
education and healthcare
facilities
For Education & Healthcare
Morotai will be the new
business hub in east Indonesia
and the new surrounding Asia
Pacific region, complimented
by sophisticated business
facilities
For Export Oriented Manufacture
Morotai’s current fisheries
industry is further developed
with support for the latest
technology
For Fish Processing Industry
Morotai SEZ Intro – SEZ Tax Incentives
Mr. President of Republic of Indonesia & Mr.
Governor of North Maluku
with employees of D’Aloha Beach Resort
Mr. Joko Widodo & Mr. Abdul Ghani
Kusuba [President of Republic of
Indonesia & Governor of North Maluku
Mr. Johan Budi and Mr. Basuki Hadimuljono (Presidential
Spokesman, Minister of Public Works and Housing)
Mr. President of Republic of Indonesia
with CEO of PT Jababeka Morotai
At D’Aloha Beach Resort
Morotai SEZ – President’s Visit on 5 April 2016