~ TOWN of SOUTHAMPTON Southampton, Massachusetts 01073 HIGHWAY DEPARTMENT February 7, 2018 Newton Tedder, EPA MS 4 Program United States Environmental Protection Agency 5 Post Office Square - Suite I00 Mail Code - OEP06-1 Boston, Massachusetts 02109-3912 Re: Town of Southampton MS4 Reporting Dear Mr. Tedder, On behalf of the Town of Southampton, Massachusetts please find the attached reports for Municipal Separate Storm Sewer Systems (MS4): NPDES PH Small MS4 Gener al Permit Annual Report 2015 (April 1, 2014 - March 31 , 2015) NPDES PII Small MS4 General Per mit Annual Report 2016 (April I, 2015 - March 3 I, 2016) NPDES PU Small MS4 General Pe rmit Annual Report 2017 (April I, 20 16 - Mar ch 31, 2017) Concurrently we have delivered one copy of the above documents to the Massachusetts DEP. Please do not hesitate to call me if you need additional information. rely, :!ni p , Town of Southa mpton CC: Fred Civian, MA OEP

Upload: others

Post on 05-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: TOWN of SOUTHAMPTON Southampton, Massachusetts 01073 ... · Report 2016 (April I, 2015 - March 3 I, 2016) NPDES PU Small MS4 General Permit Annual Report 2017 (April I, 20 16 - March

~

TOWN of SOUTHAMPTON Southampton, Massachusetts 01073

HIGHWAY DEPARTMENT

February 7, 2018

Newton Tedder, EPA MS4 ProgramUnited States Environmental Protection Agency5 Post Office Square - Suite I00Mail Code - OEP06-1Boston, Massachusetts 02109-3912

Re: Town of Southampton MS4 Reporting

Dear Mr. Tedder,

On behalfof the Town of Southampton, Massachusetts please find the attached reports for Municipal Separate StormSewer Systems (MS4):

NPDES PH Small MS4 General Permit Annual Report 2015 (April 1, 2014 - March 31 , 2015)

NPDES PII Small MS4 General Permit Annual Report 2016 (April I, 2015 - March 3 I, 2016)

NPDES PU Small MS4 General Permit Annual Report 2017 (April I, 20 16 - March 31, 2017)

Concurrently we have delivered one copy of the above documents to the Massachusetts DEP. Please do not hesitate tocall me ifyou need additional information.

rely,

:!nip,Town of Southampton

CC: Fred Civian, MA OEP

Page 2: TOWN of SOUTHAMPTON Southampton, Massachusetts 01073 ... · Report 2016 (April I, 2015 - March 3 I, 2016) NPDES PU Small MS4 General Permit Annual Report 2017 (April I, 20 16 - March
Page 3: TOWN of SOUTHAMPTON Southampton, Massachusetts 01073 ... · Report 2016 (April I, 2015 - March 3 I, 2016) NPDES PU Small MS4 General Permit Annual Report 2017 (April I, 20 16 - March

Municipality/Organization: Southampton

EPA NPDES Permit Number: MAR041021

MassDEP Transmittal Number: W-035569

Annual Report Number Year 13& Reporting Period: April 1, 2015 - March 31, 2016

NPDES PII Small MS4 General PermitAnnual Report(Due: May 1, 2016)

Part I. General Information

Contact Person: Randall Kemp Title: Highway Superintendent

Telephone #: 413-527-3666 Email: [email protected]

Mailing Address: Southampton Highway Garage, 8 Former Road, Southampton, MA 01073

Certification:

I certify under penalty of law that this document and all attachments were prepared under mydirection or supervision in accordance with a system designed to assure that qualified personnelproperly gather and evaluate the information submitted. Based on my inquiry of the person orpersons who manage the system, or those persons directly responsible for gathering theinformation, the information submitted is, to the best ofmy knowledge and belief, true, accurate,and complete. I am aware that there are significant penalties for submitting false information,including the possibility of fine and imprisonment for knowing violations.

Signature:

Printed Name: Randall Kemp

Title: Highway Superintendent

Date:

Page 4: TOWN of SOUTHAMPTON Southampton, Massachusetts 01073 ... · Report 2016 (April I, 2015 - March 3 I, 2016) NPDES PU Small MS4 General Permit Annual Report 2017 (April I, 20 16 - March

Part II. Self-Assessment

The Town of Southampton Stormwater Management Program has been in place since July 31, 2003. The Town has completed the

required self-assessment and has determined that the municipality has addressed each of the six minimum control standards. The

Town continues to publicize Stormwater-related issues and supports active participation by townspeople in addressing pollution and

Stormwater issues. The by-laws developed to address the NPDES requirements were passed at the J une 4, 2007 annual town meeting.

New developments are subject to the review and enforcement requirements of the by-laws. Two (2) Cease & Desist orders were

issued for violations under the Stormwater by-law. In o rder to be able to more proactively address catch basin cleaning, the Town

purchased a zero-emission clam-shell type truck for catch basin cleaning to be performed by Highway Department personnel. As

noted below, since the NPDES MS4 program began, the town has identified and disconnected three illicit discharges to the municipal

storm drain system. Southampton has focused efforts on promoting recycling.

Ac1·onyms Used in Following Pages BI = Building Inspector BOH = Board of Health BOS = Board of Selectmen

ConCom = Conservation Commission

HD = Highway Department PB = Planning Board PVPC = Pioneer Valley Planning Commission

WO = Water Department PD = Pol ice Department BAPAC=Barnes Aquifer Protection Advisory Committee

Part Ill. Summary of Minimum Contrnl Measures

I. Public Education and Outreach

I I Progress on Goal(sl - j Plunnctl Activities j Measu rable BMP I BMP Dcscri1,t ion l Rcs11onsiblc

2

Page 5: TOWN of SOUTHAMPTON Southampton, Massachusetts 01073 ... · Report 2016 (April I, 2015 - March 3 I, 2016) NPDES PU Small MS4 General Permit Annual Report 2017 (April I, 20 16 - March

- --- -

ID # Dept./Person Goal(s) Permjt Yea r 13Name (Reliance on non-municipal partners

indicated, if any)II\ Classroom III )/WO/School Presentation on DEP Water Cycle Skit lo 5'11 and 6'11 graders is DEP Water Cycle Skit to 5'11 and 6'11------- - E~ucation ---- --·-·-·--- water cycle typically held every other year. The ! IDRevis.:d graders is typically held every o thersponsored a ticld trip for 15' and 2nd graders to year. HD will coordinate newthe Springfield Materials Recycling Facility educational presentation with school(MRF) on May or 2015 and for the 3rd graders leadership.in the f-all o f 2015.

1B Educational 11D Post educati~in Display EP/\'s Stormwatcr and theDisplays Post Education display .display Constrnction Industry poster in the School,- -- --- - -- -· -- -· - ---· -- - ·-- --- --- --- --- --Revist:d - -· -- -- - - -- -- -- - - Planning l3oard and Con Com meeting roomsand in the Town I!all. A poster depicting theWater Cycle was also posted in the School,Town Hall and Library.

IC Newspaper Press IID Publish 2x per yearRelease

The I ID issued press released publicizing Publish drinking/water quality info------...-- -,.._______________________----------------------- _in local_newsp11J2_er____ l lousehold Hazardous Waste Day, which wereRevisc:<l annually.

held in October 20 15 in Easthampton,encouraging residents to properly dispose ofhazardous wastes. Publicized and participatedin the National Prescription Drug Take BackDay in September 20 15. In December 20 I5, apermanent drug drop off box was installed inthe Police Station at 8 East Street.

I D Local Cubie 11D Pos t bulletinsAccess, Social

The I ID runs educational notices encouraging Post bulletins on wuter quality infocontinually andMedia and Town

residents to recycle, providing information on throughout the year. In addition, theup<lated on an the water cycle, and publicizing waterWebsite local cable access statio n will beginongoing basis. restrictions. Additional educational airing live presentations.information is included on the public school--------- ----------·------------------- ------ ----·---------- --- ------------------------- intrnnel system.Rc..:vised

IE Informational IID Mail with drinking Water conservation and recycling tipspamphlets/ notices Mail water quulity info withwater quality report--- ---- distributed with Drinking Water Quality Drinking Water Qua lity Report.R.:v ised -- --·-- ---- --·------- Report. Notices distributed regardingoverwatering, and water use restrictions.

IF Informational IID Distribute mag,nets I ID distributed the available magnets andGa2,~s _______ ____ - -------------- - - --- ---- --- ------ recycling bins. Printed I ID contact Continue to seek funds foreducational/in formational gadgets to

3

Page 6: TOWN of SOUTHAMPTON Southampton, Massachusetts 01073 ... · Report 2016 (April I, 2015 - March 3 I, 2016) NPDES PU Small MS4 General Permit Annual Report 2017 (April I, 20 16 - March

-----·---·-- ------·--·----------·--·---·-·--- -------·-----------· ------------·-------------- distribute. PamphletsRevised Distribute Waler informa1ion on To\\11 !rash bags.

Quality Flyers on recycling am.l !he water cycle

Give out up to $5,000 in grants 10Give out grants tl) The town gave out $500 environmental grants ((j Environmental I ID/f'ransfor students for environmental

Cirants Station students based on under the Richard Allen Scholarship program to 17 high scho,ll seniors for Community volunteerism/essays.

~------·--------------·---- -----·-------- -------- unvirnnmcntalism ----------------------------services including environmental services an<lRevised eSS3\'S.

Ia. Additions

Continue to make notilications on Encourage Residential The Town makes notificmions on social media I H Stormwater/Water IID

social media promoting water Stormwater advising a voluntary water ban in summur Conservation Efforts months at times or low water resources. conservation at times of low wnter

storage/recycling resources.

2. Public Involvement and Participation

Responsible Progress on Goal(s) - Planned Aclh·ities BMP Descri11tion Mcasur:1hle BMP

Dept/Person Goid(s) Pe rmit Year 13 ID# (Relinncll 11n non-municipal partners Name indicated, if any)

Continue 10 support interestcc.l groups hy /\.dopHt- IIB/Boy Support interested The I ID supported I lampshirc 2A

Scouts/SchooI groups by Regional Iligh School students in providing tools nnd disposing of trash baggedRoad//\.dopt-a-

providing loots local clean-up or roadways nnJ by participants. In Town will continue to stream

assist Cub Scouts, Boy Scouts, Girl Scouts, an<l lrash disposal resources areas and William E. Norris --------------- -------·------------------ --------·---------- ---------·---------

4

Page 7: TOWN of SOUTHAMPTON Southampton, Massachusetts 01073 ... · Report 2016 (April I, 2015 - March 3 I, 2016) NPDES PU Small MS4 General Permit Annual Report 2017 (April I, 20 16 - March

- -- - -- ----- - - - -

---- ·- --Revised -- -- ------------------ -----·-------l ilementary School students and Cub and locul students in cleaning up areas aroundScuuts in cleanup or parks and around Town parks and cemetery.Town buildings.211 Community I lotline I ID Publici7.e number Number publicized through Continue to publicize number.--·------ -------·----------·---- ----------··----------- -·---·------·----·---·--------- I louschold Hazardous Waste dayRevised press, on recycling. bins and on Townwebsite.

2C Storm Dmin HD Work with In 20 I I, volunteers rrom theStenciling Continue upkeep and maintenance on catchVolunteers to Westfield River Watershed basin markers.Stencil 50 catch Association affixed "l)rains lo Pond"----- -- --------------------- -------------------- basins .[>Cryear____ markers at catch basins in theRevised IIampton Ponds neighborhoods,including urbanized areas orSouthampton. No additionalstencilini:i. has been undertaken.20 Wutcrshed ConCom /I ID/ Work with ConCom representatives attend Continue lo attend J lampden PondsCommittee WD/B(>I I/PB l lampden Ponds I lampden Ponds Association Association and BAPAC meetings.Association and met:tings. I ID/PB representative

Barnes Aquifor attended Barnes Aquifer ProtectionProtection Advisory Committee (Bi\PAC)-------~~ --·-------·-------- --··· -~-·•------ _Advisory _________ meetings.Revised

2a. Additions--

2E Community Service I ID/School Support The I11) supported students for Continue to offer volunteer opponunities to community Hampshire Regional l ligh School High School students.service community service requirements by requirements hy orCering. volunteer opportunities at theoffering volunteer landfill and lo cleanup Townopportunities properties.

3. Illicit Discharge Detection and Elimination

5

Page 8: TOWN of SOUTHAMPTON Southampton, Massachusetts 01073 ... · Report 2016 (April I, 2015 - March 3 I, 2016) NPDES PU Small MS4 General Permit Annual Report 2017 (April I, 20 16 - March

Plunncd ActiYitics BMP Dcscri11tion Rc~1wnsiblc Measurable Proi.:rcss on Goul(s) -BMP

Dc11t./Person Goal(s) Permit Year 13 ID# Name (Reliance on non-municipal partners

indicated, ifmw) Continue to strive 10 field inspect JOO% or

3A Mapping Ill) Field inspect 25<½, The 111) OPS located storm drain outfalls

of outfalls to wetlands, waterways and waler bodies outfalls in urbanized areas. Consider Stormwaler -- ---------- --------------- --~------ sampling outfalls during inspection.

Revised "ithin the urbanized areas of the Town.

Field inspected only 10% oroutfalls in

urbanized areas in 2015. Prepare new procedures/ plan as necessary.Inspections performed during catch basin 38 Develop Illicit 111) Evaluate existing

procedures cleaning; evidence or illicit discharge -·----1--PiS<:..~~c Program ------- -- ------

Revised reported to 11 D.

Continue by-law enforcement.Non-Stormwaler HD Adoption or by-law By-law was passed al June 4, 2007 JC

al Town Meeting_____ Town Meeting. Three illicit connections---·---··- - )~y-Law ---- ----·------Revised have been disconnected from the

municipal storm drain sys tem since the

l)Cg.inning of the program. None this reporting year.

Continue to maintain signag.e and perform3D Illegal Dumping. HD Maintain s ignag.e in The HD continued lo maintain signagc in

regular palrols/clcunup. sensitive areas. water supply areas anti pick up illcgnl

Perform regular <lumping throughout the Town. £JOH and

patrols/cleanup Police arc notified as necessary and

··-- -···- ---·-------- violators prosecuted.--------- --·---Revised

Continue to keep records of maintainedThe 130H continued to permit septic 3E Fuiling Septic nOJ I/I ID Keep records or system clenning companies in septic systems (BOI-1). HD Lo inform BOH

Systems failing septic systems _______ . _ Southampton and maintain records or ifany identified failing septic systems.

------------- ----· Revised septic systems cleaned throughout the

ycnr.

3a. Additions

4. Construction Site Stormwater Runoff Control

6

Page 9: TOWN of SOUTHAMPTON Southampton, Massachusetts 01073 ... · Report 2016 (April I, 2015 - March 3 I, 2016) NPDES PU Small MS4 General Permit Annual Report 2017 (April I, 20 16 - March

BMP BMP Dcscri11tion Responsible Measurable Goal(s) Progress on Conl(s) - Planned ActivitiesID# Dept./Pcrson Permit Year 13Name (Reliance on non-municipal partners

imlicated, ir any)4A Construction I ID/PB/ Adoption of hy-law al By-law was passed at .lune 4, 2007 Continue by-law enforcement._ ___,,........ _Runo ff By-law _______. ConCom--------·------ --·----- _Town_Meeling __.......___...•.. Town Meeting.Revised

'

48 Plan Review Pf3/ConCom/ Plan review under By-law Conduct plan review per l3y-law. Conduct plan rnview per By-law.IID/nOl l/131----·----------------------- ----------------------- ---.....----·----------·---------------·----Revised -

4C Inspection / HD/PB/Bl/ Enforcement under By-luw Conduct inspection I reporting per 13y- Continue inspection I reporting perConCom---------- .Re_porting········••····· --- ----------·-------- -...----------·-.....--------------------- -lu w. Require modi lications to address By-law.Revised dctic iencies in plans and follow-upwith site visits, if necessary. Two (2)Cease & Desist orders have been issuedfor violations under by-law since theby-law has been in place. No Cease&Desist Orders occurred this reportingyear.

4a. Additions

5. Post-Construction Stormwater Management in New Development and Redevelopment

BMP BMP Descri11tion Res1wnsiblc Mcasurnhlc Coal(s) Progress on Goal(s) - Planned Aeti"iticsID # Dcpt./Pcrson Permit Year 13Name (Reliance on non-municipal partners

indicated, if any)5A Post Construction HD/PB/ Adoption of By-law at By-I.aw was passed al June 4, 2007 Continue by-law enforcement.Runo ff L3 y-law ConCom----~--- --·---------"'·-------------- --------------·--------- Town_Meeting ................ To\\11 Meeting,.Revised

7

Page 10: TOWN of SOUTHAMPTON Southampton, Massachusetts 01073 ... · Report 2016 (April I, 2015 - March 3 I, 2016) NPDES PU Small MS4 General Permit Annual Report 2017 (April I, 20 16 - March

513 Construction Site HD/PB/ l'lan review under By-law Conduct plan review per By-la,v. Continue plan review per By-law.

Plan Review ConCom/l3OH/

--------- -------------------------- 131 --------------------- -- - --------------------- - - - - ---------Revised

SC Stormwater System Maintenance Plan-·-----------------------

HD/Pl3/ Enforcement under By-law Conduct inspection/ reporting per By-

ConCom law. ___,_. __----------------- ----·------------ -------------------·-

Conduct inspection / reporting per By- law.

Revised

BMP BMP Dcscri1)tion ResJlOnsiblc Measurable Goal(s) Progress on Goal(s) - Planned Activities

ID# Dept./Pcrson Permit Year 13 Name (Reliance on non-municipal partners

indicated, if any)

GA Municipal I ID Evaluate and drart Good Housekeeping Best Management Draft new policies/revise manual as

Maintenance additional policies Practices Manual drafted in March necessary.

_Activity Prog_ram ___ --------------------- ------------------------------------ 2005. Revised

68 Training of all Municipal

HD Initial good housekeeping training

Good housekeeping practices are discussed with employees at the onset

Conduct ongoing good housekeeping training.

employees ____________ or tasks. Gnod Housekeeping training --------- --------------------- ------------------- ·------·---------Revised session allcnded by DPW staff in April

2015.

Sa. Additions

New Subdivision Stormwater System Maintenance

I-ID Annual Reports on Maintenance Activities

Horneovmers' Associations in new subdivisions are required to clean out catch basin and maintain detention basins and other stormwater structures and provide annual reports on maintenance activities to the l lD. The I ID meets with 1-lomeowner's Association representatives yearly to discuss maintenance C{)(npleted in the calendar year and required maintenance for the following year.

6. Pollution Prevention and Good Housekeeping in Municipal Operations

8

Page 11: TOWN of SOUTHAMPTON Southampton, Massachusetts 01073 ... · Report 2016 (April I, 2015 - March 3 I, 2016) NPDES PU Small MS4 General Permit Annual Report 2017 (April I, 20 16 - March

6C Catch Basin I-ID Clean l00% o f catch The 11 I) inspected I00% or the cutch C lean 100% ofcatch basins inCleaning basins in urbanized basins within the urbanized area twice urbanized area.

......,_______ __Pro_gram _____________ _area annually ___________________ and c leaned I00% of the catch basins------···-------------Revised within the urbanized areas once in 20 15. The Town purchased a zero-emission clam-shell type truck torcatch basin cleaning in 2008. Catchbasin clea ning is performed by HDpersonnel.

6D Street Sweeping & IID Sweep 100% of streets in I00% ortown streets within urbanized Sweep I00% of streets in urbanizedC leanin_g____________ _urbanized area 2x__pcry ear____ area were swept two times in 2015. The ~ ------·------ --- area twice.Revise.d streets were swept in both the spring

and the early summer.

6E Used O il Recycling 1ID Ongoing collection The I ID collects used oil from residents Continue to provide faci lity of used. ..................--- _il]~~I recycling at the tr:insfer station. The service was oil collection and recycle.-Revised --- available lo residents 30 hours per

week.

6F I l37ardous Waste HD I !old collection event In October 2015, Southampton Continue to hold collection events orCollection annually ------------ participated in a household hazardous -ff~;;;ed· ----------------------- --- ---------------------- inform residents where they can

,vaste collection day with Easthampton properly dispose of householdto properly disposal of household hazardous waste.ha;,;1rdous wastes. Southampton participated in the National PrescriptionDrug Toke Back Day in September, 20 l S. In December 20 IS, apemmncnt drug drop off box wasinstalled in the Police Station at 8 EastStreet.

6a. Additions

Household 1-(1) ( )ngoing collection The I II) collects used lluorescent bulbs, Continue to provide facility of usedHazardous and recycling batteries, mercury switches, electronics and antifreeze, lluorescent bulbs, batteries,Waste white goods from residents at the transfer mercury switches, electronics and white

station. The service was available to residents goods collection and recycle.30 hours per week.

9

Page 12: TOWN of SOUTHAMPTON Southampton, Massachusetts 01073 ... · Report 2016 (April I, 2015 - March 3 I, 2016) NPDES PU Small MS4 General Permit Annual Report 2017 (April I, 20 16 - March

7. BMPs for Meeting Total Maximum Daily Load (TMDL) Waste Load Allocations (WLA) <<!f applicahle>>

BMP BMP Descri1)tion Res1)onsible Measurable Goal(s) Progress on Goal(.~) - Planned Activities ID# Dept./Pcrson Permit Y car 13

Name (Reliance on non-municipal parlners indicated, ifany)

7/\ TMDL Various Performance or The BMPs described in the above The BMPs described in the above previously identilied tasks will also address TMDL issues tasks will also address TMDL

------------- -----------·--------·------------- ---------------------- BMP's------ ---------------------------- in Pequot Pond. --- issues in Pequot Pond. Revised

7a. Additions

Fl 7b_ WLA Assessment

To date, TMDLs have not been developed for Pequot Pond. BMPs proposed in previous Minimum Control Measures will address impainnent of Pequot Pond.

IO

Page 13: TOWN of SOUTHAMPTON Southampton, Massachusetts 01073 ... · Report 2016 (April I, 2015 - March 3 I, 2016) NPDES PU Small MS4 General Permit Annual Report 2017 (April I, 20 16 - March

Pal't IV. Summary of lnfo1·matio11 Collected and Analyzed

Communication among various Town departments and boards has been strengthened in order to meet the various BMP requirements.

Since the beginning of the program, three illicit discharges have been identified and di sconnected from the storm drain system. Camp

John Associates collects E. coli samples from a private beach area on Pequot Pond and provides the BOH with the results.

Pal't V. Program Outputs & Accomplishments (OPTIONAL)

(Since beginning ofpermit coverage unless speci fied otherwise by a**, which indicates response is for period covering April I, 2010

through March 3 I, 2011)

Progrnmmatic , • .l'-".1"""'11 "",U. '-' '''".,;JJ .1.'-'-''-'t,,'V• &•,;n,.,,

(v/n)Stormwater management position created/staffed

($)Annual program budget/expenditures **

($) Total program expenditures since be_ginnin_g of permit coverage

F unding mechanism(s) (General Fund, Enterprise, Utility, etc)

Education, Involvement, and Training

(#or %)Estimated number of property owners reached bv education program(s)

(v/n)Stormwater management committee established

(#or v/n)Stream teams established or supported

(v/n or mi .) Shoreline clean-up partici pation or quantity ofshoreline miles cleaned **

(mi.)Shoreline cleaned since begi nning of permit coverage

Household Hazardous Waste Collection Days (#)

• days sponsored ** (#or%)

• community participation ** (tons or gal)

• material collected ** (y/n)

School curricula implemented

11

Page 14: TOWN of SOUTHAMPTON Southampton, Massachusetts 01073 ... · Report 2016 (April I, 2015 - March 3 I, 2016) NPDES PU Small MS4 General Permit Annual Report 2017 (April I, 20 16 - March

Legal/Regulatory

ln Place Reviewing DraftPrior to Existing m Phase II Auth-· ......_..., - ........_.".. Drafted ,._ ...__ .. -- ..R .Adonted·- ......... ·--Regulatory Mechanism Status (indicate with "X")

• Illicit Discharge Detection & Elimination • Erosion & Sediment Control

• Post-Development Storrnwater Management Accompanying Regulation Status (indicate with "X")

• Illicit Discharge Detection & El imination• Erosion & Sediment Control• Post-Development Stormwater Management

Mapping and Illicit Discharges

... •-• -••-- - ••••..,I Outfall mapping complete .---.... -----(%)Estimated or actual number ofoutfall s (#)System-Wide maooing complete (complete storm sewer infrastructure) (%)Mapping method(s)

• Paoer/Mylar (%)• CADD (%)• GIS (%)Outfalls inspected/screened** (# o r %)Outfalls inspected/screened (Since beginning of permit coverage) (#or %)Ill icit discharges identified ** (#)lllicit discharges identified (Since beg inning ofpermit coverage) (#)

lllicit connections removed ** (# ); and(est. eod)lll icit connections removed (Since beginning of permit coverage) (#); and (est. 1:rnd)% of population on sewer (%)

12

Page 15: TOWN of SOUTHAMPTON Southampton, Massachusetts 01073 ... · Report 2016 (April I, 2015 - March 3 I, 2016) NPDES PU Small MS4 General Permit Annual Report 2017 (April I, 20 16 - March

I% of population on septic systems I(%)

Construction

\.l l l;,l.;;Jl~U UJll l.:lJ 1,c.;:,µvI I.-:>c.Number of construction starts (> I-acre) ** (#) Estimated percentage o f construction starts adeciuately regulated for erosion and sediment control ** (%)Site inspections completed** (#or%)Tickets/Stop work orders issued** (#or%)Fines collected ** (#and$)Complaints/concerns received from public** (#)

Post-Development Stormwater Management

Estimated percentage of development/redevelopment projects adequately regulated for post- (%) construction stormwater control S ite inspections (for proper BMP installation & operation) completed** (#or%)BMP maintenance reauired through covenants, escrow, deed restrictions, etc. (v/n) Low-impact develooment (LID) oractices permitted and encouraged (v/n)

Operations and Maintenance

non-commercial/non-arterial streets ** times/ rcommercial/arterial or other critical streets ** times/ rof structures cleaned **

#Qty. of storm drain cleaned ** (%, LF or

. ofscreenin /debris removed from storm sewer infrastructure**Dis osal or use of screenin •s landfill POTW, com ost, beneficial use etc. ** location

IBasin Cleaning Costs

13

Page 16: TOWN of SOUTHAMPTON Southampton, Massachusetts 01073 ... · Report 2016 (April I, 2015 - March 3 I, 2016) NPDES PU Small MS4 General Permit Annual Report 2017 (April I, 20 16 - March

($) Annual budget/expenditure (labor & equipment)** •

($/hr or$Hourly or per basin contract rate** • per basin)

($) Disposal cost** • Cleaning Equipment

(#) Clam shell truck(s) owned/leased • (#)Vacuum truck(s) owned/leased •

(y/n)Vacuum trucks specified in contracts • (%) % Structures cleaned wi th clam shells**• (%) % Structures cleaned with vactor ** •

(Preferred Units) Response (times/yr)

Average frequency ofstreet sweeping (non-commercial/non-arterial streets) **

Average frequency ofs treet sweeping (commercial/arterial or other critical streets)** (times/yr) (lbs. or tons)

Qty. of sand/debris collected by sweeping** (locatio n)

Disposal of sweepings (landfill , POTW, compost, beneficial use, etc.)**

Annual Sweeping Costs ($)Annual budget/expenditure (labor & equipment)** • ($/hr. o r

Hourly or lane mile contract rate ** • In mi .) ($)

Disposal cost** • Sweeping Equipment

(#) Rotarv brush street sweepers owned/leased •

(#) Vacuum street sweepers owned/leased • (y/n)

Vacuum street sweepers specified in contracts • % % Roads swept with rotary brush sweepers** • % % Roads swept with vacuum sweepers ** •

Reduction (si nce beginning ofpermit coverage) in application on public land of:

("NIA" = never used; " I00%" =elimination) l (lbs. or%) I� Fertilizers I (lbs. or%) I� Herbicides

14

Page 17: TOWN of SOUTHAMPTON Southampton, Massachusetts 01073 ... · Report 2016 (April I, 2015 - March 3 I, 2016) NPDES PU Small MS4 General Permit Annual Report 2017 (April I, 20 16 - March

• Pesticideslntel!rated Pest ManaQement {[PM) Practices lmnlemented

(Preferred Units ResponseAverage Ratio of Anti-/Oe-lcing products used** %NaCl % CaClz(also identify chemicals and ratios used in specific areas, e.g., water supply protection areas) ¾MgCh¾CMA ¾Kac¾KCI %Sand

Pre-wetting techniques utilized** (v/n or%)Manual control spreaders used **(y/n or %) Zero-velocity spreaders used** (y/n or%)Estimated net reduction or increase in typical year salt/chemical application rate (±lbs/ln mi. or%) Estimated net reduction or increase in typical year sand application rate** (±lbs/ln mi . or%) % of salt/chemical pi le(s) covered in storage shed(s) (%)Storage shed(s) in design or under construction (y/n or#) 100% ofsalt/chemical pile(s) covered in storage shed(s) by May 2008 (y/n)

Water Su1>1>ly Protection

Storm water outfalls to public water supplies eliminated or relocated # or y/n Installed or planned treatment BMPs for pubIic drinking water supplies and their protection areas # or y/nTreatment units induce infiltration within 500-feet of a wellhead protection area # or y/n

15

Page 18: TOWN of SOUTHAMPTON Southampton, Massachusetts 01073 ... · Report 2016 (April I, 2015 - March 3 I, 2016) NPDES PU Small MS4 General Permit Annual Report 2017 (April I, 20 16 - March