tower as built 5 feb 15

18
2/5/15 DEPARTMENT OF THE ARMY 84th Engineer Battalion (Construction Effects) 142nd Engineer Detachment (Survey & Design) Schofield Barracks, HI, 96857 G-1 18 1 SHEET: OF SIZE: SCALE: D REVISION: ---- PROJECT NUMBER: DATE: MCBH R1E AS BUILT DRAWN BY: SSG GALDAMEZ AS SHOWN TEAM LEADER: CONSTRUCTION TECH: CW2 ALLEN SSG GALDAMEZ SSG GALDAMEZ CPT SHAFFER A P P R O V E D B Y S 3 S E C T I O N O I C C REVIEWER NOTES INDEX OF DRAWINGS SHT. NO. G-1 S-1 S-2 S-3 S-4 S-5 S-6 A-1 A-2 A-3 A-4 A-5 A-6 A-7 A-8 A-9 A-10 A-11 DESCRIPTION TITLE SHEET, VICINITY, LOCATION MAPS & INDEX OF DRAWINGS FOUNDATION AND REBAR DETAIL FOUNDATION LAYOUT CENTER/OUTER FOUNDATION SIDE DETAIL DETAIL VIEW OF FRONT WALL DETAIL VIEW OF SIDE AND REAR WALL NOTES FRONT AND BACK ELEVATION LEFT AND RIGHT ELEVATION 2ND AND 3RD FLOOR DETAIL FRAMING SCHEDULE 2ND FLOOR RAILING DETAIL 3RD FLOOR RAILING DETAIL PREFAB STAIR AND LADDER DETAIL PREFAB HATCH DETAIL POST ANCHOR & JOIST HANGAR DETAIL HIGH ANGLE TRAINING AID LOW ANGLE TRAINING AID VICINITY LOCATION LOCATION TITLE PAGE, SHEETS LIST, LOCATIONS AND VICINITY MAPS AND INDEX OF DRAWINGS MCBH R1E AS BUILT HI 14-034 PROJECT SUPERVISOR HI 14-034 SHT. NO.

Upload: matthew-shaffer

Post on 28-Jan-2018

141 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: TOWER AS BUILT 5 FEB 15

2/5/15

DEP

ARTM

ENT

OF

THE

ARM

Y84

th E

ngin

eer B

atta

lion

(Con

stru

ctio

n Ef

fect

s)14

2nd

Engi

neer

Det

achm

ent (

Surv

ey &

Des

ign)

Scho

field

Bar

rack

s, H

I, 96

857

G-1181SHEET: OF

SIZE:SCALE:

DREVISION: ----

PROJECT NUMBER: DATE:

MC

BH R

1E A

S BU

ILT

DRA

WN

BY:

SSG

GAL

DAM

EZ

AS SHOWN

TEAM

LEA

DER

:

CO

NST

RUC

TIO

N T

ECH

:

CW

2 AL

LEN

SSG

GAL

DAM

EZ

SSG

GAL

DAM

EZ

CPT SHAFFER

A

P

P

R

O

VE

D

B

Y

S

3

S

E

C

T IO

N

O

I

C

C

REVI

EWER

NO

TES

INDEX OF DRAWINGSSHT. NO.

G-1

S-1

S-2

S-3

S-4

S-5

S-6

A-1

A-2

A-3

A-4

A-5

A-6

A-7

A-8

A-9

A-10

A-11

DESCRIPTIONTITLE SHEET, VICINITY, LOCATION MAPS & INDEX OF DRAWINGS

FOUNDATION AND REBAR DETAIL

FOUNDATION LAYOUT

CENTER/OUTER FOUNDATION SIDE DETAIL

DETAIL VIEW OF FRONT WALL

DETAIL VIEW OF SIDE AND REAR WALL

NOTES

FRONT AND BACK ELEVATION

LEFT AND RIGHT ELEVATION

2ND AND 3RD FLOOR DETAIL

FRAMING SCHEDULE

2ND FLOOR RAILING DETAIL

3RD FLOOR RAILING DETAIL

PREFAB STAIR AND LADDER DETAIL

PREFAB HATCH DETAIL

POST ANCHOR & JOIST HANGAR DETAIL

HIGH ANGLE TRAINING AID

LOW ANGLE TRAINING AID

VICINITY

LOCATION

LOCATION

TITL

E PA

GE,

SH

EETS

LIS

T, L

OC

ATIO

NS

AND

VIC

INIT

Y M

APS

AND

IND

EX O

F D

RAW

ING

S

MCBH R1E AS BUILT

HI 14-034

PRO

JEC

T SU

PERV

ISO

R

HI 14-034

SHT. NO.

Page 2: TOWER AS BUILT 5 FEB 15

2/5/15

DEP

ARTM

ENT

OF

THE

ARM

Y84

th E

ngin

eer B

atta

lion

(Con

stru

ctio

n Ef

fect

s)14

2nd

Engi

neer

Det

achm

ent (

Surv

ey &

Des

ign)

Scho

field

Bar

rack

s, H

I, 96

857

S-1182SHEET: OF

SIZE:SCALE:

DREVISION: ----

PROJECT NUMBER: DATE:

MC

BH R

1E A

S BU

ILT

FOU

ND

ATIO

N A

ND

REB

AR D

ETAI

L

DRA

WN

BY:

SSG

GAL

DAM

EZ

AS SHOWN

TEAM

LEA

DER

:

PRO

JEC

T SU

PERV

ISO

R

CO

NST

RUC

TIO

N T

ECH

:

CW

2 AL

LEN

SSG

GAL

DAM

EZ

SSG

GAL

DAM

EZ

CPT SHAFFER

A

P

P

R

O

VE

D

B

Y

S

3

S

E

C

T IO

N

O

I

C

C

REVI

EWER

NO

TES

FOUNDATION & REBAR DETAIL

SCALE:

HI 14-034FRONT

1" = 1'-0"

FOUNDATION NOTES:

1. ALL REINFORCING STEEL TO BE

ASTM A615 GR. 60.

2. ALL ANCHOR BOLTS TO BE ASTM

A36 (CONCRETE CONTRACTOR WILL

PROVIDE NUTS, BOLTS AND

WASHERS.

3. ALL ANCHOR BOLTS FOR SILL

PLATES AT EXTERIOR WALLS TO

HAVE 7" MIN. EMBEDMENT.

4. ALL FOUNDATIONS SHALL HAVE A

MINIMUM WIDTH OF 16 INCHES. ALL

REINFORCING STEEL TO LAP A

MINIMUM OF 24" AT SPLICES.

5. PROVIDE CORNER BARS TO MATCH

CONTINUOUS STEEL.

6. ADJACENT GROUND SURFACES

SHALL BE SLOPED AWAY FROM

STRUCTURE DRAINAGE OF

WILL ALSO BE PROVIDED TO

PREVENT ACCUMULATION OF

SURFACE WATER.

7. FASTENERS USED IN FOUNDATION

SHALL BE CORROSION RESISTANT

8. ALL MATERIAL SIZES, GRADES AND

CONSTRUCTION DETAILS SHOULD

BE VERIFIED TO MEET JOB

CONDITIONS.

9. SOIL BEARING PRESSURE

1500 PSF.

10. MINIMUM ALLOWABLE

COMPRESSIVE STRENGTH TO BE

2500 PSI AT 28 DAYS. MAXIMUM

AGGREGATE SIZE IS 1". MAXIMUM

AIR ENTRAINMENT IS 3%. CEMENT TO

BE TYPE 1 OR TYPE 2.

11. PRIOR TO PLACEMENT OF

CONCRETE, FINISH FLOOR SLAB

ELEVATION SHALL BE EQUAL TO 6"

MINIMUM OR 8" MAXIMUM ABOVE

FINISHED GRADE. TYPICAL U.N.O.

12. CONCRETE RAISED USING 3" HIGH

CHAIRS.

NOTES:

1. FOR ALL DIMENSIONS NOT SHOWN

SEE ARCHITECTURAL DRAWINGS.

2. PROVIDE 15# FELT FOR EVERY

WOOD TO CONCRETE SEPARATION.

13'-0"

17'-6"

8" THICK. MIN.

CONC. SLAB-ON

-GRADE WITH #4

REBAR SPACED 9"

O.C. EA. WAY

PLACEMENT OF 6X6 POST

WITH SIMPSON CBSQ66SS TYP.

SURROUNDING AREA

Page 3: TOWER AS BUILT 5 FEB 15

2/5/15

DEP

ARTM

ENT

OF

THE

ARM

Y84

th E

ngin

eer B

atta

lion

(Con

stru

ctio

n Ef

fect

s)14

2nd

Engi

neer

Det

achm

ent (

Surv

ey &

Des

ign)

Scho

field

Bar

rack

s, H

I, 96

857

S-2183SHEET: OF

SIZE:SCALE:

DREVISION: ----

PROJECT NUMBER: DATE:

MC

BH R

1E A

S BU

ILT

FOU

ND

ATIO

N L

AYO

UT

DRA

WN

BY:

SSG

GAL

DAM

EZ

AS SHOWN

TEAM

LEA

DER

:

CO

NST

RUC

TIO

N T

ECH

:

CW

2 AL

LEN

SSG

GAL

DAM

EZ

SSG

GAL

DAM

EZ

CPT SHAFFER

A

P

P

R

O

VE

D

B

Y

S

3

S

E

C

T IO

N

O

I

C

C

REVI

EWER

NO

TES

FOUNDATION LAYOUT

SCALE:

FRONT

5'-0"

5'-0"

HI 14-034

PRO

JEC

T SU

PERV

ISO

R

1 1/2" = 1'-0"

17'-6"

13'-0"

8" THICK MIN.

CONC. SOG

W/ #4 BARS AT

9"O.C. E.W. OVER

MOISTURE BARRIER

& 2" COMPACTED

BASE COURSE TYP.

CF-1

CF-2CF-2 CF-2

CF-2

CF-2

CF-2CF-2

CF-2

CF-1

COLUMN FOOTING SIZE & REINF.:

CF-1 5'X5'X14"CONC. FTG W/ (8) #4 BARS EA. WAY

CF-2 2'X2'X14"CONC. FTG W/ (3) #4 BARS EA. WAY

4'-6"

6X6 POST WITH

SIMPSON CBSQ66-SDS2

TYP.

Page 4: TOWER AS BUILT 5 FEB 15

2/5/15

DEP

ARTM

ENT

OF

THE

ARM

Y84

th E

ngin

eer B

atta

lion

(Con

stru

ctio

n Ef

fect

s)14

2nd

Engi

neer

Det

achm

ent (

Surv

ey &

Des

ign)

Scho

field

Bar

rack

s, H

I, 96

857

S-3184SHEET: OF

SIZE:SCALE:

DREVISION: ----

PROJECT NUMBER: DATE:

MC

BH R

1E A

S BU

ILT

CEN

TER/

OU

TER

FOU

ND

ATIO

N

DRA

WN

BY:

AS SHOWN

TEAM

LEA

DER

:

CO

NST

RUC

TIO

N T

ECH

:

CW

2 AL

LEN

SSG

GAL

DAM

EZ

SSG

GAL

DAM

EZ

CPT SHAFFER

A

P

P

R

O

VE

D

B

Y

S

3

S

E

C

T IO

N

O

I

C

C

REVI

EWER

NO

TES

OUTER FOUNDATION DETAIL

SCALE:

FRONT

2'-0" 5'-0"

5'-9" 5'-9"

9" O.C.

SSG

GAL

DAM

EZ

CENTER FOUNDATION DETAIL

SCALE:

NOTE:

1.) ALL REBAR IS #4

2.) SPLICES WILL BE A MINIMUM OF 24"

3.) OVERLAP ON BENDS WILL BE 12"

HI 14-034

PRO

JEC

T SU

PERV

ISO

R

1 1/2" = 1'-0"

1'-2"

1 1/2" = 1'-0"

6X6 POST, TYP.

6X6 POST, TYP.

8" THICK MIN. CONC.

SOG W/ #4 BARS AT

9" O.C. E.W. OVER

MOISTURE BARRIER

& 4" COMPACTED

BASECOURSE, TYP.

SIMPSON CBSQ66SS

EA. POST

SIMPSON CBSQ66SS

EA. POST

2"

6"MIN

8" THICK MIN. CONC.

SOG W/ #4 BARS AT

9" O.C. E.W. OVER

MOISTURE BARRIER

& 4" COMPACTED

BASECOURSE, TYP.

CF-2 CF-2

CF-2

CF-2CF-1

CF-2

F.G.

F.G.

6" MIN

10"

2'-0" 2'-0" 4'-6"

10" 10"

2"

2'-0"

10"

2"

13'-0" 4'-6"

Page 5: TOWER AS BUILT 5 FEB 15

2/5/15

DEP

ARTM

ENT

OF

THE

ARM

Y84

th E

ngin

eer B

atta

lion

(Con

stru

ctio

n Ef

fect

s)14

2nd

Engi

neer

Det

achm

ent (

Surv

ey &

Des

ign)

Scho

field

Bar

rack

s, H

I, 96

857

S-4185SHEET: OF

SIZE:SCALE:

DREVISION: ----

PROJECT NUMBER: DATE:

MC

BH R

1E A

S BU

ILT

DET

AIL

VIEW

OF

FRO

NT

WAL

L

DRA

WN

BY:

SSG

GAL

DAM

EZ

AS SHOWN

TEAM

LEA

DER

:

PRO

JEC

T SU

PERV

ISO

R

CO

NST

RUC

TIO

N T

ECH

:

CW

2 AL

LEN

SSG

GAL

DAM

EZ

SSG

GAL

DAM

EZ

CPT SHAFFER

A

P

P

R

O

VE

D

B

Y

S

3

S

E

C

T IO

N

O

I

C

C

REVI

EWER

NO

TES

DETIAL VIEW OF FRONT WALL

SCALE:

HI 14-034FRONT

1 1/2" = 1'-0"

FIN GRADE

CF-2

2X6 DECKING WITH

10d NAILS 4" LONG SPACED

AT 6" O.C ON EDGES

AND 12" O.C FIELD TYP.

2X6 BLOCKING

5/8" ANCHOR BOLT @ 48" O.C.

MOISTURE BARRIER

4" COMPACTED BASE COURSE

CONCRETE S.O.G. WITH REINFORCEMENT

SP1SS AT 24" O.C.

H1SS EACH JOIST

Page 6: TOWER AS BUILT 5 FEB 15

2/5/15

DEP

ARTM

ENT

OF

THE

ARM

Y84

th E

ngin

eer B

atta

lion

(Con

stru

ctio

n Ef

fect

s)14

2nd

Engi

neer

Det

achm

ent (

Surv

ey &

Des

ign)

Scho

field

Bar

rack

s, H

I, 96

857

S-5186SHEET: OF

SIZE:SCALE:

DREVISION: ----

PROJECT NUMBER: DATE:

MC

BH R

1E A

S BU

ILT

DET

AIL

VIEW

OF

SID

E AN

D R

EAR

WAL

L

DRA

WN

BY:

SSG

GAL

DAM

EZ

AS SHOWN

TEAM

LEA

DER

:

PRO

JEC

T SU

PERV

ISO

R

CO

NST

RUC

TIO

N T

ECH

:

CW

2 AL

LEN

SSG

GAL

DAM

EZ

SSG

GAL

DAM

EZ

CPT SHAFFER

A

P

P

R

O

VE

D

B

Y

S

3

S

E

C

T IO

N

O

I

C

C

REVI

EWER

NO

TES

DETAIL VIEW OF SIDE AND REAR WALL

SCALE:

HI 14-034

6" = 1'-0"

6X6 POST

3"

3"

3"

11

1

2

"

2X12 BEAM

2X6 DECKING WITH

10d NAILS 4" LONG SPACED AT

6" O.C. ON EDGES AND

12" O.C.ON FIELD TYP.

2X6 BLOCKING

2X6 RIM JOIST

H1Z EACH JOIST

GIRDER SIDE VIEW DETAIL

6X6 POST

Page 7: TOWER AS BUILT 5 FEB 15

2/5/15

DEP

ARTM

ENT

OF

THE

ARM

Y84

th E

ngin

eer B

atta

lion

(Con

stru

ctio

n Ef

fect

s)14

2nd

Engi

neer

Det

achm

ent (

Surv

ey &

Des

ign)

Scho

field

Bar

rack

s, H

I, 96

857

S-6187SHEET: OF

SIZE:SCALE:

DREVISION: ----

PROJECT NUMBER: DATE:

MC

BH R

1E A

S BU

ILT

NO

TES

DRA

WN

BY:

SSG

GAL

DAM

EZ

AS SHOWN

TEAM

LEA

DER

:

CO

NST

RUC

TIO

N T

ECH

:

CW

2 AL

LEN

SSG

GAL

DAM

EZ

SSG

GAL

DAM

EZ

CPT SHAFFER

A

P

P

R

O

VE

D

B

Y

S

3

S

E

C

T IO

N

O

I

C

C

REVI

EWER

NO

TES

NOTES

SCALE:

HI 14-034

PRO

JEC

T SU

PERV

ISO

R

##########

Page 8: TOWER AS BUILT 5 FEB 15

2/5/15

DEP

ARTM

ENT

OF

THE

ARM

Y84

th E

ngin

eer B

atta

lion

(Con

stru

ctio

n Ef

fect

s)14

2nd

Engi

neer

Det

achm

ent (

Surv

ey &

Des

ign)

Scho

field

Bar

rack

s, H

I, 96

857

A-1188SHEET: OF

SIZE:SCALE:

DREVISION: ----

PROJECT NUMBER: DATE:

MC

BH R

1E A

S BU

ILT

DRA

WN

BY:

SSG

GAL

DAM

EZ

AS SHOWN

TEAM

LEA

DER

:

CO

NST

RUC

TIO

N T

ECH

:

SSG

GAL

DAM

EZ

SSG

GAL

DAM

EZ

CPT SHAFFER

A

P

P

R

O

VE

D

B

Y

S

3

S

E

C

T IO

N

O

I

C

C

REVI

EWER

NO

TES

FRONTAND BACK ELEVATION

SCALE:

HI 14-034

PRO

JEC

T SU

PERV

ISO

R

21'-11"

12'-0"

3'-11" 2'-8"

1'-3"

7'-0"

4'-0"

10'-7"

1'-3"

2'-0"

4'-0"

3'-0"

15'-7

1

2

"

1'-3"2'-8"3'-1

1

2

"

3'-8"

1'-3

1

2

"

3'-0"

1'-2"

7'-8"

11

1

2

"

5

1

2

"

1

1

2

"

8'-0"

7

1

2

"

5

1

2

"

1

1

2

"

3'-6"

5'-9" 5'-9"

FRONT BACK

3'-6

1

4

"

3/4" = 1'-0"

1

2

" PLYWOOD

SHEATHING W/ 10d

NAILS SPACED AT

4" O.C. ON EDGES

AND 12" O.C. ON

FIELD, TYP.

SEE SHEET A-2 FOR

BALANCE OF NOTES

NOTES:

1. FOR ALL DIMENSIONS NOT SHOWN, SEE ARCHITECTURAL DRAWINGS.

2. PROVIDE 15# FELT FOR EVERY WOOD TO CONCRETE SEPARATION.

COLLUMN FOOTING

WITH REINF.

SEE SHEET S-1 AND

S2, TYP.

COLLUMN FOOTING

WITH REINF.

SEE SHEET S-1 AND

S2, TYP.

2X6 BLOCKING

SIMPSON A35SS, TYP.

2X 10d NAIL TYP.

CW

2 AL

LEN

Page 9: TOWER AS BUILT 5 FEB 15

2/5/15

DEP

ARTM

ENT

OF

THE

ARM

Y84

th E

ngin

eer B

atta

lion

(Con

stru

ctio

n Ef

fect

s)14

2nd

Engi

neer

Det

achm

ent (

Surv

ey &

Des

ign)

Scho

field

Bar

rack

s, H

I, 96

857

A-2189SHEET: OF

SIZE:SCALE:

DREVISION: ----

PROJECT NUMBER: DATE:

MC

BH R

1E A

S BU

ILT

LEFT

AN

D R

IGH

T EL

EVAT

ION

DRA

WN

BY:

SSG

GAL

DAM

EZ

AS SHOWN

TEAM

LEA

DER

:

CO

NST

RUC

TIO

N T

ECH

:

SSG

GAL

DAM

EZ

SSG

GAL

DAM

EZ

CPT SHAFFER

A

P

P

R

O

VE

D

B

Y

S

3

S

E

C

T IO

N

O

I

C

C

REVI

EWER

NO

TES

LEFT AND RIGHT ELEVATION

SCALE:

HI 14-034

PRO

JEC

T SU

PERV

ISO

R

2X12 GIRDER BOLTED

THROUGH POST W/

(3) 5/8'' DIA. THRU BOLT

2X6 JOIST AT 14'' O.C.

2X6 DECKING(SEE

NOTE)

2X6 RAILING

BASE PLATE W/

1

2

" LAG

BOLTS @14 O.C.

2X6 RAILING

BOLTED INTO POST

2X6 BALUSTERS WITH

H8SS TO BOTTOM PLATE

2X6 RAILING W/ E.N. TO BALUSTERS

2X6 BALUSTER

BOLTED INTO POST

2X6 BALUSTER W/ H8SS

TO BASE PLATE

2X6 JOIST AT 14'' O.C.

2X12 GIRDER BOLTED

THROUGH POST W/

(3) 5/8" DIA. THRU BOLT

RIGHT SIDE LEFT SIDE

3/4" = 1'-0"

SIMPSON H12 EA

JOIST, 1EA. END

TYP.

FRAMING NOTES:

1. ALL EXTERIOR AND LOAD

BEARING WALLS TO HAVE

DOUBLE TOP PLATES

STAGGER SPICES 48" MIN.

WITH (12) 16d NAILS

BETWEEN SPLICES

2. ALL DIMENSIONAL

LUMBER TO BE DOUGLAS

FIR LARCH NO. 2 OR

BETTER U.N.O.

3. ALL HEADERS TO BE DF-L

NO.1 GRADE (MAX 9" SPLIT)

4. ALL WOOD CONNECTORS

MUST CARRY THE CAPACITY

OF THE MEMBER. THE

CONTRACTOR IS

RESPONSIBLE FOR ALL

CONNECTIONS. IF OTHER

THAN STANDARD CONNEC-

TIONS ARE REQUIRED, CO-

NTACT THE PROJECT ENGI-

NEER FOR ASSISTANCE.

USE "SIMPSON" OR OTHER

ICBO LISTED CONNECTIONS

5. ALL WOOD CONNECTORS

SHALL BE INSTALLED WITH

REQUIRED FASTENERS IN

COMPLIANCE WITH THEIR

LISTING

6X6 KNEE BRACE

WITH SIMPSON

KBS1Z, 2 EA.

JOINT, TYP.

6X6 KNEE BRACE

WITH SIMPSON

KBS1Z, 2 EA.

JOINT, TYP.

6X6 KNEE BRACE

WITH SIMPSON

KBS1Z, 2 EA.

JOINT, TYP.

6X6 POST WITH

SIMPSON

CBSQ66-SDS2.

6X6 KNEE BRACE

WITH SIMPSON

KBS1Z 2 EA.

JOINT, TYP.

SIMPSON H1SS

EA JOIST, 1 EA.

END TYP.

FLOOR DECKING NOTES:

1. 10d NAILS SPACED 6" O.C. ON EDGES

& 12" O.C. ON FIELD, TYP.

COLUMN FOOTING

WITH REINF. SEE

SHEET S-1 AND

S2, TYP.

COLUMN FOOTING

WITH REINF. SEE

SHEET S-1 AND

S2, TYP.

2X6 DECKING

W/ 10D NAILS SPACED

6" O.C. ON EDGES & 12"

O.C. ON FIELD , TYP.

SIMPSON A35SS, TYP.

2X6 BLOCKING

2. SLOPE TO DRAIN.

6. ALL COLUMNS SHALL

EXTEND THROUGH THE

STRUCTURE TO

FOUNDATION. ALL

COLUMNS SHALL BE

BRACED AT ALL FLOOR

LEVELS. COLUMNS SHALL

BE THE SAME WIDTH AS

MEMBERS THAT THEY ARE

SUPPORTING.

2X 10d NAILS TYP.

2'-4

1

8

"

1'-4

1

8

"

CW

2 AL

LEN

Page 10: TOWER AS BUILT 5 FEB 15

2/5/15

DEP

ARTM

ENT

OF

THE

ARM

Y84

th E

ngin

eer B

atta

lion

(Con

stru

ctio

n Ef

fect

s)14

2nd

Engi

neer

Det

achm

ent (

Surv

ey &

Des

ign)

Scho

field

Bar

rack

s, H

I, 96

857

A-31810SHEET: OF

SIZE:SCALE:

DREVISION: ----

PROJECT NUMBER: DATE:

MC

BH R

1E A

S BU

ILT

2ND

AN

D 3

RD F

LOO

R D

ETAI

L

DRA

WN

BY:

SSG

GAL

DAM

EZ

AS SHOWN

TEAM

LEA

DER

:

CO

NST

RUC

TIO

N T

ECH

:

SSG

GAL

DAM

EZ

SSG

GAL

DAM

EZ

CPT SHAFFER

A

P

P

R

O

VE

D

B

Y

S

3

S

E

C

T IO

N

O

I

C

C

REVI

EWER

NO

TES

2ND AND 3RD FLOOR DETAIL

SCALE:

HI 14-034

PRO

JEC

T SU

PERV

ISO

R

2X12 GIRDER

2X6 JOIST

6X6 POST

2X6 RAILING BOLTED

INTO POST

2X6 BALUSTER SCREWED

INTO RAILING

AND BASE PLATE

2X6 BASE PLATE

2X6 DOUBLE JOIST FOR

3RD FLOOR HATCH

2X6 RAILING

2X6 RAILING

LEFT OPEN FOR PREFAB

STAIRS LANDING

PREFABRICATED HATCH

REFERENCED ON PAGE A-8

1'-2"

3'-0"

1'-1

3

4

"

3"2'-6"2'-6

3

4

"

2ND FLOOR

3RD FLOOR

JOISTS ARE SPACED 14" O.C.

3/4" = 1'-0"

2X6 BLOCKING

2X6 RIM JOIST

2X6 RIM JOIST

2X6 BLOCKING

B

A

2X6 BLOCKING, TYP.

2X6 BLOCKING, TYP.

2X6 BLOCKING, TYP.

OPEN

TO

BELOW

SIMPSON

LUS26-2,

TYP.

CW

2 AL

LEN

Page 11: TOWER AS BUILT 5 FEB 15

2/5/15

DEP

ARTM

ENT

OF

THE

ARM

Y84

th E

ngin

eer B

atta

lion

(Con

stru

ctio

n Ef

fect

s)14

2nd

Engi

neer

Det

achm

ent (

Surv

ey &

Des

ign)

Scho

field

Bar

rack

s, H

I, 96

857

A-41811SHEET: OF

SIZE:SCALE:

DREVISION: ----

PROJECT NUMBER: DATE:

MC

BH R

1E A

S BU

ILT

FRAM

ING

SC

HED

ULE

DRA

WN

BY:

SSG

GAL

DAM

EZ

AS SHOWN

TEAM

LEA

DER

:

CO

NST

RUC

TIO

N T

ECH

:

SSG

GAL

DAM

EZ

SSG

GAL

DAM

EZ

CPT SHAFFER

A

P

P

R

O

VE

D

B

Y

S

3

S

E

C

T IO

N

O

I

C

C

REVI

EWER

NO

TES

FRAMING SCHEDULE

SCALE:

HI 14-034

PRO

JEC

T SU

PERV

ISO

R

2X6 DOUBLE HEADER

2X6 DOUBLE HEADER

2X4 SILL PLATE

2X4 TRIMMER

2X4 KING STUD

2X4 CRIPPLE STUD

DOUBLE END PLATE TO TIE

STUD INTO TOP PLATE

END PLATE NOTCHED TO ALLOW ACCESS

TO GIRDER BOLTS

2X6 DOUBLE HEADER

2X4 TRIMMER

2X4 KING STUD

2X4 CRIPPLE STUD

2X4 SILL PLATE

CRIPPLE STUD

2-2X4 TOP PLATE WITH (RIM JOIST TO DBL TOP PLATE)

2X6 DOUBLE HEADER

SILL PLATE

2X6 DOUBLE HEADER

TRIMMER

KING STUD

CRIPPLE STUD

2-2X4 TOP PLATE

8

1

2

" 3'-0"

2'-3

3

4

"

11

7

8

"

2'-8"

9

1

2

"

5'-3

3

4

" 5'-3

3

4

"

7'-0"

4'-0"

3'-0"

1'-7

1

2

"

8'-7

1

2

"

10"

3'-8"

9

3

4

"

4'-0"

1'-3"

2'-3

1

2

"

3"

2'-0"

3'-0

3

4

"

1'-3"

3'-3

1

2

"

3'-0"

1'-3"

1'-10

1

4

" 2'-8" 9

1

2

"

TYPICAL STUDS SPACED 12" O.C.

1 51/256" = 1'-0"

6X6 POST WITH

SIMPSON

CBSQ66-SDS2, TYP.

2X4 BOTTOM PLATE WITH 5/8 " DIA. A.B. AT 48" O.C.

2X6 BLOCKING, TYP.

CW

2 AL

LEN

LTP 4 SIMPSON BRACKET

Page 12: TOWER AS BUILT 5 FEB 15

2/5/15

DEP

ARTM

ENT

OF

THE

ARM

Y84

th E

ngin

eer B

atta

lion

(Con

stru

ctio

n Ef

fect

s)14

2nd

Engi

neer

Det

achm

ent (

Surv

ey &

Des

ign)

Scho

field

Bar

rack

s, H

I, 96

857

A-51812SHEET: OF

SIZE:SCALE:

DREVISION: ----

PROJECT NUMBER: DATE:

MC

BH R

1E A

S BU

ILT

2ND

FLO

OR

RAIL

ING

DET

AIL

DRA

WN

BY:

SSG

GAL

DAM

EZ

AS SHOWN

TEAM

LEA

DER

:

CO

NST

RUC

TIO

N T

ECH

:

SSG

GAL

DAM

EZ

SSG

GAL

DAM

EZ

CPT SHAFFER

A

P

P

R

O

VE

D

B

Y

S

3

S

E

C

T IO

N

O

I

C

C

REVI

EWER

NO

TES

2ND FLOOR RAILING DETAIL

SCALE:

HI 14-034

PRO

JEC

T SU

PERV

ISO

R

2X6 RAILING BOLTED INTO POST

2X4 BALUSTER

W/ SIMPSON H4SS TO BASE PLATE

2X4 BASE PLATE

2X6 BASE PLATE

W/

1

2

" DIA. LAG BOLTS AT 14 " O.C.

3'-6"

2X6 DECKING

2X6 BALUSTER

W/ SIMPSON H8SS TO

BASE PLATE

5

8

" BOLT

BACK

RIGHT SIDE

TOP

BACK SHOWN INSTEAD OF FRONT FOR CLARITY

3/4" = 1'-0"

2X6 RAILING

W/ E.N. TO

BALUSTERS, TYP.

2X6 BLOCKING

NOTE:

SEE STRUCTURAL NOTES

FOR MINIMUM NAILING

SCHEDULE.

CW

2 AL

LEN

Page 13: TOWER AS BUILT 5 FEB 15

2/5/15

DEP

ARTM

ENT

OF

THE

ARM

Y84

th E

ngin

eer B

atta

lion

(Con

stru

ctio

n Ef

fect

s)14

2nd

Engi

neer

Det

achm

ent (

Surv

ey &

Des

ign)

Scho

field

Bar

rack

s, H

I, 96

857

A-61813SHEET: OF

SIZE:SCALE:

DREVISION: ----

PROJECT NUMBER: DATE:

MC

BH R

1E A

S BU

ILT

3RD

FLO

OR

RAIL

ING

DET

AIL

DRA

WN

BY:

SSG

GAL

DAM

EZ

AS SHOWN

TEAM

LEA

DER

:

CO

NST

RUC

TIO

N T

ECH

:

SSG

GAL

DAM

EZ

SSG

GAL

DAM

EZ

CPT SHAFFER

A

P

P

R

O

VE

D

B

Y

S

3

S

E

C

T IO

N

O

I

C

C

REVI

EWER

NO

TES

3RD FLOOR RAILING DETAIL

SCALE:

HI 14-034

PRO

JEC

T SU

PERV

ISO

R

2X6 RAILING

W/ E.N. TO BALUSTERS

2X6 BALUSTER

W/ SIMPSON H4SS

TO BASE PLATE

2X6 BASE PLATE

END BALUSTER BOLTED

INTO POST WITH

5

8

" BOLT

RAILING CUT AT 45 DEGREES

W/ END TO BALUSTERS, TYP.

3'-6"

FRONT

RIGHT SIDE

TOP

3/4" = 1'-0"

2X6 BLOCKING

SIMPSON A35SS, TYP.

2X6 DECKING W/ 10d

NAILS SPACED AT 6" O.C.

ON EDGES AND 12" O.C.

ON FIELD, TYP.

CW

2 AL

LEN

Page 14: TOWER AS BUILT 5 FEB 15

2/5/15

DEP

ARTM

ENT

OF

THE

ARM

Y84

th E

ngin

eer B

atta

lion

(Con

stru

ctio

n Ef

fect

s)14

2nd

Engi

neer

Det

achm

ent (

Surv

ey &

Des

ign)

Scho

field

Bar

rack

s, H

I, 96

857

A-71814SHEET: OF

SIZE:SCALE:

DREVISION: ----

PROJECT NUMBER: DATE:

MC

BH R

1E A

S BU

ILT

DRA

WN

BY:

SSG

GAL

DAM

EZ

AS SHOWN

TEAM

LEA

DER

:

CO

NST

RUC

TIO

N T

ECH

:

SSG

GAL

DAM

EZ

SSG

GAL

DAM

EZ

CPT SHAFFER

A

P

P

R

O

VE

D

B

Y

S

3

S

E

C

T IO

N

O

I

C

C

REVI

EWER

NO

TES

PREFAB STAIRS AND LADDER DETAIL

SCALE:

HI 14-034

PRO

JEC

T SU

PERV

ISO

R

9'-2

1

2

"

4'X4' PREFAB

STAIR LANDING

7" TREAD PREFAB

STAIRS

PREFAB STAIR LANDING

SUPPORT POSTS

42" PREFAB

HANDRAILS

STAIR TREADS

SUPPORT POST

PREFAB LANDING

9'-2

1

2

"

PREFAB ATTACHMENT

BRACKETS AT TOP

AND BOTTOM OF LADDER

PREFAB LADDER CENTERED

IN HATCH OPENING

3/4" = 1'-0"

4" KICK PLATE

1'-0"

3'-0"

4"

3'-6"

ALL PREFAB ITEMS ARE NOT EXACT DRAWINGS AND ONLY

REPRESENT BASIC INTERPRETATIONS OF THE ITEMS

CW

2 AL

LEN

6-2X6 EQUAL 9"

8'-4"

Page 15: TOWER AS BUILT 5 FEB 15

2/5/15

DEP

ARTM

ENT

OF

THE

ARM

Y84

th E

ngin

eer B

atta

lion

(Con

stru

ctio

n Ef

fect

s)14

2nd

Engi

neer

Det

achm

ent (

Surv

ey &

Des

ign)

Scho

field

Bar

rack

s, H

I, 96

857

A-81815SHEET: OF

SIZE:SCALE:

DREVISION: ----

PROJECT NUMBER: DATE:

MC

BH R

1E A

S BU

ILT

PREF

AB H

ATC

H D

TEAI

L

DRA

WN

BY:

SSG

GAL

DAM

EZ

AS SHOWN

TEAM

LEA

DER

:

CO

NST

RUC

TIO

N T

ECH

:

SSG

GAL

DAM

EZ

SSG

GAL

DAM

EZ

CPT SHAFFER

A

P

P

R

O

VE

D

B

Y

S

3

S

E

C

T IO

N

O

I

C

C

REVI

EWER

NO

TES

HI 14-034

PRO

JEC

T SU

PERV

ISO

R

CW

2 AL

LEN

Page 16: TOWER AS BUILT 5 FEB 15

2/5/15

DEP

ARTM

ENT

OF

THE

ARM

Y84

th E

ngin

eer B

atta

lion

(Con

stru

ctio

n Ef

fect

s)14

2nd

Engi

neer

Det

achm

ent (

Surv

ey &

Des

ign)

Scho

field

Bar

rack

s, H

I, 96

857

A-91816SHEET: OF

SIZE:SCALE:

DREVISION: ----

PROJECT NUMBER: DATE:

MC

BH R

1E A

S BU

ILT

DRA

WN

BY:

SSG

GAL

DAM

EZ

AS SHOWN

TEAM

LEA

DER

:

CO

NST

RUC

TIO

N T

ECH

:

SSG

GAL

DAM

EZ

SSG

GAL

DAM

EZ

CPT SHAFFER

A

P

P

R

O

VE

D

B

Y

S

3

S

E

C

T IO

N

O

I

C

C

REVI

EWER

NO

TES

POST ANCHOR AND JOIST HANGAR DETAIL

SCALE:

NOTES:

1.) FASTENER WILL BE SIMPSON STRONG TIE MODEL H1Z 18 GAUGE METAL.

HI 14-034

PRO

JEC

T SU

PERV

ISO

R

NOTES:

1.) SIMPSON STRONG TIE MODEL # CSBQ66-SDS2.

2.) MATERIAL IS HOT DIPPED GALVANIZED 12 GAUGE STEEL BASE WITH 10 GAUGE

STRAPS.

3.) WITH PROVIDED SIMPSON STRONG TIES SDS 1/4"X2" WOOD SCREWS INSTALLED.

2X12 GIRDER WITH (3)-5/8"

DIAMETER THRU

BOLT TO POST SPACED

3" O.C., TYP.

2X6 JOIST

JOIST HANGER

6

7

8

"

1"

8

3

4

"

3"

4"

2"

3" = 1'-0"

2

3

4

"

3"

3"

2

3

4

"

FRONT SIDE GIRDER DETAIL VIEW

CW

2 AL

LEN

Page 17: TOWER AS BUILT 5 FEB 15

2/5/15

DEP

ARTM

ENT

OF

THE

ARM

Y84

th E

ngin

eer B

atta

lion

(Con

stru

ctio

n Ef

fect

s)14

2nd

Engi

neer

Det

achm

ent (

Surv

ey &

Des

ign)

Scho

field

Bar

rack

s, H

I, 96

857

A-101817SHEET: OF

SIZE:SCALE:

DREVISION: ----

PROJECT NUMBER: DATE:

MC

BH R

1E A

S BU

ILT

HIG

H A

NG

LE T

RAIN

ING

AID

S

DRA

WN

BY:

SSG

GAL

DAM

EZ

AS SHOWN

TEAM

LEA

DER

:

CO

NST

RUC

TIO

N T

ECH

:

CW

2 AL

LEN

SSG

GAL

DAM

EZ

SSG

GAL

DAM

EZ

CPT SHAFFER

A

P

P

R

O

VE

D

B

Y

S

3

S

E

C

T IO

N

O

I

C

C

REVI

EWER

NO

TES

GUSSET DETAIL

SCALE: 1:10

9'-0"

3'-6"

3'-8

1

4

"

1'-8

5

8

"

8'-1"

2'-0

7

8

"

1/2" PLYWOOD W/ 10d NAILS SPACED

AT 6" O.C. ON EDGES. 12" O.C. ON FIELD, TYP.

1

2

" PLYWOOD GUSSET PLATES EA.

SIDE

2X4 SUPPORTS

4'-0"

4'-0

1

2

"

1'-4"

1/2" PLYWOOD

2X4 TRUSS

2X4 SUPPORT

1

2

3

4

5

4 6

1

2

3

4 4

5

6

1'-0

3

8

"

1'-4

3

4

"

1'-0"

1'-1

1

2

"

5

3

4

"

8

3

4

"

10"

7

3

4

"

5

1

8

"

1'-2

1

4

"

1'-0

5

8

"

7

7

8

"

11"

7"

10"

1'-8"

10"

1'-0

5

8

"

1'-9

7

8

"

2'-1

1

4

"

FRONT VIEW

SCALE: 1:10

HIGH ANGLE GUSSET DET.

SCALE: 1:10

HIGH ANGLE TRAINING AID

SCALE: 1:10

HI 14-034

PRO

JEC

T SU

PERV

ISO

R

NOTE:

SHOWN NAIL PATTEN IS

EXACT.

ROOFING TAR PAPER

AND SINGLES.

Page 18: TOWER AS BUILT 5 FEB 15

2/5/15

DEP

ARTM

ENT

OF

THE

ARM

Y84

th E

ngin

eer B

atta

lion

(Con

stru

ctio

n Ef

fect

s)14

2nd

Engi

neer

Det

achm

ent (

Surv

ey &

Des

ign)

Scho

field

Bar

rack

s, H

I, 96

857

A-111818SHEET: OF

SIZE:SCALE:

DREVISION: ----

PROJECT NUMBER: DATE:

MC

BH R

1E A

S BU

ILT

LOW

AN

GLE

TRA

ININ

G A

ID

DRA

WN

BY:

SSG

GAL

DAM

EZ

AS SHOWN

TEAM

LEA

DER

:

CO

NST

RUC

TIO

N T

ECH

:

CW

2 AL

LEN

SSG

GAL

DAM

EZ

SSG

GAL

DAM

EZ

CPT SHAFFER

A

P

P

R

O

VE

D

B

Y

S

3

S

E

C

T IO

N

O

I

C

C

REVI

EWER

NO

TES

GUSSET DETAIL

SCALE:

LOW ANGLE GUSSET DET.

SCALE:

LOW ANGLE TRAINING AID

SCALE:

1/2" PLYWOOD GUSSET PLATE EA. SIDE

1/2" PLYWOOD WITH 10d NAILS

SPACED AT 6" O.C. ON EDGES.

12" O.C. ON FIELD, TYP.

1'-3"

3'-6"

4'-0"

1

2

2

3

3

3

4

1

2

4

FRONT VIEW

SCALE:

HI 14-034

PRO

JEC

T SU

PERV

ISO

R

1" = 1'-0"

3

11

5

8

"

7

1

2

"

7

5

8

"

7"

10"

8

5

8

"

7"

1'-0

3

8

"

1'-0

5

8

"

2'-0"

2'-3

1

8

"

8

1

2

"

7

7

8

"

2" = 1'-0"

7'-6

3

8

"

3'-6"

6'-8"

2'-7

3

8

"

1'-9

7

8

"

1'-1

3

8

"

2" = 1'-0"

2" = 1'-0"

NOTE:

SHOWN NAIL PATTEN IS

EXACT.

ROOFING TAR PAPER

AND SINGLES.