TOUR NOTE OF SHRI MILIND RAMTEKE, IAS, DISTRICT MAGISTRATE & COLLECTOR, WEST TRIPURA FOR THE MONTH OF JANUARY, 2016 01-01-2016 : 9.30 am: Attended Office. At 11.00 am visited the International Fair Ground, Hapania, Agartala for the visit of the Hon’ble Chief Minister, Tripura. The Secretary, I&C; CMD, TSECL, MC and MD, TIDC shall accompany during visit of the international fair ground. At 03.00 pm to 04.30 pm conducted meeting of all the 49 Ward Secretaries of Agartala Municipal Corporation at AMC Council Hall along with all the four Executive Officers of all the four zones. Reviewed various development works such as construction of Integrated Low Cost Sanitation(ILCS units), various TUEP material works, Mandays generation under TUEP under various wards etc. 5.00 pm to 8.00 pm: Conducted weekly review meeting of all the BDOs, EE RD, and line departments for various issues mainly MGNREGA convergence, Material booking, Mandays generation work, IAY/TSGHS progress, IHHL progress under SBM, MGNREGA toilets construction progress etc. 02-01-2016 : At 09.00 am Visited Sewerage Treatment Plant at Barjala constructed under JnNURM by Agartala Municipal Corporation along with the Principal Secretary UDD. At 11.30 am attended meeting in the Chamber of the Secretary to the Governor in connection with the At Home Programme and Reception of the Guests on the occasion of Republic Day to be held on 26 th January, 2016 at Raj Bhavan. At 03.30 pm attended the inaugural programme of the 11 th Regional SARAS Fair, 2016 in the International Fair Ground, Hapania along with the Principal Secretary RDD and hon,ble Minister for RD and Forest Department . At 07.00 pm conducted monthly district level Revenue meeting in the Conference Hall of DM’s Office with the all SDMs, in regards to the following issue : - Allotment of Lands : - Mutation/ CLR/ NLRMP Tea Estate land. Court Case and Revenue Court Case, Civil Court Case. Certificate/ PDR/ MACT cases.

Upload: vankhue

Post on 02-Jan-2017

244 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: Tour note of DR Milind Ramteke,IAS. DM & Collector West Tripura

TOUR NOTE OF SHRI MILIND RAMTEKE, IAS, DISTRICT MAGISTRATE &

COLLECTOR, WEST TRIPURA FOR THE MONTH OF JANUARY, 2016

01-01-2016: 9.30 am: Attended Office.

At 11.00 am visited the International Fair Ground, Hapania, Agartala for

the visit of the Hon’ble Chief Minister, Tripura. The Secretary, I&C; CMD,

TSECL, MC and MD, TIDC shall accompany during visit of the

international fair ground.

At 03.00 pm to 04.30 pm conducted meeting of all the 49 Ward

Secretaries of Agartala Municipal Corporation at AMC Council Hall along

with all the four Executive Officers of all the four zones. Reviewed

various development works such as construction of Integrated Low Cost

Sanitation(ILCS units), various TUEP material works, Mandays

generation under TUEP under various wards etc.

5.00 pm to 8.00 pm: Conducted weekly review meeting of all the

BDOs, EE RD, and line departments for various issues mainly MGNREGA

convergence, Material booking, Mandays generation work, IAY/TSGHS

progress, IHHL progress under SBM, MGNREGA toilets construction

progress etc.

02-01-2016: At 09.00 am Visited Sewerage Treatment Plant at Barjala constructed

under JnNURM by Agartala Municipal Corporation along with the

Principal Secretary UDD.

At 11.30 am attended meeting in the Chamber of the Secretary to the

Governor in connection with the At Home Programme and Reception of

the Guests on the occasion of Republic Day to be held on 26th January,

2016 at Raj Bhavan.

At 03.30 pm attended the inaugural programme of the 11th Regional

SARAS Fair, 2016 in the International Fair Ground, Hapania along with the

Principal Secretary RDD and hon,ble Minister for RD and Forest Department .

At 07.00 pm conducted monthly district level Revenue meeting in the

Conference Hall of DM’s Office with the all SDMs, in regards to the

following issue : -

• Allotment of Lands : -

• Mutation/ CLR/ NLRMP

• Tea Estate land.

• Court Case and Revenue Court Case, Civil Court Case.

• Certificate/ PDR/ MACT cases.

Page 2: Tour note of DR Milind Ramteke,IAS. DM & Collector West Tripura

• Excise Collection.

• Registration of Deeds.

• Sale Tax/Excise tax collection, other tax collection

• Certificate cases for recovery of pending sales tax.

03-01-2016: Sunday.

At 9.00-1.00 pm: Visited sanitation and cleanliness works in and

around Agartala city along with the Executive Officers, Management

wing and Sanitary Inspectors of Agartala Municipal Corporation.

04-01-2016: 9.30 am: Attended Office.

At 10.30 am: Attended weekly Video Conference in view of the issue of

RD schemes by Principal Secretary RDD and Revenue matter by

Secretary Revenue: -

At 11.30 am attended in the one Day workshop for newly elected

members of all Urban Local Bodies being organized by the UDD and

AMC in presence of the Hon’ble Chief Minister, Tripura in the Rabindra

Satabarshiki Bhawan, Agartala.

At 05.00 pm discussion with the representative of the National

Students’ Union of India, Tripura in regards to the progress of

digitization of Cable Televisions Network in Phase- III within the Urban

Areas under West Tripura District.

At 07.00 pm in the Conference Hall of the DM & Collector, West Tripura,

Agartala in connection with the meeting the progress of Digitization of

Cable Televisions Network in Phase- III in the Urban Areas under West

Tripura District.

05-01-2016: At 09.30 am visited to development works under MGNREGA schemes

under the Hezamara RD Block area along with the Officer-in-Charge,

Development of this Collectorate and conducted Development meeting

in the block with all GRS/ TA/ JE/ Panchayat Secretaries and Village

Secretaries for review of MGNREGA, IAY, IHHL etc. Visited two Village

Committee Offices 1. Barkathal & 2. Chandpur ADC Village Committee

office.

At 02.10 pm: attended Agartala Airport for welcome of Shri Nihal

Chand, Hon’ble Union Minister of State for Panchayat Raj, Government of

India.

At 03.30 pm attended workshop in the Conference Hall No. 2 of Pragna

Bhawan, Agartala the Hon’ble Minister for Panchayati Raj, Government

of India interacted with the Elected Representative of PRI bodies and 6th

Scheduled Areas and Officers of PR/RD Department in presence of the

Hon’ble Minister of Panchayat Raj Department, Government of Tripura.

Page 3: Tour note of DR Milind Ramteke,IAS. DM & Collector West Tripura

At 05.30 pm attended review meeting of the Cultural Committee in

connection with celebration of the Republic Day at A.R. Ground under the

Chairmanship by the Principal Secretary, School Education in the

Conference Hall No. 1 of the State Secretariat Building, Agartala in regards

to the State Level occasion of Republic Day.

At 07.00 pm to 08.00 pm attended Office of Agartala Municipal

Corporation.

06-01-2016: At 09.30 am: Visit of Hon,ble Minister Shri Nihal Chand, Hon’ble

Union Minister of State for Panchayat Raj, Government of India to

Mandai RD Block and Jirania RD Block along with Dr. G.S.G. Ayyangar,

IAS, Principal Secretary, Rural Development Department, Government of

Tripura.

1. Horticulture plantation under MGNREGA in Shibnagar ADC village, in

convergence with MIDH, NHM and MGNREGA. 6 Ha plantations – 3

Ha Mosambi under MGNREGA, 1.5 Ha Banana and 1.5 Ha Papaya

under MIDH, in the land of Sanjit Debbarma.

2. Visited to 10 Ha Bamboo Plantation in convergence with National

Bamboo Mission with an estimated cost of 10.5990 lakhs and 1640

person days and Visit to Harepha Para of Kathirambari ADC Village to

see the 10 number of IHHLs constructed under MGNREGA and

cluster of 10 number of houses constructed under Tripura State

Housing Scheme. Also the hon’ble Union Minister visited

Kathirambari ADC Village and held discussion with the MGNREGA

beneficiaries in the VC office.

3. Visited to 1.00 Acre Tea Plantation in land of Dinabandhu Debbarma

S/O Hari Shankar Debbarma during 2015-16 and Interaction with

small tea growers who have cultivated tea garden though MGNREGA

work at the Village Committee (Panchayat) Office, Kathirambadi.

Thereafter Hon’ble Union Minister visited Uttar Majlishpur Gram

Panchayat under Jirania Block. BDO jirania gave Power point

Presentation on Rural Development and Panchayat works of Uttar

Majlishpur GP, followed by interaction with the PRI representatives

and some MGNREGA beneficiaries.

At 02.15 pm attended Agartala Airport to see off the Hon’ble Minister

for Panchayati Raj, Government of India.

At 05.00 pm attended meeting in the Conference Hall of DM & Collector,

West Tripura District under the Chairmanship of State Election

Commissioner Tripura in connection with the preparatory and

Page 4: Tour note of DR Milind Ramteke,IAS. DM & Collector West Tripura

publication of draft list of Polling Station and Draft Electoral Roll for

ensuing Village Committee Election, 2016 by the State Election

Commissioner with all EROs, Returning Officers, DPOs and DEO, West

Tripura District in the following points.

07-01-2016: At 09.30 am attended office.

At 10.30 am discussion with Smt. Kalyani Choudhury, Ex- Mayor-in-

Councilor, Agartala Municipal Corporation and other people from

Kaviraj Tilla area in connection with the development of Kabiraj Tilla

School.

At 11.00 hrs accompanied with Dr. G.S.G. Ayyangar, Principal Secretary,

R.D. Department, Government of Tripura inspected of RD works in

Mohanpur RD Block area in West Tripura District. Following

instructions has been given by Principal Secretary during the inspection

of the said block : -

• Regarding surrender of interest fund with Block Development

Officers so as to take some project related works.

• Regarding provision of various irrigation facilities for fallow

agriculture land under West Tripura District and block level joint

survey of un-irrigated land by Block, Agriculture and Irrigation

department.

• Regarding proper verification of FTO register under MGNREGA for

various Line Department.

• All the Block Development Officers and BDO, Mohanpur are hereby

requested to ensure that both the Ist signatory and 2nd signatory must

come to BDO Office and apply their digital signatures separately so as

to issue FTOs.

• Regarding cancellation of cheques issued to the third parties but not

credited since more than 3)three) months under various RD Blocks.

• Regarding display of photograph and specimen signatures of Ist and

2nd signatory on the first page of FTO Register in all RD Blocks.

• The BDOs and all the GP/VC Offices under West Tripura District for

verification by the inspecting officials at the time of inspection of FTO

register.

Thereafter Principal Secretary and undersigned visited following works

under Mohanpur RD Block.

SL

NO.

NAME OF

SCHEME

NAME OF PROJECT NAME OF

IO/SO.

ESTIMATED

COST

MANDA

YS

MEASUR

EMENT

OUTPU

T

1 2 3 4 5 6 7 8

Page 5: Tour note of DR Milind Ramteke,IAS. DM & Collector West Tripura

1 MGNREGA Land leveling in the land of

Binanda Sarkar W-4 at

Rangacherre Gp

Sri Samir

Sarkar in-

charge PS

Rs. 60940/- 370 L=40 mtr,

B=30mtr

H=.2 mtr

97%

2 MGNREGA Land leveling in the land of

Nirmal Debnath W-1, at

Ishanpur GP

Anun

Bhoumik,in-

charge PS

Rs. 75983/- 449 L- 40 Mtr

B-18 Mtr

H-0.578

Mtr

93%

3 MGNREGA Excavation of community

water tank in the land of Sri

Prasanjit Roy, ward no- 4 of

Brahmamunda GP

Sri Subrata

Chakraborty,

PS

Rs, 7,61,050/- 4910 3 Kani 100%

• works inspected under IAY scheme:-

Sl

No

Name of Project Name of IAY

beneficiaries

Total Project Cost. Year of Sanction

1 2 4 5

1 Construction of IAY House

under Normal IAY Scheme

during the year 2014-15 at

Rangachara GP.

Smt. Shibani Deb

W/o Hari Deb

Rs, 75,000/- 2014-15

2 Construction of IAY House

under TSGH IAY Scheme

during the year 2014-15 at

Ishanpur GP.

Sri Manik Debnath

S/o Krishna Sundar

Debnath

Rs, 75,000/- 2014-15

• DETAIL OF WORK UNDER IHHL, APL- UNDER (SBM-G) SCHEME:-

Sl

No

Name of Project Name of IHHL(APL)

beneficiaries

Total Project Cost. Year of Sanction

1 2 3 4 5

1 Const of IHHL(APL) under

SBM(G) Scheme at Ishanpur

GP

Sri. Nihar Saha, S/o

Gouranga W-1

Rs. 12000/-

2014-15

2 Const of IHHL (APL) under

SBM(G) Scheme at Rangachara

GP

Sri Hiranmoy

Debbarma S/o

Manoranjan W-5

Rs. 12000/-

2014-15

3 Const of IHHL (APL) under

SBM(G) Scheme at Rangachara

GP

Sri. Bhola Debbarma

S/o Naresh W-5

Rs. 12000/-

2014-15

Page 6: Tour note of DR Milind Ramteke,IAS. DM & Collector West Tripura

4 Const of IHHL (APL) under

SBM(G) Scheme at Rangachara

GP

Sri. Ganesh Debbarma

S/o Bhupendra W-5

Rs. 12000/-

2014-15

• MGNREGA works of Line Department

4 Line dept.

Sericulture

Mulberry Plantation at kalitila

under Ishanpur GP.

Pranjit

Debbarma.

Assistant.

Demo(seri)

Rs, 72, 993/- 289 1.7 acres.

-

5 Line dept.

ARDD

Cultivation of combo napier,

nabanagar ishanpur road.

Anil Das,

(ARDA).

Rs, 8,350/- 50 ½ Kani

area

-

• Visit to Rangachera GP:-

SL

NO.

NAME OF

SCHEME

NAME OF PROJECT NAME OF

IO/SO.

ESTIMATED

COST

MANDA

YS

MEASUR

EMENT

OUTPU

T

2 IAY IAY Ghar in favour of Sibani

Deb W/o Hari Deb

Samir Sarkar

PS

Rs. 75000/- - - -

3

SBM(G)

Const of IHHL in favour of

Hiranmoy Debbarma S/o

Manoranjan W-5

Pranab

Debbarma, Jr.

Mech

Rs. 12000/-

-

-

-

4 Const of IHHL in favour of

Bhola Debbarma S/o Naresh

W-5

Pranab

Debbarma, Jr.

Mech

Rs. 12000/-

-

-

-

6 Const of IHHL in favour of

Ganesh Debbarma S/o

Bhupendra W-5

Pranab

Debbarma, Jr.

Mech

Rs. 12000/-

-

-

-

7 BADP 10 unit Market Stall near

Rangacherra GP

Biswanath

Roy

Choudhury,

TA

Rs.19.00 Lakhs

-

Length

=17mtr.

Width=9

-

• Visit to Ishanpur GP:-

SL

NO.

NAME OF

SCHEME

NAME OF PROJECT NAME OF

IO/SO

ESTIMATED

COST

MANDA

YS

MEASUR

EMENT

OUTPU

T

1 MGNREGA Land leveling in the land of

Nirmal Debnath W-1

Anun

Bhoumik, PS

Rs. 75983/- 449 L- 40 Mtr

B-18 Mtr

H-0.578

93%

Page 7: Tour note of DR Milind Ramteke,IAS. DM & Collector West Tripura

Mtr

2 Re-Excavation of Pond on the

land of Sekhar Saha W-1

Arun

Bhoumik, PS

Rs. 51840/- 328 L- 17.5

Mtr B-

15.5 Mtr

H-1.10

Mtr

96%

3 SBM(G) Const of IHHL in favour of

Nihar Saha, S/o Gouranga W-1

Arun

Bhowmik PS

Rs. 12000/-

-

-

-

4 IAY Const. of TSGH IAY Scheme in

favour of Manik Debnath S/o

Krishna Sundha Debnath at

Ishanpur GP during the year

2014-15

S.O:- Arun

Bhowmik PS

Rs, 75,000/-

-

-

-

• Visit to Kalacherra Gram Panchayat:-

SL

NO.

NAME OF

SCHEME

NAME OF PROJECT NAME OF IO ESTIMATED

COST

MANDA

YS

MEASUR

EMENT

OUTPU

T

1 2 3 4 5 6 7 8

1 BADP Const. of 322 seated

Community hall at Kalagachia

High School

Sri Subrata

Chakraborty,

TA

Rs, 40. Lakhs - 264 sqmt. -

• Visit to Brahmakunda Gram Panchayat

SL

NO.

NAME OF

SCHEME

NAME OF PROJECT NAME OF IO ESTIMATED

COST

MANDA

YS

MEASUR

EMENT

OUTPU

T

1 2 3 4 5 6 7 8

1 MGNREGA Excavation of community

water tank in the land of Sri

Prasanjit Roy, ward no- 4 of

Brahmamunda GP

Sri Subrata

Chakraborty,

PS

Rs, 7,61,050/- 4910 3 Kani 100%

At 03.30 PM conducted meeting in the Chamber of the undersigned in

connection with the District Child Protection Scheme with the DISE staff

and representative of NGOs of Childline.

At 04.00 pm attended meeting in the Chamber of the Chief Secretary for

observance of Statehood Day Programme, 2006.

5.00 pm- 8.30 pm: Worked in the AMC office

Page 8: Tour note of DR Milind Ramteke,IAS. DM & Collector West Tripura

08-01-2016: At 09.00 am joint visit to the Assam Rifle Ground followed by visit to Raj

Bhawan in connection with the Celebration of Republic Day, 2016 with

the concerned Line Department.

At 03.30 pm attended meeting in the Conference Hall NO. I of Civil

Secretariat under the Chairmanship of the Secretary, Revenue

Department in regard to the Expert Group from the National Disaster

Management Authority (NDMA) to be visited West Tripura District on

10th and 11th January, 2016 in connection with the Earthquake Resilient

Model District Programme (ERMDP) activities.

At 04.00 PM conducted meeting in the Conference Hall of DM &

Collector, West Tripura with all the concerned departments in view of

the observance of Road Safety Week w.e.f. 10th to 16th January, 2016.

At 05.00 PM conducted meeting in connection with the Noise

Population with the Line Department for implementation of the Order of

the High Court vide Case NO. W.P.(C)(PIL) 03 of 2013.

6.00 pm to 8.00 pm: Attended office work in AMC

09-01-2016: Second Saturday.

10.00 am: Attended office work

At 04.00 pm conducted urgent meeting in the Conference Hall of the

Office of the DM & Collector , West Tripura to discuss about the progress

regarding updating on National Population Registrar (NPR) and seeding

of Aadhaar in the National Population Register database with the BDOs,

Chief Executive Officer, Ranirbazar Municipal Council, Mohanpur

Municipal Council and the Executive Officer, Jirania Nagar Panchayat.

At 05.00 pm- 8.00 pm meeting in the Conference Hall of the Office of

the DM & Collection, West Tripura with the BDOs and Line Department

for proper implementation of MGNREGA schemes.

10-01-2016: SUNDAY

At 9.00 pm to 12.00 Noon visited in different places at around Agartala

City for inspection of vulnerable buildings with the Members of the

Expert Team of NDMA headed by Shri A.K. Singhi, Joint Secretary (MIT),

NDM, Government of India (2) Prof. C.V.R. Murty, Director, IIT, Jodhpur

(3) Prof. Pradeep Kumar Ramancharta, Head EERC, Hyderabad (3) Prof

Hemant B. Kaushik, IIT, Guwahati and others.

Page 9: Tour note of DR Milind Ramteke,IAS. DM & Collector West Tripura

At 05.00 pm visit of NDMA team to District Emergency Control Room,

West Tripura District.

At 06.00 pm interaction with the IAS Probationers of 2014 batch on

North East Darshan in the chamber of the undersigned

11-01-2016: At 10.30 pm attended Video Conference with the Principal Secretary,

Health & Family Welfare Department and the Secretary Revenue in

connection with the progress/ status of District Level meetings of

National Health Mission, Rogi Kalyan Samity and to ensure 100%

Institutional delivery, Immunization, ANC & PNC and NPR.

At 11.30 am meeting in regards to the District Advisory Committee

Meeting under West Tripura District for implementation of Pre-

conception and Pre-conception and Pre-natal diagnostic technique Act.

At 04.00 pm attended meeting in the Conference Hall No. II of State

Secretariat along with the Expert Team of the NDMA in the following

issues : -

• To discuss process of approval for Built Environment, essence of

ERMDP, expected outcomes, financial scope and commitment of

Government of Tripura.

• Provide skill development avenues to masons, bar-benders and

carpenters through Polytechnics, it is and Building Centres.

• Arrange capacity building of teachers of architecture and civil

engineering colleges at one Institute of National Importance in India.

• To undertake Awareness campaign through the District Team.

• Implement components of Techno-Legal Regime, like Peer Review of

Structural Designs and host examination fro voluntary licensing of

engineers.

• Prepare and rehearse Disaster Management Plant at the levels of

family, community, village, town and district, including Medical

Preparedness Plans in Health Centres and Hospital.

• Identify and empower District Disaster Response Force (DDRF)

through SOPs and drills.

• Strengthen Emergency Operations Centres with suitable and non-

redundant communication equipment and activate them.

• Identify and train Damage Assessment Team on Rapid Visual

Screening for determining occupancy of houses and critical and

lifeline buildings.

• Construct Technology Demonstration Units of houses and simple

community owned structures.

Page 10: Tour note of DR Milind Ramteke,IAS. DM & Collector West Tripura

• Plan and undertake Earthquake Retrofitting of select deficient

masonry houses and critical.

6.00 pm to 8.30 pm: Worked in DM office and AMC Office

12-01-2016: At 09.30 am attended in the Agartala Airport to reception of Shri Manoj

Singh, Hon’ble Minister of State for Railway in connection with the visit

to Agartala, Tripura.

11.00 am to 8.00 pm Attended office work in DM Office and AMC Office

At 08.30 pm attended state dinner in the State Guest House in the

honour of the Hon’ble Minister of State Shri Manoj Singh organized by

the Hon’ble Minister for Transport etc. Department, Government of

Tripura.

13-01-2016: 8.00 am: Visited Juvenile Homes for boys, Foundling Homes for boys

and girls and Institute of Visually Handicapped for boys and girls at

Narsinghgarh and , Agartala along with DISE West Tripura and other

officials from District Social Education and Social Welfare office.

At 10.30 am attended Video Conference under by Dr. G.S.G. Ayyangar,

IAS, Principal Secretary, RD Department Government of Tripura are as

follows : -

MGNREGA:-

• FTO generation has to be ensured within 3 days of completion of

works.

• To ensure 15-20 Cr. Material expenditure in the month of January.

• To ensure creation of individual assets 60%, Agriculture and allied

sector 60% and convergence 40%.

• To focus for creation of plantation and water bodies in this ongoing

season so as to generate sustainable livelihood for individual

households.

• Regarding entry of IHHL construction in MGNREGA MIS, detail

instructions are given from RD Department which needs to be

followed in such cases.

• To ensure that the proposals for connectivity in ADC areas are taken

up only for unconnected habitations, not for maintenance or

upgrading of already connected habitations.

• Regarding site selection for Small Bore Deep Tube Wells, joint teams

comprising of BDO, SE(Agriculture) and ADC Engineers need to be

constituted and site selection to be completed by 20th January, 2016.

Page 11: Tour note of DR Milind Ramteke,IAS. DM & Collector West Tripura

• Line Department converging with the MGNREGA should maintain

FTO register and the earlier instructions on FTO generation must be

strictly adhered to.

IAY & TSGHS : -

• Pending UCs for TSHS 2013-14, 2014-15 should be submitted at the

earliest.

• Awaasoft updating for IAY 2013-14 needs to be completed so as to

reflect the completion status as on field.

At 01.00 PM attended Railway Station, Agartala in the programme of

the reception of 1st Broad Gauge Train into at Agartala Station in

presence of the Hon’ble Minister of State Shri Manoj Singh, Hon’ble

Minister of Transport etc Department, people of Tripura and other

dignitaries of the Central Government and the Government of Tripura.

At 06.00 PM attended in the Closing Ceremony of 11th Regional SARAS

Fair, 2016 in the International Fair Ground & Exhibition Centre, hapania,

Agartala in presence of the Principal Secretary, RD Department, the

Hon’ble Deputy Speaker, Tripura Legislative Assembly and Shri Naresh

Jamatia, Hon’ble Minister for RD Department.

14-01-2016: At 9.30 am attended Office.

At 12.00 noon conducted Oath Taking Ceremony of the of the newly

nominated members of Agartala Municipal in the capacity of the District

Magistrate & Collector as per the Provisions of the Tripura Municipal Act

1994.

12.30 pm to 2.30 pm: Attended office work at AMC office

3.00 pm- 8.30 pm: Attended office work in DM Office

15-01-2016: At 11.00 am meeting in the Chamber of the Hon’ble Minister for Urban

Development Department in connection with the different development

works in AMC along with hon,ble Mayor AMC.

• Outbreak of Avian Influenza (Bird Flu) in the State Poultry Farm

Gandhigram Purba Gandhigram GP, Bamutia RD Block, Mohanpur Sub-

Division under West Tripura District – action for Controlling and

Containment of Avian Influenza (Bird Flu).

• 12.30 pm: Attended an urgent meeting was conducted by the Chief

Secretary, Tripura at 12.30 pm on 15th January, 2015 at Secretariat

Agartala in which various directions were given by the Chief Secretary

Page 12: Tour note of DR Milind Ramteke,IAS. DM & Collector West Tripura

in connection with the outbreak of Avian Influenza at Gandhigram State

Poultry Farm.

2.00 pm: Visited Gandhigram State Poultry Farm along with the SDM, Mohanpur, Addl.

SP, Rural, Assistant Director, ARDD, Office of the State DI Lab,

Chairperson, Bamutia Panchayat Samity, BDO, Bamutia, Hezamara,

Lefunga, Mohanpur ED Block, OC, Airport PS Agartala so as to start

various containment and control measures to control the spread of Bird

Flu as per the Prescribed guidelines of Government of India.

At 04.30 pm attended meeting in the Chamber of the Principal Secretary,

Urban Development Department in regards to the vaccination and

sterilization of stray dogs in the Agartala Municipal Corporation area.

• 5.30 PM: Conducted an emergenecy meeting with adm West, SDM

Mohanpur, ARDD Officials, Police Officials, BDO Bamutia RD Block,

Lefunga RD Block, Hezamara RD Block, Mohanpur RD Block, all the

Executive Officers of Agartala Municipal Corporation, SDM sadar, SDM

Jiranai etc. I issued various instructions and directions to the

concerened departments for control and containment of Bird Flu as per

the guidelines prescribed by the Government of India such as setting up

of 24x7 Control Room in Gandhigram HS School, Construction of drop

gates on all the approach roads to Gandhigram, Manning of these drop

gates by police in order to prevent transportation of any domestic or

wild bird in and out of Gandhigram village, to start culling of domestic

poultry birds in one km radius of the epicenter and scientific disposal as

per guidelines, to ensure proper and timely compensation for the culled

birds as per the prescribed rates of Government of India, to prevent any

law and order problem due to this culling operation, proper publicity

and awareness of masses, sensitization of public in 10 km radius of the

epicenter to take precaution and care in connection with the handling of

poultry products and poultry birds etc,

16-01-2016: At 12.00 noon attended in the Mayor in Council meeting in the Meeting

Hall of Agartala Municipal Corporation in the following agendas : -

• Modification of Tripura Building Rules, 2004 with (i) Provision for

Disaster Management is to be included in the TBR, (ii) Provisions for

joint ownership building permission are to be inserted in to TBR. (iii)

Provisions of Energy efficient clause are to be inserted., (iv)

Provisions for parking facilities in all building, fire tender movement

facility are to be included in the existing TRB Rules, (v) Provision for

Retrofitting is also to be included.

• Preparation of City Sanitation Plan for Agartala City.

• Preparation of Master Plan for Agartala City.

Page 13: Tour note of DR Milind Ramteke,IAS. DM & Collector West Tripura

• Mobile Tower Scheme. Street Dogs.

• Creation of fund for AMC Operation and maintenance.

• Discussion on ban of plastic & SHG for manufacturing of paper bags/

jute bags.

• Discussion on door to door garbage collection system.

• Procurement of 200 dustbins, 200 wheel barrow.

At 03.30 pm conducted meeting of the District Level Steering cum

Monitoring Committee on Mid-Day-Meal Programme of West Tripura in

the Conference Hall of DM & Collector, West Tripura District.

At 05.00 pm attended meeting in the Conference Hall No. 1 of the Civil

Secretariat, Agartala in accordance with the decision of the 1st review

meeting of the Cultural Committee constituted for organization of the

Cultural Programme on the occasion of Republic Day at Assam Rifles

Ground under the Chairmanship of the Principal Secretary, School

Education.

At 06.30 pm- 8.30 pm :conducted meeting with the Block Development

Officers, West Tripura District and the Officers of Line Department for

development of MGNREGA schemes : -

17-01-2016: Sunday.

18-01-2016:

19-01-2016: Casual Leave for 3(three) days w.e.f. 18-01-2016 to visit the Hometown.

20-01-2016:

21-01-2016: 9.30 am Attended office

3.30 PM: Attended the state level celebration Ceremony for State Hood

Day at Hall no I Rabindra Shatavarshiki Bhavan. The function was

inaugurated by the Hon’ble Governor Tripura

6.00 PM: Interaction with 20 number of IAS Probationers in the

chamber of the undersigned ‘who visited West Tripura district on

Bharat darshan.

7.00 pm-8.30 pm: Attended AMC office

22-01-2016: 8.30 am: Visit to Bamutia RD Block

Sl.

No.

Name of Gram

Panchayat Name of Project

Name of

Scheme

Estimated

Cost (Rs.) Present Status

1 Ananganagar

GP

Re-Excavation of Pond on the land of

Sunati Rajbhar, ward-5 MGNREGA 93585 Output 90%

Re-Excavation of Pond on the land of

Khukan Das, Ward-4 MGNREGA 94484 Output 94%

Page 14: Tour note of DR Milind Ramteke,IAS. DM & Collector West Tripura

Const. of IAY houses at Namita

Mandal W/o- Sambhu during the year

2014-15

TSGHS 75000 Completed

Const. of IAY houses at Ashutosh

Saha S/o- Ramani during the year

2014-15

TSGHS 75000 Completed

Const. of IAY houses at Kalajari

Sarkar during the year 2015-16 TSGHS 75000

Lintel Level

Completed

Const. of IAY houses at Saraswati

Biswas during the year 2015-16 TSGHS 75000

Lintel Level

Completed

Const. of IHHL Toilet (APL) at Badal

Das S/o- Sadhan SBM (APL) 12000 Completed

Const. of IHHL Toilet (APL) at Samar

Gope S/o- Upendra SBM (APL) 12000 Completed

Const. of IHHL Toilet (APL) at Sanjit

Das S/o- Anil SBM (APL) 12000 Completed

Const. of IHHL Toilet (APL) at

Haradhan Das S/o- Akhil SBM (APL) 12000 Completed

2 Laxmilunga GP

Const. of IHHL Toilet (APL) at

Saraswati Kanda W/o- Babul during

the year 2014-15

SBM (APL) 12000 Completed

Const. of IHHL Toilet (APL) at Manu

Kanda S/o- Shanicharu during the

year 2014-15

SBM (APL) 12000 Completed

Const. of Block Building at

Laxmigunga GP Under Bamutia R.D

Block

MGNREGA

and SPA 23800000

1st Floor column

raise lintel level

Const. of Tea Garden Toilet (BPL) at

Rutani Munda W/o- Baikuntha,

during the year 2014-15

Non NBA 10000 Completed

Const. of Tea Garden Toilet (BPL) at

Bina Tanti W/o- Sudhangshu during

the year 2014-15

Non NBA 10000 Completed

Const. ofTea Garden Toilet (BPL) at

Sarathi Munda W/o- Surathi during

the year 2014-15

Non NBA 10000 Completed

Const. of Tea Garden Toilet (BPL) at

Rasamani Tanti W/o- Bishu during

the year 2014-15

Non NBA 10000 Completed

Land leveling at the land of Pramode

Datta MGNREGA 24447 Ongoing

Land leveling at the land of Nepal Das MGNREGA 29123 Ongoing

2 Narsingarh GP

Excavation of pond on the land of

Subash Saha Ward-3 MGNREGA 90078 Output 95%

Land leveling at the land of Sandhya

Das ward-3 MGNREGA 55175 Output 95%

Page 15: Tour note of DR Milind Ramteke,IAS. DM & Collector West Tripura

Land leveling at the land of Mithu

Debnath Ward-1 MGNREGA 28622 Output 96%

Const. of IAY houses at Basanti Das

W/o- Ajit during the year 2014-15 IAY Normal 75000 Completed

Const. of IAY houses at Raichan

Debnath S?o- Anukul during the year

2014-15

IAY Normal 75000 Completed

Const. of IAY houses at Purnima

Bhowmik W/o- Kajal during the year

2014-15

TSGHS 75000 Completed

Const. of IAY houses at Asha Biswas

W/o- Sadhan during the year 2015-

16

TSGHS 75000 Lintel Level

Completed

Const. of IHHL Toilet (APL) at Naresh

Debnath S/o- Lt. Kailash SMB (APL) 12000 Completed

Const. of IHHL Toilet (APL) at Shanti

Saha S/o- Gouranga SMB (APL) 12000 Completed

Const. of IHHL Toilet (APL) at Gita

Deb W/o- Haripad SMB (APL) 12000

Lintel Level

Completed

Const. of IHHL Toilet (APL) at Ajoy

Bhattacharjee S/o- Lt. Kamakhya SMB (APL) 12000 Completed

At 04.30 pm attended in the Conference Hall No. 2 of State Secretariat

in view of the interaction with the Senior Officers of State Secretariat by

the group of 20 nos. of IAS Officers (Prob) as a part of their Winter

Study Tour.

6.00 pm- 8.00 pm: Attended office works in AMC

23-01-2016: Holiday: Netaji Jayanti

At 04.30 pm attended in the Conference Hall No. 2 of State Secretariat

in connection with the interaction with the team of 20 nos. of IAS

Officers by the Hon’ble Chief Minister, Tripura.

24-01-2016: Sunday.

9.00 am-1.00 pm: Weekly visit for inspection of various sanitation and

cleanliness works under various zones of Agartala Municipal Corporation

along with the Executive Officers, Engineers of SWM wing and sanitary

Inspectors.

I also visited following ongoing projects under AMC along with SE AMC

and concerned Executive engineer

1. Construction of Parking Place and Hawker Shed near Heritage

Park

Page 16: Tour note of DR Milind Ramteke,IAS. DM & Collector West Tripura

2. Kumaritilla lake development work

3. Dimsagar Phase-II Waterbody Development work

25-01-2016: At 10.30 am attended video conference with the Principal Secretary,

RD Department in connection with the MGNREGA scheme.

At 11.00 am attended in the Rabindra Satabarshiki Bhawan Hall No. 22

of Agartala in regards to the celebration of State Level National Voters

Day, 2016 by the Hon’ble Governor of Tripura and the Chief Secretary

of Tripura.

3.00 pm- 8.00 pm: Worked in AMC and DM office

26-01-2016: 6.00 am: Unfurling of National Flag at DM residence

At 07.00 am unfurling of National Flag in connection with the

observance of 67th Republic Day, 2016 in the Office premises of the DM

& Collector, West Tripura District, Agartala.

At 08.00 am unfurling of National Flag in view of the observance of

Republic Day, 2016 in the premises of Kendriya Vidyalaya No. 1

Kunjaban, Agartala.

At 09.00 am attended in the Assam Rifles Ground in regards to the

Unfurling of National Flag at the State Level 67th Republic Day, 2016 by

the Hon’ble Governor of Tripura reception of dignitaries.

At 04.00 pm attended in the Darbar Hall of the Governor House,

Tripura in view of the observance of ‘At Home’ programme.

At 06.00 pm attended in the Rabindra Satabarshiki Bhawan Hall No. I,

Agartala for the State Level Tribal Dance Competition in connection

with the 67th Republic Day, 2016 in presence of the Hon’ble Chief

Minister, Tripura; Hon’ble Minister for Tribal Welfare and Chief

Secretary, Tripura and other officials / dignitaries.

At 09.30 pm attended the programme of Tribal Dinner at Maharani

Tulsibati H.S. School under the Chairmanship by the Hon’ble Chief

Minister, Tripura.

27-01-2016: At 10.00 am attended office.

At 11.30 am attended in the Chamber of the Principal Secretary, Health

Department for Ease of Doing Business.

At 03.00 pm attended meeting in the Society Hall, City Centre, Agartala

under the Chairmanship by the Hon’ble Mayor, Agartala municipal

Corporation in connection with the shifting and development of GB

Bazar.

Page 17: Tour note of DR Milind Ramteke,IAS. DM & Collector West Tripura

At 05.30 pm attended meeting in the Conference Hall No. 2 of State

Secretariat in view of the visit of the Socio Political Study of India team

of National Defence College (NDC) on 31st January, 2016 to 5th

February, 2016.

7.30 -8.30 pm: Attended office work at AMC office

28-01-2016: At 10.30 am attended Video Conference by the State Election

Commissioner in connection with the Tripura Tribal Areas

Autonomous for preparation of the Village Committee Election, 2016.

At 11.00 am attended in the review meeting by the with the hon’ble

Urban Development Minister and Principal Secretary UDD Local Bodies

conducted by the Urban Development Department, Government of

Tripura in the Conference Hall No. 2 of Pragna Bhawan, Agartala in

connection with the following issues : -

• Share of Taxes (SoT),

• 13th Finance Commission,

• 14th Finance Commission,

• National Urban Livelihood Mission (NULM),

• 10% Lump sum

• Special Central Assistant (SCA),

• Special Plan Assistant (SPA),

• Special Development Scheme (SDS),

• Tripura State Government Housing Scheme (TSGHS).

• Land Acquisition.

• Tripura Urban Employment Programme (TUEP),

• Revenue Collection/ Generation during 2015-16,

• Construction of Office Building,

• Rajiv Awas Yojana (RAY),

• NLCPR and ILCS in respect of AMC,

• Action taken report on the minutes of the meeting of CEO/EO held

on 22-12-2015 under the chairmanship of PS, UDD.

• Status of cash balance.

At 06.00Pm to 09.00 pm work in the DM Office.

29-01-2016: At 08.30 am visited to Jirania RD Block for inspection of

various development works

IHHL: -

1. Biswamani Debbarma ,S/O Nanda Kumar at Badraipara under Barjala

Binapani GP.

2. Biswamani Debbarma ,S/O Nanda Kumar at Badraipara under Barjala

Binapani GP.

3. Shekhar Debbarma,S/O Adhin Debbarma at Badraipara under Barjala

Binapani GP.

Page 18: Tour note of DR Milind Ramteke,IAS. DM & Collector West Tripura

4. Budhu Kr. Debbarma,S/O Gayacharan Debbarma at Badraipara under

Barjala Binapani GP.

5. Bishu Laxmi Debbarma ,W/O Gayacharan at Badraipara under Barjala

Binapani GP.

6. Takhiti Debbarma ,W/O Sukram Debbarma at Badraipara under Barjala

Binapani GP.

7. Manoranjan Debbarma ,S/O Bishu Debbarma at Badraipara under Barjala

Binapani GP.

IAY:-

1. IAY house Gauri Debbarma W/O Subodh Debbarma (2014-15)- Completed. 2. IAY house Rupkanya Debbarma W/O Bishram Debbarma (2014-15)-Completed. 3. Sambhu Debbarma S/O Adhin Debbarma (2014-15)-Completed. 4. Bela Das W/O Swachu (2014-15)-Completed

MGNREGA:-

1. Land Leveling on the land of Thakiti Debbarma W/O Sukram Debbarma -Rs.

71474 Work Completed- Output- 92-94% Quality- medium

2. Land Leveling on the land of Sushma Debbarma W/O Surajit Debbarma –Rs.

41080 Work Completed- Output- 90-94%% Quality- medium

3. Seasonal flood control bandh on the land of Gulak Thakur Para to Balighat-

Rs. 181193 Output- Rs. Output 98-99% Quality- good, work ongoing

4. Land Leveling on the land of Durjoy Debbarma S/O Ranjan Debbarma -Rs.

172175 Output- Rs. Output 88-90%% Quality- medium, work completed

At 12.00 Noon attend the Video Conferencing with the Municipal

Commissioners of all these 98 cities and the concerned Collectors at the

district level and the Chief Secretary and the State Mission Director/

Principal Secretary (UD) of the State for implementation of the Smart

City Mission.

At 04.30 pm attended meeting in the Meeting Hall of the Chief

Secretarie’s Chamber, New Secretariat Building, Capital Complex,

Agartala to review the progress of works of Broad Gauge Railway Line.

AT 07.30 pm visited Circuit House, Agartala along with the Chief

Secretary, Tripura and Secretary, Tribal Welfare in connection with the

temporary accommodation of the Office of the State Human Rights

Commission, Tripura.

30-01-2016: 8.30 am: Visited Belbari RD block and conducted development review

meeting with all the Panchayat Secretaries, GRS, TA/JE, PEO and BDO.

Inspected the construction of Belbari Block Building which is being

constructed under SPA and MGNREGA convergence by EE RD

Agartala. The work is under progress and 70 % completed.

Page 19: Tour note of DR Milind Ramteke,IAS. DM & Collector West Tripura
Page 20: Tour note of DR Milind Ramteke,IAS. DM & Collector West Tripura
Page 21: Tour note of DR Milind Ramteke,IAS. DM & Collector West Tripura