DAKOTA
SOUTH
STATE OFPROJECT
SHEETSHEETS
TOTAL
27 29
1112
34
282930
18
BEGIN NH-PH 0018(180)420
111
LIN
CO
LN C
OU
NT
Y
29
19
464 A
VE
463 A
VE
462 A
VE
460 A
VE
461 A
VE
a 2
29+00
End
a 2
11+18
368+12
375+18
390+82
396+85
512+50
514+96
376+85
385+62
402+66
408+42
518+55
a 3
+05
2+18
Begin Stripin
g
INDEX OF SECTIONS
Pipe Sections Section Z:Cross SectionsSection X:PlansPermanent Signing Section S:PlansPavement MarkingSection M:Surfacing PlansSection F:Structure PlansSection E:Control PlansErosion And SedimentSection D:Traffic Control PlansSection C:Grading PlansSection B:Estimate of Quantities Section A:
STORM WATER PERMIT
43.2572 , -97.0822Approx. Begin Lat/Long
283 AcresTotal Project Area:
206 AcresArea Disturbed:
Body of Water:
Vermilion RiverMajor Receiving
should be determined by field verified procedures.
Actual Passing Striping for Passing/No Passing zones
This Striping Diagram is for information purposes only.
30 mph Urban
TO JCT. S.D. 19
Gross Length
Length of Exceptions
Net Length
UNION
TURNER
HANSON
BRULE
BEADLE
SULLY
FAULK SPINK
CLARK
GRANT
DAYWALWORTH
BROWN
PERKINS
LAWRENCE
PENNINGTON
STANLEY
JONES
GREGORY
MELLETTE
TODD
Miles
Miles
Miles
Feet
Feet
Feet
CLAY
BON HOMME YANKTON
CHARLES MIX DOUGLAS HUTCHINSONLINCOLN
MINNEHAHAMcCOOK
DAVISON
AURORA
BUFFALO JERAULD SANBORN MINERMOODY
BROOKINGSKINGSBURY
HAND
HUGHES
POTTER
CODINGTON
HAMLIN
EDMUNDS
CAMPBELL McPHERSON MARSHALL ROBERTSHARDING
CORSON
ZIEBACH DEWEY
MEADE
BUTTE
LYMAN
TRIPP
CUSTER
FALL RIVER
LAKE
HYDE
HAAKON
JACKSON
BENNETT
75,062.77
3,606.61
71,456.16
14.216
0.683
13.533
STATE OF SOUTH DAKOTA
PLANS FOR PROPOSED
DEUEL
DEPARTMENT OF TRANSPORTATIONVib
org
To
Chancellor
To
Lennox
To
ADT (2016)
ADT (2036)
DHV
D
T DHV
V
T ADT
1167
1710
212
52%
6.3%
13.9%
65 mph Rural
DESIGN DESIGNATION
OGLALA LAKOTA
PCN 036A
EROSION REPAIR, & ASPHALT CONCRETE SURFACING
SHOULDER WIDENING, GRADING, STRUCTURES,
to 241+49.74233+43.13EXCEPTION
TURNER & LINCOLN COUNTIESUS HIGHWAY 18
PROJECT NH-PH 0018(180)420
1287121110
13 2461
3
3632313635
25262526
DAVIS
35
285 ST
D
2627282930
31 32 33 34 35 36
65 4 3 2 1
7 8 9 10 11 12
284 ST
286 ST
HURLEYPOP. 415
POP. 85
284 ST
285 ST
286 ST
285 ST
284 ST
286 ST
18
18
Snake Creek
5
9 10 11
3334
6
7
31
30
32
20
17
29
19
1813
8
3025
24
5
END NH-PH 018(180)420
MRM = 435.00+0.017Township 97 North - Range 50 Westthe Northwest Corner of Section 6 -1647.42 Feet East and 68.17 Feet North ofon F 244(7)Station a 228+99.67 = Station 232+11.80
MRM = 420.81+0.004Township 97 North - Range 53 Westthe Northwest Corner of Section 2 -4.74 Feet North & 54.44 Feet East ofon F 244(2)Station 2+18.10 = Station 9+50.00
to 203+17.63175+17.63EXCEPTION
a 1+12.70 Ah524+93.90 Bk =EQUATION
Begin GradingEnd Shoulder WideningSta. 252+27.58
Begin Shoulder WideningEnd GradingSta. 259+67.50
TO JCT. I-29
R 50 W
18
1+63.5
1
R 53 W
R 53 W
a 1
06+80.9
2
107+31.6
8
210+55.8
6
524+86.4
2
R 50 W
18
263+28.6
7
U:\rd\prj\turn
036
A\Title.d
gn
File -
Plotting Date: 02/06/2018 Revised 02/06/2018 AR
Plot Scale -
1:2
00
Plotted Fro
m -
trsf1
2141
PROJECT
T 9
7 N
T 9
7 N
T 9
8 N
T 9
8 N
17
TU
RN
ER C
OU
NT
Y
470 A
VE
467 A
VE
465 A
VE
458 A
VE
457 A
VE
456 A
VE
Long Creek
R 51 WR 52 W
R 51 W
a 1
59+68.8
1
a 2
12+50.7
3
R 52 W
T 9
8 N
469 A
VE
468 A
VE
466 A
VE
459 A
VE
a 5
3+94.5
8
466 A
VE
54+58.0
2
157+71.5
6
316+17.1
0
369+07.2
7
421+71.8
1
472+24.4
8
Vermillion River
Ditch
Number Eight
Hurley Creek
1 523NH-PH 0018(180)420
10
TOTALSHEETS
PROJECT SHEETSTATE OF SOUTH
DAKOTAESTIMATE OF QUANTITIES AND ENVIRONMENTAL COMMITMENTSRevised 02/06/2018 AR02/06/2018Plotting Date:
Section B - Grading Section B - Grading (Continued)
BID ITEM NUMBER
ITEM QUANTITY UNIT BID ITEM NUMBER
ITEM QUANTITY UNIT
004E0030 Maintenance of Traffic Diversion(s) Lump Sum LS450E0408 18" RCP Bend, Furnish Each4
004E0050 Remove Traffic Diversion(s) Lump Sum LS 18" RCP Bend, Install450E0409 4 Each009E0010 Mobilization Lump Sum LS 450E2000 12" RCP Flared End, Furnish 14 Each009E3230 Grade Staking 13634 Mile 450E2001 12" RCP Flared End. Install 14 Each INDEX OF SHEETS009E3245 Final Cross Section Survey 13.779 Mile 450E2008 18" RCP Flared End. Furnish 2 Each009E3250 Miscellaneous Staking 13.779 Mile A1 to A4 Estimate of Quantities for Sections B, C, D, E, F,
M,and SEnvironmental Commitments
450E2009 18" RCP Flared End. Install 2 Each009E3280 Slope Staking 13.779 Mile 36" RCP Flared End, Furnish Each450E2028 2
A5 to A7009E3290 Structure Staking 7 Each 450E2029 36" RCP Flared End. Install 2 Each009E3300 Three Man Survey Crew 40 0 Hour 450E2052 72" RCP Flared End, Furnish 2 Each100E0100 Clearing Lump Sum LS 450E2053 72" RCP Flared End. Install 2 Each110E0600 Remove Fence 75,173 FI 450E2200 24" RCP Sloped End, Furnish 16 Each110E0700 Remove 3 Cable Guardrail 360 Ft SPECIFICATIONS450E2201 24" RCP Sloped End, Install 16 Each110E0730 Remove Beam Guardrail 2,885.0 Ft 30” RCP Sloped End, Furnish Each450E2204 10 Standard Specifications for Roads and Bridges, 2015 Edition and Required
Provisions, Supplemental Specifications, and Special Provisions as included in the Proposal.
110E0740 Remove 3 Cable Guardrail Anchor Assembly 4 Each 450E2205 30" RCP Sloped End, Install 10 Each110E1140 Remove Concrete Sidewalk 199 7 SqYd 450E2304 18" RCP Safety End. Furnish 12 Each110E7040 Remove Gate for Reset 1 Each 18" RCP Safety End. Install450E2307 12 Each
Ft110E7500Remove Pipe for Reset 168 450E3002 18" RCP Arch Class 2, Furnish 144 Ft110E7510 Remove Pipe End Section for Reset 8 Each 450E3004 18" RCP Arch Class 4, Furnish Ft260120E0010 Unclassified Excavation 410,972 CuYd 18" RCP Arch. Install450E3010 404 Ft120E0300 Borrow Unclassified Excavation 21,600 CuYd 450E3012 24" RCP Arch Class 2, Furnish 312 Ft120E0500 Option Borrow Excavation 124,600 CuYd 450E3020 24" RCP Arch. Install 312 Ft120E0600 Contractor Furnished Borrow Excavation 29,002 CuYd 450E3022 30" RCP Arch Class 2, Furnish 260 Ft120E0900 Contaminated Material Excavation 100 CuYd 30" RCP Arch Class 4, Furnish450E3024 332 Ft120E1000Muck Excavation 3,647 CuYd 450E3030 30" RCP Arch. Install 592 Ft120E2000 Undercutting 117,429 CuYd 450E3032 36" RCP Arch Class 2, Furnish Ft308120E6100 Water for Embankment 2.465 3 MGal 36" RCP Arch Class 4, Furnish450E3034 196 Ft240E0010 Obliterate Old Road Sta1 450E3040 36" RCP Arch. Install 504 Ft250E0020 Incidental Work. Grading Lump Sum LS 450E3042 42" RCP Arch Class 2, Furnish 1,158 Ft270E0040 26,295.0 TonSalvage and Stockpile Asphalt Mix and Granular Base
MaterialFt450E3050 42" RCP Arch. Install 1,158
48" RCP Arch Class 2. Furnish450E3052 158 Ft380E4050 8" PCC Fillet Section 234 SqYd450E3060 48" RCP Arch. Install 158 Ft421E0100 Pipe Culvert Undercut 2,174 CuYd
60" RCP Arch Class 2, Furnish450E3072 234 Ft450E0102 12” RCP Class 2, Furnish 46 Ft450E3080 60" RCP Arch. Install 234 Ft450E0104 12” RCP Class 4, Furnish 176 Ft
30" RCP Arch Bend. Furnish 2 Each450E3320450E0110 12” RCP. Install 222 Ft450E3321 30” RCP Arch Bend. Install 2 Each450E0122 18" RCP Class 2, Furnish 180 Ft450E3328 42” RCP Arch Bend, Furnish 1 Each450E0130 18” RCP. Install 180 Ft
42" RCP Arch Bend. Install 1 Each450E3329450E0142 24" RCP Class 2, Furnish 418 Ft450E4512 36“ RCP Arch Flared End, Furnish 14 Each450E0150 24” RCP. Install 418 Ft450E4513 36" RCP Arch Flared End, Install 14 Each450E0162 30" RCP Class 2, Furnish 310 Ft
42" RCP Arch Flared End, Furnish Each450E4516 32450E0170 30" RCP. Install 310 Ft450E4517 42" RCP Arch Flared End, Install 32 Each450E0182 36” RCP Class 2, Furnish 112 Ft450E4520 48" RCP Arch Flared End, Furnish Each4450E0190 36” RCP. Install 112 Ft
Each450E4521 48" RCP Arch Flared End, Install 4450E0242 72” RCP Class 2, Furnish 128 Ft450E4528 60" RCP Arch Flared End, Furnish 6 Each450E0250 72" RCP. Install 128 Ft
File
- ...
\pri\
turn
036A
\Not
esS
ectio
nA.d
gn
NH-PH 0018(180)420 A1 A8
TOTALSHEETS
PROJECT SHEETSTATE OF SOUTH
DAKOTAESTIMATE OF QUANTITIES AND ENVIRONMENTAL COMMITMENTSSection B - Grading (Continued) Revised 02/06/2018 AR02/06/2018Plotting Date:
Section D - Erosion and Sediment ControlSection B - Grading (Continued)BID ITEM NUMBER
ITEM QUANTITY UNIT
BID ITEM NUMBER
60" RCP Arch Flared End, Install450E4529 6 Each ITEM QUANTITY UNITBID ITEM NUMBER
ITEM QUANTITY UNIT450E4600 24" RCP Arch Sloped End, Furnish 10 Each110E1690 Remove Sediment CuYd14.0
450E4601 24" RCP Arch Sloped End, Install 10 Each 620E1030 3 Post Panel 126 Each110E1700 Remove Silt Fence 5,159 FI
450E4604 30" RCP Arch Sloped End, Furnish 21 Each 620E2012 Each12' Tubular Gate 4Placing Topsoil230E0010 90,801 CuYd450E4605 30" RCP Arch Sloped End. Install 21 Each 620E2020 20' Tubular Gate 3 Each
730E0100 Cover Crop Seeding 22 0 Bu450E4650 18" RCP Arch Safety End, Furnish 16 Each 620E2100 Reset Gate 1 Each730E0251 Special Permanent Seed Mixture 1 2,946 Lb450E4653 18" RCP Arch Safety End, Install 16 Each 630E0500 Type 1 MGS 775.0 Ft
Special Permanent Seed Mixture 2730E0252 432 Lb450E4759 18" CMP 16 Gauge. Furnish 3,060 Ft 630E1500 Type 1 Guardrail Transition 8 Each730E0253 Special Permanent Seed Mixture 3 14 Lb450E4760 18" CMP, Install 3,060 Ft
630E1505 Type 2A Guardrail Transition Each4731E0200 Fertilizing 85.80 Ton450E4769 24" CMP 16 Gauge, Furnish 354 Ft
630E2016 MGS Flared End Terminal 12 Each732E0100 Mulching 2270 Ton450E4770 24" CMP, Install Ft354
650E1080 Type F68 Concrete Curb and Gutter 24 Ft732E0200 Fiber Mulching Ton1.7450E4779 30" CMP 16 Gauge. Furnish 232 Ft
670E3200 Type D Frame and Grate Each2734E0102 Type 2 Erosion Control Blanket 4,708 SqYd450E4780 30" CMP, Install 232 Ft
670E5400 Precast Drop Inlet Collar 2 Each734E0154 12” Diameter Erosion Control Wattle 6,000 Ft450E5010 18" CMP Elbow. Furnish 2 Each
700E0310 Class C Riprap 1,431.1 Ton734E0165 Remove and Reset Erosion Control Wattle 1,500 Ft450E5011 18" CMP Elbow, Install 2 Each
720E1015 Bank and Channel Protection Gabion 224.0 CuYd734E0510 Shaping for Erosion Control Blanket Ft2,119450E5211 18" CMP Flared End, Furnish Each1
734E0900 Temporary Diversion Channel and/or Pipe 7 Each734E0602 Low Flow Silt Fence 10,790 Ft450E5212 18" CMP Flared End. Install 1 Each
831E0110 Type B Drainage Fabric SqYd3,798734E0604 Fligh Flow Silt Fence 9,846 Ft450E5406 18" CMP Safety End. Furnish 94 Each
900E0010 Refurbish Single Mailbox 22 Each450E5407 18" CMP Safety End, Install 94 Each 734E0610 Mucking Silt Fence 1,432 CuYd
900E0012 Refurbish Double Mailbox 1 Each450E5410 24" CMP Safety End. Furnish 12 Each 734E0620 Repair Silt Fence 5,159 Ft
450E5411 24“ CMP Safety End, Install 12 Each 734E0630 Floating Silt Curtain Ft1,300
Section C - Traffic Control450E5414 30" CMP Safety End, Furnish 8 Each 734E5010 Sweeping 4 Flour
450E5417 30" CMP Safety End, Install 8 Each 900E1320 Construction Entrance Each3
450E5509 18" CMP Arch 16 Gauge, Furnish 72 FtBID ITEM NUMBER
ITEM QUANTITY UNIT450E5510 18" CMP Arch. Install 72 FtSection E - Structure
Str. Nos. 63-191-170, 42-015-170, and 6’x6’ SpecialJunction Box
450E6006 18" CMP Arch Safety End, Furnish 2 Each 634E0010 Flagging 200.0 Flour450E6007 18" CMP Arch Safety End. Install 2 Each 634E0020 Pilot Car 50.0 Hour450E8008 18" CMP to RCP Transition, Furnish 1 Each 634E0110 Traffle Control Signs 1.206 0 SqFt
18" Pipe Transition, Install450E8010 1 Each 634E0120 Traffic Control. Miscellaneous Lump Sum LS450E9000 Reset Pipe 168 Ft 634E0285 Type 3 Barricade. 8' Double Sided 24 Each BID ITEM
NUMBERITEM QUANTITY UNIT
450E9001 Reset Pipe End Section 8 Each 634E0630 Temporary Pavement Marking 14.0 Mile462E0100 Class M6 Concrete 1.9 CuYd 420E0200 Structure Excavation. Box Culvert 113 CuYd634E1002 Detour Signing 605.3 SqFt464E0100 Controlled Density Fill 77.9 CuYd 421E0200 Box Culvert Undercut 392 CuYd634E1215 Each2Contractor Furnished Portable Changeable Message
Sign480E0100 Reinforcing Steel 262 Lb 460E0120 Class A45 Concrete, Box Culvert 168.4 CuYd
600E0200 Type II Field Laboratory 1 Each 460E0380 Install Dowel in Concrete 18 Each
620E0020 Type 2 Right-of-Way Fence 52,763 Ft 462E0100 Class M6 Concrete 45 CuYd620E0030 Type 3 Right-of-Way Fence 1,000 Ft 480E0100 Reinforcing Steel 34.568 Lb620E0040 Type 4 Right-of-Way Fence 386 Ft 560E2050 2-7'x3' Precast Concrete Box Culvert. Furnish 800 FI620E0060 Type 6 Right-of-Way Fence Ft14,634 560E2051 2-7'x3' Precast Concrete Box Culvert. Install 80.0 Ft620E0250 Modified Type 5 Right-of-Way Fence 638 Ft 560E3050 2 Each2-7'x3' Precast Concrete Box Culvert End Section,
Furnish620E0510 Type 1 Temporary Fence 7,964 Ft560E3051 2 Each2-7'x3' Precast Concrete Box Culvert End Section,
Install620E0520 Type 2 Temporary Fence 436 Ft
620E0530 Type 3 Temporary Fence 1,073 Ft 671E6007 Type A7 Manhole Frame and Lid 1 Each620E1020 2 Post Panel 207 Each 700E0210 Class B Riprap 29 1 Ton
700E0310 Class C Riprap 73.1 Ton
831E0110 Type B Drainage Fabric 139 SqYd
File -
..Apr
i\tur
n036
A\N
otes
Sec
tionA
.dgn
NH-PH 0018(180)420 A2 A8
TOTALSHEETS
PROJECT SHEETSTATE OF SOUTH
DAKOTAESTIMATE OF QUANTITIES AND ENVIRONMENTAL COMMITMENTSRevised 02/06/2018 AR02/06/2018Plotting Date:
Section E - Structure Str. No. 63-179-170
Section E - Structure Str. No. 63-209-170
BID ITEM NUMBER
BID ITEM NUMBER
ITEM QUANTITY UNITITEM QUANTITY UNIT
009E3310 Bridge Elevation Survey Lump Sum LS009E3310 Bridge Elevation Survey Lump Sum LS
009E5000 Concrete Penetrating Sealer 431 3 SqYd009E5000 Concrete Penetrating Sealer 530.0 SqYd
250E0030 Incidental Work, Structure Lump Sum LS250E0030 Incidental Work. Structure Lump Sum LS
Section E - Structure Str. No. 42-016-170
410E2600 Membrane Sealant Expansion Joint 83.8 Ft410E2600 Membrane Sealant Expansion Joint 83.8 Ft
CuYd420E0100 Structure Excavation. Bridge 92 CuYd 420E0100 Structure Excavation. Bridge 464
Bridge End Embankment 430E0200 Bridge End Embankment 412 CuYd430E0200 638 CuYd430E0300 Granular Bridge End Backfill 124.7 CuYd 430E0300 Granular Bridge End Backfill 68.1 CuYd BID ITEM
NUMBERITEM QUANTITY UNIT
430E0510 Approach Slab Underdrain Excavation 3.3 CuYd 430E0510 Approach Slab Underdrain Excavation 3.0 CuYd
110E0730 Remove Beam Guardrail 250.4 Ft430E0700 Precast Concrete Headwall for Drain 4 Each 430E0700 Precast Concrete Headwall for Drain 4 Each
120E0010 Unclassified Excavation 2,056 CuYd460E0030 Class A45 Concrete. Bridge Deck 2868 CuYd 460E0030 Class A45 Concrete, Bridge Deck 199 8 CuYd
120E0300 Borrow Unclassified Excavation 15 CuYd460E0050 Class A45 Concrete. Bridge 151.4 CuYd CuYd460E0050 Class A45 Concrete, Bridge 121.8630E0210 Straight Class B Thrie Beam Rail 250.4 FtConcrete Approach Slab for Bridge460E0150 1978 SqYd 460E0150 Concrete Approach Slab for Bridge 1906 SqYd
700E0310 Class C Riprap 3,817.4 Ton460E0160 Concrete Approach Sleeper Slab for Bridge 41.9 SqYd Concrete Approach Sleeper Slab for Bridge SqYd460E0160 41 9831E0110 Type B Drainage Fabric 2,645 SqYd464E0100 Controlled Density Fill 11.5 CuYd 464E0100 Controlled Density Fill 7.5 CuYd
480E0100 Reinforcing Steel 18,234 Lb Reinforcing Steel Lb480E0100 12.722
Section E - Structure
Site 1 - Alternate A Str. No. 63-224-170
480E0200 Epoxy Coated Reinforcing Steel 74,786 Lb 480E0200 Epoxy Coated Reinforcing Steel 63,346 Lb
510E0100 Extract Pile 16 Each 510E0100 Extract Pile 16 Each
510E0300 Preboring Pile 120 Ft 510E0300 Preboring Pile 100 Ft
510E3361 HP 10x42 Steel Test Pile. Furnish and Drive 510 Ft HP 10x42 Steel Test Pile. Furnish and Drive510E3361 190 Ft
510E3365 HP 10x42 Steel Bearing Pile, Furnish and Drive 5,090 Ft 510E3365 HP 10x42 Steel Bearing Pile, Furnish and Drive Ft1,080
680E0040 4" Underdrain Pipe 271 Ft 510E3851 16"x0.25” Steel Pipe Test Pile, Furnish and Drive 160 Ft BID ITEM NUMBER
ITEM QUANTITY UNIT680E2500 Porous Backfill 34 1 Ton 510E3855 16"x0.25" Steel Pipe Bearing Pile. Furnish and Drive Ft2.250
420E0200 Structure Excavation. Box Culvert 97 CuYd700E0310 Class C Riprap 1,141.2 Ton 680E0040 4” Underdrain Pipe 264 Ft
421E0200 Box Culvert Undercut 310 CuYd831E0110 Type B Drainage Fabric 1,237 SqYd 680E2500 Porous Backfill Ton30.9Class A45 Concrete. Box Culvert460E0120 2394 CuYd700E0210 Class B Riprap 798.0 Ton
462E0100 CuYdClass M6 Concrete 1.1831E0110 Type B Drainage Fabric SqYd845480E0100 Reinforcing Steel 40,250 Lb
700E0210 Class B Riprap 1675 TonSection E - Structure 42-049-170
831E0110 Type B Drainage Fabric SqYd219
BID ITEM NUMBER
ITEM QUANTITY UNIT
250E0030 Incidental Work. Structure Lump Sum LS
420E0200 Structure Excavation, Box Culvert 125 CuYd
421E0200 Box Culvert Undercut 405 CuYd
460E0120 Class A45 Concrete. Box Culvert 342 9 CuYd
462E0100 Class M6 Concrete 1.7 CuYd
480E0100 Reinforcing Steel 50,289 Lb
700E0210 Class B Riprap 607 3 Ton
831E0110 Type B Drainage Fabric 657 SqYd
File
- ..A
pri\t
urn0
36A
\Not
esS
ectio
nA.d
gn
NH-PH 0018(180)420 A3 A8
TOTALSHEETS
PROJECT SHEETSTATE OF SOUTH
DAKOTAESTIMATE OF QUANTITIES AND ENVIRONMENTAL COMMITMENTSRevised 02/06/2018 AR02/06/2018Plotting Date:
Section E - Structure Site 1 - Alternate B Str. No. 63-224-170
Section M - Pavement Marking
BID ITEM NUMBER
UNITITEM QUANTITY
633E1300 Pavement Marking Paint. White 488 GalBID ITEM NUMBER
ITEM QUANTITY UNIT 633E1305 Pavement Marking Paint, Yellow 140 Gal
420E0200 Structure Excavation, Box Culvert 120 CuYd
Section S - Permanent Signing421E0200 Box Culvert Undercut 365 CuYd
464E0100 Controlled Density Fill 22.7 CuYd
560E0184 12'x6' Precast Concrete Box Culvert, Furnish 80.0 Ft BID ITEM NUMBER
ITEM QUANTITY UNIT560E0185 12'x6' Precast Concrete Box Culvert, Install 80.0 Ft
110E5020 Salvage Traffic Sign 130 Each560E1184 12'x6' Precast Concrete Box Culvert End Section, Furnish
2 Each
632E0010 1.25' Diameter Breakaway Support Concrete Footing 400 Ft560E1185 12'x6’ Precast Concrete Box Culvert End Section,
Install2 Each
632E1320 2.0"x2.0" Perforated Tube Post 1.383 3 Ft
560E2166 2-12'x6' Precast Concrete Box Culvert, Furnish 80.0 Ft 632E1340 2.5"x2.5” Perforated Tube Post 1463 Ft
560E2167 2-12'x6' Precast Concrete Box Culvert. Install 80.0 Ft 632E2510 Type 2 Object Marker Back to Back 96 Each
560E3166 2-12'x6' Precast Concrete Box Culvert End Section, Furnish
2 Each 632E2520 Type 2 Object Marker Each84632E3203 4293 SqFtFlat Aluminum Sign, Nonremovable Copy High
IntensityFlat Aluminum Sign, Nonremovable Copy Super/Very High IntensityRemove, Salvage, Relocate, and Reset Traffic Sign
560E3167 2-12'x6' Precast Concrete Box Culvert End Section, Install
2 Each
632E3205 370.6 SqFt700E0210 Class B Riprap 83.5 Ton
831E0110 Type B Drainage Fabric 110 SqYd 632E3520 Each1
Section F - SurfacingBID ITEM NUMBER
ITEM QUANTITY UNIT
120E6200 Water for Granular Material 1,673.6 MGal
260E1010 Base Course 113,167.6 Ton
260E1030 Base Course. Salvaged 26,295.0 Ton
320E0007 PG 64-28 Asphalt Binder 1,711.8 Ton
320E1050 Class E Asphalt Concrete 30,045.5 Ton
320E3000 Compaction Sample 9 Each
330E0010 MC-70 Asphalt for Pnme 2274 Ton
330E0100 SS-1h or CSS-1h Asphalt for Tack 72.8 Ton
330E0210 SS-1h or CSS-1h Asphalt for Flush Seal 41.9 Ton
330E2000 Sand for Flush Seal 154.5 Ton
380E3020 6" PCC Driveway Pavement 13.5 SqYd
831E0300 Reinforcement Fabric (MSE) 900 SqYd
Q_
File -
...\p
ri\tu
rn03
6A\N
otes
Sec
tionA
.dgn
NH-PH 0018(180)420 A4 A8
DAKOTA
SOUTH
STATE OFPROJECT
SHEETSHEETS
TOTAL
...\prj\turn
036
A\N
otesSection
A.d
gn
File -
Plotting Date: 02/22/2018 Revised 02/06/2018 AR
Plot Scale -
1:2
00
Plotted Fro
m -
trsf1
2144
NH-PH 0018(180)420ESTIMATE OF QUANTITIES AND ENVIRONMENTAL COMMITMENTS A5 A8
DAKOTA
SOUTH
STATE OFPROJECT
SHEETSHEETS
TOTAL
...\prj\turn
036
A\N
otesSection
A.d
gn
File -
Plotting Date: 02/22/2018 Revised 02/06/2018 AR
Plot Scale -
1:2
00
Plotted Fro
m -
trsf1
2144
NH-PH 0018(180)420ESTIMATE OF QUANTITIES AND ENVIRONMENTAL COMMITMENTS A6 A8
DAKOTA
SOUTH
STATE OFPROJECT
SHEETSHEETS
TOTAL
...\prj\turn
036
A\N
otesSection
A.d
gn
File -
Plotting Date: 02/22/2018 Revised 02/06/2018 AR
Plot Scale -
1:2
00
Plotted Fro
m -
trsf1
2144
NH-PH 0018(180)420ESTIMATE OF QUANTITIES AND ENVIRONMENTAL COMMITMENTS A7 A8