Toronto: Gardiner Expressway Study
Paramics 2009 UGM: NewarkOctober 5, 2009
![Page 2: Toronto: Gardiner Expressway Study Paramics 2009 UGM: Newark October 5, 2009](https://reader035.vdocuments.mx/reader035/viewer/2022070408/56649e4f5503460f94b4644e/html5/thumbnails/2.jpg)
Project Introduction
• Frederick G. Gardiner Expressway– Elevated freeway through downtown Toronto
• Lower Don Lands– Former industrial land redeveloped into
residential and commercial uses• Gardiner is seen as a barrier to the
redeveloped LDL– Investigate solutions
![Page 3: Toronto: Gardiner Expressway Study Paramics 2009 UGM: Newark October 5, 2009](https://reader035.vdocuments.mx/reader035/viewer/2022070408/56649e4f5503460f94b4644e/html5/thumbnails/3.jpg)
Project Introduction
• Joint Clients– City of Toronto and Waterfront Toronto– City owns the Gardiner– Waterfront Toronto is charged with revitalisation
of the waterfront• Sensitive Project
![Page 4: Toronto: Gardiner Expressway Study Paramics 2009 UGM: Newark October 5, 2009](https://reader035.vdocuments.mx/reader035/viewer/2022070408/56649e4f5503460f94b4644e/html5/thumbnails/4.jpg)
Project Scope and Goals
• $6M Planning and Design Study– Sub to Dillon Consulting– ~$300k Microsimulation budget
• Investigate four design options for treatments east of Jarvis Street– Do Nothing, Ameliorate, Remove, Submerge– Five construction staging models
• Goal is to investigate ways of reconnecting the redeveloped Lower Don Lands to the City
![Page 5: Toronto: Gardiner Expressway Study Paramics 2009 UGM: Newark October 5, 2009](https://reader035.vdocuments.mx/reader035/viewer/2022070408/56649e4f5503460f94b4644e/html5/thumbnails/5.jpg)
Microsimulation Model Area
• 5 mi2 (13 km2)• Dense, urban development
SPAD
INA
DUNDAS
WOODBINE
![Page 6: Toronto: Gardiner Expressway Study Paramics 2009 UGM: Newark October 5, 2009](https://reader035.vdocuments.mx/reader035/viewer/2022070408/56649e4f5503460f94b4644e/html5/thumbnails/6.jpg)
Methodology
• Create existing conditions– Road selection– Zone system creation– Include transit and pedestrians
• Matrix Estimation• Calibration / Validation• Alternative Testing• Construction Staging
![Page 7: Toronto: Gardiner Expressway Study Paramics 2009 UGM: Newark October 5, 2009](https://reader035.vdocuments.mx/reader035/viewer/2022070408/56649e4f5503460f94b4644e/html5/thumbnails/7.jpg)
Existing Conditions
• Most roadways in study area– Arterial and up, some collectors, and few locals
• Coding issues with Lake Shore Boulevard
![Page 8: Toronto: Gardiner Expressway Study Paramics 2009 UGM: Newark October 5, 2009](https://reader035.vdocuments.mx/reader035/viewer/2022070408/56649e4f5503460f94b4644e/html5/thumbnails/8.jpg)
Existing Conditions
• Arup Model as a starting point• Approximately double model area
ARUPJACOBS
![Page 9: Toronto: Gardiner Expressway Study Paramics 2009 UGM: Newark October 5, 2009](https://reader035.vdocuments.mx/reader035/viewer/2022070408/56649e4f5503460f94b4644e/html5/thumbnails/9.jpg)
Zone System
• Layout zones on paper
![Page 10: Toronto: Gardiner Expressway Study Paramics 2009 UGM: Newark October 5, 2009](https://reader035.vdocuments.mx/reader035/viewer/2022070408/56649e4f5503460f94b4644e/html5/thumbnails/10.jpg)
Zone System
• Simple one zone per block with access to all roads
• Simplifies creation and coding
• Makes for very difficult matrix estimation
![Page 11: Toronto: Gardiner Expressway Study Paramics 2009 UGM: Newark October 5, 2009](https://reader035.vdocuments.mx/reader035/viewer/2022070408/56649e4f5503460f94b4644e/html5/thumbnails/11.jpg)
Zone System
• One zone per connector on each block face
• Allows maximum control
• Model becomes unwieldy with so many zones
![Page 12: Toronto: Gardiner Expressway Study Paramics 2009 UGM: Newark October 5, 2009](https://reader035.vdocuments.mx/reader035/viewer/2022070408/56649e4f5503460f94b4644e/html5/thumbnails/12.jpg)
Existing Conditions
• Transit– Streetcars
• Spadina and Queens Quay – Median-running• Other streets – In mixed traffic
– Buses– Subway
• Not included in our model
• Pedestrians– Taken only from Arup model, no new ped work
![Page 13: Toronto: Gardiner Expressway Study Paramics 2009 UGM: Newark October 5, 2009](https://reader035.vdocuments.mx/reader035/viewer/2022070408/56649e4f5503460f94b4644e/html5/thumbnails/13.jpg)
Streetcar Coding
• Spadina and Queens Quay– Median-running
• Median Lane Operation– Paramics limitation that similar
movements must be in adjacent lanes
– This is an issue where the transit vehicle through lane is adjacent to a left-turn lane
– Fortunately, coding the through movement in the transit lane as ‘barred’ works perfectly• Transit vehicle moves with normal
traffic ‘through’ green
![Page 14: Toronto: Gardiner Expressway Study Paramics 2009 UGM: Newark October 5, 2009](https://reader035.vdocuments.mx/reader035/viewer/2022070408/56649e4f5503460f94b4644e/html5/thumbnails/14.jpg)
Streetcar Coding
• Remainder of Streetcar network is in mixed traffic– Typically runs in the left-hand
lane of a two-lane per direction facility
• Congestion issues due to frequent stops– Both lanes in the streetcar travel
direction must stop when loading/unloading passengers
– New feature built into Paramics
STOP
![Page 15: Toronto: Gardiner Expressway Study Paramics 2009 UGM: Newark October 5, 2009](https://reader035.vdocuments.mx/reader035/viewer/2022070408/56649e4f5503460f94b4644e/html5/thumbnails/15.jpg)
Matrix Estimation
• Counts• Travel Demand Model O/D data• Screenlines
![Page 16: Toronto: Gardiner Expressway Study Paramics 2009 UGM: Newark October 5, 2009](https://reader035.vdocuments.mx/reader035/viewer/2022070408/56649e4f5503460f94b4644e/html5/thumbnails/16.jpg)
Matrix Estimation
• Issues– Estimation of congested conditions• Counts at congested locations are less useful• Use counts upstream of issues to help estimate
demand
– Grid network adds to the challenge• Many parallel routes and relatively short blocks
![Page 17: Toronto: Gardiner Expressway Study Paramics 2009 UGM: Newark October 5, 2009](https://reader035.vdocuments.mx/reader035/viewer/2022070408/56649e4f5503460f94b4644e/html5/thumbnails/17.jpg)
Calibration / Validation• Counts• Travel Times• Screenlines• Major Queue
Locations– Gardiner and
on/off ramps
![Page 18: Toronto: Gardiner Expressway Study Paramics 2009 UGM: Newark October 5, 2009](https://reader035.vdocuments.mx/reader035/viewer/2022070408/56649e4f5503460f94b4644e/html5/thumbnails/18.jpg)
Calibration/Validation
• Issues– Major queues on Gardiner• WB in PM, EB in AM• Replication of WB queue may require network
extension or link speed modification at external station
STUDYAREA
CONGESTIONSOURCE
![Page 19: Toronto: Gardiner Expressway Study Paramics 2009 UGM: Newark October 5, 2009](https://reader035.vdocuments.mx/reader035/viewer/2022070408/56649e4f5503460f94b4644e/html5/thumbnails/19.jpg)
Future Alternatives
• Do Nothing• Ameliorate
JARVIS
EASTERN
• Remove (bring to ground)• Submerge
![Page 20: Toronto: Gardiner Expressway Study Paramics 2009 UGM: Newark October 5, 2009](https://reader035.vdocuments.mx/reader035/viewer/2022070408/56649e4f5503460f94b4644e/html5/thumbnails/20.jpg)
Construction Staging
• With a preferred alternative selected– Build a series of 5 incremental networks that take
the geometry to the final design– Stages given to us for analysis
• Provide results and recommendations
![Page 21: Toronto: Gardiner Expressway Study Paramics 2009 UGM: Newark October 5, 2009](https://reader035.vdocuments.mx/reader035/viewer/2022070408/56649e4f5503460f94b4644e/html5/thumbnails/21.jpg)
Conclusions
• Most challenging work will be: – Matrix Estimation– Calibration / Validation
• Questions or Comments?– Adam Lanigan [email protected]