GHAZIABAD DEVELOPMENT AUHORITY
GHAZIABAD
PROPOSAL DOCUMENT / TERMS OF REFERENCE
FOR
Consultancy Services for Preparation of Detailed Project Report
for construction of eight lane ring road between Hapur Road and
Loni Road ia M!!ru" Road including ROB over D!#$i%
Sa$aranpur rai# "ra&' , grade separator over M!!ru" Road()rid*! o!r Hindon and improvement of Pip! Lin! Road+
GHAZIABAD DEVELOPMENT AUTHORITY GHAZIABAD.
!
8/11/2019 Tor Rfp for Dpr Gaziabad Ma
http://slidepdf.com/reader/full/tor-rfp-for-dpr-gaziabad-ma 2/27
PROPOSAL DOCUMENT / TERMS OF REFERENCEFOR
CONSULTANCY SERVICES
NAME OF ,OR-. Consultancy Services for Preparation of
Detailed Project Report for construction of eight lane ring road between Hapur Road and Loni Road ia M!!ru" Road including
ROB over D!#$i%Sa$aranpur rai# "ra&' , grade separator over
M!!ru" Road( )rid*! o!r Hindon and improvement of Pip!
Lin! Road
Cost of Tende ! Rs. "#$"/% on&'
E(nest Mone' ! Rs. "))))/% on&'
T*+e of Co+,&et*on ! -) d('s
Pe*d Meet*n ! On 0t1 se,t $)22 (t 3.)),+ Ven4e !GDA 5onfeen5e 1(&&.
D(te of Re5e*,t of Po,os(& ! 2"t1 se,t $)22
D(te of O,en*n of Po,os(&! 2"t1 se,t $)22
"
8/11/2019 Tor Rfp for Dpr Gaziabad Ma
http://slidepdf.com/reader/full/tor-rfp-for-dpr-gaziabad-ma 3/27
TERMS OF REFERENCE
FOR
CONSULLTANCY SERVICES
Consultancy Services for Preparation of Detailed Project Report
for construction of eight lane ring road between Hapur Road and
Loni Road ia M!!ru" Road including ROB over D!#$i%
Sa$aranpur rai# "ra&' , grade separator over M!!ru" Road(
)rid*! o!r Hindon and improvement of Pip! Lin! Road+
2%Gene(&
2.1 Ghaziabad Development Authority has decided to take up the Consultancy
Services for Preparation of Detailed Project Report for construction of eight lane ring
road between #apur Road and $oni Road via %eerut Road including ROB over DelhiSaharanpur rail trac&, grade separator over %eerut Road, bridge over #indon and
improvement of Pipe $ine Road+
+0 GDA will be the employer and executing agency for the consultancy
services and the standards of output required from the appointed consultants
shall be of national level in terms of both quality and adherence to the agreed
time schedule.
$% O6e5t*7e
.1 !he main ob"ective of the consultancy services is to prepare Detailed #ro"ect
$eport for construction of eight lane ring road between #apur Road and
$oni Road including detailing of road junctions, grade separators at
%eerut road , ROB over Delhi Saharanpur railway 'rac&, bridge over
(
8/11/2019 Tor Rfp for Dpr Gaziabad Ma
http://slidepdf.com/reader/full/tor-rfp-for-dpr-gaziabad-ma 4/27
#indon River and widening ) strengthening of e*isting roads in the most
economical manner but consistent with the requirements of safe and highspeed travel and to establish the technical% economical% environmental% socialand financial viability of the pro"ect under a commercial format and under
different user fee scenarios and funding options.
3% S5o,e of Se7*5es
&.1. !he Detailed #ro"ect $eport would inter'alia cover detailed design for
new carriageways and required minor structures. (t would include
design of cross drainage structures and GAD of grade separated
structures including interchanges% toll check post% quantities of various
items. Detailed working drawings. Detailed cost estimates and pre'
qualification and tender documents in suitable contract packages for
execution of civil works. !he work shall include study of environmental
enhancement.
3.$. T1e S5o,e of Se7*5es s1(&& t14s 5o7e 4t e not &*+*ted to t1efo&&o8*n +(6o t(s9s!
i' $eview of all available reports and published information about the
pro"ect road and the pro"ect influence area .
ii' Detailed reconnaissance.
iii' (dentification of possible alignments )horizontal and vertical*% most
preferably along +aster #lan road alignment shown in Ghaziabad
+aster #lan',1 with alternative. evaluation or different alternatives%
comparison on techno'economic and other considerations and
recommendations regarding most appropriate option.
iv' Detailed topographic surveys using !otal -tations and G#-
v' (dentification of sources of construction material.
vi' Detailed design of road and cross'drainage structures.
vii' (dentification of the type and the design of intersections including
interchanges.
viii' nvironmental and rehabilitation and resettlement aspects.
ix' #ro"ect costing
x' conomic and financial analysis.
xi' #reparation of strip plans indicating the scheme for construction of
carriageway. /ocation of all existing utility services )both over and
underground* and the scheme for their relocation% trees to be felled
and planted
xii' #reparation of strip plans clearly showing proposed road alignment
superimposed over revenue maps. (dentification of land area to be
acquired with arazi no%and arazi owner names.
+
8/11/2019 Tor Rfp for Dpr Gaziabad Ma
http://slidepdf.com/reader/full/tor-rfp-for-dpr-gaziabad-ma 5/27
xiii' $eport documents and drawings.
&.&. !he 0onsultant shall study the possible locations and design of toll check
post.
&.. !he local and slow traffic may need segregation from the main traffic and
provision of service roads and physical barrier including fencing may be
considered. 2herever necessary to improve efficiency and safety.&.3. !he general scope of services is given in the sections that follow.
4owever. the scope of services would. inter'alia. include the items as
mentioned in the !.5.$.
:. Gene(& Re;4*e+ents
:.2 De7e&o,+ent <o9s (nd Po6e5t C&e((n5es
2hile carrying out the field studies investigations and design. !he
development plans being implemented or proposed for future
implementation by the various agencies of 0entral Govt. -tate Govt. local
bodies should be taken into accountSt(nd(ds (nd Codes of P(5t*5es
.1.1 Activities related to field studies. Design and documentation should be
done as per the latest guidelines6circulars of +5$!74 and relevant
publications of the (ndian $oads 0ongress )($0* and 8ureau of (ndian
-tandards )8(-*. 9or aspects not covered by ($0% 8(- and (ndian $ailway
-tandard. (nternational standard practices% such as. 8ritish and American
-tandards may be adopted
.1. All notations abbreviations and symbols used in the reports. documents
and drawings shall be as per ($0:;1. Re7*e8 of D(t( (nd Do54+ents
!he 0onsultants shall collect the available data and information relevant
for the -tudy. !he data and documents of ma"or interest shall include but
not be limited to the following
i' 0limate.
ii' 4ydraulic data drawing and details of existing bridges.
iii' -urvey and evaluation of locally available construction
material.
iv' 5rigin'destination and evaluation of locally availableconstruction materials.
v' 0ommodity wise traffic volume if available.
vi' Accidental statistics
vii' 4istorical data on classified traffic volume
viii' <ehicle loading behavior )axle load spectrum*% if available.
8/11/2019 Tor Rfp for Dpr Gaziabad Ma
http://slidepdf.com/reader/full/tor-rfp-for-dpr-gaziabad-ma 6/27
ix' !ype and location of existing utility services )e.g. 9iber optical
cable% 5.4. and =.G. lectric% !elephone line. 2ater mains.
-ewer% !rees etc.*
x' !ypes of pro"ect clearances involved for implementation of
pro"ect.
.& En*nee*n S47e's (nd In7est*(t*ons
.&.1 Re5onn(*ss(n5e (nd A&*n+ent
The consultant should make in depth study of the available6ongoing
a. /.A. land width )$52* topographic maps of the pro"ect area and other
available relevant information collected by them concerning the existing
alignment. 0onsultant himself has to arrange the required maps and the
information needed by him from the potential sources.
b. !he detailed ground reconnaissance may be taken up immediately after
the study of maps and other data% !he primary tasks to be accomplishedduring the: reconnaissance surveys include:
i' !opographical features of the area
ii' !ypical physical features along the alignment i.e. load use pattern:
iii' #ossible alignment alternatives
iv' #reliminary identification of improvement requirement including
treatments and measures needed for the cross'road:
v' !raffic pattern and preliminary identification of traffic homogeneous
links :
vi' (nventory of ma"or aspects including land width. !errain. #avementtype carriageway type. 8ridges and structures )!ype% size and
location*% urban areas )location extent*. Geologically sensitive areas
environmental features. 4ydrological features
vii' 0ritical areas requiring detailed investigations and
viii' $equirements for carrying out supplementary investigations
ix' -oil )textural classifications* and drainage conditions.
x' !ype and extent of existing utility services along the alignment )within
$52*
xi' (dentification of various agencies of the govt. from whom theconcerned pro"ect clearances for implementation are to be sought.
c. !he data derived from the reconnaissance surveys are normally utilized
for planning and programming the detailed surveys and investigations. All
field studies including the traffic surveys should be taken up on the basis
of information derived from the reconnaissance surveys.
d. !he data and information obtained from the reconnaissance surveys
should be documented. !he data obtained from the reconnaissance
-
8/11/2019 Tor Rfp for Dpr Gaziabad Ma
http://slidepdf.com/reader/full/tor-rfp-for-dpr-gaziabad-ma 7/27
surveys should from the core of the database% which would be
supplemented% and augmented using the data obtained from detailed field
studies and investigations
:.3.$ To,o(,1*5 S47e's
(. !he basic ob"ective of the topographic survey would be to capture the
essential ground features along the alignment in order to consider
improvements and for working out improvements% rehabilitation andupgrading costs. !he detailed topographic surveys should normally be
taken up after the complete of reconnaissance surveys
. !he carrying out of topographic surveys will be one of the most
important and crucial field tasks under the pro"ect. !he detailed field
surveys shall be carried out using high precision instruments i.e. !otal
station. !he data from the topographic surveys shall be available in )x%
y% z* format for use in a sophisticated digital terrain model )D!+*.
H'd(4&*5 d(t( d(8*n (nd det(*&s of e=*st*n *des.
i. 4ydraulic data drawing and details of existing bridgesii. 5rigin'destination and evaluation of locally available
construction materials.
iii. 0ommodity wise traffic volume if available.
iv. Accident statistics> and
5. T1e det(*&ed f*e&d s47e's 8o4&d essent*(&> *n5&4de t1e fo&&o8*n
(5t*7*t*es!
i' !opographic -urveys along the new right of way )$52* $unning a
continuous open !raverse along the proposed alignment% andfixation of all cardinal points such as horizontal intersection points
)4(#?s* centre points and transit points and transit points etc. and
properly referencing the same with a pair of reference pillars fixed
on either side of the centre'line at safe places within the proposed
$52.
ii' 0ollection of details for all features such as structures )bridges.
0ulverts etc.* utilities% xisting roads% lectric and telephone
installations )both 54 as well as underground*% huts% building%
fencing and trees )2ith girth greater than ,.& metre * oil and gaslines etc. falling within the extent of survey.*
:.3.$.2 Lon*t4d*n(& (nd 5oss% se5t*on
!he topographic surveys for longitudinal and cross'sections shall cover the
following:
i' /ongitudinal section levels along final centre line all every 3 m
interval. At the locations of curve points. -mall streams. (ntersections
and at the location of change in elevation.
.
8/11/2019 Tor Rfp for Dpr Gaziabad Ma
http://slidepdf.com/reader/full/tor-rfp-for-dpr-gaziabad-ma 8/27
ii' 0ross sections at every 3, m interval in full extent of survey conversing
sufficient no. of spot levels on existing carriage way for profile
correction course and ad"acent ground for widening purposes and
earth work calculations.
iii' /ongitudinal sections for cross roads for length adequate for design
and quantity estimation purposes.
iv' /ongitudinal and cross sections for ma"or and minor streams as per recommendations contained in ($0 -.#: 1&',, )Guidelines for the
Design of small 8ridges and 0ulverts* and ($0: 3',, )@-tandard
-pecification 7 0ode of #ractice for $oad 8ridges. -ection 1' General
9eatures of Design*
:.3.$.$ S4%(de C1((5te*st*5s (nd Stent1
(% T1e test*n S51e+e *s ,o,osed (s *7en 4nde!
9or the roads along new alignments% the test pits for sub'grade soil shall be a
3,, m or for each soil type whichever is more. A minimum of six samples should
be tested corresponding to each homogenous segment.% T1e test*n fo s4%(de so*& s1(&& *n5&4de :
i' (n'situ density and moisture content at each test pit.
ii' 0haracterization )grain size and Atterberg limits* at each test pit and.
iii' /aboratory moisture'density characteristics )modified AA-4!5
compaction*
iv' 9ield 08$ using D0# at each test pit.
v' laboratory 08$ )unsoak and day soak compacted at three energy
levels* and swell
c. for problematic soils the testing shall be more rigorous it required.:.3.$.3 M(te*(& *n7est*(t*ons
a. !he 0onsultants shall identify potential sources )including use of fly
ash 6 slag* like quarry sites and borrow areas undertake field and
laboratory testing of the materials to determine their suitability for
various components of the work and establish quality and quantity of
various construction materials and recommend their use on the basis
of techno'economic principles.
b. (t is to be ensured that no material shall be used from the right'of'Bway
except by way of leveling the ground as required from the constructionpoint of view% or for landscaping and planting of trees etc. or from the
cutting of existing ground for obtaining the required formation levels.
c. nvironmental restrictions% if any and feasibility of availability of these
sites to prospective civil works contractors should be duly taken into
account while selecting new quarry locations.
:.3.3. Pe&*+*n(' Po6e5t Re,ot%?P.P.R.>
/
8/11/2019 Tor Rfp for Dpr Gaziabad Ma
http://slidepdf.com/reader/full/tor-rfp-for-dpr-gaziabad-ma 9/27
#reliminary #ro"ect $eport shall be prepared and shall contain the
following.
(. #reliminary Design of intersection )at grade and grade separator*
interchanges and other structure )flyovers% bridges% under passes 7
culverts etc* based upon hydraulic 7 Geotechnical investigations as
per site requirement.
((. #reliminary estimate(((. #reliminary bill of quantities and specification
(<. #reliminary drawing with GAD as required at initial stage with
preliminary design% calculation.
!he basic data obtain from the field studies and investigations and in
put data used for the preliminary deign as per relevant ($0 code provisions shall
be submitted with ##$.
!he final ##$ incorporating comment revisions and modifications
suggested by GDA% #2D6 +5$!74 shall be submitted in )C sets*.!he basic data obtained from the field studies and investigations and input
data used for the preliminary designs as per relevant ($0 code provisions shall
be submitted with #.#.$.
.Det(*&ed Des*n of Ro(d (nd P(7e+ents@ B*des (nd St45t4e
Det(*&ed Po6e5t % D#$ should contain are following five volume namely
with latest provision of +5$!74% and ($0 and relevant code of practice
with micro details.
I. 9inal $eport
II. Detailed Design)only GAD and prelim design and estimatesrequired for structures such as flyovers% bridges% underpass etc*
III. Detailed estimates )with analysis of rates for all rates based on
present market rates*.
IV. Detailed bill of quantities and specifications.
V. Detailed Drawings.
:.:.2 Gene(&
a' !he 0onsultants are to carryout detailed designs and prepare working drawing
for the following:
i' 4igh speed )minimum ,61,, kmph for plain terrain* highway with C lanecarriageway configuration complete in all respects:
ii' 8ridges <iaduct and structures etc.
iii' #repare alignment plans. /ongitudinal sections and cross'sections E 3,
m interval:
iv' Designs for road furniture and road safety traffic control features.
v' 0heck #ost.
0
8/11/2019 Tor Rfp for Dpr Gaziabad Ma
http://slidepdf.com/reader/full/tor-rfp-for-dpr-gaziabad-ma 10/27
vi' Drainage design showing location of turnouts. 5ut falling structures.
-eparate drawing sheet for each 1.,, km. stretch:
vii' Design for relocation of existing utility services:
viii' 4orizontal and vertical alignment of proposed carriageway etc.
ix' service roads and under passes near urban location.
x' location requiring illumination would be provided with complete design
and drawing including source for energy supply.xi' use of geo'synthetic or geo grit wherever warranted for pro"ect length
either from be chemical or from life cycle cost.
xii' !raffic amenities )#arking area weighing station% rest area% !elephone%
system%*
b' !he expressway shall be fully access controlled and the design should be
prepared accordingly
:.:.$ Des*n St(nd(ds
a. !he 0onsultants shall evolve Design -tandards and material specifications
for the -tudy primarily based on ($0 publications% (ndian $ailway -tandard%+5$! 74 0irculars and relevant recommendations of the international
standards )American. Australian% 8ritish% 0anadian% Fapanese*
b. !he Design -tandards evolved for the pro"ect% shall cover all aspects of
detailed design including the design of geometric elements. #avement
design. 8ridges and structures% traffic safety and materials.
:.:.3 Geo+et*5 Des*n
a' !he bye pass pro"ect is to be developed as a partially access'controlled
highway facility. !he design of geometric elements shall. !herefore% take
into accounts the essential requirements of such facilities.b' 8ased on the data collected from reconnaissance and topographic surveys.
the sections with geometric deficiencies% if any% should be identified and
suitable measures for improvement should be suggested for
implementation.
c' !he detailed design for geometric elements shall cover. but not be limited to
the following ma"or aspects:
i' 4orizontal alignment
ii' /ongitudinal profile
iii' 0ross'sectional elementsiv' Functions% intersections and interchanges check post.
v' -ervice roads.
d' !he alignments design shall be verified for available sight distances as per
the standard norms. !he provision of appropriate markings and signs shall
be made wherever the existing site conditions do not permit the adherence
to the sight distance requirements as per the standard norms
!1
8/11/2019 Tor Rfp for Dpr Gaziabad Ma
http://slidepdf.com/reader/full/tor-rfp-for-dpr-gaziabad-ma 11/27
e' !he 0onsultant shall also prepare design details of grade "unctions which
may be adopted as alternative to the grade separated structures. !he
geometric design of interchanges shall take into account the site conditions.
turning movement characteristics% level of service% overall economy and
operational safety
f' !he consultant shall prepare complete road and pavement design including
drainage for partially access control bye pass
:.:.: P(7e+ent Des*n
a' !he detailed design of pavement shall involve
i' Design of new pavement for the 'lane carriageway:
ii' Design of shoulder
iii' Design of guardrails% signage and other road furniture and
iv' Design of drainage system.
v' Design for service roads% ramps for interchanges etc.b' !he design of pavement shall be rigorous and shall make use of the latest
methods. !he design shall primarily be based on ($0 guidelines.
c' !he design alternatives shall include both rigid and flexible design options.
!he most appropriate design option shall be established on life'cycle
costing and techno'economic considerations taking design period of 13
years for flexible and &, years for rigid pavement
d' 9or the design of pavement each set of design input shall be decided on
the basis of rigorous testing and evaluation of its suitability and relevance
in respect of in'service performance of the pavement. !he designmethodology shall accompany the design proposals Band shall clearly
bring out the basic assumptions% values of the various design inputs%
rationale behind the selection or the design inputs and the criteria for
checking and control during the implementation of works. (n other words.
the design or pavement structure should take due account of the type.
characteristics of materials used in the respective courses. variability of
their properties and also the reliability of traffic predictions
e' !he pavement design task shall also cover working out the maintenance
and strengthening requirements and periodicity and timing of suchtreatments.
:.:." Des*n of E+(n9+ents
a' !he embankments design should provide for maximum utilization of locally
available materials consistent with economy use of fly ash where ever
available with in economical leads must be considered.
b' !he 0onsultants shall carry out detailed analysis and design for all
embankments of height greater than C.,, m based on relevant ($0
!!
8/11/2019 Tor Rfp for Dpr Gaziabad Ma
http://slidepdf.com/reader/full/tor-rfp-for-dpr-gaziabad-ma 12/27
publications and computer package on high embankments.
c' !he design of embankments should include the requirements for
protection works and traffic safety features.
:.:.# Des*n of F&'o7es/B*des/Unde,(sses
1. !he consultant shall prepare General Arrangement Drawings )GAD* and
Alignment #lan showing the salient feature of the structure proposed to be
constructed 6 reconstructed along the road sections covered under the study.these salient feature such as alignment% overall length% span arrangement cross
section % desk level % founding level % type of bridge components )superstructure %
substructure % foundation % bearings % expansion "oint% retaining walls etc.* shall
be finalized based upon hydraulic and geo'technical studies% cost effectiveness
and ease of construction . !he GAD shall be supplemented by #reliminary
designs in respect of span arrangement and type of bridge a few alternatives
with cost benefits implications should be submitted to enable GDA%#2D 6(ndian
$ailway 6 +5$!4 to approve the best implications .
. Dismantling 6 reconstruction of exiting structures shall be avoided as far aspossible except where considered essential in view of there poor structural
conditions6 inadequacy of the provisions etc. the exiting structures having
inadequacy carriageways width shall be widened 6 reconstructed in part or fully
as per the latest +5$!74 guidelines .
&. !he exiting structure having inadequate carriageways width shall be widened 6
reconstructed in part or fully as per the latest +5$!74 guidelines. !he
consultant shall furnish the detailed design and working drawings for carrying out
for the proposed flyovers 6bridges6underpasses.
. (n case land available is not adequate for any reason% suitable design for $00retaining wall shall be furnished.
:.:. D(*n(e S'ste+
a' !he requirement of road'side drainage system and the integration of the
same with proposed cross'drainage system shall be worked out for the
entire length of the pro"ect road section.
b' (n addition to the road side drainage system% the 0onsultants shall design
the special drainage provisions for sections with super elevated
carriageways% high embankments and for road segments passing through
cuts. !he drainage provisions shall also be worked out for road segmentspassing through urban areas.
:.:.0 T(ff*5 S(fet' Fe(t4es@ Ro(d F4n*t4e (nd Ro(d M(9*n
!he 0onsultants shall design suitable traffic safety features and road furniture
including traffic signals% signs% pavement and edge markings. 5verhead sign
boards. 0rash barrier%. delineators etc. !he locations of these features shall be
given in the reports and also shown in the drawings.
!"
8/11/2019 Tor Rfp for Dpr Gaziabad Ma
http://slidepdf.com/reader/full/tor-rfp-for-dpr-gaziabad-ma 13/27
:.:.- Ao*54&t4e (nd L(nds5(,*n
!he 0onsultants shall work out appropriate plan for planting of trees )specifying
type of plantation*. 4orticulture69loriculture on the surplus land of the right'of'way
with a view to beautify the highway and making the environment along the
highway pleasing. !he existing trees 6 plants shall be retained to the extent
possible. !he trees required to be cut. shall be properly inventoried. umberedwith paint )more than ,& m girth* and evaluated for fixing reserve value during
auctioning depending its type of species% girth etc. in consultation with local forest
Department .
:.:.2) M*s5e&&(neo4s <o9s
!he consultants shall prepared detailed plan for the traffic management and
safety during the construction period.
:.:.22 En7*on+ent (nd So5*(& I+,(5t Assess+ent
!he consultant should specify plans to enhance the environmental aspect of the
pro"ect through measure such as road side landscaping and tree planting %planting of bushes in the central median and other relevant stabilizing 6
preservation for the road and ad"oining areas. All possible steps must be taken to
minimize the adverse environmental effects of pro"ect both during construction
work and subsequent operation.
So5*(& (nd en7*on+ent(& s5een*n!
!his part of the study shall be undertaken in parallel with the economic and
ngineering analysis in order to determine any significant economic% social or
environment issues which could require further analysis )including the analysisof alternative alignment of short bypasses% improving of road "unctions etc.* to
resolve such issues. !he social and environmental screening shall include% but
not limited to the analysis of the available information ) supplemented where
appropriate by site assessment * concerning the general population distribution
of low income communities% area of significant right of way ) $52*
encroachments% sensitive and6 or critical natural habitat )e.g. national park%
reserves% wild life sanctuaries% sacred groves% protected areas forests% wetlands
etc.* ma"or rivers and waterways% recorded cultural heritage sites and any other
potentially sensitive areas% based on recent government of (ndia census % officialdata and information from G5s )such as 229* and site visits . !he result of
this analysis shall be plotted on maps and tabulated to clearly identify and ma"or
conflicts and recommendations concerning how to resolve them )including
recommendations for exclusion and analysis of alternative alignments and6or
mitigations*.
". Est*+(t*on of 4(nt*t*es (nd Po6e5t Costs
3.1. !he 0onsultants shall prepare detailed estimates for quantities and
!(
8/11/2019 Tor Rfp for Dpr Gaziabad Ma
http://slidepdf.com/reader/full/tor-rfp-for-dpr-gaziabad-ma 14/27
pro"ect cost for the entire pro"ect. including the cost of environmental and
social safeguards proposed based on +5$!74 -tandard Data 8ook %
current #2D -.5.$.% latest D.-.$. and prevalent market rate)with
analysis and documents* with standard specification for the inputs. !he
estimation of quantities shall be based on detailed design of various
components of the pro"ects
3.. !he 0onsultants shall make detailed analysis for computing the unitrates for )the different items of works. !he unit rate analysis shall duly
take into account the various inputs and their basic rates. -uggested
location of plants and respective lead distances for mechanized
construction. !he unit rate for each item of works shall be worked out in
terms of manpower machinery and materials
# E5ono+*5 An(&'s*s
1. !he consultant shall carry out economic analysis for the pro"ect. !he benefit
and cost streams shall be worked out for the pro"ect.
. !he economic analysis shall cover but be not limited to be fallowing aspects:i. Assess the capacity of exiting roads and the effects of capacity constructions
on vehicle operating costs(VOC)
ii. Calculate VOCs for the exiting road situation and those for the project.
iii. Quantity all economic benefits including those from reduced congestion travel
distance road maintenance cost saving and reduced incidence of road accidents
and
iv. !stimate the economic internal rate of return (!"##) for the project over a $%
&ear period. "n calculating the !"##s identify the tradable and non'tradable
components of projects costs and the border price value of the tradablecomponents.
&. conomic internal rates of return )($$* and et present value )#<*. @with
and @without time and without savings should be worked out based on these
cost'benefit stream. 9urther more sensitivity of ($$ and <# worked out for the
different scenarios as given under:
-cenario H( 8ase costs and base 8enefits
-cenario H(( 8ase costs plus 13I and 8ase 8enefits
-cenario H((( 8ase costs and 8ase 8enefits +inus 13I-cenario H(< 8ase costs #lus 13I and 8ase 8enefits minus 13I
!he sensitivity scenarios given above are only indicative .!he consultant shall
select the sensitivity scenarios taking into account possible construction delays %
construction costs overrun % traffic volume % revenue shortfalls% operating costs%
exchange rate variations% convertibility of foreign exchange% political risks and
future.
!+
8/11/2019 Tor Rfp for Dpr Gaziabad Ma
http://slidepdf.com/reader/full/tor-rfp-for-dpr-gaziabad-ma 15/27
. !he economic analysis shall take into account all on going and future road
and transport infrastructure pro"ects and future development plans in the pro"ect
area.
;. T*+e ,e*od fo t1e se7*5e
;.1 A total period of ,& months is envisaged for the study. !he final reports
drawings and documentation shall be completed within this time schedule.
;. GDA shall arrange to give approval on all sketches. Drawings% reports andrecommendations and other matters and proposals submitted for approval by the
consultant in such reasonable time as not to delay or disrupt the performance of
the consultant?s services.
)ote:'During entire period service the consultant shall interact with #2D
6$ailway6+5$!74 etc.*
Se;4en5*n of ,o6e5t ,e,((t*on
.1 #ro"ect preparation activities will be split into four stages as brought out
below. #reliminary design work should commence without waiting for feasibility to
be completed. ach stage will cover a set of activities to be completed beforemoving to the next stage and shall be followed with a detailed report in respect of
each stage.
-tage 1 : (nception and feasibility study $eport.
-tage : ##$ or #reliminary #ro"ect report.
)a* (nitial ##$
)b* 9inal ##$ incorporating comment revisions and modifications etc.
-tage & : Detailed #ro"ect $eport ) D#$*
-tage : 8id Document
..1 !ime schedule in respect of all such stages has been indicated in the next#ara. 0onsultant shall be required to complete% to the satisfaction of the client% all
the different stages of study within the time frame indicated in the schedule of
submission in #ara J pertaining to $eports and Documents for becoming eligible
for payment.
!
8/11/2019 Tor Rfp for Dpr Gaziabad Ma
http://slidepdf.com/reader/full/tor-rfp-for-dpr-gaziabad-ma 16/27
-. Re,ot (nd Do54+ents to e s4+*tted ' t1e 5ons4&t(nta. !he 0onsultant shall submit to the client the following reports and
documents after completion of each stage of work and in the number of
copies indicated against each
-.
o.
Activity o. of
copies
!ime w.e.f date of
commencement
of consultancy
services
)in days*
!ime period
for
Acceptance
)in days*
1. -tage 1: (nception and feasibility study
$eport.
C 13 days ,; days
. -tage : ##$ or #reliminary #ro"ect
report.
)a* (nitial ##$ C , days 1, days
)b* 9inal ##$ incorporating comment
revisions and modifications etc.
&, days 1, days
& -tage & : Detail #ro"ect $eport ) D#$* 1, C, days 13 days
-tage : 8id Document 1, J, days '
b. !he time schedule for various submissions prescribed at -(. o.1 above
shall be strictly adhered to. o time'over'run in respect of these
submissions will normally be permitted. 0onsultant is advised to go through
the entire !erms of $eference carefully and plan his work method in such a
manner that various activities followed by respective submissions are
completed as stipulated. 0onsultant is therefore advised to deploy sufficient
number of supporting personnel both technical and administrative to
undertake the pro"ect preparation activities. as far as possible should
include complete information such as numbers of such persons % name %#osition % period of engagement % remuneration rate etc.!he 0onsultant is
also advised to start necessary survey work from the beginning so as to
gain time in respect of various other activities in that stage.
St(e 2! In5e,t*on (nd fe(s**&*t' st4d' Re,ot.
!he report shall covere the following aspects
the *n5e,t*on e,ot shall cover following ma"or aspects.
!-
8/11/2019 Tor Rfp for Dpr Gaziabad Ma
http://slidepdf.com/reader/full/tor-rfp-for-dpr-gaziabad-ma 17/27
1. #ro"ect appreciation
. Detailed +ethodology to meet the requirement of the !5$.
&. nvironmental and social sensitive areas to be identified along with
sensitive index and +ethodology to tackle.
. !ask assignment and manning schedule.
3. work program
C. #erforma for data collection;. Design standard and proposed cross section
. key plan and linear plan
J. Development plans being implemented or proposed for
implementation in the near future.
1,.Draft design standard
11. (dentification of various Govt. Agency involved on the pro"ect with
whom the Design consultant interact to seek necessary pro"ect
clearances for implementation and
1.Details of #ossible types and location of interchanges enroute.
Fe(s**&*t' st4d'
1. !he consultant shall commence the 9easibility study of the pro"ect in
accordance with the accepted ($ and the report shall contain the
following ma"or aspects.
i. Design standard finalized in consultation with +5$!74
ii. Alignment plan depiction the center line of the proposed right of
way limits to appreciate the requirement of land acquisition.iii. #ossible alternative for GADs of new required flyover6bridge6
underpasses with preliminary cost benefit analysis.
iv. !raffic data and analysis of traffic data
v. details of life cycle costing model
vi. !he value of input data for economic and commercial analyses and
computing ($$.
vii. !ypes of interchanges and or overpasses6 underpasses or road
intersections location enroute
viii. nvironmental and $7$ screening $eport.ix. -trip plan.
x. Details of (nvestigation of quality and quantity of suitable
construction materials with important index values and lead level.
xi. Details of pro"ect clearances required to sought by the consultant
which are necessary for pro"ect implementation
xii. $ecommendations of pavement type based on pavement of option
study.
!.
8/11/2019 Tor Rfp for Dpr Gaziabad Ma
http://slidepdf.com/reader/full/tor-rfp-for-dpr-gaziabad-ma 18/27
. !he basic data obrianed from the field studies and investigation shall
be submitted in a separate volume for 9easibility $eport.
&. !he final feasibility study reports incorporating comments% revisions
and modification suggested by GDA6#2D and +5$!74 shall be
submitted with in limited period.
St(e $! PPR o Pe&*+*n(' Po6e5t e,ot.##$ report shall be prepared and shall contain four volumes as mention
above in #ara .&.&.&
St(e 3! Det(*&ed Po6e5t Re,ot ? DPR>
• D#$ should contains five volume as mentioned in above #ara .
• 0onducting !opographic -urvey taking K'section at 3, m interval
and longitudinal section etc. and finalization of alignment as per
route indicated over sa"ra map.
• 0onducting soil investigation 08$ test as per ($0 7 (- codel
provision.
• Detailed -oil (nvestigation
o #avement Design 7 ngineering Design
o #avement 7 4ighway Geometry
o $oad =nder #ass
o -tructure
o 4orizontal 7 <ertical 0urve
• /and acquisition #lan
• #ro"ect 0ost stimateo Analysis of $ates
o Detail of +easurement
o 8ill of Luantity
• Detailed ngineering Drawing
St(e : ! BID Do54+ent
• $equest for #roposal
• #ro"ect (nformation 7 Drawing
8id document should contain the following volumes namely.<olume'(. otice (nviting tender
<olume ((. contract Data technical specification
<olume ((( 9orm of tender% 8.5.L. securities and others
<olume (< Drawings
<olume < !o be furnished by the bidder
Luality system for road and bridges
!/
8/11/2019 Tor Rfp for Dpr Gaziabad Ma
http://slidepdf.com/reader/full/tor-rfp-for-dpr-gaziabad-ma 19/27
All assistance shall be provided by the consultant to GDA for call of
tender and its approval
D*s,4te Reso&4t*on.
(n case of any dispute between the consultant and GDA the matter shall
be referred to vice 0hairman GDA and his decision shall be final 7 binding onboth the parties.
2) Inte(5t*on 8*t1 GDA/P<D/ MORTH / R(*&8('s
a. During entire period or services. the 0onsultant shall interact
continuously with the GDA6#2D6+5$!746$ailway and provide an
clarification as regards methods being followed and carry out
modification as suggested. A programme of various activities shall be
provided to the GDA6#2D6+5$!746$ailway and prior intimation shall
be given to the GDA regarding start or key activities such as boring.
survey etc. so that inspections of the GDA officials could be arranged intime.
b. !he GDA officers and other Government officers may visit the site at any
time. (ndividual or collectively or collectively to acquaint themselves with
the field investigation and survey works
c. !he consultant shall be required to send C copies of concise weekly
progress report to the chief engineer GDA office that progress could be
monitored by the GDA . !hese reports will indicate the dates of induction
and de'induction of various key personnel and the activities performed
by them. 9requent meetings which the consultant at site office or GDAoffice foreseen during the currency of pro"ect preparation.
d. All equipments% software 7 books etc. required for satisfactory for this
pro"ect shall be obtained by the consultant at there on cost and shall be
their property.
22 P('+ent S51ed4&e
!he 0onsultant shall be paid consultancy fee on'stage payment basis for
each stage in progress. !he assignment is divided into stages as% given
in manning schedule )nclosure ( of !5$*. o payment shall become
eligible for the next stage till the consultant completes to the satisfaction of the client the work pertaining to the proceeding stage.
-.o Description of activity #ayment
1 -tage 1 : (nception and feasibility study $eport. 1,I
-tage : ##$ or #reliminary #ro"ect report.
)a* (nitial ##$
)b* 9inal ##$ incorporating comment revisions &,I
!0
8/11/2019 Tor Rfp for Dpr Gaziabad Ma
http://slidepdf.com/reader/full/tor-rfp-for-dpr-gaziabad-ma 20/27
and modifications etc
& -tage & : Detail #ro"ect $eport ) D#$* ,I
-tage : 8id Document ,I
ote:'1. #ayment shall be made with technical administrative and financial
approval.
. (ncase of $58s 6 $=8s where the "ob is to be carried out by
railway as deposit work and for which department charges are paid to them GDA
is not untitled to agency charges.
&. Getting the D#$ ) Drawing% Design% estimated etc* proof
checked from any of the (.(.!.?s6 0.$.$.(. by the consultant?s own cost.
2$%D(t( (nd Soft8(e
a' !he floppy diskettes containing all basic as well as the processed data
from all field studies and investigations. report% appendices% annexure%
documents and drawings shall be submitted to GDA at the time of the
submission of the 9inal $eport. !he data can be classified as follows
i' En*nee*n In7est*(t*on (nd T(ff*5 St4d*es: $oad
(nventory% condition% $oughness% !est #it material (nvestigation
(ncluding test results for sub grade soils. !raffic studies -ub'soil
xploration. Drainage (nventory. Data for bridge 7 culverts
indicating rehabilitation ew construction requirement etc. in
+-. xcel or /otus or any other format which could be imported
to widely used utility packages.
ii' To,o(,1*5 S47e's (nd D(8*ns. All topographic data
would be supplied in )x%y%z* format along with complete
reference so that the data could be imported into any standard
highway design software. !he drawing files would be submitted
in dxf or dwg. 9ormat
iii' R(te (n(&'s*s: the consultant shall submit the rate analysis for
various works items including the data developed on computer in this relation so that it could be used by the authority later for
the purpose of updating the cost of the pro"ect.
iv' E5ono+*5s (nd f*n(n5*(& An(&'s*s : all data relevant to such
analysis including establishing the financial viability
"1
8/11/2019 Tor Rfp for Dpr Gaziabad Ma
http://slidepdf.com/reader/full/tor-rfp-for-dpr-gaziabad-ma 21/27
v' Re,ot! all reports shall be submitted in electronic media
besides required number of 4ard copies as stipulated.
$. soft8(e! !he consultant shall also hand'over to GDA
floppies60D?s containing any general software including the
financial model which has been specifically developed for the
pro"ect.3. !he floppy diskettes60D?s should be properly indexed and a
catalogue giving contents of all floppies60D?s and print'outs of the
contents ) data from field studies topographic data and drawings*
should be handed over to GDA at the time of submission of the
final report.
23%Res,ons**&*t' fo A554(5' of Po6e5t Do54+ents
a' !he 0onsultant shall be responsible for accuracy of the data collected. by
him directly or procured from other agencies6authorities% the designs%drawings. estimates and all other details prepared by him as part of these
services. 4e shall indemnify the Authority against any inaccuracy in the
work. which might surface during implementation of the pro"ect. !he
0onsultant will also be responsible for correcting. at his own cost and risk%
the drawings including any re'survey 6 investigations and correcting layout
etc. if required during the execution of the -ervices
b' !he 0onsultant shall be fully responsible for the accuracy of design and
drawings of the bridge and structures. All the designs and drawings for
bridge and structures including all their components shall be fully checkedby a -enior ngineer after completion or the designs. All drawings for
structures shall be duly signed by the )a* Designer. )b* -enior 0hecking
ngineer% and )c* -enior -tructure xpert. !ile designs and drawings not
signed by the three persons mentioned above shall not be accepted. !he
consultant shall indemnify the client against any unaccepted. the
consultant shall indemnify the client against any inaccuracy6 deficiency in
the designs and drawings of the bridges and structures and the client shall
bear no responsibility for the accuracy of the design and drawings
submitted by the consultants.c' !he survey: control points established by the consultant shall be protected
by the consultants till the completion of the services.
"!
8/11/2019 Tor Rfp for Dpr Gaziabad Ma
http://slidepdf.com/reader/full/tor-rfp-for-dpr-gaziabad-ma 22/27
1. Pefo+(n5e se54*t'!
!he consultant shall furnish bank guarantee for an amount ot the extent of
1,I of the total consultancy free received by him. !he bank guarantee shall
be valid for a period of & year from the date of submission of final D#$. !he
bank guarantee of 3I of the bid amount shall be furnished within 1 days of the issue of letter of acceptance and remaining 3I of the bid amount at the
time of submission of final D#$. !he final installment of ,I of the fee shall
be released only on receipt of this bank guarantee.
""
8/11/2019 Tor Rfp for Dpr Gaziabad Ma
http://slidepdf.com/reader/full/tor-rfp-for-dpr-gaziabad-ma 23/27
FINANCIAL PROPOSAL
9$5+:'
MMMMMMMMM.
MMMMMMMMMM
MMMMMMMM...............
!5
0hief ngineer
Ghaziabad Development Authority
G4AN(A8AD
-=8:' Consultancy Services for Preparation of Detailed Project
Report for construction of eight lane ring road between Hapur
Road and Loni Road ia M!!ru" Road including ROB over
D!#$i%Sa$aranpur rai# "ra&' , grade separator over M!!ru" Road()rid*! o!r Hindon and improvement of Pip! Lin! Road+
-($%
(62e............................................................................ hereby offer to quote our
rates )(nclusive of all applicable taxes and charges* as below for above
consultancy services as per !.5. $.
(n figures : $sMMMMMMMMMMMMMMM..
(n words : $sMMMMMMMMMMMMMMMMM
-ign. 5f 0onsultant6firm:
ame 7 Address 5f 0onsultant6firm:
Off*5e o,en*n F*n(n5*(& ,o,os(& !%%
"(
8/11/2019 Tor Rfp for Dpr Gaziabad Ma
http://slidepdf.com/reader/full/tor-rfp-for-dpr-gaziabad-ma 24/27
Fo+(t fo Lette of A,,&*5(t*on Annex'A
)5n 9irm?s /etter H 4ead*0hief ngineerGhaziabad Development AuthorityGhaziabad
APPLICATION FOR OFFER
9or
Consultancy Services for Preparation of Detailed Project Report
for construction of eight lane ring road between Hapur Road and
Loni Road ia M!!ru" Road including ROB over D!#$i%
Sa$aranpur rai# "ra&' , grade separator over M!!ru" Road(
)rid*! o!r Hindon and improvement of Pip! Lin! Road+
Dear -ir%
2e hereby make application for offer as Design 0onsultant for the Detailed
Design 0onsultancy of above GDA pro"ect. (n support of the application wesubmit herewith one original and one attested copy of the required documents.
)(n case of other than a sole proprietorship firm% following paragraph should beadded*
A #ower of Attorney to sign and submit this letter is attached. )Alternatively anyother authorization like signed minutes of board meetings confirming boardresolutions 6 current published lists of executive directors etc may be indicated*
)(n case of a "oint venture 6 #artnership6consortium % following paragraph should
be added* !his offer is submitted on behalf of a "oint venture 6 partnership6consortium )applicant to delete as appropriate*comprisingMMMMMMMMMM..M.)applicant to state the name of eachmember*MMMMMMMMM..MMMM andMMMMMM.MM of whichMMMMMMMMMMMM)applicant to insert name of leading member of
"oint venture 6 partnership 6 consortium* has agreed to act as leader. achmember essential agreement is enclosed herewith.
Oours faithfully%MMMMMMMMMMM) -ignature*
ame of signatoryMMMMMMMMMMMMM.
0apacity of signatoryMMMMMMMMMMM.
ame and address of applicant )or of leader if applicant is a group*
) -hould be signed by representative of lead company in case of Foint <enture60onsortium6#artnership6Group
"+
8/11/2019 Tor Rfp for Dpr Gaziabad Ma
http://slidepdf.com/reader/full/tor-rfp-for-dpr-gaziabad-ma 25/27
95$+A! 95$ /!!$ 59 #A$!(0(#A!(5 9$5+ A04 ++8$ 59 AG$5=#
?on e(51 F*+s Lette He(d> Annex'80hief ngineerGhaziabad Development AuthorityGhaziabad
Dear -ir%APPLICATION FOR OFFER
9or Detailed Design 0onsultancy for GDA pro"ect9or
Consultancy Services for Preparation of Detailed Project Report
for construction of eight lane ring road between Hapur Road and
Loni Road ia M!!ru" Road including ROB over D!#$i%
Sa$aranpur rai# "ra&' , grade separator over M!!ru" Road(
)rid*! o!r Hindon and improvement of Pip! Lin! Road+
2e wish to confirm that our company 6 firm ) delete as appropriate * has formed 6intends )delete as appropriate * to form a group withMMMMMMMMMMM.MMand MMMMMMMMMMMMMM.) members to insert names of all other members of the group* for purposesassociated with Design 0onsultant for Detailed Design consultancy for GDA#ro"ect%.)+embers who are not the lead member of the group should add the followingparagraph*.
!he group is led by ) member to insert name of lead member * whom we hereby
authorize to act on our behalf for the purposes of applying for offer
)+embers being the lead member of the group should add the followingparagraph*
(n this group we act as leader and% for the purposes of applying for offer%represent the group. (n the event of our group being invited to tender for DetailedDesign 0onsultancy% we agree to be "ointly ) with other members of our group*and severally liable to GDA% its successors and assignees for all obligations%duties and responsibilities arising from or imposed by any contract subsequentlyentered into between GDA and our group
Oours faithfully%)-ignature*MMMMMMMMMMMMMMMMMMM
) ame of -ignatory*MMMMMMMMMMMMM.M )0apacity of -ignatory*MMMMMMMMMMMM..M
"
8/11/2019 Tor Rfp for Dpr Gaziabad Ma
http://slidepdf.com/reader/full/tor-rfp-for-dpr-gaziabad-ma 26/27
Annex'0
E=,e*en5e Det(*&s
ame 7 Address of 0ompany 6 9irm:'
(A)Work in Hand :
Applicants / each constituent member should indicate, in the formbelow, details for each contract/ commitment of similar naturewhich is in hand on 31.07 .2011 (Applicants are to present thisinformation in the format shown below but on sheets which are tobe inserted in the questionnaire.)
Name of Contract
And Contact No. & Date
Value of
outtandin!dei!n" #ork on31.07.11in $u%ee
timated
com%letiondate
1. ……………………..
2. ……………………..
3. ……………………..
. ……………………..
!. ……………………..
"nl# consultanc# wor$ cost to be included and not construction cost.
"-
8/11/2019 Tor Rfp for Dpr Gaziabad Ma
http://slidepdf.com/reader/full/tor-rfp-for-dpr-gaziabad-ma 27/27
)8* #revious xperience
0onsultancy6Design work completed in the last five years ) $))#%$)22* similar innature to the work for which pre'qualification is sought.
Applicant?s ame
)ach member% in case of a
group*
MMMMMMMMMMMMMMMMMMMMMMMMM
MMMMMMMMMMMMMMMMMMMMMMMMM
MMMMMMMMMMMMMMMMMMMMMMMMM
#ro"ect !itle /ocation.
0lient
MMMMMMMMMMMM..
MMMMMMMMMMMM..
MMMMMMMMMMMMM
MMMMMMMMMMMM..
0lient?s Address
MMMMMMMMMMMMMMMMMMMMMMM...
MMMMMMMMMMMMMMMMMMMMMMM...
MMMMMMMMMMMMMMMMMMMMMMM...
MMMMMMMMMMMMMMMMMMMMMMM...
0lient?s $epresentative: !elephone69ax o.:
!ype of contract:2as the work carried out aloneP
2as the work carried out as a member of a groupP
(f the answer is Oes% give you percentage share and area6s of participation
Date% 2ork commenced: Date% work was completed
2 3
2 3