top polluters overshooting cells
TRANSCRIPT
-
7/28/2019 Top Polluters Overshooting Cells
1/18
RNC 403 Overshooting Cells
Dubai Network
18th-Apr-2013
-
7/28/2019 Top Polluters Overshooting Cells
2/18
Summary
The objective of this working is to find out overshooting cells that may cause pilot pollution and
degrade quality.
Following inputs were used for identification of such cases
Pilot Pollution output generated by XEUS tools based on Huawei PCHR data.
RSCP plots from recently conducted extensive drive test activity.
Best RSCP plot from XEUS tool based on PCHR data (where required).
TP distribution stats from M2000.
In this working, only the overshooting cells which have acceptable coverage in their serving area
have been targeted.
RF footprint of the identified cells needs to be contained by down-tilting.
-
7/28/2019 Top Polluters Overshooting Cells
3/18
Recommendations
RNC Sector Name Cell IDF1 Cell IDF2 Cell IDF3
Current RF Design parametersRecommendation
Antenna Type AntennaHeight
Antenna
AzimuthE-tilt M-tilt
403 DXBA2__NationalCement Factory 1 - C 2533 2536 2539 PW 7780 27 300 10 0
Audit of RF parameter required.A down-tilt of 1 degree E-tilt will be recommended during
audit if required.
403 DXBA2__NationalCement Factory 2 - A 2541 2544 2547 PW 7780 27 40 6 2 Down-tilt by additional 2 degree E-tilt
403 DXBA2__Al Safa 3 - A 55291 55294 55297 PW 5785 35 60 8 0 No action403 DXBA2__du_ Al Safa
2_01 - A 29431 29434 29437 PW 5780 27 60 8 0 Down-tilt by additional 1 degree E-tilt
403 DXBA2__du_Safa_01 -B 9392 9395 9398 Comba ODV065R18K18L 27 180 8 0 No action
403 DXBA3__Springs PH8 -D 46827 46828 - JB5162100 35 245 4 0 Down-tilt by additional 1 degree E-tilt
403 DXBA2__NationalCement Factory 1 - A 2531 2534 2537 PW 7780 27 35 7 0 Down-tilt by additional 2 degree E-tilt
-
7/28/2019 Top Polluters Overshooting Cells
4/18
Overshooting Cell 403:2533
-
7/28/2019 Top Polluters Overshooting Cells
5/18
Overshooting Cell 403:2533
Down-tilt UDXB253_C by additional 2 degree E-tilt.
-
7/28/2019 Top Polluters Overshooting Cells
6/18
Overshooting Cell 403:2541
-
7/28/2019 Top Polluters Overshooting Cells
7/18
Overshooting Cell 403:2541
Down-tilt UDXB254_A by additional 2 degree E-tilt.
-
7/28/2019 Top Polluters Overshooting Cells
8/18
Overshooting Cell 403:55291
-
7/28/2019 Top Polluters Overshooting Cells
9/18
Overshooting Cell 403:55291
Audit of UDXB5529_A is required to confirm tilts and azimuth. RF changes for containment will be
recommended based on audit results.
-
7/28/2019 Top Polluters Overshooting Cells
10/18
Overshooting Cell 403:29431
-
7/28/2019 Top Polluters Overshooting Cells
11/18
Overshooting Cell 403:29431
Audit of UDXB2943_A is required to confirm tilts and azimuth. RF changes for containment will be
recommended based on audit results.
-
7/28/2019 Top Polluters Overshooting Cells
12/18
Overshooting Cell 403:9392
-
7/28/2019 Top Polluters Overshooting Cells
13/18
Overshooting Cell 403:9392
Audit of UDXB939_B is required to confirm tilts and azimuth. RF changes for containment will be
recommended based on audit results.
-
7/28/2019 Top Polluters Overshooting Cells
14/18
Overshooting Cell 403:46827
-
7/28/2019 Top Polluters Overshooting Cells
15/18
Overshooting Cell 403:46827
Down-tilt UDXB4682_D by additional 2 degree E-tilt.
-
7/28/2019 Top Polluters Overshooting Cells
16/18
Overshooting Cell 403:2531
-
7/28/2019 Top Polluters Overshooting Cells
17/18
Overshooting Cell 403:2531
Down-tilt UDXB253_A by additional 2 degree E-tilt.
-
7/28/2019 Top Polluters Overshooting Cells
18/18
Thank You!!