tÜv sÜd psb pte ltd - la-2007-0385-e (pt 2 of 5) · 2021. 4. 9. · sni 04-3560-1994 [iec 60064]...
TRANSCRIPT
The SAC Programme is managed by Enterprise Singapore
230 Victoria Street, #09-00 Bugis Junction Office Tower, Singapore 188024 Tel: +65 6278 6666 Fax: +65 6659 0640
www.sac-accreditation.gov.sg
TÜV SÜD PSB Pte Ltd Certificate No. : LA-2007-0385-E Testing Services (Part 3 of 5)
Electrical & Electronics Centre (EEC)
(Lighting & PV) Issue No. : 21
15 International Business Park
TUV SUD @ IBP Date : 09 January 2021
Singapore 609937
Page : 1 of 36
PRODUCTS TESTED TESTS/PROPERTIES STANDARD METHODS
A. Lighting
1. Luminaires Full Test IEC 60598-1: 1999, 2003 + A1: 2006, 2008, 2014 + A1: 2017, IEC 60598-1: 2020
IEC 62722-1: 2014
IEC/PAS 62722-1: 2011
EN 13032-1: 2004 + A1:2012
EN 60598-1: 1989, 2004 + A1: 2006, 1997, 2000, 2008 + A11: 2009, 2015 + A1: 2018
BS 5225 Pt 1: 1975
BS 5225 Pt 3: 1982
BS EN 60598-1: 1997, 2000, 2004, 2008, 2015 BS EN 60598-1:2015 + A1:2018
CIBSE LG3: 1996
CIE 70: 1987
CIE 84: 1989
CIE 117: 1995
CIE 121: 1996
CNS 14335: 1999
SASO 1318: 1997
SS 263 Part 1: 2000, 2005 + A1: 2007, 2010
SS IEC 60598-1: 2016
SS IEC 62722-1: 2015
TM5: 1980
TR 28-1: 2011
UL 1598: 2008 + revision 2011
IEC TR 61547-1:2017 IEC TR 61547-1:2020
IEC TR 63158:2018
IEEE 1789-2015
FIELD OF TESTING: Electrical Testing
Certificate No. : LA-2007-0385-E Issue No. : 21 (Part 3 of 5) Date : 09 January 2021 Page : 2 of 36
The SAC Programme is managed by Enterprise Singapore
230 Victoria Street, #09-00 Bugis Junction Office Tower, Singapore 188024 Tel: +65 6278 6666 Fax: +65 6659 0640
www.sac-accreditation.gov.sg
PRODUCTS TESTED TESTS/PROPERTIES STANDARD METHODS
AUSTRALIA & NEW ZEALAND
AS/NZS 60598-1: 1998, 2001, 2003, 2013 AS/NZS 60598.1: 2017
AS 1680.3: 1991
ASEAN EE MRA
CS 0034: 2003 [IEC 60598-1: 2003]
MS IEC 60598-1: 1997 [IEC 60598-1:1996, 1999] MS IEC 60598-1: 2003 [IEC 60598-1] MS IEC 60598-1: 2006
PNS 1328: 1996 [IEC 60598-1: 1992]
JAPAN EE MRA
J60598-1 [IEC 60598-1 Ed 4 + A1] J60598-1 [IEC 60598-1:2014]
KOREA EE MRA
K 60598-1 [IEC 60598-1: 1999]
2. Electronic Ballasts Full Test IEC 60924: 1990 + A1:1993
IEC 60925: 1989 + A1:1996 + A2:2001, 2001
IEC 60928: 1999
IEC 60929: 1990 + A1:1994 + A2:1996 IEC 60929: 2003, 2006, 2011 + A1:2015
IEC 61347-2-3: 2000 + A1: 2004 + A2:2006 IEC 61347-2-3: 2011 + A1:2016
IEC 61347-2-7: 2000, 2006, 2011 + A1:2017
IEC 61347-2-10: 2009
IEC 61347-2-12:2005 + A1:2010, 2010
EN 60925:1991 + Amd 1:1996 + Amd 2:2001
EN 60929: 1992, 2004, 2006, 2011 + A1:2016
EN 61347-2-3: 2001 + A1: 2004 + A2: 2006 EN 61347-2-3: 2011 + A1:2017
EN 61347-2-7: 2001, 2006, 2012 + A1:2019
EN 61347-2-10: 2001 + A1: 2009
EN 61347-2-12: 2005 + A1: 2010
BS EN 60929: 2006 Amd 1:1995, Amd 2: 1996 BS EN 60929 : 2011 + A1 : 2016
CNS 13755: 2006
Certificate No. : LA-2007-0385-E Issue No. : 21 (Part 3 of 5) Date : 09 January 2021 Page : 3 of 36
The SAC Programme is managed by Enterprise Singapore
230 Victoria Street, #09-00 Bugis Junction Office Tower, Singapore 188024 Tel: +65 6278 6666 Fax: +65 6659 0640
www.sac-accreditation.gov.sg
PRODUCTS TESTED TESTS/PROPERTIES STANDARD METHODS
MS IEC 61347-2-3: 2003
SASO 1488: 1999
SASO 1489: 1999
SS 380 Part 1: 1996 Amd 1: 1999 SS 380 Part 2: 1996
SS 490 Part 2: 3: 2002
AUSTRALIA & NEW ZEALAND
AS 3134: 1992
AS 61347.2.7:2019
AS/NZS 60925:2005
AS/NZS 60928: 2000
AS/NZS 60929: 2000, 2005 AS/NZS 60929 : 2005 (R2016)
AS/NZS 61347.2.3: 2004, 2016
AS/NZS 61347.2.10: 2004
ASEAN EE MRA
MS IEC 60928: 1995 [IEC 60928: 1995]
MS IEC 60929: 1995 [IEC 60929: 1990]
MS IEC 60929: 2008
MS IEC 61347-2-3: 2014
PNS 135-1: 1997 [IEC 60928: 1995-02]
PNS 135-2: 1993 + A1 & A2: 1997 [IEC 60929: 1990 + A1: 1994 + A2: 1996]
PNS IEC 60929:2006
PNS IEC 61347-2-3:2002, Amd 1:2006, 2003
JAPAN EE MRA
J60928 [IEC 60928 Ed 2]
J61347-2-3 [IEC 61347-2-3 Ed 1]
KOREA EE MRA
K 60929 [IEC 60929: 1990]
K 61347-2-3 [IEC 61347-2-3: 2004 + A1: 2006]
Certificate No. : LA-2007-0385-E Issue No. : 21 (Part 3 of 5) Date : 09 January 2021 Page : 4 of 36
The SAC Programme is managed by Enterprise Singapore
230 Victoria Street, #09-00 Bugis Junction Office Tower, Singapore 188024 Tel: +65 6278 6666 Fax: +65 6659 0640
www.sac-accreditation.gov.sg
PRODUCTS TESTED TESTS/PROPERTIES STANDARD METHODS
3. Ballast Full Test IEC 60920:1990 + A1: 1993 + A2: 1995
IEC 60921: 1988, 2004, 2006 +Amd 1: 1990 + Amd 2: 1994
IEC 62442-1 Ed1, 2011-10
EN 60921: 1991 + A1: 1992 + A2: 1995
EN 60921: 2004 + A1: 2006
EN 61347-2-8: 2001 + A1: 2006
EN 62442-1:2011 + A11:2017
MS 1778-1: 2005
MS 1778-2: 2005
MS IEC 60921: 2006
MS IEC 61347-2-8: 2003, 2014
SASO 507: 1988, 2002
SASO 508: 1987, 2002
SS 24: 1987
AUSTRALIA & NEW ZEALAND
AS/NZS 60921: 2002
AS/NZS 61347.2.8: 2003
NZHB 4782.2: 2001
NZHB 4783.2: 2001 + A1: 2001
ASEAN EE MRA
MS 141: Part 2: 1992, 1993
MS IEC 60921:2013
PNS IEC 60921:2006
TCVN 8248:2009
TIS 23-2558:2015
JAPAN EE MRA
J60920 [IEC 60920 Ed 1 + A1 & A2]
J61347-2-8: 2002 [IEC 61347-2-8 Ed 1]
Certificate No. : LA-2007-0385-E Issue No. : 21 (Part 3 of 5) Date : 09 January 2021 Page : 5 of 36
The SAC Programme is managed by Enterprise Singapore
230 Victoria Street, #09-00 Bugis Junction Office Tower, Singapore 188024 Tel: +65 6278 6666 Fax: +65 6659 0640
www.sac-accreditation.gov.sg
PRODUCTS TESTED TESTS/PROPERTIES STANDARD METHODS
4. Emergency and Exit Lights
IEC 60598-2-22: 1990
IEC 60598-2-22: 1997 + A1:2002 + A2: 2008
IEC 60598-2-22: 2014 + A1:2017
EN 60598-2-22: 1998 + Amd 1:2003 + Amd 2:2008
EN 60598-2-22: 2014
EN 60598-2-22:2014 + A1:2020
ISO 3864-1: 2002, 2011
BS 5266-1: 2005, 2011, 2016
BS 5266-7: 1999
BS 5499-1: 2002
BS 5499-3:1990
BS 5499-4: 2000, 2013
BS 5499-7: 1999
BS 5499-10: 2006, 2014
BS 5499-11: 2002
BS EN 1838 1999, 2013
BS EN 60598-2-22: 1990 & 1999, A1: 2002
BS EN 60598-2-22: 1998 + A2: 2008, 2014+ A1:2020
Full Test CP 19: 1991 Amd 1 & 2: 1994, 2000, Amd 1: 2003, Amd 2: 2005
SASO 1688: 1999, 2000
SS 263: Part 2: 1996
SS 263: Part 2: 1998, Amd 1: 2003, Amd 2: 2008
SS 508 Part 1: 2004, 2013
SS 508 Part 3: 2004, 2013
SS 508 Part 4: 2013
SS 508 Part 5: 2013
For Clause 10 & 11 SS 563 Part 1: 2010
For Clause 5.2, 5.4, 5.5, SS 563 Part 2: 2010 + A1: 2013
6, 7, 8, 9, 10.6 & 10.7. SS 563 Part 2: 2010 + A2: 2017
SS IEC 60598-2-22: 2016
AUSTRALIA & NEW ZEALAND
AS 60598.2.22: 2005
AS 60598.2.22:2019
AS/NZS 2293.1: 1998, 2005 + A1: 2008 + A2: 2014
AS/NZS 2293.3: 1995 + A1: 1998, 2005 + A1: 2010 + A2: 2012, 2018
Certificate No. : LA-2007-0385-E Issue No. : 21 (Part 3 of 5) Date : 09 January 2021 Page : 6 of 36
The SAC Programme is managed by Enterprise Singapore
230 Victoria Street, #09-00 Bugis Junction Office Tower, Singapore 188024 Tel: +65 6278 6666 Fax: +65 6659 0640
www.sac-accreditation.gov.sg
PRODUCTS TESTED TESTS/PROPERTIES STANDARD METHODS
JAPAN EE MRA
J60598-2-22 [IEC 60598-2-22 Ed 3]
5. Fluorescent Lamps
Full Test IEC 60081 Ed 5:1997 + A1:2000 + A2:2003 + A3:
2005 + A4: 2010 + A5: 2013 + A6:2017
EN 60081:1998 Amd 1:2002, Amd 2:2003, Amd 3:
2005, Amd 4:1010, Amd 5:2013, Amd 6:2017
EN 61195: 1999
SASO 138: 1979
SASO 139: 1979
AUSTRALIA & NEW ZEALAND
AS/NZS 4782.1: 2004, Amd 1: 2006
AS/NZS 4782.2: 2004, Amd 1: 2006
ASEAN EE MRA
CS 008: 2003 [IEC 60081: 2002]
PNS IEC 60081:2001 [IEC 60081:1997], 2006 +
Amd 2:2006 + Amd 3:2006
Safety Requirements TIS 956-2533 (1990)
KOREA EE MRA
K 60081 [IEC 60081: 1997]
6. Lamps and Starter Holders
Full Test
IEC 60838: 2004 + A1: 2008 + A2: 2011
IEC 60838-1:1997 + A1: 1999 + A2: 2002 IEC 60838-1:2016 + A1: 2017
IEC 60838-2-1:1994 + A1: 1998 + A2:2004
IEC 60838-2-2: 2006
MS IEC 60838-1: 2008
MS IEC 60838-2-2: 2008
Certificate No. : LA-2007-0385-E Issue No. : 21 (Part 3 of 5) Date : 09 January 2021 Page : 7 of 36
The SAC Programme is managed by Enterprise Singapore
230 Victoria Street, #09-00 Bugis Junction Office Tower, Singapore 188024 Tel: +65 6278 6666 Fax: +65 6659 0640
www.sac-accreditation.gov.sg
PRODUCTS TESTED TESTS/PROPERTIES STANDARD METHODS
AUSTRALIA & NEW ZEALAND
AS/NZS 4782.1: 2004
AS/NZS 4782.2: 2004
7. Glow Starters Full Test IEC 60155: 1993 + A1: 1995 + A2: 2006
EN 60155: 1995 + A1: 1995 + A2: 2007
SASO 146: 1979
SASO 147: 1979
AUSTRALIA & NEW ZEALAND
AS/NZS 60155: 2000, Amd 1: 2000, Amd 2:2000
ASEAN EE MRA
MS IEC 60155: 1996 [IEC 60155: 1993]
PNS 45: 1997 + A1: 1997 [IEC 60155: 1993 + A1: 1995]
TIS 183-2547 (2004) [IEC 60155: 1993 + A1: 1995]
JAPAN EE MRA
J60155 [IEC 60155 Ed 4 + Amd 1]
KOREA EE MRA
K 60155 [IEC 60155: 1993]
8. Tungsten Filament Lamps
Full Test IEC 60064 Ed 6:1993 + A1:2000 + A2:2002 +
A3:2005 + A4:2007 + A5:2009, Ed 6.3:2005
EN 60064: 1995, Amd 2: 2003, Amd 3: 2006, Amd
4: 2007, Amd 11: 2007, Amd 5: 2009
SASO 33: 1998
SASO 34: 1998
AUSTRALIA & NEW ZEALAND
AS 2325: 1993
Certificate No. : LA-2007-0385-E Issue No. : 21 (Part 3 of 5) Date : 09 January 2021 Page : 8 of 36
The SAC Programme is managed by Enterprise Singapore
230 Victoria Street, #09-00 Bugis Junction Office Tower, Singapore 188024 Tel: +65 6278 6666 Fax: +65 6659 0640
www.sac-accreditation.gov.sg
PRODUCTS TESTED TESTS/PROPERTIES STANDARD METHODS
ASEAN EE MRA
CS 006: 2003 [IEC 60064: 1993]
PNS 38-2: 1995 [IEC 60064: 1993]
SNI 04-3560-1994 [IEC 60064]
INDIA EE MRA
IS 418: 2004 [IEC 60064: 1973]
KOREA EE MRA
K 60064 [IEC 60064: 1993]
9. Fixed General Purpose Luminaires
Full Test IEC 60598-2-1: 1979 + A1: 1987, 2020
EN 60598-2-1: 1989
SASO 1674: 1999
SS 263: Part 3: 1989, A1: 1989 & A2: 1996
AUSTRALIA & NEW ZEALAND
AS/NZS 60598.2.1: 1998, 2014 + A1: 2016+ A2: 2019
ASEAN EE MRA
MS IEC 60598-2-1: 1997 [IEC 60598-2-1: 1979]
JAPAN EE MRA
J60598-2-1 [IEC 60598-2-1 Ed 1 + A1]
KOREA EE MRA
K 60598-2-1 [IEC 60598-2-1: 1979]
10. Recessed Full Test IEC 60598-2-2: 1997, Amd 1: 1997, 2011
Luminaires EN 60598-2-2: 1996, Amd 1: 1997, 2012
BS EN 60598-2-2: 1997, 2012
SASO 1675: 1999
SS 263: Part 4: 2000
AUSTRALIA & NEW ZEALAND
AS/NZS 60598.2.2: 2001, 2016 + A1:2017
Certificate No. : LA-2007-0385-E Issue No. : 21 (Part 3 of 5) Date : 09 January 2021 Page : 9 of 36
The SAC Programme is managed by Enterprise Singapore
230 Victoria Street, #09-00 Bugis Junction Office Tower, Singapore 188024 Tel: +65 6278 6666 Fax: +65 6659 0640
www.sac-accreditation.gov.sg
PRODUCTS TESTED TESTS/PROPERTIES STANDARD METHODS
ASEAN EE MRA
MS IEC 60598-2-2: 1998 [IEC 60598-2-2]
JAPAN EE MRA
J60598-2-2 [IEC 60598-2-2 Ed 2 + A1] J60598-2-2 [IEC 60598-2-2:2011]
KOREA EE MRA
K 60598-2-2 [IEC 60598-2-2: 1997]
11. Luminaires for road Full Test IEC 60598-2-3: 2001, 2002, Amd 1: 2011
and street lighting EN 60598-2-3: 1994, 2003, Amd 1: 2011
BS EN 60598-2-3: 1994, 2003, Amd 1:2011
AS/NZS 1158.6: 2010
AS/NZS 60598.2.3: 2015
SASO 1676: 1999
SS 263: Part 5: 2000, Amd 1: 2001
JAPAN EE MRA
J60598-2-3 [IEC 60598-2-3 Ed 2 + A1]
12. Luminaires with Full Test IEC 60598-2-6: 1994 + A1: 1996
built- in transformers EN 60598-2-6: 1995
for filament lamps EN 60598-2-6: 1994, A1: 1997
BS EN 60598-2-6: 1995
SASO 1679: 1999
SS 263: Part 7: 1996, Amd 1: 1998
AUSTRALIA & NEW ZEALAND
AS/NZS 60598.2.6: 1998
JAPAN EE MRA
J60598-2-6 [IEC 60598-2-6 Ed 2 + A1]
KOREA EE MRA
K 60598-2-6 [IEC 60598-2-6: 1994]
Certificate No. : LA-2007-0385-E Issue No. : 21 (Part 3 of 5) Date : 09 January 2021 Page : 10 of 36
The SAC Programme is managed by Enterprise Singapore
230 Victoria Street, #09-00 Bugis Junction Office Tower, Singapore 188024 Tel: +65 6278 6666 Fax: +65 6659 0640
www.sac-accreditation.gov.sg
PRODUCTS TESTED TESTS/PROPERTIES STANDARD METHODS
13. Lighting Chains Full Test IEC 60598-2-20:1996, 2002 + A1:1998, A2:2002, 2010
IEC 60598-2-20:2014
EN 60598-2-20: 1997 + A1:1998 + A2:2004, 2010, 2015
BS EN 60598-2-20: 1998, 2010, 2015
SASO 1687: 1999
SS 263: Part 10: 2000
AUSTRALIA & NEW ZEALAND
AS/NZS 60598.2.20: 1998, 2002 + A1:1999
AS/NZS 60598.2.20: 2018
ASEAN EE MRA
CS 0041: 2003 [IEC 60598-2-20: 2001]
MS IEC 60598-2-20:1998 [IEC 60598-2-20:1996]
MS IEC 60598-2-20: 2005
PNS 189: 2000
JAPAN EE MRA
J60598-2-20 [IEC 60598-2-20 Ed 1 + A1]
14. Ignitors Full Test IEC 60926: 1995, 2000
IEC 60927: 1996, 2000, 2004, Amd 1: 1999, Amd 2: 2004
IEC 60927:2007 + A1:2013
EN 60927: 1996, Amd 1: 1999, Amd 2: 2004, 2007
SASO 1493: 1999
AUSTRALIA & NEW ZEALAND
AS/NZS 60927: 2005
KOREA EE MRA
K 60927 [IEC 60927: 2000]
Certificate No. : LA-2007-0385-E Issue No. : 21 (Part 3 of 5) Date : 09 January 2021 Page : 11 of 36
The SAC Programme is managed by Enterprise Singapore
230 Victoria Street, #09-00 Bugis Junction Office Tower, Singapore 188024 Tel: +65 6278 6666 Fax: +65 6659 0640
www.sac-accreditation.gov.sg
PRODUCTS TESTED TESTS/PROPERTIES STANDARD METHODS
15. Isolating Full Test IEC 60742: 1983 + A1: 1992 Transformers IEC 61558-1: 1997, 1998 + Amd 1:1998, 2005 + A1:2009, 2009, 2017 IEC 61558-2-1: 1997, 2007 IEC 61558-2-2: 1997, 2007 IEC 61558-2-4: 1997, 2009 IEC 61558-2-5: 1997, 2010 IEC 61558-2-6: 1997, 2009 EN 61558-1:1997 + A1:1998, 2005 + A1:2009 EN IEC 61558-1:2019 EN 61558-2-1: 1997, 2007 EN 61558-2-2: 1998, 2007
EN 61558-2-4: 1997, 2009
EN 61558-2-6: 1997, 2009
BS EN 61558-1: 1998, 2005 + A1: 2009
BS EN 61558-2-1: 1998, 2007
BS EN 61558-2-2: 1998, 2007
BS EN 61558-2-4: 1998, 2009
BS EN 61558-2-5: 1998, 2010
BS EN 61558-2-6: 1998, 2009
MS IEC 61558-1: 2005
MS IEC 61558-2-5: 2006
MS IEC 61558-2-6: 2006
MS IEC 61558-2-17: 2007
AUSTRALIA & NEW ZEALAND
AS/NZS 3108:1994
AS/NZS 3108:1994, Amd 1:1995, Amd 2: 1995, Amd 3:1996, Amd 4:1996, Amd 5:1997, Amd 6:1997 & Amd
7:2001
AS/NZS 61558.1 & Amd 2: 2004
AS/NZS 61558.1:2000, Amd 1:2001, Amd 2: 2004, Amd 3:2004, Amd 4:2005, Amd 5:2006, Amd 6:2007, Amd
7:2011
AS/NZS 61558.1:2008 + Amd 1:2009 + Amd 2:2015 AS/NZS 61558.1 : 2018
AS/NZS 61558.2.4: 2001, 2009 + Amdt 1:2012
AS/NZS 61558.2.6:2001 + Amd 1:2006
AS/NZS 61558.2.6:2009 + Amd 1:2012
Certificate No. : LA-2007-0385-E Issue No. : 21 (Part 3 of 5) Date : 09 January 2021 Page : 12 of 36
The SAC Programme is managed by Enterprise Singapore
230 Victoria Street, #09-00 Bugis Junction Office Tower, Singapore 188024 Tel: +65 6278 6666 Fax: +65 6659 0640
www.sac-accreditation.gov.sg
PRODUCTS TESTED TESTS/PROPERTIES STANDARD METHODS
ASEAN EE MRA
CS 0046: 2003 [IEC 61558-2-6: 1997] MS 1700: 1998
PNS IEC 61558-1: 2002
JAPAN EE MRA
J61558-1 [IEC 61558-1 Ed 1] J61558-2-1 [IEC 61558-2-1:1997]
J61558-2-2 [IEC 61558-2-2:1997]
J61558-2-4 [IEC 61558-2-4 Ed 1]
J61558-2-5 [IEC 61558-2-5 Ed 1]
J61558-2-6 [IEC 61558-2-6 Ed 1]
J61558-2-7 [IEC 61558-2-7 Ed 1]
KOREA EE MRA
K 61558-1 [IEC 61558-1: 1998]
16. Portable general- Full Test IEC 60598-2-4: 1997 , 2017
purpose luminaires EN 60598-2-4: 1997, 1998 EN 60598-2-4: 2018
BS EN 60598-2-4: 1998 BS EN 60598-2-4:2018
SASO 1677: 1999
SS 263: Part 6: 1998
AUSTRALIA & NEW ZEALAND
AS/NZS 3128: 1998 + A1: 1998 + A2: 2002
AS/NZS 60598.2.4: 1998, 2005 + A1: 2007
AS 60598.2.4:2019
ASEAN EE MRA
CS 0034: 2003 [IEC 60598-2-4: 1997]
MS IEC 60598-2-4: 2003 [IEC 60598-2-4: 1997]
JAPAN EE MRA
J60598-2-4 [IEC 60598-2-4 Ed 2] KOREA EE MRA
K 60598-2-4 [IEC 60598-2-4: 2001]
Certificate No. : LA-2007-0385-E Issue No. : 21 (Part 3 of 5) Date : 09 January 2021 Page : 13 of 36
The SAC Programme is managed by Enterprise Singapore
230 Victoria Street, #09-00 Bugis Junction Office Tower, Singapore 188024 Tel: +65 6278 6666 Fax: +65 6659 0640
www.sac-accreditation.gov.sg
PRODUCTS TESTED TESTS/PROPERTIES STANDARD METHODS
17. DC or AC supplied Full Test IEC 61046: 1993 + A1: 1995
electronic step-down EN 61047:1992 + A1:1996 + A2:2001, 2004
convertors for IEC 61347-2-2: 2000, 2006 + A1: 2005 + A2:
filament lamps 2006, 2011
EN 61347-2-2: 2001 + A1: 2006 + A2: 2006; 2012
AUSTRALIA & NEW ZEALAND
AS/NZS 61046: 2001
AS/NZS 61047: 2001
AS/NZS 61347.2.2: 2004, 2007
18. Approval & test Full Test AUSTRALIA & NEW ZEALAN
specification – AS 3137: 1992 + Amd 1: 1992 + Amd 2: 1995
Luminaires (lighting
fittings)
19. Approval & test specification – Fluorescent lamp ballasts
Full Test AUSTRALIA & NEW ZEALAND AS 3168: 1991 + Amd 1: 1991
ASEAN MRA
Ballast for fluorescent TIS 23-2521 (1978)
lamps TIS 23-2558 (2015)
20. Electric Shaver supply Full Test EN 61558-2-5:1998, 2010
units BS EN 61558-2-5:1998, 2010
AUSTRALIA & NEW ZEALAND
AS/NZS 61588.2.5:2003, 2011 + A1:2012
Certificate No. : LA-2007-0385-E Issue No. : 21 (Part 3 of 5) Date : 09 January 2021 Page : 14 of 36
The SAC Programme is managed by Enterprise Singapore
230 Victoria Street, #09-00 Bugis Junction Office Tower, Singapore 188024 Tel: +65 6278 6666 Fax: +65 6659 0640
www.sac-accreditation.gov.sg
PRODUCTS TESTED TESTS/PROPERTIES STANDARD METHODS
21. Lamp Controlgear Full Test IEC 61347-1:2000, 2003 + Amd 1:2003, 2007
+ A1:2010 + A2:2012, 2015 + A1:2017
EN 61347-1:2001 + A1:2007, 2008 + A1:2011
+ A2:2013, 2015
SS 490 Part 1: 2001
AUSTRALIA & NEW ZEALAND
AS/NZS 61347.1: 2002, 2016 + A1 : 2018
ASEAN EE MRA
MS 769: 1982
MS IEC 61347-1:2003, 2012
PNS IEC 61347-1:2002 + A1:2006
JAPAN EE MRA
J61347-1 [IEC 61347-1 Ed 1]
J61347-1 [IEC 61347-1:2002 + A1:2010 + A2:2012]
KOREA EE MRA
K 61347-1 [IEC 61347-1: 2000]
K 61347-1 [IEC 61347-1: 2003 + A1: 2003]
22. Magnetic Ballast Full Test IEC 61347-2-8: 2000, 2006
EN 61347-2-8: 2001, A1: 2006
K 61347-2-8 [IEC 61347-2-8: 2006]
SS 490 Part 2: 8: 2001
SS 491: 2001
ASEAN EE MRA
PNS 12-3: 2000
PNS 2050-4:2007
PNS IEC 61347-2-8:2002
Certificate No. : LA-2007-0385-E Issue No. : 21 (Part 3 of 5) Date : 09 January 2021 Page : 15 of 36
The SAC Programme is managed by Enterprise Singapore
230 Victoria Street, #09-00 Bugis Junction Office Tower, Singapore 188024 Tel: +65 6278 6666 Fax: +65 6659 0640
www.sac-accreditation.gov.sg
PRODUCTS TESTED TESTS/PROPERTIES STANDARD METHODS
23. Magnetic Ballast for Full Test IEC 60922:1997, 1989 + A1:1990 + A2:1992
Discharge Lamps SASO 691: 1994
SASO 692: 1992, 1994
SASO 1491: 1999
AUSTRALIA & NEW ZEALAND
AS/NZS 60922: 1998
JAPAN EE MRA
J60922 [IEC 60922 Ed 1 + A1 & 2]
24. Ballasts for Full Test IEC 61347-2-9:2000 + A1:2003 + A2:2006, 2012
Discharge Lamps EN 61347-2-9:2001 + A1:2003 + A2:2006, 2013
AUSTRALIA & NEW ZEALAND
AS/NZS 61347.2.9:2004, 2019
ASEAN EE MRA
MS IEC 61347-2-9:2003
PNS 105: 1986
JAPAN EE MRA
J61347-2-9 [IEC 61347-2-9 Ed 1]
KOREA EE MRA
K 61347-2-9 [IEC 61347-2-9:2000]
25. Self-ballasted Full Test IEC 60968:1999, 2012, 2015
Lamps IEC 60969:1988 + A1:1991 + A2:2000, 2016
EN 60968:1990 + A1:1993 + A2:1999, 2013, 2015
EN 60969:1993 + A1:1993 + A2:2000
Certificate No. : LA-2007-0385-E Issue No. : 21 (Part 3 of 5) Date : 09 January 2021 Page : 16 of 36
The SAC Programme is managed by Enterprise Singapore
230 Victoria Street, #09-00 Bugis Junction Office Tower, Singapore 188024 Tel: +65 6278 6666 Fax: +65 6659 0640
www.sac-accreditation.gov.sg
PRODUCTS TESTED TESTS/PROPERTIES STANDARD METHODS
AUSTRALIA & NEW ZEALAND
AS/NZS 4847.1: 2010
AS/NZS 4847.2: 2010 + A1:2011
AS/NZS 60968: 2001
AS/NZS 60968 : 2001 (R2013)
AS/NZS 60969: 2001
AS/NZS 60969 : 2001 (R2013)
ASEAN EE MRA
CS 0027: 2003 [IEC 60968: 1988] MS IEC 60968:2006 (CONFIRMED:2011)
MS IEC 60969:2006 (CONFIRMED:2011) PNS 603-1: 1993 + A1: 2001
[IEC 60968:1988 + A1:1991 + A2:1999] PNS 603-2: 1993 + A1: 2001 [IEC 60969: 1988] PNS 2050-2:2007 PNS IEC 968:2006 PNS IEC 969:2006 SNI 04-6504-2001 [IEC 60968] TIS 2334-2557 (2014)
INDIA EE MRA
IS 15111 Part 1: 2002 [IEC 60968: 1988]
IS 15111 Part 2: 2002 [IEC 60969: 1988]
JAPAN EE MRA
J60968 [IEC 60968 Ed 1 + A1 & A2]
KOREA EE MRA
K 60968 [IEC 60968: 1999]
K 60969 [IEC 60969: 2001]
K 61347-1 [IEC 61347-1: 2003 + A1: 2003]
26. Electronic Full Test IEC 61047:2001, 2004
Transformer IEC 61047:1991 + A1:1996 + A2:2001
EN 61047:1992 + A1:1996 + A2:2001, 2004
AS/NZS 61047: 2001
AS/NZS 61047 : 2001 (R2013)
Certificate No. : LA-2007-0385-E Issue No. : 21 (Part 3 of 5) Date : 09 January 2021 Page : 17 of 36
The SAC Programme is managed by Enterprise Singapore
230 Victoria Street, #09-00 Bugis Junction Office Tower, Singapore 188024 Tel: +65 6278 6666 Fax: +65 6659 0640
www.sac-accreditation.gov.sg
PRODUCTS TESTED TESTS/PROPERTIES STANDARD METHODS
27. Single-Capped Full Test IEC 60901 Ed 2: 1996 + A1: 1997 + A2: 2000 +
Lamp A3:2004 + A4: 2007 + A5: 2011 + A6:2014
IEC 60901 Ed 2.2: 2001
EN 60901: 1996, Amd 1: 1997, Amd 2: 2000, Amd 3: 2004, Amd 4: 2008, Amd 5:2012, Amd 6:2017
AUSTRALIA & NEW ZEALAND
AS/NZS 60901: 2002 & 2003
ASEAN EE MRA
MS IEC 60901:2003 (CONFIRMED:2011)
PNS 1261: 1995 [IEC 60901: 1992]
PNS 2050-1-2:2006
PNS IEC 901:2001 + Amd 1:2006 + Amd 2:2006 + Amd 3:2006
TCVN 7896:2008
KOREA EE MRA
K 60901 [IEC 60901: 2001]
28. Handlamps Full Test IEC 60598-2-8:1996 + A1:2000 + A2:2007, 2013
EN 60598-2-8:1997 + A1:2000 + A2:2008, 2013
BS EN 60598-2-8:1997 + A2:2008, 2013
SASO 1681: 1999
SS 263 Part 13: 1997 + A1: 2000
AUSTRALIA & NEW ZEALAND
AS/NZS 60598.2.8: 1998 & 2002, 2015
ASEAN EE MRA
CS 0036: 2003 [IEC 60598-2-8: 1996]
MS IEC 60598-2-8: 1998 [IEC 60598-2-8: 1991]
MS IEC 60598-2-8: 2006
JAPAN EE MRA
J60598-2-8 [IEC 60598-2-8 Ed 2]
Certificate No. : LA-2007-0385-E Issue No. : 21 (Part 3 of 5) Date : 09 January 2021 Page : 18 of 36
The SAC Programme is managed by Enterprise Singapore
230 Victoria Street, #09-00 Bugis Junction Office Tower, Singapore 188024 Tel: +65 6278 6666 Fax: +65 6659 0640
www.sac-accreditation.gov.sg
PRODUCTS TESTED TESTS/PROPERTIES STANDARD METHODS
29. Double-Capped Full Test IEC 61195: 1999 + A1:2012 + A2:2014, 2012, 2014
Fluorescent EN 61195: 1999 + A1:2012 + A2:2015, 2013, 2015
Lamps ASEAN EE MRA
PNS 2050-1-1:2007 + Amd 1:2013 PNS IEC 61195:2006
TCVN 8249:2009
JAPAN EE MRA
J61195 [IEC 61195 Ed 2]
KOREA EE MRA
K 61195 [IEC 61195: 1999]
30. Starting Devices for Discharge
Full Test IEC 61347-2-1:2000, 2006 + Amd 1:2005 + Amd 2:2013, 2013
Lamps EN 61347-2-1:2001 + A1:2006
AUSTRALIA & NEW ZEALAND
AS/NZS 61347.2.1: 2002
31. Portable Child Appealing Luminaires
Full Test IEC 60598-2-10: 1987 +A1: 1990 & A2: 1995, 2003
EN 60598-2-10: 2003
BS EN 60598-2-10: 1989, 2003
SASO 1683: 1999
AUSTRALIA & NEW ZEALAND
AS/NZS 60598.2.10: 1998, 2015
32. Extra Low Voltage Lighting Systems for filament Lamps
Full Test IEC 60598-2-23: 2001
IEC 60598-2-23 : 1996 + A1 : 2000
EN 60598-2-23: 1996 + A1: 2000
BS EN 60598-2-23: 1997
SASO 1689: 1999
AUSTRALIA & NEW ZEALAND
AS/NZS 60598-2-23: 2002
Certificate No. : LA-2007-0385-E Issue No. : 21 (Part 3 of 5) Date : 09 January 2021 Page : 19 of 36
The SAC Programme is managed by Enterprise Singapore
230 Victoria Street, #09-00 Bugis Junction Office Tower, Singapore 188024 Tel: +65 6278 6666 Fax: +65 6659 0640
www.sac-accreditation.gov.sg
PRODUCTS TESTED TESTS/PROPERTIES STANDARD METHODS
33. Transformers for Toys
Full Test IEC 61558-2-7: 1997, 2007
EN 61558-2-7: 1997, 2007
BS EN 61558-2-7: 1998, 2007
MS IEC 61558-2-7: 2007
AUSTRALIA & NEW ZEALAND
AS/NZS 61558.2.7: 2001, 2008, Amd 1:2012
34. Electrical Equipment
Full Test AUSTRALIA & NEW ZEALAND
AS/NZS 3100:1997 & 2002, Amd 1:2003, Amd 2:2004, Amd 3:2005
AS/NZS 3100:2009 + A1:2010 + A2:2012 + A3: 2014 + A4: 2015
35. IP Test Full Test IEC 62262: 2002
IEC 60529: 2001, Amd 2: 2013
EN 60529: 1991 + A1: 2000 + A2: 2013
EN 62262: 2002
BS EN 60529: 1992 + A2: 2013
BS EN 62262: 2002
AS 60529: 2004
ISO 20653:2013
SS IEC 60529: 1989
USCG 162.060-30 (clause a7)
• Method 506.4 MIL-STD-810F: 2000
Procedure I and III (Rain) • Method 512.4
Procedure I (Immersion) • Method 506.5 MIL-STD-810G: 2008
Procedure I • Note: For sample
size up to 200mm x 200mm
Certificate No. : LA-2007-0385-E Issue No. : 21 (Part 3 of 5) Date : 09 January 2021 Page : 20 of 36
The SAC Programme is managed by Enterprise Singapore
230 Victoria Street, #09-00 Bugis Junction Office Tower, Singapore 188024 Tel: +65 6278 6666 Fax: +65 6659 0640
www.sac-accreditation.gov.sg
PRODUCTS TESTED TESTS/PROPERTIES STANDARD METHODS
• Method 506.5 MIL-STD-810G: 2008
Procedure III (Rain)
• Method 512.5
Procedure I (Immersion)
• Method 506.6 MIL-STD-810G: 2014
Procedure I
• Note: For sample
size up to 200mm x200mm • Method 506.6
Procedure III (Rain)
• Method 512.6
Procedure I (Immersion) • Method 506.6 (Rain) MIL-STD-810H: 2019
Procedure I and Procedure III • Note: For sample
size up to 200mm x 200mm (Procedure I) • Method 512.6
Procedure I (Immersion) AUSTRALIA & NEW ZEALAND AS 60529: 2004
JAPAN EE MRA J60529 [IEC 60529 Ed 2]
36. Approval and Test Full Test AUSTRALIA & NEW ZEALAND Specification – AS 3138: 1993 + A1: 1994 Starters for Fluorescent ASEAN MRA Lamps TIS 183-2528: 1985
Certificate No. : LA-2007-0385-E Issue No. : 21 (Part 3 of 5) Date : 09 January 2021 Page : 21 of 36
The SAC Programme is managed by Enterprise Singapore
230 Victoria Street, #09-00 Bugis Junction Office Tower, Singapore 188024 Tel: +65 6278 6666 Fax: +65 6659 0640
www.sac-accreditation.gov.sg
PRODUCTS TESTED TESTS/PROPERTIES STANDARD METHODS
37. Luminaries – Full Test IEC 60598-2-18: 1993 + A1: 2011 Particular EN 60598-2-18: 1994 + A1: 2012 requirements for BS EN 60598-2-18: 1994, Amd 1:2012 luminaires for SASO 1685: 1999
swimming pools and SS 263 Part 11: 1997
similar applications
AUSTRALIA & NEW ZEALAND
AS/NZS 60598.2.18: 1998
38. Luminaries – Full Test IEC 60598-2-19: 1981 + A1: 1987 + A2: 1997
Particular EN 60598-2-19: 1989, Amd 2: 1998
requirements for SASO 1686: 1999
air- handling SS 263 Part 12: 1997
luminaires
AUSTRALIA & NEW ZEALAND
AS/NZS 60598.2.19: 2001
39. Luminaires – Full Test IEC 60598-2-5: 1998, 2015
Particular EN 60598-2-5: 1989 & 1998, 2015
requirements for BS EN 60598-2-5: 1998, 2015
floodlights SASO 1678: 1999 SS 263 Part 8: 1998
AUSTRALIA & NEW ZEALAND
AS/NZS 60598.2.5: 2002, 2018
40. Luminaires – Full Test IEC 60598-2-7:1982 + A1:1987 + A2:1994
Particular EN 60598-2-7:1989, Amd 2:1996, Amd 3:1997
requirements for BS EN 60598-2-7:1997
portable luminaires for SASO 1680/1999
garden use SS 263 Part 9:1990 + A1:1990 + A2:1996
AUSTRALIA & NEW ZEALAND
AS/NZS 60598.2.7:2005
Certificate No. : LA-2007-0385-E Issue No. : 21 (Part 3 of 5) Date : 09 January 2021 Page : 22 of 36
The SAC Programme is managed by Enterprise Singapore
230 Victoria Street, #09-00 Bugis Junction Office Tower, Singapore 188024 Tel: +65 6278 6666 Fax: +65 6659 0640
www.sac-accreditation.gov.sg
PRODUCTS TESTED TESTS/PROPERTIES STANDARD METHODS
41. Single-capped fluorescent lamps -safety specifications
Full Test IEC 61199: 1999, 2011 + A1:2012 + A2:2014,
2012, 2014
EN 61199: 1999, 2011 + A1:2013 + A2:2015
KOREA EE MRA
K 61199 [IEC 61199: 1999]
ASEAN EE MRA
PNS IEC 61199:2006
42. Auxiliaries for Full Test IEC 60923: 1995, 2001, 2005 + A1: 2006
lamps – Ballasts EN 60923: 1996, 2005, Amd 1: 2006 for discharge
lamps (excluding AUSTRALIA & NEW ZEALAND
tubular fluorescent AS/NZS 60923: 1998
lamps) – AS/NZS 60923 : 1998 (R2013)
Performance
requirements
43. Safety of small Full Test IEC 61558-2-8: 1998 power IEC 61558-2-8: 2010 transformers, EN 61558-2-8: 1998 power supply units EN 61558-2-8: 2010 and similar – BS EN 61558-2-8: 1999 Particular BS EN 61558-2-8: 2010 requirements for bell and chime AUSTRALIA & NEW ZEALAND
transformers AS/NZS 61558.2.8: 2001, 2011 + Amdt 1:2012
44. Safety of power Full Test IEC 61558-2-9: 2002, 2010
transformers, EN 61558-2-9: 2003, 2011
power supply units BS EN 61558-2-9: 2003, 2011
and similar BS EN 61558-2-17: 1998
products –
Particular AUSTRALIA & NEW ZEALAND
Requirements for AS/NZS 61558.2.9: 2003, 2011 + Amdt 1:2012
transformers class AS/NZS 61588.2.17: 2001
III handlamps for
tungsten filament
lamps
Certificate No. : LA-2007-0385-E Issue No. : 21 (Part 3 of 5) Date : 09 January 2021 Page : 23 of 36
The SAC Programme is managed by Enterprise Singapore
230 Victoria Street, #09-00 Bugis Junction Office Tower, Singapore 188024 Tel: +65 6278 6666 Fax: +65 6659 0640
www.sac-accreditation.gov.sg
PRODUCTS TESTED TESTS/PROPERTIES STANDARD METHODS
45. Safety of power Full Test IEC 61558-2-17: 1997
transformers, EN 61558-2-17: 1997
power supply units and similar– JAPAN EE MRA Particular J61558-2-17 [IEC 61558-2-17 Ed 1] requirements for
transformers for
switch mode
power supplies
46. Incandescent Lamps – Safety specifications tungsten filament lamps for domestic and similar general lighting purposes
Full Test except clause 2.9 of IEC 60432-1.
ASEAN EE MRA
CS 025: 2003 [IEC 60432-1: 1999]
PNS 38-1: 1995 [IEC 60432-1:1993+ A1:1995]
TIS 4 Part 1-2529: 1986
KOREA EE MRA K 60432-1 [IEC 60432-1: 1999]
47. Electrical supply track systems for luminaries
Full Test IEC 60570: 2003 + A1:2017
EN 60570: 2003 BS EN 60570: 2003
SASO 1672: 1999
SASO 1673: 1999
KOREA EE MRA
K 60570 [IEC 60570: 2003]
48. Measurement method of total input power of ballast-lamp circuits
Full Test IEC 62442-1: 2011, 2018
EN 50294: 1998 + A1: 2001 + A2: 2003
EN 62442-1: 2011 + A11:2017, 2018
EN IEC 62442-1:2018
TIS 2337-2557 (2014)
Certificate No. : LA-2007-0385-E Issue No. : 21 (Part 3 of 5) Date : 09 January 2021 Page : 24 of 36
The SAC Programme is managed by Enterprise Singapore
230 Victoria Street, #09-00 Bugis Junction Office Tower, Singapore 188024 Tel: +65 6278 6666 Fax: +65 6659 0640
www.sac-accreditation.gov.sg
PRODUCTS TESTED TESTS/PROPERTIES STANDARD METHODS
49. Performance of electrical lighting equipment – Ballasts for fluorescent lamps – Method of measurement to determine energy consumption and performance of ballasts lamp circuits
Full Test AUSTRALIA & NEW ZEALAND AS/NZS 4783.1: 2001 (R2013)
50. Performance of electrical lighting equipment – Ballasts for fluorescent lamps – Energy performance standards labelling and minimum energy requirements
Full Test AUSTRALIA & NEW ZEALAND AS/NZS 4783.2: 2002 (R2013)
51. Automatic electrical controls for household and similar use
Full Test IEC 60730-1:2003 + A1:2003 + A2:2007
EN 60730-1:2000 + Amd 1:2004, Amd 2:2008, Amd 11:2002, Amd 12:2003, Amd 13:2004, Amd 14:2005, Amd 15:2007, Amd 16:2007
BS EN 60730-1:1995, 2001
JAPAN EE MRA
J60730-1 [IEC 60730-1 Ed 2 + A1]
52. Aquarium Full Test IEC 60598-2-11:2005, 2013
Luminaries EN 60598-2-11:2005, 2013
BS EN 60598-2-11:2005, 2013
Certificate No. : LA-2007-0385-E Issue No. : 21 (Part 3 of 5) Date : 09 January 2021 Page : 25 of 36
The SAC Programme is managed by Enterprise Singapore
230 Victoria Street, #09-00 Bugis Junction Office Tower, Singapore 188024 Tel: +65 6278 6666 Fax: +65 6659 0640
www.sac-accreditation.gov.sg
PRODUCTS TESTED TESTS/PROPERTIES STANDARD METHODS
53. D.C. or A.C. supplied electronic controlgear for LED modules
Full Test IEC 61347-2-13:2006, 2014 + A1:2016
IEC 62384:2011 IEC 62384:2020
IEC 62442-3:2014. 2018
EN 61347-2-13: 2006, 2014 + A1:2017
EN 62384: 2006 + A1: 2009
EN IEC 62384:2020
EN 62442-3:2014 + A11:2017, 2018
EN IEC 62442-3:2018
J61347-2-13 [IEC 61347-2-13: 2006] J61347-2-13 [IEC 61347-2-13: 2014]
AUSTRALIA & NEW ZEALAND
AS/NZS IEC 61347.2.13: 2013, 2018
ASEAN EE MRA
MS IEC 61347-2-13:2012
MS IEC 62384:2011, 2012
54. Miscellaneous electronic circuits used with luminaries
Full Test IEC 61347-2-11: 2001 + A1:2017
EN 61347-2-11: 2001 + A1:2019
AUSTRALIA & NEW ZEALAND
AS/NZS 61347.2.11: 2003 AS/NZS 61347.2.11 : 2003 (R2016)
55. Mains socket-outlet mounted nightlights
Full Test IEC 60598-2-12: 2006, 2013
EN 60598-2-12: 2006, 2013
BS EN 60598-2-12: 2006, 2013
AUSTRALIA & NEW ZEALAND
AS/NZS 60598-2-12: 2013, 2015
56. Ground recessed luminaries
Full Test IEC 60598-2-13: 2006 + A1: 2011 + A2: 2016
EN 60598-2-13: 2006 + A1: 2012 + A2: 2016
BS EN 60598-2-13: 2006, Amd 1:2012 + A2: 2016
Certificate No. : LA-2007-0385-E Issue No. : 21 (Part 3 of 5) Date : 09 January 2021 Page : 26 of 36
The SAC Programme is managed by Enterprise Singapore
230 Victoria Street, #09-00 Bugis Junction Office Tower, Singapore 188024 Tel: +65 6278 6666 Fax: +65 6659 0640
www.sac-accreditation.gov.sg
PRODUCTS TESTED TESTS/PROPERTIES STANDARD METHODS
57. Power Supplies Full Test AUSTRALIA & NEW ZEALAND
AS/NZS 4665.1: 2005 + A1: 2009
AS/NZS 4665.2: 2006 + A1: 2009
58. LED modules for general lighting – Safety specifications
Full Test IEC 62031:2008 + A1:2012, 2012 + A2:2014, 2018
EN 62031: 2008 + A1:2012, 2012 + A2:2015
EN IEC 62031 : 2020
SASO IEC 62031: 2009
59. Electrical and Photometric Measurements of Solid-State Lighting Products
Full Test IES LM-79-08 ANSI/IES LM-79-19
60. Measuring Lumen Maintenance of LED Light Sources
Full test except ageing process
IES LM-80-08
61. Adaptors Full test K 61558-1 [IEC 61558-1: 2005]
K 61558-2-5 [IEC 61558-2-5: 1997]
K 61558-2-6 [IEC 61558-2-6: 1997]
62. Safety of power transformers, power supplies, reactors and similar products - Part 1: General
requirements and tests
Full test IEC 61558-1: 2005 + A1: 2009, 2017 AS/NZS 61558.1: 2008 + A1: 2009, 2018
Certificate No. : LA-2007-0385-E Issue No. : 21 (Part 3 of 5) Date : 09 January 2021 Page : 27 of 36
The SAC Programme is managed by Enterprise Singapore
230 Victoria Street, #09-00 Bugis Junction Office Tower, Singapore 188024 Tel: +65 6278 6666 Fax: +65 6659 0640
www.sac-accreditation.gov.sg
PRODUCTS TESTED TESTS/PROPERTIES STANDARD METHODS
63. Safety of transformers, reactors, power supply units and similar products for supply voltages up to 1100 V
- Part 2-4: Particular requirements and tests for isolating transformers and power supply units incorporating isolating transformers
Full test IEC 61558-2-4: 2009
EN 61558-2-4: 2009
64. Safety of transformers, reactors, power supply units and similar products for supply voltages up to 1100 V
- Part 2-6: Particular requirements and tests for safety isolating transformers and power supply units incorporating safety isolating transformers
Full test IEC 61558-2-6: 2009
Certificate No. : LA-2007-0385-E Issue No. : 21 (Part 3 of 5) Date : 09 January 2021 Page : 28 of 36
The SAC Programme is managed by Enterprise Singapore
230 Victoria Street, #09-00 Bugis Junction Office Tower, Singapore 188024 Tel: +65 6278 6666 Fax: +65 6659 0640
www.sac-accreditation.gov.sg
PRODUCTS TESTED TESTS/PROPERTIES STANDARD METHODS
65. Safety of transformers, reactors, power supply units and similar products for supply voltages up to 1100 V
- Part 2-13: Particular requirements and tests for auto transformers and power supply units incorporating auto transformers
Full test IEC 61558-2-13: 1999, 2009
EN 61558-2-13: 2000, 2009
66. Safety of power transformers, power supply units and similar
- Particular requirements for transformers and power supplies for Toys
Full test AS/NZS 61558.2.7: 2008 + A1:2012
67. Switch mode power Full test IEC 61558-2-16:2009 + A1:2013, 2013
supplies EN 61558-2-16: 2009 + A1:2013, 2013
AS/NZS 61558.2.16: 2010 + A1: 2010 + A2: 2012 + A3:2014
68. Household electrical appliances – Measurement of standby power
Full test IEC 62301:2005, 2011
EN 62301:2005, 2011
AS/NZS 62031:2014
Certificate No. : LA-2007-0385-E Issue No. : 21 (Part 3 of 5) Date : 09 January 2021 Page : 29 of 36
The SAC Programme is managed by Enterprise Singapore
230 Victoria Street, #09-00 Bugis Junction Office Tower, Singapore 188024 Tel: +65 6278 6666 Fax: +65 6659 0640
www.sac-accreditation.gov.sg
PRODUCTS TESTED TESTS/PROPERTIES STANDARD METHODS
69. Energy Star Program Criteria – Requirements for Solid State Lighting Luminaires Eligibility Version 1.1 Version 1.2 Version 1.3
Luminaire Efficacy (Light Output, Input Power), Colour Rendering Index (CRI), Chromaticity Correlated and Colour Temperature (CCT)
ANSI C78.377-2008
ANSI C82.2-2002
CIE 13.3-1995
CIE 15: 2004
IESNA LM-16
IESNA LM-58-94
IESNA LM-79-08 sections 9 and 12
Power Factor ANSI C82.77-2002
Zonal Lumen Density IESNA LM-79-08 section 10
Lumen Maintenance (L70) IESNA LM-80-08
Color Spatial Uniformity and Color Maintenance
CIE 15: 2004
IESNA LM-16
IESNA LM-58-94
IESNA LM-79-08 section 12
Maximum Measured Power Supply Case or Manufacturer Designated Temperature Measurement Point (TMPPS) Temperature
ANSI/UL 153 UL 1598
Temperature Measurement Point (TMPLED)
UL1598-2008
Electromagnetic and Radio Frequency Interference
FCC 47 CFR Part 15/18
Transient Protection IEEE C62.41-1991
Output Operating Frequency, Noise
Per ENERGY STAR Solid State Lighting Luminaires Version 1.1
Certificate No. : LA-2007-0385-E Issue No. : 21 (Part 3 of 5) Date : 09 January 2021 Page : 30 of 36
The SAC Programme is managed by Enterprise Singapore
230 Victoria Street, #09-00 Bugis Junction Office Tower, Singapore 188024 Tel: +65 6278 6666 Fax: +65 6659 0640
www.sac-accreditation.gov.sg
PRODUCTS TESTED TESTS/PROPERTIES STANDARD METHODS
70. Requirements for Integral LED Lamps Eligibility Criteria – Version 1.1 Version 1.2 Version 1.3 (Omnidirectional / Directional & Decorative) Version 1.4
Correlated Colour Temperature (CCT) and DUV, Colour Rendering Index (CRI), Colour Maintenance, Power Factor, Minimum Luminous Efficacy, Minimum Light Output, Colour Spatial Uniformity (for directional lamps), Minimum Light Output (for BR, ER, K and R lamps)
ANSI C78-377-2008
CIE 13.3-1995
IESNA LM-79-08 sections 9 and 12
Luminous Intensity Distribution, Minimum Centre Intensity (for PAR and MR16 lamps)
IESNA LM-79-08 section 10
Lumen Maintenance
Elevated Temperature Test per ENERGY STAR CFL Version 4.0
IESNA LM-79-08 section 9
IESNA LM-80-08
Rapid Cycle Stress Test IESNA LM-65-01
Power Factor ANSI C82.77-2002
LM-79-08
Electromagnetic and Radio Frequency Interference
FCC 47 CFR Part 15
Transient Protection C62.41-1991
In Situ Temperature Per ENERGY STAR Integral LED Lamps Measurement Test Version 1.2 (ISTMT) UL1993-2009 Minimum Operating
Temperature, LED Operating Frequency, Audible noise
Per ENERGY STAR Integral LED Lamps Version 1.2
Certificate No. : LA-2007-0385-E Issue No. : 21 (Part 3 of 5) Date : 09 January 2021 Page : 31 of 36
The SAC Programme is managed by Enterprise Singapore
230 Victoria Street, #09-00 Bugis Junction Office Tower, Singapore 188024 Tel: +65 6278 6666 Fax: +65 6659 0640
www.sac-accreditation.gov.sg
PRODUCTS TESTED TESTS/PROPERTIES STANDARD METHODS
71. Energy Star Program Requirements for CFLs Eligibility Criteria – Version 4.0, 4.1, 4.2 (Bare, covered and globe CFLs only)
a) Lamp Power (Watts) & Configuration
IESNA LM-9-1999
b) Correlated Colour Temperature
IESNA LM-66-00 (for single-ended CFLs)
c) Colour Rendering Index (CRI) CIE 13.3-1995
d) Power Factor IESNA LM-9-1999
IESNA LM-66-00 (for single-ended CFLs)
e) Rapid Cycle Stress Test ANSI C78.5-2003
IESNA LM-65-01 (for single-ended CFLs)
f) Lumen Maintenance ANSI C78.5-2003
IESNA LM-40-01
IESNA LM-65-01
IESNA LM-66-00
g) Lamp Life ANSI C78.5-2003
IESNA LM-40-01
IESNA LM-65-01
h) Run-up Time, Starting Time ANSI C78.5-2003
i) Electromagnetic Interference FCC 47 CFR Part 2 and Part 18
j) Transient Protection IEEE C62.41-1991
k) Operating Frequency Per ENERGY STAR CFLs Version 4
Certificate No. : LA-2007-0385-E Issue No. : 21 (Part 3 of 5) Date : 09 January 2021 Page : 32 of 36
The SAC Programme is managed by Enterprise Singapore
230 Victoria Street, #09-00 Bugis Junction Office Tower, Singapore 188024 Tel: +65 6278 6666 Fax: +65 6659 0640
www.sac-accreditation.gov.sg
PRODUCTS TESTED TESTS/PROPERTIES STANDARD METHODS
72. Energy Star
Program Requirements for Decorative Light Strings Eligibility Criteria – Version 1.4: March 2008
Inspection
Per ENERGY STAR Decorative Light Strings Version 1.4, and
a. Number of Lamps per String.
b. Replaceable Lamps. c. Rated for indoor or
indoor/outdoor applications.
d. Warranty ASTM G154-05
Electrical Requirements CIE 84-1989
e. Input Power f. Over-Voltage
CIE 127-1997
IESNA TM-16-05
Lifetime Requirements
g. Maintained Light Output
h. Failed Lamps
Weathering Requirements
i. Maintained Light Output
j. Failed Lamps
Product Packaging for Consumer Awareness Requirements
k. Product Suitability l. Product Description m. Correlated Colour
Temperature for White-light Strings
73. Energy Star
Program Requirements for Luminaires (Light Fixtures) (Solid State Lighting) Eligibility Criteria – Version 1.1
Efficacy, output, zonal lumen distribution, colour angular uniformity, luminaire photometry.
IESNA LM-79-08 section 10
Colour angular uniformity IESNA LM-58-94 IESNA LM-58-11
Certificate No. : LA-2007-0385-E Issue No. : 21 (Part 3 of 5) Date : 09 January 2021 Page : 33 of 36
The SAC Programme is managed by Enterprise Singapore
230 Victoria Street, #09-00 Bugis Junction Office Tower, Singapore 188024 Tel: +65 6278 6666 Fax: +65 6659 0640
www.sac-accreditation.gov.sg
PRODUCTS TESTED TESTS/PROPERTIES STANDARD METHODS
Power Factor ANSI C82.77-2002
Colour Rendering Index (CRI)
CIE 13.3-1995
Correlated Colour Temperature (CCT)
CIE 15-2004
Efficacy, output, Lumen Maintenance, CCT, CRI, Colour maintenance
IESNA LM-79-08
Light Source Life, Lumen Maintenance, Colour maintenance
IESNA LM-80-08
74. Photo-biological Safety of Lamps and Lamp Systems
Full test IEC 62471: 2006
IEC/TR 62471-2: 2009
IEC/TR 62778:2012, 2014
EN 62471: 2008
AS/NZS 62471:2011
AS/NZS 62471.2:2012
75. Self-ballasted LED-lamps for general lighting services
Full test IEC 62560:2011 + A1:2015
IEC 62612:2013 + A1: 2015 +A2 : 2018
IEC/PAS 62612:2009
EN 62560:2012 + A1:2015 + A11:2019
EN 62612:2013 + A1:2017 + A2 : 2018
AS/NZS IEC 62560:2014, 2017 + A1:2019
CNS 15436:2012
CNS 15630:2012
MS IEC 62560:2012
MS 62612:2012 (P)
PNS IEC 62560:2012
PNS IEC 62612:2014
SS 609 : Part 1 : 2015
SS 609 : Part 2 : 2015
Certificate No. : LA-2007-0385-E Issue No. : 21 (Part 3 of 5) Date : 09 January 2021 Page : 34 of 36
The SAC Programme is managed by Enterprise Singapore
230 Victoria Street, #09-00 Bugis Junction Office Tower, Singapore 188024 Tel: +65 6278 6666 Fax: +65 6659 0640
www.sac-accreditation.gov.sg
PRODUCTS TESTED TESTS/PROPERTIES STANDARD METHODS
76. LED modules for general lighting – Performance requirements
Full test IEC/PAS 62717: 2011
IEC 62717: 2014 + A1:2015 + A2 : 2019
SS IEC 62717:2015
EN 62717:2017/A2 : 2019
MS IEC 62717:2012
TR 27: 2011
77. Projecting long term lumen maintenance of LED light source
Full Test IES TM-21-11
78. Phosphorescent pigments and Products – Measurement and Marking at the Producer
Full Test ASTM E2072 - 04 ASTM E2072 - 14
ASTM E2073 – 10
DIN 67510-1: 2009
ISO 16069:2004 ISO 16069:2017
79. Luminaire performance – Particular requirements for LED Luminaires
Full Test
IEC 62722-2-1: 2014
IEC/PAS 62722-2-1: 2011
EN 62722-2-1:2016
MS 62722-2-1: 2012
SS IEC 62722-2-1:2015
TR 28-2-1: 2011
80. Maritime navigation and radio-communication equipment systems
a) IP Test b) Clauses 8.8 and 12.1
(low voltage equipment only)
IEC 60945: 2002
EN 60945: 2002
81. Central Power Supply Full Test EN 50171:2001
BS EN 50171: 2001
Certificate No. : LA-2007-0385-E Issue No. : 21 (Part 3 of 5) Date : 09 January 2021 Page : 35 of 36
The SAC Programme is managed by Enterprise Singapore
230 Victoria Street, #09-00 Bugis Junction Office Tower, Singapore 188024 Tel: +65 6278 6666 Fax: +65 6659 0640
www.sac-accreditation.gov.sg
PRODUCTS TESTED TESTS/PROPERTIES STANDARD METHODS
82. Safety Full Test EN 50272-2:2001
Requirement for
Secondary
Batteries and BS EN 50272-2: 2001
Battery
Installations.
Part 2: Stationary
Batteries
83. Signage Full Test ISO 3864-4:2011
SS 508 Part 4:2013
84. Double-capped LED Full Test IEC 62776: 2014
lamps designed to EN 62776: 2015
retrofit linear SS IEC 62776:2015
fluorescent lamps
85. Test Method for LED Full Test EN 13032-4: 2015
lamps, LED luminaires CIE S 025/E: 2015
and LED Modules
86. Safety tests for isolating Full Test IEC 61558-2-15: 2011
transformers for the EN 61558-2-15: 2012
supply of medical AS/NZS 61558.2.15: 2012
locations
87. Light Emitting Diode (LED) Full Test CAN/CSA-C22.2 No. 250.13
Equipment for use in Lighting UL 8750:2015
Applications
88. Rope Lights Full Test IEC 60598-2-21: 2014
EN 60598-2-21: 2015
AUSTRALIA & NEW ZEALAND
AS/NZS 60598.2.21: 2018
Certificate No. : LA-2007-0385-E Issue No. : 21 (Part 3 of 5) Date : 09 January 2021 Page : 36 of 36
The SAC Programme is managed by Enterprise Singapore
230 Victoria Street, #09-00 Bugis Junction Office Tower, Singapore 188024 Tel: +65 6278 6666 Fax: +65 6659 0640
www.sac-accreditation.gov.sg
PRODUCTS TESTED TESTS/PROPERTIES STANDARD METHODS
89. Automatic Test System for Battery
Powered Emergency Escape Lighting Full Test IEC 62034: 2012
EN 62034: 2012 BS EN 62034: 2012
B. Photovoltaic Balance of System
– PV Inverter
1. Safety of power converters for use in photovoltaic power systems – Part 1: General requirements.
Full test IEC 62109-1: 2010;
EN 62109-1: 2010;
BS EN 62109-1: 2010
2. Safety of power converters for use in photovoltaic power systems – Part 2: Particular requirements for inverters.
Full test IEC 62109-2: 2011;
EN 62109-2: 2011;
BS EN 62109-2: 2011
Approved Signatories
Tan Heng Khoon - All tests in Section A
Derrick Sim - All tests in Section A and all tests in Section B
Ong Ching Yen (Ms) - For A1, A2, A4, A9-13, A17, A19, A23, A30, A33-34, A36, A39-42, A55-56
and A58-59
Adrian Kwok - For A1, A4, A9-13, A17, A19, A30, A33-34, A36, A37, A39-42, A55, A58-59,
A62, A84 and A85
Yeo Eng Teong - For A61
Note:
This laboratory is accredited in accordance with the recognised International Standard ISO/IEC 17025. A laboratory's fulfilment of the requirements of ISO/IEC 17025 means the laboratory meets both the technical competence requirements and management system requirements that are necessary for it to consistently deliver technically valid test results. The management system requirements in ISO/IEC 17025 are written in language relevant to laboratory operations and operate generally in accordance with the principles of ISO 9001.