To,TheDirector,InfrastructureandMiscellaneousProjects&CRZIndiraParyavaranBhavanJorBaghRoad,NewDelhi‐110003
Sub: ApplicationforAmendmentandExpansioninECforResidentialProjectonsub
plot ‘D’,bearingC.S.No.7/1895ofByculladivisionoffKeshavraoKhadyeMarg,Mahalaxmi,Mumbai,Maharashtra.
Ref: ECreceivedvideletterNo.SEAC‐2015/CR‐229/TC‐1dt.31.12.2015DearSir,WehaveobtainedpriorEnvironmentalClearancevideletterNo.SEAC‐2015/CR‐229/TC‐1dt.31.12.2015, forourResidentialprojectonSub‐plot ‘D’,bearingC.S.No.7/1895ofBycullaDivision,offKeshavraoKhadyeMarg,Mahalaxmi,Mumbai,Maharashtra.
TheECwasobtainedforplotareaof14,301.11m2,FSIArea(includingFungible)of24,683.38m2andTotalConstructionareaof57,500m2.
Theconstructionworkisyettostartonsite.
Now,wewouldliketoamendtheEnvironmentalClearanceduetochangein
planning.
Duetothisamendment,totalconstructionareaisincreasedby6800m2.Therefore
totalconstructionareashallbe64,300m2fromearliergrantedECis57,500m2.
ComparativeStatementisasbelow:Sr.No. ProjectDetails EarlierEC ProposedAmendment
1 PlotArea 14,301.11m2 14,301.11m2
2 Permissible FSI includingfungible
Notmentioned 24,918.54m2
3 FSIAreaProposed(includingFungible)
24,683.38m2 24,650.92m2
4 NONFSIArea 32,816.62m2 39,649.08m2
5 TotalConstructionArea 57,500m2 64,300m2
6 Buildingconfiguration Part Basement forservices+ Gr (P1) +7Podium (P2 – P8) + 38Upper floors (including2Fire check /3 servicefloors)
Part Basement for services+Gr(P1)+7Podium(P2–P8)+Stilt (AmenityLevel–1)+AmenityLevel–2+40Upperfloors(33habitablefloors+3MEP Floors + 2 Fire CheckFloors + 2 StructuraloutriggerFloor)
7 Tenement 61Nos. 61Nos.
8 Waterrequirement 43KLD 43KLD
9 Sewagegeneration 40KLD 40KLD
10 STPCapacity 50KLD 50KLD
11 SolidWastegeneration 159kg/day 159kg/day
12 Parking 191Nos 191Nos.
It canbeseen fromthecomparativestatement that there isnochange inplotareaandthereismarginalincreaseinconstructionarea.
WeareenclosingherewithamendedplanoftheprojectandForm1&1A.“AsSEACII(MMR)&SEIAAMaharashtratenureisoverandthereisnocommitteeforappraisalofprojects”we request you sir to appraiseourproject andgrantus theEnvironmentalClearance.Thankingyou,Yoursfaithfully,ForTheModernIndiaLtd.
ProjectProponentEncl: 1.Form1&1A 2.EarlierEC