To: Mayor and City Council From: Brent Walker, Parks and Recreation Director Date: January 13, 2019 Subject: Award of Contract 19-09, Peachtree Charter Middle School Field House Construction ITEM DESCRIPTION Award of Contract 19-09 Peachtree Charter Middle School Field House Construction BACKGROUND The City solicited proposals from qualified vendors to provide construction services for a Field House at the Peachtree Charter Middle School football field. EVALUATION An invitation to bid was issued in November and the City received proposals on December 11, 2019. E & E Construction Company Inc. is the apparent low bidder at $111,801. Staff have contacted references and all have given a positive referral for similar work. Attached is a copy of the bid amounts received FUNDING The City funded $150,000 in the 2019 Capital Budget for the construction of this facility. RECOMMENDATION Staff respectfully requests that Council: (1) award Purchasing Contract 19-09, Peachtree Charter Middle School Field House Construction to E & E Construction Company Inc with a 10% contingency for a total of $122,981. Total funding for the project will be within the Capital Fund amount. (2) authorize staff to provide funding for the contracts; and (3) authorize the City Manager to execute the necessary documents following satisfactory review by legal counsel. #5.. Packet page: 7

Upload: others

Post on 15-Mar-2021

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: To: Mayor and City Council From: Brent Walker, Parks and ...jkheneghan.com/city/meetings/2020/Jan/01132020_PCMS...Ujamma Construction $216,131 Amacher Brothers Construction $218,000

To: Mayor and City Council

From: Brent Walker, Parks and Recreation Director

Date: January 13, 2019

Subject: Award of Contract 19-09, Peachtree Charter Middle School Field House Construction

ITEM DESCRIPTION

Award of Contract 19-09 Peachtree Charter Middle School Field House Construction

BACKGROUND

The City solicited proposals from qualified vendors to provide construction services for a Field House at the Peachtree Charter Middle School football field.

EVALUATION

An invitation to bid was issued in November and the City received proposals on December 11, 2019. E & E Construction Company Inc. is the apparent low bidder at $111,801. Staff have contacted references and all have given a positive referral for similar work. Attached is a copy of the bid amounts received

FUNDING

The City funded $150,000 in the 2019 Capital Budget for the construction of this facility.

RECOMMENDATION

Staff respectfully requests that Council: (1) award Purchasing Contract 19-09, Peachtree Charter Middle School Field House Construction to E & E Construction Company Inc with a 10% contingency for a total of $122,981. Total funding for the project will be within the Capital Fund amount. (2) authorize staff to provide funding for the contracts; and (3) authorize the City Manager to execute the necessary documents following satisfactory review by legal counsel.

#5..

Packet page: 7

Page 2: To: Mayor and City Council From: Brent Walker, Parks and ...jkheneghan.com/city/meetings/2020/Jan/01132020_PCMS...Ujamma Construction $216,131 Amacher Brothers Construction $218,000

ITB 19-09 Bids Received

E&E Construction Company Inc. $111,801

Diversified Construction $155,800

Peachtree Construction Services $157,200

Everlast Construction $170,345

Collins & Arnold Construction Co. $200,570

Rick B General Contractors $211,266

Ujamma Construction $216,131

Amacher Brothers Construction $218,000

#5..

Packet page: 8

Page 3: To: Mayor and City Council From: Brent Walker, Parks and ...jkheneghan.com/city/meetings/2020/Jan/01132020_PCMS...Ujamma Construction $216,131 Amacher Brothers Construction $218,000

STANDING-SEAM METAL ROOFING

STANDING-SEAM METAL ROOFING

EXTERIOR ELEVATIONS

WOOD FASCIA ANDEAVE, STAINED

GABLE VENT, PAINTEDTO MATCH SIDING 12 12

6 6 WOOD FASCIA ANDEAVE, STAINED

FLOOD LIGHT W/MOTION SENSOR

4X CORNER BOARDS, TYP.

BOARD & BATTEN SIDING

OVERHEAD COILINGDOOR STEEL DOOR, TYP.

4X CORNER BOARDS, TYP.

BOARD & BATTEN SIDING

DRINKING FOUNTAINMOUNTED PER ADA REQUIREMENTS

OVERHEAD COILINGSTEEL DOOR, TYP.

LIGHTWEIGHT STONEVENEER (CULTURED STONE OR SIM. )

LIGHTWEIGHT STONEVENEER (CULTURED STONE OR SIM. TO MATCH EXISTING)

NON-FREEZEWALL HYDRANT

6A1.1

LEFT ELEVATION1/4" = 1'-0"

ELKAY SWIRLFLO ADA DRINKING FOUNTAININSTALLED PER MANUFACTURER'S SPECIFICATIONS

FREEZE PROOF WALL HYDRANT

5A1.1

REAR ELEVATION1/4" = 1'-0"

WOOD FASCIA ANDEAVE, STAINED

GABLE VENT, PAINTEDTO MATCH SIDING

12 126 6

FLOOD LIGHT W/MOTION SENSOR

FLOOD LIGHT W/MOTION SENSOR

4X CORNER BOARDS, TYP. WOOD FASCIA AND

EAVE, STAINED

BOARD & BATTENSIDING

4X CORNERBOARDS, TYP.

OVERHEAD COILINGSTEEL DOOR

BOARD & BATTENSIDING BOARD & BATTEN

SIDING

LIGHTWEIGHT STONEVENEER (CULTURED STONE OR SIM.)

LIGHTWEIGHT STONEVENEER (CULTURED STONE OR SIM. TO MATCH EXISTING)

ELKAY SWIRLFLO ADADRINKING FOUNTAIN INSTALLED PER MANUFACTURER'S SPECIFICATIONS

4A1.1

RIGHT ELEVATION1/4" = 1'-0"

2A1.1

FRONT ELEVATION1/4" = 1'-0"

10'-0

" TO

TO

P O

F W

P

14'-0

" TO

P O

F LO

UV

ER

OP

EN

ING

10'-0

" TO

TO

P O

F W

P

14'-0

" TO

P O

F LO

UV

ER

OP

EN

ING

27"

10'-0

" TO

TO

P O

F W

PA

DA

36

"

10'-0

" TO

TO

P O

F W

P

#5..

Packet page: 9

Page 4: To: Mayor and City Council From: Brent Walker, Parks and ...jkheneghan.com/city/meetings/2020/Jan/01132020_PCMS...Ujamma Construction $216,131 Amacher Brothers Construction $218,000

#5..

Packet page:...