BHOPAL
A C MACHINES ENGINEERING DIVISION74A06 RevNo.00
PRE-QUALIFTCATTON REQUTREMENTS (pQR) FORPROCUREMENT OF GLASS POLYSTER MIX YARN
INSULATION SINTERED COPPER CONDUCTOR TOSPECIFICATION AM-740O6 T1{ROUGH OPEN
Date: 2710412013
Sht. I of2 shts.
2.
Background
BHEL is manufacturing various types of rotating electrical machines (motors & generators)for power plants/industries, In these machines, various types of insulated copper conductorsare used. These motors and generators have a very long expected working life.
This specification details the Pre-Qualification Requirements for procurement of Glass PolysterMix Yarn Insulation Sintered Copper Conductor to specification AM-74006 through open tender.This material is used as main conductor in stator/Rotor coils of electrical machines withinsulation class-F. Vendors have to confirm complete compliance to BHEL purchase spec.AM-74006 in their technical offer. In addition to this, the non-PMD (new) vendors have toconfirm compliance to the Pre-Qualification Requirements (PQRs) given in the presentspecification (PQR-74006).
NOTE: Onty Original manufacturers or their authorized distributors may submittheir offers along with letter of authorization from the principal. Traders/ agentsare not acceptable and their offers will be rejected.
General information to be furnished by the firm (for information only):
sL.NO. DESCRIPTION1 Year of Establishment2 Is the company ISO 9001 certified?
3. Qualifyiag information to be furnished by the firm (Xnformation/ acceptance to begiven in this order only) :
1 List of manufacturing facilitiesThe firm must have adequate manufacturing facilities at their works/in-house formanufacturinq this material, exactly as Der the technical soecification AM-74006
2 List of testing facilitiesTesting facilities required to conduct all the tests as per spec. AM-74006 must beavailable wlth the firm, preferably in-house. List of outsourced facilities may besubmitted, Outsourced labs/ firms should be NABL accredited.
3 The firm should have at least 3 years manufacturing and supply experience ofsame/similar material to some reputed motor/generator manufacturers, The proofof the same (PO Copies) with supply experience to be attached. If required, pricescan be masked in PO copies. Performance certificate (VPR etc.) of the vendor fromthese manufacturers may be attached.
CIMMDXQCx (crM)HGEISE
Nisheeth Khare
R K Sinha
Arun Singh
ALL DIMENSIONS ARE IN MM LINLESS OTHERWISE STATED
WBIIOPAL
A C MACHINES ENGINEERING DIWSION
tSggg.lL!FIcpRocUREMENT oF cmsb poLysrER rirx yenruINSULATION SINTERED COPPER COr,rdiCrON rOspEcrFrcATroN AM-74oos rinoiici oprx
Date: 27/0412013
Sht. 2 of2 shts.
4. TECHNICAL EVALUATION OF BID AND ORDERING (FOR NON-PMD VENDORS ONLY)Vendors qualiffing in the above requirements, will have to complete the following procedurebefore final technical crearance/rejection of their offers
rr|'r!LE LrrE rvrruvvrrrg pl
1' such vendors will have to submit sample insulated conductor for testing as per BHELspec AM,74006 by BHEL,s TSD department. v vr r'l
2' Assessment/registration of vendor as per BHEL's Supplier Evaluation and Reviewprocedure.
(see the link http;//www.bhelbhopal.com/bhel-bhopal_vendor_registration.htm)
The above mentioned activities in ct. 4 are not required for the vendors whoare arready registered in BHEL's pMD for this materiar (AM-74ooui. --
NEw vENDoR wrLt BE crvEN oNLy X o/o oF THE TorAL euANTrw oF THrsENQUIRY.
The firm should u.."Rf(clause by clause confirmation/commqnts required. vague comments like noted &understood are not acceptabre. compriance has to be crearry stated, otherwiseBHEL reserves the right to seek clarification / reject the ofFer. List of deviations, ifany' shall be submitted. Even if tenderer has no particular deviation in their offer,a "NIL" statement shall be submitted.
ff#ifl*xil':,;xjll
ALL DTMENSIONS ARE INMM TINLESS OTHERWISE STATED