BHOPAL A C MACHINES ENGINEERING DIVISION 74A06 RevNo.00 PRE-QUALIFTCATTON REQUTREMENTS (pQR) FOR PROCUREMENT OF GLASS POLYSTER MIX YARN INSULATION SINTERED COPPER CONDUCTOR TO SPECIFICATION AM-740O6 T1{ROUGH OPEN Date: 2710412013 Sht. I of2 shts. 2. Background BHEL is manufacturing various types of rotating electrical machines (motors & generators) for power plants/industries, In these machines, various types of insulated copper conductors are used. These motors and generators have a very long expected working life. This specification details the Pre-Qualification Requirements for procurement of Glass Polyster Mix Yarn Insulation Sintered Copper Conductor to specification AM-74006 through open tender. This material is used as main conductor in stator/Rotor coils of electrical machines with insulation class-F. Vendors have to confirm complete compliance to BHEL purchase spec. AM-74006 in their technical offer. In addition to this, the non-PMD (new) vendors have to confirm compliance to the Pre-Qualification Requirements (PQRs) given in the present specification (PQR-74006). NOTE: Onty Original manufacturers or their authorized distributors may submit their offers along with letter of authorization from the principal. Traders/ agents are not acceptable and their offers will be rejected. General information to be furnished by the firm (for information only): sL.NO. DESCRIPTION 1 Year of Establishment 2 Is the company ISO 9001 certified? 3. Qualifyiag information to be furnished by the firm (Xnformation/ acceptance to be given in this order only) : 1 List of manufacturing facilities The firm must have adequate manufacturing facilities at their works/in-house for manufacturinq this material, exactly as Der the technical soecification AM-74006 2 List of testing facilities Testing facilities required to conduct all the tests as per spec. AM-74006 must be available wlth the firm, preferably in-house. List of outsourced facilities may be submitted, Outsourced labs/ firms should be NABL accredited. 3 The firm should have at least 3 years manufacturing and supply experience of same/similar material to some reputed motor/generator manufacturers, The proof of the same (PO Copies) with supply experience to be attached. If required, prices can be masked in PO copies. Performance certificate (VPR etc.) of the vendor from these manufacturers may be attached. CIM MDX QCx (crM) HGE ISE Nisheeth Khare R K Sinha Arun Singh ALL DIMENSIONS ARE IN MM LINLESS OTHERWISE STATED

Upload: buingoc

Post on 08-Mar-2018

231 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: to - · PDF fileThis material is used as main conductor in stator/Rotor coils of electrical machines with insulation class-F. Vendors have to confirm complete compliance to BHEL

BHOPAL

A C MACHINES ENGINEERING DIVISION74A06 RevNo.00

PRE-QUALIFTCATTON REQUTREMENTS (pQR) FORPROCUREMENT OF GLASS POLYSTER MIX YARN

INSULATION SINTERED COPPER CONDUCTOR TOSPECIFICATION AM-740O6 T1{ROUGH OPEN

Date: 2710412013

Sht. I of2 shts.

2.

Background

BHEL is manufacturing various types of rotating electrical machines (motors & generators)for power plants/industries, In these machines, various types of insulated copper conductorsare used. These motors and generators have a very long expected working life.

This specification details the Pre-Qualification Requirements for procurement of Glass PolysterMix Yarn Insulation Sintered Copper Conductor to specification AM-74006 through open tender.This material is used as main conductor in stator/Rotor coils of electrical machines withinsulation class-F. Vendors have to confirm complete compliance to BHEL purchase spec.AM-74006 in their technical offer. In addition to this, the non-PMD (new) vendors have toconfirm compliance to the Pre-Qualification Requirements (PQRs) given in the presentspecification (PQR-74006).

NOTE: Onty Original manufacturers or their authorized distributors may submittheir offers along with letter of authorization from the principal. Traders/ agentsare not acceptable and their offers will be rejected.

General information to be furnished by the firm (for information only):

sL.NO. DESCRIPTION1 Year of Establishment2 Is the company ISO 9001 certified?

3. Qualifyiag information to be furnished by the firm (Xnformation/ acceptance to begiven in this order only) :

1 List of manufacturing facilitiesThe firm must have adequate manufacturing facilities at their works/in-house formanufacturinq this material, exactly as Der the technical soecification AM-74006

2 List of testing facilitiesTesting facilities required to conduct all the tests as per spec. AM-74006 must beavailable wlth the firm, preferably in-house. List of outsourced facilities may besubmitted, Outsourced labs/ firms should be NABL accredited.

3 The firm should have at least 3 years manufacturing and supply experience ofsame/similar material to some reputed motor/generator manufacturers, The proofof the same (PO Copies) with supply experience to be attached. If required, pricescan be masked in PO copies. Performance certificate (VPR etc.) of the vendor fromthese manufacturers may be attached.

CIMMDXQCx (crM)HGEISE

Nisheeth Khare

R K Sinha

Arun Singh

ALL DIMENSIONS ARE IN MM LINLESS OTHERWISE STATED

Page 2: to - · PDF fileThis material is used as main conductor in stator/Rotor coils of electrical machines with insulation class-F. Vendors have to confirm complete compliance to BHEL

WBIIOPAL

A C MACHINES ENGINEERING DIWSION

tSggg.lL!FIcpRocUREMENT oF cmsb poLysrER rirx yenruINSULATION SINTERED COPPER COr,rdiCrON rOspEcrFrcATroN AM-74oos rinoiici oprx

Date: 27/0412013

Sht. 2 of2 shts.

4. TECHNICAL EVALUATION OF BID AND ORDERING (FOR NON-PMD VENDORS ONLY)Vendors qualiffing in the above requirements, will have to complete the following procedurebefore final technical crearance/rejection of their offers

rr|'r!LE LrrE rvrruvvrrrg pl

1' such vendors will have to submit sample insulated conductor for testing as per BHELspec AM,74006 by BHEL,s TSD department. v vr r'l

2' Assessment/registration of vendor as per BHEL's Supplier Evaluation and Reviewprocedure.

(see the link http;//www.bhelbhopal.com/bhel-bhopal_vendor_registration.htm)

The above mentioned activities in ct. 4 are not required for the vendors whoare arready registered in BHEL's pMD for this materiar (AM-74ooui. --

NEw vENDoR wrLt BE crvEN oNLy X o/o oF THE TorAL euANTrw oF THrsENQUIRY.

The firm should u.."Rf(clause by clause confirmation/commqnts required. vague comments like noted &understood are not acceptabre. compriance has to be crearry stated, otherwiseBHEL reserves the right to seek clarification / reject the ofFer. List of deviations, ifany' shall be submitted. Even if tenderer has no particular deviation in their offer,a "NIL" statement shall be submitted.

ff#ifl*xil':,;xjll

ALL DTMENSIONS ARE INMM TINLESS OTHERWISE STATED