TO: Board of Directors; South Buda WCID No. 1 FROM: David W. Gray, P.E.; Gray Engineering, Inc. DATE: June 17, 2020 Re: Epley Tract Pass-Thru Wastewater Service Request GEI No. 1501-11417-98 An Application (Application) requesting pass-thru wastewater service for the Epley Tract (Project) has been received by Gray Engineering, Inc. (GEI). The Application requests pass-thru wastewater service pursuant to South Buda WCID No. 1’s (District) agreement with the City of Buda for allowing wastewater service to tracts located outside the District’s boundaries to be passed through the District’s wastewater system and ultimately to the City of Buda for wastewater treatment and disposal. Wastewater customers within those pass-thru service areas become retail wastewater customers with the City of Buda. The Application is complete and all fees have been paid in accordance with the District’s pass-thru wastewater service policy. The Project encompasses a total of approximately 20.538 acres and is generally located adjacent to and north of the District’s boundary. The Application calls for the ultimate construction of approximately 174 townhouse units with a projected peak wastewater demand of 125 gallons per minute (gpm) service, which translates into approximately 174 LUEs. The Project is essentially a continuation of the Harvest Meadows Townhouse development currently underway by Gehan Homes in the District. A copy of Project’s supporting information is attached for reference. The project proposes to tie an internal wastewater line into the newly constructed Harvest Meadows 8” wastewater line that ties into the District’s internal wastewater collection system. From there the wastewater flows go to the existing Meadows at Buda lift station and force main to be pumped to the City of Buda’s wastewater treatment facility. Pass-thru wastewater service to the Epley Tract was anticipated and planned for in the design and construction of the District’s new Meadows at Buda Phase II Lift Station and Force Main Improvements. Capacity to serve the Epley Tract is included in those improvements. O 512.452.0371 : F 512.454.9933 8834 North Capital of Texas Highway, Suite 140 Austin, Texas 78759 : www.grayengineeringinc.com TBPE 2946

Upload: others

Post on 25-Aug-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: TO: Board of Directors; South Buda WCID No. 1 FROM: David ......to be pumped to the City of Buda’s wastewater treatment facility. Pass-thru wastewater service to the Epley Tract

TO: Board of Directors; South Buda WCID No. 1 FROM: David W. Gray, P.E.; Gray Engineering, Inc. DATE: June 17, 2020 Re: Epley Tract Pass-Thru Wastewater Service Request GEI No. 1501-11417-98 An Application (Application) requesting pass-thru wastewater service for the Epley Tract (Project) has been received by Gray Engineering, Inc. (GEI). The Application requests pass-thru wastewater service pursuant to South Buda WCID No. 1’s (District) agreement with the City of Buda for allowing wastewater service to tracts located outside the District’s boundaries to be passed through the District’s wastewater system and ultimately to the City of Buda for wastewater treatment and disposal. Wastewater customers within those pass-thru service areas become retail wastewater customers with the City of Buda. The Application is complete and all fees have been paid in accordance with the District’s pass-thru wastewater service policy. The Project encompasses a total of approximately 20.538 acres and is generally located adjacent to and north of the District’s boundary. The Application calls for the ultimate construction of approximately 174 townhouse units with a projected peak wastewater demand of 125 gallons per minute (gpm) service, which translates into approximately 174 LUEs. The Project is essentially a continuation of the Harvest Meadows Townhouse development currently underway by Gehan Homes in the District. A copy of Project’s supporting information is attached for reference. The project proposes to tie an internal wastewater line into the newly constructed Harvest Meadows 8” wastewater line that ties into the District’s internal wastewater collection system. From there the wastewater flows go to the existing Meadows at Buda lift station and force main to be pumped to the City of Buda’s wastewater treatment facility. Pass-thru wastewater service to the Epley Tract was anticipated and planned for in the design and construction of the District’s new Meadows at Buda Phase II Lift Station and Force Main Improvements. Capacity to serve the Epley Tract is included in those improvements.

O 512.452.0371 : F 512.454.99338834 North Capital of Texas Highway, Suite 140Austin, Texas 78759 : www.grayengineeringinc.com

TBPE 2946

Page 2: TO: Board of Directors; South Buda WCID No. 1 FROM: David ......to be pumped to the City of Buda’s wastewater treatment facility. Pass-thru wastewater service to the Epley Tract

Board of Directors – South Buda WCID No. 1 June 17, 2020 Page 2 of 2 Since the requested Meadows at Buda Phase II Lift Station does have sufficient capacity to serve pass thru wastewater connections, GEI is recommending approval of the subject application and connection of the facilities as outlined in the pass thru application.

Attachments

cc: Mr. Bill Flickinger; Willatt & Flickinger (w/attachment)

Mr. Matthew McPhail; Willatt & Flickinger (w/attachment) Mr. Hal Lanham; AWR Services, Inc. (w/attachment) Mr. John Nett, P.E.; City of Buda (w/attachment) Mr. Chris Lynch; Gehan Homes (w/attachment)

ENGINEERINGGRAY

Page 3: TO: Board of Directors; South Buda WCID No. 1 FROM: David ......to be pumped to the City of Buda’s wastewater treatment facility. Pass-thru wastewater service to the Epley Tract
Page 4: TO: Board of Directors; South Buda WCID No. 1 FROM: David ......to be pumped to the City of Buda’s wastewater treatment facility. Pass-thru wastewater service to the Epley Tract
Page 5: TO: Board of Directors; South Buda WCID No. 1 FROM: David ......to be pumped to the City of Buda’s wastewater treatment facility. Pass-thru wastewater service to the Epley Tract
Page 6: TO: Board of Directors; South Buda WCID No. 1 FROM: David ......to be pumped to the City of Buda’s wastewater treatment facility. Pass-thru wastewater service to the Epley Tract
Page 7: TO: Board of Directors; South Buda WCID No. 1 FROM: David ......to be pumped to the City of Buda’s wastewater treatment facility. Pass-thru wastewater service to the Epley Tract
Page 8: TO: Board of Directors; South Buda WCID No. 1 FROM: David ......to be pumped to the City of Buda’s wastewater treatment facility. Pass-thru wastewater service to the Epley Tract
Page 9: TO: Board of Directors; South Buda WCID No. 1 FROM: David ......to be pumped to the City of Buda’s wastewater treatment facility. Pass-thru wastewater service to the Epley Tract
Page 10: TO: Board of Directors; South Buda WCID No. 1 FROM: David ......to be pumped to the City of Buda’s wastewater treatment facility. Pass-thru wastewater service to the Epley Tract
Page 11: TO: Board of Directors; South Buda WCID No. 1 FROM: David ......to be pumped to the City of Buda’s wastewater treatment facility. Pass-thru wastewater service to the Epley Tract
Page 12: TO: Board of Directors; South Buda WCID No. 1 FROM: David ......to be pumped to the City of Buda’s wastewater treatment facility. Pass-thru wastewater service to the Epley Tract
Page 13: TO: Board of Directors; South Buda WCID No. 1 FROM: David ......to be pumped to the City of Buda’s wastewater treatment facility. Pass-thru wastewater service to the Epley Tract
Page 14: TO: Board of Directors; South Buda WCID No. 1 FROM: David ......to be pumped to the City of Buda’s wastewater treatment facility. Pass-thru wastewater service to the Epley Tract
Page 15: TO: Board of Directors; South Buda WCID No. 1 FROM: David ......to be pumped to the City of Buda’s wastewater treatment facility. Pass-thru wastewater service to the Epley Tract
Page 16: TO: Board of Directors; South Buda WCID No. 1 FROM: David ......to be pumped to the City of Buda’s wastewater treatment facility. Pass-thru wastewater service to the Epley Tract