to auckland sh1 northern motorway albany … · 2016-12-14 · 03.10.16 a 29.07.16 preliminary...
TRANSCRIPT
STOP STOP
RWRW RW
RW
RW
RWRW
CLIENT
DATE
TITLE
REVISION DETAILSDATEREV APPROVED
CHECKED
APPROVED
PROJECT
DRAWN
DESIGNED
PROJECT No. WP REVSTAGE TYPE NUMBER
DRAWING No.
SCALE SIZE
A1
.
Filen
ame:
Plot
Date:
Offic
e:C:
\USE
RS\V
ICCI
.SMI
TH\D
OCUM
ENTS
\2503
10-3
PRE-
3DES
-DRG
-020
0-02
10.D
WG
2/12/2
016 1
:28:49
p.m.
NZAK
L
NORTHERN CORRIDOR IMPROVEMENTS
GENERAL ARRANGEMENTSOVERALL KEY PLAN
250310 3PRE 3DES DRG 0200 E
NOT TO SCALEPRELIMINARY
NOT FOR CONSTRUCTION
V. SMITH
M. FAN
M. FRANCIS J.HIND
J. HIND03.10.16
A 29.07.16 PRELIMINARY ISSUE G. MOOREB 09.09.16 REVISED ISSUE G. MOOREC 19.09.16 REVISED ISSUE G. MOORED 23.09.16 DESIGN FREEZE G. MOOREE 30.11.16 CONSENT ISSUE G. MOORE
SHEET 1
SHEET 2
SHEET 3SHEET 4
SHEET 5SHEET 6
SHEET 7
SHEET 8
SHEET 9
SHEET 10
TO WHANGAREI
TO AUCKLAND
ALBANY BUSSTATION
McCLYMONTS ROAD BRIDGEREPLACEMENT OVER SH1
BUSWAY BRIDGE OVER SH1& ALBANY PARK & RIDE
SPENCER ROADFOOTBRIDGE
BUSWAY BRIDGE OVERGREVILLE ROAD
GREVILLE ROAD BRIDGEWIDENING
ROSEDALE ROADBRIDGE WIDENING
BUSWAY BRIDGE OVERROSEDALE ROAD
BUSWAY BRIDGE OVERCONSTELLATION DRIVE
CONSTELLATIONBUS STATION
SH18 BRIDGE OVERPAUL MATTHEWSROAD OFF-RAMP
PAUL MATTHEWS ROADBRIDGE OVER SH18
CONSTELLATION DRIVEBRIDGE WIDENING
ALBANY HIGHWAY
ALBANY EXPRESSWAY
SH1 NORTHERN MOTORWAY
SH18 UPPER
HARBOUR HIGHWAY
TO WAITAKERE
CONTAINS 2016 AERIAL IMAGERY SOURCED FROM NZ TRANSPORTAGENCY UNDER CREATIVE COMMONS 3.0 NEW ZEALAND (BY)
PROPOSEDWATERCARE POND LINK
NEW SH 1 TO SH 18 RAMPBRIDGE OVER SH 1
CONTAINS 2016 AERIAL IMAGERY SOURCED FROM NZ TRANSPORTAGENCY UNDER CREATIVE COMMONS 3.0 NEW ZEALAND (BY)
RW RWRW
RWRW
RWRW
RWRW
RWRW
RWRW
RWRW
RWRW
RWRW
RWRW
RWRW
RWRW
RWRW
RWRW
RW
RW
RWRW RW RW RW RW RW RW
RW
RW
RWRW
RW
RW
RW
RWRW
RW
RW
RWRW
RWRW
RW RW 1-3STEEL UC WALL WITH CONCRETE PANELS (CUT)
MAX H = 1.5m
RW 1-5MSE BLOCK WALL (FILL)
MAX H = 5.5m
RW 1-4MSE BLOCK WALL (FILL)
MAX H = 6.4m
RW 1-1L SHAPED GRAVITY WALL (FILL)MAX H = 3.0m
00
50
100
150 200 250
300
350
400
450
500
550
11600
11650
11700
11750
11800
11850
11900
11950
12000
12050
12100
12150 12200 12250 12300 12350
PROJ
ECT
EXTE
NTS
PROJ
ECT
EXTE
NTS
PROJ
ECT
EXTE
NTS
SH1 NORTHERN MOTORWAY
OTEH
A VA
LLEY
ROA
D
CORNERSTONE DRIVE ELLIO
T ROS
E AVE
NUELUCAS CREEK
MATCHLINE JOINS SHEET 2
KEY PLAN
13 4 65
8
9
10
2 71
CLIENT
DATE
TITLE
REVISION DETAILSDATEREV APPROVED
CHECKED
APPROVED
PROJECT
DRAWN
DESIGNED
PROJECT No. WP REVSTAGE TYPE NUMBER
DRAWING No.
SCALE SIZE
A1
.
Filen
ame:
Plot
Date:
Offic
e:C:
\PW
_WOR
K\D0
3150
96\25
0310
-3PR
E-3D
ES-D
RG-0
200-
0210
.DW
G25
/11/20
16 9:
39:17
a.m.
NZAK
L
0
SCALE 1:1000
10 40m20
NORTHERN CORRIDOR IMPROVEMENTS
GENERAL ARRANGEMENTSSHEET 1
250310 3PRE 3DES DRG 0201 H
1:1000PRELIMINARY
NOT FOR CONSTRUCTION
V. SMITH
M. FAN
M. FRANCIS J.HIND
J. HIND03.10.16
A 17.06.16 PRELIMINARY ISSUE G. MOOREB 01.07.16 REVISED ISSUE G. MOOREC 15.07.16 REVISED ISSUE G. MOORED 29.07.16 REVISED ISSUE G. MOOREE 09.09.16 REVISED ISSUE G. MOOREF 19.09.16 REVISED ISSUE G. MOOREG 03.10.16 DESIGN FREEZE G. MOOREH 30.11.16 CONSENT ISSUE G. MOORE
LEGENDEXISTING DESIGNATION BOUNDARY
ALTERATION TO EXISTINGDESIGNATION BOUNDARY
PROPOSED SHARED USE PATH
PROPOSED BUSWAY
PROPOSED TRANSIT LANE
PROPOSED FOOTPATH
CONSTRUCTION SUPPORT AREAS
PROPOSED ON-ROAD CYCLE LANE
BRIDGE EXTENTS
PROPOSED RETAINING WALL
FILL SLOPE
CUT SLOPE
EXISTING CULVERT TO BE RETAINED
EXISTING CULVERT TO BE ABANDONED
PROPOSED CULVERT
RW
SHARED USE PATH RAMPCONNECTION TO OTEHAVALLEY ROAD
EXISTING OTEHA VALLEY ROADNORTHBOUND OFF-RAMPREALIGNED AND WIDENED TOTWO-LANE EXIT
NEW BUSWAY BRIDGE OVERSH1 TO ALBANY PARK N RIDE
RW 1-2
MSE BLOCK WALL (FILL)
MAX H = 10.0m
RW 1-6MSE BLOCK WALL (FILL)MAX H = 9.7m
POTENTIAL CENTRELINEOF FUTURE EXTENSIONOF BUSWAY
EXISTING ALBANY BUS STATIONBUS ENTRY RECONFIGUREDSUBJECT TO FURTHER DESIGN
RW 1-10L SHAPED GRAVITY WALL (FILL)MAX H = 1.5m
CONTAINS 2016 AERIAL IMAGERY SOURCED FROM NZ TRANSPORTAGENCY UNDER CREATIVE COMMONS 3.0 NEW ZEALAND (BY)
CONTAINS 2016 AERIAL IMAGERY SOURCED FROM NZ TRANSPORTAGENCY UNDER CREATIVE COMMONS 3.0 NEW ZEALAND (BY)
RW
RW
RWRW
RWRW
RWRW
RWRW
RW
RWRW
RWRW
RWRW
RW
RW
RWRW
RWRW
RWRW
RWRW
RWRW
RWRW
RW
RWRW
RWRW
RWRW
RWRW
RW
RW
RW
RW
RW
RWRW
RWRW
RW
RWRW
RWRW
RWRW
RWRW
RWRW
RW
RWRW
RWRWRW
RWRW
RWRW
RWRW
RWRW
RWRW
RWRW
RWRW
RWRW
SHARED USE PATH RAMP CONNECTIONTO McCLYMONTS ROAD
RW 2-1MSE BLOCK WALL (FILL)MAX H = 7.0m
RW 2-2BORED PILE WALL (CUT)MAX H = 4.2m
EXISTING BUS RAMP REMOVED
RW 2-3ANCHORED BORED PILE WALL (CUT)
MAX H = 8.31m
RW 2-5
ANCHORED BORED PILE WALL (CUT)
MAX H = 8.6m
550
600
650
700
750
800
850
900
950
1000
1050
1100
1150
1200
1250
1300
1350
12350 12400 12450 12500
12550
12600
12650
12700
12750
12800
12850
12900
12950
13000
13050
13100
13150
PROJ
ECT
EXTE
NTS
RW 2-4MSE BLOCK WALL (FILL)
MAX H = 3.2m
ELLIO
T ROS
E AVE
NUE
SH1 NORTHERN MOTORWAY
DON MCKINNON DRIVE
ELLIOT ROSE AVENUE
DON MCKINNON DRIVE
MCCLYMONTS ROAD
MEDALLION DRIVE
SPENCER ROAD
CIVIC CRES
McCLYMONTS ROAD
COXTON LANE
RW 2-
10MS
E BL
OCK
WAL
L (FIL
L)MA
X H
= 5.1m
RW 2-7MSE BLOCK WALL (FILL)
MAX H = 3.0m
RW 2-9STEEL UC WALLWITH CONCRETEPANELS (CUT)MAX H = 3.0m
KEY PLAN
13 4 65
8
9
10
2 7MA
TCHL
INE
JOIN
S SH
EET
12
MATCHLINE JOINS SHEET 3
CLIENT
DATE
TITLE
REVISION DETAILSDATEREV APPROVED
CHECKED
APPROVED
PROJECT
DRAWN
DESIGNED
PROJECT No. WP REVSTAGE TYPE NUMBER
DRAWING No.
SCALE SIZE
A1
.
Filen
ame:
Plot
Date:
Offic
e:C:
\PW
_WOR
K\D0
3150
96\25
0310
-3PR
E-3D
ES-D
RG-0
200-
0210
.DW
G25
/11/20
16 9:
39:28
a.m.
NZAK
L
0
SCALE 1:1000
10 40m20
NORTHERN CORRIDOR IMPROVEMENTS
GENERAL ARRANGEMENTSSHEET 2
250310 3PRE 3DES DRG 0202 H
1:1000PRELIMINARY
NOT FOR CONSTRUCTION
V. SMITH
M. FAN
M. FRANCIS J.HIND
J. HIND03.10.16
A 17.06.16 PRELIMINARY ISSUE G. MOOREB 01.07.16 REVISED ISSUE G. MOOREC 15.07.16 REVISED ISSUE G. MOORED 29.07.16 REVISED ISSUE G. MOOREE 09.09.16 REVISED ISSUE G. MOOREF 19.09.16 REVISED ISSUE G. MOOREG 03.10.16 DESIGN FREEZE G. MOOREH 30.11.16 CONSENT ISSUE G. MOORE
LEGENDEXISTING DESIGNATION BOUNDARY
ALTERATION TO EXISTINGDESIGNATION BOUNDARY
PROPOSED SHARED USE PATH
PROPOSED BUSWAY
PROPOSED TRANSIT LANE
PROPOSED FOOTPATH
CONSTRUCTION SUPPORT AREAS
PROPOSED ON-ROAD CYCLE LANE
BRIDGE EXTENTS
PROPOSED RETAINING WALL
FILL SLOPE
CUT SLOPE
EXISTING CULVERT TO BE RETAINED
EXISTING CULVERT TO BE ABANDONED
PROPOSED CULVERT
RW
B0302
NEW SPENCER ROAD FOOTBRIDGE OVERSH1, BUSWAY AND SHARED USE PATH.OUTSIDE PROJECT SCOPE, SHOWN FORINFORMATION ONLY
SHARED USE PATH STAIRSCONNECTION TO SPENCER ROAD
RW 2-6BORED PILE WALL (CUT)
MAX H = 5.6m
RW 2-8
STEEL UC WALL WITH CONCRETE PANELS (CUT)
MAX H = 2.7m
NEW MAINTENANCE BAY
RW 1-6MSE BLOCK WALL (FILL)MAX H = 9.7m
REMOVAL OF EXISTINGBUS OFF-RAMP
EXISTING McCLYMONTS ROADBRIDGE TO BE REMOVED
NEW PROPOSED BRIDGETO REPLACE EXISTING
SHARED USE PATH RAMP CONNECTIONTO MEDALLION DRIVE
NEW PROPOSED PEDESTRIAN CROSSINGON McCLYMONTS ROAD TO PROPOSEDSHARED USE PATH RAMP CONNECTION(DETAIL TBC)
A0301
CSA4 - McCLYMONTS ROAD
CONTAINS 2016 AERIAL IMAGERY SOURCED FROM NZ TRANSPORTAGENCY UNDER CREATIVE COMMONS 3.0 NEW ZEALAND (BY)
RW
RWRW
RWRW
RWRW
RWRW
RW
RW RW RW RW
RW
RWRW
RWRW
RWRW
RWRW
RW RW RW RW RW RW RW RWRW RW RW
RW RW RW RW
RW
1400
1450
1500 1550 1600
1650
1700
1750
1800
1850
1900
1950
2000 2050
2100
2150
13150
13200
13250
13300 13350 13400 13450 13500
13550
13600
13650
13700
13750
13800
13850
13900
13950
SH1 NORTHERN MOTORWAY
ALBANY EXPRESSWAY
GREVILLE ROAD
TAWA DRIVE
RATH
MULL
EN P
LACE
COLLISTON RISE
COLLISTON RISE
CORINTHIAN
DRIVE
GREVILLE ROAD
KEY PLAN
13 4 65
8
9
10
2 7
MATCHLINE JOINS SHEET 4
3MA
TCHL
INE
JOIN
S SH
EET
2
CLIENT
DATE
TITLE
REVISION DETAILSDATEREV APPROVED
CHECKED
APPROVED
PROJECT
DRAWN
DESIGNED
PROJECT No. WP REVSTAGE TYPE NUMBER
DRAWING No.
SCALE SIZE
A1
.
Filen
ame:
Plot
Date:
Offic
e:C:
\PW
_WOR
K\D0
3150
96\25
0310
-3PR
E-3D
ES-D
RG-0
200-
0210
.DW
G25
/11/20
16 9:
39:39
a.m.
NZAK
L
0
SCALE 1:1000
10 40m20
NORTHERN CORRIDOR IMPROVEMENTS
GENERAL ARRANGEMENTSSHEET 3
250310 3PRE 3DES DRG 0203 H
1:1000PRELIMINARY
NOT FOR CONSTRUCTION
V. SMITH
M. FAN
M. FRANCIS J.HIND
J. HIND03.10.16
A 17.06.16 PRELIMINARY ISSUE G. MOOREB 01.07.16 REVISED ISSUE G. MOOREC 15.07.16 REVISED ISSUE G. MOORED 29.07.16 REVISED ISSUE G. MOOREE 09.09.16 REVISED ISSUE G. MOOREF 19.09.16 REVISED ISSUE G. MOOREG 03.10.16 DESIGN FREEZE G. MOOREH 30.11.16 CONSENT ISSUE G. MOORE
LEGENDEXISTING DESIGNATION BOUNDARY
ALTERATION TO EXISTINGDESIGNATION BOUNDARY
PROPOSED SHARED USE PATH
PROPOSED BUSWAY
PROPOSED TRANSIT LANE
PROPOSED FOOTPATH
CONSTRUCTION SUPPORT AREAS
PROPOSED ON-ROAD CYCLE LANE
BRIDGE EXTENTS
PROPOSED RETAINING WALL
FILL SLOPE
CUT SLOPE
EXISTING CULVERT TO BE RETAINED
EXISTING CULVERT TO BE ABANDONED
PROPOSED CULVERT
RW
EXISTING SH1 BRIDGE OVERGREVILLE ROAD. WIDENEDIN BOTH DIRECTIONS
SHARED USE PATH RAMPCONNECTION TO GREVILLE ROAD
NEW BUSWAY AND SHARED USEPATH BRIDGE OVER GREVILLE ROAD
EXISTING GREVILLEROAD NORTHBOUNDON-RAMP REALIGNED
MAINTAIN EXISTINGENFORCEMENT BAY
NEW MAINTENANCE BAY
NEW MAINTENANCE BAY
RW 3-3MSE BLOCK WALL (FILL)MAX H = 3.2m
RW 2-8STEEL UC WALL WITH CONCRETE PANELS (CUT)
MAX H = 2.7m
C0301
RW 3-1MSE BLOCK WALL (FILL)MAX H = 11.4m
STAIRS
RW 2-6BORED PILE WALL (CUT)
MAX H = 5.6m
CSA6 - GREVILLE ROAD EAST
CSA3 - GREVILLE ROAD WEST
CONTAINS 2016 AERIAL IMAGERY SOURCED FROM NZ TRANSPORTAGENCY UNDER CREATIVE COMMONS 3.0 NEW ZEALAND (BY)
RWRW
RWRW
RWRW
RWRW
RWRW
RWRW
RWRW
RWRW
RWRW
RWRW
RWRW
RWRW
RWRW
RWRW
RWRW
RWRW
RWRW
RWRW
RWRW
RWRW
RWRW
RW
RWRW
RWRW
RWRW
RWRW
RWRW
RWRW
RW
RW
RW
RW RW RW RW RW
RWRW
RWRW
RW
RWRW
RWRW
RWRW
RWRW
RWRW
RWRW
RWRW
RW
RW
RW
RW
RWRW
RWRW
RWRW
RWRW
RWRW
RWRW
RWRW
RWRW
RW RW
RW RW RW RW RW
RWRW
RWRW
RWRW
RWRW
RWRW
RWRW
RWRW
RWRW
RW RW
RW
RWRW
RWRW RW RW RW
RWRW
RWRW
RWRW
RW
RW 4-2BORED PILE WALL (CUT)MAX H = 4.7m
RW 4-9L-SHAPE GRAVITY WALL (FILL)MAX H = 2.0m
RW 4-10STEEL UC WALL WITH CONCRETE PANELS (CUT)
MAX H = 2.8m
RW 4-13MSE BLOCK WALL (FILL)MAX H = 4.6m
RW 4-1MSE BLOCK WALL (FILL)MAX H = 7.0m
RW 4-11MSE BLOCK WALL (FILL)MAX H = 2.8m
RW 4-3MSE BLOCK WALL (FILL)MAX H = 13.3m
2200
2250 2300 2350 2400 2450 2500 2550
2600
2650
2700
2750
2800
2850
2900 2950
13950
14000
14050
14100
14150 14200 14250 14300 14350 14400 14450
14500
14550 14600 14650 14700 14750
TAWA DRIVE
SH1 NORTHERN MOTORWAY
TAWA DRIVE
MIRO
PLA
CE
TITO
KI P
LACE
ROSE
DALE
ROA
D
TAWA DRIVE COWLEY PLACE
COWLEY PLACE
ROSEDALE ROAD
ARRENWAY DRIVE
TRITON DRIVE
DALL
AN P
LACE
COWLEY PLACE
OTEH
A VA
LLEY
STR
EAM
RW 4-4MSE BLOCK WALL (FILL)MAX H = 5.7m
RW 4-5ANCHORED BORED PILE WALL (FILL)MAX H = 6.8m
RW 4-6MSE BLOCK WALL (FILL)MAX H = 6.4m
RW 4-7MSE BLOCK WALL (FILL)MAX H = 2.4m
KEY PLAN
13 4 65
8
9
10
2 7MA
TCHL
INE
JOIN
S SH
EET
34
MATCHLINE JOINS SHEET 5
CLIENT
DATE
TITLE
REVISION DETAILSDATEREV APPROVED
CHECKED
APPROVED
PROJECT
DRAWN
DESIGNED
PROJECT No. WP REVSTAGE TYPE NUMBER
DRAWING No.
SCALE SIZE
A1
.
Filen
ame:
Plot
Date:
Offic
e:C:
\PW
_WOR
K\D0
3150
96\25
0310
-3PR
E-3D
ES-D
RG-0
200-
0210
.DW
G25
/11/20
16 9:
39:50
a.m.
NZAK
L
0
SCALE 1:1000
10 40m20
NORTHERN CORRIDOR IMPROVEMENTS
GENERAL ARRANGEMENTSSHEET 4
250310 3PRE 3DES DRG 0204 H
1:1000PRELIMINARY
NOT FOR CONSTRUCTION
V. SMITH
M. FAN
M. FRANCIS J.HIND
J. HIND03.10.16
A 17.06.16 PRELIMINARY ISSUE G. MOOREB 01.07.16 REVISED ISSUE G. MOOREC 15.07.16 REVISED ISSUE G. MOORED 29.07.16 REVISED ISSUE G. MOOREE 09.09.16 REVISED ISSUE G. MOOREF 19.09.16 REVISED ISSUE G. MOOREG 03.10.16 DESIGN FREEZE G. MOOREH 30.11.16 CONSENT ISSUE G. MOORE
LEGENDEXISTING DESIGNATION BOUNDARY
ALTERATION TO EXISTINGDESIGNATION BOUNDARY
PROPOSED SHARED USE PATH
PROPOSED BUSWAY
PROPOSED TRANSIT LANE
PROPOSED FOOTPATH
CONSTRUCTION SUPPORT AREAS
PROPOSED ON-ROAD CYCLE LANE
BRIDGE EXTENTS
PROPOSED RETAINING WALL
FILL SLOPE
CUT SLOPE
EXISTING CULVERT TO BE RETAINED
EXISTING CULVERT TO BE ABANDONED
PROPOSED CULVERT
RW
E0304
EXISTING GREVILLEROAD SOUTHBOUNDON-RAMP REALIGNED
NEW BUSWAY AND SHARED USE PATHBRIDGE OVER ROSEDALE ROAD
SHARED USE PATHRAMP CONNECTIONTO ROSEDALE ROAD
EXISTING GREVILLEROAD NORTHBOUNDOFF-RAMP REALIGNED
ROSEDALE ROAD LOWERED TO PROVIDEMINIMUM 4.9m HEADROOM UNDERWIDENED ROSEDALE ROAD BRIDGE
EXISTING ROSEDALEROAD BRIDGE WIDENEDIN BOTH DIRECTIONS
NEW MAINTENANCE BAY
NEW MAINTENANCE BAY
D0303
RW 4-12MSE BLOCK WALL (FILL)MAX H = 5.1m
F0304
RW 4-8STEEL UC WALL WITH CONCRETE PANELS (CUT & FILL)
MAX H = 1.8m
RW 4-14BORED PILE WALL (CUT)MAX H = 6.5m
CSA5 - ROSEDALE ROAD
CONTAINS 2016 AERIAL IMAGERY SOURCED FROM NZ TRANSPORTAGENCY UNDER CREATIVE COMMONS 3.0 NEW ZEALAND (BY)
RW RW RW
RW
RWRW
RW RW RW RW RW RW RW
RW RW RW RW
RWRW
RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW
RW RW RWRW
RW
RW
RW
RW RW RW RW RW RW RW
RWRW
RW RW RW RW RW RW
RWRW
RW
RW
RW RW RW RW RW RWRW RW RW RW RW
RW 5-3STEEL UC WALL (CUT)
MAX H = 2.4m
CH 15010 - CH 153101V:3H EARTHWORKS SLOPE WITH RIP-RAP ARMOUR
EXTENT AND DESIGN TO BE CONFIRMED AGAINST POND BATHYMETRY
00
50
100
150 200 250 300 350
400
2950 3000 3050 3100
3150
3200
3250
3300
3350
3400
3450
3500
3550
3600
3650
3700
14700 14750 14800
14850
14900
14950
15000
15050
15100
15150
15200
15250
15300
15350
15400
15450
15500
DALL
AN P
LACE
COWLEY PLACE
ARRENWAY DRIVE
CIVI
L PLA
CE
ARRE
NWAY
DRI
VE
SH1 NORTHERN MOTORWAY
CH 3370 - CH 3480
1V:3H EARTHWORKS SLOPE WITH RIP-RAP ARMOUR
EXTENT AND DESIGN TO BE CONFIRMED AGAINST POND BATHYMETRY
KEY PLAN
13 4 65
8
9
10
2 7
MATCHLINE JOINS SHEET 6
5MA
TCHL
INE
JOIN
S SH
EET
4
CLIENT
DATE
TITLE
REVISION DETAILSDATEREV APPROVED
CHECKED
APPROVED
PROJECT
DRAWN
DESIGNED
PROJECT No. WP REVSTAGE TYPE NUMBER
DRAWING No.
SCALE SIZE
A1
.
Filen
ame:
Plot
Date:
Offic
e:C:
\PW
_WOR
K\D0
3150
96\25
0310
-3PR
E-3D
ES-D
RG-0
200-
0210
.DW
G25
/11/20
16 9:
40:00
a.m.
NZAK
L
0
SCALE 1:1000
10 40m20
NORTHERN CORRIDOR IMPROVEMENTS
GENERAL ARRANGEMENTSSHEET 5
250310 3PRE 3DES DRG 0205 H
1:1000PRELIMINARY
NOT FOR CONSTRUCTION
V. SMITH
M. FAN
M. FRANCIS J.HIND
J. HIND03.10.16
A 17.06.16 PRELIMINARY ISSUE G. MOOREB 01.07.16 REVISED ISSUE G. MOOREC 15.07.16 REVISED ISSUE G. MOORED 29.07.16 REVISED ISSUE G. MOOREE 09.09.16 REVISED ISSUE G. MOOREF 19.09.16 REVISED ISSUE G. MOOREG 03.10.16 DESIGN FREEZE G. MOOREH 30.11.16 CONSENT ISSUE G. MOORE
LEGENDEXISTING DESIGNATION BOUNDARY
ALTERATION TO EXISTINGDESIGNATION BOUNDARY
PROPOSED SHARED USE PATH
PROPOSED BUSWAY
PROPOSED TRANSIT LANE
PROPOSED FOOTPATH
CONSTRUCTION SUPPORT AREAS
PROPOSED ON-ROAD CYCLE LANE
BRIDGE EXTENTS
PROPOSED RETAINING WALL
FILL SLOPE
CUT SLOPE
EXISTING CULVERT TO BE RETAINED
EXISTING CULVERT TO BE ABANDONED
PROPOSED CULVERT
RW
I0306
H0305
NEW SH18 SOUTHBOUND OFF-RAMP
NEW SH18 NORTHBOUND ON-RAMPNEW ENFORCEMENT BAY SIMILARIN LOCATION TO EXISTING
REMOVAL OF EXISTINGENFORCEMENT BAY
REMOVAL OF EXISTINGENFORCEMENT BAY
NEW MAINTENANCE BAY
NEW MAINTENANCE BAY
NEW MAINTENANCE BAY
RW 4-14BORED PILE WALL (CUT)MAX H = 6.5m
PROPOSED PONDLINK ALIGNMENT
WSL POND 1
WSL POND 2
SHARED USE PATHRAMP CONNECTIONTO ARRENWAY DRIVE
SHARED USE PATH RAMP CONNECTION TOBE USED FOR WETLAND MAINTENANCEACCESS ONLY. MAY BE CONVERTED TOSHARED USE PATH IN FUTURE
NEW ENFORCEMENT BAY
G0305
RW 5-5
MSE BLOCK WALL (FILL)
MAX H = 5.7m
RW 5-1ANCHORED BORED PILE WALL (CUT)
MAX H = 9.2mRW 5-2
BORED PILE WALL (CUT)MAX H = 5.6m
RW 5-4
STEE
L UC W
ALL W
ITH
CONC
RETE
PANE
LS
MAX H =
4.5m
RW 4-8STEEL UC WALL WITH CONCRETE PANELS (CUT & FILL)MAX H = 1.8m
RW 5-6
MSE BLOCK WALL (FILL)
MAX H = 3.3m
EXISTING VEHICULAR LINKTO BE ABANDONED ANDFILLED WITH CEMENTITIOUSBENTONITE
RW 5-7BORED PILE WALL (CUT)
MAX H = 2.6m
RW 5-8
MSE BLOCK WALL (FILL)
MAX H = 3.0m
RW 5-9MSE BLOCK WALL (FILL)
MAX H = 5.2m
PROPOSED WATERCAREPOND LINK BRIDGEUNDER SH1
CONTAINS 2016 AERIAL IMAGERY SOURCED FROM NZ TRANSPORTAGENCY UNDER CREATIVE COMMONS 3.0 NEW ZEALAND (BY)
RW RW RW RW RWRW
RWRW
RWRW
RWRW
RWRW
RWRW
RWRW
RW RWRW
RWRW
RWRW
RW
RW RW RWRW
RWRW
RWRW
RWRW
RWRW
RWRW
RWRW
RWRW RW
RW
RW
RWRW
RW 6-1
MSE BLOCK WALL (FILL)
MAX H = 8.2m
AD-4 (G)
RW 6-4
MSE BLOCK WALL (FILL)
MAX H = 5.5m
350
400
450
500
550
600
3650
3700
3750
3800
3850
3900
3950
4000
4050
4100
4150
4200
4250
4300
4350
4375.780
15450
15500
15550
15600
15650
15700
15750
15800
15850
15900
15950
16000
16050
16100
16150
16200
16250
PROJ
ECT
EXTE
NTS
PROJ
ECT
EXTE
NTS
CONS
TELL
ATIO
N DR
IVE
EXISTING SH18 UPPER HARBOUR HIGHWAY
SH1 NORTHERN MOTORWAY
SUNSET ROAD
MATC
HLIN
E JO
INS
SHEE
T 5
MATCHLINE JOINS SHEET 8
KEY PLAN
13 4 65
8
9
10
2 76MATCHLINE JOINS SHEET 7
CLIENT
DATE
TITLE
REVISION DETAILSDATEREV APPROVED
CHECKED
APPROVED
PROJECT
DRAWN
DESIGNED
PROJECT No. WP REVSTAGE TYPE NUMBER
DRAWING No.
SCALE SIZE
A1
.
Filen
ame:
Plot
Date:
Offic
e:C:
\PW
_WOR
K\D0
3150
96\25
0310
-3PR
E-3D
ES-D
RG-0
200-
0210
.DW
G2/1
2/201
6 10:1
3:18 a
.m.
NZAK
L
0
SCALE 1:1000
10 40m20
NORTHERN CORRIDOR IMPROVEMENTS
GENERAL ARRANGEMENTSSHEET 6
250310 3PRE 3DES DRG 0206 H
1:1000PRELIMINARY
NOT FOR CONSTRUCTION
V. SMITH
M. FAN
M. FRANCIS J.HIND
J. HIND03.10.16
A 17.06.16 PRELIMINARY ISSUE G. MOOREB 01.07.16 REVISED ISSUE G. MOOREC 15.07.16 REVISED ISSUE G. MOORED 29.07.16 REVISED ISSUE G. MOOREE 09.09.16 REVISED ISSUE G. MOOREF 19.09.16 REVISED ISSUE G. MOOREG 03.10.16 DESIGN FREEZE G. MOOREH 30.11.16 CONSENT ISSUE G. MOORE
LEGENDEXISTING DESIGNATION BOUNDARY
ALTERATION TO EXISTINGDESIGNATION BOUNDARY
PROPOSED SHARED USE PATH
PROPOSED BUSWAY
PROPOSED TRANSIT LANE
PROPOSED FOOTPATH
CONSTRUCTION SUPPORT AREAS
PROPOSED ON-ROAD CYCLE LANE
BRIDGE EXTENTS
PROPOSED RETAINING WALL
FILL SLOPE
CUT SLOPE
EXISTING CULVERT TO BE RETAINED
EXISTING CULVERT TO BE ABANDONED
PROPOSED CULVERT
RW
J0307
EXISTING CONSTELLATION DRIVESOUTHBOUND OFF-RAMP REALIGNED
NEW BUSWAY AND SHARED USE PATHBRIDGE OVER CONSTELLATION DRIVE
EXISTING CONSTELLATIONDRIVE NORTHBOUNDON-RAMP RECONFIGURED
EXISTING SH1 BRIDGE OVERCONSTELLATION DRIVEWIDENED IN BOTH DIRECTIONS
NEW SH1 TO SH18 RAMPBRIDGE OVER SH1
NEW ENFORCEMENT BAY
EXISTING BUS RAMP REMOVED
L0308
K0308
EXISTING BUS LANE REMOVED
EXISTING LANE WIDTHS TO BE REDUCEDTO PROVIDE INCREASED WIDTH FORPROPOSED SHARED USE PATH
EXISTING PLATFORMS AND BUSWAY AT CONSTELLATIONSTATION RECONFIGURED. REFER TO DRAWING250310-3PRE-3DES-DRG-3001 FOR PROPOSED STATIONLAYOUT
RW 6-2
MSE BLOCK WALL (FILL)
MAX H = 6.6m
RW 6-
5L-
SHAP
ED G
RAVI
TY W
ALL (
FILL
)MA
X H
= 2.3
m
RW 6-3
MSE BLOCK WALL (FILL)
MAX H = 4.9m
RW 6-6
L-SHAPED GRAVITY WALL (FILL)
MAX H = 1.3m
CSA2 - NORTH-FACING RAMPS
NZTA CONSTELLATION BUSSTATION DESIGNATION
MATCHLINE A-A
MATCHLINE A-A
CONTAINS 2016 AERIAL IMAGERY SOURCED FROM NZ TRANSPORTAGENCY UNDER CREATIVE COMMONS 3.0 NEW ZEALAND (BY)
16200
16250
16300
16350
16400
16450
16500
16550
16600
16650
16700
16750
16800
16850
16900
16950
17000
PROJ
ECT
EXTE
NTS
SUNSET ROAD
MATC
HLIN
E JO
INS
SHEE
T 6
KEY PLAN
13 4 65
8
9
10
2 77
CLIENT
DATE
TITLE
REVISION DETAILSDATEREV APPROVED
CHECKED
APPROVED
PROJECT
DRAWN
DESIGNED
PROJECT No. WP REVSTAGE TYPE NUMBER
DRAWING No.
SCALE SIZE
A1
.
Filen
ame:
Plot
Date:
Offic
e:C:
\PW
_WOR
K\D0
3150
96\25
0310
-3PR
E-3D
ES-D
RG-0
200-
0210
.DW
G25
/11/20
16 9:
40:22
a.m.
NZAK
L
0
SCALE 1:1000
10 40m20
NORTHERN CORRIDOR IMPROVEMENTS
GENERAL ARRANGEMENTSSHEET 7
250310 3PRE 3DES DRG 0207 H
1:1000PRELIMINARY
NOT FOR CONSTRUCTION
V. SMITH
M. FAN
M. FRANCIS J.HIND
J. HIND03.10.16
A 17.06.16 PRELIMINARY ISSUE G. MOOREB 01.07.16 REVISED ISSUE G. MOOREC 15.07.16 REVISED ISSUE G. MOORED 29.07.16 REVISED ISSUE G. MOOREE 09.09.16 REVISED ISSUE G. MOOREF 19.09.16 REVISED ISSUE G. MOOREG 03.10.16 DESIGN FREEZE G. MOOREH 30.11.16 CONSENT ISSUE G. MOORE
LEGENDEXISTING DESIGNATION BOUNDARY
ALTERATION TO EXISTINGDESIGNATION BOUNDARY
PROPOSED SHARED USE PATH
PROPOSED BUSWAY
PROPOSED TRANSIT LANE
PROPOSED FOOTPATH
CONSTRUCTION SUPPORT AREAS
PROPOSED ON-ROAD CYCLE LANE
BRIDGE EXTENTS
PROPOSED RETAINING WALL
FILL SLOPE
CUT SLOPE
EXISTING CULVERT TO BE RETAINED
EXISTING CULVERT TO BE ABANDONED
PROPOSED CULVERT
RW
CONTAINS 2016 AERIAL IMAGERY SOURCED FROM NZ TRANSPORTAGENCY UNDER CREATIVE COMMONS 3.0 NEW ZEALAND (BY)
STOP STOP RWRWRWRWRWRWRW
RW
RW RW RW RW RW RW RW RW RW RW RWRW
RWRW
RW RW RW RW
RW RW RW RW
RW
RWRW RW RW RW RW
RW
RWRW
RWRW
RWRW
RWRW
RWRW
RW
RWRW
RWRW
RW
RWRWRWRWRWRWRW
AD-4
(G)
550
600
650
700
750
800
850 900 950 1000 1050 1100 1150
1200
1250
1300
1350
PROJE
CT
EXTE
NTS
EXISTING SH18 UPPER HARBOUR HIGHWAY
EXISTING SH18 UPPER HARBOUR HIGHWAY
BARBADOS DRIVE
SH18 UPPER HARBOUR HIGHWAY
CARRIBEAN DRIVE
KEY PLAN
13 4 65
8
9
10
2 7
MATCHLINE JOINS SHEET 9MA
TCHL
INE
JOIN
S SH
EET
68
CLIENT
DATE
TITLE
REVISION DETAILSDATEREV APPROVED
CHECKED
APPROVED
PROJECT
DRAWN
DESIGNED
PROJECT No. WP REVSTAGE TYPE NUMBER
DRAWING No.
SCALE SIZE
A1
.
Filen
ame:
Plot
Date:
Offic
e:C:
\PW
_WOR
K\D0
3150
96\25
0310
-3PR
E-3D
ES-D
RG-0
200-
0210
.DW
G25
/11/20
16 9:
40:33
a.m.
NZAK
L
0
SCALE 1:1000
10 40m20
NORTHERN CORRIDOR IMPROVEMENTS
GENERAL ARRANGEMENTSSHEET 8
250310 3PRE 3DES DRG 0208 H
1:1000PRELIMINARY
NOT FOR CONSTRUCTION
V. SMITH
M. FAN
M. FRANCIS J.HIND
J. HIND03.10.16
A 17.06.16 PRELIMINARY ISSUE G. MOOREB 01.07.16 REVISED ISSUE G. MOOREC 15.07.16 REVISED ISSUE G. MOORED 29.07.16 REVISED ISSUE G. MOOREE 09.09.16 REVISED ISSUE G. MOOREF 19.09.16 REVISED ISSUE G. MOOREG 03.10.16 DESIGN FREEZE G. MOOREH 30.11.16 CONSENT ISSUE G. MOORE
LEGENDEXISTING DESIGNATION BOUNDARY
ALTERATION TO EXISTINGDESIGNATION BOUNDARY
PROPOSED SHARED USE PATH
PROPOSED BUSWAY
PROPOSED TRANSIT LANE
PROPOSED FOOTPATH
CONSTRUCTION SUPPORT AREAS
PROPOSED ON-ROAD CYCLE LANE
BRIDGE EXTENTS
PROPOSED RETAINING WALL
FILL SLOPE
CUT SLOPE
EXISTING CULVERT TO BE RETAINED
EXISTING CULVERT TO BE ABANDONED
PROPOSED CULVERT
RW
M0309
NEW PAUL MATTHEWS ROADBRIDGE OVER SH18
RW 8-3MSE BLOCK WALL (FILL)MAX H = 8.0m
RW 8-6BORED PILE WALL (CUT)
MAX H = 7.5m
INDICATIVE LOCATION OFRELOCATED PYLON
PROPOSED BAY FOR PYLONMAINTENANCE ACCESS
RW 8-4MSE BLOCK WALL (FILL)
MAX H = 8.2m
RW 8-1MSE BLOCK WALL (FILL)
MAX H = 6.1m
RW 8-2
MSE BLOCK WALL (FILL)
MAX H = 4.8
RW 8-5MSE BLOCK WALL (FILL)
MAX H = 7.6m
RW 8-7MSE BLOCK WALL (FILL)
MAX H = 3.0m
RW 9-1BORED PILE CUT WALL (CUT)MAX H = 5.0m
CSA2 - NORTH-FACING RAMPS
CSA1 - PAUL MATTHEWS ROAD
CONTAINS 2016 AERIAL IMAGERY SOURCED FROM NZ TRANSPORTAGENCY UNDER CREATIVE COMMONS 3.0 NEW ZEALAND (BY)
RWRW
RWRW
RW
RW
RW
RW
RW
RW
RW
RW
RWRW
RWRW RW RW RW RW RW RW RW RW RW RW RW RW RW
RWRW
RWRW
RW
RW
RW
RW
RW
RWRW
RWRW
RW
RW
RW
RWRW
RWRW
RW
RWRW
RWRW
RWRW
RWRW
RWRW
RW
RW
RW
RW
RW
RW
RW
RW
RW
RW
1300
1350
1400
1450
1500
1550
1600
1650
1700 1750 1800 1850
1900
1950
2000
2050
2100
PROJ
ECT
EXTE
NTS
PROJECT
EXTENTS
PROJ
ECT
EXTE
NTS
SH18 UPPER HARBOUR HIGHWAY
PAUL MATTHEWS ROAD
SH18 UPPER HARBOUR HIGHWAY
SATURN PLACE
OMEGA STREET
WILLIAM PICKERING DRIVE
BLUEBIRD CRES
UNSW
ORTH
DRI
VE
ALEXANDRA CREEK
KEY PLAN
13 4 65
8
9
10
2 7
MATCHLINE JOINS SHEET 10MA
TCHL
INE
JOIN
S SH
EET
8
9
CLIENT
DATE
TITLE
REVISION DETAILSDATEREV APPROVED
CHECKED
APPROVED
PROJECT
DRAWN
DESIGNED
PROJECT No. WP REVSTAGE TYPE NUMBER
DRAWING No.
SCALE SIZE
A1
.
Filen
ame:
Plot
Date:
Offic
e:C:
\PW
_WOR
K\D0
3150
96\25
0310
-3PR
E-3D
ES-D
RG-0
200-
0210
.DW
G25
/11/20
16 1:
35:23
p.m.
NZAK
L
0
SCALE 1:1000
10 40m20
NORTHERN CORRIDOR IMPROVEMENTS
GENERAL ARRANGEMENTSSHEET 9
250310 3PRE 3DES DRG 0209 H
1:1000PRELIMINARY
NOT FOR CONSTRUCTION
V. SMITH
M. FAN
M. FRANCIS J.HIND
J. HIND03.10.16
A 17.06.16 PRELIMINARY ISSUE G. MOOREB 01.07.16 REVISED ISSUE G. MOOREC 15.07.16 REVISED ISSUE G. MOORED 29.07.16 REVISED ISSUE G. MOOREE 09.09.16 REVISED ISSUE G. MOOREF 19.09.16 REVISED ISSUE G. MOOREG 03.10.16 DESIGN FREEZE G. MOOREH 30.11.16 CONSENT ISSUE G. MOORE
LEGENDEXISTING DESIGNATION BOUNDARY
ALTERATION TO EXISTINGDESIGNATION BOUNDARY
PROPOSED SHARED USE PATH
PROPOSED BUSWAY
PROPOSED TRANSIT LANE
PROPOSED FOOTPATH
CONSTRUCTION SUPPORT AREAS
PROPOSED ON-ROAD CYCLE LANE
BRIDGE EXTENTS
PROPOSED RETAINING WALL
FILL SLOPE
CUT SLOPE
EXISTING CULVERT TO BE RETAINED
EXISTING CULVERT TO BE ABANDONED
PROPOSED CULVERT
RW
SHARED USE PATH RAMP CONNECTIONTO PAUL MATTHEWS ROAD
RW 8-6BORED PILE WALL (CUT)
MAX H = 7.5m
RW 9-1BORED PILE CUT WALL (CUT)
MAX H = 5.0m
CLOSURE OF EXISTINGOFF-RAMP TO Z
RW 9-3L-SHAPE GRAVITY WALL (FILL)
MAX H = 3.0m
RW 9-4STEEL UC WALL WITHCONCRETE PANELS (CUT)
MAX H = 1.1m
EXISTING PEDESTRIAN UNDERPASSTO BE RETAINED
SHARED USE PATH RAMPCONNECTION TO EXISTINGPATH NETWORK
CLOSURE OF EXISTINGOFF-RAMP TOUNSWORTH DRIVE
O0307
RW 9-2STEEL UC WALL WITHCONCRETE PANELS (CUT)
MAX H = 1.6m
RW 9-6COMBINED TL5 CONCRETE BARRIER / RETAINING WALL (CUT)
MAX H = 1.1m
RW 9-5
L-SHAPED GRAVITY WALL (FILL)
MAX H = 1.7m
N0306
RW 9-9
STEEL UC WALL W
ITH
CONCRETE PANELS (CUT)
MAX H = 2.5m
RW 9-7L-SHAPED GRAVITYWALL (FILL)
MAX H = 2.0m
RW 9-8
MSE BLOCK WALL (FILL)
MAX H = 3.8m
CONTAINS 2016 AERIAL IMAGERY SOURCED FROM NZ TRANSPORTAGENCY UNDER CREATIVE COMMONS 3.0 NEW ZEALAND (BY)
RWRW
RWRW
RWRW
RWRW
RW
2050
2100
2127.648
PROJ
ECT
EXTE
NTS
WILLIAM PICKERING DRIVE
SH18 UPPER HARBOUR HIGHWAY
BUSH ROAD
ALBANY HIGHWAY
ALEXANDRA STREAM TRIBUTARY
KEY PLAN
13 4 65
8
9
10
2 7
MATC
HLIN
E JO
INS
SHEE
T 9
10
CLIENT
DATE
TITLE
REVISION DETAILSDATEREV APPROVED
CHECKED
APPROVED
PROJECT
DRAWN
DESIGNED
PROJECT No. WP REVSTAGE TYPE NUMBER
DRAWING No.
SCALE SIZE
A1
.
Filen
ame:
Plot
Date:
Offic
e:C:
\PW
_WOR
K\D0
3150
96\25
0310
-3PR
E-3D
ES-D
RG-0
200-
0210
.DW
G25
/11/20
16 9:
40:55
a.m.
NZAK
L
0
SCALE 1:1000
10 40m20
NORTHERN CORRIDOR IMPROVEMENTS
GENERAL ARRANGEMENTSSHEET 10
250310 3PRE 3DES DRG 0210 H
1:1000PRELIMINARY
NOT FOR CONSTRUCTION
V. SMITH
M. FAN
M. FRANCIS J.HIND
J. HIND03.10.16
A 17.06.16 PRELIMINARY ISSUE G. MOOREB 01.07.16 REVISED ISSUE G. MOOREC 15.07.16 REVISED ISSUE G. MOORED 29.07.16 REVISED ISSUE G. MOOREE 09.09.16 REVISED ISSUE G. MOOREF 19.09.16 REVISED ISSUE G. MOOREG 03.10.16 DESIGN FREEZE G. MOOREH 30.11.16 CONSENT ISSUE G. MOORE
LEGENDEXISTING DESIGNATION BOUNDARY
ALTERATION TO EXISTINGDESIGNATION BOUNDARY
PROPOSED SHARED USE PATH
PROPOSED BUSWAY
PROPOSED TRANSIT LANE
PROPOSED FOOTPATH
CONSTRUCTION SUPPORT AREAS
PROPOSED ON-ROAD CYCLE LANE
BRIDGE EXTENTS
PROPOSED RETAINING WALL
FILL SLOPE
CUT SLOPE
EXISTING CULVERT TO BE RETAINED
EXISTING CULVERT TO BE ABANDONED
PROPOSED CULVERT
RW
SHARED USE PATH CONNECTIONTO ALBANY HIGHWAY
RW 10-1
MSE BLOCK WALL (FILL)
MAX H = 3.8m
RW 9-6
CONCRETE BARRIER / RETAINING WALL (CUT)
MAX H = 1.1m
P0310
RW RW RW RW RW RW
RW RW RW RW RW RW
RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW
RW
RW RW RW RWRW
RW RW RW RW
RW
RW
RW RW RW RW RW RW RW RW RW RW RW
CLIENT
DATE
TITLE
REVISION DETAILSDATEREV APPROVED
CHECKED
APPROVED
PROJECT
DRAWN
DESIGNED
PROJECT No. WP REVSTAGE TYPE NUMBER
DRAWING No.
SCALE SIZE
A1
.
CONTAINS 2016 AERIAL IMAGERY SOURCED FROM NZ TRANSPORTAGENCY UNDER CREATIVE COMMONS 3.0 NEW ZEALAND (BY)
Filen
ame:
Plot
Date:
Offic
e:C:
\PW
_WOR
K\D0
3150
96\25
0310
-3PR
E-3D
ES-D
RG-3
001.D
WG
2/12/2
016 1
:49:12
p.m.
NZAK
L
NORTHERN CORRIDOR IMPROVEMENTS
GENERAL ARRANGEMENTSSHEET 6
250310 3PRE 3DES DRG 0201 C
1:1000PRELIMINARY
NOT FOR CONSTRUCTION
V. SMITH
M. FAN
A PRELIMINARY ISSUEB 01.07.16 REVISED ISSUEC 15.07.16 REVISED ISSUE -
CLIENT
DATE
TITLE
REVISION DETAILSDATEREV APPROVED
CHECKED
APPROVED
PROJECT
DRAWN
DESIGNED
PROJECT No. WP REVSTAGE TYPE NUMBER
DRAWING No.
SCALE SIZE
A1
.
CONTAINS 2016 AERIAL IMAGERY SOURCED FROM NZ TRANSPORTAGENCY UNDER CREATIVE COMMONS 3.0 NEW ZEALAND (BY)
Filen
ame:
Plot
Date:
Offic
e:C:
\PW
_WOR
K\D0
3150
96\25
0310
-3PR
E-3D
ES-D
RG-3
001.D
WG
2/12/2
016 1
:49:12
p.m.
NZAK
L
0
SCALE 1:250
2.5 5 10m
EXISTING STATION
NEW EXTENSION TOPLATFORM 2 AND CANOPY
NEW EXTENSION TO PLATFORM 2AND CANOPY
NEW STAIR WELL TOWER
NEW LIFT TOWERNEW EXTENSION TOGROUND FLOOR ROOF
NEW STAIR WELL TOWER
NEW LIFT TOWER
NORTHERN CORRIDOR IMPROVEMENTS
CONSTELLATION STATIONGENERAL ARRANGEMENT
250310 3PRE 3DES DRG 3001 A
1:250PRELIMINARY
NOT FOR CONSTRUCTION
C. LANE
T.WEDMAIER
M. LAING J. HIND
J. HIND20/10/16
A 20/10/16 PRELIMINARY ISSUE T. WEDMAIER
RELOCATE SERVICEVEHICLE BAY
SHARED USE PATH TOCONSTELLATION DRIVE
SHARED USE PATHTO ALBANY
NEW BUSWAY PAVEMENT
NEW MEDIAN ISLAND WITHPEDESTRIAN FENCING
SERVICE VEHICLE BAY
PLATFORM 3
PLATFORM 2
75.0m
2.6m 72.4m
3.1m
3.5m
75.0m
72.4m
PLATFORM 1
2.7m
RELOCATED TOILETS
RWRW
5.0m
3.0m
3.0m
5.0m
REMOVE EXISTING CONCRETE ISLAND
LEGENDEXISTING NZTA DESIGNATION BOUNDARY
ALTERATION TO EXISTING DESIGNATION BOUNDARY
PROPOSED LINEMARKING
PROPOSED KERB
PROPOSED RETAINING WALL
PROPOSED BUSWAY PAVEMENT
PROPOSED SHARED USE PATH/PLATFORMS
PROPOSED BUSWAY STATION STRUCTURES
PROPOSED ROOFED STRUCTURE
EXISTING ROOF STRUCTURE