ABOUT COMPANY

A company d o o Zenica

The initial placement of products and services mainly related to thecustomers within the BiH.

Develoment of market sales caused intensive investment in equipment andfacilities as well as human resources of the company.

Siemens SIMATIC S S

termomatik . . . was established in 1987. as a privateenterprise with an unlimited liability. A company from its establishment is engagedin engineering, manufacturing and installation of industrail furnaces and industrialautomation.

Development of resources of the company enabled the carrying out engineeringwork and for the foreign market from which we can emphasize engineering ofindustrial furnaces and automation, software for programmable machines( 5 and 7, its own system based on microcontroller),engineering in the field of refractory and refractory lining as well as thedevelopment and manufacture of electronic equipment and steel constructionaccording to the order for their own purposes.

Today company employs highly professional staff of different types specializedfor industrial furnaces, automation, measurement and control, and refractory andcollaborate with leading domestic and foreign companies.

A company is trying to adjust to current standards of quality and environmentmanagement to ensure preconditions for the further development of the marketsales.

Business alignment to the standards of quality and environment in the field ofdevelopment of manufacture and sales of technological equipment and machineryas well as continuosly training of human resources in the application of methodsof quality and environmental protection are guarantee for the successfulpositioning of the company in the future.

We have not had trouble with suppliers in the purpose of performing our services,and environment analysis indicates that this trend will continue in the comingyears in business. Good business relations with suppliers and their concerns forquality is certainly facilitate the realization of our vision, mission and strategic andbusiness objectives. The company currently works with 60 users who are loyal tothe founding company. In the market we are recognized for quality, experienceand good business cooperation.

Products and markets

3

Page 4: Tmk Brochure

4

MANAGEMENT PROCESSES

M A N A G E M E N T P R O C E S S E S

M A I N P R O C E S S E S

S U P P O R T E D P R O C E S S E S

INTERNAL

AUDIT

MAINTENANCE

CONTROL

MEASURING CUSTOMER

SATISFACTION

PROCUREME

NT

CORRECTIVE AND

PREVENTIVE MEASURES

PROVIDING RESOURCES

CONTINUOUS

IMPROVEMENT

PROIZVODNJA IUGRADNJA AL

STOLARIJE

MARKET

RESEARCH

TECHNOLOGY

DEVELOPMENT, MANUFACTURE AND SALES OF

INDUSTRIAL,TECHNOLOGICAL AND EQUIPMENT FOR

ENVIRONMENTAL PROTECTION, AS WELL AS ELEKTRICAL,

MECHANICAL AND REFRACTORY SERVICES

ASSEMBLY

Page 5: Tmk Brochure

5

QUALITY POLICY AND ENVIRONMENTAL MANAGEMENT

Quality policy and environmental management is defined, documented andimplemented in the company Zenica on the following principles:

- Our moto is:;

- Our customers are in the central point of overall relations and activities, we wantto meet their requirements and exceed expectations;

- We strive to ensure the rights and environmentally friendly product with the rightprice and that he finds the right time on the market;

- We establish partnerships with our suppliers based on a fair basis in the purposeof long-term business cooperation, mutually beneficial, including the requirementsof environmental management system;

- company undertakes to persue the fulfillment of all requirementsof quality management and environment policy (policy which corresponds to thenature, extent and impacts on the environment), and be responsible for their ownactivities, products and services in all phases of the business process, therebypreventing pollution of the environment;

- We provide continuous control of the complement system, quality andenvironmental management, and training and employees motivation;

- We will take care of the conserve of natural resources and will reduce energyconsumption;

- We ensure the satisfaction of the interests of all stakeholders (customers,owners, employees, suppliers, communities) including complying of theobligation with applicable legal and other requirements that the organizationhas signed in relation to its environmental aspects;

- With preventive and remedial measure we prevent repetition of mistakes andthe formation of new faults;

- Constantly provide a favorable environment for establishing and reviewing setgoals of quality and environment in which environmental policy is framework forpermanent installation and monitoring of the operational framework andenvironmental goals;

- We provide passing, understanding and achievement of quality policy andenvironmental in entire company;

- Periodically (at least annully) reviewing the adequacy of the quality policy andenvironmental as well as effectiveness of applied measures, within questioningof the quality system and environmental management by the top managementto the board for the quality and the environment.

Quality policy and environment is defined on the basis of experience from theprevious period and suggestions of carrier of business functions and agreed onthe level of the top management in accordance with vision and strategy of thecompany.

All employees are familiar with the quality policy and the environment throughdirect supervisors, and the same is placed on the visible places in the company,website as well as on the advertising materials of the company, includingimmediate comunity.Constantly analyzing and redefining policies and goals of the qualiy andenvironmental management provide the conditions for the continuousimprovement of quality and environmental management, and preventionand reduction of environmental pollution.

termomatik

termomatik

“A satisfied client is what we aspire to and we are recognizedby the quality“

Page 6: Tmk Brochure

6

General

Manager

PRKAdvisor

Manager for refractorydepartment

Manager for electricaldepartment

Manager for mechanicaldepartment

department

Human ResourceManager

ProcurementEngineering of

refractory

Manufacture ofrefractory furnace

Assembly /

disassembly

Engineering

Manufacture

Engineering

Manufacture

Sales

PROTechnicalManager

Training

Administration andlegal

Finance andaccounting

Assembly /disassembly Assembly /

disassembly

Maintenance ofrefractory Maintenance

Maintenance

FUNCTIONAL ORGANISATIONAL CHART

Page 7: Tmk Brochure

7

CONTACT PERSONS:

Faruk Babić(Manager)

Amir Jaganjac

Damir Hadžiđulbić

Laris Babić

Samir Šabić

Hamed Lutvica

Maid Henjaković

Bećir Ljubunčić

Anes Berberović

(Deputy Manager)

Electrotechnical works:

Refractory works:

Mechanical works:

Measuring and regulation:

Mario Marunović

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

Page 8: Tmk Brochure

BASIC ACTIVITIES

- Industrial furnaces and automati- Defining project tasks- ing -technical- Optimi ation- Copyright monitoring

-- Steel constructions-- M

ENGINEERING

PROJECT ENGINEERING

onof the

Screen of thermo characteristicsz

Heating technique

Refractorye

-

- Siemens SIMATIC S5, S7, PCS7 and WinCC

- ,- Measurements and control,-

chanical engineeringHydraulics

- Automation- Measurements and controls

Industrial automation

Refractory lining

PROGRAMMING SUPPORT FOR PROGRAMMABLE AUTOMATION

Z

DEVELOPMENT AND PRODUCTION

REPRESENTATIVE FOR FOREIGN COMPANIES

- Development of electronic devices for own needs- Development of electronic devices on the basis of order- Low-serial production of advanced electronic devices- Low-serial production furnaces for heat treatment of plastic,heat treatment of metals and melting of non-ferrous metal

- Furnaces, industrial

-

REALI ATION OF INVESTMENT PROJECTS IN THECOUNTRY AND ABROAD

automation and devices for measuring and control(SIEMENS; KROMSCHRODER)Refractory and isolation materials (RHI)

8

Page 9: Tmk Brochure

REFERENCE LIST - ELECTRICAL WORKS

š, Croatia

Value: 25.000 €

- laboration of the project--

šanj, B&H

Reconstruction and modernization of lime , 1997/1998

Furnace for spark plugs, 1998

Measuring station Vitez with telemetry and visualisationin the dispatch centre in Zenica, 1999

shaft kilnInvestor: KALUN, Drni

E basicInstallationCommissioning

Investor: ENKER, Te

Modernization of the equipment for measuring and control- Designing- Delivery of equipment- Installation- Commissioning- Optimization- Proving guaranteed parameters

Investor: USAID for JP “VODOVOD” Zenica, B&HValue: 56.000 BAM (approx. 28.632 €)

- D- I-- O- Proving guaranteed

Subcontractor to “Pomak” company, Split

-

LV project of overheads ports and external lighting, 1998Investor: USAID for JP “VODOVOD” Zenica, B&H

- Partially engineering- Delivery of equipment- Installation- Commissioning

Modernisation of equipment for measuring and control- Designing

elivery of equipmentnstallationCommissioning

ptimisationparameters

9

Page 10: Tmk Brochure

Annealing 40 tInvestor: Steel factory “ Š š, B&H

furnaceILIJA ” Ilija

10

Page 11: Tmk Brochure

šanj, B&HValue: 33.000 BAM (approx. 16.873 €)

-

Š” Ilijaš

Tunnel furnace No. 1, 1999

of the Annealing Furnace 40t

Pump station Guča Gora, construction of water supply

Investor: ENKER Te

Modernisation of equipment for measuring and control- Engineering- Delivery of equipment- Installation- Commissioning- Optimisation- Proving guaranteed parameters

Investor: Steel factory “ , B&HValue: 64.000 BAM (approx. 32.723 €)

- I

- Detection parameters

Investor: KALIM, Jelah, B&H

ILIJA

-

Mud thickener, 1999

Construction of furnace for galvanisation, 1999

Reconstruction , 1999

Investor: USAID for JP “VODOVOD” Zenica, B&H

- Delivery of equipment- Installation- Commissioning

- Engineering- Delivery of equipment- Installation- Commissioning- Optimisation

- Commissioning

Investor: USAID for Municipality Travnik, B&H

- EngineeringDelivery of equipment

- Work performance on construction of water supplies,pump station and water route

Subcontractor to “Metalno” company, Zenica

-

Delivery of equipmentnstallation

11

Page 12: Tmk Brochure

R f control of

Investor:

econstruction o furnacefor heat treatment of plates

VOEST-ALPINE Linz, Austria,12

Page 13: Tmk Brochure

Reconstruction of the heating and automationon the furnace for enameling

Reconstruction and modernisation of the automaticcontrol of atomizer, 2000

Reconstruction of the automatic control,

, 1999

Equipment for construction of exhausted ladles,2000

anj, B&H

VOLKSWAGEN Vogo

- Delivery manuals for handling and maintenance

Investor: HELIOS, Banović , B&HValue: 18.000 BAM (approx. 9.203 €)

Investor: ENKER, Teš

- Designing- Delivery of equipment- Work performace

Investor: , šć , B&HValue: 74.000 BAM (approx. 37.836 €)

- Engineering- Delivery of equipment- Installation

i

a

Furnace for thermal treatment of “MACRALON” V=500l, 2000

Automation and reconstruction of Annealing furnace K-9 (60 t), 2001

Investor: TRZ HAD , HadValue: 8.000 BAM (approx. 4.090 €)

- Designing- Engineering- Construction

BH STEEL - Steel factory ZENICA Zenica98 813 52 780

More then 90 % of furnace is completely new !

-- Delivery of equipment- nstallation- Engineering- Delivery of application software for PLC and OP- Commissioning- Detection of parameters- Copyright supervision

ŽI ži , B&H

Project of measuring, regulation and electro motor drive

ĆI ći

I

Investor: “ ” , B&HValue: 2 . BAM (approx. 1 . €)

13

Page 14: Tmk Brochure

T g-

Investor: F, B&H

ubular reactor for testin combustioncharacteristics of bio mass and coal

aculty of MechanicalEngineering, Sarajevo14

Page 15: Tmk Brochure

šanj, B&HValue: 33.600 BAM (approx. 17.179 €)

-

No. , 1

10 /2002

2 200

Ž-25-B

Tunnel furnace

Automation and reconstruction of Annealing furnace( 0 t), 2001

Reconstruction of automation of Annealingfurnace Ž-30-B (100 t)

Investor: ENKER Te

Modernisation of equipment for measuring and control- Designing- Delivery of equipment- Engineering- Installation- Commissioning- Optimisation- Proving of guaraneed parameters

521 329 266 551

- Copyrights

67 950 34 742

-- D

- Installation

Project of measuring, regulation and electro motor drive

I

- Commissioning

, 2002

Investor: BH STEEL - Steel factory “ZENICA” Zenica, B&HValue: . BAM (approx. . €)

More then 90 % of furnace is completely new !

-- Delivery of equipment- nstallation- Engineering- Delivery of application software for PLC and OP

- Commissioning- Proving of guaranteed parameters

Investor: BH STEEL - Steel factory “ZENICA” Zenica, B&HValue: . BAM (approx. . €)

Designingelivery of equipment

- Engineering

- Delivery manuals for handling and maintenance

99 30 50 786

Reconstruction of automatic controls on furnaces H-60 and H-100

I

Commissioning

Furnaces H-60 (60 t) and H-100(100t), 2002Investor: BH STEEL - Steel factory “ZENICA” Zenica, B&HValue: .3 BAM (approx. . €)

- Designing- Delivery of equipment- nstallation- Engineering-

15

Page 16: Tmk Brochure

Press 10/2,5 MN and sInvestor: š , B&H

respective manipulatorUNIS-PRETIS NIS, Vogo ća-Sarajevo

16

Page 17: Tmk Brochure

Reconstruction of PLC equipment, sensors and hydraulic valvespress

, 2002of SMS 25/31,5 MN and 5 MN manipulator of 250 kNDANGO&DIENNENTHALL in the Blacksmith departmentInvestor: BH STEEL - Steel factory “ZENICA” Zenica, B&HValue: BAM (approx. . €)

- Designing- Delivery of equipment- Engineering

- nstallation- Commissioning- Parameters detection

Investor: BIMAL d.d. Br , B&HValue: 166.411,00 BAM (approx. 85.085,00 €)

- Designing- Delivery of equipment- Installation- Engineering- Commissioning

1.154.000 590 030

I- Upgrade from SIMATIC S5-150 to S7-400

R silostomation of transportedsystem in Oil rafinery, 2003

econstruction and au

Automation and reconstruction of steamgeneration facilities in Oil rafinery, 2003

Automation and reconstruction of Oil rafinery, 2003

čko, Brčko

Investor: BIMAL d.d. Br , B&HValue: 83.182,00 BAM (approx. 42.530,00 €)

- Designing- Delivery of equipment- Installation- Engineering- Commissioning

Investor: BIMAL d.d. Br , B&HValue: 435.492,00 BAM (approx. 222.664,00 €)

- Designing- Delivery of equipment- Installation- Engineering- Commissioning

čko, Brčko

čko, Brčko

17

Page 18: Tmk Brochure

Press «Ivo Lola Ribar»Investor: PRETIS NIS, Vogošća-Sarajevo, B&H

18

Page 19: Tmk Brochure

Automation and reconstruction of oil supply plantfacilities in Oil rafinery, 2003

Automation and reconstruction of filtering intovinterisatio process facilities in Oil rafinery, 2003

Investor: BIMAL d.d. Br , B&HValue: 21.000,00 BAM (approx. 10.737,00 €)

- Designing- Delivery of equipment- Installation- Engineering- Commissioning

Investor: BIMAL d.d. Br , B&HValue: 22.402,00 BAM (approx. 11.454,00 €)

- Designing- Delivery of equipment- Installation- Engineering-

čko, Brčko

čko, Brčkon

Commissioning

Investor: , B&HValue: 10.500,00 BAM (approx. 5.369,00 €)

- Designing- Delivery of equipment- Installation- Engineering- Commissioning

Investor: , B&HValue: 16.032,00 BAM (approx. 8.197,00 €)

- Designing- Delivery of equipment- Installation- Engineering- Commissioning

Investor: Đ Đ Ć Slavonski brod, CroatiaValue: 26.800,00 €

- Delivery of equipment- Engineering- Commissioning

Clean water supply system, 200

, 200

Reconstruction of the equipment for combustion, measurementand regulation in the furnace for normalisation of propane-butanebottles, 200

4

Cable factory –Testing device for breakdown voltage 4

4

BOSNALIJEK, Sarajevo

KAPIS TKT, Tomislavgrad

,URO AKOVI

19

Page 20: Tmk Brochure

Furnace for testing fire-resistant materialInvestor: PROTUPOŽARNI INSTITUT Sarajevo, B&H,

20

Page 21: Tmk Brochure

21

ILIJA ” Ilija

Measuring control station for natural gas 3.000 m3/hfor the electro-steel works, 2004

milling machine 4

Investor:

Investor: Steel factory “ Š š, B&H

- Designing- Delivery of equipment- Installation-

Investor: BH STEEL - Steel factory “ZENICA” Zenica, B&H

- Delivery of equipment- Installation- Commissioning

“BIRA ć, B&H

- Delivery of equipment- Installation- Commissioning

Commissioning

Investor:Value: 190.000,00 €

- Designing- Delivery of equipment- nstallation- Commissioning- Parameters detection

Investor: , B&HValue:25.500,00 BAM (approx. 13.038,00 €)

- Delivery of equipment- Engineering-- Parameters detection

Refrigeration factory - filling machine for PUR-foam, 2004

Reconstruction of automation on , 200

” - refrigeration factory, Biha

VOEST-ALPINE Linz, Austria

I

FORESTER, Sarajevo

- Designing

Installation

R of controlssheet , 200

0 , 200

econstruction on furnace for thermal treatmentof s 4

Heating furnace 10 kg/h 4

,

Page 22: Tmk Brochure

Friction pressInvestor: PIROMETAL Brčko, B&H,

22

Page 23: Tmk Brochure

23

Heating furnace BH STEEL, 2004

Maintenance of electro-resistant in annealing furnace 4

epair o electro-resistant furnace

4

respective manipulator

UNIS-PRETIS NIS, Vogo

roject regulation and keeping the

IGMAN, Konjic B

delivery of heaters

of heaters

UNIS-PRETIS NIS, Vogo

Design

UNIS-PRETIS NIS, Vogo

Design

Investor: šć , B&H

- Delivery of burner equipment- Installation- P of furnace- Commissioning- Parameters detection

Investor: , &HValue: 15.500,00 BAM (approx. 7.925,00 €)

- Construction and(made from KANTHAL A-1)

- Installation of the heaters

Investor: BH STEEL - Steel factory “ZENICA” Zenica, B&HValue: 53.750,00 BAM (approx. 27.481,00 €)

- Construction and delivery (made from KANTHAL A-1)- Installation of material and equipment- Project of control of maintenance of atmosphere protection- Commissioning

Investor: š , B&H

Reconstruction of PLC equipment, sensors and hydraulic valves of press- ing- Delivery of equipment- Engineering- Installation- Commissioning- Parameters detection

Investor: š , B&H

- ing- Delivery of equipment- Engineering- Installation- Commissioning- Parameters detection

a-Sarajevo

ća-Sarajevo

ća-Sarajevo

, 200

General r s n 5 in MaintenanceDepartment with reconstruction of 3 furnaces, installation ofequipment for work under Ar or CO atmosphere protection,

200 /2005

Press 10/2,5 MN and s, 2005

Heating furnace 1000kg/h, 2005

2

Page 24: Tmk Brochure

Steel Plant - Station for tundish heatingInvestor: ARCELORMITTAL, Zenica, B&H

24

Page 25: Tmk Brochure

25

Remote control steam starting block 7

oncrete lant

utomatically controlled tubular reactor for testingcombustion characteristics of bio mass and coal, 200

nnealing chamber furnace

for of “ ” in ThermalPower Plant Kakanj, 2005

C P , 2005

A- 5

Laboratory furnace 20l/8kW, 2005

A , 2005

Investor: JP “ELKROPRIVREDA BIH , B&H

Investor: INGRUP Donji Vakuf, B&HValue:36.900,00 BAM (approx.18.867,00 €)

Automation engineering- Delivery of equipment-- Commissioning

Investor: F , B&HValue: 35.000,00 BAM (approx. 17.895,00 €)

- Designing- Delivery of equipment- Engineering- Installation- Commissioning- Parameters detection

Investor: TMD Gradač , B&HValue: 4.000,00 BAM (approx. 2.045,00 €)

- ing- Construction

Investor: HES-HENNINGSDORF Henningsdorf, Germany

- Designing- WinCC SCADA system- Delivery of equipment- Installation- Commissioning

”, Sarajevo

,

-

Installation

aculty of Mechanical Engineering,

,

Design

,

Sarajevo

ac

F , 2005urnace for melting non-ferrous metals 25l/6.3kWInvestor: UNIVERZAL PROGRES, Visoko, B&HValue: 6.000,00 BAM (approx. 3.068,00 €)

- Designing- Construction- Commissioning

Page 26: Tmk Brochure

Sugar factoryInvestor: “STUDEN-AGRANA”, Brčko, B&H

26

Page 27: Tmk Brochure

27

C P , 2005

F , 200

F , 200

R 200

, 200

oncrete lant - Reconstruction

urnace for melting non-ferrous metals 30,6l/6,3kW 6

urnace for melting non-ferrous metals 180l/14kW 6

econstruction and automation of hydrogenation drives, 6

Chamber for baking varnish 6

,

- E

Installation

11.000,00 5.625,00

ADIDA, Tunis

- Delivery of equipment- Engineering-- Commisioning

S-PRETIS NIS ogo a-Sarajevo

- Engineering

Investor: INGRUP Donji Vakuf, B&H

ngineering- Delivery of equipment-- Commissioning

Investor: UNIVERZAL PROGRES, Visoko, B&H

- Designing- Construction- Engineering

Investor: UNIVERZAL PROGRES, Visoko, B&HValue: BAM (approx. €)

- Designing- Construction- Engineering

Investor: JValue:51.680,00 €

- Designing

Installation

Investor: UNI , V šć , B&HValue: 35.000,00 BAM (approx.17.895,00 €)

- Designing

- Installation- Commissioning

Recontruction and automation of level measuringin Oil factory, 2005

ultrasonic sensors

Investor: BIMAL d.d. Br , B&HValue: 15.486,00 BAM (approx. 7.917,00 €)

- Designing- Delivery of- Installation- Commissioning

čko, Brčko

Page 28: Tmk Brochure

Coke Oven Battery Plant - Biologicalwaste water treatmentInvestor: ARCELORMITTAL, Zenica, B&H28

Page 29: Tmk Brochure

29

Furnace for control of temperature sensors, 2006Investor: MITTAL STEEL , B&H

- ing- Installation- Engineering- Commissioning

Zenica

Design

Peeling facility in Oil factory, 2006

Cable factory, Extruder 2,5", 2006

Cable factory, Machine for rough drag-out of copper, 2007

Press «Ivo Lola Ribar», 2007

,

Design

,

.000,00 . ,00

- Engineering

Investor: BIMAL d.d Brčko, B&HValue: 212.704,00 BAM (approx. 108.753,00 €)

- ing- Engineering- Installation- Commissioning- Parameters detection

Investor: KAPIS TKT Tomislavgrad, B&HValue: 79.564,00 BAM (approx. 40.680,00 €)

- Designing- Delivery of equipment- Engineering- Installation- Commissioning- Parameters detection

Investor: KAPIS-TKT Tomislavgrad, B&HValue: 350.000,00 BAM (approx. 178.952 €)

- Designing- Delivery of equipment- Engineering- Installation- Commissioning- Parameters detection

Investor: PRETIS NIS, Vogošća-Sarajevo, B&HValue: 75 BAM (approx. 38 347 €)

- Designing

- Installation- Commissioning

,

Page 30: Tmk Brochure

Mobile stations for a heating of caldronsInvestor: Metalska industrija Varaždin-MIV,

Varaždin, Croatia30

Page 31: Tmk Brochure

31

.000,00 . ,00

- Engineering

Design

,

Design

Emcotest machine for measuring hardness 2007

Pellet dryer Machine, 2007

Automatic foundry for vehicles parts, 2008

Friction press, 2008

,“ “

Furnace for thermal treatment VPP, 2008

Investor: PRETIS NIS, Vogošća-Sarajevo, B&HValue: 130 BAM (approx. 66 468 €)

- Designing

- Installation- Commissioning

Investor: FIS, Vitez, B&HValue: 111.000,00 BAM (approx. 56.753,00 €)

- Designing- Engineering- Installation- Commissioning

Investor: “CIMOS”, Zenica, B&HValue: 4.000.000,00 BAM (approx. 2.045.167,00 €)

- ing- Engineering- Installation- Electro equipment and automation- Commissioning

Investor: PIROMETAL Brčko, B&HValue: 400.000,00 BAM (approx. 204.517,00 €)

- ing- Engineering- Installation- Commissioning

Investor: NT FORGING Novi Travnik, B&HValue: 296.000,00 BAM (approx. 151.342,00 €)

- Designing- Delivery of equipment- Engineering- Installation- Commissioning

,

Page 32: Tmk Brochure

Coke Oven Battery Plant - Plant fornaphtalene and ammoniaInvestor: ARCELORMITTAL, Zenica, B&H32

Page 33: Tmk Brochure

33

Furnace for testing fire-resistant material, 2008

Drying furnace, 2008

Steel Plant - Station for tundish heating 1,44 MW, 2008

,

- engineering

.000,00 ,00

Investor: PROTUPOŽARNI INSTITUT Sarajevo, B&HValue: 606.000,00 BAM (approx. 309.843,00 €)

- Designing- Engineering- Delivery of equipment- Installation- Commissioning

Investor: UNIS-PRETIS NIS Vogošća-Sarajevo, B&HValue: 100.000,00 KM (approx. 51.129,00 €)

- Designing

- Installation- Commissioning

Investor: ARCELORMITTAL, Zenica, B&HValue: 50 BAM (approx. 25.565 €)

- Designing- Engineering- Installation- Commissioning

,

Coke Oven Battery Plant-Plant for naphtalene and ammonia 2008

Coke Oven Battery Plant-Biological waste water treatment, 2008

,

,00

,00

- Engineering

Investor: ARCELORMITTAL, Zenica, B&HValue: approx. 1.000.000 €

- Designing- Engineering- Installation- Automation- Commissioning

Investor: ARCELORMITTAL, Zenica, B&HValue: approx. 750.000 €

- Designing

- Delivery of equipment- Installation- Commissioning

Page 34: Tmk Brochure

Automatic foundry for car partsInvestor: “CIMOS”, Zenica, B&H

34

Page 35: Tmk Brochure

35

Design

Investor: “STUDEN-AGRANA”, Brčko, B&HValue: 2.430.000,00 BAM (approx. 1.242.439,00 €)

- ing- Installation- Electro equipment and automation- Commissioning- Parameters detection

Sugar factory, 2008

Investor: “BRIGO-INVEST”, Banovići, B&HValue: 40.000,00 BAM (approx. 20.00,00 €)

- ing- Engineering- Installation- Delivery of equipment- Commissioning

Design

Plant for the production of briquette, 2008

Furnaces for testing the resistance of materials, 2008

Induction melter furnaces, 2008

Mobile stations for a heating of caldrons, 2008/2009

. 0,00

Investor: NT FORGING Novi Travnik, B&HValue: 397.000,00 BAM (approx. 202.983,00 €)

- Designing- Engineering- Delivery of equipment- Installation- Commissioning

Investor: Metalska industrija Varaždin-MIV, Varaždin, CroatiaValue: 59.840,00 €

- Designing- Engineering- Installation- Commissioning

Investor: Metalska industrija Varaždin-MIV, Varaždin, CroatiaValue: 29 35 €

- Designing- Engineering- Installation- Commissioning

,

Page 36: Tmk Brochure

Retrofit f milling machine«WANDERER VC200»

o

36

Page 37: Tmk Brochure

37

Investor: STUDEN-AGRANA, Brčko, B&HValue: 175 BAM (approx. 89.476 €)

- Designing- Engineering- Installation- Automation- Commissioning

.000,00 ,00

Sugar factory, Boiler house 2008/2009,

Electro works in CIMOS - II phase, 2009

Protection of tanks from overloading, 2009

CIMOS - substation, 2009

Cable factory, Extruders 4,5", 2009

.000,00 00

- Engineering

Design

,

Design

,

Investor: CIMOS, Zenica, B&HValue: 754 BAM (approx. 385.514, €)

- Designing

- Delivery of equipment- Automation- Installation- Commissioning

Investor: “BIMAL”, Brčko, B&HValue: 42.000,00 BAM (approx. 21.474,00 €)

- ing- Engineering- Installation- Electro equipment and automation- Commissioning- Parameters detection

Investor: CIMOS Zenica, B&HValue: 668.000,00 BAM (approx. 341.543,00 €)

- ing- Engineering- Installation- Commissioning

Investor: KAPIS TKT Tomislavgrad, B&HValue: 210.000,00 BAM (approx. 107.371,00 €)

- Designing- Engineering- Delivery of equipment- Installation- Commissioning- Parameters detection

Page 38: Tmk Brochure

General overhaul of machine forremoving slag, ArcelorMittal Zenica

38

Page 39: Tmk Brochure

39

Re-circulation system of technological water, 2009

Machine for wire twisting „CIGARA”, 2009

EMP drives and temp. measurements on 8 cells of silo, 2009/2010

Dedusting of iron mixer on Steel Plant Department, 2010

,

Investor: Cement Plant Kakanj, B&HValue: 78.300,00 BAM (approx. 40.034,00 €)

- Designing- Engineering- Delivery of equipment- Installation- Commissioning

Investor: KAPIS TKT Tomislavgrad, B&HValue: 55.000,00 BAM (approx. 28.121,00 €)

- Designing- Engineering- Delivery of equipment- Installation- Commissioning

Investor: “BIMAL”, Brčko, B&HValue: 78.375,00 BAM (approx. 40.073,00 €)

- Designing- Engineering- Delivery of equipment- Installation- Commissioning- Parameters detection

,

Investor: “ArcelorMittal”, Zenica, B&HValue: approx. 60.000,00 €

- Designing- Engineering- Delivery of equipment- Installation- Commissioning- Parameters detection

Investor: “ArcelorMittal”, Zenica, B&HValue: 46.323,00 €

- Designing- Delivery of equipment- Installation- Commissioning

Air post on the location “LF” and “CCM” in Steel PlantDepartment, 2010

Page 40: Tmk Brochure

Installation of hydraulic and pneumatic valves,fitting pipes and hoses, electric worksFAGOR, SPAIN40

Page 41: Tmk Brochure

41

Burners and burners' armatures for air heating of the chamberfor sheet plastification, 2010

General overhaul of rotary excavator SH-630, no. 1352P.K. “Šikulje” - Lukavac, 2010/2011

Expansion of compressor station in BOF Steel Mill, 2011

Reconstruction of heating furnace LOI-SAAR,capacity 1.300 kg/h, 2011

Investor: “ArcelorMittal”, Skopje, FYR MacedoniaValue: 109.667,00 €

- Designing- Delivery of equipment- Installation- Commissioning- Parameters detection

Investor:

Investor: “ArcelorMittal”, Zenica, B&HValue: 150.360,00 BAM (approx. 76.877,00 €)

- Designing- Delivery of equipment- Installation- Commissioning

Investor: “NT FORGING”, Novi Travnik, B&HValue: 82.720,00 BAM (approx. 42.294,00 €)

- Designing- Delivery of equipment- Installation- Commissioning

JP ELEKTROPRIVREDA BIH D.D. Sarajevo,ZD Rudnici “Kreka” d.o.. Tuzla

Value: 4.450.000,00 BAM (approx. 2.275.249,00 €)

- Electrical designing and engineering based on Siemens equipment,- Video surveillance,- Lighting,- Installation,- Delivery of equipment,- Commissioning- Parameters detection

Page 42: Tmk Brochure

Reconstruction and automation of AnnealingFurnace Ž-25B in ArcelorMittal Zenica

42

Page 43: Tmk Brochure

43

Reconstruction of furnace for thermal treatment, 2011

System for measuring temperature inside the flowingtunnel furnace BTU, 2011

Delivery and commissioning of the communication and controlequipment in the HE Rama, 2011

Electrical design –electrical installations and automation controlof Depo 1, TE Tuzla, 2011

Investor: UNIS-TOK, Kalesija, B&HValue: 338.800 BAM (approx. 173.226,00 €)

- Designing- Engineering- Delivery of equipment- Installation- Commissioning- Parameters detection

Investor: SELK, Kutina, CroatiaValue: approx. 20.000,00 €

- Designing- Engineering- Delivery of equipment- Installation- Commissioning- Parameters detection

Subcontractor to “COMEL” SarajevoValue: 37.200,00 BAM (approx. 19.020,00 €)

- Designing- Delivery of equipment- Installation- Commissioning

Investor: JP ELEKTROPRIVREDA BIH D.D. Sarajevo,Power Plant Tuzla

Value: 23.000 €

- Designing of automation, video surveillance, monitoringand control based on Siemens Simatic S7

Page 44: Tmk Brochure

F forSkopje, Macedonia

urnace galvanizing sheetin ArcelorMittal

44

Page 45: Tmk Brochure

45

REFERENCE LIST - REFRACTORY WORKS

Reconstruction , 1999

Lime shaft kiln, 1999

Electric arc furnace 10t, 2001

of the Annealing Furnace 40T

Lime shaft kiln, 1999

Lime shaft kiln No. 1, 1999

Furnace for thermal treatment of “MACRALON” V=500l, 2000

Boiler «Pelluchi» type, 2000

Investor: Steel factory “ Š š, B&HValue: 64.000 BAM (approx. 32.723 €)

Delivery of equipment- Installation- Commissioning

- Reconstruction of the refractory wall

- Reconstruction of the refractory wall

- Reconstruction of the refractory wall(installed approx. 160t of material)

Investor: TRZ HADŽ Ć , Hadž ćValue: 8.000 BAM (approx. 4.090 €)

- Engineering

Investor: KONJUH, Živinice

Investor: Steel factory “ Š š, B&H

-

ILIJA ” Ilija

-

Investor: KALIM, Jelah, B&H

Investor: KALUN, Drniš, Croatia

Investor: INGRAM, Srebrenik, B&H

I i , B&H

, B&H

- Engineering of hanging arch

ILIJA ” Ilija

Design of the project of refractory walls 10 t of electrical furnacefor casting of melt up to 25 t, monitoring of performance during lining

I i

Page 46: Tmk Brochure

Beaching area in ArcelorMittal ZenicaSpill transport system for ladle

46

Page 47: Tmk Brochure

47

Automation and reconstruction of Annealing furnace K-9 (60 t), 2001

econstruction of Annealing furnace Ž (100 t), 2001/2002

EProject of high temperature refractory isolation of furnaceProject of refractory walls of furnaceDelivery of refractory and high temperature isolation materials

Investor: ENKER, Tešanj, B&H

- Delivery and installation of refractory material in the bell ofhigh-temperature chamber furnace

Investor: INGRAM, Srebrenik, B&H

Reconstruction of refractory wall on furnace No 3-Installation of 90 t of material

- Project of high temperature refractory isolation of furnaceProject of refractory walls of the wagon of furnaceDelivery of refractory and high temperature isolation materials

Investor: BIRA, Refrigeration factory, Biha

Deliver of refractory material and reconstruction of refractorywalls of boilers 1 and 2

Investor: KONJUH, Živinice, B&H

Reconstruction of refractory wall of boiler-Delivery of material-Work performance-Installation of approx. 10 t of refractory material

Investor: BH STEEL - Steel factory “ZENICA” Zenica, B&HValue: 298.813 BAM (approx. 152.780 €)

More then 90 % of furnace is completely new !

- ngineering---

Investor: BH STEEL - Steel factory “ZENICA” Zenica, B&HValue: 521.329 BAM (approx. 266.551 €)

More then 90 % of furnace is completely new !

- Engineering

--

High-temperature bell furnace, 2001

Lime shaft kiln No. 3, 2001

R -25-B

Boilers No 1 & 2, 2002

Boiler “Peluchi”, 2002

ć, B&H

-

Page 48: Tmk Brochure

Upgrading of truck with mobile equipmentStation for testing of gas

48

Page 49: Tmk Brochure

49

Investor: KALUN, Drniš, Croatia

- Inspection and reporting on refractory liningcondition in the furnace No. 2

Investor: ENKER, Tešanj, B&H

- Deliver and installation of refractory material into two bells ofhigh-temperature chamber furnace

Investor: KONJUH, Živinice

- Delivery of material, work performance- Installed around 8 t of refractory material

Investor: INGRAM, Srebrenik, B&HValue: 22.615,00 BAM (approx. 11.562,00 €)

Reconstruction of the refractory lining on furnace 1(Nearly 125 t of refractory material installed)

Investor: Steel factory “LIJAŠ”, Ilijaš, B&HValue: 46.000,00 BAM (approx. 23.520,00 €)

Reconstruction of the refractory lining of the wagonand reparation of the refractory lining of furnace

- Engineering- Delivery of refractory material- Installation

Investor: BH STEEL, Zenica, B&H

- Engineering of refractory covering- Delivery of material for refractory lining, approx. 100 m3- Installation of material- Commissioning

Investor: BH STEEL, Zenica, B&H

- Installation of material, approx. 160m3

Lime shaft kiln No. 2, 2002

High-temperature bell furnace, 2003

Chair factory - Reconstruction of refractory lining of boiler, 2003

Lime shaft kiln No. 1, 2004

Annealing furnace 40t, 2004

Tunnel furnace DANIELLI, Rolling Mill III, 2004

Electric Steel Plant, Stetting chamber, Line Chamber, 2004

, B&HValue: 25.090,00 BAM (approx. 12.828€). 2 Contracts

Page 50: Tmk Brochure

Hot Blast Stoves VP-4 in ArcelorMittal Zenica

50

Hot Blast Stoves VP-4

Page 51: Tmk Brochure

51

Investor: BH STEEL, Zenica, B&H

- Installation of material, approx. 300 t

Investor: Steel factory “LIJAŠ”, Ilijaš, B&H

- Delivery of material for lining- Supervision during construction

Investor: FORESTER, Sarajevo

- Engineering

UNIS-PRETIS NIS, Vogo

IGMAN, Konjic B

- Delivery of refractory material

UNIS-PRETIS NIS, Vogo

Electric Steel Plant, first lining of two bath tub of 100 t furnace, 2004

Electric Arc Furnace 10t, 2004

Heating furnace 100 kg/h, 2004

Heating furnace BH STEEL, 2004

Maintenance of electro-resistant in annealing furnace 4

epair o electro-resistant furnace

4

, B&HValue: 25.500,00 BAM (approx. 13.038,00 €)

a-Sarajevo

ća-Sarajevo

Investor: šć , B&H

- Installation og refractory lining

Investor: , &HValue: 15.500,00 BAM (approx. 7.925,00 €)

- Engineering

Investor: BH STEEL - Steel factory “ZENICA” Zenica, B&HValue: 53.750,00 BAM (approx. 27.481,00 €)

- Installation of material

Investor: š , B&H

- Engineering

, 200

General r s n 5 in MaintenanceDepartment with reconstruction of 3 furnaces, installation ofequipment for work under Ar or CO atmosphere protection,

200 /2005

Heating furnace 1000kg/h, 2005

2

Page 52: Tmk Brochure

Steam drying plant for drying of sampledmaterial such as pellets, sand, dust, etc.

52

Page 53: Tmk Brochure

53

Investor: KALUN, Drniš, Croatia

- Reconstruction of refractory lining, approx. 110 t material

Investor: JP "ELEKTROPRIVREDA BiH" Sarajevo,Power Plant Tuzla

Reparation of refractory lining in channels of hot gases, channelsand hopper of fire-place and collector of chimney of block 6

- Installation of approx. 70 t of material

Investor: Steel factory “ILIJAŠ”, Ilijaš

- Delivery of material for refractory lining- Delivery of material for covers- Supervision during construction

aculty of Mechanical Engineering,

- Supervision during construction

Investor: JP "ELEKTROPRIVREDA BiH" Sarajevo,Power Plant Tuzla

Reparation of refractory lining in hot gases channels and hopper ofboiler combustion in boiler 5 of block 4

- Installation of approx. 33 t of material

Lime furnace, 2005

Power Plant, Block 6, 2005

Electric Arc Furnace, 2005

utomatically controlled tubular reactor for testingcombustion characteristics of bio mass and coal, 200

Power Plant Tuzla, Block 4, Boiler 5, 2005

, B&H

Sarajevo

A- 5

Investor: F , B&HValue: 35.000,00 BAM (approx. 17.895,00 €)

- Engineering- Delivery of material- Construction

F , 2005urnace for melting non-ferrous metals 25l/6.3kWInvestor: UNIVERZAL PROGRES, Visoko, B&HValue: 6.000,00 BAM (approx. 3.068,00 €)

- Engineering

Page 54: Tmk Brochure

54

Deduster in foundry for car partsInvestor: “CIMOS”, Zenica, B&H

Page 55: Tmk Brochure

55

Investor: JP “KANTONALNA BOLNICA”, Zenica, B&H

Reparation of refractory lining of boiler

- Delivering and Installation of approx. 3 t of material

,

Engineering

- Engineering and installation of ceramic fibers in the arch of furnace

Investor: JP "ELEKTROPRIVREDA BiH" Sarajevo,Power Plant Tuzla

Reparation of refractory lining in hot gases channels and hopper ofboiler combustion in boiler 5 of block 4

- Installation of approx. 30 t of material

Investor: GIRK “KALUN”, Drniš, Croatia

Investor: Steel factory “ILIJAŠ”, Ilijaš

- Delivery of material for furnace lining- Installation of material

Investor: JP "ELEKTROPRIVREDA BiH" Sarajevo,Power Plant Tuzla

Reparation of refractory lining in hot gases channels and hopper ofboiler combustion in boiler 5 of block 4

- Installation of approx. 50 t of material

Cantonal hospital - Boiler-room, 2005

Furnace K-9, 2006

Power Plant Tuzla, Block 4, Boiler 5, 2006

Electric Arc Furnace 10t, 2006

Power Plant Tuzla, Block 4, Boiler 5, 2006

Laboratory furnace 20l/8kW, 2005Investor: TMD Gradač , B&HValue: 4.000,00 BAM (approx. 2.045,00 €)

-- Construction

Investor: BH STEEL - Steel factory “ZENICA” Zenica, B&H

ac

, B&H

Lime F , 2006urnace

Reparation of refractory lining, approx. 90 t of material-

Page 56: Tmk Brochure

Lubrication DC motor driveCostumer: NESMA Co. Saudi Arabia,for porpose of ARAMCO Co.56

Page 57: Tmk Brochure

57

11.000,00 5.625,00

S-PRETIS NIS ogo a-Sarajevo

- Engineering

- Delivering and Installation of approx. 150 t of material

Investor: Energoinvest termoaparati "E-TAT", Sarajevo, B&H

- Reconstruction of the refractory lining of the wagon

Investor: “LIVTEX”, Livno, B&H

Reparation of refractory lining

Investor: GIRK “KALUN”, Drniš, Croatia

Investor: JP “KANTONALNA BOLNICA”, Zenica, B&H

Reparation of refractory lining of boiler

- Delivering and Installation of approx. 5,5 t of material

Investor „ATB SEVER LIVNICA OKA“, oka, Serbia

F , 200

, 200

urnace for melting non-ferrous metals 180l/14kW 6

Chamber for baking varnish 6

Reconstruction of refractory lining of the furnace "SALEM", 2006

Annealing furnace, 2006

Cantonal hospital - Boiler-room, 2007

Refractory lining of channel furnace IRV 70, 2007

Investor: UNIVERZAL PROGRES, Visoko, B&HValue: BAM (approx. €)

- Construction- Engineering

Investor: UNI , V šć , B&HValue: 35.000,00 BAM (approx.17.895,00 €)

- Installation- Commissioning

Investor: BH STEEL - Steel factory “ZENICA” Zenica, B&H

Č Č

Boiler KLM 100 TPK

urnace

, 2006

Lime F , 2006

Reparation of refractory lining, approx. 98 t of material

-

-

Page 58: Tmk Brochure

Bag filters for dedusting of exhaust gas insugary rafinary «STUDEN-AGRANA» Brčko, B&H

58

Page 59: Tmk Brochure

59

Investor: GIRK “KALUN”, Drniš, Croatia

- Reparation of the bottom of furnace

Investor: JP "ELEKTROPRIVREDA BiH" Sarajevo,Power Plant Tuzla

Reparation of refractory lining in hot gases channels and lining rearof the boiler approx. 320 m2 and reparation of lining at the entrancein the chimney-approx. 70 m2

-Installation of approx. 200 t of material

Investor: „ArcelorMittal“ Zenica, B&H

Repairing of refractory lining of hot blast stoves VP-4

- Installation of approx. 3.500 t of refractory material

Investor: „ArcelorMittal“ Zenica, B&H

Runner lining on cast house of VP-4

- Installation of approx. 650 t of refractory material

Investor: "NT FORGING" Novi Travnik, B&H

- Engineering of refractory lining- Installation of refractory lining- Commissioning- Parameters detection

Furnace D-soel 14/5/94

Power Plant Tuzla, Block 5, 2007

Assembling and reconstruction of new Foundry

Hot Blast Stoves VP-4, 2008

Cast house of VP-4, 2008

Furnace for annealing - large continuous facility, 2008

, 2007

, 2008

Investor: NT-FORGING, Novi Travnik, B&H

Investor: “CIMOS”, Zenica, B&H

- Engineering

Lime F , 2007urnace

Reparation of refractory lining, approx. 20 t of material-

Page 60: Tmk Brochure

Refractory lining of the 1.300t Mixer No.1in ArcelorMittal Zenica

60

Page 61: Tmk Brochure

61

Investor: “CALUCEM”, Pula, Croatia

Investor: ArcelorMittal, Zenica, B&H

- Installation of approx. 600 t of refractory material

ArcelorMittal, Zenica, B&H

- Installation of approx. 660 t of refractory material

Investor: JP “KANTONALNA BOLNICA”, Zenica, B&H

Sanation of refractory lining of boiler

- Delivery and installation of material 4,0 t

Investor: „ArcelorMittal“ Zenica, B&H

- Installation of ca 590 t of refractory material

Investor: JP "ELEKTROPRIVREDA BiH" Sarajevo,Power Plant Tuzla

Reparation of refractory lining in hot gases channelsand lining of boiler 3 and 4

- Installation of approx. 100t of material

Furnace for testing fire-resistant material, 2008

, 2008

Investor: PROTUPOŽARNI INSTITUT Sarajevo, B&HValue: 606.000,00 BAM (approx. 309.843,00 €)

- Engineering- Delivery of equipment and refractory material- Installation- Commissioning- Parameters detection

Investor:

,

Mixer refractory lining 1.300 t, 2008

Convertor refractory lining 1 and 2

Cantonal hospital - Boiler-room, 2008

Refractory lining of 20 ladles for iron transport, 2008

Power Plant Tuzla, Block 3, 2008

Furnace refractory lining for cement casting, 2008

Installation of approx. 300 t of refractory material-

Page 62: Tmk Brochure

Coiling machine for cablesInvestor: KAPIS TKT, Tomislavgrad

62

Page 63: Tmk Brochure

63

Investor: ArcelorMittal, Zenica, B&H

Investor: ArcelorMittal, Zenica, B&H

- Installation of approx. 500 t of refractory material

Investor: ArcelorMittal, Zenica, B&H

- Installation of approx. 160 t of refractory material

Investor: CIMOS TMD CASTING, Zenica, B&H

Investor: ArcelorMittal, Zenica, B&H

- Installation of approx. 2.300 t of refractory material

Investor: JP “KANTONALNA BOLNICA”, Zenica, B&H

Reparation of refractory lining of boiler

- Delivering and Installation of approx. 3 t of material

Investor: GIRK “KALUN”, Drniš, Croatia

Investor: ArcelorMittal, Zenica, B&H

Investor: ArcelorMittal, Zenica, B&H

- Installation of approx. 950 t of refractory material

Annual contract for 2008: Refractory lining of ladles forpig-iron transport

Convertor lininig 1 and 2 (regular reparation)

Reparation of runners on the casting platform VP-4, 2008

Reparation of refractory walls of Channel Induction Furnace

Annual contract for 2009: Convertor Lining

Cantonal hospital - Boiler-room, 2009

Annual contract for 2009: Refractory lining of ladles forpig-iron transport

Annual contract for 2009: Refractory lining of ladles for hotmetal transport and charging

, 2008

, 2009

Reparation of refractory lining, approx. 250 t of material-

Lime F , 2009urnace No.1

Page 64: Tmk Brochure

Refractory lining of ladlesInvestor: ArcelorMittal Zenica

64

Page 65: Tmk Brochure

65

Investor: ArcelorMittal, Zenica, B&H

- Installation of approx. 2.000 t of refractory material-

- Installation of approx. 900 t of refractory material- - Installation of approx. 370 t

of refractory material

- Installation of approx. 50 t of refractory material

Investor: ArcelorMittal, Zenica, B&H

Reparation of refractory lining of boiler KO No1

- Installation of approx. 50t of refractory material

Investor: ArcelorMittal, Zenica, B&H

- Installation of approx. 175 t of refractory material

Investor:

- Project of refractory lining- Installation of refractory materials- Commissioning- Parameters detection

Investor: ArcelorMittal, Zenica, B&H

- Installation of approx. 1.750 t of refractory material-

- Installation of approx. 900 t of refractory material- - Installation of approx. 150 t

of refractory material

- Installation of approx. 50 t of refractory material- - Installation of approx. 450 t of

refractory material-

- Installation of approx. 5.000 t of refractory material

Annual contracts for 2010:

Boiler - Convertor

Heating furnace 100t/h,"SALEM" Rolling Mill, 2010

Heating furnace for forging, 11,5t/day

Annual contracts for 2011:

Convertor Lining

Refractory lining of ladles for hot metal transport and charging

Runners for iron lining and slag VP-4

Convertor Lining

Refractory lining of ladles for hot metal transport and charging

Runners for iron lining and slag VP-4

Gunning of convertor and mixer

, 2010

, 2011

Refractory works in ladle in the hall of steel work

UNIS-TOK, Kalesija, B&H

-

-

-

-

Refractory lining of tuber segments and beaching runners

Refractory lining of tuber segments and beaching runners

Page 66: Tmk Brochure

66

Refractory lining of furnace K-25AInvestor: ArcelorMittal Zenica

Page 67: Tmk Brochure

67

Investor: NT FORGING

- Project of refractory lining- Installation of refractory materials- Commissioning- Parameters detectionl

Investor: Steel factory “ILIJAŠ”, Ilijaš

- Delivery of material for lining of furnace and two covers- Installation of material into three furnaces

Heating furnace for forging 1,5 t/h

Electric Arc Furnace 10t, 2011, B&H

, Novi Travnik, B&H

Page 68: Tmk Brochure

68

Refractory works on the «SALEM» heating furnace100t/h in Rolling Mill Department, ArcelorMittal Zenica

Page 69: Tmk Brochure

69

REFERENCE LIST - MECHANICAL WORKS

Furnace for spark plugs, 1998

of the Annealing Furnace 40t

Investor: ENKER, Teš

Modernization of the equipment for measuring and control- Designing- Delivery of equipment- Installation- Commissioning- Optimization- Parameters detection

Investor: USAID for JP “VODOVOD” Zenica, B&H

- Delivery of equipment- Installation- Commissioning

- Engineering- Delivery of equipment- Installation- Commissioning- Optimisation

Investor: Steel factory “ Š š, B&H

Delivery of equipment- Installation- Commissioning- Detection parameters

Investor: USAID for Primary school “GOJEVIĆI , B&H

anj, B&H

Subcontractor to “Metalno” company, Zenica

Investor: KALIM, Jelah, B&H

ILIJA ” Ilija

Reapir-

”, Municipality Fojnica

- Engineering- Delivery of equipment- Works

Mud thickener, 1999

Construction of furnace for galvanisation, 1999

Reconstruction , 1999

Reconstruction of boiler room and hot water network, 1999

Page 70: Tmk Brochure

70

General overhaul of rotary excavator SH-630P.K. «Šikulje», Lukavac

Page 71: Tmk Brochure

71

Pump station Guča Gora, construction of water supply, 1999

Reconstruction of the heating on the furnace for enameling

Furnace for thermal treatment of “MACRALON” V=500l, 2000

Automation and reconstruction of Annealing furnace K-9 (60 t), 2001

Automation and reconstruction of Annealing furnaceŽ (100 t), 2001/2002

SMS 25/31,5 MNand 5 MN manipulator of 250 kN DANGO&DIENNENTHALL inthe Blacksmith department

Investor: USAID for Municipality Travnik, B&H

- EngineeringDelivery of equipment

- Work performance on construction of water supplies,pump station and water route

Investor: HELIOS, Banović , B&H

Investor: TRZ HADŽ Ć , Hadž ć

Investor: Orašje Municipality, Orašje

Investor: BH STEEL - Steel factory “ZENICA” Zenica, B&HValue: 298.813 BAM (approx. 152.780 €)

More then 90 % of furnace is completely new !

Investor: BH STEEL - Steel factory “ZENICA” Zenica, B&HValue: 521.329 BAM (approx. 266.551 €)

More then 90 % of furnace is completely new !

Investor: BH STEEL - Steel factory “ZENICA” Zenica, B&HValue: BAM (approx. . €)

- Delivery of equipment- Engineering- nstallation- Commissioning

-

I i , B&H

, B&H

- Engineering- Mechanical Project of mantle and chimney of furnace- Project of gas and air installation- Delivery of equipment

- Engineering- Mechanical Project of mantle and chimney of furnace- Project of gas and air installation- Delivery of equipment

1.154.000 590 030

I

, 1999

Pump station „KOSTR “, Water supply, 2000

-25-B

Reconstruction of hydraulic valves of press

, 2002

i

I i

Č

Page 72: Tmk Brochure

General overhaul of rotary excavator SH-630P.K. «Šikulje», Lukavac

72

Page 73: Tmk Brochure

73

Reconstruction of steam generation facilities in Oil rafinery, 2003

Reconstruction of oil supply plant facilities in Oil rafinery, 2003

Reconstruction of the equipment for combustion, measurementand regulation in the furnace for normalisation of propane-butanebottles, 200

Refrigeration factory - filling machine for PUR-foam, 2004

,

” - refrigeration factory, Biha

Investor: BIMAL d.d. Br , B&HValue: 83.182,00 BAM (approx. 42.530,00 €)

- Delivery of equipment- Installation- Engineering- Commissioning

Investor: BIMAL d.d. Br , B&HValue: 21.000,00 BAM (approx. 10.737,00 €)

- Delivery of equipment- Installation- Engineering- Commissioning

Investor: Đ Đ Ć Slavonski brod, CroatiaValue: 26.800,00 €

- Delivery of equipment- Engineering- Welded vessels- Commissioning

Investor: BH STEEL - Steel factory “ZENICA” Zenica, B&H

- Delivery of equipment- Installation- Commissioning

Investor: “BIRA ć, B&H

- Delivery of equipment for filling machine- Installation- Commissioning

čko, Brčko

čko, Brčko

4

Measuring control station for natural gas 3.000 m3/hfor the electro-steel works, 2004

URO AKOVI

Page 74: Tmk Brochure

Furnace for heating of model plates, 15kWInvestor: CIMOS TMD CASTING, Zenica

74

Page 75: Tmk Brochure

75

R of sheet , 200

0 , 200

, 200

Press 10/2,5 MN and s, 2005

econstruction furnace for thermal treatment of s 4

Heating furnace 10 kg/h 4

Heating furnace BH STEEL, 2004

Maintenance of electro-resistant in annealing furnace 4

respective manipulator

VOEST-ALPINE Linz, Austria

I

FORESTER, Sarajevo

- Designing

Installation

UNIS-PRETIS NIS, Vogo

roject regulation and keeping the

IGMAN, Konjic B

delivery of heaters

UNIS-PRETIS NIS, Vogo

Design

Investor:Value: 190.000,00 €

- Delivery of equipment- nstallation- Commissioning- Parameters detection

Investor: , B&HValue:25.500,00 BAM (approx. 13.038,00 €)

- Delivery of equipment- Engineering-- Parameters detection

Investor: šć , B&H

- Delivery of burner equipment- Installation- P of furnace- Commissioning- Parameters detection

Investor: , &HValue: 15.500,00 BAM (approx. 7.925,00 €)

- Construction and(made from KANTHAL A-1)

- Installation of the heaters

Investor: š , B&H

Reconstruction of hydraulic valves of press- ing- Delivery of equipment- Engineering- Installation- Commissioning- Parameters detection

,

a-Sarajevo

ća-Sarajevo

Page 76: Tmk Brochure

Remount of rotary furnace, «IGMAN» Konjic

76

Page 77: Tmk Brochure

77

Heating furnace 1000kg/h, 2005

0 , 200

A- 5

Laboratory furnace 20l/8kW, 2005

F , 200

Heating furnace 10 kg/h 4

utomatically controlled tubular reactor for testingcombustion characteristics of bio mass and coal, 200

urnace for melting non-ferrous metals 30,6l/6,3kW 6

UNIS-PRETIS NIS, Vogo

Design

FORESTER, Sarajevo

- Designing

Installation

aculty of Mechanical Engineering,

,

Investor: š , B&H

- ing- Delivery of equipment- Engineering- Installation- Commissioning- Parameters detection

Investor: , B&HValue:25.500,00 BAM (approx. 13.038,00 €)

- Delivery of equipment- Engineering-- Parameters detection

Investor: F , B&HValue: 35.000,00 BAM (approx. 17.895,00 €)

- Designing- Delivery of equipment- Engineering- Installation- Commissioning- Parameters detection

Investor: TMD Gradač , B&HValue: 4.000,00 BAM (approx. 2.045,00 €)

- Engineering- Installation- Commissioning

Investor: UNIVERZAL PROGRES, Visoko, B&H

- Engineering- Construction- Commissioning

ća-Sarajevo

Sarajevo

ac

Page 78: Tmk Brochure

Furnace for thermal treatment VPPInvestor: NT FORGING, Novi Travnik

78

Page 79: Tmk Brochure

79

F , 200

, 200

Press «Ivo Lola Ribar», 2007

“Emcotest“ machine for measuring hardness 2007

Pellet dryer Machine, 2007

urnace for melting non-ferrous metals 180l/14kW 6

Chamber for baking varnish 6

Furnace for control of temperature sensors, 2006

,

11.000,00 5.625,00

S-PRETIS NIS ogo a-Sarajevo

- Engineering

Zenica

.000,00 . ,00

- Engineering

.000,00 . ,00

- Engineering

Investor: UNIVERZAL PROGRES, Visoko, B&HValue: BAM (approx. €)

- Engineering- Installation- Commissioning

Investor: UNI , V šć , B&HValue: 35.000,00 BAM (approx.17.895,00 €)

- Installation- Commissioning

Investor: MITTAL STEEL , B&H

- Installation- Engineering- Commissioning

Investor: PRETIS NIS, Vogošća-Sarajevo, B&HValue: 75 BAM (approx. 38 347 €)

- Installation- Commissioning

Investor: PRETIS NIS, Vogošća-Sarajevo, B&HValue: 130 BAM (approx. 66 468 €)

- Installation- Commissioning

Investor: FIS, Vitez, B&HValue: 111.000,00 BAM (approx. 56.753,00 €)

- Engineering- Installation- Commissioning

Page 80: Tmk Brochure

Re-circulation system of technological waterin Cement Plant Kakanj

80

Page 81: Tmk Brochure

81

Friction press, 2008

Furnace for thermal treatment VPP, 2008

Furnace for testing fire-resistant material, 2008

Drying furnace, 2008

Steel Plant - Station for tundish heating 1,44 MW, 2008

Coke Oven Battery Plant-Biological waste water treatment, 2008

,

,

,

- engineering

.000,00 ,00

,00

- Engineering

Investor: PIROMETAL Brčko, B&HValue: 400.000,00 BAM (approx. 204.517,00 €)

- Engineering- Installation- Commissioning

Investor: NT FORGING Novi Travnik, B&HValue: 296.000,00 BAM (approx. 151.342,00 €)

- Engineering- Installation- Commissioning

Investor: PROTUPOŽARNI INSTITUT Sarajevo, B&HValue: 606.000,00 BAM (approx. 309.843,00 €)

- Engineering- Installation- Commissioning

Investor: UNIS-PRETIS NIS Vogošća-Sarajevo, B&HValue: 100.000,00 KM (approx. 51.129,00 €)

- Installation- Commissioning

Investor: ARCELORMITTAL, Zenica, B&HValue: 50 BAM (approx. 25.565 €)

- Engineering- Installation- Commissioning

Investor: ARCELORMITTAL, Zenica, B&HValue: approx. 750.000 €

- Installation- Commissioning

,

Page 82: Tmk Brochure

Hydraulic power unit of platform for converterlining in ArcelorMittal Zenica

82

Page 83: Tmk Brochure

83

ARCELORMITTAL, Zenica, B&HValue: approx. 70.636 €

Investor: CIMOS, Zenica, B&HValue: 754 BAM (approx. 385.514, €)

- Delivery of equipment- Installation- Commissioning

,00

- Dismantling of existing equipment- Delivery- Installation and supervision- Trial work and parameterisation- Commissioning

.000,00 00

- Engineering

Mechanical works in CIMOS - II phase, 2009

Furnaces for testing the resistance of materials, 2008

Induction melter furnaces, 2008

Mobile stations for a heating of caldrons, 2008/2009

. 0,00

Investor:

Investor: NT FORGING Novi Travnik, B&HValue: 397.000,00 BAM (approx. 202.983,00 €)

- Engineering- Delivery of equipment- Installation- Commissioning

Investor: Metalska industrija Varaždin-MIV, Varaždin, CroatiaValue: 59.840,00 €

- Engineering- Installation- Commissioning

Investor: Metalska industrija Varaždin-MIV, Varaždin, CroatiaValue: 29 35 €

- Engineering- Installation- Commissioning

,

Equipment for preserving of temperature of liquid metal inmixer in Steel Mill Department – “ArcelorMittal Zenica”, 2009

Page 84: Tmk Brochure

Dedusting of iron mixer on Steel PlantDepartment in ArcelorMittal Zenica

84

Page 85: Tmk Brochure

85

Re-circulation system of technological water, 2009

Machine for wire twisting „CIGARA”, 2009,

- Engineering and attest technical documentation- Procurement and delivery of equipment- Installation- Trial work- Parameter detection

Investor: Cement Plant Kakanj, B&HValue: 78.300,00 BAM (approx. 40.034,00 €)

- Engineering- Delivery of equipment- Installation- Commissioning

Investor: KAPIS TKT Tomislavgrad, B&HValue: 55.000,00 BAM (approx. 28.121,00 €)

- Designing- Engineering- Delivery of equipment- Installation- Commissioning

Investor: “ArcelorMittal”, Zenica, B&HValue: 46.323,00 €

- Designing- Delivery of equipment- Installation- Supervision- Commissioning

Investor: “ArcelorMittal”, Skopje, FYR MacedoniaValue: 109.667,00 €

- Designing- Delivery of equipment- Installation- Supervision- Commissioning- Parameters detection

Investor: IVEX, Usora, B&HValue: 71.000,00 BAM (approx. 36.300,00 €)

,

Air post on the location “LF” and “CCM” in Steel PlantDepartment, 2010

Burners and burners' armatures for air heating of the chamberfor sheet plastification, 2010

Upgrading of truck with mobile equipment,Station for testing of gas, 2010

Page 86: Tmk Brochure

Administrative office and workshop

86

Page 87: Tmk Brochure

87

JP "ELEKTROPRIVREDA BiH" Sarajevo,Power

Construction of the system for emergency oil evacuationTurbo unit of blocks 5. and 6. TE “KAKANJ” KAKANJ

General overhaul of rotary excavator SH-630, no. 1352P.K. “Šikulje” - Lukavac, 2010/2011

Reconstruction of heating furnace LOI-SAAR,capacity 1.300 kg/h, 2011

Expansion of compressor station in BOF Steel Mill, 2011

Reconstruction of furnace for thermal treatment, 2011

, 2010

-Procurement and delivery of equipment-Installation and Supervision- Commissioning

JP ELEKTROPRIVREDA BIH D.D. Sarajevo,ZD Rudnici “Kreka” d.o.. Tuzla

Value: 4.450.000,00 BAM (approx. 2.275.249,00 €)

- Dismantling of existing equipment- Procurement and delivery of equipment- Installation and Supervision- Parameters detection and Commissioning

- Dismantling of existing equipment- Procurement and delivery of equipment- Installation and Supervision- Commissioning

- Mechanical engineering- Procurement and delivery of equipment- Installation and Supervision- Parameters detection and Commissioning- Revision of project documentation

Investor: UNIS-TOK, Kalesija, B&HValue: 338.800 BAM (approx. 173.226,00 €)

- Engineering, control and running furnace- Procurement and delivery of equipment- Installation and Supervision- Trial work- Parameters detection and Commissioning

Investor:Plant Kakanj, B&H

Value: 94.716,00 BAM (approx. 48.427,00 €)

Investor:

Investor: “NT FORGING”, Novi Travnik, B&HValue: 82.720,00 BAM (approx. 42.294,00 €)

Investor: “ArcelorMittal”, Zenica, B&HValue: 150.360,00 BAM (approx. 76.877,00 €)

,

Page 88: Tmk Brochure

© Copyright by termomatik

LOCATION OF COMPANY

Ltd Zenica

42, Juraja Neidharta Street

72000 Zenica, B&H

phone: +387 32 44 88 10

fax: +387 32 32 44 88 27

web site: www.termomatik.com

e-mail: [email protected]

termomatiktermomatik