title line 1 ridge proje t title line 2 infrastruture ...team member names who helped reate the...

2
Team Member Names Who Helped Create the Poster Past Work Partners Acknowledgements Sponsors: Advisors: Dr. Brian Swartz Tim Zimmerman John Souto Current Need La Gigi, Panama Our Mission In the Bridge Project, we believe that everyone deserves the right to have access to essential life resources. We are increasing hope and transforming lives in cutoff communities by de- signing bridges, and helping the local communities construct them in essential locations. Current Design La Gigi, Panama People are unable to safely travel to the main road where food and supplies can be purchased. The need is confirmed by an existing bridge, built by the locals, which is hazardous. (Shown in the picture to the right.) The need was first expressed by the Mayor of the municipality and our partnering organiza- tion, Rio Missions. People are unable to safely cross into Bajo Grande, the central town where the only school and medical center for the area are located. Community of Arraijan cut off from Church, Community Center, and clean water source by a deep ravine. Our team designed a 40 ſt mber truss to provide the community with safe transportaon across the unsafe ra- vine (seen in the photo below). 230 ſt cable suspended bridge Cast-in-place reinforced concrete anchors 1 1/8 in. diameter cables Stone masonry footers and ers Concrete-filled reinforced CMU towers Timber decking consisng of 4x4, 2x6, 2x8 size boards Will be constructed during a six construcon week trip From May 18 to June 30, 2015 Bridge designed in the Spring of 2014 Constructed in the Sum- mer of 2014 Construcon included a new addion to their Com- munity Center. Contact Us Dr. Brian Swartz: [email protected] Russell Wolslagle: [email protected] Arraijan, Panama BRIDGE PROJECT INFRASTRUCTURE GROUP Prepared by: Russell Wolslagle, Andrew Joy

Upload: others

Post on 13-Nov-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Title Line 1 RIDGE PROJE T Title Line 2 INFRASTRUTURE ...Team Member Names Who Helped reate the Poster Past Work Partners Advisors: Acknowledgements Sponsors: Dr. Brian Swartz Tim

Title Line 1

Title Line 2

Team Member Names Who Helped Create the Poster

Past Work

Partners

Acknowledgements Sponsors:

Advisors:

Dr. Brian Swartz

Tim Zimmerman

John Souto

Current Need

La Gigi, Panama

Our Mission In the Bridge Project, we believe that everyone deserves the right to have access to essential

life resources. We are increasing hope and transforming lives in cutoff communities by de-

signing bridges, and helping the local communities construct them in essential locations.

Current Design

La Gigi, Panama

People are unable to safely travel to the main road

where food and supplies can be purchased.

The need is confirmed by an existing bridge, built by the locals,

which is hazardous. (Shown in the picture to the right.)

The need was first expressed by the Mayor of the municipality and our partnering organiza-

tion, Rio Missions.

People are unable to safely cross into Bajo Grande, the central town where the only school

and medical center for the area are located.

Community of Arraijan cut off from Church, Community

Center, and clean water source by a deep ravine.

Our team designed a 40 ft timber truss to provide the

community with safe transportation across the unsafe ra-

vine (seen in the photo below).

230 ft cable suspended bridge

Cast-in-place reinforced concrete anchors

1 1/8 in. diameter cables

Stone masonry footers and tiers

Concrete-filled reinforced CMU towers

Timber decking consisting of 4x4, 2x6, 2x8 size boards

Will be constructed during a six construction week trip

From May 18 to June 30, 2015

Bridge designed in the

Spring of 2014

Constructed in the Sum-

mer of 2014

Construction included a

new addition to their Com-

munity Center.

Contact Us Dr. Brian Swartz: [email protected]

Russell Wolslagle: [email protected]

Arraijan, Panama

BRIDGE PROJECT INFRASTRUCTURE GROUP

Prepared by: Russell Wolslagle, Andrew Joy