tiong aik construction pte ltd - drywall pbu · 231 1 300 1 37480 1 600 1 600 146 171 100 5 75 175...
TRANSCRIPT
DATE DRAWN:SCALE:
CHECKED:
DRAWING TITLE:
MAIN CONTRACTOR:
REV:
FILENAME:
DRAWN BY:
DRYWALL PBU_REFERENCE TABLE
DRAWING NUMBER:
TAC/PBU/RD/000
TAC / PBU / RD / 001
TIONG AIK CONSTRUCTION PTE LTD - DRYWALL PBU
OVERALL PBU SYSTEMS/N ITEM DESCRIPTION WALL FLOOR CEILING
TAC / PBU / RD / 001TAC / PBU / RD / 001TAC / PBU / RD / 001Cross-Section View1
TAC / PBU / RD / 002TAC / PBU / RD / 002TAC / PBU / RD / 002TAC / PBU / RD / 002
Assembly of PBU structure including corner details 2
(complete with finishes)
N.ATAC / PBU / RD / 003
Reinforcement for grab bars to be retro-fitted in the future and 3
other fittings if necessary
a). Materials
b). Critical dimensions e.g. thickness
c). Proposed locations
N.A N.A
TAC / PBU / RD / 001Thickness and other critical dimensions4
TAC / PBU / RD / 003
TAC / PBU / RD / 001
TAC / PBU / RD / 003
TAC / PBU / RD / 001
TAC / PBU / RD / 003
N.A
Material description including5
a). Type
b). Brands (if applicable)
c). Grade of concrete
TAC / PBU / RD / 001
TAC / PBU / RD / 002
TAC / PBU / RD / 003
TAC / PBU / RD / 001
TAC / PBU / RD / 002
TAC / PBU / RD / 003
TAC / PBU / RD / 001
TAC / PBU / RD / 002
TAC / PBU / RD / 003
N.A
Detailing for installation of mechanical, electrical and plumbing6
(MEP) services including
a). Proposed locations
b). Recesses/ cast-in/ openings or other installation methods
TAC / PBU / RD / 004 N.ATAC / PBU / RD / 004 TAC / PBU / RD / 004
Types of tiles7 Based on project
requirement
Based on project
requirement
N.A N.A
TAC / PBU / RD / 004Type(s) of floor trap8 N.A N.A N.A
Isometric view of a completely finished and fitted-out PBU9
before it is installed on site
N.A N.AN.ATAC / PBU / RD / 005
Maintenance panel10 N.A N.AN.A TAC / PBU / RD / 005
Interfacing between PBU floor to structural floorTAC / PBU / RD / 001
TAC / PBU / RD / 002
TAC / PBU / RD / 003
N.A
11
(e.g. double slab, edge beam)
N.AN.A
Window installation12 N.AN.A N.ATAC / PBU / RD / 004
REFERENCE TABLE
NO. 1 JALAN BERSEH
SINGAPORE 209037TEL : (65) 6392 2988 FAX : (65) 6392 0988
TIONG AIK CONSTRUCTION PTE LTD
#03-03 NEW WORLD CENTRE
X
X
YY
FT
FW
25
16
25
87
5
25
00
1425
1825
16
00
90
0
25
00
975 850
400
OUTLINE OF 50x50x5mm
THK SHS
9mm THK MOISTURE
RESISTANT BOARD
CH 2300
ACCESS PANEL
LIGHT
10
0
515600
60
0
30
0
NS GROUT AFTER PBU
INSTALLATION
THRESHOLD
12.7mm THK. USG
DUROCK CEMENT BOARD
24
00
FFL BATH
24
25
10mm THK. TILES
12.7mm THK. USG DUROCK
CEMENT BOARD (ON WET AREAS)
FFL BATH
50x50x4.5mm THK
GALV. HOLLOW SECTION
31
50
31
50
45
0
45
0
WATERPROOFING
WATERPROOFING
50x50x4.5mm THK
GALV. HOLLOW SECTION
G40 PRECAST RC SLAB
DATE DRAWN:SCALE:
CHECKED:
DRAWING TITLE:
MAIN CONTRACTOR:
REV:
FILENAME:
DRAWN BY:
PBU - LAYOUTS,
DRAWING NUMBER:
TAC/PBU/RD/001
50x50x5mm SHS
TILE FINISH
RONDO STUD: PN491
35mmx64mmxBMT0.75
305mm C/C
12.7mm THK. USG DUROCK
CEMENT BOARD (ON WET AREAS)
RCP AND SECTIONS
PBU - REFLECTED CEILING PLAN
2
PBU LAYOUT
1
PBU - SECTION X-X
3
PBU - SECTION Y-Y
4
NO. 1 JALAN BERSEH
SINGAPORE 209037TEL : (65) 6392 2988 FAX : (65) 6392 0988
TIONG AIK CONSTRUCTION PTE LTD
#03-03 NEW WORLD CENTRE
20 170
75
10
10
20 100
10
77
5
10
20 100
10
64
13
5
10
175
RONDO TRACK: PN492
32mmx64mmx BMT 0.75mm THK
RONDO STUD: PN491
35mmx64mmx BMT 0.75mm THK
305mm C/C
12.7mm THK. USG DUROCK
CEMENT BOARD (ON WET AREAS)
10mm TILES
10mm TILES
WATERPROOFING
50x50x4.5mm THK.
L-ANGLE BAR
SHIM PLATE
5
CEMENT/SAND
SCREED
50
10
10
10
0
50
20
10
0
100Ø mm PIPE
FLOOR TRAP COVER
WATERPROOFING
10mm TILES
CEMENT/SAND SCREED
5
25
10
10
100
50
100
FFL BATHROOM
FFL UNIT
50x50x4.5mm THK.
L- ANGLE BAR
SHIM PLATE
NS GROUT AFTER PBU
INSTALLATION
THRESHOLD
TIMBER DOOR
10mm TILES
WATERPROOFING
CEMENT/SAND SCREED
120
5
SILICON
5
25
ram
p
25 drop
Sh
Bath 2
747 775
75
0
100
30
0
1mm THK. GALVANIZED
STEEL PLATE
S/S GRAB BAR
24
0
20
10
0
750
19 64
13
5
10
S/S GRAB BAR
10mm TILES
12.7mm THK. USG DUROCK
CEMENT BOARD (ON WET AREAS)
19mm THK. BORAL IMPACT
240
750
400
FT
FW
25
16
25
87
5
25
00
1425
1825
16
00
90
0
25
00
975 850
400
SC1
SC1
SC1
SC1
SC1
SC1
SC1
SB1
SB1
SB1
SB1
SB1
LP
LP
LP
LP
SB1
SB1
16
25
87
5
25
00
1425
1825
16
00
90
0
400
25
00
SC1
SC1
SC1
SC1
SC1
SC1
SC1
SB1
SB1
SB1
SB1
SB1
LP
LP
LP
LP
SB1 SB1
SB1
16
25
87
5
25
00
1425
1825
16
00
90
0
400
25
00
(PBU-SHOP DRAWINGS)
WATERPROOFING DETAIL
3A
(PBU-SHOP DRAWINGS)
WATERPROOFING DETAIL (PIPE PENETRATION)
3B
(PBU-SHOP DRAWINGS)
THRESHOLD DETAIL (TILE FINISH)
4
96
75
S.O. = 764 940
96
1971
41
56
93
41
5
15
96
15
24
15
96
87
7
10
26
23
96
15
24
35
15
77
10
26
23
96
15
374
1
600
1
373
15
96
1571
10
710
23
1
1
30
0
1
23
1
80
37
3
1
60
0
1
60
0
300 244
60
0
244
32
2
37
38
0
300
92
FRAME WIDTH=758
(HANDICAPPED GRAB BAR POSITION)
PBU - TILE LAYOUT PLAN
2A
A
(HANDICAPPED GRAB BAR POSITION)
ELEVATION - A
2B
Y Y
DATE DRAWN:SCALE:
CHECKED:
DRAWING TITLE:
MAIN CONTRACTOR:
REV:
FILENAME:
DRAWN BY:
PBU - LAYOUTS,
DRAWING NUMBER:
TAC/PBU/RD/002
50x50x5mm SHS
TILE FINISH
RONDO STUD: PN491
35mmx64mmxBMT0.75
305mm C/C
12.7mm THK. US DUROCK
CEMENT BOARD (ON WET AREAS)
50x50x4.5mm THK
L - ANGLE
50x50x4.5mm THK
L - ANGLE
PBU LAYOUT
1A
PBU - STRUCTURAL STEEL
FRAME PLAN (BOTTOM)
1B
PBU - STRUCTURAL STEEL
FRAME PLAN (TOP)
1C
(HANDICAPPED GRAB BAR POSITION)
SECTION THRU Y- Y
2C
ELEVATION, SECTION & DETAILS
NO. 1 JALAN BERSEH
SINGAPORE 209037TEL : (65) 6392 2988 FAX : (65) 6392 0988
TIONG AIK CONSTRUCTION PTE LTD
#03-03 NEW WORLD CENTRE
231
1
300
1
23180
374
1
600
1
600
14
6
17
1
10
0
5
75
17
5
20
170
10
900
50
1577
96
2383
250
10
0
5
10
0
20
15
77
10
170
NS GROUT AFTER
PBU INSTALLATION
THRESHOLD
10mm THK. TILES
12.7mm THK. USG DUROCK
CEMENT BOARD (ON WET AREAS)
24
00
FFL BATH
25
25
75
45
0
110
600
110
RONDO STUD: PN491
35mmx64mmx BMT 0.75mm THK
305mm C/C
RONDO TRACK: PN492
32mmx64mmx BMT 0.75mm THK
377
128
68
31
50
5
75
20
20
05
0
10
0
10
0
5
75
20
374
600 374
75
20
24
25
75
17
1
128 137
374
9696
96
15
374
1
600
1
374
15
96
5
75
17
5
10mm THK. TILES
12.7mm THK. USG DUROCK
CEMENT BOARD (ON WET AREAS)
FFL BATH
RONDO TRACK: PN492
32mmx64mmx BMT
0.75mm THK
RONDO STUD: PN491
35mmx64mmx BMT
0.75mm THK
305mm C/C
10
75
6868
68
31
50
1379
75
20
20
0
50
10
0
5
41
5
10
0
5
10
5
231
1
300
1
23180
374
1
600
1
600
14
6
17
1
10
0
5
75
17
5
20
170
10
77
883
15
1537
96
5
75
20
15
77
10
170
400
NS GROUT AFTER PBU
INSTALLATION
THRESHOLD
10mm THK. TILES
12.7mm THK. USG DUROCK
CEMENT BOARD (ON WET AREAS)
24
00
FFL BATH
25
25
75
45
0
15
110
600
110
RONDO STUD: PN491
35mmx64mmx BMT 0.75mm THK
305mm C/C
RONDO TRACK: PN492
32mmx64mmx BMT 0.75mm THK
511
68
20
0
10
0
5
75
20
50
9696
10
0
5
10
0
15
0
19mm THK. BORAL IMPACT
STOP BOARD (DRY AREAS)
(AFTER PBU INSTALLATION)
FFL BATH
37
5
300
1
300
15
300
1
300
1
300
1
244
1
15
96
96
23
00
75
45
0
1779
RONDO TRACK: PN492
32mmx64mmx BMT
0.75mm THK
165 600
165
14
6
38
58
20
0
50
10
0
5
10
0
20
PBU - TILE ELEVATION -A
1
PBU - TILE ELEVATION -B
2
PBU - TILE ELEVATION -C
3
PBU - TILE ELEVATION -D
4
DATE DRAWN:SCALE:
CHECKED:
DRAWING TITLE:
MAIN CONTRACTOR:
REV:
FILENAME:
DRAWN BY:
PBU - TILE ELEVATION
DRAWING NUMBER:
TAC/PBU/RD/003
NO. 1 JALAN BERSEH
SINGAPORE 209037TEL : (65) 6392 2988 FAX : (65) 6392 0988
TIONG AIK CONSTRUCTION PTE LTD
#03-03 NEW WORLD CENTRE
16
01
65
Ø1
50
W
AS
TE
S
TA
CK
TOP OF PBU
15
0
29
5
100
260
Ø150 W
AS
TE
S
TA
CK
TOP OF PBU
375
511
ALUMINUM POWDER COATED
GLASS WINDOW
SEALANT
50x50x4.5mm THK SHS
9mm THK. GYPSUM BOARD
CEILING FINISH
65
24
25
20 100
10
64
13
10
511
12.7mm THK. USG DUROCK
CEMENT BOARD
RONDO STUD: PN491
10mm TILES
WATERPROOFING
SEALANT
ALUMINUM POWDER COATED
GLASS WINDOW
10
5
ALUMINUM FLASHING
ra
mp
25
d
ro
p
Sh
Bath 2
25
MEP LAYOUT PLAN
1
DATE DRAWN:SCALE:
CHECKED:
DRAWING TITLE:
MAIN CONTRACTOR:
REV:
FILENAME:
DRAWN BY:
PBU - LAYOUT, SECTIONS & DETAILS
DRAWING NUMBER:
TAC/PBU/RD/004
PLAN OF SHALLOW FLOOR TRAP
2A
SECTION OF PBU WITH SHALLOW FLOOR TRAP
2B
WINDOW DETAIL (TOP)
4A
WINDOW DETAIL (BOTTOM)
4B
SECTION OF PBU WITH CONVENTIONAL FLOOR TRAP
3A
DETAIL OF S-TRAP
3B
NO. 1 JALAN BERSEH
SINGAPORE 209037TEL : (65) 6392 2988 FAX : (65) 6392 0988
TIONG AIK CONSTRUCTION PTE LTD
#03-03 NEW WORLD CENTRE
ra
mp
25
d
ro
p
Sh
Bath 2
25
Master Bdrm.
Master Bath
PBU - ISOMETRIC VIEWS
2
PARTIAL PLAN FOR
MAINTENANCE ACCESS FROM ADJACENT ROOM
1
DATE DRAWN:SCALE:
CHECKED:
DRAWING TITLE:
MAIN CONTRACTOR:
NO. 1 JALAN BERSEH
SINGAPORE 209037TEL : (65) 6392 2988 FAX : (65) 6392 0988
REV:
TIONG AIK CONSTRUCTION PTE LTD
#03-03 NEW WORLD CENTRE
FILENAME:
DRAWN BY:
PBU - MAINTENANCE ACCESS &
DRAWING NUMBER:
TAC/PBU/RD/005
ISOMETRIC VIEWS