![Page 1: Tim Hanley, P.E.– WisDOT Project Manager Daniel Schave, P ... · Mill (remove) 2 inches of asphalt Cold-in-place recycle 4 inches of asphalt Place 1.75 inches of new asphalt Addresses](https://reader034.vdocuments.mx/reader034/viewer/2022042806/5f6a6103d89721252121fe5f/html5/thumbnails/1.jpg)
Tim Hanley, P.E.– WisDOT Project ManagerDaniel Schave, P.E.– WisDOT Project LeaderMay 16, 2017
![Page 2: Tim Hanley, P.E.– WisDOT Project Manager Daniel Schave, P ... · Mill (remove) 2 inches of asphalt Cold-in-place recycle 4 inches of asphalt Place 1.75 inches of new asphalt Addresses](https://reader034.vdocuments.mx/reader034/viewer/2022042806/5f6a6103d89721252121fe5f/html5/thumbnails/2.jpg)
Review purpose and needs for the project Identify alternatives (solutions) to address the
needs Discuss next steps
2
![Page 3: Tim Hanley, P.E.– WisDOT Project Manager Daniel Schave, P ... · Mill (remove) 2 inches of asphalt Cold-in-place recycle 4 inches of asphalt Place 1.75 inches of new asphalt Addresses](https://reader034.vdocuments.mx/reader034/viewer/2022042806/5f6a6103d89721252121fe5f/html5/thumbnails/3.jpg)
3
![Page 4: Tim Hanley, P.E.– WisDOT Project Manager Daniel Schave, P ... · Mill (remove) 2 inches of asphalt Cold-in-place recycle 4 inches of asphalt Place 1.75 inches of new asphalt Addresses](https://reader034.vdocuments.mx/reader034/viewer/2022042806/5f6a6103d89721252121fe5f/html5/thumbnails/4.jpg)
Regional and local traffic Approximately 3,700 vehicles per day 16% trucks
Constructed in 1998 Existing asphalt 8 inches thick asphalt 24 crashes in 5 year period Run-off-the-road crashes present Ice and snow primary factors
4
![Page 5: Tim Hanley, P.E.– WisDOT Project Manager Daniel Schave, P ... · Mill (remove) 2 inches of asphalt Cold-in-place recycle 4 inches of asphalt Place 1.75 inches of new asphalt Addresses](https://reader034.vdocuments.mx/reader034/viewer/2022042806/5f6a6103d89721252121fe5f/html5/thumbnails/5.jpg)
Purpose Maximize the life of the pavement Improve safety
Needs Deteriorating pavement (cracking and rutting) Four culvert pipes in poor condition Deteriorating railroad crossing pavement
5
![Page 6: Tim Hanley, P.E.– WisDOT Project Manager Daniel Schave, P ... · Mill (remove) 2 inches of asphalt Cold-in-place recycle 4 inches of asphalt Place 1.75 inches of new asphalt Addresses](https://reader034.vdocuments.mx/reader034/viewer/2022042806/5f6a6103d89721252121fe5f/html5/thumbnails/6.jpg)
6
![Page 7: Tim Hanley, P.E.– WisDOT Project Manager Daniel Schave, P ... · Mill (remove) 2 inches of asphalt Cold-in-place recycle 4 inches of asphalt Place 1.75 inches of new asphalt Addresses](https://reader034.vdocuments.mx/reader034/viewer/2022042806/5f6a6103d89721252121fe5f/html5/thumbnails/7.jpg)
7
![Page 8: Tim Hanley, P.E.– WisDOT Project Manager Daniel Schave, P ... · Mill (remove) 2 inches of asphalt Cold-in-place recycle 4 inches of asphalt Place 1.75 inches of new asphalt Addresses](https://reader034.vdocuments.mx/reader034/viewer/2022042806/5f6a6103d89721252121fe5f/html5/thumbnails/8.jpg)
8
Four culverts are in poor condition Proposing to replace three Two by railroad in Oxford One by 5th Drive Repair one 1 mile east of 5th Drive
Size/location unchanged
![Page 9: Tim Hanley, P.E.– WisDOT Project Manager Daniel Schave, P ... · Mill (remove) 2 inches of asphalt Cold-in-place recycle 4 inches of asphalt Place 1.75 inches of new asphalt Addresses](https://reader034.vdocuments.mx/reader034/viewer/2022042806/5f6a6103d89721252121fe5f/html5/thumbnails/9.jpg)
9
![Page 10: Tim Hanley, P.E.– WisDOT Project Manager Daniel Schave, P ... · Mill (remove) 2 inches of asphalt Cold-in-place recycle 4 inches of asphalt Place 1.75 inches of new asphalt Addresses](https://reader034.vdocuments.mx/reader034/viewer/2022042806/5f6a6103d89721252121fe5f/html5/thumbnails/10.jpg)
10
![Page 11: Tim Hanley, P.E.– WisDOT Project Manager Daniel Schave, P ... · Mill (remove) 2 inches of asphalt Cold-in-place recycle 4 inches of asphalt Place 1.75 inches of new asphalt Addresses](https://reader034.vdocuments.mx/reader034/viewer/2022042806/5f6a6103d89721252121fe5f/html5/thumbnails/11.jpg)
Resurface Recycle Replacement
All alternatives include: Culvert pipe repair Railroad crossing surface replacement Five-day detour required (WIS 13, WIS 21 and I-39) Centerline rumble strips Safety edge installation
11
![Page 12: Tim Hanley, P.E.– WisDOT Project Manager Daniel Schave, P ... · Mill (remove) 2 inches of asphalt Cold-in-place recycle 4 inches of asphalt Place 1.75 inches of new asphalt Addresses](https://reader034.vdocuments.mx/reader034/viewer/2022042806/5f6a6103d89721252121fe5f/html5/thumbnails/12.jpg)
12
![Page 13: Tim Hanley, P.E.– WisDOT Project Manager Daniel Schave, P ... · Mill (remove) 2 inches of asphalt Cold-in-place recycle 4 inches of asphalt Place 1.75 inches of new asphalt Addresses](https://reader034.vdocuments.mx/reader034/viewer/2022042806/5f6a6103d89721252121fe5f/html5/thumbnails/13.jpg)
Reduce head-on fatal/injury crashes by 44% Increase “awareness” Inattentive driving Limited Visibility Rain, snow or fog
Low installation cost
Not installed near intersections or commercial driveways
13
![Page 14: Tim Hanley, P.E.– WisDOT Project Manager Daniel Schave, P ... · Mill (remove) 2 inches of asphalt Cold-in-place recycle 4 inches of asphalt Place 1.75 inches of new asphalt Addresses](https://reader034.vdocuments.mx/reader034/viewer/2022042806/5f6a6103d89721252121fe5f/html5/thumbnails/14.jpg)
6% reduction in all crashes Low cost of installation Reduces hazard of low shoulders Creates “smooth transition” back onto roadway
14
Normal Edge Safety Edge
![Page 15: Tim Hanley, P.E.– WisDOT Project Manager Daniel Schave, P ... · Mill (remove) 2 inches of asphalt Cold-in-place recycle 4 inches of asphalt Place 1.75 inches of new asphalt Addresses](https://reader034.vdocuments.mx/reader034/viewer/2022042806/5f6a6103d89721252121fe5f/html5/thumbnails/15.jpg)
15
Resurface Mill (remove) 2 inches of pavement Place 1.75 inches of new pavement
Temporarily eliminates rutting/cracking. Underlying issues not addressed.
Limited traffic impacts (flagging operation, 5 day detour)
Cost = $1.5 million – $2 million
![Page 16: Tim Hanley, P.E.– WisDOT Project Manager Daniel Schave, P ... · Mill (remove) 2 inches of asphalt Cold-in-place recycle 4 inches of asphalt Place 1.75 inches of new asphalt Addresses](https://reader034.vdocuments.mx/reader034/viewer/2022042806/5f6a6103d89721252121fe5f/html5/thumbnails/16.jpg)
16
Remove 2 inches of asphaltPlace 1.75 inches of asphaltInstall centerline rumble stripsLane and shoulder width unchanged
![Page 17: Tim Hanley, P.E.– WisDOT Project Manager Daniel Schave, P ... · Mill (remove) 2 inches of asphalt Cold-in-place recycle 4 inches of asphalt Place 1.75 inches of new asphalt Addresses](https://reader034.vdocuments.mx/reader034/viewer/2022042806/5f6a6103d89721252121fe5f/html5/thumbnails/17.jpg)
17
Recycle Mill (remove) 2 inches of asphalt Cold-in-place recycle 4 inches of asphalt Place 1.75 inches of new asphalt
Addresses more of the rutting and cracking issues Limited traffic impacts (flagging operation, five-day
detour) Cost = $2.4 million – $3 million
![Page 18: Tim Hanley, P.E.– WisDOT Project Manager Daniel Schave, P ... · Mill (remove) 2 inches of asphalt Cold-in-place recycle 4 inches of asphalt Place 1.75 inches of new asphalt Addresses](https://reader034.vdocuments.mx/reader034/viewer/2022042806/5f6a6103d89721252121fe5f/html5/thumbnails/18.jpg)
18
Remove 2 inches of asphaltRecycle 4 inches of asphaltPlace 1.75 inches of asphaltInstall centerline rumble stripsLane and shoulder width unchanged
![Page 19: Tim Hanley, P.E.– WisDOT Project Manager Daniel Schave, P ... · Mill (remove) 2 inches of asphalt Cold-in-place recycle 4 inches of asphalt Place 1.75 inches of new asphalt Addresses](https://reader034.vdocuments.mx/reader034/viewer/2022042806/5f6a6103d89721252121fe5f/html5/thumbnails/19.jpg)
19
Replacement Remove all pavement Replace with new pavement
Removes pavement not past its useful life (wastes money) Possible real estate impacts (slope widening) Greater traffic impact (four-month detour) Cost = $3.7 million – $4.5 million
![Page 20: Tim Hanley, P.E.– WisDOT Project Manager Daniel Schave, P ... · Mill (remove) 2 inches of asphalt Cold-in-place recycle 4 inches of asphalt Place 1.75 inches of new asphalt Addresses](https://reader034.vdocuments.mx/reader034/viewer/2022042806/5f6a6103d89721252121fe5f/html5/thumbnails/20.jpg)
20
Remove all existing asphaltReplace with 6 inches of new asphaltInstall centerline rumble stripsLane and shoulder width unchangedSlopes possibly widened
![Page 21: Tim Hanley, P.E.– WisDOT Project Manager Daniel Schave, P ... · Mill (remove) 2 inches of asphalt Cold-in-place recycle 4 inches of asphalt Place 1.75 inches of new asphalt Addresses](https://reader034.vdocuments.mx/reader034/viewer/2022042806/5f6a6103d89721252121fe5f/html5/thumbnails/21.jpg)
21
Five-day detour (Monday – Friday) State signed detour route via WIS 13, WIS 21, I-39 Local access maintained at all times
V. Oxford
Closure
![Page 22: Tim Hanley, P.E.– WisDOT Project Manager Daniel Schave, P ... · Mill (remove) 2 inches of asphalt Cold-in-place recycle 4 inches of asphalt Place 1.75 inches of new asphalt Addresses](https://reader034.vdocuments.mx/reader034/viewer/2022042806/5f6a6103d89721252121fe5f/html5/thumbnails/22.jpg)
Meet with local officials: April 26, 2017 Public involvement meeting: May 16, 2017 Select preferred alternative: June 2017 Project design complete: August 2018 Construction currently scheduled: Summer 2019
22