Technical Information Project Location: Beaverton, OR Concrete Strength Requirements: 3,000, 4,000, and 5,000 psi Water/Cement Ratios: .33, .38, .39, .40, .45 and .55 Unique or High Volume Admixtures: ASTM C494 – Type A Water Reducer 23.00, ASTM C494 – Type F Water Reducer 64.00
Carmax Beaverton
![Page 3: Tilt-Up Re-Entries 2010 · 2017-08-15 · Carmax Beaverton. The concrete structure includes concrete columns, decks, walks, and elevator construction. The suspended slabs were formed](https://reader034.vdocuments.mx/reader034/viewer/2022050610/5fb1502c70024a203c00b4e3/html5/thumbnails/3.jpg)
Construction of a new CarMax dealership in Beaverton Oregon consists of a new 146,000 square foot cast-in-place parking structure. The new 3-level parking structure
needed extensive ground improvements including over 500, 25’ long rammed aggregate piers.
Carmax Beaverton
![Page 4: Tilt-Up Re-Entries 2010 · 2017-08-15 · Carmax Beaverton. The concrete structure includes concrete columns, decks, walks, and elevator construction. The suspended slabs were formed](https://reader034.vdocuments.mx/reader034/viewer/2022050610/5fb1502c70024a203c00b4e3/html5/thumbnails/4.jpg)
The parking structure was 46’8” in height and provided parking accommodations for 210 vehicles. A very challenging aspect of the project was the first floor utilized extensive high bay shoring for the 24’ tall elevated level 1. The assembly and dis-assembly of concrete formwork was carefully thought out with extreme caution
due to the heights involved with this work.
Carmax Beaverton
![Page 5: Tilt-Up Re-Entries 2010 · 2017-08-15 · Carmax Beaverton. The concrete structure includes concrete columns, decks, walks, and elevator construction. The suspended slabs were formed](https://reader034.vdocuments.mx/reader034/viewer/2022050610/5fb1502c70024a203c00b4e3/html5/thumbnails/5.jpg)
The concrete structure includes concrete columns, decks, walks, and elevator construction. The suspended slabs were formed using a post tensioned beam
system combined with wood joist panels.
Carmax Beaverton
![Page 6: Tilt-Up Re-Entries 2010 · 2017-08-15 · Carmax Beaverton. The concrete structure includes concrete columns, decks, walks, and elevator construction. The suspended slabs were formed](https://reader034.vdocuments.mx/reader034/viewer/2022050610/5fb1502c70024a203c00b4e3/html5/thumbnails/6.jpg)
The large parking structure included two access ramps, one from the North and one from the South. The perimeter crash wall system combined cast in place
concrete walls and a cable rail system embedded through the concrete columns.
Carmax Beaverton
![Page 7: Tilt-Up Re-Entries 2010 · 2017-08-15 · Carmax Beaverton. The concrete structure includes concrete columns, decks, walks, and elevator construction. The suspended slabs were formed](https://reader034.vdocuments.mx/reader034/viewer/2022050610/5fb1502c70024a203c00b4e3/html5/thumbnails/7.jpg)
Carmax Beaverton
![Page 8: Tilt-Up Re-Entries 2010 · 2017-08-15 · Carmax Beaverton. The concrete structure includes concrete columns, decks, walks, and elevator construction. The suspended slabs were formed](https://reader034.vdocuments.mx/reader034/viewer/2022050610/5fb1502c70024a203c00b4e3/html5/thumbnails/8.jpg)
Carmax Beaverton
![Page 9: Tilt-Up Re-Entries 2010 · 2017-08-15 · Carmax Beaverton. The concrete structure includes concrete columns, decks, walks, and elevator construction. The suspended slabs were formed](https://reader034.vdocuments.mx/reader034/viewer/2022050610/5fb1502c70024a203c00b4e3/html5/thumbnails/9.jpg)
Carmax Beaverton
![Page 10: Tilt-Up Re-Entries 2010 · 2017-08-15 · Carmax Beaverton. The concrete structure includes concrete columns, decks, walks, and elevator construction. The suspended slabs were formed](https://reader034.vdocuments.mx/reader034/viewer/2022050610/5fb1502c70024a203c00b4e3/html5/thumbnails/10.jpg)
Carmax Beaverton