Tiling A Bathtub Stall Starts With The Shower Pan
Building a custom made Ceramic Tile Shower
By Mark J. Donovan
The most important feature inside a ceramic tile bath stall is the bath pan. The bath pan channels
normal water to the drain and also prevents the bath from leaking. As a result it is critical that the bath
pan be set up correctly and that it's waterproof and durable.
The shower pan is really a mortar bed that includes a flexible shower pan liner sandwiched in
between two layers of mortar. The bath stall walls tend to be framed with 2x4 studding and confronted
with some type of backerboard underlayment designed for receiving porcelain tile.
The installing a shower pan starts with the scattering of a layer of mortar. The mortar needs to be
sloped effectively to enable water to operate off towards the drain. The flexible plastic-type material
shower pan membrane layer liner is then attached to top of the sloped mortar bed.
The bath pan membrane lining should be cut to size and side molded into the bath base.
Note: your shower pan must be cut to sizing such that several further inches of bath pan material
might be run up the bath stall side surfaces to enable the bath pan to be guaranteed with nails on the
studs. Also, your shower pan must be installed prior to the installing backerboard on the bath walls. After your shower pan membrane layer is secured, the 2nd layer of mortar should be installed in thefoot of the shower, again maintaining the incline of the mortar on the drain. Once your shower pan mortar bed has set up, it is possible to install the backerboard to the walls andcommence to install the porcelain tiles. Start installing tiles in the center of your shower pan place and work your way outwards. Next, install porcelain tiles on the surfaces. Use a plumb series to run straight collections down thelength of your walls. Position your plumb line in the ceiling and devoted to a wall. Snap the line, sothat you have any vertical line operating the length of the wall membrane. Next, Install your current tiles outwards in the line toward the perimeters of the wall. Do this againprocess for all the surfaces. For tile slicing , a wet observed works best, as you can receive very accurate reductions and
minimize porcelain tile waste. After the ceramic floor tile has had 24-48 several hours to set up, grout may then be applied to thefloor tile. Finally a sealant should be used on your grout to minimize dampness seeping through the grout lines. For more info on installing any shower pan membrane layer liner, see the Shower Pan Membranelining Installation EBook via HomeAdditionPlus.com. About the Author: within the last 20+ years mark Donovan has been associated with building homesand also additions to homes. His / her projects have included : building a vacation home , buildingadditions and also garages on to present homes, and concluding unfinished homes. For moreinformation about Home Improvement and home Additions, and Home upgrading and Repair visithomeadditionplus.com and also homeaddition.blogspot.com For More Info Click Here