This year’s London prime residential development pipeline shows a 25% increase in planned activity over the next ten years. With 25,000 units in the pipeline and a combined sales value of £60 billion, the level of prime development now being planned and constructed is at an unprecedented high. Interestingly, the annual growth in total units in the pipeline, at 25%, has fallen yet again (2013 saw an increase of 29% and 2012 an increase of 70%). This may indicate that the pace of new development opportunities being identified in Central London is continuing to reduce. This could reflect nervousness that London land pricing is now ‘full’ as more challenge and scrutiny is being applied to outturn viability forecasts, particularly in emerging prime locations. It also may suggest that the pipeline is starting to be worked through by developers rather than just added to. With the strength of the London residential development market remaining central to the recovery of the UK property market and the wider economy, the overall increase in development activity from last year’s report is no real surprise. However, this volume of development, representing the very top slice of London housebuilding, barely scratches the surface of the capital’s housing output target set out in the Greater London Authority’s Housing Strategy. The total number of units identified in this report over a ten year delivery period would account for just 60% of one year’s required total delivery output in Greater London of circa 42,000 units. This is perhaps worth remembering in the context of the ongoing politicisation of foreign investment in London residential and the inferred negative impacts on the domestic sales and rental market. The question we pose this year is not whether the level of purchaser demand is sustainable to absorb the increased supply levels, or even how schemes must be differentiated in order to sell. It is the more pressing question that developers and investors already active in project delivery are grappling with: “how do I secure the construction capacity needed to get my development built?”

Upload: vutuyen

Post on 03-Jul-2018

219 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: This year’s London - Arcadis98CAF45C-FCB6-4F04-9EDE... · This year’s London prime residential development pipeline shows a 25% increase in planned activity over the next ten

This year’s London prime residential development pipeline shows a 25% increase in planned activity over the next ten years. With 25,000 units in the pipeline and a combined sales value of £60 billion, the level of prime development now being planned and constructed is at an unprecedented high.

Interestingly, the annual growth in total units in the pipeline, at 25%, has fallen yet again (2013 saw an increase of 29% and 2012 an increase of 70%). This may indicate that the pace of new development opportunities being identified in Central London is continuing to reduce. This could reflect nervousness that London land pricing is now ‘full’ as more challenge and scrutiny is being applied to outturn viability forecasts, particularly in emerging prime locations. It also may suggest that the pipeline is starting to be worked through by developers rather than just added to.

With the strength of the London residential development market remaining central to the recovery of the UK property market and the wider economy, the overall increase in development activity from last year’s report is no real surprise. However, this volume of development, representing the very top slice of London housebuilding, barely scratches the surface of the capital’s housing output target set out in the Greater London Authority’s Housing Strategy. The total number of units identified in this report over a ten year delivery period would account for just 60% of one year’s required total delivery output in Greater London of circa 42,000 units. This is perhaps worth remembering in the context of the ongoing politicisation of foreign investment in London residential and the inferred negative impacts on the domestic sales and rental market.

The question we pose this year is not whether the level of purchaser demand is sustainable to absorb the increased supply levels, or even how schemes must be differentiated in order to sell. It is the more pressing question that developers and investors already active in project delivery are grappling with: “how do I secure the construction capacity needed to get my development built?”

Page 2: This year’s London - Arcadis98CAF45C-FCB6-4F04-9EDE... · This year’s London prime residential development pipeline shows a 25% increase in planned activity over the next ten

PRO

JEC

T N

AM

EIM

MED

IATE

TE

RM

(2

014-

2017

)

MED

IUM

TE

RM

(2

018-

2020

)

LON

GTE

RM

(2

021-

2023

)1

PALA

CE

STR

EET

10 T

RIN

ITY

SQU

AR

E10

0 PI

CCA

DIL

LY10

0 W

EST

CRO

MW

ELL

ROA

D10

2 JE

RM

YN S

TREE

T10

3-10

9 W

AR

DO

UR

STR

EET

11-1

5 G

ROSV

ENO

R C

RES

CEN

T11

9 EB

URY

STR

EET

119-

122

BAY

SWAT

ER R

OA

D1-

3 G

ROSV

ENO

R S

QU

AR

E13

5 G

ROSV

ENO

R R

OA

D15

1-16

1 K

ENSI

NG

TON

HIG

H S

TREE

T16

DE

VER

E G

AR

DEN

S17

-19

BED

FOR

D S

TREE

T17

-35

CR

AVEN

HIL

L G

AR

DEN

S1-

8 C

LAR

GES

ST,

82-

84 P

ICC

AD

ILLY

AN

D 2

9 B

OLT

ON

STR

EET

18-1

9 B

UC

KIN

GH

AM

GAT

E18

5 PA

RK

STR

EET

19 Q

UEE

N E

LIZA

BET

H S

TREE

T, B

UTL

ER'S

WH

AR

F19

0 ST

RA

ND

19-2

7 YO

UN

G S

TREE

T 19

5 W

ARW

ICK

RO

AD

20 B

LAC

KFR

IAR

S20

GRO

SVEN

OR

SQ

UA

RE

205

HO

LLA

ND

PA

RK

AV

ENU

E21

3-21

5 W

ARW

ICK

RO

AD

22

GRO

SVEN

OR

SQ

UA

RE

22 T

OW

ER S

TREE

T24

BU

CK

ING

HA

M G

ATE

257

CIT

Y RO

AD

26 C

HA

PTER

STR

EET

3 ST

. JA

MES

SQ

UA

RE,

BU

CH

AN

AN

HO

USE

30 O

LD B

UR

LIN

GTO

N S

TREE

T31

-36

FOLE

Y ST

REE

T35

MA

RYLE

BO

NE

HIG

H S

TREE

T36

PA

RK

STR

EET

36 S

T JO

HN

'S W

OO

D R

OA

D37

5 K

ENSI

NG

TON

HIG

H S

TREE

T 38

HYD

E PA

RK

GAT

E38

-44

LOD

GE

ROA

D38

-62

YEO

MA

NS

ROW

4-5

QU

EEN

STR

EET,

MAY

FAIR

406-

408

THE

STR

AN

D4-

16 A

RTIL

LERY

RO

W48

CA

REY

STR

EET

5 &

6 CO

NN

AU

GH

T PL

AC

E50

-57

HIG

H H

OLB

OR

N

52-5

7 &

8-16

PR

INC

ES S

QU

AR

E55

BRO

AD

WAY

55 H

AN

S PL

AC

E55

VIC

TOR

IA S

TREE

T55

-73

DU

KE

STR

EET

56 C

UR

ZON

STR

EET

60 S

LOA

NE

AVEN

UE

61 O

XFO

RD

STR

EET

62-6

8 RO

SEB

ERY

AVEN

UE

66 C

HIL

TER

N S

TREE

T6-

9 B

UC

KIN

GH

AM

GAT

E74

-76

CH

ILTE

RN

STR

EET

88 S

T. JA

MES

STR

EET

9 M

ARY

LEB

ON

E LA

NE

90-9

3 PI

CCA

DIL

LY (F

OR

MER

LY IN

AN

D O

UT

CLU

B)

9-10

ST

MA

RY A

T H

ILL

AB

ELL

& C

LELA

ND

HO

USE

, WES

TMIN

STER

ALL

EN H

OU

SEA

MB

ERLE

Y W

ATER

FRO

NT

APA

RTM

ENTS

AM

ERIC

AN

EM

BA

SSY

ARU

ND

EL G

REA

T CO

URT

BA

BM

AES

STR

EET

BA

RTS

SQU

AR

E - P

HA

SE 1

BA

RTS

SQU

AR

E - P

HA

SE 3

BAT

TER

SEA

PO

WER

STA

TIO

N P

HA

SE 1

CIR

CU

S W

EST

BIS

HO

PSG

ATE

GO

OD

S YA

RD

(PA

RT O

NLY

)B

OLS

OV

ER S

TREE

TB

REW

ER S

TREE

T C

AR

PA

RK

BU

CK

ING

HA

M S

TREE

TC

ALE

STR

EET

CEN

TREP

OIN

TC

HA

MB

ERS

WH

AR

F (P

ART

ON

LY)

CH

ELSE

A B

AR

RA

CK

S C

HEL

SEA

ISLA

ND

CH

EYN

E TE

RR

AC

EC

LEV

ELA

ND

RO

W A

ND

RU

SSEL

L CO

URT

COLL

ING

HA

M R

OA

DCO

NFI

DEN

TIA

L - C

HEL

SEA

CON

FID

ENTI

AL

- KEN

SIN

GTO

NCO

NFI

DEN

TIA

L - K

ENSI

NG

TON

CON

FID

ENTI

AL

- MAY

FAIR

CON

FID

ENTI

AL

- MAY

FAIR

CON

FID

ENTI

AL

- MAY

FAIR

CON

FID

ENTI

AL

- MAY

FAIR

CON

FID

ENTI

AL

- MAY

FAIR

CON

FID

ENTI

AL

- MID

TOW

NCO

NFI

DEN

TIA

L - V

ICTO

RIA

CON

FID

ENTI

AL

- VIC

TOR

IACO

NFI

DEN

TIA

L - V

ICTO

RIA

CON

FID

ENTI

AL

- VIC

TOR

IACO

VEN

T G

AR

DEN

EST

ATE

- VA

RIO

US

CRO

SSR

AIL

TO

TTEN

HA

M C

OU

RT R

OA

D, 9

1-10

1 O

XFO

RD

STR

EET

DU

DLE

Y H

OU

SED

UK

ES L

OD

GE,

HO

LLA

ND

PA

RK

EAR

LS C

OU

RT M

AST

ERPL

AN

EAST

BU

RY H

OU

SE, 3

0 A

LBER

T EM

BA

NK

MEN

TEB

URY

SQ

UA

RE,

BEL

GR

AVIA

ELIZ

AB

ETH

HO

USE

, WAT

ERLO

OEM

BA

SSY

GA

RD

ENS

FITZ

ROY

PLA

CE

FOR

MER

HO

LLA

ND

PA

RK

SC

HO

OL,

AIR

LIE

GA

RD

ENS

FOR

MER

TA

SIT

E, 2

45 W

ARW

ICK

RO

AD

FUR

NIV

AL

HO

USE

GLE

BE

PLA

CE

GO

OD

MA

N'S

FIE

LDS

GR

EAT

MIN

STER

EA

ST, M

AR

SHA

M S

TREE

TG

REA

T M

INST

ER H

OU

SE N

ORT

H

GR

EAT

PORT

LAN

D S

TREE

TG

ROSV

ENO

R G

AR

DEN

S H

OU

SEH

AM

ILTO

N G

ROV

EH

AM

PTO

N H

OU

SE, 2

0 A

LBER

T EM

BA

NK

MEN

TH

AR

ROW

RO

AD

HEN

RY M

OO

RE

COU

RTH

ERO

N P

LAZA

HER

TSM

ERE

HO

USE

HO

RTEN

SIA

RO

AD

HU

RLI

NG

HA

M G

ATE

HU

RLI

NG

HA

M R

ETA

IL P

AR

KH

YDE

PAR

K B

AR

RA

CK

S

JOH

N L

EWIS

CLE

AR

ING

S SI

TEK

ENSI

NG

TON

PA

RK

RO

AD

KIN

GS

CRO

SS C

ENTR

AL

KIN

GS

ROA

D F

IRE

STAT

ION

KN

IGH

TON

PLA

CE

KN

IGH

TS H

OU

SELE

INST

ER S

QU

AR

ELI

LLIE

SQ

UA

RE

LON

DO

N D

OC

K

LON

DO

N F

IRE

BR

IGA

DE

HQ

, ALB

ERT

EMB

AN

KM

ENT

(PA

RT O

NLY

)LO

TS R

OA

D P

OW

ER S

TATI

ON

LOW

ND

ES S

QU

AR

E PE

NTH

OU

SES

LUD

GAT

E H

OU

SE /

SAM

PSO

N H

OU

SE

MA

DD

OX

STR

EET

MA

RB

LE A

RCH

TO

WER

MER

CH

AN

T SQ

UA

RE

BU

ILD

ING

3M

ERC

HA

NT

SQU

AR

E B

UIL

DIN

GS

1 &

6M

OX

ON

STR

EET

NO

RTH

KEN

SIN

GTO

N S

PORT

S C

ENTR

EN

ORT

H W

HA

RF

GA

RD

ENS

- PH

ASE

1N

ORT

H W

HA

RF

GA

RD

ENS

- PH

ASE

2O

DEO

N K

ENSI

NG

TON

ON

E B

LAC

KFR

IAR

SO

NE

NIN

E EL

MS

ON

E TO

WER

BR

IDG

EPA

LL M

ALL

, ST

JAM

ES'S

PAR

AM

OU

NT

HO

USE

PAR

K C

RES

CEN

TPA

RK

ER H

OU

SEPA

RK

ER T

OW

ERPR

INC

IPA

L PL

AC

E F

ULH

AM

WH

AR

FR

ATH

BO

NE

PLA

CE

REG

ENTS

GAT

E R

IVER

LIG

HT

(PA

RT O

NLY

)R

IVER

WA

LK H

OU

SERO

YAL

MIN

T ST

REE

TSO

UTH

KEN

SIN

GTO

N T

ELEP

HO

NE

EXC

HA

NG

E, D

RAY

COTT

AV

ENU

ESO

UTH

KEN

SIN

GTO

N U

ND

ERG

ROU

ND

STA

TIO

NSO

UTH

QU

AY P

LAZA

, 183

-189

MA

RSH

WA

LLSO

UTH

BA

NK

PLA

CE,

WAT

ERLO

OSO

UTH

BA

NK

TO

WER

ST D

UN

STA

N'S

HO

USE

, FET

TER

LA

NE

ST E

DM

UN

DS

TER

RA

CE

ST J

OH

N’S

WO

OD

BA

RR

AC

KS

SUG

AR

QU

AYTH

E CO

URT

HO

USE

, 70

HO

RSE

FER

RY R

OA

DTH

E M

ON

TAG

UTH

E O

LD W

AR

OFF

ICE

THE

PAR

AB

OLA

/HO

LLA

ND

GR

EEN

, KEN

SIN

GTO

NTH

E SO

LITA

IRE,

158

BRO

MPT

ON

RO

AD

TH

E TO

WER

, ON

E ST

GEO

RG

E W

HA

RF

TOTT

ENH

AM

CO

URT

RO

AD

TREN

CH

AR

D H

OU

SE 1

9-25

BRO

AD

WIC

K S

TREE

TVA

UX

HA

LL B

ON

DW

AYVA

UX

HA

LL C

ROSS

VAU

XH

ALL

SK

Y G

AR

DEN

SVA

UX

HA

LL S

QU

AR

EV

ICA

RA

GE

GAT

EW

ALT

ON

STR

EET

POLI

CE

STAT

ION

WA

RD

OU

R S

TREE

TW

ESTB

OU

RN

E H

OU

SE, W

ESTB

OU

RN

E G

ROV

E

TOTA

L U

NIT

S (2

5,00

0)12

,000

10,0

003,

000

WILL DEVELOPERS WIN THE RACE TO SECURE THE SUPPLY CHAINAND DELIVERTHE PIPELINE?

25%INCREASE IN

UNITS ON LAST YEAR

25,000 UNITS£60 BILLION TOTAL SALES VALUE 12,000

(2014-2017)

10,000(2018-2020)

3,000(2021-2023)

Page 3: This year’s London - Arcadis98CAF45C-FCB6-4F04-9EDE... · This year’s London prime residential development pipeline shows a 25% increase in planned activity over the next ten

Our report methodology has to include an element of conjecture as to how quickly schemes will progress, dependant upon planning, funding and sales factors. However, by producing a theoretical timeline, we are able to discuss the headline trends and shape of the ten year pipeline.

ANOTHER YEAR ON YEAR INCREASE IN NUMBERS - BUT WHAT IS SHAPING THE PIPELINE?

The familiar peak of potential units being delivered year on year that has been seen in previous reports continues to be a key feature and the expected peak around 2017 remains. Much of this peak is based on the premise that there has been a surge in schemes during 2014 progressing beyond planning consent and pure land trading into procurement and construction commitment that will start to deliver units in 2017 onwards. There is still an assumption on multi-phase schemes that they continue without pause and that funding is secured to underpin development. However, the increased levels of construction activity seen over the last two to three years could be dwarfed in the next three to four year period, based on the development activity that is beginning and thus, the reality is that many of these schemes may end up being pushed into the latter part of the timeline because of deliverability constraints. Interestingly, the 2014 estimated completion numbers are down from what was forecast only last year. This is perhaps a reflection of a more deep seated issue regarding project delays both in design and procurement as well as during construction, as

part of the wave of larger prime residential projects that were committed as far back as 2010.As with previous years, this year’s pipeline profile has been led by substantial growth in the lower sales value bands. Although we have raised the average sales value threshold by 8% (from £1,250/ft² to £1,350/ft²), a large number of new schemes have been captured in the £1,350/ft² - £1,700/ft² sales value bracket. Even with background inflation accounted for, there is a continuing trend of larger ‘regeneration’ style schemes in fringe locations around traditional prime areas, albeit, the rate of increase in this value segment has lessened as more and more of the development opportunities are identified and brought to market. There may also be the beginnings of a deceleration in the lower end of fringe of prime development planning as more developers and investors recognise the beginnings of a wider London recovery. It is clear that there is already a ‘bow wave’ of planned and actual development in the £1,000/ft² - £1,350/ft² sales value bracket which covers wider geographic areas. This is particularly noticeable in the less mature prime markets immediately

east of the City of London and in Docklands as well as further away from the River Thames within the non-riverside South Bank stretch. There is also increasing interest in the £500/ft² - £1,000/ft² segment of the market which is starting to capture much larger areas of Greater London, particuarly those that benefit from good transport connections such as those on the Crossrail corridor or around the London Overground network.The more land constrained super and ultra-prime residential value segments have seen much less growth due to the smaller lot size of these developments and the rarity of true trophy sites coming forward. However, there has been an above average increase in the value of some parts of the London market which has now pushed schemes into higher value bands and also contributed to an element of upward value migration within the previously identified projects. This is especially prevalent in Victoria and Pimlico, Midtown, Bayswater and Paddington and parts of Earls Court and Fulham. This ‘inner circle’ of fringe of super prime has seen some strong sales value growth fuelled by ongoing overseas investor appetite.

Units per year (2013 vs 2014)

2014 2015 2016 2017 2018 2019 2020 2021 2022 2023

500045004000350030002500200015001000

5000

Units per year 2013 Units per year 2014

Number of units 2013 Number of units 2014

>£2,500£1,750 - £2,500£1,300 - £1,750

14000

12000

10000

8000

6000

4000

2000

0

Units per sales value threshold (2013 vs 2014)

2014

14

12

10

8

6

4

2

02015 2016 2017 2018

Year

GD

V (£

billi

on)

2019 2020 2021 2022 2023

GDV per year

2014

5000

4500

4000

3500

3000

2500

2000

1500

1000

500

02015 2016 2017 2018 2019

Year

Num

ber o

f uni

ts to

be

deliv

ered

2020 2021 2022 2023

Units delivered per year

Page 4: This year’s London - Arcadis98CAF45C-FCB6-4F04-9EDE... · This year’s London prime residential development pipeline shows a 25% increase in planned activity over the next ten

The geographic distribution of the 2014 pipeline follows many of the patternsobserved in last year’s report. Again, circa half of the entire pipeline by unit count is located in either South Bank or the wider Chelsea and Fulham area. This is an ongoing reflection of the proliferation of larger regeneration style schemes which are commanding values at the lower end of the prime spectrum.

GEOGRAPHIC TRENDS

The largest single increase in unit numbers by area has occurred in the South Bank stretch from Battersea to Tower Bridge. The ‘turbo charging’ of the residential development market in these areas continues and we’re seeing some re-balancing of the historic large differential between sales values north and south of the River Thames in Central London. The ongoing concentration of more high-rise residential development in this area rather than anywhere else in London continues to drive premium values. This year we have also identified Docklands as a separate area because some isolated landmark schemes now fall within the value thresholds of this report.

“The estate must be adapted to the future direction of the university”

77054861

41761740

1376780

1157

1088 612

494442

323

246

TOTAL UNITS

25,000

NUMBER OF UNITS PER AREA ANDPERCENTAGE INCREASE / DECREASE

SOUTH BANK | 7705 | +34%

CHELSEA AND FULHAM | 4861 | +6%

CITY AND FRINGE | 4176 | 45%

MIDTOWN | 1740 | +16%

VICTORIA AND PIMLICO | 1376 | -8%

DOCKLANDS | 780

KENSINGTON | 1157 | +18%

BAYSWATER AND PADDINGTON | 1088 | +13%

MAYFAIR | 612 | +11%

BELGRAVIA | 494 | -2%

KNIGHTSBRIDGE | 442 | +5%

ST JOHN’S WOOD | 323 | +45%

MARYLEBONE | 246 | -14%

Page 5: This year’s London - Arcadis98CAF45C-FCB6-4F04-9EDE... · This year’s London prime residential development pipeline shows a 25% increase in planned activity over the next ten

The above diagram shows which areas are ‘punching above their weight’ when it comes to total GDV relative to unit numbers being delivered. Mirroring previous trends, the highest value areas of Mayfair, Belgravia, Knightsbridge and Kensington represent only 11% of total unit numbers but 32% of total GDV of the pipeline.

COMPARISON BETWEEN GDV AND UNIT COUNT PER AREA

OUTPUT CONSTRAINTS ARE STARTING TO BITEAt first glance, the shape of the pipeline appears very similar to previous years, however there is a slight lag on anticipated delivery in the year as well as increases in the total volumes being forecast. This increase is underpinned by a raft of large projects which have been actively committed to construction in the last 12 months, perhaps at a rate not seen in the previous years of this report. This level of post-planning consent stage activity by developers and investors now progressing schemes into procurement and further into construction is also creating a growing concern, which we have previously noted, as to how this volume of high quality development will physically be delivered by the construction industry.

As stated in last year’s report, there is little evidence of Permitted Development Rights led ‘Office to Residential’ conversions contributing to any of the pipeline, even in those limited prime areas outside of the previously designated Central Activity Zone.

THE DELIVERABILITY CEILING As with previous reports, we have overlaid our year by year pipeline histogram with what we have termed the ‘deliverability ceiling’ which recognises the capacity constraints in the market, both in terms of financing and more particularly, human resources. This is creating a funnel through which the development pipeline needs to be filtered. We believe that no more than 2,500 to 3,000 units per year can be delivered in the prime London residential market, based on a high level review of industry capacity.

When looking at the resource breadth of the main contractor construction management and supervision market (Tier 1), the diversity of models means that this encapsulates both developer / contractors (including housebuilders) and conventional main contractor delivery. An assessment of the current distribution of work in this year’s pipeline suggested that there are currently only 20 players in this market, with far fewer able to take on larger projects. The ability of each of these organisations to deploy multiple residential completion teams from within their own resource, and subsequently from the trades, is the ultimate determinant of the number of projects that can be handed over on site concurrently, given the limit on the number of skilled

professionals and tradesmen available to execute the work.

The actual rate of construction handover that can be achieved by individual teams on individual projects varies dramatically (from one high quality unit per week to six or seven units per week at the lower end of prime). It is also dependent upon the exact specification and project logistics. This handover rate can be influenced by deploying multiple completion teams on one site, however, experience suggests this is a high risk strategy that still suffers from limitations in the rates of production that can be achieved.

We believe there are circa 10 to 15 competent Tier 2 fitting out handover teams (tradesmen and trade supervision) from each of the completion trades such as; specialist finishes, joinery, final engineering services, kitchen and bathroom fitters, working in the sales value range covered by this report on higher volume schemes. This excludes the niche builders operating in the private residence market. This also does not include the ‘shell and core’ trades where there is perhaps a greater available pool of resource that is shared by other construction sectors such as commercial.

Therefore, assuming a weighted average handover rate (drawn from the value distribution of projects on our pipeline) of, say, five units per week, this equates to a potential maximum output of 2,500 to 3,750 units per annum and we predict that the reality is towards the lower end of this range, say, 2,500 to 3,000 units.

2014

5000

4500

4000

3500

3000

2500

2000

1500

1000

500

02015 2016 2017 2018 2019

Year

Num

ber o

f uni

ts to

be

deliv

ered

2020 2021 2022 2023

Units delivered per year

The deliverability ceiling

0

2

4

6

8

10

12

0

1000

2000

3000

4000

5000

6000

7000

8000

9000 Sum of estimated GDVNumber of units per area

Bay

swat

er &

Pad

ding

ton

Bel

grav

ia

Che

lsea

& F

ulha

m

City

& F

ringe

Doc

klan

ds

Kens

ingt

on

Kni

ghts

brid

ge

Mar

yleb

one

May

fair

Mid

tow

n

Sout

h B

ank

St J

ohn’

s W

ood

Vic

toria

& P

imlic

o

£bill

ion

GD

V £

billi

on

Page 6: This year’s London - Arcadis98CAF45C-FCB6-4F04-9EDE... · This year’s London prime residential development pipeline shows a 25% increase in planned activity over the next ten

This output constraint is what goes to the heart of current concern and is creating increasing competition among developers and investors to secure appropriate supply chains for their projects as soon as possible. The need to identify and commit high calibre Tier 1 management resource to one project from start to finish is the first issue being tackled and has been an area of considerable focus in the last 6 to 12 months for many clients. Total project ownership is a key feature of successful delivery and the emerging volatility in the professional services sector of residential construction resourcing is making this increasingly difficult for development clients who need to now make decisions based on individual capability and competence rather than corporate brand or price to protect the successful outcome of their projects.

THE SUPPLY CHAIN RACE - PUSHING THROUGH THE BOTTLENECK

What is of more concern is the Tier 2 trade contractor bottleneck that is evident, given the prospective volume in the pipeline. At the moment, the peak of potential development activity in 2017 could be double what may be possible for the competent and qualified residential construction market to deliver at current capacity. Therefore, this suggests that many schemes may need to be delivered later to avoid this bottleneck, or will be forced to use inappropriate supply chains. These schemes also face the risks of tender price inflation and ‘cover pricing’ as trade contractors pick and choose which projects to work on. For many schemes starting on site in 2014, with potential delivery in 2016 to 2018, it is difficult for developers and main contractors to secure the supply chain to execute the fitting out works for two reasons: a lack of willingness by suppliers to fix prices early;

A POLARISED DELIVERY MARKET

As predicted in our previous report, we have witnessed a spike in construction tender price inflation in 2014 which is being driven not only by the buoyanttrade contractor market but also by ‘learning curve’ inflation whereby Tier 1 contractors are compensating for delivery lessons learned on the projects currently being delivered or recently completed. Some high end residential projects have been marred by problems in achieving the required quality within the original planned programme and this has led to

reassessment of the suitability of the supervisory teams involved, as well as the Tier 2 trade contractors and their supply chains. Going forward, this is likely to put further pressure on schemes as there is even more rigour, particularly from main contractors who are relative newcomers to high quality volume residential, to ensure their own levels of preliminaries and site overheads reflect the true demands of the project. The issue is increasingly in the hands of client side advisors as they to try to identify and drive out

‘over compensation’ where the client is getting poor value from an undue level of comfort being inserted into resourcing and logistics assumptions.

The polarisation of the delivery market is evidenced by the current contractor allocation of projects in the pipeline. Of the near 200 projects identified, only 60 of them have a Tier 1 developer / contractor or main contractor appointed. Of these, there are just over 20 companies, suggesting a significant bias towards just a few

well known players - particularly on the higher construction value projects where funding parameters sometimes dictate the need for sufficient covenant and balance sheet strength. More significantly, of the projects already allocated, half of these have gone to less than five large main contractor / house builder companies.

or the lack of detailed design on which to base a final price without excessive risk transfer or refusal to accept that risk. This apparent Tier 2 supply chain capacity ceiling is potentially being suppressed as an issue on many projects as fitting out procurement is being deferred until after Tier 1 contractors are appointed or shell and core works have been procured.

CIRCA 20 Tier 1 contractors

CIRCA 10-15 Tier 2 fit-out completion teams (per trade)

2,500 - 3,000maximum achievable

units per annum

4,000 - 5,000 units per annum at peak

(theoretical)

“There is increasing competition among developers and investors to secure supply chains for their projects as soon as possible.”

Page 7: This year’s London - Arcadis98CAF45C-FCB6-4F04-9EDE... · This year’s London prime residential development pipeline shows a 25% increase in planned activity over the next ten

The reality for the businesses with the largest secured residential workload is that there are signs of increasing staff volatility and retention and recruitment challenges. Valued resource is now moving between companies and projects and there appear to be few newcomers to the industry. This is creating increased risk around project continuity and knowledge transfer that could ultimately impact on delivery. The ability of the major players to source multiple delivery teams, as well as their intended Tier 2 fitting out supply chain, is the biggest immediate threat to project delivery. As the larger companies reach their maximum bandwidth, there will be pressure to look much more laterally at main contractor alternatives. There will also be a need to explore hybrid models that potentially involve direct or shared risk procurement of the fitting out trades alongside the use of main contractors who are more comfortable with shell and core type works. However, this will introduce more client side risk and will need to be carefully analysed in terms of price fixity, overall construction programme impact and separate contract interface management. The greatest latent problem is of clients retaining the implied risk of not being able to obtain bona fide prices from competent trade contractors with spare capacity to deliver in perhaps up to two to three years’ time.

A SIGNIFICANT THREAT TO DELIVERY

INNOVATION IN PROCUREMENT IS CRITICALThere is one significant barrier to delivery capacity being increased in the London prime residential market; the size of the specialist high quality fit-out trade contractor sector. This moves the debate from the people managing the trade contractors to the physical execution of the work itself by competent tradesmen and direct operative led supervision. As the need to diversify supply chains grows, procurement innovation will also be required to overcome the limiting constraints. The only real variable, except the introduction of new, fully trained and experienced fitting out resource across both Tier 1 and 2 contractors, is the use of a more diverse list of main contractors for shell and core type works with other, more direct measures being used either in collaboration with or separate from shell and core led contractors. There will also be more consideration of off-site solutions that are less labour intensive.

A RELATIONSHIP LED APPROACH TO PROCUREMENT IS KEYThe largest commissioning clients in the prime London market are realising that, in order to underpin project deliverability, they must have a portfolio wide approach when engaging with

their supply chain. Although this will not always alleviate the issue of market driven tender price inflation, it will at least ensure that those developers and investors with established relationships and trust are in the best position to secure the scarce talent required, particularly in the key areas that make the difference between a successful and unsuccessful project.

However, this issue creates a risk for new entrants to the market who have no proven track record or established commercial or personal relationships with the London residential supply chain. Some of the new players have very mature delivery models in their home markets but will not be able to deploy these in London without wholesale transplantation of resources which is, for many reasons, impractical. Hybrid models, where some materialsare supplied from overseas markets, are already being considered for some schemes and large-scale importation of labour and professional resource from overseas Tier 1 or 2 contractors may eventually occur through joint ventures or alliances with established UK businesses. This alone will not solve the scale of the capacity issue the market is facing in the short-term.

IMPACT ON BUILD COSTS

The consequence of the market conditions highlighted above is a considerable variability in levels of tender pricing from both Tier 1 and Tier 2 contractors. It is clear that, during 2014, the selling price to developer clients has effectively de-coupled from the cost base of executing the work. Nothwithstanding the noticeable upward pressure on labour day rates for craftsmen and increased

material / commodity pricing, the quotes now being received on bids across projects is being driven by top line supply and demand forces and subjective adjudication. This may affect the ability to forecast pricing as it is dependent more now on order book, desire to work on a particular project or with a specific client than the input cost of the work itself.

Over the last 12 to 18 months, the industry has been coming out of a long- term deflationary / static tender price market. The five years prior to that saw much more benign bidding behaviours and a greater willingness to fix pricing on longer term projects due to lack of inflation or capacity risks. Since then, we have seen ‘super inflation’ as benchmarks, established on prices fixed in 2010 to 2012, have had to be adjusted by much more than the long-term annual trended rate of tender price inflation.

An element of the ‘learning curve’ inflation referenced above is due to delivery issues on the current projects being delivered. It is important that these issues and consequential cost impacts and the true cost of delivery, at the required quality, to programme, is identified. This is a key challenge for client side advisors where cost

overruns on projects are seen mostly on the bottom line by Tier 1 contractors, without due consideration to why there was an overrun. There is a risk that the next wave of projects will have an artificial premium, based on fear of repeating losses. The focus should be on the calibre and experience of the site management team, not the quantity employed or the float inserted in the programme.

The greatest volatility being seen in pricing is at Tier 2 trade level. Again, it would be very easy to accept current levels of tender returns as a true representation of the market. The reality is that there is large variability in the price levels being received, which is a function of how well project supply chains are being pre-qualified. Many are so busy that they will not provide a ‘sensible’ price, others will decline, yet those with a window in their order book will give a fairer

representation of the true price for the work.

The largest risk of artificial inflation of the selling price is in the high demand fitting out completion trades. The ability to shop around and find substitutes is much more limited without danger of engaging inappropriate resource that require the very best Tier 1 supervisory teams. This makes it even more important to drive value for money from high quality Tier 1 management and appropriate identification of competent trade contractors based on a full market review, not just based on historical relationships that are potentially perpetuating higher levels of inflation by consistently going to the same supply chain, even when capacity is exhausted.

2014

5000

4500

4000

3500

3000

2500

2000

1500

1000

5000

2015 2016 2017 2018 2019Year

Num

ber o

f uni

ts to

be

deliv

ered

2020 2021 2022 2023

Bui

ld c

ost i

nflat

ion

9%

8%

7%

6%

5%

4%

3%

2%

1%

0%

Build cost inflation forecast

“The ability of the major players to source multiple delivery teams, as well as their intended Tier 2 fitting out supply chain, is the biggest immediate threat to project delivery.”

Page 8: This year’s London - Arcadis98CAF45C-FCB6-4F04-9EDE... · This year’s London prime residential development pipeline shows a 25% increase in planned activity over the next ten

MARKET OUTLOOKThis report coincides with an element of continued uncertainty regarding confidence in the London residential sales market. This is mainly promoted by various macro-economic and politically influenced factors but concerns over the fundamentals of the market, especially at the lower end of the prime value range, are being driven more by a growing realisation that long-term affordability ratios are out of balance. This has been the case for some time for home ownership but perhaps has more relevance to this report in terms of rental affordability. A large amount of the demand for the lower segments of the prime market is driven by yield focused investors looking for continuous income returns as well as capital appreciation. As capital values have increased, the ability to raise rental levels in parallel will hit a glass ceiling of domestic market led rental affordability and this in turn has created more reliance on capital value appreciation to drive total returns. As questions remain over the sustainability of recent levels of sales value inflation, the fragility of this market is brought into focus. The 2014 to 2015 sales launch season will be a critical barometer of continued market sentiment.

Offset against this risk is the continuing awareness that there are large amounts of international finance looking to invest in London and the internationalism of equity flows creates interesting opportunities for the London residential market. As the Chinese property market cools and more Asian based developers and investors arrive in London, this could generate more ‘mass market’ demand from these regions. However, as supply levels are already forecast to increase rapidly, this will perhaps help to stabilise pricing and sales velocities rather than fuelling an ongoing inflationary bubble through under supply.

The Government’s role and impact on the dynamics of the market will be watched with interest post-election and it will be crucial that the message received by international markets is that London is ‘open for business’. It must also be recognised that the affordable housing delivered directly or indirectly by the current international demand, will be critical to the attainment of the Greater London Authority’s Housing Strategy and the

associated ambitious housing output targets. As previously stated, the total number of units in this year’s pipeline is inconsequential in terms of total required housing in London. Also, the schemes listed in this report will have a disproportionate impact on the associated funding or physical delivery of affordable housing that will play a role in addressing overall London housing shortfalls which should be offset against the perceived negative sentiments associated with a foreign investor driven central London market.

There is the possibility of dilution of some of the international investor (as opposed to owner occupier) interest in the central London prime residential market as investors look at other areas either in Greater London or perhaps even further afield in the UK. However, the reality is that the unique characteristics of the central London market continue to give it an advantage, as long as sentiment over rental levels or sales value stability stays positive.

SUMMARYThe delivery challenge facing developers and investors has never been greater. The cost / value sensitivity that formed the main theme of last year’s report is now perhaps being overshadowed by the imperative of achieving supply chain security.

The labour capacity constraints that are starting to affect the delivery of the next three to four years of development are leading to the realisation that some projects may be undeliverable in quality and programme terms unless they get to the front of the queue to secure the right resources. Some of this might be driven by the price paid but it is increasingly likely that softer issues such as relationships, mutual track record and trust, as well as the way in which risk is managed and transferred, will start to have an increasing impact on who wins and who loses in the race to secure capacity.

Page 9: This year’s London - Arcadis98CAF45C-FCB6-4F04-9EDE... · This year’s London prime residential development pipeline shows a 25% increase in planned activity over the next ten

CONTACT

CONTACTMark FarmerHead of DevelopmentT 07831 244 646

E [email protected]

For advice on how we can help you navigate the development and investment challenges ahead in the London residential market, please contact:

www.arcadis.com/residential

METHODOLOGYThis research excludes the value of transactions in the existing properties market and only counts the top slice by value of development in prime central London locations. The research is based on a ‘snapshot’ analysis of new private residential development projects currently being built or planned for delivery in central London through to 2023. It uses an estimation of development programme, total unit numbers, saleable area and sales values to assess the total number and value of units being delivered per annum in this market segment for the next 10 years. It only includes projects with an average sales value of greater than circa £1,350/ft², it also excludes affordable housing unit numbers as well as one off personal residence and smaller projects. It is not an exhaustive analysis of all schemes in the public domain but illustrates the clear profile of the future development pipeline.