Page 1: This  is an  instruction how to use  the new EKV- timesheet

This is an instruction how to use the new EKV-timesheet.

Page 2: This  is an  instruction how to use  the new EKV- timesheet

Your new time sheet will look like this

Page 3: This  is an  instruction how to use  the new EKV- timesheet

Enter the number of the monthThis will update the timesheet with the right dates.

Page 4: This  is an  instruction how to use  the new EKV- timesheet

Click on ”Update Project list”. The latest project list can always be found on the Time sheet FAQ page on explore-polygenerations website.

If you have worked on the same project as last month and there have been no changes in project number or project leader, there is no need to update the project list.

Page 5: This  is an  instruction how to use  the new EKV- timesheet

It is important to enter both one’s first and last name

Page 6: This  is an  instruction how to use  the new EKV- timesheet

The actual spread sheet for hours differs little from the old one, with two exceptions:• Type of project• Type of time (important when worked

hours extend past the regular 40 per week.) • Saving the time-sheet is done by clicking

on the icon.• You can sign the time-sheet by clicking on

the icon the the bottom left corner.• You don’t need to download a new

timesheet each month - Just update the project list.

Page 7: This  is an  instruction how to use  the new EKV- timesheet

Type of project (research, teaching absence)

Page 8: This  is an  instruction how to use  the new EKV- timesheet

When the project number is entered the field with the project title is updated automatically.

Page 9: This  is an  instruction how to use  the new EKV- timesheet

Select the type of time (important to indicate when ”non-paid” time has been spent on a project. This is indicated by selecting Mertid

Förberedelsetid = Preparation time

Handledning = Advising (of /PhD/MSc/students)

Kursutveckling = Course development

Mertid = Additional time

Salstid = Classroom time

Övrigt tid = Other time

Page 10: This  is an  instruction how to use  the new EKV- timesheet

Enter the number of hours worked on the project

Page 11: This  is an  instruction how to use  the new EKV- timesheet

In the far right columns there is a summery of the hours worked, and how much of the persons total time that has been spent, on each project.

Page 12: This  is an  instruction how to use  the new EKV- timesheet

If you want to keep track of your accumulated hours over the year, the last three columns can be used for this. Click in the red and gray box at the end of the month and all the hours will be added.

This is only for your own personal use.

Page 13: This  is an  instruction how to use  the new EKV- timesheet

By cklicking on the button at the bottom of the spread sheet…

…the date and signature will appear!

Page 14: This  is an  instruction how to use  the new EKV- timesheet

Saves the time sheet under a correct name. Please don’t press ctrl + S, please.

Don’t bother with this buttonIt will ask for a password.

Page 15: This  is an  instruction how to use  the new EKV- timesheet

Everything is automatically updated in this spreadsheet that imports all the timesheets.

I like to call it the ”mother-ship of all spreadsheets”.

And why do we do this?