this is a placeholder image. to replace either right click and select “change picture” or insert...
TRANSCRIPT
![Page 1: This is a placeholder image. To replace either right click and select “change picture” or insert a new picture via the insert menu and crop to size. Local](https://reader030.vdocuments.mx/reader030/viewer/2022032802/56649de65503460f94ade1b3/html5/thumbnails/1.jpg)
1
This is a placeholder image. To replace either right click and select “change picture” or insert a new picture via the insert menu and crop to size.
Local Government Victoria UpdateA look at the data, have you got proof? LGMA Conference, 30/31st April 2015
Mark Grant, Director Sector Performance and Development, LGV
![Page 2: This is a placeholder image. To replace either right click and select “change picture” or insert a new picture via the insert menu and crop to size. Local](https://reader030.vdocuments.mx/reader030/viewer/2022032802/56649de65503460f94ade1b3/html5/thumbnails/2.jpg)
2
Local Government Victoria – Emergent Data
1. Performance Reporting2. Strategic Resource Planning3. Productivity and business sustainability• The
![Page 3: This is a placeholder image. To replace either right click and select “change picture” or insert a new picture via the insert menu and crop to size. Local](https://reader030.vdocuments.mx/reader030/viewer/2022032802/56649de65503460f94ade1b3/html5/thumbnails/3.jpg)
3
![Page 4: This is a placeholder image. To replace either right click and select “change picture” or insert a new picture via the insert menu and crop to size. Local](https://reader030.vdocuments.mx/reader030/viewer/2022032802/56649de65503460f94ade1b3/html5/thumbnails/4.jpg)
![Page 5: This is a placeholder image. To replace either right click and select “change picture” or insert a new picture via the insert menu and crop to size. Local](https://reader030.vdocuments.mx/reader030/viewer/2022032802/56649de65503460f94ade1b3/html5/thumbnails/5.jpg)
2005-06 2007-08 2008-09 2009-10 2009-10 2010-11 2011-12 2012-13 2013-14 2005-14$0.00
$50.00
$100.00
$150.00
$200.00
$250.00
$300.00
$350.00
$400.00
$118.36 $117.29 $121.33
$161.67 $146.95
$155.70
$194.05
$221.98
$170.59
$140.66 $145.47
$123.94$134.56
$146.75$158.15
$176.62
$207.42
$176.10$190.54
$162.17
$206.27 $215.59
$224.32
$298.24
$248.33
$268.63
$346.90
$252.68
$138.48
$217.34
Large ShiresGovernment Grants Per Capita, 2005-2014Source: Local Government Victoria, 2015
Non Recurrent Recurrent Victoria Grants Commission
![Page 6: This is a placeholder image. To replace either right click and select “change picture” or insert a new picture via the insert menu and crop to size. Local](https://reader030.vdocuments.mx/reader030/viewer/2022032802/56649de65503460f94ade1b3/html5/thumbnails/6.jpg)
2005-06 2007-08 2008-09 2009-10 2009-10 2010-11 2011-12 2012-13 2013-14 2005-14$0.00
$100.00
$200.00
$300.00
$400.00
$500.00
$600.00
$700.00
$800.00
$900.00
$1,000.00
$194.81
$234.86
$180.71
$296.14
$227.66
$640.03
$925.23
$792.47
$641.59
$434.54
$228.22
$171.62 $171.17 $204.75
$229.59 $242.04
$319.03 $349.00
$326.52
$224.15
$335.59 $353.61
$371.86
$493.42
$419.62
$458.08
$595.49
$466.82
$246.29
$369.57
Small ShiresGovernment Grants Per Capita, 2005-2014Source: Local Government Victoria, 2015
Non Recurrent Recurrent Victoria Grants Commission
![Page 7: This is a placeholder image. To replace either right click and select “change picture” or insert a new picture via the insert menu and crop to size. Local](https://reader030.vdocuments.mx/reader030/viewer/2022032802/56649de65503460f94ade1b3/html5/thumbnails/7.jpg)
2005-06 2007-08 2008-09 2009-10 2009-10 2010-11 2011-12 2012-13 2013-14 2005-14$0.00
$500.00
$1,000.00
$1,500.00
$2,000.00
$2,500.00
$91.78
$619.45 $697.51
$1,226.93
$985.04
$1,798.42
$1,914.56
$2,041.30
$1,529.03
$1,185.73
$1,442.00 $1,419.45 $1,491.18
$1,427.11
$1,653.79 $1,711.23
$1,860.09 $1,847.44
$1,657.67
$1,434.02
$1,243.87 $1,310.75
$1,388.88
$1,809.44
$1,510.32
$1,609.97
$2,061.34
$1,616.47
$826.28
$1,324.11
Regional CentresGovernment Grants Per Capita, 2005-2014Source: Local Government Victoria, 2015
Non Recurrent Recurrent Victoria Grants Commission
![Page 8: This is a placeholder image. To replace either right click and select “change picture” or insert a new picture via the insert menu and crop to size. Local](https://reader030.vdocuments.mx/reader030/viewer/2022032802/56649de65503460f94ade1b3/html5/thumbnails/8.jpg)
2005-06 2007-08 2008-09 2009-10 2009-10 2010-11 2011-12 2012-13 2013-14 2005-14$0.00
$10.00
$20.00
$30.00
$40.00
$50.00
$60.00
$70.00
$80.00
$90.00
$100.00
$17.32
$11.63
$18.99
$30.01
$36.69
$18.72 $18.68
$25.08
$15.82
$21.44
$82.68 $79.69
$84.58
$88.20 $86.77
$92.72
$89.03 $88.64 $89.36 $86.85
$29.54 $28.11 $27.16
$34.54
$27.34 $28.97
$36.98
$28.58
$15.03
$28.47
Inner Metropolitan CouncilsGovernment Grants Per Capita, 2005-2014Source: Local Government Victoria, 2015
Non Recurrent Recurrent Victoria Grants Commission
![Page 9: This is a placeholder image. To replace either right click and select “change picture” or insert a new picture via the insert menu and crop to size. Local](https://reader030.vdocuments.mx/reader030/viewer/2022032802/56649de65503460f94ade1b3/html5/thumbnails/9.jpg)
2005-06 2007-08 2008-09 2009-10 2009-10 2010-11 2011-12 2012-13 2013-14 2005-14$0.00
$10.00
$20.00
$30.00
$40.00
$50.00
$60.00
$70.00
$80.00
$90.00
$100.00
$26.09
$33.38
$26.58
$50.64
$56.31
$48.26
$34.35
$48.63
$44.57
$35.07
$74.73 $74.99 $75.09
$84.33 $84.51 $82.73
$87.65 $88.79 $89.38
$73.63
$58.51 $59.23 $62.06
$80.78
$64.25 $67.17
$86.75
$66.49
$34.43
$57.82
Outer Metropolitan CouncilsGovernment Grants Per Capita, 2005-2014Source: Local Government Victoria, 2015
Non Recurrent Recurrent Victoria Grants Commission
![Page 10: This is a placeholder image. To replace either right click and select “change picture” or insert a new picture via the insert menu and crop to size. Local](https://reader030.vdocuments.mx/reader030/viewer/2022032802/56649de65503460f94ade1b3/html5/thumbnails/10.jpg)
Where Will the “Missing Money” Come From?(Not Here!)
2005-06 2007-08 2008-09 2009-10 2009-10 2010-11 2011-12 2012-13 2013-14 2005-14$0.00
$500.00
$1,000.00
$1,500.00
$2,000.00
$2,500.00
$1,244$1,311
$1,389
$1,809
$1,510$1,610
$2,061
$1,616
$826
$1,486
$335.59 $353.61 $371.86$493.42
$419.62 $458.08
$595.49
$466.82
$246.29
$415.64
Council Groupings, Victoria Grants Commission Grants Per Capita, 2005-14Local Government Victoria, 2015
INNER MELB AVE LARGE SHIRES AVERAGE OUTER MELBOURNEREGIONAL CENTRE AVE SMALL SHIRES AVE STATE TOTAL
![Page 11: This is a placeholder image. To replace either right click and select “change picture” or insert a new picture via the insert menu and crop to size. Local](https://reader030.vdocuments.mx/reader030/viewer/2022032802/56649de65503460f94ade1b3/html5/thumbnails/11.jpg)
Or here…………
2005-06 2007-08 2008-09 2009-10 2009-10 2010-11 2011-12 2012-13 2013-14 2005-14$0.00
$200.00
$400.00
$600.00
$800.00
$1,000.00
$1,200.00
$1,400.00
$1,600.00
$1,800.00
$2,000.00
$1,442 $1,419$1,491
$1,427
$1,654$1,711
$1,860 $1,847
$1,658$1,612
$228.22$171.62 $171.17 $204.75 $229.59 $242.04
$319.03 $349.00 $326.52$249.11
Council Groupings Recurrent Government Grants Per Capita, 2005-2014Local Government Victoria, 2015
INNER MELB AVE LARGE SHIRES AVERAGE OUTER MELBOURNEREGIONAL CENTRE AVE SMALL SHIRES AVE STATE TOTAL
![Page 12: This is a placeholder image. To replace either right click and select “change picture” or insert a new picture via the insert menu and crop to size. Local](https://reader030.vdocuments.mx/reader030/viewer/2022032802/56649de65503460f94ade1b3/html5/thumbnails/12.jpg)
Or here…………..
2005-06 2007-08 2008-09 2009-10 2009-10 2010-11 2011-12 2012-13 2013-14 2005-14$0.00
$200.00
$400.00
$600.00
$800.00
$1,000.00
$1,200.00
$1,400.00
$1,600.00
$1,800.00
$2,000.00
$1,442 $1,419$1,491
$1,427
$1,654$1,711
$1,860 $1,847
$1,658$1,612
$228.22$171.62 $171.17 $204.75 $229.59 $242.04
$319.03 $349.00 $326.52$249.11
Council Groupings Recurrent Government Grants Per Capita, 2005-2014Local Government Victoria, 2015
INNER MELB AVE LARGE SHIRES AVERAGE OUTER MELBOURNEREGIONAL CENTRE AVE SMALL SHIRES AVE STATE TOTAL
![Page 13: This is a placeholder image. To replace either right click and select “change picture” or insert a new picture via the insert menu and crop to size. Local](https://reader030.vdocuments.mx/reader030/viewer/2022032802/56649de65503460f94ade1b3/html5/thumbnails/13.jpg)
Or here………….
2005-06 2007-08 2008-09 2009-10 2009-10 2010-11 2011-12 2012-13 2013-14 2005-14$0.00
$500.00
$1,000.00
$1,500.00
$2,000.00
$2,500.00
$91.78
$619.45 $697.51
$1,226.93
$985.04
$1,798.42
$1,914.56
$2,041.30
$1,529.03
$1,211.56
$194.81 $234.86 $180.71
$296.14 $227.66
$640.03
$925.23
$792.47
$641.59
$459.28
Council Groupings, Non Recurrent Government Grants Per Capita, 2005-2014Local Government Victoria, 2015
INNER MELB AVE LARGE SHIRES AVERAGE OUTER MELBOURNEREGIONAL CENTRE AVE SMALL SHIRES AVE STATE TOTAL
![Page 14: This is a placeholder image. To replace either right click and select “change picture” or insert a new picture via the insert menu and crop to size. Local](https://reader030.vdocuments.mx/reader030/viewer/2022032802/56649de65503460f94ade1b3/html5/thumbnails/14.jpg)
An Asset Renewal Gap?
![Page 15: This is a placeholder image. To replace either right click and select “change picture” or insert a new picture via the insert menu and crop to size. Local](https://reader030.vdocuments.mx/reader030/viewer/2022032802/56649de65503460f94ade1b3/html5/thumbnails/15.jpg)
Victoria’s Self Assessment Under National Asset Management Framework
Question: How Accurate are our Condition Assessments?
Answer: Not Very!
• The
![Page 16: This is a placeholder image. To replace either right click and select “change picture” or insert a new picture via the insert menu and crop to size. Local](https://reader030.vdocuments.mx/reader030/viewer/2022032802/56649de65503460f94ade1b3/html5/thumbnails/16.jpg)
![Page 17: This is a placeholder image. To replace either right click and select “change picture” or insert a new picture via the insert menu and crop to size. Local](https://reader030.vdocuments.mx/reader030/viewer/2022032802/56649de65503460f94ade1b3/html5/thumbnails/17.jpg)
17
![Page 18: This is a placeholder image. To replace either right click and select “change picture” or insert a new picture via the insert menu and crop to size. Local](https://reader030.vdocuments.mx/reader030/viewer/2022032802/56649de65503460f94ade1b3/html5/thumbnails/18.jpg)
“Integrated service delivery and network management to create value for customers, water corporations and Government …”
What is an Intelligent Water Network?
Mine data to create intelligence“smarter utility decision
making”
Remote shut off to stop leakages
&
re-route resource flows as needed
![Page 19: This is a placeholder image. To replace either right click and select “change picture” or insert a new picture via the insert menu and crop to size. Local](https://reader030.vdocuments.mx/reader030/viewer/2022032802/56649de65503460f94ade1b3/html5/thumbnails/19.jpg)
Water Innovation Forum 2015
Participant, March 18, 2015
“One exciting program trial involves trialing multiple technologies to improve leak detection in water pipes, especially old pipes from the 60's and 70's.Some of the new technologies and innovative approaches are: pipe rover, pressure waves, digital noise, and one using CSRIO fibre optic technology”.
![Page 20: This is a placeholder image. To replace either right click and select “change picture” or insert a new picture via the insert menu and crop to size. Local](https://reader030.vdocuments.mx/reader030/viewer/2022032802/56649de65503460f94ade1b3/html5/thumbnails/20.jpg)
20
Sustainable Business Practices: Three Recent Innovations
• Towong Shire providing the rating function for Indigo Shire, delivering a 50% reduction in cost for notice production across the two small shires).
• Five Shires around Ballarat reducing Bituminous resealing costs by $3.15 m over the life of the contract period by negotiating a single harmonised contract
• Nine Metropolitan Councils in Melbourne's East developed a standard specification and contract for Line Marking delivering $800,000 in recurrent savings.