  • Third Party Requirements in the Vicinity of Natural

    Gas Facilities

    V3.1 2018Enbridge Gas Distribution

  • Revision History Version Date Approval Revisions

    3.1 2018-Jul-25 Gonzalo Juarez Manager, Pipeline Engineering

    Added new Section 6.0 Hydro-Excavation

    3.0 2018-Apr-25 Gonzalo Juarez Manager, Pipeline Engineering

    2.1 Work in the Vicinity of Pipelines • Updated contact

    numbers. 2.2 NEB-regulated Pipelines & Vital Mains • Added clarity. Table 2-2: Pipeline Location Verification Requirements for NEB- regulated pipelines and Vital Mains • Clarified requirements.

    Organized requirements by location of work.

    Table 2-3: Pipeline Location Verification Requirements for All Other Pipelines • Clarified requirements.

    Organized requirements by location of work.

    2.4 Safe Excavation • Emphasized

    requirement that within 1 m (3.3 ft) of the NEB regulated or Vital Main only Hand Digging or hydro-excavation is allowed.

    Third Party Requirements in the Vicinity of Natural Gas Facilities V3.1 Effective Date: 2018-Sep-05 © Enbridge Gas Distribution Inc. Page i of vi

  • 2.5 Points of Thrust • Clarified when EGD

    may require additional time to review the proposed work area.

    2.6 Minimum Clearance from Other Structures • Updated captions for

    Table 2-5, 2-6, and 2-7. Added instruction to consider effects of stray current. Changed requirements for drilling perpendicular to a pipeline that is smaller than NPS 12.

    2.10 Tree Planting • Added clarity to

    installation requirements for root deflectors. Removed inactive link to EGD information on tree planting.

    4.1 General • Added clarity to

    approval requirements for exposed pipelines.

    Version Date Approval Revisions

    Third Party Requirements in the Vicinity of Natural Gas Facilities V3.1 Effective Date: 2018-Sep-05 © Enbridge Gas Distribution Inc.Page ii of vi

  • 5.3 Drilling Across Pipelines • Changed requirements

    for drilling perpendicular to a pipeline that is smaller than NPS 12.

    7.1 General • Added clarity. 7.2 Notification Requirements • Added clarity. • Updated insurance

    requirements. 7.3 Guidelines for Blasting • Added clarity. 8.3 Guidelines • Added clarity. 9.0 Appendix • Updated contact

    information. Added URL for Click Before You Dig.

    Version Date Approval Revisions

    Third Party Requirements in the Vicinity of Natural Gas Facilities V3.1 Effective Date: 2018-Sep-05 © Enbridge Gas Distribution Inc. Page iii of vi

  • 2.1 2015-Sep-30 Gonzalo Juarez Senior Engineering Construction & Maintenance

    2.2 NEB Pipelines & Vital Mains • Added requirement for

    new NPS 42 Vital Main for GTA project, EGD's approval is required for all work within 30 m of the pipeline.

    2.3 Pipeline Location Verification • Table 2-2, 2-3, 2-4 and

    2-5. Added specific pipeline verification requirement for horizontal directional drilling.

    5.1 General • Added additional

    daylight hole requirement for horizontal directional drilling.

    5.2 Drilling Parallel to Pipelines • For drilling parallel to the

    pipeline, changed distance requirement to be measured from the side of the pipeline instead of locate marks.

    5.3 Drilling Across Pipelines • Added additional

    daylight hole requirement and diagram, for horizontal directional drilling.

    Version Date Approval Revisions

    Third Party Requirements in the Vicinity of Natural Gas Facilities V3.1 Effective Date: 2018-Sep-05 © Enbridge Gas Distribution Inc.Page iv of vi

  • 2.0 2018-Apr-10 Nick Thalassinos Chief Engineer

    2.0 General Requirements • Added requirements for

    clearance for Vital Mains and NEB regulated pipelines.

    • Added daylight hole requirements

    • Updated clearance requirements.

    3.0 Operation of Heavy Equipment • Added Section 3.4

    Damage to Enbridge Gas Distribution's Facilities.

    5.0 Horizontal Directional Drilling • New section. 6.0 Backfilling • New section. Appendix • Updated contact

    numbers.

    1.0 2007-Oct-01 Rob Fox Chief Engineer

    Initial release.

    Version Date Approval Revisions

    Third Party Requirements in the Vicinity of Natural Gas Facilities V3.1 Effective Date: 2018-Sep-05 © Enbridge Gas Distribution Inc. Page v of vi

  • Third Party Requirements in the Vicinity of Natural Gas Facilities V3.1 Effective Date: 2018-Sep-05 © Enbridge Gas Distribution Inc.Page vi of vi

  • Table of Contents

    Revision History . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . i

    Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1

    1.0 Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2

    2.0 General Requirements . . . . . . . . . . . . . . . . . . . . . . 4

    3.0 Operation of Heavy Equipment . . . . . . . . . . . . . . . 14

    4.0 Support of Gas Pipelines . . . . . . . . . . . . . . . . . . . . 16

    5.0 Horizontal Directional Drilling . . . . . . . . . . . . . . . . 22

    6.0 Hydro-Excavation . . . . . . . . . . . . . . . . . . . . . . . . . 26

    7.0 Backfilling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28

    8.0 Blasting Requirements . . . . . . . . . . . . . . . . . . . . . 30

    9.0 Pile Installation Or Compaction Requirements . . . 35

    10.0 Appendix . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 42

    Third Party Requirements in the Vicinity of Natural Gas Facilities V3.1 Effective Date: 2018-Sep-05 © Enbridge Gas Distribution Inc. Page vii of viii

  • Third Party Requirements in the Vicinity of Natural Gas Facilities V3.1 Effective Date: 2018-Sep-05 © Enbridge Gas Distribution Inc.Page viii of viii

  • Introduction This document is intended for anyone involved in planning or carrying out work in the vicinity of Enbridge Gas Distribution’s (EGD) network. It summarizes the requirements to be followed and specifies the technical requirements aimed at protecting EGD’s Facilities, and by extension, ensuring public and worker safety. These Requirements supersede the prior version of EGD's Third Party Requirements in the Vicinity of Natural Gas Facilities, version 2.1 (2015). Version 3.0 (2018) is effective on June 6, 2018. Within this document, "Third Party" refers to an individual or organization that is not employed by or performing work under contract to EGD. These Requirements are applicable to work done by individuals such as homeowners, other utility companies, Excavators, Constructors, and Contractors. Third Parties must follow the regulations and legislation applicable to their work in addition to these Requirements. It is understood that all legal provisions applicable to work carried out around natural gas Facilities take precedence over this document. The terms “gas lines”, “gas pipelines”, and “mains” used throughout this document apply equally to natural gas mains and service lines, as well as any other component of the EGD’s natural gas distribution system found on public or private land. Note: The latest revision of this manual is available for download at

    https://www.enbridgegas.com/~/media/Extranet-Pages/Safety/ Before-you-dig/Third-Party-Requirements-in-the-Vicinity-of- Natural-Gas-Facilities.

    Third Party Requirements in the Vicinity of Natural Gas Facilities V3.1 Effective Date: 2018-Sep-05 © Enbridge Gas Distribution Inc. Page 1 of 42

    https://www.enbridgegas.com/~/media/Extranet-Pages/Safety/Before-you-dig/Third-Party-Requirements-in-the-Vicinity-of-Natural-Gas-Facilities https://www.enbridgegas.com/~/media/Extranet-Pages/Safety/Before-you-dig/Third-Party-Requirements-in-the-Vicinity-of-Natural-Gas-Facilities

  • 1.0 Definitions Terms used in the following document are defined as follows: Applicant: The owner of the proposed work. Blaster: The person or persons responsible for setting the charges and performing the blast. Blasting, Surface: An operation involving the excavation of rock foundations for various types of structures, grade construction for highways or railroads, or canals (trenches) for water supply or collection purposes. Blasting, Tunnel: Operations involving the piercing of below ground (generally horizontal) opening in rock. Compaction: Any vibration generating operation which will result in a potential increase of the density of soils or controlled backfill materials. The means to increase the density may be static or dynamic. Constructor: A person who undertakes a project for an owner and includes an owner who undertakes all or part of a project by himself or by more than one employer (as defined by Occupational Health & Safety Act). Contractor or Excavator: Any individual, partnership, corporation, public agency, or other entity that intends to dig, bore, trench, grade, excavate, hammer into, or break ground with mechanical equipment or explosives in the vicinity of a gas pipeline or related Facility. Enbridge Gas Distribution (EGD): EGD refers to Enbridge Gas Distribution Inc., Enbridge Gas New Brunswick LP, Gazifère Inc., St. Lawrence Gas Company Inc., Niagara Gas Transmissions Limited, 2193914 Canada Limited. Facility: Any Enbridge Gas Distribution main, service, regulator station or storage Facility and its related com