A Partnership in Technology and DeliveryAsphalt Repair TechnologyAll information, processes and designs in this presentation are sent commercially in confidence and is subject to UK Patent Application no: GB1413765.7. Please do not distribute without the permission of the sender.
1
System Development - Repairs TRR have targeted the main problems with surface course asphaltJoint failures
Texture loss
Potholing
Desire for a cost effective First Time Reinstatement Option
Utility trench density and air void failures
Providing jointless paving
Product Family
How does our process work? We use a like for like material to the treatment areaHeater is positioned over the repair area
Controlled heat is pulsed into the surface at controlled depth
Surface material is agitated to level the treatment area
New material added (where required) and mixed
Treatment area is compacted
4
System Advantages
National Highways Sector Scheme approved NHSS 13 Significant savings on carbon emissions, on delivery and use of recycled materialsElimination of any formed edge, negating future maintenance issues Heat controlled by computer system giving constant heated material, which will help with compaction and quality of surface finish.Non aggressive action of repair, no saw cutting, no hydraulic breakers, no milling.Kit can achieve high outputs - 100 l m to 200 l m per shift
What does our process deliver?
Within specHigh quality reworks options Hand over jointless repairs, trenches and potholes Complete efficient surface repairs Low cost
Aesthetically sound
How does it work Non Operated Hire?
Non-Operated Hire Right First Time
Resolution of air void failures ClientSiteDateUntreatedReworkedImprovementLocationWigan MBCMakerfield Way, Wigan Jul-1418.40%5.60%12.8%CarriagewayENWLowland Way, BisphamMay-1516.70%10.80%5.90%FootwayENWClifton Drive North, St AnnesMay-1516.40%12.80%3.6%FootwayENWClifton Drive North, St AnnesMay-1519.6%*13%*6.6%Footway
All testing has been independently carried out by a UKAS accredited laboratory (PTS)
Air void defect rework
October 2014, A51 Tarpoley Cheshire (Client Cheshire West and Chester)
Completed Works
April 2016, CWAC (Client Ringway)
Completed Works
May 2015, Moorhouse, Carlisle, Cumbria (client ENW)
Completed Works
August 2014, Crewe, Cheshire (client Cheshire East)
Completed Works
What is your current cost of delivering repairs that fail? Minimising return visits to siteIncreasing work output
How long will your conventional reinstatement last?
Cost Savings
Case Study
Actual Environmental Benefits from Recently Completed Electricity North West Scheme (690m2)