the purpose-driven project: keys to building high-performing teams

78
© Bostwick Design Partnership 2015 Keys to Building High Performing Teams April 23, 2015 Registered Provider #A217 Course Code PDP_BP15 THE PURPOSE DRIVEN PROJECT Pamela Neckar, MBA Project Coach and Chief Financial Officer Bostwick Design Partnership [email protected] Robert Bostwick, AIA President and Director of Design Bostwick Design Partnership bostwickr @bostwickdesign.com

Upload: aia-pittsburgh

Post on 16-Jul-2015

306 views

Category:

Leadership & Management


2 download

TRANSCRIPT

Page 1: THE PURPOSE-DRIVEN PROJECT: KEYS TO BUILDING HIGH-PERFORMING TEAMS

© Bostwick Design Partnership 2015

Keys to Building High Performing Teams

April 23, 2015Registered Provider #A217

Course Code PDP_BP15

THE PURPOSE

DRIVEN PROJECT

Pamela Neckar, MBAProject Coach and Chief Financial Officer

Bostwick Design [email protected]

Robert Bostwick, AIAPresident and Director of Design

Bostwick Design [email protected]

Page 2: THE PURPOSE-DRIVEN PROJECT: KEYS TO BUILDING HIGH-PERFORMING TEAMS

© Bostwick Design Partnership 2015

Bostwick Design Partnership

The Purpose Driven ProjectRegistered Provider #A217

Course Code PDP_BP15

Robert Bostwick, AIA President and Director of Design

Pamela Neckar, MBA Project Coach and Chief Financial Officer

April 23, 2015

Page 3: THE PURPOSE-DRIVEN PROJECT: KEYS TO BUILDING HIGH-PERFORMING TEAMS

Credit(s) earned on completion of this course will be reported to AIA CES for AIA members. Certificates of Completion for both AIA members and non-AIA members are available upon request.

This course is registered with AIA CES

for continuing professional education. As such, it does not include content that may be deemed or construed to be an approval or endorsement by the AIA of any material of construction or any method or manner ofhandling, using, distributing, or dealing in any material or product._______________________________________

____

Questions related to specific materials, methods, and services will be addressed at the conclusion of this presentation.

Page 4: THE PURPOSE-DRIVEN PROJECT: KEYS TO BUILDING HIGH-PERFORMING TEAMS

This presentation is protected by US and International Copyright laws. Reproduction, distribution, display and use of the presentation without written

permission of the speaker is prohibited.

© Bostwick Design Partnership 2015

Copyright Materials

Page 5: THE PURPOSE-DRIVEN PROJECT: KEYS TO BUILDING HIGH-PERFORMING TEAMS

Traditional project delivery methods are inefficient, frequently contentious, and often unsuccessful.

With the design profession in a time of change, the architect has the unique opportunity to lead the

industry through collaboration. This presentation will engage the audience through a discussion of

success factors, the initiatives to achieve them, and how they support the project mission. Using case

studies, the focus will be on the process of Team Development, a clear, specific and valuable

methodology for structuring a true project Team. We will show how Team Development skills

enhance both conventional and alternative project delivery methods while improving the practice of

architecture. We will illustrate the process and tools needed to successfully implement innovative

techniques, motivate the Team, and measure its performance. From our perspectives as Chief

Financial Officer and Director of Design, we will share specific project examples to show how

effective collaboration helped to manage risk and increase financial success, while enhancing the

quality of design. Architects are uniquely skilled in fostering Teamwork, and we will show how our

profession can lead the industry toward innovation and success in project delivery. We will show how

to drive communication, collaboration, accountability and pride into every level of the project Team.

CourseDescription

Page 6: THE PURPOSE-DRIVEN PROJECT: KEYS TO BUILDING HIGH-PERFORMING TEAMS

LearningObjectives

1. Apply effective project Team Development techniques and achieve positive outcomes by aligning strengths with purpose and mission.

2. Create a meaningful and compelling project mission statement around specific key success factors.

3. Identify specific, objective performance measures to be applied to each phase of design and construction which will drive Team members toward the overall goals of the project.

4. Formulate a strategy to position the architect as Team leader by using architect-driven collaboration techniques.

5. Manage project risks by establishing a culture of accountability anchored to the project mission.

At the end of the this course, participants will be able to:

Page 7: THE PURPOSE-DRIVEN PROJECT: KEYS TO BUILDING HIGH-PERFORMING TEAMS

© Bostwick Design Partnership 2015

Page 8: THE PURPOSE-DRIVEN PROJECT: KEYS TO BUILDING HIGH-PERFORMING TEAMS

© Bostwick Design Partnership 2015

Page 9: THE PURPOSE-DRIVEN PROJECT: KEYS TO BUILDING HIGH-PERFORMING TEAMS

© Bostwick Design Partnership 2015©Bostwick Design Partnership 2015

Page 10: THE PURPOSE-DRIVEN PROJECT: KEYS TO BUILDING HIGH-PERFORMING TEAMS

© Bostwick Design Partnership 2015

Page 11: THE PURPOSE-DRIVEN PROJECT: KEYS TO BUILDING HIGH-PERFORMING TEAMS

© Bostwick Design Partnership 2015

D I S C O V E R Y

D E S I G N

D R E A MD E S T I N Y C O R E

APPRECIATIVE INQUIRY

Page 12: THE PURPOSE-DRIVEN PROJECT: KEYS TO BUILDING HIGH-PERFORMING TEAMS

© Bostwick Design Partnership 2015

TEAM

DEVELOPMENT

Page 13: THE PURPOSE-DRIVEN PROJECT: KEYS TO BUILDING HIGH-PERFORMING TEAMS

2 3 4 5 6 7

PROGRAM/

CONCEPT DESIGN

SCHEMATIC

DESIGN

DESIGN

DEVELOPMENT

CONSTRUCTION

DOCUMENTSBIDDING

CONSTRUCTION

ADMINISTRATION

CLOSE

OUT

DEFINE

SUCCESS

CREATE

PURPOSE

DEVELOP

GOALS

DEVELOP

PLAN

GAIN

COMMITMENT

REMAIN

FOCUSED

CELEBRATE

SUCCESS

TRANSPARENCY COMMITMENT COLLABORATION COOPERATION EDUCATION EXECUTION RECOGNITION

1

© Bostwick Design Partnership 2015

TEAM DEVELOPMENT

PROCESS

Page 14: THE PURPOSE-DRIVEN PROJECT: KEYS TO BUILDING HIGH-PERFORMING TEAMS

1 2 3 4 5 6 7

PROGRAM/

CONCEPT DESIGNSCHEMATIC DESIGN

DESIGN

DEVELOPMENT

CONSTRUCTION

DOCUMENTSBIDDING

CONSTRUCTION

ADMINISTRATIONCLOSE OUT

DEFINE

SUCCESS

CREATE

PURPOSE

DEVELOP

GOALS

DEVELOP

PLAN

GAIN

COMMITMENT

REMAIN

FOCUSED

CELEBRATE

SUCCESS

TR

AN

SP

AR

EN

CY

© Bostwick Design Partnership 2015

1 DEFINE SUCCESS

TR

AN

SP

AR

EN

CY

Page 15: THE PURPOSE-DRIVEN PROJECT: KEYS TO BUILDING HIGH-PERFORMING TEAMS

PROGRAM/CONCEPT DESIGN

DEFINE SUCCESS 1

© Bostwick Design Partnership 2015

A S K A B O U T T H E B E S T O F W H AT I S

APPRECIATIVE INQUIRY

DISCOVERY

Page 16: THE PURPOSE-DRIVEN PROJECT: KEYS TO BUILDING HIGH-PERFORMING TEAMS

PROGRAM/CONCEPT DESIGN

DEFINE SUCCESS 1

© Bostwick Design Partnership 2015

1. IDENTIFY PROJECT SUCCESS• PROJECT SIGNIFICANCE

• LEGACY

• ACHIEVEMENT

• HAPPINESS

2. STATE KNOWN OBSTACLES

3. UNDERSTAND BEST PAST PRACTICES

PROCESS

Page 17: THE PURPOSE-DRIVEN PROJECT: KEYS TO BUILDING HIGH-PERFORMING TEAMS

PROGRAM/CONCEPT DESIGN

1

© Bostwick Design Partnership 2015

DEFINE SUCCESS

SUCCESS

Page 18: THE PURPOSE-DRIVEN PROJECT: KEYS TO BUILDING HIGH-PERFORMING TEAMS

PROGRAM/CONCEPT DESIGN

1

© Bostwick Design Partnership 2015

DEFINE SUCCESS

OBSTACLES

Page 19: THE PURPOSE-DRIVEN PROJECT: KEYS TO BUILDING HIGH-PERFORMING TEAMS

PROGRAM/CONCEPT DESIGN

DEFINE SUCCESS 1

© Bostwick Design Partnership 2015

TRANSPARENCY

Page 20: THE PURPOSE-DRIVEN PROJECT: KEYS TO BUILDING HIGH-PERFORMING TEAMS

PROGRAM/CONCEPT DESIGN

DEFINE SUCCESS 1

© Bostwick Design Partnership 2015

TRANSPARENCY

Page 21: THE PURPOSE-DRIVEN PROJECT: KEYS TO BUILDING HIGH-PERFORMING TEAMS

12 3 4 5 6 7

PROGRAM/

CONCEPT DESIGNSCHEMATIC DESIGN

DESIGN

DEVELOPMENT

CONSTRUCTION

DOCUMENTSBIDDING

CONSTRUCTION

ADMINISTRATIONCLOSE OUT

DEFINE

SUCCESS

CREATE

PURPOSE

DEVELOP

GOALS

DEVELOP

PLAN

GAIN

COMMITMENT

REMAIN

FOCUSED

CELEBRATE

SUCCESS

CO

MM

IT

ME

NT

© Bostwick Design Partnership 2015

CREATE PURPOSE2

Page 22: THE PURPOSE-DRIVEN PROJECT: KEYS TO BUILDING HIGH-PERFORMING TEAMS

SCHEMATIC DESIGN

CREATE PURPOSE 2

© Bostwick Design Partnership 2015

PROCESS

Page 23: THE PURPOSE-DRIVEN PROJECT: KEYS TO BUILDING HIGH-PERFORMING TEAMS

2SCHEMATIC DESIGN

CREATE PURPOSE

© Bostwick Design Partnership 2015

EXAMPLES

Page 24: THE PURPOSE-DRIVEN PROJECT: KEYS TO BUILDING HIGH-PERFORMING TEAMS

2SCHEMATIC DESIGN

CREATE PURPOSE

© Bostwick Design Partnership 2015

COMMITMENT

Page 25: THE PURPOSE-DRIVEN PROJECT: KEYS TO BUILDING HIGH-PERFORMING TEAMS

2SCHEMATIC DESIGN

CREATE PURPOSE

© Bostwick Design Partnership 2015

COMMITMENT

Page 26: THE PURPOSE-DRIVEN PROJECT: KEYS TO BUILDING HIGH-PERFORMING TEAMS

©Bostwick Design Partnership 2015

1 23 4 5 6 7

PROGRAM/

CONCEPT DESIGNSCHEMATIC DESIGN

DESIGN

DEVELOPMENT

CONSTRUCTION

DOCUMENTSBIDDING

CONSTRUCTION

ADMINISTRATIONCLOSE OUT

DEFINE

SUCCESS

CREATE

PURPOSE

DEVELOP

GOALS

DEVELOP

PLAN

GAIN

COMMITMENT

REMAIN

FOCUSED

CELEBRATE

SUCCESS

©Bostwick Design Partnership 2015

CO

LL

AB

OR

AT

IO

N

© Bostwick Design Partnership 2015

3 DEVELOP GOALS

• 3

CO

LL

AB

OR

AT

IO

N

Page 27: THE PURPOSE-DRIVEN PROJECT: KEYS TO BUILDING HIGH-PERFORMING TEAMS

DESIGN DEVELOPMENT

DEVELOP GOALS 3

© Bostwick Design Partnership 2015

I M A G I N E W H AT C O U L D B E

APPRECIATIVE INQUIRY

DREAM

Page 28: THE PURPOSE-DRIVEN PROJECT: KEYS TO BUILDING HIGH-PERFORMING TEAMS

DESIGN DEVELOPMENT

DEVELOP GOALS 3

© Bostwick Design Partnership 2015

1. ANALYZE TEAM• STRENGTHS

• WEAKNESSES

• OPPORTUNITIES

• THREATS

2. LIST POTENTIAL GOALS• DEFINE CRITERIA

• BRAINSTORMING

• BRAIN WRITING

3. PRIORITIZE GOALS

PROCESS

Page 29: THE PURPOSE-DRIVEN PROJECT: KEYS TO BUILDING HIGH-PERFORMING TEAMS

3DESIGN DEVELOPMENT

DEVELOP GOALS

© Bostwick Design Partnership 2015

EXAMPLES

BUDGET SCHEDULE QUALITY SATISFACTION ENGAGEMENT

COMMUNICATION COMMUNITY SAFETY DIVERSITY CREATIVITY

Page 30: THE PURPOSE-DRIVEN PROJECT: KEYS TO BUILDING HIGH-PERFORMING TEAMS

3DESIGN DEVELOPMENT

DEVELOP GOALS

© Bostwick Design Partnership 2015

EXAMPLES

REDUCE

BUDGETBY X%

BETTER THE

SCHEDULEBY X%

ZERO OSHARECORDABLES

HUNDRED YEARBUILDING

NO POST

OCCUPANCY

CHANGEORDERS

ELIMINATE REWORK

HIT X%

OF PLANNEDSTARTS

ZERO

BYSTANDERINCIDENTS

ONE

PUNCHLIST

MAINTAIN

PATIENTSATISFACTION

Page 31: THE PURPOSE-DRIVEN PROJECT: KEYS TO BUILDING HIGH-PERFORMING TEAMS

3DESIGN DEVELOPMENT

DEVELOP GOALS

© Bostwick Design Partnership 2015

BALANCED GOALS

Page 32: THE PURPOSE-DRIVEN PROJECT: KEYS TO BUILDING HIGH-PERFORMING TEAMS

DESIGN DEVELOPMENT

DEVELOP GOALS 3

© Bostwick Design Partnership 2015

COLLABORATION

Page 33: THE PURPOSE-DRIVEN PROJECT: KEYS TO BUILDING HIGH-PERFORMING TEAMS

1 2 34 5 6 7

PROGRAM/

CONCEPT DESIGNSCHEMATIC DESIGN

DESIGN

DEVELOPMENT

CONSTRUCTION

DOCUMENTSBIDDING

CONSTRUCTION

ADMINISTRATIONCLOSE OUT

DEFINE

SUCCESS

CREATE

PURPOSE

DEVELOP

GOALS

DEVELOP

PLAN

GAIN

COMMITMENT

REMAIN

FOCUSED

CELEBRATE

SUCCESS

CO

OP

ER

AT

IO

N

© Bostwick Design Partnership 2015

DEVELOP PLAN4

CO

OP

ER

AT

IO

N

Page 34: THE PURPOSE-DRIVEN PROJECT: KEYS TO BUILDING HIGH-PERFORMING TEAMS

CONSTRUCTION DOCUMENTS

DEVELOP PLAN 4

© Bostwick Design Partnership 2015

P L A N W H AT W I L L B E

APPRECIATIVE INQUIRY

DESIGN

Page 35: THE PURPOSE-DRIVEN PROJECT: KEYS TO BUILDING HIGH-PERFORMING TEAMS

4CONSTRUCTION DOCUMENTS

DEVELOP PLAN

© Bostwick Design Partnership 2015

DEFINE GOALS

Page 36: THE PURPOSE-DRIVEN PROJECT: KEYS TO BUILDING HIGH-PERFORMING TEAMS

CONSTRUCTION DOCUMENTS

DEVELOP PLAN 4

© Bostwick Design Partnership 2015

PROJECT PLAN

Page 37: THE PURPOSE-DRIVEN PROJECT: KEYS TO BUILDING HIGH-PERFORMING TEAMS

4CONSTRUCTION DOCUMENTS

DEVELOP PLAN

© Bostwick Design Partnership 2015

CREATECOMMITMENT

PARTNER COMMUNICATE ENGAGERESPECT

SURROUNDINGS

BE TRANSPARENT

DEMANDPERFORMANCE

BE ACCURATE

ASK QUESTIONS

SHARERESOURCES

PROCESS : STRATEGIES

Page 38: THE PURPOSE-DRIVEN PROJECT: KEYS TO BUILDING HIGH-PERFORMING TEAMS

4CONSTRUCTION DOCUMENTS

DEVELOP PLAN

© Bostwick Design Partnership 2015

WEEKLYNEWSLETTERS

ORIENTATIONEXECUTIVEROUNDING

TEAMMEETINGS

FOLLOW

DESIGN

PROCESS

GUIDE

PULL PLANNING

FACE TO FACEFIRST

CO-LOCATIONSAFETY

TEAMS

A/E PRESENCEIN THE FIELD

PROCESS : INITIATIVES

Page 39: THE PURPOSE-DRIVEN PROJECT: KEYS TO BUILDING HIGH-PERFORMING TEAMS

4CONSTRUCTION DOCUMENTS

DEVELOP PLAN

© Bostwick Design Partnership 2015

ON TIMESTART

REWORK CHANGESRESPONSE

TIMEMEETING

ATTENDANCE

SATISFACTION RATE

SAFETYESTIMATING ACCURACY

NUMBER OF PUNCHLISTS

PROCESS : MEASURES

NUMBER OF PUNCHLISTS

LEED CERTIFICATION

Page 40: THE PURPOSE-DRIVEN PROJECT: KEYS TO BUILDING HIGH-PERFORMING TEAMS

4CONSTRUCTION DOCUMENTS

DEVELOP PLAN

© Bostwick Design Partnership 2015

MEASURESINITIATIVESSTRATEGIES

• Communicate impact of

project

• Create commitment

to common purpose

• Keep users engaged

from design through

construction

• Inform hospital daily

safety huddles

• Update hospital on

project via weekly

newsletter

• Hold regular Team

session

• Orientate new Team

members to purpose and

goals

• Patient Satisfaction

Survey (target: maintain

current level during CA)

• Core Team/Trade Survey

(target: score above 4.5)

• Member Turnover

(Target: 0 turnover)PATIENT/

PHYSICIAN/

STAFF/TEAM

SATISFACTION

PROJECT PLAN

Page 41: THE PURPOSE-DRIVEN PROJECT: KEYS TO BUILDING HIGH-PERFORMING TEAMS

4CONSTRUCTION DOCUMENTS

DEVELOP PLAN

© Bostwick Design Partnership 2015

MEASURESINITIATIVESSTRATEGIES

• Generate buy-in

• Remain flexible

• Demand performance

• Collaboration

• Be transparent

• Collective and complete

generation of schedule

during design

• Daily/weekly/monthly

monitoring

• Continued presence of

A/E during Construction

• Confirm user needs

• Understand existing

conditions

• BIM coordination

• Actual vs. planned

completion

• Budget reliability

• User changes

• Existing conditions

changes

• Rework

• Contingency usage

BUDGET/

SCHEDULE

MANAGEMENT

PROJECT PLAN

Page 42: THE PURPOSE-DRIVEN PROJECT: KEYS TO BUILDING HIGH-PERFORMING TEAMS

CONSTRUCTION DOCUMENTS

DEVELOP PLAN 4

© Bostwick Design Partnership 2015

PROCESS : MEASURES

Page 43: THE PURPOSE-DRIVEN PROJECT: KEYS TO BUILDING HIGH-PERFORMING TEAMS

CONSTRUCTION DOCUMENTS

DEVELOP PLAN 4

© Bostwick Design Partnership 2015

COOPERATION

Page 44: THE PURPOSE-DRIVEN PROJECT: KEYS TO BUILDING HIGH-PERFORMING TEAMS

CONSTRUCTION DOCUMENTS

DEVELOP PLAN 4

© Bostwick Design Partnership 2015

COOPERATION

Page 45: THE PURPOSE-DRIVEN PROJECT: KEYS TO BUILDING HIGH-PERFORMING TEAMS

CONSTRUCTION DOCUMENTS

DEVELOP PLAN 4

© Bostwick Design Partnership 2015

COOPERATION

Page 46: THE PURPOSE-DRIVEN PROJECT: KEYS TO BUILDING HIGH-PERFORMING TEAMS

1 2 3 45 6 7

PROGRAM/

CONCEPT DESIGNSCHEMATIC DESIGN

DESIGN

DEVELOPMENT

CONSTRUCTION

DOCUMENTSBIDDING

CONSTRUCTION

ADMINISTRATIONCLOSE OUT

DEFINE

SUCCESS

CREATE

PURPOSE

DEVELOP

GOALS

DEVELOP

PLAN

GAIN

COMMITMENT

REMAIN

FOCUSED

CELEBRATE

SUCCESS

ED

UC

AT

IO

N

© Bostwick Design Partnership 2015

GAIN COMMITMENT5

ED

UC

AT

IO

N

Page 47: THE PURPOSE-DRIVEN PROJECT: KEYS TO BUILDING HIGH-PERFORMING TEAMS

5BIDDING

GAIN COMMITMENT

© Bostwick Design Partnership 2015

PROCESS

• PERSONAL COMMITMENT

• ORIENTATION• ALL BIDDERS

• EVERY INDIVIDUAL

• NEW MEMBERS

• CHARTER AGREEMENT

Page 48: THE PURPOSE-DRIVEN PROJECT: KEYS TO BUILDING HIGH-PERFORMING TEAMS

5BIDDING

GAIN COMMITMENT

© Bostwick Design Partnership 2015

EDUCATION

Page 49: THE PURPOSE-DRIVEN PROJECT: KEYS TO BUILDING HIGH-PERFORMING TEAMS

5BIDDING

GAIN COMMITMENT

© Bostwick Design Partnership 2015

EDUCATION

Page 50: THE PURPOSE-DRIVEN PROJECT: KEYS TO BUILDING HIGH-PERFORMING TEAMS

5BIDDING

GAIN COMMITMENT

© Bostwick Design Partnership 2015

EDUCATION

Page 51: THE PURPOSE-DRIVEN PROJECT: KEYS TO BUILDING HIGH-PERFORMING TEAMS

1 2 3 4 56 7

PROGRAM/

CONCEPT DESIGNSCHEMATIC DESIGN

DESIGN

DEVELOPMENT

CONSTRUCTION

DOCUMENTSBIDDING

CONSTRUCTION

ADMINISTRATIONCLOSE OUT

DEFINE

SUCCESS

CREATE

PURPOSE

DEVELOP

GOALS

DEVELOP

PLAN

GAIN

COMMITMENT

REMAIN

FOCUSED

CELEBRATE

SUCCESS

EX

EC

UT

IO

N

© Bostwick Design Partnership 2015

REMAIN FOCUSED6

EX

EC

UT

IO

N

Page 52: THE PURPOSE-DRIVEN PROJECT: KEYS TO BUILDING HIGH-PERFORMING TEAMS

CONSTRUCTION ADMINISTRATION

6REMAIN FOCUSED

© Bostwick Design Partnership 2015

APPRECIATIVE INQUIRY

C R E AT E W H AT W I L L B EDESTINY

Page 53: THE PURPOSE-DRIVEN PROJECT: KEYS TO BUILDING HIGH-PERFORMING TEAMS

CONSTRUCTION ADMINISTRATION

6REMAIN FOCUSED

© Bostwick Design Partnership 2015

PROCESS / STRATEGIES

TRANSPARENT REPORTING

Page 54: THE PURPOSE-DRIVEN PROJECT: KEYS TO BUILDING HIGH-PERFORMING TEAMS

CONSTRUCTION ADMINISTRATION

6REMAIN FOCUSED

© Bostwick Design Partnership 2015

PROCESS / STRATEGIES

“COMING THROUGH WHEN IT MATTERS MOST.”

Page 55: THE PURPOSE-DRIVEN PROJECT: KEYS TO BUILDING HIGH-PERFORMING TEAMS

CONSTRUCTION ADMINISTRATION

6REMAIN FOCUSED

© Bostwick Design Partnership 2015

PROCESS / STRATEGIES

INNOVATIVE CONTRIBUTIONS

Page 56: THE PURPOSE-DRIVEN PROJECT: KEYS TO BUILDING HIGH-PERFORMING TEAMS

CONSTRUCTION ADMINISTRATION

6REMAIN FOCUSED

© Bostwick Design Partnership 2015

PROCESS / STRATEGIES

MEASURE TEAMWORK

Page 57: THE PURPOSE-DRIVEN PROJECT: KEYS TO BUILDING HIGH-PERFORMING TEAMS

CONSTRUCTION ADMINISTRATION

6REMAIN FOCUSED

© Bostwick Design Partnership 2015

EXECUTION

• OVERALL SATISFACTION

• CLEANLINESS

PROJECT START DATE MAY 13

PATIENT SATISFACTION SCORES:CLEVELAND CLINIC LUTHERAN HOSPITAL

Data Source – Press Ganey 1.29.15

Page 58: THE PURPOSE-DRIVEN PROJECT: KEYS TO BUILDING HIGH-PERFORMING TEAMS

CONSTRUCTION ADMINISTRATION

6REMAIN FOCUSED

© Bostwick Design Partnership 2015

EXECUTION

Let’s Hear From You

Page 59: THE PURPOSE-DRIVEN PROJECT: KEYS TO BUILDING HIGH-PERFORMING TEAMS

CONSTRUCTION ADMINISTRATION

6REMAIN FOCUSED

© Bostwick Design Partnership 2015

EXECUTION

Let’s Hear From You

Page 60: THE PURPOSE-DRIVEN PROJECT: KEYS TO BUILDING HIGH-PERFORMING TEAMS

CONSTRUCTION ADMINISTRATION

6REMAIN FOCUSED

© Bostwick Design Partnership 2015

EXECUTION

Page 61: THE PURPOSE-DRIVEN PROJECT: KEYS TO BUILDING HIGH-PERFORMING TEAMS

CONSTRUCTION ADMINISTRATION

6REMAIN FOCUSED

© Bostwick Design Partnership 2015

EXECUTION

Let’s Hear From You

Page 62: THE PURPOSE-DRIVEN PROJECT: KEYS TO BUILDING HIGH-PERFORMING TEAMS

CONSTRUCTION ADMINISTRATION

6REMAIN FOCUSED

© Bostwick Design Partnership 2015

EXECUTION

Let’s Hear From You

Page 63: THE PURPOSE-DRIVEN PROJECT: KEYS TO BUILDING HIGH-PERFORMING TEAMS

CONSTRUCTION ADMINISTRATION

6REMAIN FOCUSED

© Bostwick Design Partnership 2015

EXECUTION

Let’s Hear From You

Page 64: THE PURPOSE-DRIVEN PROJECT: KEYS TO BUILDING HIGH-PERFORMING TEAMS

CONSTRUCTION ADMINISTRATION

6REMAIN FOCUSED

© Bostwick Design Partnership 2015

EXECUTION

Let’s Hear From You

Page 65: THE PURPOSE-DRIVEN PROJECT: KEYS TO BUILDING HIGH-PERFORMING TEAMS

CONSTRUCTION ADMINISTRATION

6REMAIN FOCUSED

© Bostwick Design Partnership 2015

EXECUTION

Let’s Hear From You

Page 66: THE PURPOSE-DRIVEN PROJECT: KEYS TO BUILDING HIGH-PERFORMING TEAMS

CONSTRUCTION ADMINISTRATION

6REMAIN FOCUSED

© Bostwick Design Partnership 2015

EXECUTION

Let’s Hear From You

Page 67: THE PURPOSE-DRIVEN PROJECT: KEYS TO BUILDING HIGH-PERFORMING TEAMS

CONSTRUCTION ADMINISTRATION

6REMAIN FOCUSED

© Bostwick Design Partnership 2015

EXECUTION

©Bostwick Design Partnership 2015

Page 68: THE PURPOSE-DRIVEN PROJECT: KEYS TO BUILDING HIGH-PERFORMING TEAMS

CONSTRUCTION ADMINISTRATION

6REMAIN FOCUSED

© Bostwick Design Partnership 2015

EXECUTION

©Bostwick Design Partnership 2015

Page 69: THE PURPOSE-DRIVEN PROJECT: KEYS TO BUILDING HIGH-PERFORMING TEAMS

1 2 3 4 5 67

PROGRAM/

CONCEPT DESIGNSCHEMATIC DESIGN

DESIGN

DEVELOPMENT

CONSTRUCTION

DOCUMENTSBIDDING

CONSTRUCTION

ADMINISTRATIONCLOSE OUT

DEFINE

SUCCESS

CREATE

PURPOSE

DEVELOP

GOALS

DEVELOP

PLAN

GAIN

COMMITMENT

REMAIN

FOCUSED

CELEBRATE

SUCCESS

RE

CO

GN

IT

IO

N

© Bostwick Design Partnership 2015

CELEBRATE SUCCESS7

RE

CO

GN

IT

IO

N

Page 70: THE PURPOSE-DRIVEN PROJECT: KEYS TO BUILDING HIGH-PERFORMING TEAMS

© Bostwick Design Partnership 2015

RECOGNITION

7CELEBRATE SUCCESS

CLOSE OUT

Page 71: THE PURPOSE-DRIVEN PROJECT: KEYS TO BUILDING HIGH-PERFORMING TEAMS

7CELEBRATE SUCCESS

CLOSE OUT

© Bostwick Design Partnership 2015

RECOGNITION

Page 72: THE PURPOSE-DRIVEN PROJECT: KEYS TO BUILDING HIGH-PERFORMING TEAMS

2 3 4 5 6 7

PROGRAM/

CONCEPT DESIGN

SCHEMATIC

DESIGN

DESIGN

DEVELOPMENT

CONSTRUCTION

DOCUMENTSBIDDING

CONSTRUCTION

ADMINISTRATION

CLOSE

OUT

DEFINE

SUCCESS

CREATE

PURPOSE

DEVELOP

GOALS

DEVELOP

PLAN

GAIN

COMMITMENT

REMAIN

FOCUSED

CELEBRATE

SUCCESS

TRANSPARENCY COMMITMENT COLLABORATION COOPERATION EDUCATION EXECUTION RECOGNITION

1

© Bostwick Design Partnership 2015

TEAM

DEVELOPMENT

Page 73: THE PURPOSE-DRIVEN PROJECT: KEYS TO BUILDING HIGH-PERFORMING TEAMS

©Bostwick Design Partnership 2015

1 23 4 5 6 7

PROGRAM/

CONCEPT DESIGNSCHEMATIC DESIGN

DESIGN

DEVELOPMENT

CONSTRUCTION

DOCUMENTSBIDDING

CONSTRUCTION

ADMINISTRATIONCLOSE OUT

DEFINE

SUCCESS

CREATE

PURPOSE

DEVELOP

GOALS

DEVELOP

PLAN

GAIN

COMMITMENT

REMAIN

FOCUSED

CELEBRATE

SUCCESS

©Bostwick Design Partnership 2015

CO

LL

AB

OR

AT

IO

N

© Bostwick Design Partnership 2015

3IDENTIFY

POTENTIAL PROJECT GOALS

• 3

CO

LL

AB

OR

AT

IO

N

Page 74: THE PURPOSE-DRIVEN PROJECT: KEYS TO BUILDING HIGH-PERFORMING TEAMS

3DESIGN DEVELOPMENT

DEVELOP GOALS

© Bostwick Design Partnership 2015

BALANCED GOALS

Page 75: THE PURPOSE-DRIVEN PROJECT: KEYS TO BUILDING HIGH-PERFORMING TEAMS

3DESIGN DEVELOPMENT

DEVELOP GOALS

© Bostwick Design Partnership 2015

Let’s Hear From YouSHARE

Let’s hear from you…

Page 76: THE PURPOSE-DRIVEN PROJECT: KEYS TO BUILDING HIGH-PERFORMING TEAMS

3DESIGN DEVELOPMENT

DEVELOP GOALS

© Bostwick Design Partnership 2015

• ADD CONTENT HERE

POTENTIAL PROJECT GOALS

• ADD CONTENT HERE

Page 77: THE PURPOSE-DRIVEN PROJECT: KEYS TO BUILDING HIGH-PERFORMING TEAMS

© Bostwick Design Partnership 2015

• The Owner’s Dilemma by Barbara White Bryson with Canan Yetman

• The Owner’s Guide to Starting Integrated Building Projects by Oscia Wilson, AIA

• An Introduction to Lean Construction by Larry Robrich, PE

• A Positive Revolution in Change: Appreciative Inquiry by David Cooperrider and Diana Whitney

• The Bridge by Gay Talese

• Harvard Business Review Articles

• Discipline of Teams by Katzenbach and Smith

• Success that Lasts by Nash and Stevenson

• Coming Through When it Matters Most by Gardner

• Building Emotional Intelligence of Groups by Druskat and Wolff

• How Management Teams Can Have a Good Fight by Eisenhardt

• Project Collaboration Best Practices

• http://www.mbawpa.org/aia-mba/

RESOURCES

Page 78: THE PURPOSE-DRIVEN PROJECT: KEYS TO BUILDING HIGH-PERFORMING TEAMS

This concludes The American Institute of Architects Continuing Education Systems Course

Robert Bostwick, AIAPresident and Director of Design

[email protected]

Pamela Neckar, MBAProject Coach and Chief Financial Officer

[email protected]