The procedure followed and the results achieved from CIM piloting Gebeyehu Belay Environmental Protection Land Administration and Use Authority (EPLAUA) May 11, 2009

Upload: yestin

Post on 24-Feb-2016

30 views

Category:

Documents


2 download

DESCRIPTION

The procedure followed and the results achieved from CIM piloting. Gebeyehu Belay Environmental Protection Land Administration and Use Authority (EPLAUA) May 11, 2009. Points to be covered. Introduction ISLA printout Preparatory works Screen digitizing Approval by the committee - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: The procedure followed and the results achieved from CIM piloting

The procedure followed and the results achieved from CIM piloting

Gebeyehu BelayEnvironmental Protection Land Administration and Use

Authority (EPLAUA)May 11, 2009

Page 2: The procedure followed and the results achieved from CIM piloting

Points to be covered• Introduction• ISLA printout• Preparatory works• Screen digitizing• Approval by the

committee• Field check• Public hearing• Export to ISLA

Page 3: The procedure followed and the results achieved from CIM piloting

Introduction• 3.6 million holdings• More than 16 million

parcels• Second level book of

holding requires plans to be attached

• Speedy spatial data generation methods

• CIM and provisional second level book of holding

Page 4: The procedure followed and the results achieved from CIM piloting

ISLA printout

• Printout of confirmed ISLA data in XL sheet

• In alphabetical order• Parcel ID and names

of bordering land users

Page 5: The procedure followed and the results achieved from CIM piloting

Preparatory works

• Identification of Kebele/Woreda boundary using CSA senses map

• Selection of the right type of image

• Geo referenced and auto rectified

• Subdividing in to manageable size

• In-house training on methodology and software

Page 6: The procedure followed and the results achieved from CIM piloting

Screen digitizing

• Polygons are created• Familiarization• Easley identifiable

reference points

Page 7: The procedure followed and the results achieved from CIM piloting

Corrections together with the

committee• Minimizes field work• Corrections can be

made directly in to the computer

• Errors can be minimized

• Boundaries of CPRs• Manageable size for

group discussion

Page 8: The procedure followed and the results achieved from CIM piloting

Displays

• Landholders can easily visualize maps

• Can be used as communication tool

• Convenient for landholders

Page 9: The procedure followed and the results achieved from CIM piloting

Field check• Important especially

for boundaries difficult to identify on the screen

• Can be supported by field measurements

• Parcel IDs and ISLA printout

Page 10: The procedure followed and the results achieved from CIM piloting

Public hearing• Forum to inform the

public about the survey result

• Approval shall be given by the public

• Minutes will be documented

• Approval by the Woreda

• Export to ISLA

Page 11: The procedure followed and the results achieved from CIM piloting

Issues for further verification

• The extent of shifts• Area• Variations due to topography• Ground control and transformation

Page 12: The procedure followed and the results achieved from CIM piloting

Thank you So much