thao nguyen xanh consulting investment corporation

64
THAO NGUYEN XANH CONSULTING INVESTMENT CORPORATION ADDRESS: 158 NGUYEN VAN THU, DAKAO WARD, DISTRICT 1, HO CHI MINH CITY TEL: 0918755356 0839118552 FAX: 0839118579 PROFILE Consult engineering regarding environmental, water supply drainage technology Prepare report on environmental impact, environmental impact assessment, check and take over Collect, treat waste water, rubbish Design and build industrial and civil works Set up invested project

Upload: thao-nguyen-xanh

Post on 19-Jul-2015

302 views

Category:

Business


5 download

TRANSCRIPT

Page 1: Thao Nguyen Xanh Consulting Investment Corporation

THAO NGUYEN XANH

CONSULTING INVESTMENT CORPORATION ADDRESS: 158 NGUYEN VAN THU, DAKAO WARD, DISTRICT 1, HO CHI MINH CITY

TEL: 0918755356 – 0839118552 FAX: 0839118579

PROFILE

Consult engineering regarding environmental, water supply drainage technology

Prepare report on environmental impact, environmental impact assessment, check and take

over Collect, treat waste water, rubbish Design and build industrial and civil works Set up invested project

Page 2: Thao Nguyen Xanh Consulting Investment Corporation

INTRODUCTION

Being one of leading companies specializing in project preparation consulting and one

of very few companies having enough ability to perform formalities relating to

environmental consulting such as apply for waste discharge license issue, set up report

on environmental impact assessment “ĐTM” departmental based on decree 18, 2015,

we are proud of our consultancy for small large groups such as becamex, City land,

SCG, Ha Do,… would like to cooperate with investor “real-estate companies, hospitals,

schools, enterprises, factories,….” to support and consult the entire sequence of setting

up and performing project and environment right since preparation for investment plan

application, we shall help investors complete dossier of money flow estimation, internal

rate of return IRR, Net present value NPV, survey and assess project’s feasibility,

prepare report on environmental impact assessment “ĐTM”…. for investors to get a

comprehensive view and decide for investment exactly, create foundation for investor to

apply for investment plan, call for investment, borrow for investment, and perform

project.

Page 3: Thao Nguyen Xanh Consulting Investment Corporation

In 2015 Thao Nguyen Xanh is the first company establishing five-star personnel

model to provide for clients the best, fastest, and most professional services. We commit

to serve for client by the best staffs, almost staff team of Thao Nguyen Xanh are

excellent students of Architecture University, Polytechnic College, Natural Science

University, Economics University….

In the past, successful enterprises always hire famous and professional consultants who

are the only ones having ability to help them become successful. High effective project

cannot be done by normal consultants. In practical, a normal company cannot perform

well and also cannot communicate well to ensure proper progress, and they also have no

enough funds to hire good staff. In 2015, 1/4 customer of Thao Nguyen Xanh is booting

rather well; we shall stand by Enterprises to consult and perform all procedure regarding

project and environment.

Page 4: Thao Nguyen Xanh Consulting Investment Corporation

BUSINESS LINES

1. INVESTED PROJECT ESTABLISHING

Consult regulation, procedures related to investment in Viet Nam.

Consult feasibility of investment incentive procedures.

Set up invested project, apply for investment certificate issue.

Set up business plan, capital borrowing plan.

Set up

2. ENVIRONMENTAL CONSULTING

Set up environmental impact assessment departmental/ ministerial level

Set up environmental protection project departmental/ ministerial level

Set up commitment to environmental protection

Set up environmental supervision periodically

Discharge permits

Ground water extraction licenses

Book all emissions sources of hazardous waste

Design, construct, install treatment system for waste water, supply water, exhaust

fumes

3. DESIGNING, SUPPERVISING, CONSTRUCTING WORK

Design consulting

Construction supervision consulting

Work quality checking

4. DESIGN, CONSTRUCT, INSTALL TREATMENT SYSTEM FOR WASTE

WATER, SUPPLY WATER, EXHAUST FUMES…

Clean water supply system – supply water treatment system

Waste water treatment system

Technical pipe and equipment system

Hygiene and drainage system

Ventilation and air condition system – Compressed air machine

Boiler system and thermal equipment

Other utilized systems –Prevent and fight fire system…

Page 5: Thao Nguyen Xanh Consulting Investment Corporation

System of waste water - supply water treatment of brick factory

Page 6: Thao Nguyen Xanh Consulting Investment Corporation

HEAD OFFICE AND COMPANY OFFICE

Team of environmental engineers, experts of Thao Nguyen Xanh Consulting

Investment Corporation

HEAD OFFICE

THAO NGUYEN XANH CONSULTING INVESTMENT CORPORATION

Address: 158 Nguyen Van Thu, Dakao ward, District 1, HCMC

Tel: (08) 39118552 - 0918755356

Fax: (08) 39118579

Tax code: 0 3 0 5 5 9 1 8 6 1

Charter capital: 10.000.000.000 VND Ha Noi Office: No. B3/D6, Cau Giay New City Area, Dich Vong, Ha Noi

Hotline: 0433526997-0918755356

Branch at Vung Tau: E35 Ong Ich Khiem, Ward 6, Vung Tau City

Website: www.lapduan.com.vn - www.xaydungduan.com

www.thamdinhduan.com - www.ketoanclub.com

Thao Nguyen Xanh – Smart choice of enterprise

Page 7: Thao Nguyen Xanh Consulting Investment Corporation
Page 8: Thao Nguyen Xanh Consulting Investment Corporation

Proud of being trusted and cooperated such as: SJC Saigon Company, Mai Linh Group, Dong Tam

Long An, Mrs. Nguyen Thi Phan of FATACO Ben Tre Company, Becamex Binh Duong Group

and domestic and foreign companies such as Tam Chau Tea Company, Taiwan Fotai, Samco, Quang

Nam Industrial Park-Prime Dai Loc, Nhon Trach Industrial Park and many other companies trusted

and signed environmental, supervising contracts.

Company leaders participated in the National Congress "YOUNG

ENTREPRENEURS ASSOCIATION VIETNAM" in Hanoi Capital

Page 9: Thao Nguyen Xanh Consulting Investment Corporation

BUSINESS LICENSE

NGÀNH NGHỀ KINH DOANH

NGÀNH NGHỀ KINH DOANH

Page 10: Thao Nguyen Xanh Consulting Investment Corporation
Page 11: Thao Nguyen Xanh Consulting Investment Corporation
Page 12: Thao Nguyen Xanh Consulting Investment Corporation
Page 13: Thao Nguyen Xanh Consulting Investment Corporation
Page 14: Thao Nguyen Xanh Consulting Investment Corporation
Page 15: Thao Nguyen Xanh Consulting Investment Corporation
Page 16: Thao Nguyen Xanh Consulting Investment Corporation

CHĂM SÓC KH

THẨM

ĐỊNH

TRỢ LÝ

PGĐ ĐIỀU HÀNH

P.KT TC

Page 17: Thao Nguyen Xanh Consulting Investment Corporation

TỔNG GIÁM ĐỐC

THƯ KÝ

TRỢ LÝ

PHIÊN

DỊCH

P.KỸ THUẬT

PGĐ ĐIỀU HÀNH PGĐ ĐIỀU HÀNH

TRỢ

P.TƯ

VẤN

DN

P.

HÀNH

CHÍNH

P. KẾ

TOÁN

K.TOÁ

N

P.

MARK

ETING

CHĂM SÓC KH

KINH

DOANH

THÍ

NGHIỆM

THẨM

ĐỊNH P. ĐĂNG

KÝ SHTT

P. DỰ ÁN

P. MÔI TRƯỜNG

TRỢ

THIẾT

KẾ

XD

GIÁM

SÁT TƯ

VẤN

MT

HỘI ĐỒNG QUẢN TRỊ

KT

TỔNG

HỢP

KT

CÔNG

NỢ

THỦ

QUỸ

CÔNG TY CP TƯ VẤN ĐẦU TƯ

THẢO NGUYÊN XANH

www.lapduan.com.vn

PGĐ ĐIỀU HÀNH

BAN KIỂM SOÁT

P.KT TC

KẾ TOÁN

TRƯỞNG

PGĐ ĐIỀU HÀNH

TRỢ

ĐẠI HỘI ĐỒNG CỔ ĐÔNG

TRỢ

THI

CÔNG

Page 18: Thao Nguyen Xanh Consulting Investment Corporation

HUMAN RESOURCES STRUCTURE

OFFICE STAFF EXPERIENCE SPECIALTY

1 Nguyen Thai Son 15 years Construction

2 Truong Van Trung 5 years Construction

3 Pham Tan Đuc 5 years Engineer

3 Nguyen Dinh Hieu 10 years Construction

4 Tran Trong Thai 5 years Construction

5 Nguyen Anh Toan 30 years Constructive economy

6 Nguyen Van Chinh 15 years Mechanical engineer

7 Nguyen Hong Trung 20 years Civil and industrial electricity

8 Nguyen Thi Ngoc Nhung 5 years Accountant

9 Nguyen Anh Tuan 8 years Constructive engineer

10 Dang Thi Cam Duy 3 years Accountant

11 Nguyen Thuy Tram 5 years Accountant-Auditor

12 Dang Ngoc Dong Thu 3 years Accountant-Auditor

13 Tran Thi Bich Lien 7 years Industrial engineering

14 Huynh Thi Yen Thinh 5 years Environmental engineering

15 Nguyen Thi Ry 2 years Technology designer

16 Duong Van Trinh 3 years Water supply and drainage

17 Nguyen Phu Lam 2 years Environmental science

18 Nguyen Viet Thuy 4 years Environmental science

19 Phan Trong Tan 4 years Environmental science

20 Hoang Nguyen My Linh 3 years Environmental and technology

Page 19: Thao Nguyen Xanh Consulting Investment Corporation

engineer

21 Thieu Viet Cuong 3 years Environmental engineering

22 Nguyen Thi Thuy Linh 4 years Environmental technology

23 Le Van Tuan 5 years Water supply and drainage

24 Pham Thi Anh Thu 15 years Environmental and technology

engineer

25 Le Mai Thao 5 years Water supply and drainage

26 Tran Anh Tho 3 years Water supply and drainage

27 Tran Thi Ut Thuy 8 years Economy

28 Pham Thi Thu Hien 5 years Plan economy and investment

29 Ha Nguyen Thuy Doan 2 years Map - GIS

30 Tran Cao Thanh Toan 4 years Economy - Law

31 Do Thi Thanh Thao 4 years Plan economy and investment

32 Le Huyen Chi (IT) 3 years Management information system

33 Đoan Thi Huong Thuyet 4 years Information technology

34 Tran Huu Thai 5 years Electricity - Electronic

With more than 60 environmental engineers and experts, we combine and perform

many successful contracts with partners, agencies such as Environmental Police Department,

Ministry of Natural Resources and Environment, General Department of Environment…..

DON’T WORK HARD – WORK SMART

Page 20: Thao Nguyen Xanh Consulting Investment Corporation

TYPICAL PROJECTS - CONSTRUCTIONS

Project; Design, Construct Waste Water Treatment System of Cai Nuoc

General Hospital

-

Page 21: Thao Nguyen Xanh Consulting Investment Corporation

Image of acceptance of Cai Nuoc Hospital

Page 22: Thao Nguyen Xanh Consulting Investment Corporation

Project: Design, Construct, Provide, Install Waste Water Treatment System Equipment of

Obstetric – Pediatric Hospital at Ca Mau Province Capacity 350m3/ day

Investor: Board of project management social – cultural of Ca Mau

Location: Ly Thuong Kiet, w.6, Ca Mau City

The construction is invested by Board of project management social – cultural of Ca

Mau and completed in 12/2011. Construction stated Thao Nguyen Xanh is not only

successful in project, but also successful in environment.

ENGINEERING DRAWING OF HOSPITAL WASTE WATER TREATMENT

SYSTEM

Drawing:

+ Air condition tank

+ Air condition tank

+ Reflection

+ Chemical

Page 23: Thao Nguyen Xanh Consulting Investment Corporation

+ Bump bunch...

Project: Purchase, Install, Construct Waste Water Treatment System Belonging to

Project of Constructing Dam Doi General Hospital, Ca Mau

Page 24: Thao Nguyen Xanh Consulting Investment Corporation
Page 25: Thao Nguyen Xanh Consulting Investment Corporation

Project: Purchase, Install, Construct Waste Water Treatment System Belonging to

Project of Constructing General Hospital, Ca Mau

Page 26: Thao Nguyen Xanh Consulting Investment Corporation

PROJECT, CONSTRUCTION OF DESIGNING CONSTRUCTING INDUSTRIAL

WASTE WATER TREATMENT SYSTEM FOR FACTORY, INDUSTRIAL

PARK, APARTMENT…

With the purpose of speeding up domestic industrial development and attract

foreign investor to national development under industrialize, modernize, therefore industrial

zones and export processing zones are built and developed with larger and larger scale.

The main cause is industrial zones, factories are lack of waste water treatment

system due to not having attention of investor and due to weak policy of the government.

Waste water treatment at Khanh Hoa, Nha Trang

Each kind of waste water will be treated in different way. Many waste water treatment

Page 27: Thao Nguyen Xanh Consulting Investment Corporation

systems are designed based on low cost, lack

of measure equipment, supervision.

Through practical process of building many

waste water treatment systems for industrial

zones, factories, Thao Nguyen Xanh is

proud of being leader a

Project: Design Engineering and Provide,

Install Domestic Waste Water Treatment

System at 22-Floor-Thuy Van-Apartment – Ba Ria Vung Tau

Page 28: Thao Nguyen Xanh Consulting Investment Corporation

Waste water from different activities of human

being such as (domestic, industrial, agricultural) is

not allowed to pull out to the environment, but

must be treated via waste water treatment system.

Treatment process includes physical, chemical,

and biological processes. This is to improve waste

water quality after treatment.

Page 29: Thao Nguyen Xanh Consulting Investment Corporation

INDUSTRIAL WASTE WATER TREATMENT – INDUSTRIAL PARK – DYE

TEXTILE

Dyed waste water is generated mainly during washing, sizing, bleaching, dyeing ...

Textile Dyeing Wastewater often have high pH is toxic to aquatic kind, corrosive

The color of textile wastewater in the process due to use dye color volume fraction

just stick to fabric was largely discharged with sewage water causing color when released into

the environment

In addition to the two elements on other toxins such as supplied, metal heavy

speakers, the halogenated organic compounds can accumulate in organisms can populate and

went on up the food chain causing chronic diseases for humans and animals .

Construction of dye-textile waste water treatment

With a team of environmental engineers long experience, we constantly study uses

the most advanced technology today, by combining chemical and physical methods proposed

bio suit the characteristics and properties of water bring high efficiency waste;

The concentration of pollutants after processing achieve current regulations;

Land use minimum.

Process simple, easy to operate

We've done a lot of construction works textile wastewater treatment capacity of

1000m3 / day to 1.500m3 / day as sewage treatment works dyeing of textile companies

of South Korea in Hai Duong, textile Dyeing company in Nhon Trach ...

Page 30: Thao Nguyen Xanh Consulting Investment Corporation

In 2013, with the economy still remains difficult, however with environmental company

Thao Nguyen Xanh had a great success in projects large and small across the country. We

have been implementing the system of sewage and water in IP Dai Quang Dai Loc, Quang

Nam by Prime Dai Loc Corporation investor.

Project: Design Engineering, Construction, Install Waste Water Treatment System

(Capacity 400m3/ day) and Construction, Install Water Treatment System (Capacity

600m3/ day))

Construction: Prime Dai Quang, Dai Loc, Quang Nam, Da Nang

Page 31: Thao Nguyen Xanh Consulting Investment Corporation

Swimming sewage wastewater treatment works built crude Danang

With advanced technology, using imported equipment, Thao Nguyen Xanh has executed

many works projects large and small wastewater treatment systems throughout the country from

the South to the North, specialized in the design and construction of treatment systems wastewater

industrial parks, factories, hospitals ... With innovative technology, modern machinery and a team

of engineers, experienced professionals will bring to our customers the confidence and satisfaction

Page 32: Thao Nguyen Xanh Consulting Investment Corporation

With the goal of promoting industrial development in the country and attract foreign

investment to develop the country in the direction of industrialization and modernization,

hence the industrial zones and export processing zones are built and developed with scale

growing. However, in parallel with the positive developments, the process of industrial

development and industrial zones systems in Vietnam is creating many challenges of

environmental pollution caused by solid waste, wastewater and industrial emissions. The

main reason is the industrial zones, factories lack of sewage system mainly because

investors are not really interested and so mechanisms, policies and sanctions are not strong

enough. Wastewater from industrial parks, factories, enterprises are diverse examples:

textile wastewater, plating wastewater ...

Each different type of wastewater will have separate process technology for

processing. Many wastewater treatment system is designed, the construction with the spirit

of "minimal cost", lacks many important items such as laboratory and measuring

equipment, monitoring, control, pump , sludge dewatering and generator backup ...

Through the process of actually constructing the wastewater treatment system of

industrial zones, different plants, Thao Nguyen Xanh proud forefront of technology and

build waste water treatment system.

Page 33: Thao Nguyen Xanh Consulting Investment Corporation

System of sewage treatment tank

System of steel treatment tank

Page 34: Thao Nguyen Xanh Consulting Investment Corporation

System sewage treatment basin in Quang Nam Industrial Park – Danang

Construction unit: THAO NGUYEN XANH CONSULTING INVESTMENT

CORPORATION

Page 35: Thao Nguyen Xanh Consulting Investment Corporation

Project: Construct Yokowo Manufacturing Waste Water Treatment (Japan) 1000m3

Location: Ha Nam

Works by JSC

CENTEC specialized electrical

construction as an investor with

a total construction cost 7.6

billion was completed in 2011.

It is one of the big ones which

have partnered Thao Nguyen

Xanh success in the North and

the results of testing showed

that the parameters were

achieved by QCVN 24-2009.

Project title: Design and construction of Sewage Treatment Systems BUILDING

ORIENT SAIGON capacity of 100 m3 / day

Investor: SAI GON PHUONG DONG LIMITED COMPANY

Location: No 12, Phan Ke Binh, Da Kao ward, District 1, HCMC

Page 36: Thao Nguyen Xanh Consulting Investment Corporation

In 2014, there are several outstanding events and notable for the business community

and the economy of Vietnam.

Most significantly, the business screening actually have quality and potential, not

only flexible to survive the most difficult period, but also seek new business opportunities

in order to expand the scale of operations. Trends strong selection took place, to review the

economic activities of enterprises. Many small businesses have to stop the game, forced to

dissolve or suspend registration of a term. Thao Nguyen Xanh strong to overcome the

economic storms that demonstrate potential and deserves to be honored.

Photos: Leader of Thao Nguyen Xanh and test engineering team, guiding the workers

about workplace safety at work Danang

Page 37: Thao Nguyen Xanh Consulting Investment Corporation

For example in particular in the environmental field as JSC Consulting Thao Nguyen

Xanh - based in District 1 (HCMC). In times of crisis, to reach up and improve market

competitiveness, business leaders have promoted separate strategy with finding foreign

partners, research technologies, wastewater treatment, advanced emissions, technology

transfer from developed countries like Norway and Sweden to apply in Vietnam. The

results of this business have been successful and achieved many accomplishments as

becoming the environment since 2014. As consumer companies operating in the technology

sector, designing, constructing and operating treatment systems wastewater. Supply of

equipment, machinery and chemical processing environments. Maintenance, repair and

upgrade the sewage system. The wastewater treatment facilities, but Thao Nguyen Xanh

emissions apply new technologies have brought significant benefits, clearly reduced

operating costs textile treatment systems. Voted the enterprise is one of the top 10

environmental consulting unit in Vietnam. And especially consulting firms and make the

records and procedures related to the environmental sector on reporting environmental

impact assessment (EIA), environmental protection schemes with fastest time present day

Design technology projects - construction and installation of wastewater treatment

systems activities in Ba Ria Vung Tau

Capacity: 350 m3 / day

System of domestic waste water treatment

Page 38: Thao Nguyen Xanh Consulting Investment Corporation

The model-scale livestock farms contribute to promoting economic development and

solve local employment for many workers in place.

However, the discharge of animal waste into the environment through treatment not

causing environmental pollution and affect other industries. Finding the right solution for

handling livestock waste water before discharging it into the environment is essential for the

sustainable development of this model.

Model of waste water treatment for pig livestock

Thao Nguyen Xanh livestock wastewater treatment successful projects, large and small

farms in the provinces of Binh Duong, Dong Nai, Tay Ninh ....

Tank of livestock waste concentration

GROUND ENGINEERING DRAWINGS PIPES SYSTEM HOSPITAL

PROJECT DESIGN, CONSTRUCTION LIVESTOCK WASTE WATER

TREATMENT

Page 39: Thao Nguyen Xanh Consulting Investment Corporation

WASTEWATER TREATMENT

Surface for placing pump equipment

Surface for water pipe

Page 40: Thao Nguyen Xanh Consulting Investment Corporation

Surface for chemical pipe

Surface for mud pipe

Page 41: Thao Nguyen Xanh Consulting Investment Corporation

Surface for gas blowing pipe

Apply advanced technology and engineering

Page 42: Thao Nguyen Xanh Consulting Investment Corporation

Surface for placing foundation of condition tank – container support

Page 43: Thao Nguyen Xanh Consulting Investment Corporation
Page 44: Thao Nguyen Xanh Consulting Investment Corporation
Page 45: Thao Nguyen Xanh Consulting Investment Corporation
Page 46: Thao Nguyen Xanh Consulting Investment Corporation
Page 47: Thao Nguyen Xanh Consulting Investment Corporation

Thao Nguyen Xanh, specialized consultants to formulate investment projects on

how areas: environmental project planning, project wastewater treatment plant,

construction of apartments, built hospitals, amusement parks - entertainment, hotels and

restaurants, business investment projects, investment in construction projects on

schools, farm projects, etc.

With a team of engineers and consultants are enthusiastic, experienced,

customers will be directed to complete the procedures for setting up projects quickly as

possible. Depending on the size of the business operations, the engineer of prairie Green

will offer customers alternatives to complete the procedures for setting up their projects

efficiently, feasible and fastest.

CONSULTING FOR PROJECT ESTABLISHMENT

Page 48: Thao Nguyen Xanh Consulting Investment Corporation

TYPICAL PROJECTS

PROJECT OF CITYLAND RESIDENTIAL ZONE

Investor: Real Estate Investment City Co. (Cityland)

- Forms Management: Investors direct project management through management

established by investors.

- Investment Purpose: Creating a new urban space modern, synchronous technical

infrastructure, architecture, environment and social infrastructure, coupling with

neighboring projects are deployed, upgrade and renewal urban development contributes

to the cultural, economic, socio - ward area Me Tri, Tu Liem district Nam, Hanoi.

- Scope of analysis: Analyze segments: low-rise houses (villas, townhouses) for high

income earners and utilities such as kindergartens, trees, traffic to the scale of 6

hectares.

Architectural layout space

Construction of a new modern residential architecture has its own characteristics, with

comfortable living environment, high ecological nature. Exploited these landscape

elements in the region, organized harmonious overall architectural landscape of the city.

Space height in units in harmonious organization covers the entire low-rise buildings

(around 4 floors) include garden cottages, garden cottages adjacent incorporate green

space interspersed.

In the center of the entire core area of greenery combined service, underground parking

to meet demand for the entire stay. There is also a system of uninterrupted greenery

organizations, including the flower garden green areas focused, street trees, the bands

and clusters of trees scattered in groups in order to provide maximum efficiency in use

and its significant contributions to landscape architecture urban areas, contributing to

improved environmental conditions microclimate

The transport axis arranged easily coherent link between the buildings and outside areas

at. Also yet to make a compelling change varies spatially and points of view.

Architectural forms of housing projects, public harmonious design style and have

unified Vietnam architectural identity, in accordance with the conditions of tropical

climate.

Page 49: Thao Nguyen Xanh Consulting Investment Corporation

Perspective of low-rise housing

Page 50: Thao Nguyen Xanh Consulting Investment Corporation

PROJECT OF CONSTRUCTION INVESTMENT FOR RESIDENTIAL ZONE

PRIMARY DEMONSTRATION

Buildings are built on land with an area of 3347.8 m2, including 12 villas with land use

coefficient is 0.74; construction density 37% as planned. Part outdoor garden layout,

internal roads, shade trees, building fences and gates.

INVESTMENT TARGET

Toward city:

The project will form a high-end villa modern national standard scale of District 2. 3347.8

m2 villas that exploit a complex of works includes the sale and rental apartments utility

services comes closed. Project when being exploited to meet the increasing demand for

housing, demand for rented apartments are deficient in HCMC with complete technical

infrastructure and modern society, sync.

Villas suitable for landscape and city planning contributed to improving habitat security

and public order in District 2.

Mobilizing been idle funds from customers in need of housing and banks, credit

institutions wishing commercial loans, or participation in projects aimed at creating value

for the society material .

To create more resources for housing fund to help solve the housing shortage at present

area project also creates many jobs are to society in the process of building, contributing to

the state budget and bring profit corresponding to the Investor

Toward local people:

Restoration of technical infrastructure and modern society and in sync.

Gradually improve literacy levels in the community living with the equipment and

technical infrastructure and modern society.

Model of single villa

Page 51: Thao Nguyen Xanh Consulting Investment Corporation

Model of detached villa

PROJECT CONSTRUCTION INVESTMENT HOUSE AND APARTMENT

The objective of the plan

Distribute functions in accordance with nature of activity, ensure to

closely coordinate between these areas in the whole surrounding region.

Determine scale, location of land plot for public work

Connect urban technical infrastructure house groups and residential parks

with surrounding area.

Harmonious architecture space disposition closely attaches to green piece

and water surface area.

Project: Investment in building housing complexes and condominiums

Page 52: Thao Nguyen Xanh Consulting Investment Corporation

PROJECT OF RESORT TOURIST PARK Nature area planned nature of the planning area is construction of tourist service

luxury resort catering demand, rest, recreation and nursing for domestic and

foreign tourists with works hotel and villa gardens to long stay and

convalescence

Zoning 1/2000, and also meet the needs satisfied utilization parts management

function in the operating area of the resort.

Accommodation area.

Hotel area.

Villas, Bungalow serving for short term and long term staying demand.

Supermarket area.

Restaurant, club.

Sport area, football yard, multipurpose hall.

Entertaining and camping area, outdoor hall.

Interior way, car parking of tourist.

Rubbish gathering area.

Park, green tree, sightseeing.

Water lake, sightseeing lake

INVESTMENT PROJECTS WASTE TREATMENT PLANT

Real environmental pollution

A burning issue, upset public opinion in the country today is the pollution of the

ecological environment by the production and life of human caused. This problem is

increasingly serious, direct threat of economic development - a sustainable society, the

existence and development of the current generation and the future.

+ The status of the urban environment, industrial parks

The types of pollutants commonly found in urban areas in Vietnam is surface water

pollution, dust pollution, pollution of sulfur, carbon dioxide, nitric, pollution, lead, solid

waste (in hospitals, birth operation).

In Vietnam, the concentration of pollutants in surface water is often very high as the

suspended solids, chemical oxygen demand, nitrite, nitrate .... fold from 2-5 times, even

up to 10 to 20 times the standard values for surface water type B, the index reached the

standard ecoli allows hundreds of times. In addition to organic pollutants on the

environment of urban surface water in some places are polluted by heavy metals and

toxic substances such as lead, mercury, arsenic, chlorine, phenol, ...

Page 53: Thao Nguyen Xanh Consulting Investment Corporation

In most urban dust pollution, much of the serious pollution, the most polluted places are

residential areas near the cement plants, industrial parks, manufacturing materials and

plants coal ... In residential areas near industrial areas, the concentration of sulfur

exceeding the allowed number several times. In Vietnam, the percentage of solid waste

collection is still very low compared to the requirements set out, in many places the

percentage of solid waste collection by 20% - 40%. Measures to collect solid waste

currently land filled (currently no landfills that meet the technical standards of

environmental hygiene).

According to statistics, Vietnam has over 800 industrial establishments with 70 export

processing zones (industrial parks). The contribution of industry to GDP is very large.

However we have to suffer environmental damage caused by industrial sector caused.

+ The status of the rural environment

Water pollution in the rural and agricultural sector is also very serious. Nearly 75% of

our country's population live in rural areas, where infrastructure is outdated, the

majority of human waste and untreated cattle, infiltration into the ground or washed

away, making the condition water contamination in organic and biological constantly

rising.

Many places by massive aquaculture, lack of planning, not following the technical

process has caused many negative impacts to the aquatic environment. The amount of

waste water processing enterprises Frozen seafood is also very large, exceeding allowed

a few dozen to hundreds of times. Rural water environment is also polluted by improper

use and improper agricultural chemicals (pesticides, herbicides, ....) The lack of sanitary

facilities, infrastructure support facilities works made for household use only clean

water to reach about 30% - 40%, and only 20% - 305 works of households use hygienic

standards.

+ Technology plan:

MBT-CD.08 technology: waste processing

Garbage stage approach

Quantitative phases, separating primary filter

Cutters tear stages and intermediate recruitment

Secondary separation stage

Multilayer tear from cutting and artisanal nylon

Page 54: Thao Nguyen Xanh Consulting Investment Corporation

Downstream crushing stages

Stage composted in composting biological tower

Stage crushing and blending additives (production of pellets)

Annealing step for stabilizing natural materials

Stage curing and shaping the fuel pressure members

Stage crushing and blending additives (sx adobe bricks)

Technology industrial waste hazardous: Technology FBE incinerator ...

Page 55: Thao Nguyen Xanh Consulting Investment Corporation

Pictures: Model systems tunnel kiln incineration of hazardous industrial (carousel

format)

HOSPITAL PROJECTS COMBINED COMMUNICATION

Project construction combined

hospital communication: As the

first hospital in Vietnam to use

all the equipment and machinery

of Japanese, doctors each

department head is in Japanese.

Specialized hospital care and free

counseling for all patients,

especially patients with HIV /

AIDS; and free HIV testing to

patients.

Duration of the project: 25 years, the project is under

construction from month to

month 06/2014 02/2013;

operational from January

07/2014, ending in 2038;

liquidation of assets in 2039

The purpose of the

assessment of environmental

impact "project combines

Hospital communication" is

considered assessment of the

factors positively and negatively

affect the environment in the

hospital and surrounding areas,

thereby making recovery

solution, reduce pollution to

improve the environmental

quality impacts limiting risks for

the environment and for the

hospital when the project is

implemented, meet the

requirements environmental

standards.

Page 56: Thao Nguyen Xanh Consulting Investment Corporation

Prepare report on environmental impact assessment DTM

Prepare report on environmental supervision periodically

Prepare environmental protection plan

Prepare environmental protection commitment

Prepare book of emission sources for hazardous waste matter

Prepare report on hazardous waste matter controlling

Thao Nguyen Xanh established environmental commitments apply to businesses

manufacturing, trading and services with environmental impact, but not on the list of

projects that need to EIA. Often the projects of small and medium scale capacity below

1 million pieces / year. Environmental protection commitments made before the

business goes into operation

active basis but have carried out the renovation and expansion, enhance production

capacity scale but not on the list of projects that need to EIA.

- The production, business and services not subject to the investment project but

production waste generation.

- For the project, the proposed production, sales, service has been registered

environmental protection commitments but not yet in operation and re-registration must

make a commitment to protecting the environment in the following cases:

+ Relocation of implementation;

+ No implemented within twenty-four (24) months from the date of commitment to

environmental protection is registered;

+ Increase the size, capacity or technological change increases the scope of impact or

increase the negative impact on the environment due to waste not cause or increase the

total amount of waste generated or the new types of waste, waste polluting components

higher than forecast in the environmental protection commitment has been registered

but not serious enough to require reports on environmental impact assessment.

ENVIRONMENT

Page 57: Thao Nguyen Xanh Consulting Investment Corporation

Along with the quality of each project, we trained with specialized skills for overseeing

the construction of civil and industrial, such as: The headquarters office buildings, high-

rise apartment buildings, houses investment, hotels, industrial parks, processing plants,

warehouses ... Construction Supervisor leveling and construction supervision of

infrastructure and urban residential areas, industrial zones: Construction Supervisor

foundations, bored piles, basement, water supply systems, internal transport system of

urban residential areas, industrial zones and parks ... Construction Supervisor water

supply, waste water treatment ...

We had many large and small contract construction supervision consultant works from

the South to the North. Professional engineering team combined with practical

experience many, who commanded many large projects, stature.

The environmental services of Thao Nguyen Xanh get appreciation and trust

from customers and partners. According to the partners, the Agency departments and

service quality of Thao Nguyen Xanh good, ensure the completion of work on time and

commitment between the parties and put the interests of customers above all else . The

working principle of objectivity Thao Nguyen Xanh tied to reality. Our team of

engineers with high qualifications, friendly, professional and ensure the implementation

of the commitment, service style and enthusiastic consultants.

Page 58: Thao Nguyen Xanh Consulting Investment Corporation

Image: Meeting at Binh Phuoc

TYPICAL WASTE WATER TREATMENT SYSTEM

Nam of Project Investor Place

Design and construct waste water treatment

system (Capacity 400m3/ day – supply

water capacity 600m3/ day.

Prime Dai Loc

Corporation

Dai Quang Industrial

Park, Dai Quang

Commune, Dai Loc

District, Quang Nam,

Da Nang

Design and construct waste water treatment

system of Restaurant 13, capacity 5m3/ day.

night

Restaurant 13 23 Nguyen U Di, Dist

2, Ho Chi Minh City

Expand waste water treatment system of Ca

Mau Province General Hospital (Capacity

200m3/ day)

Cultural – Social

Project Controlling

Committee of Ca

Mau Province

Hai Thuong Lan Ong,

W.6, Ca Mau City

Construct waste water treatment system of

Cai Nuoc General Hospital in Ca Mau

Province (Capacity 250m3/ day. night)

Cultural – Social

Project Controlling

Committee of Ca

Mau Province

Lac Long Quan, W.7,

Ca Mau City

Provide, install equipment for waste water

treatment system of Dam Doi Hospital, Ca

Mau

XDCB Project

Controlling

Committee of Dam

Doi Province

Dam Doi, Ca Mau

Cultural – Social Ly Thuong Kiet, W.6,

Page 59: Thao Nguyen Xanh Consulting Investment Corporation

Design, construct, provide, install waste

water treatment system of obstetrical –

Pediatrics Hospital in Ca Mau Province

Project Controlling

Committee of Ca

Mau Province

Ca Mau City

Build manufacturing and domestic waste

water treatment system capacity 150m3

Fotai Co., Ltd Binh Duong

Build manufacturing and domestic waste

water treatment system capacity 1000m3,

Project Yokowo (Japanese capital)

CenTec Corporation

constructing

electromechanical

work

Ha Nam

Design engineering – construct install

domestic waste water treatment system

Son Thinh Office

Building Vung Tau City

Design construct building’s waste water

treatment system

Trung Nam Co., Binh Duong

DTM Establishment Contract

Set up DTM “Widening Wine Production

Factory – capacity 7,000,000 liters/ year”

International Wine

Corporation Binh Duong

Set up DTM Project of Commercial Service

Complex at 02 Hong Ha, Ward 2, Tan Binh

District

HA DO GROUP

CORPORATION Ho Chi Minh City

Set up DTM Project of Ha Do Complex

Center – Project 756 Sai Gon, 3/2 Street,

Ward 12, District 10

HA DO GROUP

CORPORATION -

756 Sai Gon

Ho Chi Minh City

Set up DTM Project “working office,

warehouse, factory of ink production,

producing and packing chemical”

Le Phan Chemical

Co., Ltd Ho Chi Minh City

Set up DTM Viet Nam Acecook Viet Nam Acecook

Co., Ltd Ho Chi Minh City

Set up DTM project “ Increase factory

capacity from 2,000 crates/ day up to

5,0002,000 crates/ day”

Namviet Oil Refinery

and Petrochemicals

JSC - NVO

Ho Chi Minh City

Set up DTM project “Eden Saigon Hotel” Sai Gon Eden Hotel

Co., Ltd Ho Chi Minh City

Set up DTM project “Factory of fertilizer Branch of An Long Long An

Page 60: Thao Nguyen Xanh Consulting Investment Corporation

production” An My Viet Fertilizer

Corporation

Construct waste water treatment system for

plated cement production 600m3. Italisa Co., Ltd Bac Giang

Set up DTM Ha Tien urban and sea resort

Lien Thanh

Investment

Construction

Corporation

Kien Giang

Kid Set up DTM project of Kid Cooking oil

production factory

TF Cooking oil C.,

Ltd Vinh Long

Set up DTM Biti’s Plaza Complex Biti’s Corporation

(Binh Tien) Buon Me Thuoc

Apply for license of waste water into water

source

(approved by MNRE)

La Nga Sugar Cane

Corporation Dong Nai

Apply for license of discharge of waste

water into water sources capacity >5000m3

(approved by MNRE)

Vitasa Manufacturing

Co., Ltd Long An

Build manufacturing and domestic waste

water treatment system capacity 250m3

Nam Ha Co., Ltd Thua Thien Hue

Build textile dye production waste water

treatment system 800m3 project washaki

(Japan’s capital)

Witalisit Co., Ltd Ninh Binh

Register for groundwater usage exploitation Ngoc Tram Co., Ltd Ngoc Tram Co., Ltd

Set up CKBVMT Center of Jewelry trading

and working office

SJC Sai Gon Jewelry

Corporation

District 3, Ho Chi

Minh City

Set up CKBVMT Sofit Hotel Sao Mai Co., Ltd Can Tho

Set up DTM Anpha shipping and repair

project

Anpha Technical

Service Corporation Ben Tre

Set up DTM project of high building

apartment zone 2.4ha

Golden Land Da

River Corporation

Bien Hoa City, Dong

Nai

Song Soc Industrial Park

Ca Mau Industrial

Park Infrastructure

Development Co.

Ca Mau

Set up DTM Minh Hung Industrial Park

Minh Hung Industrial

Park Infrastructure

Development Co.

Tay Ninh

Build manufacturing waste water treatment

system for ViKa Rubber Recycling Factory

1500m3

ViKa Rubber Plastic

Commercial

Corporation

Bac Giang

Set up environmental supervision report Viet Nam Interwood Binh Duong

Page 61: Thao Nguyen Xanh Consulting Investment Corporation

Co., Ltd

Set up environmental supervision report Tae Kwang MTC VN

Co., Ltd Dong Nai

Set up environmental supervision report Oil & Gas Sai Gon

Corporation Ho Chi Minh City

Register for book mission sources of

hazardous waste matter Asia Pacific Co., Ltd Ho Chi Minh City

Register for book mission sources of

hazardous waste

Viet Nam R&T Lock

& Security Co., Ltd Tien Giang

Register for hazardous waste export Viet Duc Co. Viet Nam to German

Domestic waste water treatment system New Décor Wood

Industrial Co. Long Thanh

Set up DTM of project “Sai Gon Paradise

Hotel”

Sai Gon Paradise

Hotel Co., Ltd Ho Chi Minh City

Consult, provide equipment of exhaust

fumes treatment

Kim Phong

Investment –

Commerce – Service

Corporation

Dong Nai

Provide chemical for waste water treatment

SEPZONE Co., Ltd -

Linh Trung (Viet

Nam)

Tay Ninh

Analyze air environment quality Shimada Shoji Co.,

Ltd Binh Duong

Design & construct waste water treatment

system of wood processing with capacity

1000m3/ day. night

Wooden Industrial

Group Corporation Can Tho

Set up DTM project “build My Quynh zoo,

hotel, and entertainment park”

My Quynh Zoo

Corporation Long An

Design & construct domestic waste water

and wood processing factory’s waste water

treatment system with capacity 2500m3/

day. night

B.H Trading and

Manufacturing Co.,

Ltd

Binh Duong

Design, construct & transfer technology

Domestic waste water treatment station for

high-ranking apartment QSK Capacity Q =

600m3/day

Nam Viet Investment

Joint Stock Company Nha Trang

Design, construct & transfer technology

Domestic waste water treatment system

300m3.

Green Real Group Gia Lai

Design, construct & transfer technology

plated waste water treatment system 300m3.

Viet Duc Joint

Venture Co., Ltd Ho Chi Minh City

Set up DTM project “ Saigon River Viet Nam Land SSG Ho Chi Minh City

Page 62: Thao Nguyen Xanh Consulting Investment Corporation

Residential Complex (Sai Gon Pearl) – step

2

Co., Ltd

Improve, install, and instruct for waste

water treatment station operation

Nam Hai Seafood

Co., Ltd Binh Dinh

Set up environmental supervision report Hung Lam Co., Ltd Ho Chi Minh City

Set up environmental supervision report

Saigon Commercial

Bank

Ho Chi Minh City

Set up environmental supervision report Nhat Minh Avila Co.,

Ltd

Ho Chi Minh City

DEVELOPMENT ORIENTATION

Page 63: Thao Nguyen Xanh Consulting Investment Corporation

We continuously study, cooperate, trade with foreign partners for knowledge

improvement as well as import high-tech modern machines and equipment, state success

through each construction. That proves that Thao Nguyen Xanh its stronger and stronger

development.

Thao Nguyen Xanh always strives continuously to become a leading environmental

company in Viet Nam.

Thao Nguyen Xanh’s considers principle “ Contributing for environment protection” as a

mission to contribute for environment protection, enhance community awareness in nature

environment construction and protection, contributes to build a happy and civilized society

for human life, for living environment, for human culture, for future life, and also for

ourselves.

TTHHAANNKK YYOOUU

Page 64: Thao Nguyen Xanh Consulting Investment Corporation

We are proud of owning an abundant team of staffs with active creative

thought, high responsible spirit and willing to face to all challenges for a general aim

is to strive for Thao Nguyen Xanh to become a strong and developed group in order

to provide for The Clients with the most optimal service.

One more time, sincerely thank all Clients and hope to receive more interest,

support, and coordination of Clients for same benefit, same development of two sides.

Wish Clients “Health – Happiness - Success “

Respectfully!