TH 2 – Wilton Bridge ReplacementTH 2 – Wilton Bridge ReplacementDesign-Build ProjectDesign-Build Project
S.P. 0406-53S.P. 0406-53
March 5, 2009
Todd Vonasek, P.E.Mn/DOT Project Manager
PROJECT INFORMATIONAL MEETINGPROJECT INFORMATIONAL MEETINGPROJECT INFORMATIONAL MEETINGPROJECT INFORMATIONAL MEETING
Design-Build OverviewDesign-Build Overview
Jay HietpasJay Hietpas
Design Build Program Manager Design Build Program Manager Mn/DOTMn/DOT
Design-BuildDesign-Build
A project delivery method that overlaps the A project delivery method that overlaps the design and construction phases design and construction phases
Phases are concurrent, rather than sequential Phases are concurrent, rather than sequential like traditional Design-Bid-Build methodlike traditional Design-Bid-Build method
New project and quality management New project and quality management approachapproach
New roles and responsibilities for Mn/DOT and New roles and responsibilities for Mn/DOT and ContractorsContractors
How Does Design-Build How Does Design-Build Change the Traditional Process?Change the Traditional Process?
ProjectScoping(Mn/DOT)
Develop ConstructionPlan & R/W Acquisition
(Mn/DOT)
Pre-Design & Enviro. Studies
(Mn/DOT)
Construction(Contractor)
Traditional Process = Design–Bid–BuildOpen Bids
Open to Traffic
ProjectScoping(Mn/DOT)
Pre-Design & Enviro. Studies
(Mn/DOT)
Detail Design(Design-Builder)
Construction(Design-Builder)
TimeSavings
New Process “Tool” = Design-Build Process
Develop Request for Proposals & R/W
Acquisition(Mn/DOT)
Open Bids
Open to Traffic
Past Design-Build ProjectsPast Design-Build Projects
ROC 52 in RochesterROC 52 in Rochester
I-494 Expansion in West MetroI-494 Expansion in West Metro
TH 10/32 Interchange near HawleyTH 10/32 Interchange near Hawley
TH 212 Expansion in West MetroTH 212 Expansion in West Metro
TH 52 in OronocoTH 52 in Oronoco
Sign Replacement – District 4Sign Replacement – District 4
I-35W BridgeI-35W Bridge
Low Bid (35W Lakeville, TH 100, TH 14)Low Bid (35W Lakeville, TH 100, TH 14)
State Law ProcessState Law ProcessTwo Step Process (Best-Value)Two Step Process (Best-Value) Request for Qualifications (RFQ)Request for Qualifications (RFQ) Short-List of TeamsShort-List of Teams Request for Proposals (RFP)Request for Proposals (RFP)
Low BidLow Bid Short-List is OptionalShort-List is Optional Request for Proposals (RFP)Request for Proposals (RFP)
Difference to bid-buildDifference to bid-build Lump SumLump Sum
Contractor responsible for designContractor responsible for design
Mn/DOT will review design prior to Mn/DOT will review design prior to constructionconstruction
3-year warranty3-year warranty
Quality ProcessQuality Process
Project OverviewProject Overview
Todd Vonasek, Mn/DOT District 2Todd Vonasek, Mn/DOT District 2
Project ManagerProject Manager
DISCLAIMERDISCLAIMER
What is discussed today is informational only, What is discussed today is informational only, meant to assist interested teams in the pursuit meant to assist interested teams in the pursuit of this project.of this project.
The ultimate contract requirements will be The ultimate contract requirements will be included in the Request for Proposals (RFP). included in the Request for Proposals (RFP).
There may be changes between now and the There may be changes between now and the time the RFP is issued and proposal due date.time the RFP is issued and proposal due date.
Project PartnersProject Partners
Federal Highway AdministrationFederal Highway Administration
Design-Build ProposersDesign-Build Proposers
HNTB – Design-Build Contract HNTB – Design-Build Contract DevelopmentDevelopment
Project DescriptionProject DescriptionGeneral LayoutGeneral Layout
– RoadwayRoadway– Bridge removalBridge removal– New Trail StructureNew Trail Structure– No New Right of WayNo New Right of Way
Project DescriptionProject DescriptionUtilitiesUtilities
NoiseNoise
StagingStaging
@.
@
Project GoalsProject GoalsQuality materials and workmanshipQuality materials and workmanship
Construction and Public SafetyConstruction and Public Safety
Environmental complianceEnvironmental compliance
Fiscal responsibilityFiscal responsibility
Minimizing transportation Minimizing transportation disruptions disruptions
TH 2 Procurement ProcessTH 2 Procurement Process
Joe CampbellJoe Campbell
Mn/DOT Bridge OfficeMn/DOT Bridge Office
Design-Build Low BidDesign-Build Low BidInstruction to Proposers (ITP)Instruction to Proposers (ITP)– Introduction and SummaryIntroduction and Summary– Procurement ScheduleProcurement Schedule– Procurement ProcessProcurement Process– Proposal Delivery, Content and FormatProposal Delivery, Content and Format– Proposal Evaluation ProcessProposal Evaluation Process
Request for Proposals (RFP)Request for Proposals (RFP)– Instruction to Proposers (ITP)Instruction to Proposers (ITP)– Contract Documents (Books 1, 2 and 3)Contract Documents (Books 1, 2 and 3)– Reference Information Documents (RID)Reference Information Documents (RID)– Final Contract will contain above and the Contractors Final Contract will contain above and the Contractors
proposalproposal
Design-Build Low BidDesign-Build Low BidContractors ProposalsContractors Proposals– Technical Proposal (Pass/Fail)Technical Proposal (Pass/Fail)
Proposer team Key ParticipantProposer team Key Participant– Construction Field SuperintendentConstruction Field Superintendent– Roadway, Bridge and Traffic Engineer FirmsRoadway, Bridge and Traffic Engineer Firms
Qualification documentationQualification documentation– Const. Field Sup. – Experience and ReferencesConst. Field Sup. – Experience and References– Roadway Design Firm Mn/DOTs Consultant Services Work type Roadway Design Firm Mn/DOTs Consultant Services Work type
2.1 Level 22.1 Level 2– Bridge Design Firm Mn/DOTs Consultant Services Work type 3.1 Bridge Design Firm Mn/DOTs Consultant Services Work type 3.1
Level 1Level 1
Project Understanding documentationProject Understanding documentation– Summary of major project componentsSummary of major project components
– Price ProposalPrice ProposalForms 14, 16, 17, etc.Forms 14, 16, 17, etc.DBE & EEO SubmittalDBE & EEO Submittal
Design-Build Design-Build
Proposal Review ApproachProposal Review Approach
Technical ProposalTechnical Proposal– Pass/FailPass/Fail– ResponsivenessResponsiveness
Price Proposal – Low BidPrice Proposal – Low Bid
Information made public at AwardInformation made public at Award
Written CommunicationWritten Communication
Quality ApproachQuality Approach– Design Quality procedure outlined in RFP Design Design Quality procedure outlined in RFP Design
Quality ManualQuality Manual
– Construction Quality follow standard District Construction Quality follow standard District procedures Supplemented by some Quality process procedures Supplemented by some Quality process outlined in RFPoutlined in RFP
Project InformationProject Information
http://www.dot.state.mn.us/designbuild/stimulus.html
Procurement InformationProcurement Information
Information Posted on WebsiteInformation Posted on Website– http://www.dot.state.mn.us/designbuild/stimulus.htmlhttp://www.dot.state.mn.us/designbuild/stimulus.html
Interested Proposer ListInterested Proposer List– Supply Mn/DOT with contact person name Supply Mn/DOT with contact person name
& contact information.& contact information.– Mn/DOT will distribute updates to Mn/DOT will distribute updates to
suppliment website postings (this is for suppliment website postings (this is for conveniance, not for complete information conveniance, not for complete information transfer) Proposer to verify website transfer) Proposer to verify website information.information.
Design-Build Design-Build General Discussion PointsGeneral Discussion Points
Co-Housing – No.Co-Housing – No.
Key Participants to be on project or Key Participants to be on project or available as described in RFPavailable as described in RFP– Designers – Available during constructionDesigners – Available during construction– Surveyor – present during all survey activities, available Surveyor – present during all survey activities, available
during constructionduring construction– Construction Field Superintendent – On Project during all Construction Field Superintendent – On Project during all
construction activitiesconstruction activities
DBEDBE– Goal will be 5%, additional information in the RFPGoal will be 5%, additional information in the RFP
Design-Build Design-Build
Process is different than Traditional Process is different than Traditional Design-BuildDesign-Build
Contractor is responsible for Contractor is responsible for Unforeseen conditions and changes Unforeseen conditions and changes
Contractor and designer work together Contractor and designer work together proactively to correct and/or mitigate proactively to correct and/or mitigate problemsproblems
Changes and modification will require Changes and modification will require Mn/DOT acceptanceMn/DOT acceptance
ScheduleScheduleTentative – Subject to ChangeTentative – Subject to Change
ACTIVITY ACTIVITY Due DateDue DateIssue RFP Issue RFP March 23March 23
Clarification Submittal Deadline Clarification Submittal Deadline April 20April 20
Technical and Price Proposal Due DateTechnical and Price Proposal Due Date May 1 May 1
Public Opening DatePublic Opening Date May 1May 1
Anticipated First Notice Anticipated First Notice to Proceed (NTP1) to Proceed (NTP1) May 30May 30
GeneralGeneralApril 20 - Deadline for RFP ClarificationsApril 20 - Deadline for RFP Clarifications
May 1 - Proposal due date May 1 - Proposal due date – Central Office (9:00 am)Central Office (9:00 am)– Deliver to Jay HietpasDeliver to Jay Hietpas
May 1 - Proposal Public OpeningMay 1 - Proposal Public Opening– Mn/DOT Central Office (9:30 am)Mn/DOT Central Office (9:30 am)
Mn/DOT Single Point of ContactMn/DOT Single Point of Contact– [email protected]@dot.state.mn.us
Questions ?Questions ?