test section of chf (critical heat flux) test setup for the study on ivr (in vessel retention)...

2
www. copper-manufacture.com Luoyang Hengzheng Copper Co.,Ltd AddressJinyuan Mansion C, Room 507, 38#Taiyuan Road, Jianxi District, Luoyang City, China 471003 Tel:+86-0379-64391187 | Fax:+86-0379-64390787 Email[email protected] | sunji0407@126.com Chinese: www.lyhengzheng.com English: www.copper-manufacture.com Русский: www.hzc-solutions.ru Raw Materials | Machining Factory | Professional Design Team | Strict Quality Control | Experience in project contracting EBCHR cooling bed SAF Contact shoes Pressure ring Copper Chute Crystallizer &crucible Electrode Holder

Upload: michael-chen

Post on 16-Jul-2015

13 views

Category:

Engineering


1 download

TRANSCRIPT

Page 1: Test section of chf (critical heat flux) test setup for the study on ivr (in vessel retention) strategy

www. copper-manufacture.com

Luoyang Hengzheng Copper Co.,Ltd

Address:Jinyuan Mansion C, Room 507, 38#Taiyuan

Road, Jianxi District, Luoyang City, China 471003

Tel:+86-0379-64391187 | Fax:+86-0379-64390787

Email:[email protected] | [email protected]

Chinese: www.lyhengzheng.com

English: www.copper-manufacture.com

Русский: www.hzc-solutions.ru

Raw Materials | Machining Factory | Professional Design Team | Strict Quality Control | Experience in project contracting

EBCHR cooling bed

SAF Contact shoes

Pressure ring Copper Chute Crystallizer &crucible

Electrode Holder

Page 2: Test section of chf (critical heat flux) test setup for the study on ivr (in vessel retention) strategy

www. copper-manufacture.com

Raw Materials | Machining Factory | Professional Design | Project contracting | Strict Quality Control | Transportation

About Products Project case

HZC designed and produced the core test section of CHF (critical heat flux)

test setup for the study on IVR (In-Vessel Retention) strategy— CGNPC Chi-

na Guangdong Nuclear Power Corporation.

Nuclear Power