Page 1: TerraCORE Hospitality Prefab Presentation

Hospitality Division

Luxury Bath and FlooringPrefab Panel System

Page 2: TerraCORE Hospitality Prefab Presentation

PREFAB PANEL

Prefab Panel with Honeycomb Backing Usage: Wall Panel, Cladding, Curved

PanelAluminum

Sheet

Aluminum Honeycomb

Aluminum Sheet

Natural marble

Page 3: TerraCORE Hospitality Prefab Presentation

PREFAB PANEL

Prefab Panel with Fiberstone Backing Usage: Floor Panel, Pattern flooring,

high-strength requested

Page 4: TerraCORE Hospitality Prefab Presentation

SYSTEM ADVANTAGES

Light-weight panels Ease handling for semi-skilled workers

Watertight Suitable for shower & bath

Adapt to your design vision. More stone choices to use such as

limestone, sandstone, marble, granite & onyx

Match with site tolerances Proven high speed production

300 bathrooms per month

Page 5: TerraCORE Hospitality Prefab Presentation

INSTALATION ADVANTAGES

Major work done in factory

Reduce Site work Fast installation Improve workmanship No wet work on site No waste/debris on site

Page 6: TerraCORE Hospitality Prefab Presentation

ECONOMICAL ADVANTAGES

Early back to business Short installation lead time Clean & Quiet site Renovation along with normal business operation is possible

Better Quality Highest standards of workmanship Easily retrofitted

Save building cost Less building weight (Only drywall needed) Less natural stone used Less site debris Less experienced labor required Less transportation cost

Page 7: TerraCORE Hospitality Prefab Presentation

GENERAL COMPARISON

Page 8: TerraCORE Hospitality Prefab Presentation

PRODUCTION PROCESS

Page 9: TerraCORE Hospitality Prefab Presentation

INSTALLATION SEQUENCE

Page 10: TerraCORE Hospitality Prefab Presentation

SITE INSTALLATION

Bath Tub & Frame

Page 11: TerraCORE Hospitality Prefab Presentation

INSTALLATION: 4-DAY CYCLE

AM PM AM PM AM PM AM PM AM PM

INSTALLATION PERIOD

PREPARATORY WORKS

MATERIAL PACKAGING

SITE PROGRESSFOR 5 WORKERS' TEAM STEP 0

2 CARPENTERS LEVELLING SCREED

1 STONELAYER1 PAINTER

1 MEP WORKER STEP 1

1. TUB/FRAME NEXT ROOM

ADVANTAGES: 2. CONNECT PIPES

1. ONLY 30% OF CONVENTIONAL SITE LABOR 3. PRESSURE TEST STEP 2 STEP 0 NEXT RM

2. ONLY 30% OF CONVENTIONAL SITE TIME 4. VANITY WALLS 1. WALL PANELS LEVELLING SCREED

3. FACTORY STANDARD WORKMANSHIP 2. MIRRORS

3. TUB APRON STEP 3

4. GLASS RAILS 1. CEILING PANELS

5. VANITY COUNTER 2. CORNICES STEP 4

6. SHOWER TRAY 3. FLOOR PANELS 1. PAINT FINAL COAT

4. SKIRTING 2. JOINT REPAIR STEP 5

5. DOOR FRAMES 3. WALL COVERING 1. SANITARY WARES

6. MEP WIRING 4. GLASS DOORS 2. FITTING STEP 6

5. WOOD DOORS 3. ACCESSORIES 1. CLEANING

4. LIGHTINGS 2. PROTECTION

5. SOCKET/SWITCH 3. HANDOVER

AM PM AM PM AM PM AM PM AM PMDATE:2005-9-20 DAY 3 DAY 4-DAY 5 -DAY 1 DAY 1 DAY 2

DESCRIPTION -DAY 5 -DAY 1 DAY 1PREPARATORY PERIOD INSTALLATION PERIOD

DAY 2 DAY 3 DAY 4

PREPARATORY

STEP 1

START

1. Dry walls OK2. Anchor bolts3. MEP lead-ins4. Waterproofing

PACKAGE 0LEVELLING SCREED

+ TOOLS

PACKAGE 11.BATH TUB/FRAME

2.PLUMB PIPES3.VANITY WALLS4.INSTALL TOOLS

PACKAGE 21.WALL PANELS2.BATH APRON

3.VANITY4.SHOWER TRAY

5.GLASS RAIL6.MIRROR

7.GLUE/TOOLS

PACKAGE 31.CEILING PANELS

2.CORNICES3.FLOOR PANELS

4.SKIRTING5.DOOR FRAME6.MEP WIRING

7.ACCESSORIES8.TOOLS

PACKAGE 41.CEILING PAINT FINAL COAT

2.REPAIR WALL JOINTS3.LAY WALL COVERING

4.INSTALL GLASS DOORS5.INSTALL WOOD DOORS6.ACCESSORIES/TOOLS

PACKAGE 51.SANITARY WARES

2.FITTINGS3.LIGHTINGS

4.SOCKET/SWITCH3.ACC/TOOLS

waterprooftest OK

INSTALLATION PERIOD=4 DAYS

STEP 2 STEP 3 STEP 4 STEP 5 STEP 0STEP 0

Page 12: TerraCORE Hospitality Prefab Presentation

FINISHED PROJECT:

Macau Ponte 16 Resort Installation of 404 bathrooms in just 48

days. Product Used: Prefab with honeycomb;

wall & flooring

Comparison Conventional

Method:160 Skilled Workers50 Cleaners

Prefab System:40 Semi-Skilled

Workers8 Skilled Workers10 Cleaners

Page 13: TerraCORE Hospitality Prefab Presentation

MACAU PONTE 16 RESORT

Page 14: TerraCORE Hospitality Prefab Presentation

MACAU PONTE 16 RESORT

Page 15: TerraCORE Hospitality Prefab Presentation

MACAU PONTE 16 RESORT

Page 16: TerraCORE Hospitality Prefab Presentation

FINISHED PROJECT:

Singapore Marina Bay Sands Installation of 2797 bathrooms in just

69 days. Product Used: Prefab with honeycomb; wall

& flooring

Comparison Conventional

Method:762 Skilled Workers60 Cleaners

Prefab System:122 Semi-Skilled

Workers61 Skilled Workers20 Cleaners

Page 17: TerraCORE Hospitality Prefab Presentation

SINGAPORE MARINA BAY SANDS

Page 18: TerraCORE Hospitality Prefab Presentation

SINGAPORE MARINA BAY SANDS

Page 19: TerraCORE Hospitality Prefab Presentation

FINISHED PROJECT:

Venetian, Macau Installation of 1,200 m2 Waterjet

Pattern in just 15 days. Product Used: Prefab panel with

fiberstone; flooring

Comparison Conventional

Method:10 Skilled Workers2 Cleaners

Prefab System:2 Semi-Skilled

Workers2 Skilled Workers1 Cleaners

Page 20: TerraCORE Hospitality Prefab Presentation

VENETIAN, MACAU

Page 21: TerraCORE Hospitality Prefab Presentation

MORE PREFAB STONE PRODUCTS

1.5 mm thk Slate Veneer 3 mm thk semi transparent Onyx

Panel Floor / Wall Panel

Patterns or Inlays Hairline / 1 mm Joint

Shower Panel Curved Panel

1/5 weight to original 30mm stone

Page 22: TerraCORE Hospitality Prefab Presentation