tender issue - fiji national university · installation edmonds h500 hurricane ventilator or...
TRANSCRIPT
TENDER ISSUE
DESCRIPTION
PB
AS SHOWN
DATEBYREV.
DRAWING No:
PROJECT No:
DRAFTING CHECK:DRAFTED:
DESIGNED:
SCALE:
BE PROVEN ON JOB BY THE CONTRACTOR. ARE APPROXIMATE ONLY AND THEIR EXACT POSITION SHALL
ON JOB PRIOR TO STARTING WORKS AND SHALL IMMEDIATELY NOTIFY THE ENGINEER/ CLIENT OF ANY DISCREPANCIES.WARNING : THE LOCATION OF UNDERGROUND SERVICES
THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS ON
CONCEPT ISSUE 14/11/2017PBC1
SHEET TITLE:PROJECT: DESIGN CHECK:
A08.1REVISION:
PB DCP&I - NC
FIJI NATIONAL UNIVERSITY PROPOSED WALL TYPE 3DETAIL
NTT ISSUE
FMA MARITIME CAMPUSPROPOSED ENGINEERING
WORKSHOP028 FMA 2017
DCP&I - NC
SHEET No:
CP&I14.17
TENDER ISSUET1 PB 29/11/2017
R1
NTT ISSUENTT1 PB 23/02/2018
TENDER ISSUE
4000
CO
S
TYPICAL WALL TYPE 3 - SECTION SCALE 1:10
50x50 Square mesh welded to 50x50 Galv. square tubing
50x50 Square mesh welded to 50x50 Galv. square tubing
50x50 Galv. square tubing
50x50 Galv. square tubing frame fixed to FFL with 50x50 L-Plate and m12x50 Dyna bolt
50x50 Galv. square tubing frame screw fixed to 100x50mm timber packer( 75 screw @ 400crs)
TYPICAL WALL TYPE 3 - INTERNAL ELEVATION ESCALE 1:20
50x50 Square mesh welded to 50x50 Galv. square tubing
50x50 Galv. square tubing
50x50 Galv. square tubing frame fixed to FFL with 50x50 L-Plate and m12x50 Dyna bolt
50x50 Galv. square tubing frame fixed to Exterior with 50x50 L-Plate and m12x50 Dyna bolt
50x50 Galv. square tubing at 1000 ctrs
50x50 Galv. square tubing frame fixed to Internal wall type 2 with 50x50 L-Plate and 75mm Couch screw
50x50 Galv. square tubing frame door refer to Door schedule
4000
CO
S
100x50 Timber Multigriped to timber packers @ 400 crts.C20020 RPFL
purlins @ 1000mm max
100x50 timber packer piece fixed to C-purlins
100x50 timber packer piece fixed to C-purlins
100x50 Timber Multigriped to timber packers @ 400crts.
50x50 Galv. square tubing frame screw fixed to 100x50mm timber packer( 75 screw @ 400crs)
C20020 RPFL purlins @ 1000mm max
Revision Note:Contractor is to allow for new fixing detail to top of Purlin side as per detail
TENDER ISSUE
DESCRIPTION
PB
AS SHOWN
DATEBYREV.
DRAWING No:
PROJECT No:
DRAFTING CHECK:DRAFTED:
DESIGNED:
SCALE:
BE PROVEN ON JOB BY THE CONTRACTOR. ARE APPROXIMATE ONLY AND THEIR EXACT POSITION SHALL
ON JOB PRIOR TO STARTING WORKS AND SHALL IMMEDIATELY NOTIFY THE ENGINEER/ CLIENT OF ANY DISCREPANCIES.WARNING : THE LOCATION OF UNDERGROUND SERVICES
THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS ON
CONCEPT ISSUE 14/11/2017PBC1
SHEET TITLE:PROJECT: DESIGN CHECK:
A08REVISION:
PB DCP&I - NC
FIJI NATIONAL UNIVERSITY PROPOSED WALL TYPEDETAIL 1&2
NTT ISSUE
FMA MARITIME CAMPUSPROPOSED ENGINEERING
WORKSHOP028 FMA 2017
DCP&I - NC
SHEET No:
CP&I14.17
TENDER ISSUET1 PB 29/11/2017
R1
NTT ISSUENTT1 PB 23/02/2018
TENDER ISSUE
ex. 20
10
10
ex. 1
00
SKIRTING DETAIL( TYPICAL )SCALE 1 : 2
floor finish line
4000
CO
S
Ex. 100 x 20 mmH3 timber skirting allaround refer detail
ceiling line
100 x 50mm H3 F7 timber nogs @ 600 ctrs
100 x 50mm H3 F7 timber studs @ 600 ctrs fixed to top plate with Multigrip on botthsides
100 x 50mm H3 F7 timber plate dyna bolted to existing slab with 12 dia. dyna bolt @ 600 ctrs
WALL TYPE 2 SECTIONSCALE 1:10
100 x 50mm H3 treated timber top plate on flat screw fixed to steel purlins (75mm screw)
INTERIOR
new 6mm exterior ply board frombothtsides on 100 x 50mmtimber framing. Boards to bepainted as per Architectsinstruction
12dia. vertical bar@ 600 ctrs.
1-16 dia. bar @ every third course in bond beam, allow to drill & epoxy grout 12 dia. horizontal bars 75mm into existing wall
300x300 concrete beam. Refer to structural details
3650
CO
S 150mm concrete block with Painted and plasted finish from both sides
Plastered and painted finish
12dia. vertical bar@ 600 ctrs
TYPICAL WALL TYPE 1 SECTIONSCALE 1:10
floor finish line
300
CO
S
EXTERIOR
ceiling line
Ex. 100 x 20 mmH3 timber skirting allaround refer detail
C20020 RPFL purlins@ 1000mm max
Revision Note:Contractor is to allow for new fixing detail to Bottom of Purlin side as per detail.
A
BD
C
EXTERIOR ELEVATIONS
PROPOSED ROOF PLANSCALE 1:100
OPEN ENGINEERING WORKSHOPRL: +400
EXISTING WORKSHOP
EXISTING WALKWAY
building line below
dp
fall
230 x 240 x 0.8mmColorbond gutter strapped @ 400 ctrs
dp
fall
fall
building line below
build
ing
line
belo
w
build
ing
line
belo
w
Colorbond 0.55 BMT end flashing fixed to roofing iron & Fascia board, Color to match roof colour
Colorbond 0.55 BMT end flashing fixed to roofing iron & Fascia board, Color to match roof colour
Trimdek 0.48BMT colorbond(24g) over selected 50mm noise control blanket over 430 double sided sisalation install as per manufacturers instruction Passionate blue color as per FMA colors
8600
18700
Revision note:Contractor to allow for installation Edmonds H500 Hurricane ventilator or approved equivalent installed to manufacturers specification and requirements. Contractor to ensure flushing installation to roof edge
DESCRIPTION
PB
AS SHOWN
DATEBYREV.
DRAWING No:
PROJECT No:
DRAFTING CHECK:DRAFTED:
DESIGNED:
SCALE:
BE PROVEN ON JOB BY THE CONTRACTOR. ARE APPROXIMATE ONLY AND THEIR EXACT POSITION SHALL
ON JOB PRIOR TO STARTING WORKS AND SHALL IMMEDIATELY NOTIFY THE ENGINEER/ CLIENT OF ANY DISCREPANCIES.WARNING : THE LOCATION OF UNDERGROUND SERVICES
THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS ON
CONCEPT ISSUE 14/11/2017PBC1
SHEET TITLE:PROJECT: DESIGN CHECK:
A07REVISION:
PB DCP&I - NC
FIJI NATIONAL UNIVERSITY PROPOSED ROOF PLAN
NTT ISSUE
FMA MARITIME CAMPUSPROPOSED ENGINEERING
WORKSHOP028 FMA 2017
DCP&I - NC
SHEET No:
CP&I14.17
TENDER ISSUET1 PB 29/11/2017
R1
NTT ISSUENTT1 PB 23/02/2018
-
- 60 pole main distribution board with stainless steel enclosure
Industrial grade Clipsal General purpose outlet (GPO)
-
ELECTRICAL SERVICES NOTE
-
LEGENDS SCHEDULE OF DRAWINGS
Schedule of Drawings, Legends and Notes
TITLEDWG No: SCALE
E00 NTS
Proposed Electrical lighting layout E01 1:75 @A3
GENERAL NOTES
- Three wire Clipsal WS226SSR/3 brand sunset switch with Auotmatic switch and overide & weather shield
One Way Switch PDL 600 SeriesOr Approved Equivalent All Switches To Be 1200mm AboveFloor Or Unless Otherwise Noted
-
GPO notationxx - outlet amperage rating / Outlet quantity (single/double)/zz- mounting height AFL
P1
XX/YYZZ
MDB
1:75 @A3
NTS
E02 Proposed Electrical Power layout
E03 Main Distribution board single line diagram
Philips 1200mm suspended LED batten fixture with 2 x 18w LED lamps complete with diffuser or approved equivalent with 5 year warrantyPhilips 600mm suspended LED batten fixture with 2 x 18w LED lamps with diffuser or approved equivalent with 5 year warranty
1. These drawings shall be read in conjunction with
relevant architectural and structural drawings and
specifications.
2. The contractor shall seek clarification from the
architect/engineer for any discrepancies, conflicts and
ambiguities in the drawings in writing.
3. Contractor shall allow to liaise with relevant
authorities as required.
4. Contractor shall allow to co-ordinate works with the
main contractor and other sub-contractors on site.
5. All works shall be carried out to the relevant
standards and requirement of various authorities and
municipality
6. ALL distribution boards shall be weather proof and
constructed from marine grade stainless steel.
7. All cabling works shall be concealed. Where
concealed cables may be an issue, not appropriate or
impossible, approval shall be taken prior.
8. Contractor to provide shop drawings and equipment /
material specification within a week of award.
9. Contractor to provide as-built drawings and
operations and maintenance manuals prior to
completion of the works.
10. Contractor to liaise with FEA for all inspections,
permits and approvals.
- circuit reference
EXIT - Clipsal EXITSM - quicksmart series exit light fitting
-
DESCRIPTION
PB
AS SHOWN
DATEBYREV.
DRAWING No:
PROJECT No:
DRAFTING CHECK:DRAFTED:
DESIGNED:
SCALE:
BE PROVEN ON JOB BY THE CONTRACTOR. ARE APPROXIMATE ONLY AND THEIR EXACT POSITION SHALL
ON JOB PRIOR TO STARTING WORKS AND SHALL IMMEDIATELY NOTIFY THE ENGINEER/ CLIENT OF ANY DISCREPANCIES.WARNING : THE LOCATION OF UNDERGROUND SERVICES
THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS ON
TENDER ISSUE 14/11/2017PBC1
SHEET TITLE:PROJECT: DESIGN CHECK:
E00REVISION:
PB DCP&I - NC
FIJI NATIONAL UNIVERSITY ELECTRICAL NOTES
NTT ISSUE
FMA MARITIME CAMPUSPROPOSED ENGINEERING
WORKSHOP028 FMA 2017
DCP&I - NC
SHEET No:
CP&I14.17
TENDER ISSUET1 PB 20/11/2017
-NTT ISSUENTT1 PB 23/02/2018
Wash Bay
Storeroom
Wash Bay
EXISTING ENGINEERING WORKSHOP
PROPOSED LIGHTING LAYOUTSCALE 1:75
OPEN ENGINEERING WORKSHOP
11
1 1
L2 L1
1
2
L2EXIT
EXIT
EXIT
L3
1
1
1 1
1
1
111
DESCRIPTION
PB
AS SHOWN
DATEBYREV.
DRAWING No:
PROJECT No:
DRAFTING CHECK:DRAFTED:
DESIGNED:
SCALE:
BE PROVEN ON JOB BY THE CONTRACTOR. ARE APPROXIMATE ONLY AND THEIR EXACT POSITION SHALL
ON JOB PRIOR TO STARTING WORKS AND SHALL IMMEDIATELY NOTIFY THE ENGINEER/ CLIENT OF ANY DISCREPANCIES.WARNING : THE LOCATION OF UNDERGROUND SERVICES
THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS ON
CONCEPT ISSUE 14/11/2017PBC1
SHEET TITLE:PROJECT: DESIGN CHECK:
E01REVISION:
BSE-MN
FIJI NATIONAL UNIVERSITY PROPOSED LIGHTINGLAYOUT
NTT ISSUE
FMA MARITIME CAMPUSPROPOSED ENGINEERING
WORKSHOP028 FMA 2017
SHEET No:
CP&I14.17
TENDER ISSUET1 PB 20/11/2017
-
BSE-MN
BSE-MN
Wash Bay
EXISTING ENGINEERING WORKSHOP
PROPOSED POWER LAYOUTSCALE 1:75
OPEN ENGINEERING WORKSHOP
P2
10/21200AFL
10/21200AFL
10/21200AFL
DD15/1
P4
P7
15/11200AFL15/1
1200AFL
P6
15/11200AFL
P5
10/21200AFL
P1
DD15/1
P3
10/21200AFL
FIP
MDB
15/11200AFL
1200AFL10/2
1200AFL
DESCRIPTION
PB
AS SHOWN
DATEBYREV.
DRAWING No:
PROJECT No:
DRAFTING CHECK:DRAFTED:
DESIGNED:
SCALE:
BE PROVEN ON JOB BY THE CONTRACTOR. ARE APPROXIMATE ONLY AND THEIR EXACT POSITION SHALL
ON JOB PRIOR TO STARTING WORKS AND SHALL IMMEDIATELY NOTIFY THE ENGINEER/ CLIENT OF ANY DISCREPANCIES.WARNING : THE LOCATION OF UNDERGROUND SERVICES
THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS ON
CONCEPT ISSUE 14/11/2017PBC1
SHEET TITLE:PROJECT: DESIGN CHECK:
E02REVISION:
BSE - MN
FIJI NATIONAL UNIVERSITY PROPOSED POWERLAYOUT
NTT ISSUE
FMA MARITIME CAMPUSPROPOSED ENGINEERING
WORKSHOP028 FMA 2017
SHEET No:
CP&I14.17
TENDER ISSUET1 PB 20/11/2017
-
BSE - MN
BSE - MN
10A 10A 10A 10A 15A
L1 L2 L3 L4 P1 P2 P3 P4 P5 P6 P7 FIP
15A 15A 15A 15A 15A 15A 15A 15A 15A 15A 15A
SPARE
SCALE: NTS
MDB SLD
1
DESCRIPTION
PB
AS SHOWN
DATEBYREV.
DRAWING No:
PROJECT No:
DRAFTING CHECK:DRAFTED:
DESIGNED:
SCALE:
BE PROVEN ON JOB BY THE CONTRACTOR.
ARE APPROXIMATE ONLY AND THEIR EXACT POSITION SHALL
ON JOB PRIOR TO STARTING WORKS AND SHALL IMMEDIATELY
NOTIFY THE ENGINEER/ ARCHITECT OF ANY DISCREPANCIES.
WARNING : THE LOCATION OF UNDERGROUND SERVICES
THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS ON
TENDER ISSUE 20/11/2017PB-
SHEET TITLE:PROJECT:
DESIGN CHECK:
REVISION:
FIJI NATIONAL UNIVERSITY
FNU
MAIN DISTRIBUTION
BOARD SINGLE LINE
DIAGRAM
BSE-MN
FMA MARITIME CAMPUS
PROPOSED ENGINEERING
WORKSHOP
NTT ISSUE
CP&I
14.17028 FMA 2017
SHEET No:
E03
COUNCIL ISSUE 22/01/2018PB-
NOTE
- All switch gear to be schneider
electric NHP or approved
equivalent.
- Contractor to allow for 50% spare
capacity on the Distribution board.
- Contractor to size the mains cable
and the main switch based an
cable run distance, losses etc.
- Contractor to allow to install
RCD/ELCB breakers as per
current standards.
36 pole Main Distribution
switchboard with
stainless steel marine
grade weather proof
enclosure
To Main switch board
BSE-MN
BSE-MN
FIRE SERVICES
SCHEDULE OF DRAWINGS
Schedule of Drawings, Legends, Specification and Scope of Works
TITLEDWG No: SCALE
F00 NTS
Proposed Fire Protection and Detection system Layout F01 1:100 @A3
LEGENDS
- 4.5 kg ABE type fire extingusherABE4.5
fire hose reel - 25meter 19mm hose in
stainless steel cabinet with swivel
mechanism
FHR -
- isolating valve
1. These drawings shall be read in conjunction with relevant
architectural and structural drawings and specifications.
2. The contractor shall seek clarification from the architect/engineer
for any discrepancies, conflicts and ambiguities in the drawings in
writing.
3. Contractor shall allow to liaise with relevant authorities as
required.
4. Contractor shall allow to co-ordinate works with the main
contractor and other sub-contractors on site.
5. All works shall be carried out to the relevant standards and
requirement of various authorities and municipality
6. Contractor to provide shop drawings and equipment / material
specification within a week of award.
7. Contractor to provide as-built drawings and operations and
maintenance manuals prior to completion of the works.
Contractor to liaise with NFA for all inspections, permits and
approvals.
8. All underground pipework shall be UPVC. All above ground piping
shall be galvanized and painted Red to suit fire installation.
9. Contractor to locate closet existing FHR piping for point of
connection and connect a pressure point. Contractor to advise
accordingly.
GENERAL NOTES
Proposed Wet Fire services LayoutF02 1:100 @A3
DESCRIPTION
PB
AS SHOWN
DATEBYREV.
DRAWING No:
PROJECT No:
DRAFTING CHECK:DRAFTED:
DESIGNED:
SCALE:
BE PROVEN ON JOB BY THE CONTRACTOR. ARE APPROXIMATE ONLY AND THEIR EXACT POSITION SHALL
ON JOB PRIOR TO STARTING WORKS AND SHALL IMMEDIATELY NOTIFY THE ENGINEER/ CLIENT OF ANY DISCREPANCIES.WARNING : THE LOCATION OF UNDERGROUND SERVICES
THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS ON
COUNCIL ISSUE 14/11/2017PBC1
SHEET TITLE:PROJECT: DESIGN CHECK:
F00REVISION:
PB DCP&I - NC
FIJI NATIONAL UNIVERSITY FIRE SERVICES NOTES
NTT ISSUE
FMA MARITIME CAMPUSPROPOSED ENGINEERING
WORKSHOP028 FMA 2017
DCP&I - NC
SHEET No:
CP&I14.17
TENDER ISSUET1 PB 20/11/2017
-NTT ISSUENTT1 PB 20/02/2018
PROPOSED FIRE PROTECTION AND DETECTION SYSTEM LAYOUTSCALE 1:100
EXISTING WORKSHOP
EXISTING WALKWAY
RAMP
RAMP
ABE4.5
ABE4.5
ABE4.5
Wash Bay
OPEN ENGINEERING WORKSHOP
Storeroom
DESCRIPTION
PB
AS SHOWN
DATEBYREV.
DRAWING No:
PROJECT No:
DRAFTING CHECK:DRAFTED:
DESIGNED:
SCALE:
BE PROVEN ON JOB BY THE CONTRACTOR. ARE APPROXIMATE ONLY AND THEIR EXACT POSITION SHALL
ON JOB PRIOR TO STARTING WORKS AND SHALL IMMEDIATELY NOTIFY THE ENGINEER/ CLIENT OF ANY DISCREPANCIES.WARNING : THE LOCATION OF UNDERGROUND SERVICES
THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS ON
CONCEPT ISSUE 14/11/2017PBC1
SHEET TITLE:PROJECT: DESIGN CHECK:
F01REVISION:
BSE - MN
FIJI NATIONAL UNIVERSITYPROPOSED FIRE
PROTECTION ANDDETECTION SYSTEM
LAYOUT
NTT ISSUE
FMA MARITIME CAMPUSPROPOSED ENGINEERING
WORKSHOP028 FMA 2017
SHEET No:
CP&I14.17
TENDER ISSUET1 PB 20/11/2017
-
BSE - MN
BSE - MN
Wash Bay
OPEN ENGINEERING WORKSHOP
Storeroom
PROPOSED WET FIRE SERVICES LAYOUTSCALE 1:100
EXISTING WORKSHOP
EXISTING POND
EXISTING WALKWAY
RAMP
RAMP
Allow to connect from existing FHR Reticulation piping
FHR
FHR
FHRFHR
FHR
FHR
FHR FHR
FHR
DN25
DN32
DN25
DN25
DESCRIPTION
PB
AS SHOWN
DATEBYREV.
DRAWING No:
PROJECT No:
DRAFTING CHECK:DRAFTED:
DESIGNED:
SCALE:
BE PROVEN ON JOB BY THE CONTRACTOR. ARE APPROXIMATE ONLY AND THEIR EXACT POSITION SHALL
ON JOB PRIOR TO STARTING WORKS AND SHALL IMMEDIATELY NOTIFY THE ENGINEER/ CLIENT OF ANY DISCREPANCIES.WARNING : THE LOCATION OF UNDERGROUND SERVICES
THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS ON
COUNCIL ISSUE 14/11/2017PBC1
SHEET TITLE:PROJECT: DESIGN CHECK:
F02REVISION:
BSE-MN
FIJI NATIONAL UNIVERSITY PROPOSED WET FIRESERVICES LAYOUT
NTT ISSUE
FMA MARITIME CAMPUSPROPOSED ENGINEERING
WORKSHOP028 FMA 2017
SHEET No:
CP&I14.17
TENDER ISSUET1 PB 20/11/2017
2
BSE-MN
BSE-MN
BSE-MN
HYDRAULICS SERVICES
LEGEND1. These drawings shall be read in conjunction with relevant architectural and structural drawings and specifications. 2. The contractor shall seek clarification from the architect/engineer for any discrepancies, conflicts and ambiguities in the drawings in writing. 3. Contractor shall allow to liaise with relevant authorities as required. 4. Contractor shall allow to co-ordinate works with the main contractor and other sub-contractors on site. 5. All works shall be carried out to the relevant standards and requirement of various authorities and municipality6. Contractor to provide shop drawings and equipment / material specification within a week of award. 7. Contractor to provide as-built drawings and operations and maintenance manuals prior to completion of the works. 8. Contractor shall liaise with Water Authority of Fiji if needed.9. Contractor to check the DCW supply pressure at the nearest possible point of connection in the existing reticulation and advise the architect/Engineer.
Inspection chamber
SCHEDULE OF DRAWINGS
Schedule of Drawings, Legends and Notes
TITLEDWG No: SCALE
H00 NTS
Proposed Hydraulic water supply layoutH01 1:100 @A3
1:100 @A3H02 Proposed Stormwater and waste water drainage layout
IC -
2 stage oil and grit separatorOC -
Storm water inspection chamberSIC -
GENERAL NOTE
Isolating valve-1:10 @A3H03 Proposed I.C Details
1:10 @A3H03 Proposed Hydraulic Details
DESCRIPTION
PB
AS SHOWN
DATEBYREV.
DRAWING No:
PROJECT No:
DRAFTING CHECK:DRAFTED:
DESIGNED:
SCALE:
BE PROVEN ON JOB BY THE CONTRACTOR. ARE APPROXIMATE ONLY AND THEIR EXACT POSITION SHALL
ON JOB PRIOR TO STARTING WORKS AND SHALL IMMEDIATELY NOTIFY THE ENGINEER/ CLIENT OF ANY DISCREPANCIES.WARNING : THE LOCATION OF UNDERGROUND SERVICES
THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS ON
CONCEPT ISSUE 14/11/2017PBC1
SHEET TITLE:PROJECT: DESIGN CHECK:
H00REVISION:
PB DCP&I - NC
FIJI NATIONAL UNIVERSITY HYDRAULIC NOTES
NTT ISSUE
FMA MARITIME CAMPUSPROPOSED ENGINEERING
WORKSHOP028 FMA 2017
DCP&I - NC
SHEET No:
CP&I14.17
TENDER ISSUET1 PB 20/11/2017
-
PROPOSED HYDRAULIC PLAN - WATER SUPPLY LAYOUTSCALE 1:100
EXISTING WORKSHOP
EXISTING POND
EXISTING WALKWAY
RAMP
RAMPDN15DCWDCW DCW
DN
20
Wash Bay
OPEN ENGINEERING WORKSHOP
Storeroom
Allow to connect to existing DCW Reticulation
DESCRIPTION
PB
AS SHOWN
DATEBYREV.
DRAWING No:
PROJECT No:
DRAFTING CHECK:DRAFTED:
DESIGNED:
SCALE:
BE PROVEN ON JOB BY THE CONTRACTOR. ARE APPROXIMATE ONLY AND THEIR EXACT POSITION SHALL
ON JOB PRIOR TO STARTING WORKS AND SHALL IMMEDIATELY NOTIFY THE ENGINEER/ CLIENT OF ANY DISCREPANCIES.WARNING : THE LOCATION OF UNDERGROUND SERVICES
THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS ON
COUNCIL ISSUE 14/11/2017PBC1
SHEET TITLE:PROJECT: DESIGN CHECK:
H01REVISION:
BSE-MN
FIJI NATIONAL UNIVERSITY PROPOSED HYDRAULICWATER SUPPLY LAYOUT
NTT ISSUE
FMA MARITIME CAMPUSPROPOSED ENGINEERING
WORKSHOP028 FMA 2017
SHEET No:
CP&I14.17
TENDER ISSUET1 PB 20/11/2017
2
BSE-MN
BSE-MN
Wash Bay
OPEN ENGINEERING WORKSHOP
Storeroom
A
BD
C
EXTERIOR ELEVATIONS
PROPOSED STORMWATER & WASTE WATER DRAINAGE LAYOUTSCALE 1:100
EXISTING WORKSHOP
EXISTING POND
EXISTING WALKWAY
RAMP
DP
SIC
OS IC
Connect to existing storm water drainage
GT
SSIC100Dia. 100Dia.
DP
S100Dia.100Dia.
DP
SIC150Dia.
SIC
S
SS
S15
0Dia
.15
0Dia
.
SIC
S
S S S50Dia. 40Dia.
40Dia.50Dia.
150D
ia.
DESCRIPTION
PB
AS SHOWN
DATEBYREV.
DRAWING No:
PROJECT No:
DRAFTING CHECK:DRAFTED:
DESIGNED:
SCALE:
BE PROVEN ON JOB BY THE CONTRACTOR. ARE APPROXIMATE ONLY AND THEIR EXACT POSITION SHALL
ON JOB PRIOR TO STARTING WORKS AND SHALL IMMEDIATELY NOTIFY THE ENGINEER/ CLIENT OF ANY DISCREPANCIES.WARNING : THE LOCATION OF UNDERGROUND SERVICES
THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS ON
COUNCIL ISSUE 14/11/2017PBC1
SHEET TITLE:PROJECT: DESIGN CHECK:
H02
REVISION:
BSE - MN
FIJI NATIONAL UNIVERSITYPROPOSED STORMWATER
AND WASTE WATERDRAINAGE LAYOUT
NTT ISSUE
FMA MARITIME CAMPUSPROPOSED ENGINEERING
WORKSHOP028 FMA 2017
SHEET No:
CP&I14.17
TENDER ISSUET1 PB 20/11/2017
-
BSE - MN
BSE - MN
DESCRIPTION
PB
AS SHOWN
DATEBYREV.
DRAWING No:
PROJECT No:
DRAFTING CHECK:DRAFTED:
DESIGNED:
SCALE:
BE PROVEN ON JOB BY THE CONTRACTOR. ARE APPROXIMATE ONLY AND THEIR EXACT POSITION SHALL
ON JOB PRIOR TO STARTING WORKS AND SHALL IMMEDIATELY NOTIFY THE ENGINEER/ CLIENT OF ANY DISCREPANCIES.WARNING : THE LOCATION OF UNDERGROUND SERVICES
THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS ON
CONCEPT ISSUE 14/11/2017PBC1
SHEET TITLE:PROJECT: DESIGN CHECK:
H03REVISION:
PB DCP&I - NC
FIJI NATIONAL UNIVERSITY I.C DETAILS
NTT ISSUE
FMA MARITIME CAMPUSPROPOSED ENGINEERING
WORKSHOP028 FMA 2017
DCP&I - NC
SHEET No:
CP&I14.17
TENDER ISSUET1 PB 20/11/2017
-COUNCIL ISSUE 18/01/2018PBC1
X
150 DIA P.V.CPIPE
I.C PLAN
Y
MORTAR BED
600
600
100mm R.CWALL
KEY HOLE
G.T SECTION
GLGL
150 DIA CAST IRONGRATING
"U" P.V.C GALLEY'P' TRAP
WATER SEAL
300 X 300
GL
SECTION - X
MORTAR BED
10 DIA BARS @ 200mmCTRS BOTHWAYS
AIR TIGHT CASTIRON COVER
150 DIA "U" P.V.CSPLIT PIPE
GL
DEP
TH V
ARIE
S
100
600m
m M
IN.
100
IC " Y : PLAN
600
600
150 DIA P.V.CPIPE
100mm R.CWALL
IC " L" PLAN
100mm R.CWALL
AIR TIGHT CASTIRON COVER
MORTAR BED
150 DIA P.V.CPIPE
600
600
SECTION - Y
GL GL
AIR TIGHT CASTIRON COVER
MORTAR BED
10 DIA BARS @ 200mmCTRS BOTHWAYS
150 DIA "U" P.V.CSPLIT PIPE
DEP
TH V
ARIE
S
100
600m
m M
IN.
100
DESCRIPTION
PB
AS SHOWN
DATEBYREV.
DRAWING No:
PROJECT No:
DRAFTING CHECK:DRAFTED:
DESIGNED:
SCALE:
BE PROVEN ON JOB BY THE CONTRACTOR. ARE APPROXIMATE ONLY AND THEIR EXACT POSITION SHALL
ON JOB PRIOR TO STARTING WORKS AND SHALL IMMEDIATELY NOTIFY THE ENGINEER/ CLIENT OF ANY DISCREPANCIES.WARNING : THE LOCATION OF UNDERGROUND SERVICES
THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS ON
CONCEPT ISSUE 14/11/2017PBC1
SHEET TITLE:PROJECT: DESIGN CHECK:
H04REVISION:
BSE-MN
FIJI NATIONAL UNIVERSITY HYDRAULIC DETAIL
NTT ISSUE
FMA MARITIME CAMPUSPROPOSED ENGINEERING
WORKSHOP028 FMA 2017
SHEET No:
CP&I14.17
TENDER ISSUET1 PB 20/11/2017
-COUNCIL ISSUE 18/01/2018PBC1
BSE-MN
BSE-MN
OIL SEPARATOR DETAILSCALE 1:10
300
100 PVC DOWNPIPE SCREW FIX TOWALL USING METALSTRAP- PAINTED40mm THICK CONC. LIDWITH 665 MESH- PROVIDEHOLE FOR DOWN PIPE
100 THICK CONC. WALLWITH 665 MESH-PLASTERED
100 DIA. PVC STORMWATERDRAIN
BUILDING STRUCTUREREFER ENG'S DWG.
BUILDING LINE
CONC. SUMP DETAIL SCALE 1:10
ALLOW STANDPIPE DISH DRAINDISCHARGE TO SUMP- SHOWN ATBACKGROUND WITH GALV. WIRE NETTING
250
100
GL.
12080
25
SELECTED HOSETAP WITH GALV. ELBOW& SOCKET
200DIA. DISH DRAINCONC PLASTERED
15DIA PVC PIPE
STAND PIPE (SP) DETAILSCALE 1:10
50200
CONC. BLOCKWALL WITHCERAMIC TILE SPLASH BACK450 WIDE UPTO TAP HT.
AIR TIGHT CASTIRON COVER
INLET DISCHARGE
WATER LINE
INLET CHAMBER
SLUDGE
SEPARATION CHAMBER
OUTLET CHAMBER
BAFFLE BAFFLE
WATER LINE
100mm R.CWALL
100mm R.CWALL
800
1000
500
max
.
250
250TOP SOIL
ALLOWANCE FOR SETTLEMENT
75
SURFACE DRAINAGE
ground surface
LAYER OF PAPER
20 - 25MM AGGREGATE
BASE OF TRENCH ON LEVEL GRADE ( FLAT )
1000
SECTION THROUGH RUBBLE DRAINSCALE 1:20
100 DIA FIELD TILE PIPE
CUT EVERY SECOND REINFORCING BAR AT JOINT
SAWN JOINT DETAIL
approved hardcorefill
SCALE 1:10
20
CONSTRUCTION JOINT DETAILSCALE 1:10
DOWEL CAP END FILLED WITH COMPRESSIBLE MATERIAL
approved hardcorefill
HALF BAR COATED WITH BOND BREAKING COMPUND POR USE SLEEVE
10mm Wide joint sealer Sikaflex 11FC
2-LAYER 665 MESH WITH 30MM TOP COVER50 100
15mm WIDE COMPRESSIBLE FILLER BOARD
150
INDUCED CRACK
2-LAYER 665 MESH WITH 30MM TOP COVER 5-10mm WIDE X 20mm DEEP
SAWN R MOULED GROVE
150
BLOCK BINDING DETAILSCALE 1:20
binding detail for 200/150/100 blockwall
blockwall
2-12dia bars 6 dia ties at200mm ctrs
CORNER
BLOCK BINDING DETAILSCALE 1:20
binding detail for 200/150/100 blockwall
TEE JUNCTION
blockwall
3-12dia bars 6 dia ties at200mm ctrs
EXTERIOR ELEVATIONS
PROPOSED GROUND FOUNDATION PLANSCALE 1:75
A B C
1
2
7000
P1
saw
n jo
int
NOTES:ALL SAWN JOINT ATMIN. 5M CTRS
saw
n jo
int
saw
n jo
int
construction joint construction jointconstruction joint
ED
P1 P1 P1P1
P1 P1 P1 P1P1
NOTES:EXISTING GROUND TO BE EXCAVATED MINIMUM 400 DEEP AND ROLLEDWITH 8 TONNE VIBRATING ROLLER. SALVAGED MATERIAL TO BE STORED ON SITE IN A DESIGNATED AREA.
SOAPSTONE FILL MATERIAL (BOLDERS NOT BIGGER THAN 200mm DIAMETER)TO BE PLACED IN LAYERS AND COMPACTED USING MINIMUM 4 PASSES OF 8 TONNE VIBRATING SHEEPFOOT ROLLER FOLLOWED BY MINIMUM 4 PASSES OF 8 TONNE VIBRATING SMOOTH DRUM ROLLER.
EACH LAYER TO BE PROOF ROLLED AND APPROVAL OF ENGINEER TO BE OBTAINED PRIOR TO LAYING OF SUCCESSIVE LAYER.
S04FW1
S04FW1
150MM FLOOR WITH 2-LAYER 665 MESH 30MM TOP COVER AND 40MM BOTTOM COVER
S04FW1
S04FW1
S04FW2
S03FW1
S04FW3
S04FW4
S04FW1
S04FW5
construction joint
DESCRIPTION
PB
AS SHOWN
DATEBYREV.
DRAWING No:
PROJECT No:
DRAFTING CHECK:DRAFTED:
DESIGNED:
SCALE:
BE PROVEN ON JOB BY THE CONTRACTOR. ARE APPROXIMATE ONLY AND THEIR EXACT POSITION SHALL
ON JOB PRIOR TO STARTING WORKS AND SHALL IMMEDIATELY NOTIFY THE ENGINEER/ CLIENT OF ANY DISCREPANCIES.WARNING : THE LOCATION OF UNDERGROUND SERVICES
THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS ON
CONCEPT ISSUE 14/11/2017PBC1
SHEET TITLE:PROJECT: DESIGN CHECK:
S01REVISION:
PB DCP&I - NC
FIJI NATIONAL UNIVERSITY PROPOSED GROUNDFOUNDATION PLAN
NTT ISSUE
FMA MARITIME CAMPUSPROPOSED ENGINEERING
WORKSHOP028 FMA 2017
DCP&I - NC
SHEET No:
CP&I14.17
TENDER ISSUET1 PB 20/11/2017
R1
NTT ISSUE 18/02/2018PBNTT1
PROPOSED ROOF FRAMING PLANSCALE 1:75
A B C
1
2
ED
20mm rod bracing with turnbuckles
C20020 RPFL purlins@ 1000mm max. ctrs with 1 row of proprietary bridging in every bay
ROOF TYPE :
RPFL TRIMDEK ( 0.48BMT )
FIX ROOF WITH NO. 14-10 X 75mmHEX HEADED TYPE 17 SCREWS WITHSUPPORT WASHERS , E.P.D.M BLACKSPECIAL AT EVERY CREST
ROOF FIXING
3S06
150mm conc. block wall plastered & painted from bothsides as per architects instructions
200
UB
x 2
5.4
kg
200
UB
x 2
5.4
kg
200
UB
x 2
5.4
kg
200
UB
x 2
5.4
kg
200
UB
x 2
5.4
kg
150 PFC Outrigger rafter
Fly brace at every 2nd purlin refer detail
1S06
150 PFC Outrigger rafter
20mm rod bracing with turnbuckles
2S06
20mm rod bracing with turnbuckles
20mm rod bracing with turnbuckles
DESCRIPTION
PB
AS SHOWN
DATEBYREV.
DRAWING No:
PROJECT No:
DRAFTING CHECK:DRAFTED:
DESIGNED:
SCALE:
BE PROVEN ON JOB BY THE CONTRACTOR. ARE APPROXIMATE ONLY AND THEIR EXACT POSITION SHALL
ON JOB PRIOR TO STARTING WORKS AND SHALL IMMEDIATELY NOTIFY THE ENGINEER/ CLIENT OF ANY DISCREPANCIES.WARNING : THE LOCATION OF UNDERGROUND SERVICES
THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS ON
CONCEPT ISSUE 14/11/2017PBC1
SHEET TITLE:PROJECT: DESIGN CHECK:
S03REVISION:
PB DCP&I - NC
FIJI NATIONAL UNIVERSITY PROPOSED ROOFFRAMING PLAN
NTT ISSUE
FMA MARITIME CAMPUSPROPOSED ENGINEERING
WORKSHOP028 FMA 2017
DCP&I - NC
SHEET No:
CP&I14.17
TENDER ISSUET1 PB 20/11/2017
NTT ISSUENTT1 PB 19/01/2018
R1