TENDER DOCUMENT FOR

UP-GRADATION OF HEP KARNAH FROM 2X1MW TO 3X4 MW IN TEHSIL KARNAH DISTRICT

KUPWARA

JAMMU & KASHMIR STATE

2 | P a g e

Chief Engineer, Jammu and Kashmir Civil Invest. & Design Wing Kashmir, State Power Development Corporation JKSPDC, Bemina Srinagar Regd. Office: Shaw Inn, The Boulevard, Srinagar, Kashmir-190001. Email: - [email protected] Ph: 0194-2500071, 2500109. Fax: 0194-2500145.

Tel. No: 0194-2493163 FAX No: - 0194-2491363 Jammu Office: Ashok Nagar, Satwari, Jammu- 180004

Mobile No: 9906588196 Ph: 0191-2430548, 2439039. Fax: 0191-2435403.

E-Mail: [email protected], Website: http://www.jkspdc.nic.in

Sub: SELECTION OF CONSULTANTS FOR REVIEW AND UPDATION OF DPRs AND ASSISTING JKSPDC IN

BIDDING PROCESS FOR PROCUREMENT OF CONTRACT FOR ENGINEERING, PROCUREMENT &

CONSTRUCTION IN IMPLEMENTATION OF REMODELING, MODERNIZATION AND UP-GRADING (RMU) OF

EXISTING HYDRO ELECTRIC PROJECTS OF:-

(1) 2 MW (TO BE UP- GRADED TO 12 MW), KARNAH HYDRO ELECTRIC PROJECT ON QAZI NAG

NALLA IN DISTRICT KUPWARA

(2) 9 MW MOHRA HYDRO ELECTRIC PROJECT ON BONIYAR NALLAH/RIVER JEHLUM IN

DISTRICT BARAMULLA, JAMMU & KASHMIR STATE ON TURN-KEY BASIS.

NIT NO: - 03 of 2012

Dated:- 11 /03/2012 ************************************

CIVIL INVESTIGATION & DESIGN WING KASHMIR (JKSPDC), INVITES BIDS FROM REPUTED CONSULTANCY COMPANIES/

ORGANIZATIONS REGISTERED UNDER COMPANIES ACT, 1956 FOR REVIEW /UPDATION OF DETAILED PROJECT

REPORTS & ASSISTING JKSPDC IN BIDDING PROCESS FOR PROCUREMENT OF EPC CONTRACTS FOR IMPLEMENTATION

OF RMU OF FOLLOWING EXISTING HYDRO ELECTRIC PROJECTS OF THE J & K STATE ON TURN KEY BASIS:

1. 2 MW (TO BE UP GRADED TO 12 MW) KARNAH HEP ON QAZI NAG NALLH IN DISTRICT KUPWARA.

2. 9 MW MOHRA HEP ON BONIYAR NALLAH/RIVER JEHLUM IN DISTRICT BARAMULLA.

The bids are to be received in the office of the undersigned i.e, Civil Investigation & Design Wing Kashmir

(JKSPDC) at PDC Complex Bemina Srinagar by or before 1400 hours on 03-04-2012

The Detailed tender document can be obtained on all working days from 01-03-2012 to 10-03-2012 up to

1400 hours from this office against payment of Rs. 15,000/- (Rupees fifteen thousand only) per

set/per work (Non-refundable/Non- Transferable) in the form of a non-refundable demand draft drawn

in favour of “Accounts Officer”, with the Chief Engineer, Civil Investigation & Design Wing Kashmir

(JKSPDC) and payable at Srinagar. Tender document can also be downloaded from the JKSPDC website:

www.jkspdc.nic.in. during the said sale period from 01-03-2012 to 10-03-2012. In case, the tender

document is downloaded from the website and used for submission of bid, it would be mandatory for the

bidder to pay the cost of the tender document in the manner specified above by enclosing the demand draft in

the cover containing technical offer alongside the requisite EMD. However, firms downloading the bid document

from website shall intimate through fax/e-mail about their intention of submitting their bid during the period

fixed for sale of bid document in office of the Chief Engineer, Civil Investigation & Design Wing Kashmir

(JKSPDC) Bemina, Srinagar. i.e. 01-03-2012 to 10-03-2012. Pre-bid quarries, if any, shall be received by

this office latest by 1400 hours of 19th March 2012.

Issued on behalf of Managing Director, JKSPDC Srinagar. - S d -

(Er.Zhoor Ahmad Chat)) Chief Engineer Civil Invest. & Design Wing Kashmir (JKSPDC)

3 | P a g e

No: CE/CID/Tech/ 8770-8807 Dated: 11/02/2012.

Copy to:-

1. Commissioner/Secretary to Government Power Development Department, Civil Secretariat, Srinagar/Jammu.

2. Managing Director, J & K State Power Development Corporation Srinagar.

3. Executive Director (Civil) JKSPDC, Jammu.

4. Director Finance, J & K State Power Development Corporation Srinagar.

5. Chief Engineer CI&D wing JKSPDC Jammu

6. Chief Engineer (Civil) Baglihar Hydro Electric Project Chanderkote, Ramban.

7. Chief Engineer (Electric) Baglihar Hydro Electric Project Chanderkote, Ramban.

8. Chief Engineer Generation JKSPDC Jammu.

9. Chief Engineer Generation Kashmir JKSPDC Bemina Srinagar.

10. Chief Engineer, I & FC Department Srinagar/ Jammu for information.

11. Chief Engineer, PHE Department Srinagar/ Jammu for information.

12. Chief Engineer, R & B Department Srinagar/ Jammu for information.

13. Chief Engineer, PMGSY, Srinagar/ Jammu for information.

14. Chief Engineer, UEED Department Srinagar/ Jammu for information.

15. Vice- chairman, LAWDA Srinagar/ Jammu for information.

16. Director information Srinagar for information & necessary action, with the request that the NIT may please

be got published in two local dailies & two National Delhi Based dailies well before the issue date of

documents.

17. Chief Project Engineer Parnai, JKSPDC, Jammu

18. Chief Project Engineer Kargil, JKSPDC, Kargil.

19. Senior General Manager Corporate Office, JKSPDC.

20. Superintending Engineer Generation Leh.

21. Company Secretary, JKSPDC for uploading of the tender document on JKSPDC website www.jkspdc.nic.in

22. General Manager (Accounts) Corporate Office Jammu

23. All Deputy General Managers, JKSPDC Corporate Office Jammu.

24. Lahmeyer international (India) Pvt. Ltd. Gurgaon. ( Hariyana)

25. Energy Infratech Pvt. Ltd. Gurgaon ( Hariyana)

26. Tata Consulting Engineers Ltd. Kailash Colony Extension (New Delhi)

27. Smec snowy Mountains Engineering Corporation (Gurgaon Hariyana India)

28. Energy Infratech Pvt. Ltd.

29. Eptisa consultancy Pvt. Ltd. 608, level JMD Regent Sqaure, MG road (Gurgaon India)

30. Voyants Solutions PVt. Ltd C 0118 ( first Floor) Super Market-I DLF City phase IV (Gurgaon India)

31.Tractebel Engineering Pvt. Ltd. India 10-A Shivaji Marg, New Delhi.

32.Synergics Hydro (Indi) Pvt. Ltd 012, IHDP business Park Plot #7 sector-127 Noida.

33.Space Engineers Consortium Pvt. Ltd.281 Jawahar Nagar Srinagar India. email [email protected]

34.Mecon Ltd. Ranchi-834002, Jharkhand.

35.Feedback Infrastructure services Pvt. Ltd. 15th Floor Tower 9-B DLF Cyber City Phase-III Gurgaon.

36.URS Scott Wilson India Pvt. Ltd.

37.Wapcos Engineering Consultancy, email [email protected]

-sd-

(Er.Zhoor Ahmad Chat)

Chief Engineer, Civil Invest. & Design Wing Kashmir (JKSPDC),

4 | P a g e

5 | P a g e

Chief Engineer, State Power Development Corporation Civil Invest.& Design Wing Kashmir, Regd. Office: Shaw Inn, The Boulevard, Srinagar, Kashmir-JKSPDC, Bemina Srinagar Ph: 0194-2500071, 2500109. Fax: 0194-2500145

Email: - [email protected] Jammu Office: Ashok Nagar, Satwari, Jammu- 180004 Mobile No: CE; 9906588196 Ph: 0191-2430548, 2439039. Fax: 0191-2435403. Tel. No: 0194-2493163 FAX No: - 0194-2491363 E-Mail: [email protected], Website: http://www.jkspdc.nic.in

Sub: SELECTION OF CONSULTANTS FOR REVIEW AND UPDATION OF DPRs AND ASSISTING JKSPDC

IN BIDDING PROCESS FOR PROCUREMENT OF CONTRACT FOR ENGINEERING, PROCUREMENT

& CONSTRUCTION IN IMPLEMENTATION OF REMODELING, MODERNIZATION AND UP-

GRADING (RMU) OF EXISTING HYDRO ELECTRIC PROJECTS OF

(1) 2 MW (TO BE UP- GRADED TO 12 MW), KARNAH HYDRO ELECTRIC PROJECT ON QAZI NAG

NALLAH IN DISTRICT KUPWARA

(2) 9 MW MOHRA HYDRO ELECTRIC PROJECT ON BONIYAR NALLAH/RIVER JEHLUM IN

DISTRICT BARAMULLA, JAMMU & KASHMIR STATE ON TURN- KEY BASIS.

Ref:- i) This office N.I.T No:-03 of 2012 Datd:- 11-02-2012 issued under No:-CE/ CID/ Tech/ 8770 –

8807 Dated:-11-02-2012

ii) Corrigendum issued vide this office No:- CE/CID/Tech/9489-9526 Dated:- 01-03- 2012.

CORRIGENDUM

In continuation to this office corrigendum No;- CE/CID/Tech/9489-9526 Dated:- 01- 03-2012,

the bidding process of above mentioned works are re-scheduled as under:-

S.No Event Date & Time Venue

1. Sale of Bid

Documents

16-03-2012 to

31-03-2012

1.Civil Investigation & Design Wing PDC ,

Kashmir Bemina Srinagar

2. Down load from official web site of JKSPDC

www. Jkspdc.nic.in

2. Request for

clarification on

Bid Documents

Up to 14th April

2012

To be received by Email, Fax or through post at

Civil Investigation & Design Wing PDC ,

Kashmir Bemina Srinagar ( no queries to be

entertained thereafter)

3. Pre-Bid

conference

21st April 2012 Corporate Office Jammu

4. Reply to Queries 5th May 2012 By Email

5. Last date for 15th May 2012 Civil Investigation & Design Wing PDC ,

6 | P a g e

receipt of Bids Kashmir, Bemina. Srinagar

6. Opening of Bids 15th of May 2012. Civil Investigation & Design Wing PDC ,

Kashmir Bemina Srinagar

All other terms and condition will remain same as laid down in the aforementioned NIT

Issued on behalf of Managing Director JKSPDC Srinagar

-Sd -

(Er. Naseer Ahmad Dhar)

Chief Engineer,

Civil Invest. & Design Wing Kashmir,

Bemina Srinagar.

NO: CE/CID/Tech/ CJ/14-52 Dated: 06/03/2012.

Copy to:-

1. Commissioner/Secretary to Government Power Development Department, Civi Secretariat, Srinagar/Jammu. 2. Managing Director, J & K State Power Development Corporation Srinagar. 3. Executive Director (Civil) JKSPDC, Jammu. 4. Director Finance, J & K State Power Development Corporation Srinagar. 5. Chief Engineer CI&D wing JKSPDC Jammu 6. Chief Engineer (Civil) Baglihar Hydro Electric Project Chanderkote, Ramban. 7. Chief Engineer (Electric) Baglihar Hydro Electric Project Chanderkote, Ramban. 8. Chief Engineer Generation JKSPDC Jammu. 9. Chief Engineer Generation Kashmir JKSPDC Bemina Srinagar. 10. Chief Engineer, I & FC Department Srinagar/ Jammu for information. 11. Chief Engineer, PHE Department Srinagar/ Jammu for information. 12. Chief Engineer, R & B Department Srinagar/ Jammu for information. 13. Chief Engineer, PMGSY, Srinagar/ Jammu for information. 14. Chief Engineer, UEED Department Srinagar/ Jammu for information. 15. Vice- chairman, LAWDA Srinagar/ Jammu for information. 16. Director information Srinagar for information & necessary action, with the request

that the NIT may please be got published in two local dailies & two National Delhi based

dailies well before the issue date of documents.

17. Chief Project Engineer Parnai, JKSPDC, Jammu 18. Chief Project Engineer Kargil, JKSPDC, Kargil. 19. Senior General Manager Corporate Office, JKSPDC. 20. Superintending Engineer Generation Leh. 21. Company Secretary, JKSPDC for uploading of the tender document on JKSPDC Website 22. www.jkspdc.nic.in 23. General Manager (Accounts) Corporate Office Jammu 24. All Deputy General Managers, JKSPDC Corporate Office Jammu. 25. Lahmeyer international (India) Pvt. Ltd. Gurgaon. ( Hariyana) 26. Energy Infratech Pvt. Ltd. Gurgaon ( Hariyana) 27. Smec snowy Mountains Engineering Corporation (Gurgaon Hariyana India) Energy Infratech Pvt. Ltd. 29. Eptisa consultancy Pvt. Ltd. 608, level JMD Regent Sqaure, MG road (Gurgaon India)

30. Voyants Solutions PVt. Ltd C 0118 ( first Floor) Super Market-I DLF City phase IV (Gurgaon India)

7 | P a g e

31. Tractebel Engineering Pvt. Ltd. India 10-A Shivaji Marg, New Delhi. 32. Synergics Hydro (Indi) Pvt. Ltd 012, IHDP business Park Plot NO.7 sector-127, Noida. 33. Space Engineers Consortium Pvt. Ltd.281 Jawahar Nagar Srinagar India. Email [email protected]

34. Mecon Ltd. Ranchi-834002, Jharkhand. 35. Feedback Infrastructure services Pvt. Ltd. 15th Floor Tower 9-B DLF Cyber City Phase-III Gurgaon. 36. URS Scott Wilson India Pvt. Ltd. 37. Wapcos Engineering Consultancy, email [email protected]

-Sd-

(Er. Naseer Ahmad Dhar)

Chief Engineer,

Civil Invest. & Design Wing Kashmir

Bemina Srinagar.

8 | P a g e

Chief Engineer, State Power Development Corporation

Civil Invest.& Design Wing Kashmir, Regd. Office: Shaw Inn, The Boulevard, Srinagar, Kashmir-

19JKSPDC, Bemina Srinagar Ph: 0194-2500071, 2500109. Fax: 0194-2500145 Email:- [email protected] Jammu Office: Ashok Nagar, Satwari, Jammu- 180004

Mobile No: CE; 9906588196 Ph: 0191-2430548, 2439039. Fax: 0191-2435403. Tel. No: 0194-2493163 FAX No: - 0194-2491363 E-Mail: [email protected], Website: http://www.jkspdc.nic.in

Sub: SELECTION OF CONSULTANTS FOR REVIEW AND UPDATION OF DPRs AN ASSISTING JKSPDC

IN BIDDING PROCESS FOR PROCUREMENT OF CONTRACT FOR ENGINEERING, PROCUREMENT

& CONSTRUCTION IN IMPLEMENTATION OF REMODELING, MODERNIZATION AND UP-

GRADING (RMU) OF EXISTING HYDRO ELECTRIC PROJECTS OF

(1) 2 MW (TO BE UP- GRADED TO 12 MW), KARNAH HYDRO ELECTRIC

PROJECT ON QAZI NAG NALLAH IN DISTRICT KUPWARA

(2) 9 MW MOHRA HYDRO ELECTRIC PROJECT ON BONIYAR NALLAH/RIVER

JEHLUM IN DISTRICT BARAMULLA, JAMMU & KASHMIR STATE ON TURN-

KEY BASIS.

Ref:- i) This office N.I.T No:-03 of 2012 Datd:- 11-02-2012 issued under No:-CE/ CID/ Tech 8770-

8807 Dated:-11-02-2012

ii) Corrigendum No-1 issued vide this office No:- CE/CID/Tech/9489-9526 Dated:- 01-03-

2012.

iii) Corrigendum No-2 issued vide this office No:-CE/CID/Tech/CJ/14-52 Dated:- 06-03-

2012

CORRIGENDUM

In continuation to this office corrigendum No -1;- Vide No: CE/CID/Tech/9489-9526 Dated:- 01-

03-2012, & Corrigendum No-2 Vide No:CE/CID/Tech/CJ/14-52 Dated:- 06-03-2012, the bidding

process of above mentioned works are re-scheduled as under:-

S.No Event Date & Time Venue

1. Sale of Bid

Documents

21-03-2012 to

28-04-2012

1.Civil Investigation & Design Wing PDC ,

Kashmir Bemina Srinagar

2. Down load from official web site of JKSPDC

www. Jkspdc.nic.in

2. Request for

clarification on

Bid Documents

Up to 10th April

2012

To be received by Email, Fax or through post at

Civil Investigation & Design Wing PDC ,

Kashmir Bemina Srinagar ( no queries to be

9 | P a g e

entertained thereafter)

3. Pre-Bid

conference

21st April 2012 Corporate Office ,JAMMU

4. Reply to Queries 30th April 2012 By Email

5. Last date for

receipt of Bids

9th May 2012 Civil Investigation & Design Wing PDC ,

Kashmir, Bemina. Srinagar

6. Opening of Bids 9th of May 2012. Civil Investigation & Design Wing PDC ,

Kashmir Bemina Srinagar

All other terms and condition will remain same as laid down in the aforementioned NIT

Issued on behalf of Managing Director,

JKSPDC Srinagar

- sd –

(Er. Naseer Ahmad Dhar)

Chief Engineer,

Civil Invest. & Design Wing Kashmir,

PDC Bemina Srinagar.

NO: CE/CID/Tech/ PDC/9927-67 Dated: 16/03/2012.

Copy to:-

1. Commissioner/Secretary to Government Power Development Department, Civi Secretariat, Srinagar/Jammu.

2. Managing Director, J & K State Power Development Corporation Srinagar. 3. Executive Director (Civil) JKSPDC, Jammu. 4. Director Finance, J & K State Power Development Corporation Srinagar. 5. Chief Engineer CI&D wing JKSPDC Jammu 6. Chief Engineer (Civil) Baglihar Hydro Electric Project Chanderkote, Ramban. 7. Chief Engineer (Electric) Baglihar Hydro Electric Project Chanderkote, Ramban. 8. Chief Engineer Generation JKSPDC Jammu. 9. Chief Engineer Generation Kashmir JKSPDC Bemina Srinagar. 10. Chief Engineer, I & FC Department Srinagar/ Jammu for information. 11. Chief Engineer, PHE Department Srinagar/ Jammu for information. 12. Chief Engineer, R & B Department Srinagar/ Jammu for information. 13. Chief Engineer, PMGSY, Srinagar/ Jammu for information. 14. Chief Engineer, UEED Department Srinagar/ Jammu for information. 15. Vice- chairman, LAWDA Srinagar/ Jammu for information. 16. Director information Srinagar for information & necessary action, with the request

that the NIT may please be got published in two local dailies & two National Delhi based

dailies well before the issue date of documents.

17. Chief Project Engineer Parnai, JKSPDC, Jammu 18. Chief Project Engineer Kargil, JKSPDC, Kargil. 19. Senior General Manager Corporate Office, JKSPDC.

10 | P a g e

20. Superintending Engineer Generation Leh. 21. Company Secretary, JKSPDC for uploading of the tender document on JKSPDC Website www.jkspdc.nic.in 22. General Manager (Accounts) Corporate Office Jammu 23. All Deputy General Managers, JKSPDC Corporate Office Jammu. 24. Lahmeyer international (India) Pvt. Ltd. Gurgaon. ( Hariyana) 25. Energy Infratech Pvt. Ltd. Gurgaon ( Hariyana) 26. Tata Consulting Engineers Ltd. Kailash Colony Extension (New Delhi) 27. Smec snowy Mountains Engineering Corporation (Gurgaon Hariyana India) 28. Energy Infratech Pvt. Ltd. 29. Eptisa consultancy Pvt. Ltd. 608, level JMD Regent Sqaure, MG road (Gurgaon India) 30. Voyants Solutions PVt. Ltd C 0118 ( first Floor) Super Market-I DLF City phase IV

(Gurgaon India)

31. Tractebel Engineering Pvt. Ltd. India 10-A Shivaji Marg, New Delhi. 32. Synergics Hydro (Indi) Pvt. Ltd 012, IHDP business Park Plot NO.7 sector-127, Noida. 33. Space Engineers Consortium Pvt. Ltd.281 Jawahar Nagar Srinagar India. Email [email protected]

34. Mecon Ltd. Ranchi-834002, Jharkhand. 35. Feedback Infrastructure services Pvt. Ltd. 15th Floor Tower 9-B DLF Cyber City Phase-III Gurgaon. 36. URS Scott Wilson India Pvt. Ltd. 37. Wapcos Engineering Consultancy, email [email protected]

-Sd-

(Er. Naseer Ahmad Dhar)

Chief Engineer,

Civil Invest. & Design Wing Kashmir

PDC, Bemina Srinagar

11 | P a g e

JAMMU & KASHMIR STATE POWER DEVELOPMENT

CORPORATION LIMITED

(CHIEF ENGINEER, CIVIL INVESTIGATION & DESIGN WING KASHMIR)

LETTER OF INVITATION (LOI)

FOR

ENGAGEMENT OF CONSULTANT

FOR REVIEW AND UPDATION OF DPR AND

ASSISTING JKSPDC

IN PROCUREMENT OF EPC CONTRACT

FOR

UP-GRADATION OF HEP KARNAH FROM 2X1 MW TO 3X4 MW IN TEHSIL KARNAH DISTRICT KUPWARA

JAMMU & KASHMIR STATE

ON TURN-KEY BASIS

12 | P a g e

J & K STATE POWER DEVELOPMENT CORPORATION LIMITED

OFFICE OF THE CHIEF ENGINEER, CIVIL INVESTIGATION & DESIGN WING KASHMIR,

SRINAGAR-190018

Telephone: 0194-2493163. Fax: 0194-2491363 Email: [email protected]

LETTER OF INVITATION

No:

Date:

To

__________________________

__________________________

__________________________

__________________________

Subject: Engagement of Consultant for REVIEW AND UPDATION OF EXISTING DPR AND ASSISTING JKSPDC IN BIDDING PROCESS FOR PROCUREMENT OF AN EPC CONTRACT FOR UP-GRADATION OF HEP KARNAH FROM 2X1 MW TO 3X4 MW IN TEHSIL KARNAH

DISTRICT KUPWARA

JAMMU & KASHMIR STATE ON TURNKEY BASIS

Dear Sir,

The J&K State Power Development Corporation Limited (JKSPDC) intends to up-grade KARNAH

HYDRO ELECTRIC PROJECT from 2x1 MW to 3x4 MW IN DISTRICT KUPWARA, JAMMU & KASHMIR STATE ON TURN-KEY BASIS.

For the above purpose, the JKSPDC is intending to engage the services of reputed consultants/ consulting companies/ consulting organizations for:

1. Review /Update the DPR as per the detailed terms of reference/scope indicated in this document.

2. Preparation of pre-qualification (RFQ) bid documents conforming to CEA, CWC, MOP, GOI Guidelines/ Standard FIDIC documents (as per the requirement of the Owner) and evaluation thereof for selection of technically responsive bidders for the EPC Contract through an International competitive bidding process.

3. Preparation of “REQUEST FOR PRPOSALS (RFP)”- Bid Documents conforming to CEA,

MOP,GOI guidelines/Standard FIDIC documents (as per the requirement of the Owner) using

The Reviewed/updated DPR and evaluation thereof for selection of EPC Contractor.

4. Assisting JKSPDC in bidding process at all stages including techno-commercial evaluation of

bids received for procurement of the EPC Contract.

13 | P a g e

5. The Consultant shall also be required to share and transfer all requisite information and

knowledge regarding the project execution and all technical features including design layout,

design features, construction schedule, etc with JKSPDC and also the Project Management

Supervision Consultant to be separately engaged by JKSPDC.

ELIGIBILITY CRITERIA

The intending bidders would be required to meet and comply with following eligibility criteria.

A. ESSENTIAL TO MEET

1. The bidder should be an established well known reputed Consulting Company/ Organization established under Indian Companies Act 1956 ( or equivalent registration for foreign companies ) for providing consultancy services in the field of hydro-electric projects.

2. The prospective bidders should have previous experience of providing consultancy services comprising of:

Minimum 5 Years experience in Review/Updating/Preparation of DPR‟s of Hydro Electric Power Projects with minimum capacity of 20 MW and above as on 31-12- 2011.

Framing bid documents i.e. RFQ & RFP for the hydro electric projects including assisting the Owner in conducting the National competitive bidding process for procurement of EPC contract or (having been associated with Design/Engineering & Construction) of Hydro Power Projects, for the implementation of at least one hydro power project having installed capacity of at least 25 MW or more.

3. The bidder must not have been blacklisted/ debarred from practicing as Consultant by

Government of India or any Department/ Undertaking thereof, any State Government or any Department/ Undertaking thereof.

4. Intending bidders would be required to produce certified copies of the audited accounts/statements for the last 3 years and other documentary evidence in support of their submissions in response to requirements listed at serial no 1-2 as above and self declaration in respect requirement listed at S. No. 3. The bidder should have a minimum average annual turnover of Rs 50 lacs consecutively from the last three years.

BIDDERS FAILING TO MEET THE ESSENTIAL CRITERIA WOULD BE CONSIDERED NON

RESPONSIVE AND THEIR BIDS WOULD STAND REJECTED AT THE TECHNICAL

EVALUATION STAGE.

B. DESIRABLE

5. The bidders companies should preferably have on its regular roll, working for at least last one year, minimum 5 Senior level key Consultants in the fields of DPR preparation; Procurement of Contracts, Civil Engineering (with experience in construction of dam/ barrage and tunnelling), Mechanical Engineering (with experience in hydro-mechanical engineering works related to

14 | P a g e

construction of hydroelectric projects), Electrical Engineering (with experience in electro- mechanical engineering works related to construction of hydroelectric projects) & Engineering Geology who have working experience of more than 10 years (in respect of post graduate engineers/geologists) and 15 years (in case of graduate engineers/ geologists), assisted by other support staff with adequate experience in procurement of contracts, surveying, design and engineering in the field of hydro power.

6. Bidders, to support and strengthen their credentials in respect of previous experience, may submit along with applications for pre-qualification, performance certificates/ completion

certificates testifying successful completion and commissioning of hydro electric projects

having installed capacity equal to or more than 25 MW in aggregate for which the

consultancy stood provided by the bidder in last 5 years.

Proposals to provide the above stated services (referred to as “proposal” herein after) should be submitted in the manner stated herein after:

SECTION-I

Instructions to Bidders:

1.0 Bidders are required to furnish all information and documents as called for in this request for proposal (RFP) document in English. Any printed literature furnished by the bidder in a language other than English, should be accompanied with an English translation, in which case, for the purpose of interpretation of the document, the English version will be referred.

1.1 Proposal should be typed or filled in ink.

1.2 All additions, alterations and over-writings in the proposal or accompanying documents must be clearly initialed by the authorized signatory.

1.3 Bidder has to be a single entity, Joint Ventures or Consortiums. The proposal is non document transferable.

1.4 The proposal document shall be submitted in the following manner in three envelopes :

Envelope-1

1.4.1 The bid shall be accompanied with earnest money amounting to Rs. 30,000/- (Rupees Thirtythousand only) which shall be in the form of a crossed Demand Draft in favour of Accounts officer with Chief engineer, CI&D Wing Kashmir, J&K State Power Development Corporation Limited, payable at Srinagar and placed in a separate sealed envelope-1 marked as „BID EARNEST MONEY‟ FOR CONSULTANCY SERVICES FOR RMU works of exiting Karnah HEP on the top of the envelope.

Envelope-2

1.4.2 All the other documents explained hereinafter, shall be furnished in three sets and placed in a separate sealed envelope-2 and marked as „TECHNICAL BID DOCUMENTS‟ FOR CONSULTANCY SERVICES FOR RMU works of exiting Karnah HYDRO ELECTRIC PROJECT‟ on the top of the envelope. The price bid should be quoted as explained hereinafter and should be placed in a separate sealed envelope clearly marked as „PRICE BID‟ FOR CONSULTANCY SERVICES FOR RMU works of exiting Karnah HYDRO ELECTRIC PROJECT‟ on the top of the envelope.

15 | P a g e

Envelope-3

1.4.3 The price bid should be quoted as explained hereinafter and should be placed in a separate sealed envelope-3 clearly marked as „PRICE BID‟ FOR CONSULTANCY SERVICES FOR RMU works of exiting Karnah HYDRO ELECTRIC PROJECT‟ on the top of the envelope.

1.4.4 All the above three sealed envelopes should be put inside one single cover, sealed and clearly

super scribed on top of the cover with the words „BID FOR CONSULTANCY SERVICES FOR HYDRO ELECTRIC project Karnah. Name and address of the bidder should also be clearly written on the packet.

1.5 Proposal document shall be submitted at the following address on or before 9th May 2012 upto 1400 hrs.

Chief Engineer, Civil Investigation & Design Wing Kashmir (JKSPDC), Bemina Srinagar. PHONE NO: 0194 2493163, 0194 2491363

E-mail: [email protected]

However it may be noted that the Chief Engineer, Civil Investigation & Design Wing Kashmir

(JKSPDC) may, at his discretion, extend the due date and time for submission of the proposals

which shall be duly notified.

1.6 Any proposal received after the closing of the due date and time shall not be considered. Chief

Engineer, Civil Investigation & Design Wing Kashmir (JKSPDC) shall retain all documents

submitted by the bidder.

1.7 Chief Engineer, Civil Investigation & Design Wing Kashmir (JKSPDC) Bemina,Srinagar. Also takes no

responsibility for delay, loss or non receipt of documents sent by post / courier / or other means.

1.8 All proposals (in the sealed cover/ envelope referred at 1.4.4 above super scribed as

„CONSULTANCY SERVICES FOR upgradation of Karnah HYDRO ELECTRIC PROJECT

from 2x1 MW to 3x4 MW‟ submitted by the applicant/ bidders by the due date and time at

office of the Chief Engineer, Civil Investigation & Design Wing Kashmir (JKSPDC) shall be opened

first by opening of the sealed envelope-1 (referred at 1.4.1 above) marked as „BID EARNEST

MONEY‟ FOR CONSULTANCY SERVICES FOR RMU works of exiting Karnah HYDRO

ELECTRIC PROJECT‟ on the same date at 1400 hrs or on any subsequent date which shall be

communicated to the bidders in advance in the same office in the presence of such

applicants/ bidders or their authorized representatives who would like to attend the Bid

Opening.

1.9 Envelope-2 containing TECHNICAL BID DOCUMENTS FOR Karnah HYDRO ELECTRIC

PROJECT‟ (refer 1.4.2) of only those bidders, who are found to have submitted the Bid Earnest Money in the form and in accordance with the requirements laid herein, shall be taken up for opening.

1.10 Bids not accompanied by Bid Earnest Money shall be rejected at very outset.

16 | P a g e

1.11 The technical bids shall be evaluated by the “Bid Evaluation Committee” to be constituted for the purpose by the Chief Engineer, Civil Investigation & Design Wing Kashmir (JKSPDC).

1.12 Price bids, submitted in Envelope-3 and super scribed as „PRICE BID‟ of only those bidders

whose score is equal to or more than specified by the JKSPDC herein after shall be opened on a date which shall be separately communicated to each of the technically responsive bidders in the same office in the presence of such technically responsive bidders or their authorized representative who would like to attend the Price Bid Opening.

1.13 The bidder may properly check the proposal before submission to ensure that all information / documents required are included.

1.14 At any time prior to opening of proposals, the Chief Engineer, Civil Investigation & Design Wing Kashmir (JKSPDC) either at his own initiative or in response to clarifications requested by a prospective bidder(s) may modify the RFP document by issuing an amendment. In addition, such amendment(s) shall be sent by fax / mail to the bidders who have already submitted their bids.

1.15 The proposals as submitted shall indicate that proposal is FIRM and that the proposal shall remain valid for a period of not less than 180 days from the date of opening of proposal.

1.16. The Chief Engineer, Civil Investigation & Design Wing Kashmir (JKSPDC) shall preliminarily

examine the proposal to determine whether the proposals are responsive to the requirements of the RFP document. Proposals shall be considered non-responsive and liable for summary rejection if any of the following primary requirements have not been met.

1.16.1 Proposal is not received by the due date and time.

1.16.2 Proposal is not accompanied with Bid Earnest Money.

1.16.3 Proposal is not accompanied with the required documents.

1.16.4 Proposal is not a FIRM proposal.

1.16.5 Proposal is not valid for the prescribed minimum period.

1.17 The Chief Engineer, Civil Investigation & Design Wing Kashmir (JKSPDC) shall take up evaluation of only responsive bids. Negotiations may be initiated with one or more bidders at the discretion of the Chief Engineer, Civil Investigation & Design Wing Kashmir (JKSPDC).

1.18 The Chief Engineer, Civil Investigation & Design Wing Kashmir (JKSPDC) reserves right to reject any proposal, if at any point of time, it becomes known or is discovered that a material misrepresentation has been made by an applicant/ bidder in the process related to submission of the bid.

1.19 In the event of any bidder not responding to further clarifications as required for the finalization of the bid, the Chief Engineer, Civil Investigation & Design Wing Kashmir (JKSPDC) reserves the right to forfeit the bid earnest money furnished by such bidder and reject the bid.

1.20 Any deviation to any clause of this document must be properly spelt out in exceptions and deviations statement to be submitted along with the bid, giving details of page number and clause number and detailing the deviation. The Chief Engineer, Civil Investigation & Design Wing Kashmir (JKSPDC) reserves the right to accept or reject any deviation or modify the

17 | P a g e

relevant clause of the RFP document to the extent necessary. Exceptions and deviations statement in the prescribed format as per Annex-7 must be attached with the proposal.

1.21 After opening of proposal and till final selection of successful bidder, no correspondence of

any type, unless called for and initiated by the Chief Engineer, Civil Investigation & Design Wing Kashmir (JKSPDC), shall be entertained.

1.22 Applicant/ Bidder or authorized representative of the applicant/ bidder must sign each page of the proposal.

1.23 Bidders are informed that the Chief Engineer, Civil Investigation & Design Wing Kashmir (JKSPDC) is neither under any obligation to select any bidder, nor to give any reason for selecting any bidder; the Chief Engineer, Civil Investigation & Design Wing Kashmir (JKSPDC) is also under no obligation to proceed with the work or part thereof.

1.24 Successful Bidders shall have to enter into contract with JKSPDC, as per agreement format supplied herein as a part of the bid document within 7 days from the issuance of letter of intent/ letter of award of contract for consultancy services.

1.25 Successful bidder shall be required to provide a security deposit (contract performance guarantee) in the form of bank guarantee of amount not less than 5% (five per cent) of the total value of the contract and valid for the tenure of the contract plus twenty eight days in the prescribed format.

1.26 Date of start for providing of consultancy services shall be as specified in the contract agreement or notice to proceed to be issued under the contract agreement, whichever is later.

1.27 In the event of failure of successful bidder to execute the contract agreement within 7 days

from the date of receipt of acceptance of the proposal/ letter of intent/ letter of act, full earnest money deposit shall stand forfeited and the Chief Engineer, Civil Investigation & Design Wing Kashmir (JKSPDC) may consider placing order on next competitive bidder at the risk and cost of the successful bidder.

1.28 The Standard Guidelines for Engagement of Consultants by the Chief Engineer, Civil

Investigation & Design Wing Kashmir (JKSPDC) and also containing contract for Engagement of Consultants specifying scope of work; deliverables etc. is enclosed as Annex-II.

SECTION-II

Information to be furnished by the Bidders2.0 Team Leader and Members:-

2.1 The experience and qualifications of the team proposed to be assigned for the Task should be indicated as per Annex-III.

2.2 Price Bid The bidder must quote consultancy charges in detail in one quote including travel, stay, office

expenses or any other sundry charges. This quote should include all tax liability under income tax,

service tax, professional tax, and any other tax existing ten days before the submission of price bid.

The price bid should be placed in separate sealed envelope-3 and should be clearly marked as price

bid for

“CONSULTANCY SERVICES FOR UP- GRADATION OF 2X1 MW TO 3X4 MW KARNAH

HYDRO ELECTRIC PROJECT”.

18 | P a g e

SECTION-III

Proposal Evaluation Criteria:

3.0 Technical CRITERIA

The following shall be the criteria for technical evaluation of proposals contained in the bid

documents.

3.1 Team Leader and Members:

Team:

Constitution of the assigned team in respect of number of members, their qualifications and

experience shall entitle the bidder to a maximum score of 1200 points.

The actual score for the team (including the team leader) of the team of 6 no senior level consultants

proposed by the bidder companies would be calculated by using following points:

1. Points for each member being on regular roll of the bidder for last 12 months @50/ each . 2. Points for post graduate degree with 10 years working experience:

Qualification: 75

Experience: 75

Points for graduate degree with 15 years working experience: Qualification: 60

Experience: 90

3.2 PREVIOUS EXPERIENCE IN THE PROFESSION/BUSINESS OF PROVIDING CONSULTANCY

SERVICES:

The time duration for which the Bidder Companies, established under Indian Companies Act, 1956 (

or equivalent registration for foreign companies ) have been in the profession/ business of providing

consultancy in the field of hydropower would be taken as an indicator of their being active in the

business as well as resourcefulness of the bidders.

All applicant bidders having an experience of five or more years as on 31-12-2011 in this regard

would be given 250 points. Bidders with lesser experience as per eligibility para-2 page no: 5 would

be scaled accordingly.

Team Leader:

In addition to above, the consultant/ expert, out of the 6 number senior level consultants/ experts,

nominated as the Team Leader for the present assignment would receive additional 250 points if the

expert has the comprehensive experience of having been responsible/ being associated with the

implementation of a hydro electric project having installed capacity equal to or more than 25 MW

from the stage of preparation of bid documents to testing and commissioning of the project. The

19 | P a g e

expert must have assisted the owner/ employer in bid evaluation, award of contract, design&

engineering supervision & monitoring of civil construction and erection of plant and equipment.

The Team Leader, having experience of maximum number of projects, in conformity with above,

would earn full 250 points and Team Leaders with lesser number of projects would be scaled

accordingly.

Desirable:-

3.3 QUANTUM OF BUSINESS: Quantum of business handled by the bidder, supported by Income Tax Returns for last three years, would decide award of 250 Points. The bidder having the highest combined turn over at least above the minimum of average annual turnover of 50Lacs (para-4,page-5) for the last 3 years would be given full 250 points and bidders with lesser turn over would be scaled accordingly.

3.4 PREVIOUS EXPERIENCE OF PROVIDING CONSULTANCY SERVICE FOR HEP:

Previous experience of providing consultancy services involving framing/ review of bid documents,

RFQ & RFP, assisting the Employer in the bidding process for procurement of an EPC Contract, Design

& Engineering for the implementation of hydro power projects: 250 Points.

Bidder with maximum experience in terms of MW would be given full 250 points and bidders with

lower figures would be scaled accordingly.

3.5 PERFORMANCE CERTIFICATES:

Performance certificate testifying successful completion and commissioning of assignment of Design,

EPC at least one hydro electric project having capacity equal to or more than 25 MW for which the

consultancy stood provided: 500 points. The bidder furnishing the certificates in conformity with

above for the largest project would be given full 500 points and the other bidders would be rated

accordingly as per the size of the Project.

3.6 Qualifying Technical Score The minimum qualifying technical score, for being eligible for consideration in the next stage of

evaluation, against the maximum score of 2700, shall be 2025 POINTS (75%). The financial bids of

only those bidders, who score 2025 points or above in the technical evaluation, shall be opened and

bidders considered eligible for consideration for next stage of evaluation.

3.7 Financial Evaluation The proposal with the lowest financial bid shall be given a score of 100 and score of other bidders

shall be inversely proportional to their prices.

3.8 Technical Evaluation

The bidder with highest technical score shall be given a score of 100 and the actual scores of other

bidders shall be normalized directly in proportion to the technical score secured by them.

20 | P a g e

3.9 Overall Evaluation

The total score of each bidder shall be worked out by adding 60% weight age of technical score and

40% of financial score.

SECTION-IV

4.0 Terms of Reference

Scope of Work

4.1 Review and Updating of existing DPR.

4.2 Preparation of pre-qualification (RFQ) bid documents in conformity with CEA,CWC, MOP, GOI, Guidelines / FIDIC documents (as per the requirement of Owner) and assisting the Chief Engineer, Civil Investigation & Design Wing Kashmir (JKSPDC) in invitation of RFQ bids and evaluation thereof for selection of technically responsive bidders through International competitive bidding process.

4.3 Preparation of “REQUEST FOR PROPOSALS”- Bid Documents conforming to CEA, CWC,

MOP, GOI guidelines/FIDIC documents (as per the requirement of Owner) using the

Reviewed/updated DPR.

4.4 Assisting the Chief Engineer, Civil Investigation & Design Wing Kashmir (JKSPDC) in

bidding process at all stages of the bidding process including techno-economic evaluation of bids received for the procurement of an EPC Contract.

4.5 The Consultant shall also be required to share and transfer all requisite information and knowledge regarding the project execution and all technical features including design layout,

design features, construction schedule, etc with the Chief Engineer, Civil Investigation & Design Wing Kashmir (JKSPDC) and also the Project Management Supervision Consultant

to be separately engaged by the Chief Engineer, Civil Investigation & Design Wing Kashmir (JKSPDC). A 5% of the total payment due to the consultant shall be retained up to

the complete transfer of knowledge to the Project Management Supervision Consultant.

SECTION-V

5.0 Responsibilities of the Consultant

1. Review and Updation of the existing DPR. 2. Preparation of Pre-Qualification Bid Documents for International competitive bidding

conforming to CEA, CWC, MOP, GOI guidelines/ FIDCIC documents (requirements of the Owner).

3. Evaluation of pre-Qualification Bids received in response to RFQ. 4. Preparation of Detailed RFP Bid Documents is conforming to CEA, CWC, MOP, GOI

guidelines/FIDIC documents (requirements of the Owner) using the data and other information available from DPR for RMU works of KARNAH HYDRO ELECTRIC PROJECT formulated by JKSPDC.

5. Assisting the Chief Engineer, Civil Investigation & Design Wing Kashmir (JKSPDC) at all stages of the bidding process including participating in pre-bid conferences, drafting of replies to bidders queries, carrying out necessary modifications to the bidding documents.

21 | P a g e

6. Techno-economic evaluation of bids received in response to RFP Bids and assisting the Chief Engineer, Civil Investigation & Design Wing Kashmir (JKSPDC) in selection of EPC arrangement on turnkey basis.

7. Presentation before the Management committee/ Board of Directors of JKSPDC or its sub-committees /Govt. of J&K and follow-up action as per feedback from the Chief Engineer, Civil Investigation & Design Wing Kashmir (JKSPDC).

8. Assisting in all documentations like Contract Agreements, Construction Schedules, Interface

Schedules including signing of the various agreements. 9. Knowledge transfer and sharing. 10. Any other matter / issue related to above scope of services.

6.0 DETAILS OF DOCUMENTS TO ACCOMPANY THE BID

The following documents duly filled and signed by the applicant bidders shall be treated as part of

the bid document:

Annexure 1: LOI data

Annexure 2: Terms of reference, schedule for deliverables under the contract & schedule

for payments

Annexure 3: Format for submission of technical bids (FORMS 1-7)

Annexure 4: Format for submission of financial bid (FORM 8-9)

ANNEXURE 5: GUIDELINES FOR ENGAGEMENT OF CONSULTANTS

Annexure 6: PROPOSED CONTRACT WITH APPENDICES

ANNEXURE 7: PERFORMA FOR EXCEPTIONS AND DEVIATIONS

ANNEXURE 8: CHECK LIST

Applicant/ Bidders are requested to keep their Proposal/ Bid valid for a period of One Hundred and

Eighty (180) days from the date of opening of the Technical Proposal, during which period they will

maintain the personnel proposed for the assignment and also the offered price.

Kindly acknowledge receipt of this Letter of Invitation through fax/e-mail per return.

Yours Sincerely,

Chief Engineer,

Civil Investigation & Design Wing Kashmir

(JKSPDC),Bemina, Srinagar.

22 | P a g e

ANNEXURE-I

LETTER OF INTENT

BID DATA SHEET

23 | P a g e

LETTER OF INTENT

BID DATA SHEET

SN0: ITEM DESCRIPTION

1.1 Name

of

Assign

ment

Selection/ Engagement of Consultants for Review/Updation of DPR and assisting

the Chief Engineer, Civil Investigation & Design Wing Kashmir (JKSPDC) in

procurement of EPC Contract for the IMPLEMENTATION OF RMU works of

exiting 2X1 MW TO 3X4 MW KARNAH HEP in District Baramulla in J&K State on

turnkey basis.

1.2 Name of Owner J&K STATE POWER DEVELOPMENT CORPORATION LTD.,REGISTERED OFFICE:

SHAW INN ,BOULEVARD SRINAGAR-190001J&KTEL:-0194 – 2500109,0194-2500165 , FAX:0194-2500145

JAMMU OFFICE:J&K STATE POWER DEVELOPMENT CORPORATION LTD. ASHOK

NAGAR SATWARIJAMMU-180003JAMMU & KASHMIR STATETEL:0191-2430548 FAX 0191-2435403

1.3 Description

and

objective of

assignment

The Chief Engineer, Civil Investigation & Design Wing Kashmir (JKSPDC) desires to up-grade HEP Karnah from 2x1 MW to

3x4 MW for which it has got the Detailed Project Report (DPR) framed by

JKSPDC in the Year 2011

For the above purpose, the Chief Engineer, Civil Investigation & Design Wing Kashmir (JKSPDC) is intending to engage the

services of reputed consultants/ consulting organizations for: Review and Up-dation of existing DPR. Preparation of pre-qualification (RFQ) bid documents in conformity with CEA, MOP, GOI guidelines/FIDIC documents (as per the requirement of Owner) and assisting the Chief Engineer, Civil Investigation & Design Wing Kashmir (JKSPDC) in invitation of RFQ bids and evaluation thereof for selection of technically responsive bidders through International competitive bidding process.

Preparation of “REQUEST FOR PROPOSALS”- Bid Documents conforming to CEA, MOP, GOI guidelines/FIDIC documents (as per the requirement of Owner) using the DPR of 12 MW karnah HYDRO ELECTRIC PROJECT. Assisting the Chief Engineer, Civil Investigation & Design

Wing Kashmir (JKSPDC) in bidding process at all stages of the

bidding process including techno-economic evaluation of bids

received for procurement of an EPC contract for the up-gradation

of HEP karnah from 2x1 MW to 3x4 MW ( HYDRO ELECTRIC

PROJECT IN DISTRICT Kupwara, JAMMU & KASHMIR STATE ON

TURN KEY BASIS.

The Owner

will provide

Detailed Project Report formulated by JKSPDC can be seen by the

consultants at the office of Chief Engineer CI&D wing JKSPDC, Srinagar.

24 | P a g e

1.4 the following

inputs:

Successful bidder (Consultant) shall be provided a copy of the DPR on

award of the Contract.

1.5 The

documents

enclosed are:

1. LOI Data Sheet

2. Terms of Reference, Schedule of deliverables, Schedule of

Payments under the proposed contract.

3. Formats for the technical and financial proposals.

4. JKSPDC Standard Guidelines for engagement of Consultants.

5. Draft Contract for the Consultancy Services

1.6 Consortium The bidder has to be a single entity or consortium of companies to

participate in the bidding process.

1.7 Address for

submission of

bids

Chief Engineer,

Civil Investigation & Design Wing Kashmir (JKSPDC), Bemina,

Srinagar.

E-mail: [email protected].

TEL: 0194-2493163 FAX :0194-2491363

1.8 Date & Time for

submission of

bids

[09-05-2012] at 1400 Hours.

1.9 Date of opening

of bids

On the same date i.e on 09-05-2012 at 1400 Hours or on any subsequent date

which shall be communicated to the bidders in advance. The date of opening of

financial bids shall be communicated to technically responsive bidders separately.

25 | P a g e

ANNEXURE-II

TERMS OF REFERENCE

1. SCOPE OF WORK

2. TIME SCHEDULE FOR DELIVERABLES UNDER THE CONTRACT

3. SCHEDULE OF PAYMENTS UNDER THE CONTRACT

26 | P a g e

SCOPE OF WORK AND RESPONSIBILITIES OF CONSULTANT

Detailed Scope of Work

Introduction

Tehsil Karnah is a remote backward and far-flung boder Tehsil of District Kupwara facing

tremendous shortages of electricity which aggravates during winter due to depletion of discharge in

the existing water channels. The main source of electricity in this remote area is the existing 2 MW

KARNAH HEP located in the Tehsil Head quarter in village Pingla. The project is located about 80 Kms

from District Head quarter Kupwara and about 175 kms from capital city Srinagar. The said project

was commissioned in the year 1991The scheme is a run of the river scheme taking off from a local

Nallah (QAZI NAAG)., which is a perennial Nallah fed by Glaciers. The Nallah passes through steep

virgin gorges and has tremendous potential of causing damages due to its high velocity of flow,

rolling heavy boulders, & the area being prone to heavy cloud bursts causes instantaneous and

sporadic floods.

The intake of the existing scheme consists of a trench weir with grable excluder and a hopper

shaped slit excluder. Thereafter and open water conductor of about 1.5 KM length carries water up to

the forebay, where from penstock, leads water to two turbines of 1 MW each. The project as a whole

is prone to recurring damages as most of its components like Trench weir, Gravel excluder, Spil

channel, main power house and Tailrace channel, are located under the direct hit of this ferocious

Nallah. Due to such regular damages, the power house remains under forced shud down for most of

the time during summer causing heavy loss of generation work as well as heavy expenditure on

restoration works. Heavy Mulba gets deposited over the Trenchweir making it non-functional. The

open water conductor is also prone to damages due to heavy rock fall from hill site.To over come the

recurring damages and loss of generation in the project, it is proposed to shift the main power

house from existing site in village Pingla to a comparatively safer site in village khudri about 1500 M

on downstream side. The shifting of power house will also result in increase in its gross head to

103M from existing 37M. in addition to this increase in head there is a scope for increasing the

discharge in the water conductor also in view of available hydrology, which can increase the power

potential above 12 MW.

Proposed RMU works.

To increase the generation capacity upto 12 MW or above and to ensure safety of the project

against recurring damages it is proposed to shift the power house to a new location about 1500M

towards downstream site and conduct requisite modifications in the existing other project

components. It is proposed to utilize the existing infrastructure to maximum utilization of diversion

works, water conductor, Forebay, Spillway/ Spill channel, desilting tank etc after conducting requisite

repairs/ restorations/ modifications/ replacements as per present revised design requirements and

site conditions. The discharge carrying capacity of all the units from intake to tailrace is required to

be enhanced to meet the requirements as per revised power potential. The Penstock from the

Forebay is proposed to be extended upto the proposed new power house site. The main RMU/

upgradation works may include but not limited to the following:

27 | P a g e

Modifications in design of Trench weir including its protection works.

Modifications in gravel excluder and desilting tank including protection works.

Modifications in the water conductor, spill way, spill channel and forebay to accommodate

additional discharge.

Extension of penstock from existing forebay to new power house.

Construction of new power house and tailrace at village Khudri.

Flood protection works and protection measures against rock fall for various project

components.

Procurement, installation and commissioning of New hydro- mechanical, Electro- mechanical

& other auxiliary equipment as per revised power potential.

Now the Consultant‟s task shall be as follows:

b) Infrastructure.

The consultant shall ensure maximum utilization of existing infrastructure and give details of new

infrastructure including access and service roads to be developed.

c) PROJECT LAYOUT/ Proposals:

Examine various alternative layouts and proposals of Kharna HEP. The Consultant will rank the

alternatives, techno economically.

d) DPR REVIEW:

The Consultant shall review and update the DPR in accordance with the prevalent:

i. CEA / CWC norms,

ii. Applicable BIS standards,

iii. Latest editions of “Guidelines for Formulation of Project Reports for Power Projects”

published by CEA,

iv. “Guidelines for Preparation of Detailed Project Report of Irrigation and Multipurpose

Projects, Govt. of India, Ministry of Irrigation” published by CWC.

v. “Guidelines for Preparation of Estimates for River Valley Schemes” published by CWC.

vi. MOEF/ Forest/ PCB guidelines.

The references of such standards, practices shall be specified in the DPR, together

with appropriate appendices and drawings.

e) The DPR shall include design briefs, general project layout and layout of each major structure,

Sufficient plans and cross-sections to establish the magnitude and characteristics of works

and their costs. The D.P.R shall include detailed design of each component and specific details

and specifications for all the restoration, retrofitting, refurbishing, and all new works.

28 | P a g e

f) Electromechanical Works:-

For E&M and Hydro Mechanical Works, the details in DPR shall include the Design Briefs, calculations

for preliminary dimensions, weights, ratings and settings, single line diagrams indicating ratings of

equipments, sizes, Plans and Sections indicating their locations etc.

g) DESIGNS:

The Consultant shall prepare in sufficient detail, designs of all structures required for the selected

alternative. The recommendation for proposed alternative shall be supported with cost details and

optimization studies. The Consultant shall establish conclusively, that the suggested Project

alternative and layout, is the techno economically the most feasible option, with maximum possible

utilization of existing infrastructure.

h) POWER POTENTIAL STUDIES: -

The consultant will carry out power potential optimization studies to review the Capacity and unit

configuration.

i) COST ESTIMATION: -

The Consultant shall review cost estimates based on the available data as well as that to be collected

by way of additional survey/investigation at DPR stage. This shall include:-

I) The cost of R & R, EMP, etc.

II) The cost on account of project‟s engineering and construction management

expenses, the owner‟s overhead expenses, and an adequate allowance for physical

contingencies (to be determined on the basis of risks involved in the construction of the

different structures, as per relevant guidelines).

III) Import duties, taxes and interest during construction shall be assessed and separately indicated the cost estimates shall be broken down into local and foreign currency components if required

on the basis of Indian/International practices. Prices for major civil works and for permanent equipment shall be estimated on the basis of Indian/International Practices, supported with Rate Analysis as per CWC Guidelines and/or documents showing current market trends.

J) Surveys / Investigations

The bidder shall have to review the documents, and available data required for Updation of D.P.R.

Any additional D.P.R level Geological investigations as may be suggested by the consultants shall be

carried out by the owner. However all the additional topographical digitized survey for the project

components like Head works, water conductor, Intake works, X- drainage works, Desilting Basin,

Forebay, Spill Channel, Penstock, Power house Area, Tailrace etc. shall have to be carried out by

the Consultant, for which rates shall have to be quoted by the Consultant separately for taking L-

section, X- sections, Site plan, Contour plans etc. for about 3 sq. Km of the area. The details of

Tentative B.O.Q for this survey work as under:

29 | P a g e

1. Preparation of L- section & X- section along Nallah / water Conductor, submergence area

etc using automatic electronic Digital total station by taking readings after intervals not

exceeding 100M and at all obligatory / profile charge points.( width of cross sections as

per site requirement but not less than 100M Width) for a total length of 15 Kms.

2. Preparation of site plans with Contours as per required contour interval along Nallah, water

conductor and other main project components using Automatic Electronic Digital total

station by taking readings after intervals not exceeding 100M and at all important profile

changes, Buildings, Bridges, and other permanent features for an area of 3 sq.kms.

The quantum of survey works may increase or decrease as per actual site requirements and

payments shall be regulated as per the rates allotted to the consultant separately for this Survey

work. The consultant shall have to provide survey field data in three sets both in hard & soft copies

for working out the actual Quantum of survey work conducted and regulating payments thereof for

the survey work.

Any other Tests, if any required shall have to be carried out by the bidder. All consistency and other

requisite Tests and studies on the available Hydro-Metrological data shall form part of the scope of

work for the bidder.

The EIA / EMP studies have not been conducted by owner as this is an existing project for which

RMU is being undertaken. Bidders shall have to collect all the D.P.R level baseline field data for

developing R&R plans and the D.P.R shall contain a separate chapter on EIA/ EMP issue as per norms

/ requirements of MOEF/ Forest department / Pollution Control Board.

k) SENSITIVITY ANALYSIS:

Sensitivity analysis on tariff of energy generated at the Project shall be performed taking into

consideration the provisions of J&K Electricity Act, 2010 JKSERC/CERC guidelines, and specially

covering the material and labour costs, load growth, foreign exchange variation, capital outlay, as

well as operating costs including change in depreciation rates, interest rate, return on equity and O &

M expenditure and discount rates. A Risk Matrix shall be prepared and included in the DPR covering

aspects like unplanned delays in project implementation, R & R, etc, and also the environmental

protection aspects of the Project.

l) DATA REVIEW & VALIDATION:

The Consultant shall review and analyze the available hydro meteorological data, encompassing the

impact of upstream/downstream projects and perform the necessary work for up-gradation of the

hydrologic studies to establish the river flow series, the design floods, the sediment inflow and

deposition and other hydrologic parameters for design work. The Consultant shall formulate and

deliver a suitable software model in which future data updating can be made and used for forecasting

daily/seasonal water discharges.

30 | P a g e

m) CONSTRUCTION MATERIALS:

Consultant shall verify availability of various construction materials at locations indicated as well as

properties, characteristics and adequacy as indicated in the available documents and if necessary,

suggest suitable alternatives.

n) CONSTRUCTION SCHEDULE:-

A construction schedule using modern project management tools and analysis, showing schedules for

annual construction expenditures, covering the entire construction period, shall be prepared. The

construction and installation program for each package shall be developed on the basis of the

detailed study of all activities involved and of the construction techniques planned. These programs

shall take into consideration interface with other construction activities, access availability, anticipated

Geological conditions, normal construction efficiencies, meteorology and river regime, etc. The

construction and installation programs developed shall be made in Prima Vera/Microsoft Projects

which shall incorporate all contracting activities, supplies, civil works and equipment erection in such

a way as to maintain appropriate sequence. All these programs shall be computer based. Sufficient

knowledge/hands on training shall be provided to JKSPDC team of officials to use these programs.

o) FLOOD MODERATION: -

Perform flood moderation studies, which besides other details shall include assessment of the cost of

flood moderation. This should also encompass designing a flood forecasting and flood warning

system to give adequate time for taking up all the possible precautionary measures in case of

occurrence of heavy floods, during the construction, and post Construction period.

p) R&R ISSUES: -

A detailed assessment of submergence of property, villages, roads, cultivation etc. and a suitable

rehabilitation and resettlement plan along with costing, inconsonance with EIA/EMP Plans, shall be

provided in the DPR as per relevant guidelines.

r) FINANCING MIX:-

The DPR shall include detailed financial model indicating the best financing mix. The model shall have

both options of “with or without mega power status.”

A. DPR SUBMISSION AND APPROVAL :

a. Between the DPR submission and bidding process there may be a break. In this case the

Consultant will be granted time extension with cost remaining neutral. In case the break is

for more than three months for the reasons not attributable to the consultant or beyond his

control, escalation @5% per annum shall be granted for the cost related to the Bid

Process. The time schedule for various mile stones shall be as under:

31 | P a g e

S. No. Activity Time (in days)

1 Letter of Award/ letter of intent T0

2. Submission of work plan and methodology with approval of Owner (JKSPDC).

T0 + 14

3. Submission of the review report on DPR & on additional surveys, investigations, tests required if any by the owner and/ or by the consultant.

To +21

4. completion of topographical surveys To + 28

5. Submission of Hydrology, Power Potential studies. T0 + 35

6. Submission of Draft DPR

T0 + 70

7. Submission of final DPR and RFQ.

To + 90

8. Finalization of pre-qualification of tenderers and issue of RFP. To + 135

9. Clearances from IWT/ Forest/PCB and other statutory bodies To + 150

10. Completion of bidding process for procurement of EPC

contract and financial closure.

T0 + 180

a. Consultant shall ensure that the DPR is “bankable” and complete in all respects. Cost

Structuring i.e. with or without access road

b. The DPR in draft form shall be submitted to office of the Chief Engineer, Civil Investigation &

Design Wing (Kashmir) JKSPDC. The Chief Engineer, Civil Investigation & Design Wing

(Kashmir) JKSPDC will review the draft DPR and after incorporating JKSPDC‟s comments, the

Consultant shall submit 5 bound hard copies of the final DPR along with two copies in soft

form.

c. The DPR shall be submitted by JKSPDC to IWT for its Clearance and the Consultant shal

l provide all assistance required to obtain required clearances/ approvals, including drafting of

replies to queries raised by GSI/CWC/CEA/Indus Commission/PCB/ Forest and other statutory

bodies which shall include doing and redoing any calculations/ revision in proposals/

Drawings/ Designs etc as per their directive and deputing experts during the discussions with

GSI/CEA / CWC/Indus Commission/ PCB/ Forest and other statutory bodies. The Consultant

shall also submit the final revised DPR after their observations.

B. BIDDING DOCUMENT & PROCESS:

The Consultant will also prepare the bidding documents comprising of Request for Qualification&

Request for Proposal leading to award of EPC contract. The consultant shall assist the Chief Engineer,

Civil Investigation & Design Wing (Kashmir) JKSPDC through the entire bidding process up to the

selection of the EPC contractor and award of contract. Drafting/Preparation of Agreements

documents for the purpose shall be the responsibility of the Consultants. The consultant may draft

the RFQ/RFP as a concurrent activity with DPR preparation.

32 | P a g e

C. KNOWLEDGE SHARING & TRANSFER:

The Consultant shall also be required to share and transfer all requisite information and knowledge

regarding the project execution and all technical features including design layout, design features,

construction schedule, etc with the Chief Engineer, Civil Investigation & Design Wing (Kashmir)

JKSPDC and also the Project Management Supervision Consultant to be separately engaged by

JKSPDC.A 5% of the total payment due to the consultant shall be retained up to the complete

transfer of knowledge to the Project Management Supervision Consultant.

2. COST OFFER:

The cost quoted should be all inclusive including taxes & duties, out of pocket expenses, boarding and lodging etc. Service tax may be indicated separately. The cost offer should separately indicate the cost for DPR review /Updation, topographical surveys and Bidding Process for EPC Contract in the following manner

S.No Module Basic

cost

Service

tax

Total

1. Review & Updation of DPR

2. Conducting additional topographical

survey/investigations rates to be quoted as per

given BOQ

3. Bidding Process including drafting of RFQ, RFP,

and assisting the Chief Engineer, Civil

Investigation & Design Wing (Kashmir) JKSPDC

in procuring EPC contract

Total*

The total cost is all total inclusive of taxes, duties, out of pocket expenses, travelling,

boarding, lodging, visits to site, conducting meetings and making presentations with the

owner and other concerned authorities as may be required, etc. Nothing extra over this

cost shall be paid by the owner.

Responsibilities of the Consultant:

1. Review/Updation of DPR

2. Preparation of Pre-Qualification Bid Documents for International competitive bidding conforming to CEA, MOP, GOI guidelines/ FIDIC documents (requirements of the Owner).

3. Evaluation of Pre-Qualification Bids received in response to RFQ.

4. Preparation of Detailed RFP Bid Documents conforming to CEA,CWC, MOP, GOI guidelines/

33 | P a g e

FIDIC documents(requirements of the Owner) using the data and other information available from DPR of RMU works of existing Karnah HYDRO ELECTRIC PROJECT formulated by JKSPDC.

5. Assisting the owner at all stages of the bidding process including participating in pre-bid conferences, drafting of replies to bidders queries, carrying out necessary modifications to the bidding documents.

6. Techno-economic evaluation of bids received in response to RFP Bids and assisting the

Chief Engineer, Civil Investigation & Design Wing (Kashmir) in selection of EPC arrangement on turnkey basis. Presentation before the management committee/ Board of Directors of JKSPDC /Govt. of J&K/ other statutory bodies & authorities and follow-up action as per feedback from the owner.

7. Assisting in all documentations like Contract Agreements, Construction Schedules,

Interface Schedules including signing of the various agreements.

8. Knowledge sharing & transfer.

9. Any other matter / issue related to above scope of services.

Signature of Bidder

34 | P a g e

2. SCHEDULE OF PAYMENTS UNDER THE CONTRACT Module I: Review & Updation of DPR S. No. Milestone % of fee (excluding cost on

account of topographical

surveys)

1 Commissioning advance against bank guarantee after issue of

Letter of Award.

10%

2. Submission of work plan and methodology with approval of

Owner (JKSPDC).

5%

3. Submission of the review report on DPR & on additional

surveys, investigations, tests required if any by the owner and/

or by the consultant.

10%

4. Completion of topographical surveys and sub-mission of survey

data.

As per BOQ for survey work.

5. Submission of Hydrology, Power Potential studies, Geological

surface mappings and layouts

15%

6. Submission of Draft DPR 20%

7. Submission of final DPR and RFQ. 20%

8. Clearances from IWT/ Forest/PCB and other statutory bodies 15%

9. Retention money for knowledge sharing and transfer 5%

Total ( Including taxes) 100%

Module II: Bid process for selection of an EPC contractor

S No Milestone % of Fee

1 Commissioning Advance against submission of Bank Guarantee 10%

2 Submission of RFQ documents conforming to current CWC/CEA guidelines based

on data of reviewed/available DPR and approval of owner. 10%

3 Evaluation of RFQ and acceptance by the Owner. 10 %

4 Submission of RfP documents conforming to current CWC/CEA guidelines based

on data of reviewed DPR and approval of owner. 10%

4 Techno-Economic evaluation of bids received and assistance in selection through

EPC arrangement on turnkey basis 20%

5 Preparation of draft agreement and Presentation before the management

committee/BOD of JKSPDC and incorporating feedback from the owner.. 15%

6 Execution of EPC Contract with the selected bidder for development of project on

approval of owner. 20%

7 Knowledge Sharing & transfer 5 %

Total (incl. taxes) 100%

Payment of 5% retained shall be released after sharing & transfer of knowledge to the owner & / or

to PMC if appointed by owner separately.

Signature of Bidder

35 | P a g e

ANNEXURE III

FORMAT

FOR TECHNICAL BID

(Bid Data sheets)

FORM NO: 1-7 ___

36 | P a g e

FORM NO: 1

FROM TO _________________________ CHIEF ENGINEER

_________________________ CIVIL INVEST. & DESIGN WING, SRINAGAR

KASHMIR

_________________________ PDC COMPLEX BEMINA.

Subject: Engagement of Consultant for review and Updation of D.P.R including assisting the Chief

Engineer, Civil Investigation & Design Wing (Kashmir) JKSPDC in competitive bidding at all stages to

procure EPC Contract for implementation of RMU works of existing Karnah HEP in District

Baramulla J&K State.

Dear Sir,

I, on behalf of ___________________________________, a Consultancy Company

herewith enclose Technical Proposal for engagement of my/our Company as a Consultant

for review and updation of D.P.R including assisting the Chief Engineer, Civil Investigation & Design

Wing (Kashmir) JKSPDC in International competitive bidding at all stages to procure EPC Contract

for implementation of RMU works of existing Karnah HEP in District Baramulla J&K State.

_____________________________ Yours faithfully,

1. Signature of the authorized signatory:________________________________

2. Name of the authorized signatory:____________________________________

3. Name of the company:

4. Seal of the company:______________________________________________

37 | P a g e

FORM NO:-F-2

CERTIFICATE AS TO CORPORATE PRINCIPAL

I, ________ [NAME] _____________certify that I am the _____ [DESIGNATION] of [NAME

OF THE COMPANY] established under the Companies Act 1956 who has signed the above tender/

bid is authorized to sign bid on behalf of the Company by the authority of its governing body.

1. Signature of the authorized signatory:__________________________________

2. Name of the authorized signatory:______________________________________

3. Name of the company:_______________________________________________

4. Seal of the company:_________________________________________________

38 | P a g e

FORM NO:-F-3

1. Brief description of the registered company

2. Assignments of similar nature successfully completed:

3. The Bidder Consultancy Company/ Organization should also give details of the ongoing similar assignments in the above format.

1. Signature of the authorize d signatory:_____________________________________

2. Name of the authorized signatory:_________________________________________

3. Name of the company:__________________________________________________

4. Seal of the company:___________________________________________________

Note: The applicant/bidder companies must attach documentary evidence in support of their

submissions above.

S. No. Name

Assignment

(Brief Scope)

Name of

project

Owner/

Sponsor

Cost of

assignment

Date of

commencement

Date of

completion

Was

assignment

satisfactorily

completed

1 2 3 4 5 6 7 8

39 | P a g e

FORM NO:- F-4

WORK PLAN & TIME SCHEDULE

Consultant may furnish the work plan, time schedule of the key staff for the various activities and

methodology/approach involved in the assignment. The complete process is scheduled to be

completed in 180 DAYS from the date of start under the contract.

1. Signature of the authorized signatory:_______________________________

2. Name of the authorized signatory:___________________________________

3. Name of the company:____________________________________________

4. Seal of the company:______________________________________________

40 | P a g e

FORM NO: F-5

Composition of the team personnel and the task which would be assigned to each team member for the proposed assignment: (TECHNICAL / FINANCIAL/ LEGAL/ OTHER KEY MEMBERS OF THE TEAM FOR CARRYING OUT

THE ASSIGNMENT)

S. No

POSITION

NAME

QUALIFICA-

TION

RELEVANT

EXPERIENCE

DURATION

OF PROPOSED

DEPLOYMENT

(DAYS)

AMOUNT

REMARKS

1

TEAM LEADER

(with Min. 25 Years experience as

Hydraulic Engineer with a Min. of 10

Years experience in similar

assignments in Hydro Power Sector)

2

CIVIL ENGINEERING EXPERT

(with Min. 20 Years experience as

Hydraulic Engineer with a Min. of 7

years experience in similar

assignments in Hydro Power Sector)

3

MECHANICAL ENGINEERING

EXPERT

(with Min. 20 years experience as

Mechanical Engineer & 7 years

experience in hydro-mechanical

works in Hydro Power Sector)

4

ELECTRICAL ENGINEERING EXPERT

(with Min. 20 years experience as

electrical Engineer & 7 years

experience in electro-mechanical

works in Hydro Power Sector)

5 GEOLOGIST ENGINEERING

(with Minimum 25 years experience

as Engineering Geologist and 7

years as Engineering Geologist in

Hydro Power Sector)

6

PROCUREMENT EXPERT

(with Min. 15 Years experience in

similar assignments in Hydro Power

Sector)

7

ANY OTHER EXPERT PROPOSED BY

THE CONSULATANT

1. Signature of the authorized signatory:_______________________________

2. Name of the authorized signatory:___________________________________

3. Name of the company:____________________________________________

4. Seal of the company:______________________________________________

41 | P a g e

Form F-6

SUGGESTED FORMAT OF CURRICULUM VITAE FOR MEMBERS OF

CONSULTANTS TEAM

1. Name: _________________________________________

2. Profession/ Present Designation:____________________

3. Length of service with the Company: _________________

4. Internationality: __________________________________

5. Academic Qualification:: ___________________________

(Under this heading, summarize College/ University and other specialized education of the proposed team member, giving names of schools, colleges, professional institutions attended with dates on which attended and degrees/ diplomas obtained. Use up to quarter page.)

6. Proposed Position on the Team for Transaction Advisor : ________________

7. Key Qualifications:_________________________________________________

(Under this heading give outline of proposed Team Member‟s experience and training most pertinent to assigned work on proposed team. Describe degree of responsibility held by staff member on relevant previous assignments and give dates and locations. Use up to half-a-page)

8. Experience: ___________________________________________________________

(Under this heading, give the list of positions held by the proposed Team Member since graduation, giving dates, names of employing organization, title of positions held and location of assignments. For experience in last ten years also give types of activities performed and Owner references, where appropriate. Use up to three quarters of a page) .

9. Language: ________________________________________________________(Indicate

proficiency in speaking, reading and writing of each language by „excellent‟, 'good' or 'poor').

1. Signature of the authorized signatory:________________________________

2. Name of the authorized signatory:____________________________________

3. Name of the company:_____________________________________________

4. Seal of the company:_______________________________________________

42 | P a g e

FORM NO. F-7

COMMENTS/SUGGESTIONS OF CONSULTANT

(On the terms of reference):

1. ________________________________________________________________

2. ________________________________________________________________

3. ________________________________________________________________

4. ________________________________________________________________

5. ________________________________________________________________

1. Signature of the authorized signatory:_______________________________

2. Name of the authorized signatory:___________________________________

3. Name of the company:____________________________________________

4. Seal of the company:______________________________________________

43 | P a g e

Annexure IV

Format for

Financial proposal

(Bid Data forms)

Forms 8-9

44 | P a g e

FORM NO: 8

FINANCIAL PROPOSAL

(To be submitted with Financial Offer in Second Envelope) FROM:

TO: ________________________________

_________________________ _ THE CHIEF ENGINEER

_________________________ CIVIL INVEST. & DESIGN WING, SRINAGAR

KASHMIR

_________________________ _ PDC COMPLEX BEMINA.

Subject: Engagement of Consultant for revising and updation of D.P.R including assisting the Chief Engineer,

Civil Investigation & Design wing ( Kashmir) JKSPDC in International Competitive Bidding at all

stages to procure EPC Contract for implementation of RMU works of existing Karnah HEP in

District Baramulla J&K State.

Sir,

I, on behalf of ___________________________________, a Consultancy Company herewith

enclose Financial Proposal for selection of my/our Company as a Consultant for Engagement of

Consultant for assisting the Chief Engineer, Civil Investigation & Design wing ( Kashmir) JKSPDC in

International Competitive Bidding at all stages to procure EPC Contract for implementation of

RMU works of existing Karnah HEP in District Baramulla J&K State.

Yours faithfully,

1. Signature of the authorized signatory:________________________________

2. Name of the authorized signatory:____________________________________

3. Name of the company:_____________________________________________

4. Seal of the company:______________________________________________

45 | P a g e

FORM NO. F-9

SCHEDULE OF PRICE BID

Note: 1. The cost is all inclusive including taxes & duties and Out of Pocket expenses

2. The prices shall remain FIRM till completion of the Assignment.

1. Signature of the authorized signatory:_____________________________

2. Name of the authorized signatory:_________________________________

3. Name of the company:__________________________________________

4. Seal of the company:___________________________________________

S.No Module Basic

cost

Service

tax

Total

1. Review & Updation of DPR

2. Conducting additional topographical

survey/investigations rates to be quoted as per

given BOQ

3. Bidding Process including drafting of RFQ, RFP,

and assisting the Chief Engineer, Civil

Investigation & Design Wing (Kashmir) JKSPDC in

procuring EPC contract

Total*

The total cost is all total inclusive of taxes, duties, out of pocket expenses,

travelling, boarding, lodging, visits to site, conducting meetings and

making presentations with the owner and other concerned authorities as

may be required, etc. Nothing extra over this cost shall be paid by the

owner.

46 | P a g e

ANNEXURE-V

JKSPDC STANDARD GUIDELINES FOR

ENGAGEMENT OF CONSULTANTS

47 | P a g e

Jammu & Kashmir State

Power Development Corporation Ltd.

Standard Guidelines for Engagement of Consultants by JKSPDC

1.0 Short Title and Commencement

These Guidelines shall be called „The J&K State Power Development Corporation Limited (JKSPDC) Engagement of Consultants Guidelines‟,

2.0 Definitions

In these Guidelines, unless the context otherwise requires;

2.a Words or expressions used in these guidelines shall have the meaning respectively assigned

to them in the Jammu and Kashmir Electricity Act, Samvat 1997 or the Jammu and Kashmir

Electricity Duty Act, 1963 or the Jammu and Kashmir State Electricity Regulatory Commission

Act, 2000;

2. b Commission‟ means the Jammu & Kashmir State Electricity Regulatory Commission constituted

under the J&K State Electricity Regulatory Commission Act, 2000;

2. c „Management Committee‟ means a Committee designated as Management Committee

appointed by the Board of Directors of JKSPDC;

2. d „Consultant‟ includes any individual, firm, company, body or association of persons, not in the

employment of the JKSPDC, who or which possesses or has access to any specialized

knowledge, experience or skill relevant for the work and functions of the Commission;

2. e „Material breach of Contract‟ shall include but not be limited to the instances enumerated

hereinafter in these guidelines and shall also include all such violations of the terms of the

Contract which cannot be described in ordinary parlance as trivia

2. f „Officer‟ means an officer of the JKSPDC.

3.0 Engagement of Consultants

3.a Could be engaged only for executing specialized tasks for which requisite skills are either not available within the staff of the JKSPDC or where the nature of job is specific and time bound.

3.b Consultant will not normally be engaged for routine day-to-day work of the JKSPDC, for which staff is available.

3.c The „Terms of Reference‟ (TOR) for the „Engagement of Consultants‟ for specific tasks will be

approved by the Management Committee of JKSPDC.

3.d The Management Committee of JKSPDC may decide either to invite combined technical and financial proposals, or separate technical and financial proposals.

48 | P a g e

3.e The Management Committee of JKSPDC shall in each case stipulate the minimum qualifying

marks for the technical bid. 3.f After approval of the TOR by the Management Committee of JKSPDC, the Managing Director

will cause the request for Proposals to be issued inviting proposals, and ensuring that appropriate publicity is given in each case, which shall normally be through advertisement, in at least two International newspapers.

3.g In addition, „Request For Proposal‟ may also be issued to a panel of Consultants of

standing, as approved by the JKSPDC or by the Central Electricity Authority (CEA) or by the Central Water Commission (CENTRAL WATER COMMISSION, GOI) or by the Central Electricity Regulatory Commission (CERC) or by the Ministry of Power, Government of India depending upon the context, from time to time.

4.0 Request for Proposals (RFP)

The request for proposal shall include the following:

4.a A letter of invitation stating the intention of the JKSPDC to enter into a contract for provision of a consulting services, the source of funds, the details of the plan and the date, time and address for submission of proposals. 4.b Information to consultants shall contain all necessary information that will help consultants

prepare responsive proposals by providing information on the evaluation process and by indicating the evaluation criteria and factors and their respective weights and the minimum pre-qualification score.

4.c Terms of reference (TOR) shall be prepared to define clearly the objectives, goals and

scope of the assignment and provide background information including a list of existing relevant studies and basic data to facilitate the consultant‟s preparation of their proposals. If transfer of knowledge, training is an objective, the TOR will detail the number of staff to be trained. TO shall list the services and surveys necessary to carry out the assignment and the expected outputs (for example reports, data, surveys etc.) linked to each task in the TOR.

5.0 Receipt of Proposals

5.1 Enough time shall be allowed for the consultant to prepare and submit their proposals. While the time allowed shall depend on the assignment, it will normally not be less than two weeks, during which period firms may seek clarifications about the information provided in the TOR.

5.b The Board of Directors of JKSPDC/ Chief Engineer CI & D Wing Kashmir may decide to extend the deadline for submission of proposals, as deemed appropriate by it.

5.c No amendments to the technical or financial proposals shall be accepted after the deadline except before a Management Committee appointed by the Board of Directors of jkSPDC/ChiefEngineerCI&DWingKashmir. The proposal shall be submitted in sealed cover. Where the Chief Engineer, CI & D Wing Kashmir prescribes the separate technical and financial proposals to be submitted, they shall be submitted in separate sealed envelopes.

49 | P a g e

6.0 Single Source Selection

Single source selection shall be exercised only in exceptional cases where it is appropriate and

represents a clear advantage because the tasks represent a natural continuation of previous

work carried out by the Consultant or where a rapid selection is essential or for very small

assignments where the fee payable does not exceed Rs.1.00 lac in each case or where only

one firm is qualified or has experience for the assignment. For each single source selection,

prior approval of the Board of Directors of JKSPDC/Chief Engineer CI & D Wing Kashmir

is required.

7.0 Selection of Individual Consultant

7.a Individual Consultant shall be employed for assignments for which team of personnel is not required, no additional outside (home office) professional support is required, and where the experience and qualifications of the individual are the paramount requirement.

7.b Individual Consultants shall be selected on the basis of their qualifications for the assignment. They may be selected on the basis of references, or through comparison of qualifications among those expressing interest in the assignment, or those who are approached directly by the Chief Engineer, CI & D Wing Kashmir. JKSPDC. Evaluation shall be on the basis of academic background, relevant experience and appropriate technical knowledge, knowledge of local conditions, administrative systems and concerned organizations. For individual consultants the fee payable shall not exceed Rs. fifty thousands in each case.

8.0 Scope of Work

8.a The „Terms of Reference‟(TOR) would specify the exact nature of the tasks to be undertaken by the Consultant, the time allowed for completion of each task, the services and surveys necessary to carry out the assignment and the specific Outputs and deliverables that are to be provided by the Consultant in relation to each task.

8.b If transfer of knowledge, or training to staff is a task envisaged, then the TOR will list the details of staff to be trained.

8.c Detailed terms of engagement will be drawn up in each case and agreed to between the Consultant and the Chief Engineer CI & D Wing Kashmir. prior to award of Contract for consultancy. Contract shall incorporate on said details of engagement as far as possible as per „Model Contract at Schedule- I of these Guidelines.

9.0 Fees and Other Charges

9.a The Chief Engineer CI & D Wing Kashmir shall determine, based on the bids, the fees and other charges separately for each case, commensurate with the quantum of work involved and the level of professional expertise made available based on the bids.

9.b The amount determined shall be inclusive of all of the Consultant‟s costs and profits as well as any tax obligations (Income Tax, Service Tax and any other) of the Consultant.

50 | P a g e

9.c Fees will be paid, subject to Chief Engineer CI & D Wing Kashmir‟s certificate of satisfaction, and statutory Tax Deduction at Source under relevant laws including the Income Tax Act 1961.

10.0 Conflict of Interest

10.a Consultant shall not be hired for any assignment that would be in conflict with their prior or current obligations to other Owners that may place them in a position of not being able to carry out the assignments objectively and impartially.

10.b The Consultant, or any entity affiliated with the Consultant, engaged by the Chief Engine CI & D Wing Kashmir shall in no case represent or give opinion or advice to other

stakeholders in any matter which is adverse to the interest of the Chief Engineer CI & D Wing Kashmir. This would constitute a „Material Breach of Contract‟.

11. Obligations and Liability

11.a The Consultant‟s obligation shall be to provide the Services and Deliverables (agreed to and specified in the Contract at Schedules A, C and D respectively) to the Chief Engineer CI &

D Wing Kashmir within the time period provided in the Contract, except in the case of any „Force Majeure Events‟. Slippage in the Consultants‟ submission of Deliverables beyond a period of THIRTY days past the due date, shall constitute a „Material Breach of Contract‟.

11.b The Consultant‟s obligation shall be to provide the services (Schedule-C of the Contract) through the team of personnel stipulated therein (Schedule-B of the Contract) because the experience, qualification and Curriculum Vitae (CV) of the said personnel is fundamental to the technical evaluation of the bid, which is the basis for award of Contract. Change in team composition, task assignment, or person-day efforts contracted without written approval of the Chief Engineer CI & D Wing Kashmir shall constitute a Material Breach of Contract and no payment shall be made for any such breach of Contract for the concerned activity.

11.b The Chief Engineer CI & D Wing Kashmir may, in his discretion, terminate the Contract or a part thereof in the event of the Consultant failing to meet the aforesaid

obligations. In case of such defaults the Chief Engineer CI & D Wing Kashmir shall be at liberty to get the work completed from any other agency at the „risk and cost‟ of the Consultant. Given that any such mid-term termination could entail higher costs than contracted, any enhanced costs would be covered by the „risk and cost‟ liability.

11.c „Force Majeure Events‟ shall include, without limitation, the following events to the extent that such events or their consequences qualify as per the standard set out above: i. any event beyond the reasonable control of the Consultant: natural disasters or other

acts of God; including earthquake, cyclone, flood, storm, war, terrorist attack, civil commotion or other similar occurrence

ii. any change in law including any legislation, sub-ordinate or delegated legislation, rules, regulation, directive, order, notification, exemption or any interpretation thereof duly issued/promulgated in exercise of lawful authority, after the date hereof adversely affecting the performance by the Consultants of its obligations hereunder, or

iii. Any event or circumstance of a nature analogous to any of the foregoing.

51 | P a g e

12.0 Confidentiality

The Consultant, or any entity affiliated with the Consultant, shall not disclose to any

unauthorized person any information and/or data that may be supplied to him/her by the

Chief Engineer CI & D Wing Kashmir or by any other organization, under the directions of

the JKSPDC/ Chief Engineer CI & D Wing Kashmir. All such documents shall be the

property of the JKSPDC/ Chief Engineer CI & D Wing Kashmir or any information that

may have come to his/her knowledge directly or indirectly by virtue of the assignment.

13.0 Intellectual Property Rights

13.a Where the Contract requires the Consultant to deliver reports or other materials (Deliverables) to the Chief Engineer CI & D Wing Kashmir the copyright in such Deliverables belong to the Chief Engineer CI & D Wing Kashmir.

13.b Without the express written consent of the Chief Engineer CI & D Wing Kashmir, a Consultant engaged by the Chief Engineer CI & D Wing Kashmir shall not utilize, publish, disclose, or part with any information collected for the Chief Engineer CI & D Wing Kashmir and shall be duty bound to handover the entire record of the assignment to the Chief Engineer CI & D Wing Kashmir before the expiry of the Contract.

14.0 Duty of Care and Performance Standards

14.a The Consultant shall perform the services contracted with the highest standards of professional and ethical competence and integrity and shall furnish its independent professional opinion.

14.b The Consultant shall promptly replace without any cost to the Chief Engineer CI & D Wing Kashmir, any employee assigned under a contract awarded under these Guidelines that the Chief Engineer CI & D Wing Kashmir considers unsatisfactory. Any such replacement shall be with express approval of the Chief Engineer CI & D Wing Kashmir, and shall be by personnel of comparable qualifications and experience.

15.0 Termination of Contract

15.a The Chief Engineer CI & D Wing Kashmir may terminate a Contract to which these Guidelines apply if; 1. the Consultant commits any material or persistent breach of Contract (which, in the

case of a breach capable of remedy, is not remedied within the period specified in the notice after receipt of notice of material breach of contract by consultant) ; or

2. the Consultant becomes insolvent; or 3. The Chief Engineer CI & D Wing Kashmir exercises its discretion to terminate

services under Article-11 of these guidelines.

15.b Termination shall be effected by written notice served on the Consultant and will take effect on any date as far as possible, not less than seven days from the date of delivery of such notice.

52 | P a g e

15.c The termination will be, without prejudice to either party‟s rights accrued before termination as per the Contract, but subject to Chief Engineer CI & D Wing Kashmir‟s certificate of satisfaction with Deliverables submitted before termination.

16.0 Dispute Resolution

In case of any differences or disputes between the parties arising out of contracted

agreement, it shall be referred for arbitration to a person nominated by the Chief Engineer

CI & D Wing Kashmir. The proceedings shall be subject to the Jammu & Kashmir

Arbitration and Conciliation Act, as amended from time to time. Jurisdiction of J&K Courts will

apply.

17.0 Power to Remove Difficulties

If any difficulty arises in giving effect to any of the provisions of these Guidelines, the Chief

Engineer CI & D Wing Kashmir may, by general or special order, do anything, not being

inconsistent with the provisions of the relevant Jammu & Kashmir Government regulations

which appears to it to be necessary or expedient for the purpose of removing the difficulties.

Jurisdiction of J&K courts shall apply.

18.0 Saving of Inherent Power of JKSPDC

Nothing in these provisions shall bar the Chief Engineer CI & D Wing Kashmir from

adopting a procedure which is at variance with any of the provisions of these Guidelines, if

the Chief Engineer CI & D Wing Kashmir, in view of the special circumstances of the

matter or class of matters, and for reasons to be recorded in writing, deems it necessary or

expedient to depart from the procedure stipulated in these Guidelines.

19.0 General Power to Amend

The Chief Engineer CI & D Wing Kashmir may, at any time and on such terms as it may

deem fit, amend any of these Guidelines for the purpose of meeting the objectives with which

these Guidelines have been framed.

53 | P a g e

ANNEXURE-VI

PROPOSED CONTRACT

FOR

PROVIDING OF CONSULTANCY SERVICE

54 | P a g e

ANNEXURE-VI PROPOSED CONTRACT FOR CONSULTANCY SERVICES

This CONTRACT (hereinafter, together with all Appendices attached hereto and forming an integral part hereof, called the "Contract") is made the---------. day of the ---------month of, 2012, between,

on the one hand Chief Engineer CI & D Wing Kashmir. (JKSPDC)(Herein after called the

"Owner") and, on the other hand,................. (Here in after called the “Consultant").

WHEREAS:-

Chief Engineer CI & D Wing Kashmir, in order to augment and improve the hydro power

generation in the state and to reduce the demand-supply gap of the state, desires the

implementation of RMU works of existing Karnah HEP in District Baramulla J&K State.

For the above purpose, the Chief Engineer CI & D Wing Kashmir is intending to engage the

services of reputed consultants/ consulting organizations for:

a. Review and updation of D.P.R

b. Preparation of pre-qualification (RFQ) bid documents conforming to CEA, CWC, MOP,

GOI guidelines/ Standard FIDIC documents (as per the requirement of Owner) and evaluation thereof for selection of technically responsive bidders for the EPC Contract through an International competitive bidding process.

c. Preparation of “REQUEST FOR PRPOSALS (RFP)”- Bid Documents conforming to CEA,

CWC, MOP, GOI guidelines/Standard FIDIC documents (as per the requirement of

Owner) using the DPR for RMU works of existing Karnah HEP in District

Baramulla J&K State.

d. Assisting Chief Engineer CI & D Wing Kashmir in bidding process at all stages

including techno-economic evaluation of bids received for procurement of the EPC

Contract for implementation of RMU works of existing Karnah HEP in District

Baramulla J&K State.

And WHEREAS:

The Consultant, have represented to Chief Engineer CI & D Wing Kashmir, the

Owner that they have the required professional skills, expert personnel backed up with the technical and financial resources required to provide the Services on the terms and conditions set forth in this Contract; And

Chief Engineer CI & D Wing Kashmir, the Owner, based on the offer of the

Consultant, to the effect that the Consultants have the required professional skills, expert personnel and technical and financial resources to provide the above cited Services required for the successful completion of the assignment as defined hereinafter (hereinafter called the "Services");

55 | P a g e

NOW THEREFORE the parties hereto hereby agree as follows:

1. GENERAL PROVISIONS 1.1. Definitions

Unless the context otherwise requires, the following terms whenever used in this Contract have the following meanings:

(a) "Applicable Law" means the laws and any other instruments having the force of law in the State of J&K, as they may be issued and in force from time to time; (b) "Contract" means this Contract together with all Appendices/Attachments and

including all modifications made, in accordance with the provisions of Clauses 2.6 hereof between the owner and the Consultants.

(c) "Effective Date" means the date on which this Contract comes into force and effect pursuant to Clause 2.1 hereof; (d) "Personnel" means persons hired by the Consultants or by any Sub- consultant

as employees and assigned to the performance of the Services or any part hired had their domicile outside the Government's country; and "Local

Personnel" means such persons who at the time of being so hired had their domicile inside the Government's country;

(e) “Party” means the Owner or the Consultants as the case may be: (f) “Project” means providing of Consultancy Services as a Consultant for Review /

updation of existing Detailed Project Report (DPR), framing of Bid Documents for

International Competitive Bidding and assisting Chief Engineer CI & D Wing

Kashmir (JKSPDC) at all stages of the Bidding Process to procure an EPC

Contract for implementation of RMU works of existing Karnah HEP in

District Baramulla J&K State.

(g) "Services" means the work to be performed by the Consultants pursuant to this Contract for the purposes of the Project, as described in Appendix A hereto;

(h) “Starting Date” means the date referred to in Clause 2.3 hereto.

(i) "Sub consultant" means any entity to which the Consultants subcontract any part of

the Services in accordance with the provisions of Clause 3.5 hereinafter; and

(j) "Third Party" means any person or entity other than the Chief Engineer CI & D Wing Kashmir, the Owner and the Consultants or a Consultant.

56 | P a g e

1.2. Relation between the parties Nothing contained herein shall be construed as establishing a relation of master and servant

or of agent and principal as between Chief Engineer CI & D Wing Kashmir, the

Owner and the Consultants. The Consultant/s, subject to this Contract, have complete charge of Personnel performing the Services and shall be fully responsible for the Services performed by them or on their behalf hereunder.

1.3. Law Governing Contract

This Contract, its meaning and interpretation, and the relation between the parties shall be governed by the Applicable Law prevailing in the J&K State.

1.4. Language

This Contract has been executed in the English language, which shall be the binding and controlling language for all matters relating to the meaning or interpretation of this Contract.

1.5. Headings

The headings shall not limit, alter or affect the meaning of this Contract. 1.6. Notices 1.6.1 Any notice, request or consent required or permitted to be given or made pursuant to this

Contract shall be in writing. Any such notice, request or consent shall be deemed to have been given or made when delivered in person to an authorized representative of the Party to whom the communication is addressed, or when sent by registered mail, telex, telegram or facsimile to such Party at the following address:

For the Owner: ________________

________________ Attention: Post: Telegram: Fax: Email:

For the Consultants: _________________

_______________ Attention: Post: Telegram: Fax: Email:

1.6.2 Notice will be deemed to be effective as follows:

a. India Postage Service Mail or by Courier: On delivery b. India Postage Telegram: Seventy Two (72) hours following confirmed Transmission C. Fax: Seventy Two hours. d. Email: Seventy Two hours.

57 | P a g e

1.6.3 A Party may change its address for notice hereunder by giving the other Party notice of such

change pursuant to this Clause.

1.7 Location

The Services shall be performed in J&K State or at any other location desired by the Chief Engineer CI & D Wing Kashmir, the owner and, where the location of a particular task is not

so specified, at such locations, as the JKSPDC, the Owner may approve.

1.8 Authority of Member in Charge

The Consultant may authorize any individual to act as the Team Leader on their behalf in exercising the entire Consultants' rights and obligations towards the Owner under this Contract, including without limitation the receiving of instructions and payments from the Owner.

1.9 Authorized Representative Any action required or permitted to be taken, and any document required or permitted to be executed under this Contract, may be taken or executed:

(a) on behalf of the Owner by____________________ or his designated representative;

(b) on behalf of the Consultants by________________or his designated representative.

1.20 Taxes and Duties

The consultants and the personnel shall pay the taxes, duties; fees, levies and other impositions levied under the existing, amended or enacted laws during life of this contract and the Owner shall perform such duties in regard to the deduction of such tax as may be lawfully imposed.

2. COMMENCEMENT, COMPLETION, MODIFICATION AND TERMINATION OF CONTRACT Effectiveness of Contract:

This Contract shall come into force and effect on the date (the "Effective Date") of the Owner's notice to the Consultants confirming that the following conditions have been met:

(a) This Contract has been approved by the Chief Engineer CI & D Wing Kashmir, the Owner.

(b) Requisite Contract Performance Bank Guarantee in the prescribed format has been submitted by the Consultant.

2.1 Termination of Contract for failure to become Effective:

If this Contract has not become effective within fourteen (14) days of the date hereof, either Party may, by not less than THREE (3) weeks' written notice to the other Party, declare this Contract to be null and void, and in the event of such a declaration by either Party, neither Party shall have any claim against the other Party with respect hereto.

58 | P a g e

2.2 Commencement of Services:

The Consultants shall begin carrying out the Services immediately viz. from the date of issue of LOI/

Letter of Award OR such date as communicated by the Chief Engineer CI & D Wing Kashmir,

the Owner in the notice to proceed whichever is later.

2.3 Expiration of Contract:

Unless terminated earlier pursuant to Clause 2.9 hereof, this Contract shall terminate' when, pursuant to the provisions hereof, the Services have been completed and the payments on account of remuneration and reimbursable expenditures have been made.

2.4 Entire Agreement:

This Contract contains all covenants, stipulations and provisions agreed by the Parties. No agent or representative of either Party has authority to make, and the Parties shall not be bound by or be liable for, any statement, representation, promise or agreement not set forth herein.

2.5 Modification:

Modification of the terms and conditions of this Contract, including any modification of the scope of the Services, may only be made by written agreement between the Parties and shall not be effective until the consent of the parties has been obtained. Pursuant to Clause 7.2 hereof, however, each Party shall give due consideration to any proposals for modification made by the other Party.

2.6 Force Majeure: 2.7 Definition

(a) For the purposes of this Contract, "Force Majeure" means an event which is beyond the reasonable control of a Party, and which makes a Party's performance of its obligations hereunder impossible or so impractical as reasonably to be considered impossible in the circumstances, and includes, war, riots, civil disorder, earthquake, fire, explosion, storm, flood or other adverse weather conditions, strikes, lockouts or other industrial action (except where such strikes, lockouts or other industrial action are within the power of the Party invoking Force Majeure to prevent), confiscation or any other action by government agencies.

(b) Force Majeure shall not include

Any event which is caused by the negligence or intentional action of a Party or such Party's Sub-consultants or agents or employees nor any event which a diligent Party could reasonably have been expected to both (i) take into account at the time of the conclusion of this Contract, and (ii) avoid or overcome in the carrying out of its obligations hereunder.

59 | P a g e

2.7.1 No Breach of Contract:

The failure of a Party to fulfill any of its obligations hereunder shall not be considered to be a breach of, or default under, this Contract in so far as such inability arises from an event of Force Majeure, provided that the Party affected by such an event has taken all reasonable precautions, due care and reasonable alternative measures, all with the objective of carrying out the terms and conditions of this Contract.

2.7.2 Measures to be taken:

(a) A Party affected by an event of Force Majeure shall take all reasonable measures to remove such Party's inability to fulfill its obligations hereunder with a minimum of delay.

(b) A Party affected by an event of Force Majeure shall notify the other Party of such

event as soon as possible, and in any event not later than fourteen (14) days following the occurrence of such event, providing evidence of the nature and cause of such event, and shall similarly give notice of the restoration of normal conditions as soon as possible.

© The Parties shall take all reasonable measures to minimize the consequences of any event of Force Majeure.

2.7.3 Extension of Time:

Any period within which a Party shall, pursuant to this Contract, complete any action or task, shall be extended for a period equal to the time during which such Party was unable to perform such action as a result of Force Majeure

2.7.4 Consultation:

Not later than thirty (30) days after the Consultants, as the result of an event of Force Majeure, have become unable to perform a material portion of the Services, the Parties shall consult with each other with a view to agreeing on appropriate measures to be taken in the circumstances.

2.8. Suspension:

The Owner may, by written notice of suspension to the Consultants, suspend all payments to the `Consultants hereunder if the Consultants fail to perform any of their obligations under this Contract, including the carrying out of the Services, provided that such notice of suspension:-

(i) shall specify the nature of the failure, and (ii) shall request the Consultants to remedy such failure within a period not exceeding

three weeks after receipt by the Consultants of such notice of suspension and shall invoke contract performance guarantee.

2.9 Termination:

2.9.1. By the Owner: The Owner may, by not less than three (03) weeks' written notice of termination to the Consultants (except in the event listed in paragraph (f) below, for which there shall be a written notice of not less than fifteen (15) days), such notice to be given after the occurrence of any of the events specified in paragraphs (a)- through (f) of this Clause 2.9.1, terminate this Contract:

60 | P a g e

(a) If the Consultants fails to remedy a failure in the performance of their obligations hereunder, as specified in a notice of suspension pursuant to Clause 2.8 herein above, within three (03) week‟s of receipt of such notice of suspension or within such further period as the Owner may have subsequently approved in writing;

(b) If the Consultants become insolvent or bankrupt or enter into any agreements with their creditors for relief of debit or take advantage of any law for the benefit of

debtors or go into liquidation or receivership whether compulsory or voluntary;

© If the Consultants fail to comply with any final decision reached as a result of arbitration proceedings pursuant to Clause 8 hereof;

(d) If the Consultants submit to the owner a statement which has a material effect on the rights, obligations or interests of the Owner and which the Consultants know to be false;

(e) If, as the result of Force Majeure, the Consultants are unable to perform a material portion of the Services for a period of not less than fifteen days (15) days; or

(f) If the Owner, in its sole discretion and for any reason whatsoever, decides to terminate this Contract.

2.9.2. Cessation of Rights and Obligations:

Upon termination of this Contract pursuant to Clauses 2.2 or 2.9 hereof, or upon expiration of this Contract pursuant to Clause 2.4 hereof, all rights and obligations of the Parties hereunder shall cease, except

(a) Such rights and obligations as may have accrued on the date of termination or expiration,

(b) The obligation of confidentiality set forth in clause 3.2 hereof,

© Any right which a Party may have under the applicable law

2.9.3 Cessation of Services:

Upon termination of this Contract by notice to pursuant to Clauses 2.9 hereof, the Consultants shall, immediately upon dispatch or receipt of such notice, take all necessary steps to bring the Services to a close in a prompt and orderly manner and shall make every reasonable effort to keep expenditures for this purpose to a minimum.

2.9.4. Payment upon Termination:

Upon termination of this Contract pursuant to Clauses 2.9 hereof, the 'Owner shall make the following payments to the Consultants:

(a) Remuneration pursuant to Clause 6 hereof for Services satisfactorily performed prior to the effective date of termination:

(b) Reimbursable expenditures pursuant to Clause 6 hereof for expenditures actually incurred prior to the effective date of termination; and

61 | P a g e

(c) Except in the case of termination pursuant to paragraphs (a) through (d) of Clause 2.9 hereof, reimbursement of any reasonable cost incident to the prompt and orderly termination of the Contract including the cost of the return travel of the Consultants' personnel and their eligible dependents

3.0 OBLIGATIONS OF THE CONSULTANTS 3.1 General 3.1.1 Standard of Performance

The Consultants shall perform the Services and carry out their obligations hereunder with all due diligence, efficiency and economy, in accordance with generally accepted techniques and practices used with professional engineering and consulting standards recognized by professional bodies, and shall observe sound management, and technical and engineering practices, and employ appropriate advanced technology and safe and effective equipment, machinery, materials and methods. The Consultants shall always act, in respect of any matter relating to this Contract or to the Services, as faithful advisers to the Owner, and shall at all times support and safeguard the Owner's legitimate interests .

3.1.2 Law Governing Services

The Consultants shall perform the Services in accordance with the Applicable Law prevailing in the State of J&K and shall take all practicable steps to ensure that any Sub-consultants, as well as the Personnel and agents of the Consultants and any Sub consultants, comply with the Applicable Law prevailing in the State of J&K.

3.1.3 Conflict of Interest

The consultant shall hold the Owner's interest paramount, without any consideration for future work, and strictly avoid conflict with other assignments or their corporate interests.

3.2 Consultants not to benefit from Commission, Discounts etc.

The payment of the Consultant shall constitute the Consultant's only payment in connection with this Contract or the Services, and the Consultant shall not accept for their own benefit any trade commission, discount, or similar payment in connection with activities pursuant to this Contract or to the Services or in the discharge of their obligations under the Contract, and the Consultant shall use their best efforts to ensure that the Personnel, any Sub-Consultants, and agents of either of them similarly shall not receive any such additional payment.

3.2.1 Consultants and Affiliates not to be otherwise interested in Project

The Consultant agrees that, during the term of this Contract and after its termination, the Consultant and any entity affiliated with the Consultant, as well as any Sub-Consultants and any entity affiliated with such Sub- Consultants, shall be disqualified from providing goods, works or services (other than consulting services) resulting from or directly related to the Consultant's Services for the preparation or implementation of the project.

62 | P a g e

3.2.2 Prohibition of Conflicting Activities: The Consultant shall not engage, and shall cause their Personnel as well as their Sub Consultants and their Personnel not to engage, either directly or indirectly, in any business or professional activities which would conflict with the activities assigned to them under this Contract.

3.2.3 Confidentiality:

The Consultants, their Sub-consultants and the Personnel of either of them shall not, either during the term or within two (2) years after the expiration of this Contract, disclose any proprietary or confidential information relating to the Project, the Services, this Contract or the Owner's business or operations without the prior written consent of the Owner. 3.3 Insurance to be taken out by the Consultant:

The Consultant (a) shall take out and maintain, and shall cause any Sub-Consultants to take out and maintain, at their (or the Sub-Consultants', as the case may be) own cost but on terms and conditions approved by the Owner, insurance against the risks, and for the coverage, as shall be specified in the SC; and (b) at the Owner's request, shall provide evidence to the Owner showing that such insurance has been taken out and maintained and that the current premiums have been paid.

3.4 Liability of the Consultants

The Consultants shall be liable to the Owner for the performance of the Services in accordance with the provisions of this Contract. If the Consultants consist of more than one entity, then the Consultants and each of their members shall be jointly and severally liable to the Owner for the performance of the Services and for any loss suffered by the Owner as a result of a fault of the Consultants in such performance, subject to the following limitations: a. The Consultants shall not be liable for any damage or injury caused by or arising out of the

act, neglect, fault or omission of any persons other than the Consultants, its Sub-consultants or the personnel of either of them; and

b. The Consultants shall not be liable for any loss or damage caused by or arising out of circumstances over which the Consultants had no control. c. In the event that the Consultant is in default of his duties in performance of the services as

envisaged in the Contract Agreement, the Consultant shall redo, rectify all deficits, inadequacies, insufficiencies pointed out by Owner and authorities before whom the report(s) is submitted within a period of 15 days from the date on which such defects, deficits etc have been communicated to the consultant verbally or in writing as the case may be.

3.5 Indemnification of the Owner by the Consultants

The Consultants shall keep the Owner, both during and after the term of this Contract, fully and effectively indemnified against all losses, damage, injuries, deaths, expenses, actions, proceedings, demands, costs and claims, including, but not limited to, legal fees and expenses, suffered by the Owner or any Third Party, where such loss, damage, injury or death is the result of a wrongful action, negligence or breach of Contract of the Consultants or their Sub-consultants; or the Personnel or agents of either of them, including the use or violation of any copyright work or literary property or patented invention, article or appliance.

3.6 Consultants Actions Requiring Owner‟s Prior Approval:

The Consultants shall obtain the Owner's prior approval in writing before taking any of the following actions:

63 | P a g e

(a) Appointing Personnel to carry out any part of the Services, including the terms and conditions of such appointment;

(b) Entering into a subcontract for the performance of any part of the Services, it being understood:

1. That the selection of the Sub-consultant and the terms and conditions of the Subcontract shall have been approved in writing by the Owner prior to the execution of the subcontract, and 2. That the Consultants shall remain fully liable for the performance of the Services by the Sub-consultant and its Personnel pursuant to this Contract;

3.7 Reporting Obligations: The Consultants shall submit to the Owner the reports and documents specified in Appendix B hereto, in the form, in the numbers and within the time periods set forth in the said Appendix, including any supporting data required by the Owner 3.8 Documents Prepared by the Consultants to Be the Property of the Owner

All plans, drawings, specifications, designs, reports and other documents prepared by the Consultants in performing the Services shall become and remain the property of the Owner, and the Consultants shall, not later than upon termination or expiration of this Contract, deliver all such documents to the Owner, together with a detailed inventory thereof. The Consultants may retain a copy of such documents but shall not use them for purposes unrelated to this Contract without the prior written approval of the Owner.

4.0 CONSULTANTS' PERSONNEL

4.1 General

The Consultants shall employ and provide such qualified and experienced Personnel as are required to carry out the Services

4.2 Description of Personnel

(a) The titles, agreed job descriptions, minimum qualifications and estimated periods of engagement in the carrying out of the Services of each of the Consultants' Personnel are described in Appendix C.

(b) If required to comply with the provisions of Clause 3.1.1 of this Contract, adjustments with respect to the estimated periods of engagement of Personnel set forth in Appendix C may be made by the Consultants by written notice to the Owner, provided:

1. That such adjustments shall not alter the originally estimated period of engagement

of any individual by more than 10% or one week, whichever is lesser, and

2. That the aggregate of such adjustments shall not cause payments under this Contract to exceed the ceilings set forth in Clause 6.2 of this Contract. Any other such adjustments shall only be made with the Owner's written approval.

(c) If additional work is required beyond the scope of the Services specified in Appendix A, the estimated periods of engagement of personnel set forth in Appendix C may be increased by agreement in writing between the Owner and the Consultants, provided

64 | P a g e

that any such increase shall not, except as otherwise agreed, cause payments under this Contract to exceed the ceilings set forth in Clause 6 of this Contract.

4.3 Agreed Personnel The Consultant hereby agrees to engage the personnel and sub-consultants listed by title as well as by name in Appendix C in order to fulfill his contractual obligations under this contract.

4.4 Removal and/or Replacement of Personnel

(a) Except as the Owner may otherwise agree, no changes shall be made in the Personnel. If, for any reason beyond the reasonable control of the Consultants, it becomes necessary to replace any of the personnel, the Consultants shall forthwith provide as a replacement a person of equivalent or better qualifications.

(b) If the Owner

(1) Finds that any of the Personnel has committed serious misconduct or has been charged with having committed a criminal action, or

(2) Has reasonable cause to be dissatisfied with the performance of any of the personnel, then the Consultants shall, at the Owner's written request specifying the grounds there for, forthwith provide as a replacement a person with qualifications and experience acceptable to the Owner.

(c) Any of the Personnel provided as a replacement under Clauses (a) and (b) above, the rate of remuneration applicable to such person as well as any reimbursable expenditures (including expenditures due to the number of eligible dependents) the Consultants may wish to claim as a result of such replacement, shall be subject to the prior written approval by the Owner. Except as the Owner may otherwise agree,

(1) The Consultants shall bear all additional travel and other costs arising out

of or incidental to any removal and/or replacement, and (2) The remuneration to be paid for any of the Personnel provided as a

replacement shall not exceed the remuneration which would have been payable to the personnel replaced.

5.0 Obligations of the Owner: 5.1 Payment

In consideration of the Services performed by the Consultants under this Contract, the Owner shall make to the Consultants such payments and in such manner as is provided by Clause 6 of this contract.

5.2 Services and Facilities The Owner shall make available free of charge to the Consultant the Services and Facilities listed under Appendix D. 6.0 SCHEDULES FOR DELIVERY OF SERVICES & Payment to the Consultants:

65 | P a g e

6.1 SCHEDULES FOR DELIVERY OF SERVICES:

The time schedule and the time duration during which the Consultant shall be obliged to deliver the services shall be here under:

S.

No.

Activity Time (in

days)

1 Letter of Award/ letter of intent T0

2. Submission of work plan and methodology with approval of Owner (JKSPDC).

T0 + 14

3. Submission of the review report on DPR & on additional surveys, investigations, tests required if any by the owner and/ or by the consultant.

T0 +21

4. completion of topographical surveys To + 28

5. Submission of Hydrology, Power Potential studies. T0 + 35

6. Submission of Draft DPR

T0 + 70

7. Submission of final DPR and RFQ. T0 + 90

8. Finalization of pre-qualification of tenderers and issue of RFP. T0 + 135

9. Clearances from IWT/ Forest/PCB and other statutory bodies T0 + 150

10. Completion of bidding process for procurement of EPC contract and

financial closure.

T0 + 180

66 | P a g e

6.2 SCHEDULE & Mode of Payment;

Module I: Review & Updation of DPR

S. No.

Milestone % of fee (excluding cost on account of

topographical surveys)

1 Commissioning advance against bank guarantee after issue of Letter

of Award.

10%

2. Submission of work plan and methodology with approval of Owner (JKSPDC).

5%

3. Submission of the review report on DPR & on additional surveys,

investigations, tests required if any by the owner and/ or by the consultant.

10%

4. Completion of topographical surveys and sub-mission of survey data. As per BOQ for survey

work.

5. Submission of Hydrology, Power Potential studies, Geological surface

mappings and layouts

15%

6. Submission of Draft DPR 20%

7. Submission of final DPR and RFQ. 20%

8. Clearances from IWT/ Forest/PCB and other statutory bodies 15%

9. Retention money for knowledge sharing and transfer 5%

Total ( Including taxes) 100%

Module II: Bid process for selection of an EPC contractor

S No Milestone % of Fee

1 Commissioning Advance against submission of Bank Guarantee 10%

2 Submission of RFQ documents conforming to current CWC/CEA guidelines

based on data of reviewed/available DPR and approval of owner. 10%

3 Evaluation of RFQ and acceptance by the Owner. 10 %

4 Submission of RfP documents conforming to current CWC/CEA guidelines based on data of reviewed DPR and approval of owner.

10%

4 Techno-Economic evaluation of bids received and assistance in selection through EPC arrangement on turnkey basis

20%

5 Preparation of draft agreement and Presentation before the management

committee/BOD of JKSPDC and incorporating feedback from the owner.. 15%

6 Execution of EPC Contract with the selected bidder for development of project

on approval of owner. 20%

7 Knowledge Sharing & transfer 5 %

Total (incl. taxes) 100%

Payment of 5% retained shall be released after sharing & transfer of knowledge to the owner & / or

to PMC if appointed by owner separately.

67 | P a g e

6.3 The Consultant shall submit the bills in triplicate to the Owner on Consultants‟ printed bill forms indicating the work done by him during the period for which payment is sought.

6.4 The Owner shall cause the payment of the Consultants as per above given in schedule of

payment above within forty five (45) days after the receipt of bills by the Owner with supporting documents. But if the progress is not satisfactory and according to agreed work program/schedule the payment may be withheld.

6.5 The final payment under this Clause shall be made only after satisfactory completion of the

activities mentioned in the TOR. 6.6 All payments under this Contract shall be made to the account of the Consultants with: [NAME OF BANK] 7.0 Fairness and Good Faith: 7.1 Good Faith: The Parties undertake to act in good faith with respect to each other's rights under this Contract and to adopt all reasonable measures to ensure the realization of the objectives of this Contract.

7.2 Operation of the Contract: The parties recognize that it is impractical in this Contract to provide for every contingency which may arise during the life of the Contract, and the Parties hereby agree that it is their intention that this Contract shall operate fairly as between them, and without detriment to the interest of either of them, and that, if during the term of this Contract either party believes that this Contract is operating unfairly, the Parties will use their best efforts to agree on such action as may be necessary to remove the cause or causes of such unfairness, but no failure to agree on any action pursuant to this Clause shall give rise to a dispute subject to arbitration in accordance with Clause 8 hereof.

8.0 SETTLEMENT OF DISPUTES 8.1 Amicable Settlement The parties shall use their best efforts to settle amicably all disputes arising out of or in connection with this Contract or the interpretation thereof. Any dispute between the parties as to matters arising pursuant to this Contract which cannot be settled amicably shall be resolved as per the J&K Arbitration & Conciliation Act, 1997 as amended from time to time. Jurisdiction of J&K Courts will apply.

IN WITNESS WHEREOF, the parties hereto have caused this Contract to be signed in their respective names as of the day and year first above written.

For and on behalf of (Owner) Witness: By_____________________ 1. Authorised Representative 2. For and On Behalf of (Consultants) Witness: By_____________________ 1. Authorised Representative 2.

68 | P a g e

LIST OF APPENDICES TO FORM PART OF THE CONTRACT

Description of the Services Detailed descriptions of the Services to be provided; dates for completion of various tasks; place of performance for different tasks; specific tasks to be approved by Owner; etc.

Reporting requirements Format, frequency and contents of reports; persons to receive them; dates of submission; etc.

Consultants' Personnel Titles and names (if already available), detailed job descriptions and minimum qualifications of Personnel to be assigned to work and man-months for each.

Duties of the Owner Service, facilities and properties to be made available to the consultants by the owner.

Cost of Services

69 | P a g e

ANNEXURE VII

LIST OF DEVIATIONS

PROFORMA FOR EXCEPTIONS AND DEVIATIONS

The bidder is required to stipulate the list of Exceptions and Deviations of RFP document, if any, in

the Performa given below:

S. No. Description Reference Exception / Deviation desired

Signature of Bidder

70 | P a g e

ANNEXURE VIII

CHECK LIST

Bidder shall complete this checklist and submit the same along with proposal document. Checklist

only covers certain important items required for evaluation of proposal. It has been enclosed to

ensure that applicant has submitted all the necessary data / information as called for in the RFP

document.

Please write Yes or No for ensuring compliance.

1. Mode of participation

As single bidder

1. Whether the proposal document is in English language? 2. Whether requisite earnest money in appropriate form has been enclosed? 3. Has the proposal document been submitted in three sets? 4. Whether following documents have been submitted?

Exceptions and deviations sheet (Annex-I).

Experience of team (Annex-III)

5. Whether price bid has been placed in separate sealed envelope? 6. Whether three sealed envelopes of Bid have been placed in a sealed packet? 7. Whether a list of documents, data, brochures etc. submitted in support of the claims mentioned

in the proposal document has been enclosed? 8. Whether each page of the proposal document has been signed by the authorized signatory?

Signature of Bidder