ten minutes ppt

28
Gayatri Facility Services BUSINESS PLAN PRESENTATION GIVEN BY MR. VASANT VISHNU SHETAKE

Upload: vinay-shetake

Post on 14-Jul-2015

60 views

Category:

Business


0 download

TRANSCRIPT

Gayatri Facility ServicesBUSINESS PLAN PRESENTATION GIVEN BY

MR. VASANT VISHNU SHETAKE

Mission StatementOUR ENDEAVOR TO ADHERE TO OUR CORE VALUES, WINNING THE TRUST OF OUR CLIENTS, ABIDING BY THE PRINCIPLES OF HONESTY AND INTEGRITY WOUL D ENABLE US TO HONOR THE CLIENT’S EXPECTATIONS WITH HIGH QUALITY AND ON T IME. THE VISIBILITY/VOICE LEVEL THUS CREATED BY OUR SATISFIED CLIENT’S WILL GOVERN OUR EXISTENCE AS AN ORGANIZATION.

Competition

• Today in 21st century and in our developing

nation it is essential to cope up with our fellow

competitors in terms of all manners.

• Regardless of the size/value of the project and

standing of the client, we always go an extra

mile to ensure best in class services founded

on the principles of honesty and integrity.

About us• GFS is a CONTRACTOR for civil works since past 14 years.

• Established in Andheri (E), Mumbai with a well trained and highly skilled

workforce of 12 workers.

• Have proven expertise in the area of crack filling, water proofing,

tile fixing (Italian, marble, granite).

• Have successfully undertaken civil projects in various residential and

commercial premises.

• Our adherence to high quality standards and timely completion of

projects have grown our customer base to over 100 satisfied customers.

• Undertake projects all over Mumbai, Navi Mumbai and Thane.

• Our recent success story includes, completion of civil work project

in a 1200 sq. ft. residential area in Andheri (E), 700 sq. ft. residential area

in Dahisar (W) and a 3000 sq. ft. commercial area in Aptech House,

Andheri (E).

• Let us have a look at one of these success stories.

This is the living

room of a 1200 sq.

ft. residential flat.

• Indian sitting with

storage facility.

• Small window

carved on the side

of the wall.

CIVIL WORKS

• Photo frame of

bathroom door.

• round molding of

three stones.

CIVIL WORKS

• Italian flooring.

CIVIL WORKS

Toilet and bathroom-

• Dry area on the left

side.

• Wet area on the

right side.

CIVIL WORKS

BEFORE AFTER

CIVIL WORKS

BEFORE AFTER

CIVIL WORKS

BEFORE AFTER

CIVIL WORKS

CIVIL WORKS

CIVIL WORKS

CIVIL WORKS

CIVIL WORKS

CIVIL WORKS

CIVIL WORKS

CIVIL WORKS

SR.NO

.

CLIENT ADDRESS

01. Bespeak Europe Ltd. Center point, andheri kurla road, J.B.

nagar, andheri (E), mumbai.

02. Span Interior. Saki vihar road, powai, andheri (E)

03. Royal Space Interior. Shimpoli Borivali (W), mumbai.

04. Modi Stone Interior. Vira Desai road, Andheri (W), mumbai.

05. A.N.S. Bharti Logistic PVT. LTD. Saki naka, Andheri kurla road, mumbai.

06. Transocean (Sedco Forex

International Drilling INC.)

Powai, Jogeshwari – Vikhroli link road,

mumbai.

07. Mr. Ashok Kumar. Andheri (E), mumbai.

08. Mr. Rajesh Sharma. Shere – e – Punjab, Andheri

(E),mumbai.

09. Cricket Club of India. LTD. J.N. Tata pavilion, Brabourne stadium,

Dinshaw vachha road, mumbai.

10. Aptech House Aptech House (Head office) M.I.D.C

andheri (E).

REFERRALS REQUIRED

• In providing contact details of Architects,

Interior Designers and H.R./Admin

Managers.

• In forwarding my company’s profile to

your customers, relatives and friends.

CIVIL WORKS

THANK YOU

ANY QUESTION’S?

CIVIL WORKS

Opportunities

• Identify problems and opportunities.

– State consumer problems and define the nature of

product/service opportunities that are created by

those problems.

Business Concept

• Summarize the key technology, concept, or

strategy on which your business is based.

Goals and Objectives

• List five-year goals

• State specific, measurable objectives for

achieving your five-year goals.

– List market-share objectives.

– List revenue/profitability objectives.

Financial Plan

• Outline a high-level financial plan that defines

your financial model and pricing assumptions.

– This plan should include expected annual sales and

profits for the next three years.

– Use several slides to cover this material

appropriately.

Resource Requirements

• List requirements for the following resources:

– Personnel

– Technology

– Finances

– Distribution

– Promotion

– Products

– Services

Risks and Rewards

• Summarize the risks of the proposed project

and how they will be addressed.

• Estimate expected rewards, particularly if you

are seeking funding.

Key Issues• Near term

– Identify key decisions and issues that need immediate or near-term resolution.

– State consequences of decision postponement.

• Long term– Identify issues needing long-term resolution.

– State consequences of decision postponement.

• If you are seeking funding, be specific about any issues that require financial resources for resolution.