Temporary flood resilient phaydemand shauchalay (ECO-san) @ Chaidha, a recent flood
affected village in Khagaria, Bihar
ByThe Sanitation Squad
(Residents of Chaidha, Khagaria; Thumbimpression Collaborative, Ahmedabad; National Centre for Peoples Action in Disaster Preparedness, Ahmedabad; People in Centre, Ahmedabad; Arghyam, Bengaluru; Samta, Khagaria and Megh Pyne Abhiyan, Delhi)
September 2016
![Page 2: Temporary flood resilient phaydemand shauchalay (ecosan) khagaria, 2016](https://reader035.vdocuments.mx/reader035/viewer/2022062400/5879930f1a28ab95318b5f05/html5/thumbnails/2.jpg)
Status of Chaidha between August 26 - September 05, 2016
![Page 3: Temporary flood resilient phaydemand shauchalay (ecosan) khagaria, 2016](https://reader035.vdocuments.mx/reader035/viewer/2022062400/5879930f1a28ab95318b5f05/html5/thumbnails/3.jpg)
Assessment and consultation was held before initiating work on the flood resilient and temporary
phaydemand shauchalay (Day 1)
![Page 4: Temporary flood resilient phaydemand shauchalay (ecosan) khagaria, 2016](https://reader035.vdocuments.mx/reader035/viewer/2022062400/5879930f1a28ab95318b5f05/html5/thumbnails/4.jpg)
Process – Procurement of raw materials (Day 2)
Bamboo/ Baas
Local Thread/ Fitta Oil Tin Split Bamboo
Water Drum
![Page 5: Temporary flood resilient phaydemand shauchalay (ecosan) khagaria, 2016](https://reader035.vdocuments.mx/reader035/viewer/2022062400/5879930f1a28ab95318b5f05/html5/thumbnails/5.jpg)
Process – Identifying human resources (skilled and unskilled)
Pits for erection of Bamboo column
Artisans working on Eco- san
Day 2…
![Page 6: Temporary flood resilient phaydemand shauchalay (ecosan) khagaria, 2016](https://reader035.vdocuments.mx/reader035/viewer/2022062400/5879930f1a28ab95318b5f05/html5/thumbnails/6.jpg)
Process (Day 2)
Digging pits
Sharpening the bamboo
Bamboo Joinery
![Page 7: Temporary flood resilient phaydemand shauchalay (ecosan) khagaria, 2016](https://reader035.vdocuments.mx/reader035/viewer/2022062400/5879930f1a28ab95318b5f05/html5/thumbnails/7.jpg)
Process (Day 2)
Wrapping the bamboo with plastic sheet before pitching it in the ground
Sharpening the bamboo
Bamboo Joinery
One of the bamboo columns being pitched
![Page 8: Temporary flood resilient phaydemand shauchalay (ecosan) khagaria, 2016](https://reader035.vdocuments.mx/reader035/viewer/2022062400/5879930f1a28ab95318b5f05/html5/thumbnails/8.jpg)
Process (Day 2)
Making Bamboo Pins
Making of Joinery Bamboo Joinery
![Page 9: Temporary flood resilient phaydemand shauchalay (ecosan) khagaria, 2016](https://reader035.vdocuments.mx/reader035/viewer/2022062400/5879930f1a28ab95318b5f05/html5/thumbnails/9.jpg)
Process
Erecting Bamboo Columns Making of Bamboo Frame
At the end of day 2…
![Page 10: Temporary flood resilient phaydemand shauchalay (ecosan) khagaria, 2016](https://reader035.vdocuments.mx/reader035/viewer/2022062400/5879930f1a28ab95318b5f05/html5/thumbnails/10.jpg)
Process - Making of compost drum (Day 3)
![Page 11: Temporary flood resilient phaydemand shauchalay (ecosan) khagaria, 2016](https://reader035.vdocuments.mx/reader035/viewer/2022062400/5879930f1a28ab95318b5f05/html5/thumbnails/11.jpg)
Compost Drum
Process - Making of compost drum (Day 3)
![Page 12: Temporary flood resilient phaydemand shauchalay (ecosan) khagaria, 2016](https://reader035.vdocuments.mx/reader035/viewer/2022062400/5879930f1a28ab95318b5f05/html5/thumbnails/12.jpg)
Process (Day 3)
![Page 13: Temporary flood resilient phaydemand shauchalay (ecosan) khagaria, 2016](https://reader035.vdocuments.mx/reader035/viewer/2022062400/5879930f1a28ab95318b5f05/html5/thumbnails/13.jpg)
Process
Using Split Bamboo as Flooring material
Installing drum for compost and fixing flooring
At the end of day 3…
![Page 14: Temporary flood resilient phaydemand shauchalay (ecosan) khagaria, 2016](https://reader035.vdocuments.mx/reader035/viewer/2022062400/5879930f1a28ab95318b5f05/html5/thumbnails/14.jpg)
Process (Day 4)
Installing Bamboo ladder
Installing Bamboo roof
![Page 15: Temporary flood resilient phaydemand shauchalay (ecosan) khagaria, 2016](https://reader035.vdocuments.mx/reader035/viewer/2022062400/5879930f1a28ab95318b5f05/html5/thumbnails/15.jpg)
Process (Day 4)
Cross Bracing the structureCovering the roof
At the end of day 4…
![Page 16: Temporary flood resilient phaydemand shauchalay (ecosan) khagaria, 2016](https://reader035.vdocuments.mx/reader035/viewer/2022062400/5879930f1a28ab95318b5f05/html5/thumbnails/16.jpg)
Process (Day 5)
Compost pit installed under split bamboo floor to collect excreta, urine and back wash water separately
![Page 17: Temporary flood resilient phaydemand shauchalay (ecosan) khagaria, 2016](https://reader035.vdocuments.mx/reader035/viewer/2022062400/5879930f1a28ab95318b5f05/html5/thumbnails/17.jpg)
Process (Day 5)
Bamboo floor
![Page 18: Temporary flood resilient phaydemand shauchalay (ecosan) khagaria, 2016](https://reader035.vdocuments.mx/reader035/viewer/2022062400/5879930f1a28ab95318b5f05/html5/thumbnails/18.jpg)
By the end of day 5
Temporary and flood resilient phaydemand shaucahaly aka ECO-san
![Page 19: Temporary flood resilient phaydemand shauchalay (ecosan) khagaria, 2016](https://reader035.vdocuments.mx/reader035/viewer/2022062400/5879930f1a28ab95318b5f05/html5/thumbnails/19.jpg)
Costing…
Item Quantity Rate CostingBamboo 20 pieces Rs 170/piece 3400
Lashing - Fitta 2 kg Rs 180/kg 360Plastic drum 2 Rs 300/piece 600Tin container 3 Rs 20/piece 60Thin plastic 10 pieces Rs 20/piece 200Syl-polene 459 sq feet 400Plastic bag 6 bags Rs 25/bag 150
Sand 3 bags Rs 60/bag 180Brick bats 25 pieces Rs 7/piece 175
Dabiya mistri (Bamboo worker) 6 human days Rs 350/day 2100
Labourer(Unskilled) 3 human days Rs 300/day 900
TOTAL 8525