Tekfen Holding Investor Presentation March 2014

Upload: others

Post on 11-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Tekfen Holding Investor Presentation March 2014Share Classes Single type of shares (one share one vote) Composition of the Board ... core operations, deliver the highest quality products

Tekfen Holding Investor Presentation March 2014

Page 2: Tekfen Holding Investor Presentation March 2014Share Classes Single type of shares (one share one vote) Composition of the Board ... core operations, deliver the highest quality products

Tekfen Group At a glance

Tekfen Group Contracting Agri Industry Real Estate Other www.tekfen.com.tr

1956 Feyyaz Berker, Nihat Gökyiğit and Necati Akçağlılar formed an engineering consulting company 1957 The three partners establish Tekfen Construction Ltd. 1963 Tekfen Industry and Trading Co., Inc. is founded to produce incandescent lamps.

1971 Foundation of Tekfen Holding 1975 Iraq-Turkey pipeline 1976 Mis Süt (Dairy products) enters the market 1978 Tekfen Construction goes overseas

1981 Toros Fertilizer starts production 1987 TAG Highway project 1989 Tekfenbank Acquisition of Akgübre fertitilizer 1992 Tekfen Philarmonics

2000 Tekfen Real Estate Development Group 2001 Acquisition of Bank Ekspres 2003 Tekfen Tower opens 2005 Acquisition of Samsun Gübre fertilizer plant 2006 Completion of BTC crude oil pipeline

2

2007 Partnership with Eurobank EFG in Tekfenbank Acquisition of EFG Istanbul Securities IPO of Tekfen Holding

2012 Sale of Eurobank Tekfen

Page 3: Tekfen Holding Investor Presentation March 2014Share Classes Single type of shares (one share one vote) Composition of the Board ... core operations, deliver the highest quality products

www.tekfen.com.tr

Tekfen Group

Tekfen Group Contracting Agri Industry Real Estate Other

Corporate Governance

Share Classes

Single type of shares (one share one

vote)

Composition of the Board

4 out of 11 members are independent.

Board members to be elected for max.

of three years

Dividends

30% of the distributable income has

to be paid out

Ownership Structure

No cross ownership within the group

Gökyiğit ; 21%

Berker ; 21%

Akçağlılar ; 19%Others; 4%

Free Float; 34%

Ownership structure

3

Page 4: Tekfen Holding Investor Presentation March 2014Share Classes Single type of shares (one share one vote) Composition of the Board ... core operations, deliver the highest quality products

www.tekfen.com.tr

Tekfen Group

Tekfen Group Contracting Agri Industry Real Estate Other

At a glance

Main Operations

• Construction

• Engineering

• Fabrication

Main Companies

• Tekfen Construction

• Tekfen Engineering

• Tekfen Manufacturing &

Engineering

Contracting

Share in consolidated

revenues*: 60,5%

Main Operations

• Fertilizer production and

distribution

• Terminal services

• Seed, sapling and seedling

production and distribution

• Free zone operations

Main Companies

• Toros Agricultural Industry

& Trade

• Toros-Adana Yumurtalık

Free Zone

• Hishtil-Toros Seedling

Industry & Trade

• Black Sea Fertilizer Trade

Agri Industry

Share in consolidated

revenues*: 37,0%

Main Operations

• Real Estate Development

• Construction & Marketing

of Real Estate Projects

• Facility Management

Main Companies

•Tekfen Real Estate

Development

•Tekfen Tourism & Facility

Management

• Tekfen Real Estate

Investment

Real Estate

Share in consolidated

revenues*: 0,8%

Tekfen Industry

• Lighting and chemical

products

Tekfen Papfen

• Cotton yarn production

Tekfen Insurance

• Authorised agent of 18

insurance and 3 pension

fund companies

Other

Share in consolidated

revenues*: 1,7%

4 * As of 31.12.2013

Page 5: Tekfen Holding Investor Presentation March 2014Share Classes Single type of shares (one share one vote) Composition of the Board ... core operations, deliver the highest quality products

www.tekfen.com.tr

Tekfen Group

Tekfen Group Contracting Agri Industry Real Estate Other

Strategic focus

• Tekfen Holding is devoted to the motto “do what you know best in the best way

possible” which was determined by its founding shareholders. In this framework

Tekfen has focused on Contracting, Agri-industry / Terminal Services and Real-Estate

Development sectors.

• Contracting is an activity that Tekfen Holding operates in since its foundation and

has gained first class expertise. The potential demand for contracting activities of the

countries in Middle East, Caspian Region and North Africa which have been

developing and enriching in the recent years has played a key role in the

determination of this activity as a strategic focus.

•Agri-industry sector addresses to the most basic need of the mankind, namely

nutrition. Fertilizer, on the other hand, is an indispensable input for agri sector. Due to

the growing world population in addition to the alternative uses like bio-fuel

production, it is anticipated that demand for agricultural production and for fertilizers

will grow. As a result, this activity has a strategic focus for the Group.

5

Page 6: Tekfen Holding Investor Presentation March 2014Share Classes Single type of shares (one share one vote) Composition of the Board ... core operations, deliver the highest quality products

www.tekfen.com.tr

Tekfen Group

Tekfen Group Contracting Agri Industry Real Estate Other

Strategic focus

• Terminal activities are undertaken in the framework of Agri-industry segment

comprising of two marine terminals strategically located in the Mediterranean and the

Black Sea regions.

• It is observed that in parallel to the development and enrichment of every country,

demand for modern, luxurious and high standard residential and commercial housing

increases. Hence, Real Estate Development is another strategic focus for Tekfen

Group.

• Tekfen Holding aims to grow and become leader in the strategic sectors mentioned

above and does not plan to enter new sectors in the near future.

6

Page 7: Tekfen Holding Investor Presentation March 2014Share Classes Single type of shares (one share one vote) Composition of the Board ... core operations, deliver the highest quality products

www.tekfen.com.tr

Tekfen Group

Tekfen Group Contracting Agri Industry Real Estate Other

Vision / Mission

Our Vision

“To be one of the leading forces of Turkey’s growth in our areas of operations

namely, Contracting, Agri-Industry and Real-Estate Development.”

Our Mission

“While remaining commited to our traditional values, we aim to focus on our

core operations, deliver the highest quality products and services, become

the leader of our segments, and at the same time, generate value for all of our

stakeholders, namely, our customers, suppliers, employees, shareholders

and society.”

7

Page 8: Tekfen Holding Investor Presentation March 2014Share Classes Single type of shares (one share one vote) Composition of the Board ... core operations, deliver the highest quality products

www.tekfen.com.tr

Tekfen Group

Tekfen Group Contracting Agri Industry Real Estate Other

Social Responsibility

• Tekfen Group believes that supporting social culture and environmental activities

are the natural extentions of its corporate structure. All the companies under the

Tekfen Group umbrella emphasize “usefulness”, “harmony” and “protection”

principles as a prerequisite for the activities in their own fields.

• Believing that supporting social development and improvement is everybody’s

common task Tekfen continues its efforts for this end for decades. These activities

which are the common values for all employees, from top executives to entry level

employees of the Group coincides with the philosophy which puts human and the

environment as the focal value.

• With the purpose of continuing its contribution to social and cultural activities,

Tekfen established Tekfen Foundation for Education Health, Culture, Arts, and

Protection of Natural Habitat in 1999. Supporting a variety of projects in the fields

of education, culture and art since its establishment, Tekfen Foundation obtained

status as an “institution that works for the benefit of society“ through the Cabinet’s

decision in 2004.

8

Page 9: Tekfen Holding Investor Presentation March 2014Share Classes Single type of shares (one share one vote) Composition of the Board ... core operations, deliver the highest quality products

www.tekfen.com.tr

Tekfen Group

Tekfen Group Contracting Agri Industry Real Estate Other

16.868

11.36613.079

15.50917.532

15.514

2008 2009 2010 2011 2012 2013

Tekfen Group

Human resources

Tekfen Holding has a dynamic and

professional workforce of over

15.000 employees.

Number of employees

Contracting Agri Industry Real Estate Other Total

2008 14.664 1.050 325 760 16.799

2009 8.877 949 745 795 11.366

2010 10.680 993 569 837 13.079

2011 12.982 995 710 822 15.509

2012 15.546 1.035 419 532 17.532

2013 13.614 1.033 348 519 15.514

Number of employees (breakdown by segment)

9

Page 10: Tekfen Holding Investor Presentation March 2014Share Classes Single type of shares (one share one vote) Composition of the Board ... core operations, deliver the highest quality products

Contracting

Page 11: Tekfen Holding Investor Presentation March 2014Share Classes Single type of shares (one share one vote) Composition of the Board ... core operations, deliver the highest quality products

Contracting

Tekfen Group Contracting www.tekfen.com.tr Agri Industry Other Real Estate

Overview

• Founded in 1956 as an engineering and consultancy firm.

• One of the largest contracting groups in Turkey.

• Main area of specialization is construction projects in the oil and gas industry.

• Is among the leading international construction companies in the world and ranks at

number 85 among the world’s 225 biggest international contractors, based on

contracting revenue from projects outside home country, in a list published by

Engineering News-Record magazine in 2013.

• Over 350 projects with a total amount of US$12.2 billion completed .

• Successfully completed US$6.5 billion worth of projects abroad.

• The Group has broken records for working hours without LTI (lost time incident) in

Azerbaijan, Kazakhstan and Ceyhan projects.

11

Page 12: Tekfen Holding Investor Presentation March 2014Share Classes Single type of shares (one share one vote) Composition of the Board ... core operations, deliver the highest quality products

Contracting

Tekfen Group Contracting www.tekfen.com.tr Agri Industry Other Real Estate

Selected Clients

12

TURKISH

• TCK, Turkish State Highways Authority

• EÜAŞ, Electricity Production Co.

• PETKİM, Petrochemical Co.

• TÜPRAŞ, Turkish Petroleum Refineries Co.

• BOTAŞ, Petroleum Pipeline Co.

• Ministry of Public Works and Settlement

• Several Municipalities

• TPAO, Turkish Petroleum Co.

• DSI, State Hydraulic Works

• Turkish State Railways Authority

• Turkish Olympic Committee

• Ministry of Energy and Natural Resources

• DLH, State Harbours and Airports Authority

INTERNATIONAL

SAUDI ARABIA IRAQ

• Saudi Aramco

• Ma’aden

• Petro Rabigh

• WCC, Saline Water Conversion Co.

• Min. of Agriculture & Water

• Min. of Municipal & Rural Affairs

• SCOP, State Company for Oil Projects

• North Refineries Company

QATAR

• Qatar Petroleum

• QAPCO

• Ashghal (Public Works Authority)

KUWAIT MOROCCO

• Ministry of Public Works

• KOC, Kuwait Oil Co.

• OCP, State Phospate Company

• SAMIR, Refinery Company of Morocco

OTHER

• AGIP

• Shell

• BP

• BTC, Baku Tbilisi Ceyhan Pipeline Co.

• Uzbekneftegas, Uzbekistan

• Kazakturkmunay, Kazakhstan

• CPC, Caspian Pipeline Consortium, Kazakhstan

• AIOC (Azerbaijan Operating Co. led by BP)

• BP Exploration Shah Deniz Ltd.

• Georgian Pipeline Co.

• MMRA, Libya (Man Made River Authority)

• SOCAR (State Oil Company of Azerbaijan)

Page 13: Tekfen Holding Investor Presentation March 2014Share Classes Single type of shares (one share one vote) Composition of the Board ... core operations, deliver the highest quality products

Contracting

Tekfen Group Contracting www.tekfen.com.tr Agri Industry Other Real Estate

Selected International Project Partners

13

• Alstom, France

• AMEC, UK

• Babcock Borsig Power, Germany

• Chiyoda Corp., Japan

• Fluor, USA

• Foster Wheeler, Italy

• Hitachi Plant Technologies, Japan

• Impregilo, Italy

• Itochu, Japan

• JGC, Japan

• John Brown, UK

• Lurgi GmBH, Germany

• Marubeni Corp., Japan

• Mitsubishi Corp., Japan

• Mitsui Corp. Japan

• Mitsubishi Heavy Ind., Japan

• NEC, Japan

• Nippon Signal, Japan

• Parsons Inc., USA

• Petrofac, UAE

• SAE, France

• Saipem, Snamprogetti, Italy

• Siemens, Germany

• Skoda Export, Czech Republic

• Sofregaz, France

• Spie Batignolles, France

• Technip, Germany

• Technicas Reunidas, Spain

• Toyo Engineering, Japan

• Uhde GmbH, Germany

• Vinci, France

• Williams Brothers, USA

Page 14: Tekfen Holding Investor Presentation March 2014Share Classes Single type of shares (one share one vote) Composition of the Board ... core operations, deliver the highest quality products

Contracting

Tekfen Group Contracting www.tekfen.com.tr Agri Industry Other Real Estate

PHOTO!

Overview

• With its sister companies Tekfen Engineering, Tekfen Manufacturing,

Hallesche Mitteldeutsche Bau-AG (HMB) (Germany), AZFEN (Azerbaijan) and

strategic partnerships, Tekfen is positioned to extend its services to a large

range of clients on three continents.

• The Group has one of the largest equipment fleets in Turkey with a

replacement value of US$ 350 million.

• As of 2013-end, Tekfen Contracting Group had an active portfolio of US$ 3

billion, 85% of which are abroad, located in 8 different countries.

• In 2013, the Group undertook US$ 1,893 million of new works. Of this total,

US$ 1,757 million is in Azerbaijan and US$ 136 million is in Turkey. Total

additions to the backlog reached US$2.2 billion including the extensions in

ongoing projects.

• The projects in Azerbaijan are:

-US$ 640 million Baku Olympic Stadium with 68k persons capacity.

The project is expected to be completed in March 2015.

- Fabrication, installation and delivery of 2 offshore platforms and

associated platform connection bridge . Tekfen portion of the project

is US$ 496 million.

- Construction of Shah Deniz Stage 2 Onshore Terminal Facilities at

Sangachal . Tekfen portion of the project is US$ 621 million.

• The project in Turkey amounts to US$ 136 million and entails the repairing,

strengthening and improvement works of the Baku-Tbilisi-Ceyhan pipeline.

Overview

14

Page 15: Tekfen Holding Investor Presentation March 2014Share Classes Single type of shares (one share one vote) Composition of the Board ... core operations, deliver the highest quality products

Contracting

Tekfen Group Contracting www.tekfen.com.tr Agri Industry Other Real Estate

Total Manpower: 14.354

TURKEY:7.526 ABROAD:6.828

Manpower

Azerbaijan 3.845

Morocco 467 Qatar 1.448

Abu Dhabi 23

Turkmenistan 463

Iraq 145

Saudi Arabia 383

Kazakhstan 35 Libya 13 Uzbekistan 6

15

Page 16: Tekfen Holding Investor Presentation March 2014Share Classes Single type of shares (one share one vote) Composition of the Board ... core operations, deliver the highest quality products

Contracting

Tekfen Group Contracting www.tekfen.com.tr Agri Industry Other Real Estate

DISIPLINE&DIVISION

ENGINEERS 347 2,4%

MANAGEMENT 152 1,1%

PROCUREMENT 27 0,2%

ADMIN 421 2,9%

QA&QC/HSE 126 0,9%

TECHNICIANS 149 1,0%

FOREMEN 315 2,2%

OPERATORS&DRIVERS 869 6,1%

CIVIL WORKS 1.447 10,1%

ELECTRICAL WORKS 612 4,3%

PIPE&WELDING WORKS 1.744 12,2%

MECHANICAL WORKS 748 5,2%

STEEL&ERECTION WORKS 442 3,1%

OTHERS 2.521 17,6%

SUBCONTRACTORS 4.434 30,9%

TOTAL 14.354 100%

NATIONALITY

TURKISH 8.980 62,6%

AZERBEIJANI 2.997 20,9%

TURKMEN 705 4,9%

MOROCCAN 326 2,3%

INDIAN 183 1,9%

NEPALESE 277 1,9%

PHILIPIN 79 0,6%

ETHIOPIAN 248 0,2%

KAZAKH 30 0,2%

IRAQI 32 0,2%

OTHER 497 3,5%

TOTAL 14.354 100%

Manpower Structure

16

Page 17: Tekfen Holding Investor Presentation March 2014Share Classes Single type of shares (one share one vote) Composition of the Board ... core operations, deliver the highest quality products

Contracting

Tekfen Group Contracting www.tekfen.com.tr Agri Industry Other Real Estate

Areas of Expertise

17

BASIC

ENGINEERING*

DETAILED

ENGINEERING

PROCUREMENT FABRICATION CONSTRUCTION START UP

E

E + P

E + P + F

E + P + C

PMS

* In pipelines, tank farms / terminals, motorways, bridges, tunnels, infrastructure and civil projects.

E : Engineering F : Fabrication

P : Procurement PMS : Project Management Services

C : Construction

Page 18: Tekfen Holding Investor Presentation March 2014Share Classes Single type of shares (one share one vote) Composition of the Board ... core operations, deliver the highest quality products

Contracting

Tekfen Group Contracting www.tekfen.com.tr Agri Industry Other Real Estate

• Tekfen Contracting Group continues its operations in 8 countries spread around 2 continents (Asia & Africa).

Among these, in 7 countries (Turkey, Azerbaijan, Qatar, Saudi Arabia, Turkmenistan, Morocco and Libya*)

Tekfen has construction sites. In Iraq, on the other hand, Tekfen gives project management services to BP.

• In addition to contracting activities, the Group has 3 manufacturing plants in Derince, Ceyhan (Turkey) and

Baku (Azerbaijan). Fabrication done (tanks, vessels, columns and heavy steel structures) in manufacturing

facilities of Tekfen are exported to countries such as Iran, Syria, Iraq and Brasil.

Geography

18 * As of the date of this presentation, the operations in Libya are frozen.

Page 19: Tekfen Holding Investor Presentation March 2014Share Classes Single type of shares (one share one vote) Composition of the Board ... core operations, deliver the highest quality products

Contracting

Tekfen Group Contracting www.tekfen.com.tr Agri Industry Other Real Estate

569 484 484 368 237 159 111 72 75 34 36555

561 474175 201 242 167 264

1.535 1.350 1.6681.257 1.225

1.7941.449 1.589

2.524

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013

Abroad Turkey

• Thanks to its increasing investments in oil and gas producing countries, starting from 2005, the

backlog of Tekfen Contracting Group abroad increased significantly.

Backlog (US$ million)

Backlog Growth

19

744 685 726

535 501

1.694 1.461

1.740

1.333 1.259

1.830 2.150

2005

2.998

Page 20: Tekfen Holding Investor Presentation March 2014Share Classes Single type of shares (one share one vote) Composition of the Board ... core operations, deliver the highest quality products

Contracting

Tekfen Group Contracting www.tekfen.com.tr Agri Industry Other Real Estate

Backlog (as of 31 December 2013)

20

* “Expected end date” refers to the “Mechanical Completion” or “Temporary Acceptance” date for construction works.

** “Financial completion rate” reflects the earned value of the project on the basis of revenue.

Project Location

Expected End

Dates *

Revenue

Based

Completion

Rate

Remaining

Amount (US$)

Çiftehan-Pozantı Motorway Turkey 15.10.2014 318.970.115 $ 225.352.386 $ 95,9% 9.277.222

Prov. of P/L Repair Services/Geohazard Works/Main Oil Line Works/BP Iraq Works Turkey 31.03.2014 102.061.732 $ 102.061.732 $ 98,5% 1.547.057

Prov. of Pipeline and Facilities Repair Services for BTC Turkey Turkey 10.09.2016 136.200.000 $ 136.200.000 $ 0,0% 136.200.000

Tüpraş - Residuum Upgrading Project of Izmit Refinery Turkey 09.09.2014 497.463.416 $ 497.463.416 $ 69,9% 149.684.562

Toros Tarım Samsun Plant Investment Project Turkey 31.12.2014 176.224.332 $ 176.224.332 $ 21,8% 137.765.254

Supply and Fabrication of Steel Structure Type Pancakes Turkey 07.02.2014 13.267.742 $ 13.267.742 $ 0,0% 13.267.742

Supply and Fabrication of Pancakes of Top Sides Modules Turkey 08.12.2014 26.302.112 $ 26.302.112 $ 0,0% 26.302.112

TURKEY TOTAL 474.043.949

South Yoloten Gas Field Project Package 2&3A Turkmenistan 31.12.2013 315.493.170 $ 315.493.170 $ 89,1% 34.404.721

TURKMENISTAN TOTAL 34.404.721

New Management Office Project of SOCAR Azerbaijan 30.09.2014 348.145.408 $ 348.145.408 $ 66,1% 118.051.105

Fabrication of Topsides & Drilling Facilities and Integration of Living Quarters Azerbaijan 20.04.2014 206.799.725 $ 206.799.725 $ 98,6% 2.846.167

Baku Olympic Stadium Project Azerbaijan 28.02.2015 717.792.893 $ 717.792.893 $ 44,8% 396.318.251

Shah Deniz Stage 2 Fabrication of Offsite Facilities Azerbaijan 31.12.2017 262.365.978 $ 262.365.978 $ 0,0% 262.365.978

Shah Deniz Stage 2 Onshore Terminal Facility - Sangachal Terminal Azerbaijan 15.10.2017 369.395.209 $ 369.395.209 $ 0,0% 369.395.209

AZFEN Projects Azerbaijan 1.761.574.939 $ 704.629.976 $ 27,7% 509.108.606

AZERBAIJAN TOTAL 1.658.085.316

Propylene Oxide Process Unit S. Arabia 05.01.2015 149.826.676 $ 149.826.676 $ 29,6% 105.416.366

SAUDI ARABIA TOTAL 105.416.366

OCP Slurry Pipeline Project Khouribga - Jorf Lasfar Morocco 01.04.2014 433.867.013 $ 433.867.013 $ 90,6% 40.701.625

MOROCCO TOTAL 40.701.625

Qatar Primary Routes North Roads Contracts 2&3 Qatar 30.09.2013 792.756.364 $ 792.756.364 $ 96,4% 28.724.060

Additional Work for North Road Project Qatar 25.02.2014 95.991.781 $ 95.991.781 $ 78,9% 20.269.877

QAPCO LDPE 3 Project Low Density Polyethylene Plant Qatar 30.06.2012 166.348.917 $ 166.348.917 $ 98,2% 3.067.922

Design and Construct Service Road Enhancement to North Road Corridor Qatar 25.06.2016 592.030.028 $ 592.030.028 $ 15,6% 499.758.064

QATAR TOTAL 551.819.923

Kufra Conveyance System Libya On Hold 486.461.084 $ 325.928.926 $ 70,0% 97.898.859

LIBYA TOTAL 97.898.859

Rumalia Field Dev. Project Prov. Of Engineering and Project Management Services Iraq 30.06.2014 213.130.573 $ 213.130.573 $ 83,1% 35.917.805

IRAQ TOTAL 35.917.805

TOTAL 2.998.288.564

Current

Contract Price

Tekfen

Portion

Page 21: Tekfen Holding Investor Presentation March 2014Share Classes Single type of shares (one share one vote) Composition of the Board ... core operations, deliver the highest quality products

Contracting

Tekfen Group Contracting www.tekfen.com.tr Agri Industry Other Real Estate

Ongoing projects (as of 31 December 2013)

Backlog Breakdown by Regions

Region US$ (million)

Caspian Region 1.692

Middle East 693

Turkey 476

North Africa 139

Total 2.998

Backlog Breakdown by Project Types

Project Type US$ (million)

Industrial Facilities 1.610

Motorway 558

Buildings 514

Pipeline 276

Fabrication Works 40

Total 2.998

21

Middle East 23%

North Africa

5%

Turkey 16%

Caspian Region

56%

Industrial Facilities

54%

Buildings 17%

Motorways 19%

Pipelines 9%

Fabrication Works 1%

Page 22: Tekfen Holding Investor Presentation March 2014Share Classes Single type of shares (one share one vote) Composition of the Board ... core operations, deliver the highest quality products

Contracting

Tekfen Group Contracting www.tekfen.com.tr Agri Industry Other Real Estate

Overview

• Currently, the tenders entered into typically have a contract size of over

US$ 200 million, compared to the US$ 25 million threshold prior to 2005.

• Tekfen bids for 30 - 35 projects per year and the average success rate for

winning tenders is around 10%.

• The bid price is calculated as cost plus a mark-up, which is between 15-

25%.

• Average project completion period is approximately 2.5 years.

• Tax rates that the Group is exposed to in the countries it operates vary

between 0-35%.

22

Page 23: Tekfen Holding Investor Presentation March 2014Share Classes Single type of shares (one share one vote) Composition of the Board ... core operations, deliver the highest quality products

Contracting

Tekfen Group Contracting www.tekfen.com.tr Agri Industry Other Real Estate

• Founded in 1984.

• Undertakes the engineering (E) of EPC projects and the detailed engineering in other projects

of Tekfen Contracting Group.

• Has experience on a wide spectrum of projects, with an emphasis on pipelines, industrial,

process plants and motorways.

• The company employs a professional staff of over 100 engineers who utilize advanced

software in the preparation of all design and contract documents.

• Also serves non-group clients, mainly the General Directorate of Highways and

municipalities. Non-group clients generate around 35% of Tekfen Engineering’s business

volume.

Tekfen Engineering Co., Inc.

• Disciplines:

• Industrial Plants

• Pipelines and Piping

• Motorways and Highways

• Bridges and Viaducts

• Mass Transit Systems and Railways

• Mass Housing

• Commercial Buildings

• Harbour & Offshore Structures

• Infrastructure

Engineering

23

Page 24: Tekfen Holding Investor Presentation March 2014Share Classes Single type of shares (one share one vote) Composition of the Board ... core operations, deliver the highest quality products

Contracting

Tekfen Group Contracting www.tekfen.com.tr Agri Industry Other Real Estate

• Founded in 1970.

• Specialized mainly in engineering, manufacturing and construction of high

quality process and storage equipment related to petroleum, petrochemical,

chemical and fertilizer industries and power plants, such as cylindrical and

spherical storage tanks, heat exchangers, pressure vessels, process columns,

waste heat recovery boilers and pressurized piping for industrial plants to

respond to Tekfen’s increasing steel production and fabrication needs.

• 188 skilled manpower.

Tekfen Manufacturing Co., Inc.

24

• Design and fabrication are carried out according to International

Codes such as ASME, API, TEMA, AD-2000, EN 13445, BS etc. and the

company is qualified to work with all sorts of carbon steel materials

(including high tensile quenched and tempered), clad carbon steels, all

types of stainless steels, non-ferrous materials such as Monel, Brass,

Aluminum etc.

•Heavy manufacturing facility in Derince (Kocaeli), Turkey.

• Kuwait, Saudi Arabia, Iraq, Iran, Pakistan, Libya, Syria, Jordan, Oman,

Lebanon, Israel, Northern Cyprus, Morocco, Tunisia, Senegal, Sudan,

Russia, Kazakhstan, Turkmenistan and Azerbaijan are the countries that

the company exports.

• Spread on an area of 48,500 m2, of which 18,000 m2 is covered.

Page 25: Tekfen Holding Investor Presentation March 2014Share Classes Single type of shares (one share one vote) Composition of the Board ... core operations, deliver the highest quality products

Contracting

Tekfen Group Contracting www.tekfen.com.tr Agri Industry Other Real Estate

• Spread on an area of 160,000 m2, of which 30,000 m2 is

covered,

• Annual capacity of 30,000 tons,

• 650 skilled manpower,

• Production space consisting of 5 fabrication shops,

• An open material handling storage area,

• A welding school,

• Materials divisions

• Social facility quarter.

• The plant is equipped with full shot blast,

• CNC flame cutting and coping facilities,

• Sawing and drilling lines,

• Automated beam welding line

• Training Center & Welding School

Ceyhan Steel Structure Fabrication Plant Bayil Steel Construction Manufacturing Plant

• Tekfen’s manufacturing facility in Baku, Azerbaijan

• Spread on an area of 290,000 m2, of which 26,000 m2 is

covered,

• Capable of meeting exceptionally high standards of the oil

and gas projects

• Equipped with high end machinery and advanced

technology to serve manufacturing of Topsides and

Modules

• Easy access is provided to the plant through the main

highway, being at a distance of 7 km from the city center of

Baku, materials and equipment can also be delivered to the

quaysides of the facility by the sea.

Fabrication Plants

25

Page 26: Tekfen Holding Investor Presentation March 2014Share Classes Single type of shares (one share one vote) Composition of the Board ... core operations, deliver the highest quality products

Contracting

Tekfen Group Contracting www.tekfen.com.tr Agri Industry Other Real Estate

Revenues and EBITDA Margin

Revenues (MTRY) and EBITDA Margin (%)

• Expected project-end EBITDA margin on project basis varies from 10% to 25% at the beginning of

each project.

26

1.029

1.319 1.339

1.111

1.864

2.395 2.327 2.445

7,2%

8,3%

11,0%

13,2%

9,3%

5,9%

-4,3%

6,8%

-6,0%

-1,0%

4,0%

9,0%

14,0%

19,0%

-1.000

-500

0

500

1.000

1.500

2.000

2.500

3.000

2007 2008 2009 2010 2011 2012 2013 2014E

Revenue EBITDA Margin

Page 27: Tekfen Holding Investor Presentation March 2014Share Classes Single type of shares (one share one vote) Composition of the Board ... core operations, deliver the highest quality products

Contracting

Tekfen Group Contracting www.tekfen.com.tr Agri Industry Other Real Estate

AZERBAIJAN – NEW MANAGEMENT OFFICE PROJECT OF SOCAR

Project is for the turnkey construction of SOCAR’s (State Oil Company of

Azerbaijan Republic) new headquarter complex in Baku. Project size, which was

USD 235 million initially, increased to USD 306 million.

Designed by Heerim Architects form South Korea, the two-towered project will

rise from an elongated, canopy-like podium and snake their way skywards.

Curving into each other, the seemingly shorter tower almost looks like its

resting its head on the chest of the taller tower, the taller towers peak slightly

bending over it in a confident, reassuring manner. The towers will have 32

floors, at a height of 173 meters. Covering an area of 12,000 square meters and

providing 100.000 sqm of usage area, the headquarter will mainly house office

space but will also have conference and sports facilities, a guest house and

retail spaces, food outlets to keep the expected 2000 employees in the tower.

Ongoing projects – Caspian Region

27

AZERBAIJAN – COP-WC-PDQ (Chirag Oil Project - West Chirag –PDQ)

FABRICATION OF TOPSIDES, DRILLING FACILITIES AND THE INTEGRATION OF

LIVING QUARTERS

COP-WC-PDQ is a single integrated deck comprising a production platform, drilling

module, utilities and living quarters located 120 km South East of Baku, in water

depths of 170 meters within the 432 km² “Azeri - Chirag – Guneshli” Oil Field.

The onshore work scope covers fabrication, assembly, erection, testing,

mechanical completion, commissioning, weighing, jacking, onshore completion

and load-out of integrated deck.

The offshore work scope covers offshore hook up and commissioning assistance

works.

The project was undertaken in partnership with Azfen and AMEC.

Page 28: Tekfen Holding Investor Presentation March 2014Share Classes Single type of shares (one share one vote) Composition of the Board ... core operations, deliver the highest quality products

Contracting

Tekfen Group Contracting www.tekfen.com.tr Agri Industry Other Real Estate

COP-WC-PDQ Fabrication of Topsides, Drilling Facilities and

Living Quarters, Bayil, Azerbaijan

Page 29: Tekfen Holding Investor Presentation March 2014Share Classes Single type of shares (one share one vote) Composition of the Board ... core operations, deliver the highest quality products

Contracting

Tekfen Group Contracting www.tekfen.com.tr Agri Industry Other Real Estate

AZERBAIJAN – BAKU OLYMPIC STADIUM

Baku Olympic Stadium Project which is located near the Boyuk Shor

Lake, Baku, Azerbaijan will have a capacity of 68.000 seats. 496.000 m2

total site area, 204.000 m2 gross floor area of the Stadium contains

commercial areas and disabled, public, media, CIP, VIP and VVIP

Sections.

Tekfen Construction has been awarded for completion of the Design and

Build Olympic Stadium Project in Baku , the work has been commenced

after the notice to proceed issued on 27.02.2013, planning the

completion of the Project within a period of 24 months.

Ongoing projects – Caspian Region

29

Page 30: Tekfen Holding Investor Presentation March 2014Share Classes Single type of shares (one share one vote) Composition of the Board ... core operations, deliver the highest quality products

Contracting

Tekfen Group Contracting www.tekfen.com.tr Agri Industry Other Real Estate

Ongoing projects – Caspian Region

30

Shah Deniz Stage 2 Project Overall Scope

Page 31: Tekfen Holding Investor Presentation March 2014Share Classes Single type of shares (one share one vote) Composition of the Board ... core operations, deliver the highest quality products

Contracting

Tekfen Group Contracting www.tekfen.com.tr Agri Industry Other Real Estate

OFFSHORE PLATFORMS

The contract signed on between ATA Consortium (AMEC – Tekfen – Azfen) of which Tekfen

is a member and BP Exploration (Shah Deniz) Ltd. comprises fabrication, installation and

delivery of 2 offshore platforms of total weight of 26.442 tonnes, and associated platform

connection bridge. Duration of work is 42 months from commencement date of the

contract.

SANGACHAL TERMINAL

The contract signed on between Tekfen – Azfen Consortium of which Tekfen is a member

and BP Exploration (Shah Deniz) Ltd. comprises construction of Shah Deniz Stage 2

Onshore Terminal Facilities at Sangachal, Baku,Azerbaijan. Scope of work includes

construction and installation of gas and condensate processing facilities, power

generation, storage tanks, utility systems, connections and upgrade works within existing

facilities, control systems, onshore pipelines between caspian sea shore and terminal,

compression facilities. Duration of work is 43 months from commencement date of the

contract.

Ongoing projects – Caspian Region

31

Shah Deniz Stage 2

Tekfen Projects

Page 32: Tekfen Holding Investor Presentation March 2014Share Classes Single type of shares (one share one vote) Composition of the Board ... core operations, deliver the highest quality products

Contracting

Tekfen Group Contracting www.tekfen.com.tr Agri Industry Other Real Estate

Ongoing projects – Caspian Region

32

TURKMENISTAN – SOUTH YOLOTEN GAS FIELD DEVELOPMENT PROJECT

UTILITIES & OFF SITE - CROSS COUNTRY SALES GAS EXPORT PIPELINE

101 KM

The South Yoloten Gas Field Development is situated in the region of

Maryiskiy Welayat of Yoloteniskiy Etrap, 20 km to the South of Yoloten, in

the area of the 74th km of the trunk railway Mary – Serhetabad. The overall

gas development project targets upstream and treatment and downstream

works of 40 billion cubic meters natural gas annually.

Out of this 40 billion cubic meters, the EPC works for 10 billion cubic

meters including upstream works, flow lines, trunk lines, GTUs, central gas

processing facility and 56” gas export pipeline are under the scope of

Petrofac UIL. Accordingly, Tekfen has been awarded for the "utilities and

offsites" works of the Central Gas Processing facility including civil,

mechanical, electrical and instrumentation works and the installation of the

100 km long 56" cross-country export sales gas pipeline together with

assistance to commissioning works after the mechanical completion of the

aforementioned

The works are scheduled to be completed in 30 months.

Page 33: Tekfen Holding Investor Presentation March 2014Share Classes Single type of shares (one share one vote) Composition of the Board ... core operations, deliver the highest quality products

Contracting

Tekfen Group Contracting www.tekfen.com.tr Agri Industry Other Real Estate

Galkynysh Gas Field Development Project

Turkmenistan

Page 34: Tekfen Holding Investor Presentation March 2014Share Classes Single type of shares (one share one vote) Composition of the Board ... core operations, deliver the highest quality products

Contracting

Tekfen Group Contracting www.tekfen.com.tr Agri Industry Other Real Estate

Ongoing projects - Middle East

34

QATAR - PRIMARY ROUTES, NORTH ROAD PROJECT PHASE 2 & 3 and

ADDITIONAL WORKS

Tekfen, is awarded by Ashghal, Public Works Authoritry of Qatar; construction

of a 94 km Motorway, namely Primary Routes, North Road Project Phase 2 & 3.

The Main Works comprise two separate sections as described here below:

Contract 2 (Km : 4 + 000 – Km : 37 + 000): Contract “2” starts at Duhail, passing

through sub-urban and rural areas to the North of Doha City, namely Duhail,

Kheessa, Khuraitiyat, Umm Salal Ali, Umm Salal Mohammad. The Contract

includes the Simaisma road link and continues till its end after Al-Khor road

intersection.

Contract 3 (Km : 37 + 000 – Km : 98 + 200): Contract “3” starts near Al Khafaij

area, passing through rural areas, namely North Military Camp, Al Khaaban, Al

Juthay, Fuwairit, Al Ghariya, Athba Al Shamaliyah and Madinat Al Shamal.

QATAR - DESIGN AND CONSTRUCT SERVICE ROAD ENHANCEMENT TO

NORTH ROAD CORRIDOR PROJECT

Awarded by Ashghal, Public Works Authoritry of Qatar, the Project comprises

the Design, Construction and 400 days Maintenance of “Design and Construct

Service Road Enhancement to North Road Corridor Project”.

The scope of the project includes, new Service Roads, Carriageways,

Connection Roads, 96 km Bicycle Path, Flyovers and Bridges, Underpass

Bridges, Pedestrian Bridges, Road Pavement Works, Drainage System,

Guardrails and Concrete Barriers, Fencing, Electrical and Road Lighting Works,

Traffic Signing and Road Marking, Traffic Signalization, Footways, Paving with

Concrete Blocks and Natural Stone, Q-Tel, Qatar Armed Forces and DSSS (Doha

Street Surveillance System) Works, Landscaping & Irrigation System

Page 35: Tekfen Holding Investor Presentation March 2014Share Classes Single type of shares (one share one vote) Composition of the Board ... core operations, deliver the highest quality products

Contracting

Tekfen Group Contracting www.tekfen.com.tr Agri Industry Other Real Estate

North Road

Qatar

Page 36: Tekfen Holding Investor Presentation March 2014Share Classes Single type of shares (one share one vote) Composition of the Board ... core operations, deliver the highest quality products

Contracting

Tekfen Group Contracting www.tekfen.com.tr Agri Industry Other Real Estate

Ongoing projects - Middle East

36

SAUDI ARABIA - PROPYLENE OXIDE PROCESS UNIT

Tekfen was awarded the construction of LSPB contract for Propylene Oxide Plant at

Sadara Petrochemical Complex. The scope of work covers all civil works, erection of

prefabricated columns and vessels, installation of electrical and instrumentation including

central control building. Project location is in Jubail, and is part of the SADARA Chemical

Company's petrochemical plant. The works are scheduled to be completed in 30 months

and the project size is US$122,9 million.

Page 37: Tekfen Holding Investor Presentation March 2014Share Classes Single type of shares (one share one vote) Composition of the Board ... core operations, deliver the highest quality products

Contracting

Tekfen Group Contracting www.tekfen.com.tr Agri Industry Other Real Estate

37

Ongoing projects – North Africa

MOROCCO – OCP SLURRY PIPELINE PROJECT

OCP Slurry Pipeline project has been designed to deliver several grades of

phosphates to Jorf Lasfar Terminal. Project location is between Khouribga and

Jorf Lasfar. Project duration is 28 months.

The project scope includes Detail Engineering, Procurement, and Construction

(EPC) services to supply, install, and commission the facilities including all

associated works .

Project consists of approximately 240 km of pipelines including the feeder lines,

Doui Pump station, MEA Head Station, Halasaa pump station and Jorf Terminal.

Feeder pipelines from each wash plant pump station will deliver sequential batches

of each grade to segregated tanks at the head station at MEA. From the head

station sequential phosphate batches will be pumped through the main pipeline

into storage tanks at the terminal. One slurry grade will be supplied to the local acid

plants and all slurry grades will be supplied for export purposes.

Page 38: Tekfen Holding Investor Presentation March 2014Share Classes Single type of shares (one share one vote) Composition of the Board ... core operations, deliver the highest quality products

Contracting

Tekfen Group Contracting www.tekfen.com.tr Agri Industry Other Real Estate

Phosphate Slurry Pipeline Project

Morocco

Page 39: Tekfen Holding Investor Presentation March 2014Share Classes Single type of shares (one share one vote) Composition of the Board ... core operations, deliver the highest quality products

Contracting

Tekfen Group Contracting www.tekfen.com.tr Agri Industry Other Real Estate

LIBYA - AL KHUFRA - TAZERBO WATER CONVEYANCE SYSTEM (On Hold*)

Great Man Made River Authority of Libya awarded one of the most challenging

sections of Libya’s mega water transmission scheme to Tekfen – TML partnership

in 2005; Construction of Al Khufra - Tazerbo Water Conveyance System of 380 km

will take place at deeper south – east region of the Libyan Sahara.

Post-tensioned concrete pipes, each with a length of 7.5 meters, a diameter of 4

meters and a weigh of approximately 72 t, will be transported and erected to form

a water conveyance line within the scope of Great Man Made River Project, Phase

3 at the harsh conditions of Sahara Desert.

The source of the water is the Nubian Aquifer (a geological formation extending

from Western Cameroon to Eastern Palestine) in the south - east part of Libya.

The project is part of a multinational scheme monitored and supported by

International Fund for Agricultural Development (IFAD), an organization under

United Nations.

* The political and social unrest in Libya forced Tekfen to stop all activities and leave country

together with all other foreign contractors in February 2011.

Ongoing projects – North Africa

39

Page 40: Tekfen Holding Investor Presentation March 2014Share Classes Single type of shares (one share one vote) Composition of the Board ... core operations, deliver the highest quality products

Contracting

Tekfen Group Contracting www.tekfen.com.tr Agri Industry Other Real Estate

Kufra Conveyance System

Libya

Page 41: Tekfen Holding Investor Presentation March 2014Share Classes Single type of shares (one share one vote) Composition of the Board ... core operations, deliver the highest quality products

Contracting

Tekfen Group Contracting www.tekfen.com.tr Agri Industry Other Real Estate

TURKEY – TÜPRAŞ IZMIT REFINERY, RESIDUUM UPGRADING PROJECT

Residuum Upgrade Project (RUP) has been decided for Izmit Refinery of Tüpraş, which

is located in Gulf of Izmit, at the center of a consumption hub that accounts for around

40% of Turkish petroleum product consumption.

The main purpose of the Residuum Upgrading Project (RUP) is to built units that

process the low value of fuel oil and convert it to valuable products. With completion of

the Residuum Upgrading Project, owner Tüpraş will process 4,2 million tons of high

sulfur fuel oil and produce 3,5 million tons of valuable high quality white products

(diesel / jet fuel, gasoline and LPG) in Euro-V standarts, 690,000 tons of petroleum coke

and 86,000 tons of sulfur.

Shell GSI, Foster Wheeler USA, UOP and Technip are the technology licensors for the

project. Tecnicas Reunidas, an international general contractor in engineering and

construction in the oil and gas sector, is the main contractor for the Project.

Tekfen has been awarded a $ 501 million contract that includes the execution of all

Construction Works for Civil Works, HVAC System, Steel Structure Engineering, Supply

and Erection, Mechanical Erection, Electrical and Instruments Installation and also

Precommissioning and Commissioning Activities.

As one of the most experienced contractors in the country in the oil and gas sector,

Tekfen will use approximately 5,000 of its own direct/indirect man-power in the peak,

utilize its own project management team and use its own machinery/equipments during

course of the project which started on December 2011. The project will last 33 months.

Ongoing projects – Turkey

41

Page 42: Tekfen Holding Investor Presentation March 2014Share Classes Single type of shares (one share one vote) Composition of the Board ... core operations, deliver the highest quality products

Contracting

Tekfen Group Contracting www.tekfen.com.tr Agri Industry Other Real Estate

Tekfen Contracting Group consistently works on the following in line with the goals of its

Strategic Plan:

• Existing and new projects will be undertaken within the framework of the adopted business

principles and occupational health, safety and environment (HSE) policies. Maximizing work

quality and maintaining accident-free operations in line with occupational safety standards

are the main priorities.

• The company will continue to focus on projects that emphasize the EPC concept and it will

continue to improve its competency in this area. Engineering and procurement functions will

be key areas to be improved. To achieve this, required personnel recruitments are done both

in our engineering company and in procurement departments.

• The emphasis will be on increasing business volume in countries where operations

continue. The goal is to secure new projects that at least maintain the current level of

revenue generated from projects in these countries.

• Addition of new subcontractors to our existing subcontractor portfolio and increasing the

share of South East Asia origined personnel in our total work force are considered as

strategy implementations.

• Activities geared towards increasing efficiency and profitability will continue.

• All requirements to preserve Tekfen’s strong and prestigious brand image in existing

markets will be met.

Strategic Direction

42

Page 43: Tekfen Holding Investor Presentation March 2014Share Classes Single type of shares (one share one vote) Composition of the Board ... core operations, deliver the highest quality products

Agri Industry

Agri Industry www.tekfen.com.tr Real Estate Tekfen Group Other Contracting

Agri Industry

Page 44: Tekfen Holding Investor Presentation March 2014Share Classes Single type of shares (one share one vote) Composition of the Board ... core operations, deliver the highest quality products

Agri Industry

Agri Industry www.tekfen.com.tr Real Estate Tekfen Group Other Contracting

The pioneer in Turkey’s agricultural industry

• Sign of “quality” and “trust”

• In business since 1981 under TOROS brand name

• Over 1,000 employees

• Highest employee loyalty in the industry

• Seasoned – well experienced employees

Overview

44

Page 45: Tekfen Holding Investor Presentation March 2014Share Classes Single type of shares (one share one vote) Composition of the Board ... core operations, deliver the highest quality products

Agri Industry

Agri Industry www.tekfen.com.tr Real Estate Tekfen Group Other Contracting

• Active in fertilizer, seed, seedling and sapling production and distribution, as well as marine

terminal services and free zone operations

• Consolidated turnover of TRY 1,423 million as of 2013

• Leading company in Turkish fertilizer industry with a market share of 28% as of 2013

• Significant player in port activities, providing services to third parties in two ports strategically

located at the Eastern Mediterranean and the Black Sea Coast

Turnover Breakdown EBITDA Breakdown

45

Overview

2009 2010 2011 2012 2013

Mil

lio

n T

RY

Seed, Seedling andOthers

Terminal Services

Fertilizers81% 88% 89% 90%

6%

5%

13%

6%

6%

90%

5%

5%

6% 883

1.026

1.209

1.424 1.423

5%

5%

2009 2010 2011 2012 2013

Mil

lio

n T

RY

Seed, Seedling andOthers

Terminal Services

Fertilizers

72%

15%

73%

19%

64%

21% 9%

21%

6%

81%

13%

6%

43

147

191

137

117

68%

25%

7%

Page 46: Tekfen Holding Investor Presentation March 2014Share Classes Single type of shares (one share one vote) Composition of the Board ... core operations, deliver the highest quality products

Agri Industry

Agri Industry www.tekfen.com.tr Real Estate Tekfen Group Other Contracting

Fertilizers

• Supplying every type of fertilizer Turkish

farmers need

• Market leader since 1986

• Vast dealers network with over 800 dealers

• Sales and Marketing Team located in 7 regions

• Constant contact with dealers and farmers

• Timely delivery to dealers via 8 warehouses

46

Page 47: Tekfen Holding Investor Presentation March 2014Share Classes Single type of shares (one share one vote) Composition of the Board ... core operations, deliver the highest quality products

Agri Industry

Agri Industry www.tekfen.com.tr Real Estate Tekfen Group Other Contracting

Regional Offices & Other Units

İSTANBUL

Head Office

İZMİR

REGIONAL OFFICE

Warehouse

Grain Silos

Seed Processing

ANKARA

REGIONAL OFFICE

Warehouse

SAMSUN

REGIONAL OFFICE

Warehouse

ANTALYA

REGIONAL OFFICE

Seedling Nurseries

Warehouse

KONYA

Warehouse

ADANA & CEYHAN

REGIONAL OFFICE

Bag Manufacturing Plant

Free Zone

Micropropagation

Warehouse

Grain Silos

Seed Processing

ŞANLIURFA

REGIONAL OFFICE

Warehouse

TEKİRDAĞ

REGIONAL OFFICE

Warehouse

47

Page 48: Tekfen Holding Investor Presentation March 2014Share Classes Single type of shares (one share one vote) Composition of the Board ... core operations, deliver the highest quality products

Agri Industry

Agri Industry www.tekfen.com.tr Real Estate Tekfen Group Other Contracting

• Nitrogen fertilizers:

• AN26 (CAN) - Calcium Ammonium Nitrate

• AN33 - Ammonium Nitrate

• AS - Ammonium Sulphate

• Urea

• Phosphate fertilizers:

• TSP - Triple Super Phosphate

• SSP - Single Super Phosphate

• Potash fertilizers:

• PS - Potassium Sulphate

Fertilizers – Product Types

48

• Compound fertilizers (NPs and NPKs):

• DAP - Di-Ammonium Phosphate

• NP 20.20

• NP 20.20+Zn

• NPK 15.15.15

• NPK 15.15.15+Zn

• Special grade compound fertilizers:

• NPK 25.5.10

• NPK 15.15.15 Gold

• NPK 10.20.20

Page 49: Tekfen Holding Investor Presentation March 2014Share Classes Single type of shares (one share one vote) Composition of the Board ... core operations, deliver the highest quality products

Agri Industry

Agri Industry www.tekfen.com.tr Real Estate Tekfen Group Other Contracting

2013 Total Sales: 1.64 million tons

Fertilizers – Sales

49

2012 Total Sales: 1.63 million tons

NP/NPK (Compound)

41%

AN26 21%

AN33 21%

DAP 9%

Urea 4% AS 3% Other 0,2%

NP/NPK (Compound)

42%

AN26 17%

AN33 21%

DAP 10%

Urea 7% AS 3% Other 0,3%

Page 50: Tekfen Holding Investor Presentation March 2014Share Classes Single type of shares (one share one vote) Composition of the Board ... core operations, deliver the highest quality products

Agri Industry

Agri Industry www.tekfen.com.tr Real Estate Tekfen Group Other Contracting

Consumption and Toros Sales Volume/Marketshare Turkey’s Total Production and Toros’ Production

Turkey’s Total Imports and Toros’ Imports

Fertilizers – Leader in Turkish Fertilizer Market

50

30% 35% 31% 30%

28%

0%

5%

10%

15%

20%

25%

30%

35%

0

1.000

2.000

3.000

4.000

5.000

6.000

7.000

2009 2010 2011 2012 2013

1,0

00 t

on

s

Consumption Toros Sales Marketshare

39% 42%

37% 39% 39%

0%

10%

20%

30%

40%

50%

0

500

1.000

1.500

2.000

2.500

3.000

3.500

4.000

2009 2010 2011 2012 2013

1,0

00 t

on

s

Total Production Toros Production Toros Share

19%

10% 10% 8%

6%

0%

5%

10%

15%

20%

0

500

1.000

1.500

2.000

2.500

3.000

3.500

2009 2010 2011 2012 2013

1,0

00 t

on

s

Total Imports Toros Imports Toros Share

Page 51: Tekfen Holding Investor Presentation March 2014Share Classes Single type of shares (one share one vote) Composition of the Board ... core operations, deliver the highest quality products

Agri Industry

Agri Industry www.tekfen.com.tr Real Estate Tekfen Group Other Contracting

• Three fertilizer plants located in Mersin, Ceyhan and Samsun

• Total installed capacity is 2 million tpa of which 1,85 million tpa is in operation

• Leading producer with 38% share in Turkey’s total installed production capacity (SPO*)

Fertilizers – Production Facilities

SAMSUN PLANT

MERSIN PLANT

CEYHAN PLANT

* SPO:State Planning Organization 51

Page 52: Tekfen Holding Investor Presentation March 2014Share Classes Single type of shares (one share one vote) Composition of the Board ... core operations, deliver the highest quality products

Agri Industry

Agri Industry www.tekfen.com.tr Real Estate Tekfen Group Other Contracting

CEYHAN PLANT

NPK and DAP production

CAPACITY

2 x 330,000 tpa NPK

or

330,000 tpa NPK & 200,000 tpa DAP

SAMSUN PLANT

NPK and DAP production

CAPACITY

300,000 tpa NPK

227,000 tpa DAP

PHOSPHORIC ACID CAPACITY

PLANT I = 80,000 tpa (100% P2O5)

PLANT II = 108,000 tpa (100% P2O5)

MERSIN PLANT

AN and CAN production

CAPACITY

660,000 tpa CAN

NITRIC ACID CAPACITY

405,000 tpa

Fertilizers – Production Capacity

52

Page 53: Tekfen Holding Investor Presentation March 2014Share Classes Single type of shares (one share one vote) Composition of the Board ... core operations, deliver the highest quality products

Agri Industry

Agri Industry www.tekfen.com.tr Real Estate Tekfen Group Other Contracting

• The scarcity of low-cost raw materials

and high investment costs is a barrier

for a new producer to enter into the

market

• No restrictions on imports

• 7 fertilizer producers with a total

annual production capacity of 5.3

million tpa in 10 plants (SPO*)

Toros 38%

Gübretaş 17%

İgsaş 15%

Bagfaş 12%

Gemlik 8%

Ege 6%

Yıldız 4%

Turkish Fertilizer Industry

Breakdown of Domestic Production Capacities*

* SPO:State Planning Organization 53

Page 54: Tekfen Holding Investor Presentation March 2014Share Classes Single type of shares (one share one vote) Composition of the Board ... core operations, deliver the highest quality products

Agri Industry

Agri Industry www.tekfen.com.tr Real Estate Tekfen Group Other Contracting

In Mersin Plant, Toros produces nitric acid for its CAN/AN unit.

NITRIC ACID AIR

WATER

AMMONIUM

NITRATE

AMMONIA AMMONIUM

NITRATE

CALCIUM

AMMONIUM

NITRATE

LIME

STONE

Fertilizers – CAN/AN Production Diagram

54

Page 55: Tekfen Holding Investor Presentation March 2014Share Classes Single type of shares (one share one vote) Composition of the Board ... core operations, deliver the highest quality products

Agri Industry

Agri Industry www.tekfen.com.tr Real Estate Tekfen Group Other Contracting

Fertilizers – DAP/NP/NPK Production Diagram

*Either Urea or AS is added as nitrogen (N) source in addition to ammonia.

**Potash is added as potassium (K) source for NPKs.

SULPHURIC

ACID

PHOSPHATE

ROCK

PHOSPHORIC

ACID

AMMONIA

UREA/AS* DAP/NP/NPK

POTASH**

55

• In Samsun Plant, Toros both produces and imports phosphoric acid for its DAP/NPK units.

• In Ceyhan Plant, phosphoric acid is imported for DAP/NPK units.

Page 56: Tekfen Holding Investor Presentation March 2014Share Classes Single type of shares (one share one vote) Composition of the Board ... core operations, deliver the highest quality products

Agri Industry

Agri Industry www.tekfen.com.tr Real Estate Tekfen Group Other Contracting

Fertilizers – Raw Materials

Raw Materials Used in 2013 (1.48 million tons)

56

• Ammonia is one of the main raw materials

imported

• Phosphoric acid is an intermediate good and is

imported to be used for phosphatic fertilizers

(DAP/NP/NPK)

• Phosphate rock and sulphuric acid are imported

to produce phosphoric acid

• Urea is a nitrogen source and imported as raw

material

• Ammonium sulphate is a nitrogen and a sulphur

source and imported as raw material

• Potassium Chloride (KCl), also known as MOP, is

imported to be used as potassium source for

NPKs

• Limestone is used as filler

Ammonia 21%

Phosphoric Acid 6%

Phosphate Rock 26%

Sulphuric Acid 22%

Urea 7%

Ammonium Sulphate 10%

Limestone 6%

Potassium Chloride 2%

Page 57: Tekfen Holding Investor Presentation March 2014Share Classes Single type of shares (one share one vote) Composition of the Board ... core operations, deliver the highest quality products

Agri Industry

Agri Industry www.tekfen.com.tr Real Estate Tekfen Group Other Contracting

Imports - Breakdown by Products

Fertilizers – Production and Imports

57

Production - Breakdown by Products

43%

48% 46% 47% 47%

28%

23% 25%

21% 19%

12% 13%

18% 21%

23%

17% 16%

11% 11% 11%

2009; 1.11 mntons

2010; 1.45 mntons

2011; 1.39 mntons

2012; 1.42 mntons

2013; 1.41 mntons

Compound(NP/NPK)

AN26 (CAN)

AN33

DAP

38%

57%

42%

51% 50%

34%

12% 17%

11% 15%

12%

30%

37% 36% 33%

16%

1% 4% 2% 2%

2009; 562K tons 2010; 237K tons 2011; 219K tons 2012; 171K tons 2013; 189K tons

Urea

AN33

AS

Other

Page 58: Tekfen Holding Investor Presentation March 2014Share Classes Single type of shares (one share one vote) Composition of the Board ... core operations, deliver the highest quality products

Agri Industry

Agri Industry www.tekfen.com.tr Real Estate Tekfen Group Other Contracting

Toros Ceyhan Terminal

• 1 jetty with 5 berths loading 1,300 tons and

discharging 1,000 tons of bulk liquids per day

• 1 jetty with 3 berths handling 45,000 tons of

dry bulk cargo per day

• Grain warehouse with 60,000 tons capacity

• Closed storage area capacity: 300,000 tons

• Open storage area capacity: 1,000,000 tons

• Bagging capacity: 38,000 tons per day

• Tank farm capacity: 236,000 m3

Toros Samsun Terminal

• 1 jetty with 2 berths handling 14,000 tons of

dry bulk cargo per day

• Closed storage area capacity: 210,000 tons

• Open storage area capacity: 300,000 tons

• Tank farm capacity: 60,000 m3

TOROS has two marine terminals offering loading/unloading and storage services to third parties

Marine Terminal Services

58

Page 59: Tekfen Holding Investor Presentation March 2014Share Classes Single type of shares (one share one vote) Composition of the Board ... core operations, deliver the highest quality products

Agri Industry

Agri Industry www.tekfen.com.tr Real Estate Tekfen Group Other Contracting

Vegetable Seedlings:

• Operating under Hishtil-Toros Seedlings brandname

• A 50-50 JV with Hishtil Holdings since 1999

• Producing high quality grafted and standard

vegetable seedlings for the growing local and

foreign markets

Field Crop Seeds:

• Cooperating with two state research institutes to produce and

distribute certain types of wheat

• Wheat seed breeding program that earned support from TÜBİTAK

(The Scientific and Technological Research Council of Turkey)

Specialty Fertilizers:

• Suppliers of specialty fertilizers are globally known leading producers;

• Haifa Chemicals

• Tessenderlo Chemie

• Prayon

• Rosier of the Total Group

• Leading brand in specialty fertilizers in Turkey since 2000

Complementary Products and Services

59

Page 60: Tekfen Holding Investor Presentation March 2014Share Classes Single type of shares (one share one vote) Composition of the Board ... core operations, deliver the highest quality products

Agri Industry

Agri Industry www.tekfen.com.tr Real Estate Tekfen Group Other Contracting

Micropropagation:

• Targets to meet the sector's demand for high quality,

high yield and disease-free homogenous seed,

saplings and young plants

• First local successful producer of potato seeds on

commercial scale by using micropropagation

techniques in Turkey

• Serving to a market which is historically dominated

by imported potato seeds

Complementary Products and Services

60

Free zone operations:

• Founding partner and operator of the largest free

zone in Turkey

• 4.5 million m2 of area

• Strategically located in Ceyhan region which is

becoming the energy hub for Turkey

Page 61: Tekfen Holding Investor Presentation March 2014Share Classes Single type of shares (one share one vote) Composition of the Board ... core operations, deliver the highest quality products

Agri Industry

Agri Industry www.tekfen.com.tr Real Estate Tekfen Group Other Contracting

CEYHAN PLANT

ISO 14001:2004 Environment

Management

ISO 9001:2000 Quality

Management

OHSAS 18001:1999 Occupational

Health and Safety Management

SAMSUN PLANT

Emission Certificate

MERSIN PLANT

Catalytic reduction system

to keep NOX emission in

exhaust gases released to

atmosphere from nitric acid

unit under 200 ppm

Environmentally Conscious Production

61

Page 62: Tekfen Holding Investor Presentation March 2014Share Classes Single type of shares (one share one vote) Composition of the Board ... core operations, deliver the highest quality products

Agri Industry

Agri Industry www.tekfen.com.tr Real Estate Tekfen Group Other Contracting

Social Responsibility

62

Supporting farmers;

• Educational seminars and training

programs to improve agricultural

productivity and product quality

Raising awareness;

• Supporting UNFPA’s “Improving health conditions of

seasonal workers in agriculture” program in Turkey

• “Wheat” documentary based on field trials done by

Toros throughout Turkey

• Sponsorships for scientific research and academic

seminars on agriculture and fertilizers

• “Balanced Fertilization with Right Fertilizers” Project

with the support of the Ministry of Food, Agriculture

and Livestock

• “Toprak Ana” (Mother Earth) documentary about

agricultural production in Turkey

Supporting local communities;

• Sponsoring sporting activities in Samsun and

Mersin

• Toros Primary School and Toros Secondary School

in Adana, and Toros Tarım Necati Akçağlılar High

School in Samsun

Page 63: Tekfen Holding Investor Presentation March 2014Share Classes Single type of shares (one share one vote) Composition of the Board ... core operations, deliver the highest quality products

Real Estate

Page 64: Tekfen Holding Investor Presentation March 2014Share Classes Single type of shares (one share one vote) Composition of the Board ... core operations, deliver the highest quality products

Real Estate Development

Real Estate www.tekfen.com.tr Agri Industry Tekfen Group Other Contracting

Te

kfe

n R

ea

l E

sta

te D

eve

lop

me

nt

Gro

up

Tekfen Real Estate Development Investment and Trade

Co., Inc

Business Line: Investment, development, project

management, asset management

Tekfen Tourism and Facility Management Co., Inc

Business Line: Facility Management

Tekfen Real Estate Investment Co.,Inc

Business Line : Investment, development

Business Structure

64

Page 65: Tekfen Holding Investor Presentation March 2014Share Classes Single type of shares (one share one vote) Composition of the Board ... core operations, deliver the highest quality products

Real Estate Development

Real Estate www.tekfen.com.tr Agri Industry Tekfen Group Other Contracting

Project Project

Function

Start Date of

Project

End Date of

Project

Estimated Revenue*

(million $)

Total/Tekfen Share

Estimated Cost**

(million $)

Total/Tekfen Share

Izmir Project Mixed Use Jan.13 Dec.16 508/254 230/115

Esenyurt Project Residential May.13 Jun.16

Projects

65

Project Total ***

Gross Leasable/ Sellable Area

(m²) Total Construction Area (m²)

Residence 50.000 80.000

Office 20.000 35.000

Shopping Mall 60.000 120.000

Total 130.000 235.000

*** Tekfen share is 50%.

*Residential & Office Sales Revenue: 2.800 $/m² x 70.000 sqm (adds up to $196 M in total)

Shopping Mall Revenue: 40 $/ m² /month x 10 years rent revenue (adds up to $ 288 M) + $24 M first year rent revenue with

80% occupancy

**Total cost, excluding land.

Izmir Project Details:

Page 66: Tekfen Holding Investor Presentation March 2014Share Classes Single type of shares (one share one vote) Composition of the Board ... core operations, deliver the highest quality products

Real Estate Development

Real Estate www.tekfen.com.tr Agri Industry Tekfen Group Other Contracting

Ongoing Projects

Transaction Overview:

• 50%-50% partnership with Renaissance Shopping Malls

• The largest mixed use project in Izmir

Total Project Size – (Revenues, $ millions): 508

Tekfen Share : 50 %

Project Summary:

• Total Sellable/Leasable area :

Shopping Mall 30.000 sqm GLA, Home-Office Tower 10.000

sqm GLA and Residential Tower 25.000 sqm

• Est. Contruction period: Q2/2014 – Q4/2016

• Landmark project for the city of Izmir

Investment Rationale:

• Location within the new planned CBD of Izmir

• High accesibility and visibility through the main arteries

Izmir Mixed Use

66

Page 67: Tekfen Holding Investor Presentation March 2014Share Classes Single type of shares (one share one vote) Composition of the Board ... core operations, deliver the highest quality products

Real Estate Development

Real Estate www.tekfen.com.tr Agri Industry Tekfen Group Other Contracting

Ongoing Projects

Transaction Overview:

• Being developed on 56.800 sqm land which is purchased on May 2013

• Construction permit granted on December 2013 for the project including aproximately 1.400 residential and retail units

Total Project Size – (Revenues, $ millions): 231

Tekfen Share : 100 %

Project Summary:

•Total Sellable Space:

Housing: 170.000 sqm, Retail: 3.000 sqm

• Construction Period- Start: Q2/2014 Complete: Q2/2016

Investment Rationale:

• Esenyurt property is in a sought-after area because of its developing transportation infrastructure, the city’s growth dynamics, and its situation on the intersection between the E5 highway and TEM motorway

• Esenyurt has great potential for the development having a predominantly middle-class area which is tha target segment.

Esenyurt Housing Project

67

Page 68: Tekfen Holding Investor Presentation March 2014Share Classes Single type of shares (one share one vote) Composition of the Board ... core operations, deliver the highest quality products

Real Estate Development

Real Estate www.tekfen.com.tr Agri Industry Tekfen Group Other Contracting

• Facility Management of Tekfen Tower, Taksim

Residences, Tekfen Offices, Yalıkavak Tekfen Houses,

Gumusluk Muskulum Ciftligi, Kagithane Office Park,

Levent Office and S-Cafe are directed and operated by

Tekfen Tourism & Facility Management Co., Inc. under

the brand name of Tekfen Services.

• Facility Management for the ongoing and the potential

projects of Tekfen Real Estate Development Group is

planned to be operated by Tekfen Services.

• Tekfen Services’ professional facility management

improves the values of Real Estate Development Group

projects.

Tekfen Services - Facility Management

68

Page 69: Tekfen Holding Investor Presentation March 2014Share Classes Single type of shares (one share one vote) Composition of the Board ... core operations, deliver the highest quality products

Real Estate Development

Real Estate www.tekfen.com.tr Agri Industry Tekfen Group Other Contracting

• Tekfen Holding earns rental income from the offices it owns in Akmerkez

and Tekfen Tower.

• Tekfen Tower has 33.000 m² rentable area, of which, 25% is used by Group

Companies, while the rest is rented to various institutions.

•Total rental income from Tekfen Tower amounted to USD 11.4 million as of

December, 2013.

Assets

69

Page 70: Tekfen Holding Investor Presentation March 2014Share Classes Single type of shares (one share one vote) Composition of the Board ... core operations, deliver the highest quality products

Real Estate Development

Real Estate www.tekfen.com.tr Agri Industry Tekfen Group Other Contracting

• The concept of “environmental friendly / sustainable building” is becoming more

and more important everyday as the awareness and consciousness for energy use

and environment increases. Tekfen Real Estate Group, as in its all other projects, is

aiming LEED-CS (core&shell) of The U.S. Green Building Association (USGBC) for

its new projects , Tekfen-OZ Kagithane OfisPark & Tekfen Bomonti Apartments.

• In accordance with this policy, Tekfen-OZ LeventOfis - completed in 2010 - is the

first project of the Group rewarded with LEED-CS Gold Certificate.

• The projects aim to achieve LEED certification by introducing sustainable solution

to design elements such as encouraging public transportation, collection and

reusing of storm water and grey water within the system, decreasing overall water

consumption, efficiency in energy consumption with shell design and decreasing

the load of the cooling system via plantation integrated within the facade system.

Social Responsibility

70

Page 71: Tekfen Holding Investor Presentation March 2014Share Classes Single type of shares (one share one vote) Composition of the Board ... core operations, deliver the highest quality products

Other

Page 72: Tekfen Holding Investor Presentation March 2014Share Classes Single type of shares (one share one vote) Composition of the Board ... core operations, deliver the highest quality products

Other

Other www.tekfen.com.tr Agri Industry Real Estate Tekfen Group Contracting

Tekfen Industry and Trade Co. Inc. operates in two main sectors:

Lighting and Chemical Products

Light bulb sector

• Wide product range

• Own “Tekfen” brand products are incandescent,

fluoresant, halogen lamps, starters and magnetic balasts,

also owned other brand “Tekfen Wiselite” products are

energy saving lamps, LEDs, metal halide, sodium vapor,

mercury vapor lamps and electronic balasts.

• Outsourced from China

• Due to increasing global demand for LED lamps, the

company increased its investments in this area in 2008.

Goal is to become one of the leading players in the LED

segment of the Turkish market.

Fentox brand household insecticide

• Product line that includes Fentox Stop, Super Fentox,

Water-based New Fentox, Fentox Likit and Fentox Mat,

also new products Fenkov Lotion and Fenkov Aerosol

were added to this portfolio.

Match production

• Manufacturing in India.

Tekfen Industry

72

Page 73: Tekfen Holding Investor Presentation March 2014Share Classes Single type of shares (one share one vote) Composition of the Board ... core operations, deliver the highest quality products

www.tekfen.com.tr

Tekfen Group

Tekfen Group Contracting Agri Industry Real Estate Other

Financial Highlights 74

Net Cash Position 75

Capital Expenditures 76

Disclaimer 77

Contact Info 78

Appendix

73

Page 74: Tekfen Holding Investor Presentation March 2014Share Classes Single type of shares (one share one vote) Composition of the Board ... core operations, deliver the highest quality products

www.tekfen.com.tr

Tekfen Group

Tekfen Group Contracting Agri Industry Real Estate Other

TRY Million

Revenues 2012 % in Total 2013 % in Total 2014E % in Total Contracting 2.395 61% 2.327 61% 2.445 61% Agri Industry 1.424 36% 1.423 37% 1.408 35%

Real Estate 61 2% 30 1% 54 1% Other 68 2% 67 2% 84 2%

Total 3.949 100% 3.846 100% 3.991 100% EBITDA 2012 Margin 2013 Margin 2014E Margin

Contracting 142 5,9% -100 -4,3% 167 6,8% Agri Industry 137 9,7% 117 8,3% 111 7,9%

Real Estate 0 -0,5% 0 -0,8% -7 -13,0% Other 2 2,5% -8 -11,9% 1 1,2% Total 281 7,1% 10 0,3% 272 6,8%

Net Income 2012 Margin 2013 Margin 2014E Margin

Contracting 24 1,0% -217 -9,3% 37 1,5% Agri Industry 116 8,1% 63 4,4% 80 5,7% Real Estate 2 3,0% -1 -2,5% -6 -11,1%

Other 159* 232,7% 92 137,2% 40 47,6% Total 300* 7,6% -64 -1,7% 151 3,8%

Financial Highlights – Segmental Breakdown

74 *Sale of Eurobank Tekfen had an impact of around TRY129 million on the Net Income figure.

Page 75: Tekfen Holding Investor Presentation March 2014Share Classes Single type of shares (one share one vote) Composition of the Board ... core operations, deliver the highest quality products

www.tekfen.com.tr

Tekfen Group

Tekfen Group Contracting Agri Industry Real Estate Other

2011 2012 2013

193

-230

196

19

391

-619

224

-99

688

Contracting Agri Industry Real Estate Other

2011 2012 2013

Tekfen Group

Net Cash Position

Tekfen Group Net Cash Position (TRY million) Net Cash Position by segment (TRY million)

75

376

635

Page 76: Tekfen Holding Investor Presentation March 2014Share Classes Single type of shares (one share one vote) Composition of the Board ... core operations, deliver the highest quality products

www.tekfen.com.tr

Tekfen Group

Tekfen Group Contracting Agri Industry Real Estate Other

Tekfen Group

Capital Expenditures

133

43 5497

193 184

2008 2009 2010 2011 2012 2013

Million TRY

Contracting Agri Industry Real Estate Other Total

2008 88,5 17,3 15,8 11,8 133,4

2009 26,5 15,3 0,7 0,8 43,3

2010 30,0 10,2 0,2 13,5 53,9

2011 78,4 11,4 0,3 6,4 96,5

2012 142,6 49,9 0,3 0,4 193,3

2013 24,7 158,4 0,4 0,6 184,1

Capital Expenditures (Segmental Breakdown, Million TRY)

76

Page 77: Tekfen Holding Investor Presentation March 2014Share Classes Single type of shares (one share one vote) Composition of the Board ... core operations, deliver the highest quality products

www.tekfen.com.tr

Tekfen Group

Tekfen Group Contracting Agri Industry Real Estate Other

Tekfen Holding A.S. (the “Company”) has prepared this presentation (the “Presentation”) in

order to provide investors with general information about the Company. The contents of this

Presentation is based on public information and on data provided by the Company

management. Neither the Company nor any of its directors, managers or employees nor any

other person shall have any liability whatsoever for any loss arising from use of this

presentation. This Presentation does not constitute an offer or invitation to purchase the

securities of the Company. Investors and prospective investors interested in the securities of

the Company are required to conduct their own independent investigations and appraisal of

the business, financial condition of the Company and the nature of its securities. Except for

the historical information contained herein, the statements made in this Presentation with

respect to the Company’s plans, strategies, beliefs and other prospective matters are

forward-looking statements that involve risk and uncertainty that are not under the

Company’s control which may cause actual results to differ materially from those anticipated.

Except where otherwise indicated, this Presentation speaks as of the date hereof. We

undertake no duty to update or revise any forward looking statements, whether as a result of

new information, future events or otherwise.

Disclaimer

77

Page 78: Tekfen Holding Investor Presentation March 2014Share Classes Single type of shares (one share one vote) Composition of the Board ... core operations, deliver the highest quality products

www.tekfen.com.tr

Tekfen Group

Tekfen Group Contracting Agri Industry Real Estate Other

• For General Questions and Requests for Reports:

Çağlar Gülveren, CFA Investor Relations and Corporate Governance Coordinator

e-mail: [email protected]

Tel: +90 212 359 3420

• Contracting Group:

Fatih Bahçeci, Head of Projects Planning and Control

e-mail: [email protected]

Tel: +90 212 359 3583

• Agri-Industry Group:

Canan Senkut, Toros Tarım IR Chief

e-mail: [email protected]

Tel: +90 212 357 0202 (ext.381)

• Real-Estate Development Group:

Ayşe Turalı, Assistant General Manager

e-mail: [email protected]

Tel: +90 212 377 0700

Contact Information

78