Page 1: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…

    

CARROLL COUNTY CAREER & TECHNOLOGY CENTER 

FEASIBILITY STUDY  

Carroll County Public Schools | January 10, 2017     

  

Page 2: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…
Page 3: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…

Table of Contents 

    Carroll County Career & Technology Center ǀ 1     January 10, 2017 

01  Study Team              3 

02  Executive Summary 

    Introduction            4 

    Purpose            5 

    Findings            6 

    Proposed Design Options         8 

    Alternative Sites          12 

03  History               13 

04  Educational Goals             

    Educational Program          14 

Program Summary Table        17 

Program Summary Table‐ Wait List      24 

05  Existing Conditions 

    Site              25 

    Architectural            28 

    Structural            32 

    Food Service / Kitchen          34     

Mechanical            39 

    Electrical            44 

    Existing Site Plan          46 

    Existing Floor Plans          47 

06  Code Analysis              49 

07  Proposed Design Options          51 

    Option A: Modernization        53 

    Option B: Modernization/ Partial Replacement    60 

    Option C: Replacement on Existing Campus    68 

    Option D: Replacement on Undeveloped Site    75 

Page 4: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…

Table of Contents 

    Carroll County Career & Technology Center ǀ 2     January 10, 2017 

    Mechanical Recommendations        77 

Plumbing Recommendations        82 

Electrical Recommendations        84 

08  Appendix 

    Appendix A –   Cost Estimate Options‐ A‐D    88 

        Cost Estimate‐ Relocated Programs  89 

    Appendix B – Life Cycle Costs        90 

 

Page 5: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…

    Carroll County Career & Technology Center    

 

 

 

 

 

 

 

 

 

 

 

 

STUDY TEAM  

Page 6: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…
Page 7: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…

Study Team ǀ 01 

    Carroll County Career & Technology Center ǀ 3     January 10, 2017 

 Carroll County Career and Technology Center 

William Eckles  Principal 

 

Westminster High School 

Jeffrey Hopkins  Principal 

 

Carroll County Public Schools 

Mike Andrews  Supervisor of Facilities Maintenance and Operations 

William Caine  Facilities Planner 

Kim Dolch  Director of High Schools 

James Marks  Supervisor of Construction 

Angie McCauslin  Supervisor of CTE 

Ted McNett  Assistant Supervisor of CTE 

Margaret Pfaff  Director of Curriculum and Instruction 

Ray Prokop  Director of Facilities 

 

Maryland State Department of Education 

Jillian Storms  School Facilities Architect 

 

Feasibility Study Design Team 

Architect  Hord Coplan Macht, Inc. 

Civil Engineer  MK Consulting Engineers , LLC 

Structural  SK&A Structural Engineers, PLLC 

Mechanical & Electrical  Alban Engineering, Inc. 

Food Service  Nyikos Associates, Inc. 

Page 8: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…
Page 9: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…

    Carroll County Career & Technology Center    

 

 

 

 

 

 

 

 

 

 

 

 

EXECUTIVE SUMMARY  

Page 10: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…
Page 11: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…

Executive Summary ǀ 02 

    Carroll County Career & Technology Center ǀ 4     January 10, 2017 

Introduction 

Carroll  County  Career  and  Technology  Center 

(CCCTC) is located on a 68.56 acre parcel shared 

with Westminster High School.   The property  is 

bounded by single family residential homes  and 

Hook Road to the north, New Washington Road 

(Rte. 97)  to  the east, and a Carroll County Fire 

Training  facility  to  the  south.  The  west 

boundary of the property lies along Washington 

Road (Rte. 32). The building was constructed  in 

1969 with  an  addition  added  along  the  south 

side  in  1986.    Five  relocatable  classrooms  are 

located  adjacent  to  the  building  on  the  west 

side and are utilized for Health and Information 

Technology programs. The  state  rated  capacity 

of  the school  is 380, however  the students are 

enrolled and accounted  for at  their home high 

schools. The current enrollment for semester 1 

is 769  students and 815  students  for  semester 

2.  There  is  a  wait  list  of  approximately  300 

students.  

The  site  is  accessed  via  two  points  along 

Washington  Road  (Rte.  32)  and  a  third  along 

Hook Road. Bus traffic typically enters from the 

Hook  Road  or  northern  Washington  Road 

access point onto  a  campus  road  (Washington 

Lane)  leading  to  a  continuous  campus  drive 

aisle loop encircling the campus.  The drive aisle 

loop serves both Westminster High School and 

CCCTC.  The  south  access  point  along 

Washington  Road  serves  student,  parent,  and 

staff  traffic  for  CCCTC  in  addition  to  serving 

Westminster  High  School  students  and  buses. 

Upon  entering  the  common  drive  aisle  access 

point,  CCCTC  traffic  is  directed  to  the  right 

toward  a  common  parking  lot  for  students, 

staff,  and  visitors.  CCCTC’s  receiving  area  for 

deliveries  is  also  located  along  this  portion  of 

the drive  aisle northwest of  the building.   The 

CCCTC parking  lot  is  shared with  a  community 

media  center  on  the  southwest  corner  of  the 

campus.    The  drive  aisle  loop  continues  along 

the west between the building and parking  lot, 

acting  as  both  campus  loop  road  and  bus 

queuing  area.  Additional  parking  lots  for 

Westminster High  School  are  located  north  of 

CCCTC.   Grassed multi‐purpose play  fields with 

overlapping  softball  and  baseball  diamonds, 

practice field for football, field hockey field, and 

football/soccer  stadium with  track  are  located 

to the northeast of CCCTC. Fields are utilized by 

Westminster High School. 

The  existing  school  suffers  from  insufficient 

space  to  accommodate  the  proposed 

educational  program  and  outdated  systems.  

Additionally,  there  is  a  wait  list  of  students 

hoping to enroll that cannot be accommodated 

without  additional  space  to  expand  the 

programs.  The facility is aging and suffers from 

a  combination  of  mechanical,  electrical, 

plumbing,  accessibility,  and  educational 

deficiencies.  

With  broad  and  accelerated  change  that 

continues to  influence  learning and  instruction, 

the  current  Carroll  Career  and  Technology 

Center  cannot  keep  pace  with  the  facility 

demands  of  today’s  educational  imperatives.   

In  short,  the  school  no  longer  reflects  a 

standard  for  career  and  technology  school 

facilities  that  is  consistent  with  the  Board  of 

Education’s  vision  for  Carroll  County  and 

requires modernization or replacement.  

 

Page 12: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…

Executive Summary ǀ 02 

    Carroll County Career & Technology Center ǀ 5       January 10, 2017 

Purpose The purpose of  this  feasibility study, commissioned by Carroll County Public  (CCPS), was  to direct  the 

study  team  to  assess  the  condition  of  the  existing  building  and  site,  offer  recommendations  for 

improvements or  replacement of  current  facilities, and present  four options  for  consideration by  the 

Board of Education (BOE).  

A program  inventory was developed by the Study Team  in conjunction with Hord Coplan Macht, using 

the  school’s current  inventory as a baseline and proposing  space  improvements based on enrollment 

needs  including  wait  list,  state  education  guidelines,  and  programs  from  comparable  career  and 

technology facilities  in Maryland.   Each design option presented  in this document reflects an approach 

to  the  proposed  educational  program: Option A  addresses  the wait  list  enrollment  space  needs  and 

systemic upgrades only to provide a more modestly scaled intervention option while Options B, C, and D 

address the educational program in full, including wait list.  

The  feasibility  study  team  worked  closely  with  the  study  team  to  determine  the most  reasonable 

approach  to each option. This study  includes a photographic and narrative assessment of  the existing 

facility,  including  a  preliminary  evaluation  of  compliance with  current  building  and  life  safety  codes. 

Descriptive  summaries  and  illustrations  are  provided  for  each  option,  followed  by  appendices  that 

include proposed costs and life cycle cost data.  

 

 

Page 13: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…

Executive Summary ǀ 02 

    Carroll County Career & Technology Center ǀ 6       January 10, 2017 

Findings 

The existing school has insufficient space to accommodate the proposed educational program, outdated 

systems, and inefficient adjacencies. It is an aging facility that suffers from a combination of mechanical, 

electrical,  plumbing,  and  accessibility  deficiencies  and  needs  to  be  modernized.  These  deficiencies 

include: 

Site: 

Access point/route that mixes cars and buses rather than separating them. 

Parking lots need resurfacing. 

 

Building: 

Administration suite lacks storage for general use and records. 

Guidance suite is comingled with main administration 

Health suite does not meet COMAR requirements – all health services are provided  from a single office that is accessed through the main office. 

Maintenance personnel share space with the building maintenance program for students. 

Engineering program is lacking in quantity of classroom and storage spaces. 

Manufacturing Lab is undersized and program lacks adequate storage space. 

Drafting program lacks dedicated storage space. 

Welding program  lab and classroom are undersized and there  is no  locker space for female students. 

Finishing area of welding  is housed  in a mezzanine, making  it  inaccessible  to students/staff who cannot use stairs. 

Textiles/Fashion design  space  is undersized and  configured  in an  inefficient  shape, making space deficiencies worse.  

Cosmetology  program  lacks  the  appropriate  quantity  of  classroom  spaces  and  its  support spaces are undersized. 

Culinary Arts program  is undersized  in all programmed spaces and  locker rooms are  located in storage closets.  

Special education  space  is grossly oversized while math, English, and  computer  spaces are undersize. 

Food service lacks a dedicated storage room. 

Academy of Health Professionals program is deficient in size, number of lab spaces, number of classroom spaces, and required support spaces. A portion of this program  is  located  in a relocatable classroom space. 

Biomedical program labs are undersized and the program lacks dedicated storage space. 

Page 14: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…

Executive Summary ǀ 02 

    Carroll County Career & Technology Center ǀ 7       January 10, 2017 

Criminal Justice program  lab  is undersized,  located  in a relocatable classroom, and  lacks the required amount of classroom spaces. 

Construction  programs  (HVAC,  Carpentry, Masonry,  Electrical,  and  Building Maintenance) have  undersized  lab  and  classroom  spaces  and  do  not  have  locker  facilities  for  female students.    Storage  space  is  highly  concentrated  in mezzanines, making  it  inaccessible  for students/staff who cannot use stairs.  

Building maintenance program has no dedicated space.  They share the building services staff space (see item above). 

Video production  lacks dedicated support spaces, possesses an undersized  lab space, and  is currently located in a relocatable classroom. 

Print production  lacks  a photo  lab.    Program  currently uses  a mechanical  room  for photo development. 

Computer Technology and CISCO/Networking programs have undersized  labs,  too  few  labs spaces, and no dedicated storage.  CISCO is currently located in a relocatable classroom. 

Automotive Technology is undersized by nearly one half the programmed size. 

Collision Repair program is undersized and lacks locker space. 

Heavy Equipment and Truck Technology (Diesel) is undersized by approximately 33%. 

Staff resource rooms do not exist for the career clusters.  Staff currently share space with the special education area for this use.   

Retail  spaces  (cosmetology,  textiles/fashion,  and  culinary)  do  not  have  dedicated  public access points.  Patrons must walk through the building to access these spaces. 

 

 

 

 

 

 

 

 

   

Page 15: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…

Executive Summary ǀ 02 

    Carroll County Career & Technology Center ǀ 8       January 10, 2017 

Proposed Design Options 

The development of the following design options  included an assessment of the Carroll County Career 

and  Technology  Center  building  and  concluded  that  the  building  has  educational  and  functional 

limitations.    It does, however, provide opportunity  to create multiple design options  that address  the 

requirements described in the proposed space summary developed by the Study Team.   The proposed 

design options went through a series of design review meetings with members of the Study Team. 

 

 

OPTION A ‐ PARTIAL MODERNIZATION 

 

 

 

 

 

 

OPTION B ‐ MODERNIZATION 

 

 

 

 

 

Option A ‐ Partial Modernization 

Partial  Modernization  (Option  A)  includes 

constructing  a  21,000  sf  addition  that  contains 

spaces  for  the  wait  list  programs  indicated  in  the 

program  inventory  space  summary.  Proposed work 

also  includes  complete  renovation  of  the  existing 

building  to  bring  the  entire  building  into 

conformance  with  current  building  and  life  safety 

codes.  Enlargement  of  program  space  within  the 

existing building is not provided as part of this partial 

modernization,  and  life  safety  renovations  may 

reduce  the  existing  instruction  space  to 

accommodate  the  modifications.  Relocatable 

classrooms will  remain during and after  completion 

of  the  partial  modernization.  Maintaining  building 

occupancy and operation will  require a multi‐phase 

construction process.  

 

Option B ‐ Modernization 

Modernization (Option B) includes renovation of the 

existing  building  to  bring  the  entire  building  into 

conformance  with  current  building  and  life  safety 

codes  and  reconfiguration  of  the  spaces  to  better 

accommodate  the  proposed  program.  It  will  also 

include  91,185  sf  in  additions  to  be  in  compliance 

with  the  proposed  program.    Existing  detached 

building  for  auto  collision  repair  program  will  be 

demolished.    Maintaining  building  occupancy  and 

operation  will  require  a  multi‐phase  construction 

process. 

Page 16: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…

Executive Summary ǀ 02 

    Carroll County Career & Technology Center ǀ 9       January 10, 2017 

 

 

OPTION C ‐ REPLACEMENT 

 

 

 

OPTION D – REPLACEMENT OFFSITE 

 

 

 

 

 

Option C ‐ Replacement 

Replacement  (Option  C)  includes  a  design  of  a  new 

two‐story  facility  on  the  existing  campus  to  be  in 

compliance  with  the  proposed  program,  including 

square  footage  and  proper  spatial  and  educational 

relationships.  The  existing  building  will  remain 

operational  during  construction  of  the  new  building 

and  will  be  demolished  when  the  new  building  is 

completed.  The  site  design  will  address  traffic 

patterns,  parking,  and  replacement  athletic  fields  at 

the location of existing building to be demolished. The 

Community  Media  Center  will  be  replaced  in  this 

option  to  provide  space  for  the  relocated  athletic 

fields  and  will  be  constructed  as  part  of  the  new 

building. 

 

Option D – Replacement Offsite 

Replacement Offsite (Option D) includes a design of a 

new  two‐story  facility  to  be  in  compliance with  the 

proposed  program,  including  square  footage  and 

proper  spatial  and  educational  relationships.  This 

option will be constructed on a site to be determined. 

The  existing  building will  remain  operational  during 

construction of the new building and the building will 

be  vacated  when  the  new  building  is  completed, 

leaving it available for future use. The new site design 

will optimize traffic patterns, parking, and stormwater 

management at the new site. 

   

Page 17: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…

Executive Summary ǀ 02 

    Carroll County Career & Technology Center ǀ 10       January 10, 2017 

 

 

 

OPTION A ‐ PARTIAL MODERNIZATION 

 

 

 

 

 

 

OPTION B ‐ MODERNIZATION 

 

 

 

LEGEND: 

 

*Costs include site and building construction; 

phasing; and contingency costs.  

 

 

 

 

OPTION A 

Area of Existing Building    116,775 GSF 

Area of Demolition                  0 GSF 

Area of Modernization    116,775 GSF 

Area of New Construction      21,000 GSF 

Total Area        137,775 GSF 

Total Estimated Construction Cost*  $42,088,199 

 

 

 

 

 

 

OPTION B 

Area of Existing Building    116,775 GSF 

Area of Demolition                7,550 GSF 

Area of Modernization    109,225 GSF 

Area of New Construction      91,185 GSF 

Total Area        200,410 GSF 

Total Estimated Construction Cost*  $66,239,686 

 

   

Page 18: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…

Executive Summary ǀ 02 

    Carroll County Career & Technology Center ǀ 11       January 10, 2017 

 

 

OPTION C ‐ REPLACEMENT 

 

 

 

 

OPTION D ‐ REPLACEMENT OFFSITE 

            

 

 

 

OPTION C 

Area of Existing Building    116,775 GSF 

Area of Demolition (entire school)   116,775 GSF 

Area of Modernization    N/A 

Area of New Construction    207,210 GSF 

Total Area        207,210 GSF 

Total Estimated Construction Cost*  $72,190,564 

 

 

 

 

 

OPTION D 

Area of Existing Building    116,775 GSF 

Area of Demolition (entire school)               0 GSF 

Area of Modernization    N/A 

Area of New Construction    200,410 GSF 

Total Area        200,410 GSF 

Total Estimated Construction Cost*  $66,359,258

 

LEGEND: 

 

*Costs include site and building construction;  phasing; and contingency costs.  

Page 19: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…

Executive Summary ǀ 02 

    Carroll County Career & Technology Center ǀ 12       January 10, 2017 

 

Alternative Sites 

As  part  of  the  design  option  review  process,  CCPS  directed  HCM  to  review  the  viability  of  locating portions of CCCTC programs at existing CCPS facilities.  HCM reviewed potential spaces at Westminster High  School,  South Carroll High  School, and North Carroll High  School.    In each  case,  space  could be utilized  to  reduce  the  size  of  the  required  additions  or  size  of  a  replacement  facility.    However, renovation costs would be required at similar $/SF capital renovation costs as required to renovate the existing facility to accommodate the relocation of the programs to these spaces. Operational costs (i.e. transportation costs, additional  staffing, utility costs, etc.) also will need  to be accounted  for and will vary significantly between currently occupied facilities and buildings that are not currently in use. Refer to Appendix A for a cost breakdown of work typical for renovation at Westminster High School if some programs  are  relocated  as  an example. The proposed options do not  take  relocation of programs  to other sites into account for purposes of this study.  

Page 20: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…
Page 21: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…

    Carroll County Career & Technology Center    

 

 

 

 

 

 

 

 

 

 

 

 

HISTORY  

Page 22: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…
Page 23: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…

History ǀ 03 

    Carroll County Career & Technology Center ǀ 13     January 10, 2017 

Historical Summary 

The existing building, constructed  in 1969, has been expanded on one occasion and has no historical significance.   A stepped, one story addition was constructed  in 1986 and contains high bay classroom and lab spaces for the HVAC, Welding, and Heavy Equipment and Truck Technology (Diesel) programs. In 1998,  the  original  storage  building  on  the west  side was  renovated  to  be  shop  space  for  the  Auto Collision Repair program. 

 

    

Years of Construction Plan     

 

Maintenance,  repair,  and  replacement  projects  have  occurred  throughout  the  life  of  the  building. 

Projects performed in the last 15 years include: 

2001 ‐ Replace Aluminum Exterior Doors    2014 ‐ Exterior Lighting Upgrade 

2002 ‐ Replace Cooling Tower        2014 ‐ Security Upgrades (Access Control  

2003 ‐ Replace VAT flooring with VCT         and Visitor Management System)  

2005 ‐ Replace VAT flooring with VCT       2015 ‐ Roof Replacement 

Page 24: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…
Page 25: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…

    Carroll County Career & Technology Center    

 

 

 

 

 

 

 

 

 

 

 

 

EDUCATIONAL GOALS  

Page 26: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…
Page 27: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…

Educational Goals ǀ 04 

    Carroll County Career & Technology Center ǀ 14     January 10, 2017 

Educational Program  

A primary goal of this study is to analyze the educational adequacy of the existing building to determine 

if  it  can  accommodate  the proposed  educational program  and  if not, determine what  is  required  to 

achieve  the educational goals put  forth by  the Study Team. This  includes accommodating  the current 

enrollment of 769  semester 1  students, 815  semester 2  students,  and  a wait  list of 300  students. A 

program inventory created collaboratively by Carroll County Public Schools and Hord Coplan Macht was 

used  as  a  baseline.    Program  inventory  was  based  on  enrollment  needs  including  wait  list,  state 

education guidelines, and programs from comparable career and technology facilities in Maryland. The 

program  is organized  into the six career clusters, administration, and general education. The six career 

clusters are:  

Engineering 

Business/ Retail 

Health & Human Services 

Construction 

Computer Related 

Transportation 

When  a modernization  project moves  forward,  a  Planning  Committee will  be  formed  and  they will 

develop a detailed educational specification at that time.  

An analysis of the proposed program versus the existing building  identified an additional 82,457 gross 

square feet is required to be added to the existing building to accommodate the proposed program (see 

Program Summary Table at the end of this section). The additional square footage  is addressed  in the 

four  design  options  presented  in  this  report.  The  analysis  also  revealed many  educational  program 

deficiencies with  the  existing building  that will  require  reconfiguration  and  expansion of  the  existing 

building to accommodate. A partial list of deficiencies is as follows:  

Administration suite lacks storage for general use and records. 

Guidance suite is comingled with main administration. 

Health suite does not meet COMAR requirements – all health services are provided  from a single office that is accessed through the main office. 

Maintenance personnel share space with the building maintenance program for students. 

Engineering program is lacking in quantity of classroom and storage spaces. 

Manufacturing Lab is undersized and program lacks adequate storage space. 

Drafting program lacks dedicated storage space. 

Welding program  lab and classroom are undersized and there  is no  locker space for female students. 

Finishing area of welding  is housed  in a mezzanine, making  it  inaccessible  to students/staff that cannot use stairs. 

Page 28: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…

Educational Goals ǀ 04 

    Carroll County Career & Technology Center ǀ 15     January 10, 2017 

Textiles/Fashion design  space  is undersized and  configured  in an  inefficient  shape, making space deficiencies worse.  

Cosmetology  program  lacks  the  appropriate  quantity  of  classroom  spaces  and  its  support spaces are undersized. 

Culinary Arts program is undersized in all programmed spaces and locker spaces are located in storage closets. 

Special education  space  is grossly oversized while math, English, and  computer  spaces are undersize. 

Food service lacks a dedicated storage room. 

Academy of Health Professionals program is deficient in size, number of lab spaces, number of classroom spaces, and required support spaces. A portion of this program  is  located  in a relocatable classroom space. 

Biomedical program labs are undersized and the program lacks dedicated storage space. 

Criminal Justice program  lab  is undersized,  located  in a relocatable classroom, and  lacks the required amount of classroom spaces. 

Construction  programs  (HVAC,  Carpentry, Masonry,  Electrical,  and  Building Maintenance) have  undersized  lab  and  classroom  spaces  and  do  not  have  locker  facilities  for  female students.    Storage  space  is  highly  concentrated  in mezzanines, making  it  inaccessible  for students/staff who cannot use stairs.  

Building maintenance program has no dedicated space.  They share the building services staff space (see item above). 

Video production  lacks dedicated support spaces, possesses an undersized  lab space, and  is currently located in a relocatable classroom. 

Print production  lacks  a photo  lab.    Program  currently uses  a mechanical  room  for photo development. 

Computer Technology and CISCO/Networking programs have undersized  labs,  too  few  labs spaces, and no dedicated storage.  CISCO is currently located in a relocatable classroom. 

Automotive Technology is undersized by nearly one half the programmed size. 

Collision Repair program  is undersized,  lacks a dedicated paint booth area (it currently uses shop space), and lacks locker space. 

Heavy Equipment and Truck Technology (Diesel) is undersized by approximately 33%. 

Staff resource rooms do not exist for the career clusters.  Staff currently share space with the special education area for this use. 

Retail  spaces  (cosmetology,  textiles/fashion,  and  culinary)  do  not  have  dedicated  public access points.  Patrons must walk through the building to access these spaces.   

 

 

Page 29: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…

Educational Goals ǀ 04 

    Carroll County Career & Technology Center ǀ 16     January 10, 2017 

In addition to the programmatic deficiencies noted above, there are deficiencies and inefficiencies with locations of programs within the existing building. A partial  list follows and will be refined more when the detailed educational specification is written and identifies specific adjacency requirements that need to be met.  

The  cosmetology  salon,  culinary  restaurant,  and  textiles/fashion  lab  do  not  have  exterior access for community patrons.  

Health and Biosciences cluster spaces are spread out across  four  locations over  two  floors, with one being a relocatable classroom. 

Engineering  cluster  is  spread  out  across  three  locations,  including  space  that  divides  the Information Technology cluster. 

Business and retail spaces are spread out across three locations.  

Main entry is not based on prevailing site access point/route. 

Elevator  location  is as remote  from main entry as possible, requiring a user to traverse the entire building to use it. 

Building services space and loading dock are not optimally located. 

   

Page 30: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…

Educational Goals ǀ 04 

    Carroll County Career & Technology Center ǀ 17     January 10, 2017 

 

The  following  table  summarizes  the existing program and  compares  it  to  the proposed program. The programs  in  the  table  are  organized  by  career  cluster.  Items  highlighted  in  red  identify  the major programmatic deficiencies.  

Program Summary Table 

Items highlighted in red are deficiencies with the current building that do not meet the proposed program.  Subtotals have 

been provided per career cluster for an additional level of information. 

  

Page 31: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…

Educational Goals ǀ 04 

    Carroll County Career & Technology Center ǀ 18     January 10, 2017 

    

Page 32: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…

Educational Goals ǀ 04 

    Carroll County Career & Technology Center ǀ 19     January 10, 2017 

    

Page 33: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…

Educational Goals ǀ 04 

    Carroll County Career & Technology Center ǀ 20     January 10, 2017 

      

Page 34: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…

Educational Goals ǀ 04 

    Carroll County Career & Technology Center ǀ 21     January 10, 2017 

   

Page 35: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…

Educational Goals ǀ 04 

    Carroll County Career & Technology Center ǀ 22     January 10, 2017 

 

    

Page 36: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…

Educational Goals ǀ 04 

    Carroll County Career & Technology Center ǀ 23     January 10, 2017 

     

Page 37: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…

Educational Goals ǀ 04 

    Carroll County Career & Technology Center ǀ 24     January 10, 2017 

The following table summarizes the program spaces that are required to be added to accommodate the current Wait List. The programs in the table are organized by career cluster.  

Page 38: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…
Page 39: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…

    Carroll County Career & Technology Center    

 

 

 

 

 

 

 

 

 

 

 

 

EXISTING CONDITIONS  

Page 40: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…
Page 41: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…

Existing Conditions ǀ 05 

    Carroll County Career & Technology Center ǀ 25     January 10, 2017 

EXISTING CONDITIONS 

 

SITE  

Site Description 

The  subject  site  for  Carroll  County  Career  & 

Technology  Center  is  located  at  1229 

Washington  Road,  Westminster,  Maryland 

21157.    The  site  is  approximately  68.56  acres 

and currently contains the Career & Technology 

Center  building,  five  (5)  relocatable  classroom 

buildings  and  the  existing  Westminster  High 

School building.   The property  is also known as 

parcel 412 as shown on tax map 52, grid 7.  The 

tax  account  number  for  the  property  is  07‐

003528.    The  site  is  owned  by  the  Board  of 

Education of Carroll County  and  the deeds  for 

the property can be found in the Carroll County 

Courthouse at Liber 436, Folio 628.   

 

The  property  is  bounded  by Washington  Road 

(MD Route 32), a retirement home facility, and 

an  apartment  complex  to  the west, Municipal 

buildings  to  the  south,  single  family  residential 

homes  and New Washington  Road  (MD Route 

97)  to  the  east  and  single  family  residential 

homes and Hook Road to the north. 

 

 

 

Site Circulation and Parking 

There are three existing access points onto the 

site, one of these access points is located along 

Washington  Road  (MD  Route  32).    The  other 

two access points are located along Washington 

Lane.   The  first access point along Washington 

Road  is  located  opposite  the  entrance  to  the 

Golden  Living  Center  just  south  of  Pennington 

Place.   This access point provides access to the 

Career & Technology Center, Westminster High 

School  shared  parking  area, Westminster High 

School  bus  loop  and  the  loop  road  that  runs 

around both buildings.  The main parking lot for 

the  Career &  Technology  Center  is  located  on 

the west side of the existing building and is also 

accessed from the loop road.  This parking lot is 

shared  with  the  existing  Community  Media 

Center that is located on a county owned parcel 

that wraps around  the southern portion of  the 

parking  lot.    The  Career &  Technology  Center 

main  parking  lot  contains  approximately  230 

parking  spaces  including  14  ADA  accessible 

parking spaces.   The shared parking  lot  located 

off  the  northwest  corner  of  the  Career  & 

Technology Center  contains approximately 157 

parking  spaces  including  5  ADA  accessible 

parking spaces. 

The second access point along Washington Lane 

appears  to mainly  serve  the Westminster High 

School.    The  third  access  point  is  also  located 

along Washington Lane and serves as access to 

both  the  Career  &  Technology  Center  and 

Westminster  High  School.    There  is  an 

additional parking lot located off of this access/ 

loop  road  that  appears  to be primarily  for  the 

Page 42: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…

Existing Conditions ǀ 05 

    Carroll County Career & Technology Center ǀ 26     January 10, 2017 

high  school.   This parking  lot  is  located off  the 

northeast  corner  of  the  Career  &  Technology 

Center  and  contains  approximately  91  parking 

spaces. 

Zoning Information 

The  property  is  currently  zoned  as  C  ‐ 

Conservation  District.    The  properties 

surrounding  the  school  site  to  the  east  are 

zoned Residential (R‐20,000).  The properties to 

the  north  and  west  are  zoned  Residential  (R‐

10,000).  The properties to the south are zoned 

Conservation District (C).   

 

The  following  specific  development  standards 

for the Conservation zone (an excerpt from Title 

15‐Chapter  158  Zoning  Regulations)  of  the 

Carroll  County  Maryland  Code  of  Ordinances 

are  provided  for  guidance  only.    Per  Chapter 

158,  schools  are  considered  a  principal 

permitted use. 

Bulk Zoning Regulations  in a Conservation zone 

for the current permitted use of a school are as 

follows: 

Minimum lot size  10 acres 

Minimum lot width  500 feet 

Minimum setbacks for principal structures:   

   Front Yard  150 feet  

   Rear Yard  50 feet 

   Side Yard  100 feet 

Maximum height limitations:   

   Principal structures  35 feet 

   Accessory structures  25 feet  

 

Site Soils 

According  to  information  obtained  from  the 

United  States  Department  of  Agriculture 

Natural  Resources  Conservation  Service,  the 

site falls into six (6) distinct soil groups: 

BaA – Baile silt loam, 0 to 3 percent slopes. 

BrD – Brinklow channery loam, 15 to 25 percent 

slopes. 

GeC – Glenelg channery  loam, 8  to 15 percent 

slopes. 

GfB  –  Glenelg‐Urban  land  complex,  0  to  8 

percent slopes. 

UrB  – Urban  land‐Udorthents  complex,  0  to  8 

percent slopes. 

WhB  –  Wheaton‐Glenelg  complex,  0  to  8 

percent slopes. 

Refer to image below for soil group locations. 

Page 43: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…

Existing Conditions ǀ 05 

    Carroll County Career & Technology Center ǀ 27     January 10, 2017 

 

Additional  information  regarding  these  soils  is 

identified below: 

Map 

Unit 

%  of 

Site 

Area 

Hydro  

Soils 

Group 

Class Hydric 

Soils 

Topsoil 

Source 

BaA  12%  C/D  MH  Yes  Poor 

BrD  6%  C  CL  No  Poor 

GeC  1%  B  ML  No  Fair 

GfB  23%  B  ML  No  Fair 

UrB  36%  D  N/A  No Not 

Rated 

Wh

B 22%  B  ML  No  Fair 

 

Site Topography 

The  site  topography  has  gradual  changes  in 

elevation.   The highest elevations are along the 

northern portion of  the property.    From  there 

the  grade  slopes  down  toward  the  south 

gradually to the two plateaus of the site where 

the buildings and fields are located.  The grades 

near  the  building  are  slightly  higher  than  the 

field grades.   The grades  continue  to gradually 

slope  across  the  fields  toward  the  southern 

portion of  the property.    In  the  vicinity of  the 

Career & Technology Center 1986 addition, the 

grades  come  up  approximately  5’  from  the 

remainder of the building on the southern side 

and then they fall off quickly toward the south. 

Water Service 

Based on our review of existing documentation, 

it appears  that  the existing building  is  serviced 

from the existing 12” water main located within 

Washington  Road.    Several  fire  hydrants  exist 

on‐site. 

Sanitary Sewer 

The  existing  building  is  currently  served  by  a 

public  sanitary  sewer  system.    The  existing 

sewer leaves the building in several locations in 

the back  along  the  eastern building wall.    The 

sewer  line  is  8”  in  size  and  is  collected  at  a 

manhole  just  off  the  loop  road  to  the  east.  

From the manhole, the 8” sewer line leaves the 

site on the south side where there is an existing 

8” public sewer line.   

Storm Drains 

Storm water around  the  site  is  conveyed via a 

combination of overland flow and closed storm 

drain system.  Primarily, the closed storm drains 

convey  runoff  from  the  existing  building  roof 

and  paved  parking  areas.    The  storm  drains 

range  in  size  from  6”  to  60”.    The majority of 

the  storm  drainage  discharges  on  the 

southeastern  portion  of  the  property  into  an 

existing stormwater management pond. 

Page 44: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…

Existing Conditions ǀ 05 

    Carroll County Career & Technology Center ǀ 28     January 10, 2017 

Stormwater Management 

The site does currently contain one stormwater 

management  facility.    This  facility  is  a  pond 

located on the southeastern portion of the site.  

Any  new  construction  that  occurs  will  be 

required  to meet  the requirements established 

by  the  Maryland  Stormwater  Act  of  2007.  

These  guidelines  establish  a  process  by which 

new construction needs to utilize sustainable or 

environmental  site  design  (ESD)  to  the 

maximum  extent  possible  to  satisfy  water 

quality requirements.  ESD’s include but are not 

limited  to micro‐bio  retention, dry  and/or wet 

swales,  rain  gardens,  etc.  Attempts  should  be 

made  to  provide  for  impervious  disconnects 

and  to  allow  for  adequate  open  space  to 

construct multiple  smaller  facilities  throughout 

the site to satisfy these requirements. 

Floodplains, Wetlands, and Waterways 

The  site  is  not  located  within  the  100  year 

floodplain  as  delineated  on  FEMA  flood 

insurance  rate map  24013C0215D.    The  site  is 

located  in  zone  X  which  means  an  area 

determined  to  be  outside  the  0.2%  annual 

chance  floodplain.    A  review  of  the Maryland 

Department  of  Natural  Resources  (DNR) 

mapping indicates that onsite wetlands do exist 

on the site.  The wetland areas are located near 

the existing pond.  It also appears that a portion 

of  Middle  Run  also  runs  through  the 

southernmost corner of the site. 

Landscape, Trees and Forest Conservation 

There are no existing forested areas  located on 

the  site.    There  are  several  groupings  of  trees 

located  sporadically  around  the  site.  A  forest 

stand delineation and  forest  conservation plan 

will  be  required  for  any  development  that 

exceeds 40,000 square  feet on  the site.   There 

were  a  few  large  trees  noted  during  our  site 

investigation.   Specimen tree removal that may 

be  required will  require  a  variance  as well  as 

mitigation  as  part  of  any  design  that  impacts 

trees  that  are  determined  to  meet  specimen 

tree requirements.   

Recreational Site Amenities 

The  property  has  several  on‐site  recreational 

areas  located  on  the  eastern  portion.    They 

consist  of  2  baseball  fields,  a  grassed  multi‐

purpose  field,  a  track with multi‐purpose  field 

located within  it,  3  long  jump  runways  and  4 

tennis courts.   There  is also a soft surface play 

area  located  on  the  south  side  of  the  high 

school. 

 

ARCHITECTURAL  

Existing Buildings 

The  original  building was  constructed  in  1969, 

with  an  addition  to  the  Southeast  side  of  the 

building  in  1986.    A  renovation  to  an  original 

storage  building  in  1998  converted  the 

structure  to an Automotive Collision Repair  lab 

and  classroom building.   A  storage building on 

the West side of the building was added in 2004 

for  building  maintenance  staff.  Numerous 

modifications  to  the  interior  walls  have  been 

made throughout the history of the building to 

accommodate  the  delivery  of  the  program  to 

students.   

The  original  building  is  a  two  story  structure 

with  the main  entry  at  the  upper  level  and  a 

grade change around the rear of the building to 

at‐grade access on the lower level.  An elevator 

and  two stair  towers allow access  to  the  lower 

level.    The  upper  level  contains  the 

Administration,  cafeteria,  kitchen,  health  and 

Page 45: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…

Existing Conditions ǀ 05 

    Carroll County Career & Technology Center ǀ 29     January 10, 2017 

human  services  labs  and  classrooms  and  the 

majority  of  the  construction  labs  and 

classrooms.  A courtyard is located on the upper 

level.   The  lower  level contains the automotive 

and  biomedical  labs  and  classrooms  and  the 

main  mechanical  room.  Greenhouses  serving 

the  biomedical  program  are  adjacent  to  the 

lower  level.   The Auto body building  is  located 

on  the west  side  of  the  building  at  the  same 

elevation  as  the  ground  floor  of  the  original 

building.   The 1986  addition  follows  the  grade 

on  the Southeast  side of  the building with  the 

floor  elevation  between  the  first  and  ground 

floors  of  the  original  building.    Access  to  the 

addition  is  via  a  stair  tower on  the North  side 

and  a  ramp  on  the  South  side.    Diesel 

Mechanics,  HVAC,  and Welding  are  located  in 

the addition.    

Roof 

The roof over the 1970 and 1986 portions of the 

building was  replaced  in  2015,  and  is  in  good 

condition.  Roof  drainage  is  via  internal  roof 

drains.  No  overflow  roof  drains,  as  currently 

required  by  Code, were observed  in  the  areas 

served by internal roof drains.  

Exterior Wall   

The  exterior  walls  of  the  1970  and  the  1986 

sections of building are 14” thick masonry cavity 

walls  consisting  of  7.625”  concrete  block 

backup, 1.5” of rigid board  insulation, 1.25” air 

cavity,  and  3.625”  brown  brick  veneer.  Fluted 

white CMU  veneer  is used as an accent  finish. 

The existing building does not make use of an 

air  barrier,  which  is  recommended  based  on 

current construction methods.  Window sills are 

profiled metal sills.  

The overall condition of the exterior walls is fair, 

however,  there are numerous mortar  locations 

that  are  in  poor  condition  and  require  re‐

pointing.  Poor  mortar  joints  allow  water  into 

the wall  cavity which  can  then migrate  inside 

the building, particularly without  the  presence 

of an air barrier. 

 

Exterior Windows and Doors 

Exterior  windows  on  the  original  building  are 

aluminum  windows  with  single  pane  glazing.  

The frames of these windows are not thermally 

broken.    Leaks  have  been  noted  at  these 

windows  by  school  maintenance  personnel 

indicating  the  need  for  repair  to  the  window 

seals  and  flashing.    Exterior  windows  in  the 

1986  addition  are  thermally  broken  aluminum 

windows  with  insulated  glazing  (multi‐pane) 

units. 

 

Page 46: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…

Existing Conditions ǀ 05 

    Carroll County Career & Technology Center ǀ 30     January 10, 2017 

Exterior  entry  doors  are  a  combination  of aluminum  and  hollow  metal  steel  doors.    At corridors  and  lobbies,  aluminum  doors  within an aluminum window system are used.  Exterior doors  to  classrooms,  labs, and building  service spaces are hollow metal steel doors. 

Building – Interior 

Floors 

The main lobby  and commons/ dining floor are terrazzo.    This  extends  into  some  of  the Academy of Health Professionals spaces where partitions  have  been  added  over  time.    The remaining  corridors  in  the original building are sealed  concrete.    Heavy  duty  lab  spaces  have sealed  concrete  floors while  classrooms,    light duty  labs  (such  as  print  production  and cosmetology),  and  staff  spaces  have  vinyl composition  tile  (VCT).  The  corridors  in  the addition are vinyl  composition  tile with  rubber flooring  on  the  ramp.    The  kitchen  floor  is quarry tile that is in good condition. 

If  a  renovation  option  that  keeps  the  existing building  is  selected,  the  terrazzo  floors  should remain and be cleaned.  The vinyl tile should be replaced as part of a building wide renovation. 

 

Partitions 

Interior partitions are typically painted concrete masonry  unit  (CMU)  if  part  of  the  original building  or  addition  construction.    Where program  spaces  have  been  modified  to  meet 

changing program needs, drywall on metal stud or  demountable  metal  partitions  have  been used.    Vinyl  cove  based  is  used  at  all  interior partition types. 

 

Ceilings 

Ceilings  are  a  combination  of  acoustical  lay  in tiles,  painted  drywall,  and  exposed  painted structure.    Corridors,  classrooms,  and  staff spaces  utilize  2x4  acoustical  ceiling.    Toilet rooms  and  the  kitchen  utilize  painted  drywall.  Heavy  duty  labs  have  no  ceilings  with  roof structure being left exposed and painted. 

 

 

 

 

Page 47: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…

Existing Conditions ǀ 05 

    Carroll County Career & Technology Center ǀ 31     January 10, 2017 

 

Doors/ Hardware 

Interior doors are typically wood unless located in a high abuse area that benefits from the use of  hollow  metal  doors.    Hardware  has  been updated  so  doors  have  a  lever  per  current design  standards  for  accessibility.    Current school design guidelines indicate that all spaces where  a  student  and  teacher  interact  need  to have  a  vision  panel  into  the  room.    Several repurposed  rooms do not  currently  satisfy  this requirement  and  would  require  addition  of  a vision lite kit to the door.   

Corridors/ Circulation 

Corridors are generally accessible, of adequate width, and in good condition with the exception of  the  ramped  corridor  serving  the  1986 addition.    The  ramps  are  too  steep  to  satisfy ADA guidelines. 

 

 

Toilet Rooms/Locker Rooms 

Toilet  rooms  are  too  few  in number  based on current  code  requirements  for  quantity  of plumbing  fixtures  of  a  building  the  size  of  the school.    Layout  of  rooms  does  not meet  ADA guidelines  for  clear  space.    Leaking  has  been noted  by  school  maintenance  personnel  that would  need  to  be  addressed  as  part  of  a building renovation. 

 

 

Locker  rooms  are  required  by  multiple programs.    Many  programs  have  lockers  for only  one  gender.    Equal  facilities  need  to  be provided to both male and female students for each  program.  In  addition, many  locker  areas have been  located  in make‐shift spaces such as existing  storage  closets  or  areas  partitioned within  other  spaces.    The  girls  culinary  locker room, for example, is located in a corner of the dining area with partitions that were added for privacy.    The  male  culinary  locker  room  is located  in  a  storage  closet  and  has compromised privacy when the door is opened. 

 

Page 48: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…

Existing Conditions ǀ 05 

    Carroll County Career & Technology Center ǀ 32     January 10, 2017 

 

 

 

Casework and Equipment 

Generally,  the  casework  is  stained  or  painted wood  and  is  in  good  condition.    Some  spaces have added mobile or  less durable storage that would  not  be  worthy  of  salvage  through  a renovation. 

Equipment  is  in good condition and appears  to have  been  updated  through  the  years  as program  technology  needs  evolve.    We recommend salvaging and reusing equipment in both renovation and replacement options. 

 

Hazardous Materials  

Based on the year of construction, it is assumed that  there  are  hazardous  materials  in  the building  construction  in  the  form  of  asbestos, lead based paint, etc.   The hazardous materials report maintained by CCPS will be  reviewed as part of the final report. 

 

STRUCTURAL 

Existing Building Observations 

Structural  drawings  for  the  original  building were provided  for our review, and  indicate the building was  designed  in  1969. An  addition  at the east end of  the building was  introduced  in the  late  1980s,  however  drawings  were unavailable at time of writing. 

Based on our review of the documents and on‐site observations, the following is a summary of construction: 

Roof Framing 

Original construction consists of precast double  tees,  single‐stem  “giant”  tees, and  channel  slabs.    Roof  framing support  consists  of  masonry  bearing walls at perimeter and corridors as well as  structural  steel girders  and  columns at the commons area. 

Roof framing at the addition consists of 

Page 49: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…

Existing Conditions ǀ 05 

    Carroll County Career & Technology Center ǀ 33     January 10, 2017 

metal  deck  on  long‐span  open  web steel  joists.  Joists  are  typically supported  on  interior  and  exterior masonry bearing walls. 

Floor construction in the areas bounded by  lines A,  F,  1,  18  and  lines  F, H  1,  9 consists of a 4‐inch reinforced concrete slab on composite structural steel  filler beams.  Filler  beams  are  typically  24‐inches  in  depth  spaced  at  8‐feet  on‐center  and  supported  by  24‐inch structural  steel  girders  and  W8  steel columns.  

Floor  construction at  the Ground Floor and balance of the First Floor consists of a  4‐inch  concrete  slab‐on‐grade, reinforced with welded wire fabric. 

Exterior  Walls  consist  of  masonry  veneer  on concrete masonry unit back‐up. 

Foundations  are  conventional  spread  footings bearing at a nominal depth. 

Observations 

Our walk‐thru  of  the  existing  building was  for general review of the existing conditions, to the extent visible without demolition, and to gather information  from  maintenance  personnel regarding  known  issues  and  remedial  work undertaken. 

Based on our walk‐thru and conversations with the building engineer, we note the following: 

Façade:  

Exterior  veneer  has  varying  degrees  of mortar  deterioration,  including  loose and missing mortar. 

Transition  from  brick  to  fluted  CMU veneer  near  the  top  of  the  walls appears  to  have  been  caulked  (white caulk). This was observed at the interior courtyard and some portions of exterior walls. 

Auto  Repair  Garage  Bay  Doors:    Lintels  were recently  replaced  to  address  corrosion  issues, including  failure  of  lintel  at  one  of  the  bay doors. 

Courtyard  Leaks:  Building  engineer  noted periodic leaks occur in the area of the courtyard to the ground floor in rain events. 

Storefront:  Building  engineer  noted  ongoing leak  issues  at  base  of  storefront  systems, including  at  the  north  corridor  between commons  and  classrooms,  the  adjacent stairwell, and courtyard. 

Machine  Shop:    The  existing  slab‐on‐grade  in the machine shop shows signs of settlement at the  north,  east  and  south  walls  of  the  shop. Cracking of the slab was evident, in these areas. East wall also exhibits cracking  in the CMU and a  gap  at  the  slab‐on‐grade  and masonry  wall interface. 

CMU Walls:  With the exception of the Machine Shop noted above, cracking was not evident  in observed  interior  masonry  walls  and  interior wythes of exterior walls. 

Assessment and Recommendations 

Based on our observations, it is our opinion that 

the  existing  building  is  structurally  sound  and 

reuse  of  the  existing  building  is  feasible  with 

proper  detailing,  repairs  and  separation 

considerations. 

New  addition(s)  should  be  structurally 

separated  by  expansion  joints  to 

accommodate  differential  settlement 

and mitigate  the  need  to  upgrade  the 

lateral  load  resisting  system  of  the 

existing facility.  

A façade survey should be performed to 

define  locations,  extent  and  scope  of 

façade  repairs  required.  Local 

destructive  investigation  may  be 

Page 50: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…

Existing Conditions ǀ 05 

    Carroll County Career & Technology Center ǀ 34     January 10, 2017 

required  to  assess  veneer  and  lintel 

conditions.  A  contingency  should  be 

carried  in  the  cost  estimates  for 

restoration of facades and lintels. 

Existing  machine  room  slab‐on‐grade 

cracking should be further investigated. 

This will  require  geotechnical  sampling 

in  the  area  to  assess  subgrade 

conditions.  We  would  recommend  a 

contingency  be  carried  to  reflect 

removal  and  replacement  of  the 

perimeter slab‐on‐grade  in the areas of 

settlement. 

Slab‐on‐grade  upgrades:    As  noted 

above, the existing slab‐on‐grade is a 4‐

inch  slab  reinforced  with  welded  wire 

fabric.  Dependent  on  the  space 

program  and  associated  equipment 

required it may be necessary to remove 

and  replace  the  existing  slab‐on‐grade 

with  heavier  slab‐on‐grade 

construction.  

We  understand  there  are  existing  geothermal 

well  fields  in  the  vicinity  of  the  existing  play 

fields. As‐built  location and extent of  the wells 

should be understood prior  to commencement 

of  design,  and  building  footprint  configured  in 

this  area  to  avoid overlaying or  surcharging of 

the wells and associated piping. Construction in 

this  area  will  require  a  long  run  of  retaining 

walls  to  level  the  site  for  the  new  play  fields.  

Cost  effective  solutions  for  these  walls  may 

include  dry  stacked  modular  retaining  wall 

systems.   Final design and wall  type  should be 

determined  following  geotechnical 

recommendations for local and global stability. 

 

 

FOOD SERVICE/KITCHEN 

General Description 

Carroll County Career and Technology Center’s 

culinary  arts  program  has  both  culinary  and 

pastry  chef  classes.    These  classes  are  held 

simultaneously  in  the  same  kitchen  spaces.  

Class  sizes  are  held  to  22  students  per 

instructor.   

Existing Conditions 

Floor Finishes 

Kitchen  and  serving  areas  are  thick‐set  quarry 

tile with  coved  base.  Although  old, most  tiles 

appear  in  sound  condition.  Due  to  smooth 

surface, tiles can be slippery when wet or laden 

with  grease.  Floors  in  the  dry  storage  are 

concrete 

Wall Finishes 

In  the  kitchen,  the walls  are  glazed  tiles up  to 

finished  ceiling  and  appear  in  good  shape.    In 

dry storage, the walls are painted block. 

Ceilings and Lighting 

Ceiling  heights  are  10’‐0”  high  and  exposed 

throughout  the  kitchen,  dry  storage,  and 

serving  area.      Ceilings  are  painted  and 

scrubable.    Twin  bulb  surface  mounted 

florescent  light fixtures. Light  levels throughout 

the space are above the 50’ candle as required.  

Assessment of Food Service Areas/Rooms 

Receiving 

This  area  has  a  raised  deck  for  deliveries.    To 

access the kitchen for deliveries they must cross 

a  hallway  used  by  the  general  population.  

Supplies cannot be brought in on pallets with all 

Page 51: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…

Existing Conditions ǀ 05 

    Carroll County Career & Technology Center ǀ 35     January 10, 2017 

door  sizes  having  standard  openings.    All 

products  are  removed  from  the  pallets  and 

taken by hand  truck  to  the  refrigerator/freezer 

and dry storage.  Refer to photos below. 

 

 

Fire Protection 

An Ansul system is in place.  It is possible that it 

may have to be updated in the future. 

Dry Storage 

Product  is  stored  on  4‐tier  mobile  shelving 

units, dunnage  racks,  and  can  racks. Walls  are 

painted  block.  Flooring  is  concrete.  Ceiling  is 

painted drywall.    Light  levels appear  sufficient. 

There  appears  to  be  sufficient  storage  in  the 

space. 

Walk‐in Cooler and Freezer Storage 

These units are in fair condition.  The unit is set 

up  to  enter  through  the  cooler  to  access  the 

freezer.   Light  is  inefficient  in both units.   Both 

units are completely filled to capacity indicating 

that they are in need of more cooler and freezer 

space.  Refer to photos below. 

     

 

Kitchen 

Area  is  poorly  ventilated  for  the  amount  of 

equipment  in  the  space.  Additional  cooking 

equipment  is  needed  to  properly  prepare 

current menu items. There are (3) hand washing 

sinks  to  cover entire kitchen  space  in violation 

of  health  code.  Light  levels  appear  sufficient. 

Layout for the kitchen flow  is  inefficient.   Walls 

could be  removed and  the area  reorganized  to 

provide  a  more  laborsaving  workflow  from 

receiving,  to  storage,  to  prep,  cooking,  plating 

serving and clean‐up. Refer to photos below. 

Page 52: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…

Existing Conditions ǀ 05 

    Carroll County Career & Technology Center ǀ 36     January 10, 2017 

 

 

Plating Area 

The  chef’s  table  area work  flow  is  inefficient, 

cramped and  labor  intensive for the number of 

students in the space. Refer to photo below. 

 

Restaurant/Classroom 

Students  serve  the  teachers  in  the  designated 

dining  area.    The  space  is  separated  with  a 

folding  divider  wall  to  create  a  classroom  on 

one  side and  teacher dining on  the other  side. 

More  space  is  recommended  for  both  areas. 

Refer to photos below. 

 

 

Dishwashing 

The Dish machine  is  fairly  new.    The  ceiling  is 

painted  drywall.    The  dirty  dish  table  is  not 

configured for the best use of space.  The tables 

have  galvanized  bases  that  are  high 

maintenance and are no  longer  to  code. Refer 

to photos below. 

    

Page 53: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…

Existing Conditions ǀ 05 

    Carroll County Career & Technology Center ǀ 37     January 10, 2017 

 

Janitor Closet/Mop Sink 

There  is no mop  sink  in  the  janitor  area.    The 

washer  is  oversized  for  the  needs  of  the 

kitchen.  It is recommended to have a dedicated 

soap and chemical storage space.  

Hand Sinks 

There  are  only  three  (3)  hand  sinks  in  the 

kitchen  area.    Today’s  health  code  requires  a 

hand  sink  in  each  section  of  the  kitchen: 

cooking,  food  prep,  serving  and  dishwashing 

within 15 feet.  One hand sink has an eye wash 

station which  is no  longer  to  code  and  should 

be in the main cooking area with more access to 

the students. 

 

Assessment of Equipment 

Exhaust Hood 

Hood appears to be original to the program.   It 

appears  in  good  working  condition.    Some  of 

the  equipment  currently  in  the  space  is  not 

under the hood and will need to be relocated to 

comply  with  code.    This  will  require  a  new, 

expanded hood that is code compliant. 

 

Current Cooking Equipment Inventory 

(1)  ‐ Double Fryer (Recommended that a dump 

station is added for this piece of equipment) 

(2)  ‐ Double‐Stack Convection Oven  (one  is not 

under the hood) 

(1) ‐ Griddle 

(1) ‐ Char‐broiler 

(1) ‐ Salamander 

(2) ‐ 10‐Burner ranges 

(1) ‐ Steamer (Should be under the hood) 

Additional Cooking Support Equipment 

Floor Mixer‐60‐Gallon 

Hot Food Wells‐4 Wells‐1 each 

Reach‐In Cooler‐2 each 

Double door Reach‐In Cooler‐1 each 

Page 54: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…

Existing Conditions ǀ 05 

    Carroll County Career & Technology Center ǀ 38     January 10, 2017 

Mobile Heated Cabinets‐1 each  

Pan Rack‐2 each 

Prep Sink,  

Pot Sink  

Baker’s Table 

Scales‐3 each 

Walk‐In Cooler/Freezer 

4 Compartment Hot Food Chef’s Table 

Ansul System 

Worktable with Sink 

Coffee Makers 

Hood 

Ice Machine 

5‐gallon Mixers‐5 each 

Slicer 

Heated Proofer Cabinet 

Worktables‐10 Stainless Steel, 5 

Butcher Block 

Utility Cart‐1 each 

Baker Storage Bins 

Hand Sinks‐3 each 

Shelving 

Storage Cage 

Washer & Dryer 

Beverage Counter with Sink 

Most of the equipment appears to be  in fair to 

good working condition. 

Recommendations 

The cooler/freezer is undersized for the 

class  needs.    Consider  increasing  the 

size  of  the  cooler/freezer with  a more 

efficient separate system. 

Install  a  demonstration  kitchen  with 

induction  cooking,  under‐counter 

refrigeration,  and  display  mirror  with 

TV/video  screens  to  provide  more 

extended  student  access  to  the 

instructor. 

It  is recommended that knife storage  is 

placed in a secured cabinet. 

 

Expansion  of  the  beverage  station  is 

recommended to properly address how 

stations  flow  during  usage.    Possibly 

include an ice tea dispenser. 

 

Conclusions 

With  the  current  number  of  students  in  the 

program  the  space  is  overcrowded.    Pastry 

students and culinary students constantly cross 

paths  while  accessing  the  cooking  and  pastry 

Page 55: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…

Existing Conditions ǀ 05 

    Carroll County Career & Technology Center ǀ 39     January 10, 2017 

equipment  which  is  used  by  both  programs. 

With  the possibility of expanding  the programs 

the  kitchen  will  need  to  be  enlarged  to 

accommodate  both  programs.  The majority  of 

the  equipment  is  reusable  with  various  life 

spans  per  each  piece.    Additional  cooking 

equipment  recommendations  would  include  a 

tilting  skillet,  a  combi‐oven,  induction  cookers 

and  a  pastry  deck  oven.  Reconfigure  overall 

kitchen  cooking, prepping and  serving areas  to 

better maximize  space.   The wall between  the 

kitchen and pot sink area could be removed if it 

is  not  structural,  then  the  kitchen  can  be 

reconfigured  to create additional space  for  the 

current program.   If expansion of the programs 

is  in  the  future,  additional  square  footage will 

be required. 

 

MECHANICAL 

EXISTING MECHANICAL CONDITIONS 

General 

The  existing mechanical  systems,  for  the most 

part, are original to the time of construction, be 

it  the 1969 building or  the 1986 Addition.   The 

Auto  Collision  Shop,  which  was  relocated  in 

1998,  into  the  renovated  Storage Building, has 

new  HVAC  and  plumbing  systems  and 

equipment.  Similarly,  the  Masonry  Shop  and 

Carpentry  Shop HVAC  Systems were  upgraded 

to  help  alleviate  indoor  air  quality  concerns.  

The existing cooling tower, chiller, domestic hot 

water heater(s), greenhouse systems, and shop 

air  compressors have been  replaced as part of 

independent  systemic  projects  over  the  years.  

Supplemental  split  type  direct  expansion 

systems  have  been  sporadically  added 

throughout the building.   

There  have  been  several modifications  to  the 

spaces  and/or  their  function  with  little  to  no 

modifications to the mechanical system. 

Heating 

The original and primary heating source for the 

building  is  electric  resistance.    Carroll  County 

Public  Schools,  in  conjunction with  BGE,  ran  a 

new four‐inch (4”) two‐pound (2 psig) gas main 

into a small mechanical room at the northwest 

end  of  the  building  which  also  houses  the 

domestic hot water heaters.  Currently, this gas 

service  does  supply  the  domestic  hot  water 

heaters,  greenhouse  units,  carpentry  and 

masonry shops make‐up air units, collision shop 

rooftop  unit,  collision  shop  classroom  rooftop 

unit,  and  the  paint  spray  booth  heater.  

Currently,  a  3‐inch  valved  and  capped 

connection  exists  in  the  water  heater 

mechanical room for future extension.  A valved 

and  capped  connection was  also  provided  for 

the  emergency  generator;  however,  at  this 

time,  the unit has not been converted  from LP 

to natural gas. A gas  line has been extended to 

the Lower Level Electrical Room for connection 

to  the  emergency  generator,  which  currently 

remains propane‐fired.  

Cooling 

The  building  is  partially  air‐conditioned.    Labs, 

such  as  Diesel,  Welding,  HVAC,  Automotive 

Mechanics,  Masonry,  and  Carpentry  Labs  are 

heated  and  ventilated  only.    Classrooms  are 

typically cooled.  Chilled water is generated by a 

water‐cooled  chiller  located  in  the  Lower 

Level/Ground  Floor  Mechanical  Equipment 

Room which  serves  the  original  building  only.  

Split  type  Dx  units  serve  the  1986  Addition 

classrooms as well as various spaces within the 

original building.   

Page 56: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…

Existing Conditions ǀ 05 

    Carroll County Career & Technology Center ǀ 40     January 10, 2017 

The chiller, manufactured by York  International 

(Model  #VCWJ77KHO‐46PA;  Serial#  SMEM‐

569940)  was  installed  in  1997,  utilizes 

refrigerant R‐22, has 181 nominal ton capacity, 

has  two  (2)  semi‐hermetic  reciprocating 

compressors, and operates at a flow rate of 436 

gallons per minute (gpm).  A new Spirotherm air 

and dirt separator has recently been installed in 

the  chilled  water  system.    Two  (2)  base‐

mounted end  suction pumps, one  (1)  standby; 

circulate chilled water through steel pipe mains 

to  unit  ventilators  which  serve  individual 

spaces. 

A  forced  draft,  centrifugal  type  open  cooling 

tower  is  located  at  the  northwest  end  of  the 

building.   It has a nominal capacity of 116 tons.  

The  unit  is  fairly  new  and  is manufactured  by 

Baltimore  Air  Coil  Company  (BAC  Model 

Number  VTO‐116M).      Condenser water  pipes 

between  the  building  and  cooling  tower  are 

located  below‐grade.    A  remote  sump  tank  is 

located  in  the  Lower  Level/Ground  Floor 

Mechanical Equipment Room, which houses the 

chiller and multiple shop air compressors.   Two 

(2)  base‐mounted  end  suction  pumps,  one  (1) 

standby,  circulate  condenser  water  to  the 

water‐cooled chiller. 

Compressed Air 

A  new  (2003/2004)  Ingersoll  Rand  air 

compressor and refrigerated air dryer has been 

installed  for  the  shops.    The  existing  air 

compressors/tanks  are  used  for  back‐

up/redundancy.  These air compressors, dryers, 

and  tanks  are  located  in  the  Lower 

Level/Ground  Floor  Mechanical  Equipment 

Room,  which  is  shared  with  the  chiller  and 

cooling plant equipment. 

 

Individual Space Condition – 1986 Addition 

The  HVAC  and  Diesel  Shops  utilize  roof‐

mounted heating and ventilating units equipped 

with  electric  resistance  heating  coils  (42  kW 

HVAC  Shop/78kW Diesel  Shop).      These  shops 

have exposed ductwork, a roof‐mounted gravity 

relief  air  hood,  space  exhaust  fan  and  ceiling 

fans.    The Diesel  Shop  has multiple  dedicated 

local exhaust systems.  The Classroom areas are 

equipped with  a  residential  type  split  fan  coil 

unit  with  electric  heat  and  remote  air‐cooled 

condensing  unit.    Outside  air  is  provided 

through a gravity  intake vent connected  to  the 

return air duct. Independent exhaust fans serve 

the toilet and locker room areas. 

The Welding Shop utilizes two (2) roof‐mounted 

heat  recovery  units  equipped  with  57  kW 

electric heat  coils. Heat  recovery units  contain 

both a supply fan and exhaust fan.  The exhaust 

system  connects  to  multiple  welding  booth 

canopy  hoods  and  local  source  capture  work 

bench  inlets.    The  classroom  is  served with  a 

residential  type  split  fan  coil  unit with  electric 

heat  and  remote  air‐cooled  condensing  unit.  

Outside air  is provided through a gravity  intake 

vent  connected  to  the  return  air  duct.  An 

independent exhaust fan serves the toilet room 

and locker room area. 

The  Conference  room  is  served  with  a 

residential  type  split  fan  coil  unit with  electric 

heat  and  remote  air‐cooled  condensing  unit.  

Outside air  is provided through a gravity  intake 

vent  connected  to  the  return  air  duct.  An 

independent exhaust fan serves the toilet room 

and locker room area. 

Electric  heaters  are  located  at  the  entryways 

and in the corridor. 

Page 57: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…

Existing Conditions ǀ 05 

    Carroll County Career & Technology Center ǀ 41     January 10, 2017 

Individual  Space  Condition  –  Original 

Building 

Greenhouse 

The  Greenhouse  system  has  been  recently 

upgraded, including new gas‐fired heating units, 

circulation  fans,  motorized  windows,  water 

spray  system,  and  “microgrow”  greenhouse 

control system. 

Horticulture (now Biomedical)  

A split A/C unit currently serves the Biomedical 

Computer  Lab.   A  heating  and  ventilating  unit 

ventilator  currently  serves  the Biomedical  Lab.  

A  fume  hood  was  recently  installed  with  an 

exhaust  fan  tied  into  the  existing  Collision 

Repair  Shop  Paint  Booth  Exhaust  Fan/Duct 

System.    The  Biomedical  Shop  is  currently 

located  where  the  existing  Paint  Spray  Booth 

was located. 

Auto Shop Labs   

The main  incoming fire service  is  located  in the 

old  Collision  Shop  Area  (New  Auto 

Transportation  Area).    A  large  heating  and 

ventilating unit  (96 kW heating coil) serves  the 

old  Collision  Repair  Shop  and  is  hung  in  the 

associated  Storage  Room.    Similarly,  a  large 

heating and ventilating unit (50 kW heating coil) 

located  over  the  same  Storage  Area  is  one  of 

two  (2)  units  that  serve  the  Auto  Mechanics 

Lab.    The  second  unit  (60  kW)  is  located  over 

the adjacent gang toilet rooms at the Southeast 

end of the Lower Level.  The common classroom 

is  served by  a horizontal/above‐ceiling heating 

and  ventilating  unit  ventilator.    This  unit 

ventilator  and  the  two  (2)  heating  and 

ventilating  units  located  above  the  Storage 

Room  have  outside  air  ducted  to  an  areaway 

located in the Courtyard at the Main Level. 

Both  shops have  independent exhaust  systems 

and the Auto Transportation Area still has  local 

dust  filtration  units  originally  utilized  for  the 

Collision Repair Shop. 

Collision Repair Shop 

The  Collision  Repair  Shop  was  previously 

relocated to the existing Storage Building, which 

is  adjacent  to  the Main  Building,  Lower  Level, 

Northeast  side.    The  classroom  is  served  by  a 

dedicated  roof‐mounted packaged air handling 

unit with gas‐fired furnace.  The Collision Repair 

Lab is served by an independent roof‐mounted, 

gas‐fired  heating  and  ventilating  unit.    A  new 

Paint  Spray  Booth  is  located  at  the  Southeast 

end  of  the  building  and  its  associated  air 

exchange  heater  unit  (gas‐fired)  is  located 

outside at grade. 

Lower Level Corridor 

Relief  air  from  the  labs  is  ducted  into  the 

corridor  where  a  separate  intake  grille  is 

connected  to  a  vertical  duct  up  to  a  roof 

exhaust fan.   This  is currently a Code Violation.  

Electric unit heaters are  located  in the corridor 

and stair towers. 

Upper  Level  East  Labs  (Electrical,  Career 

Assessment, Physical Rehab., Cosmetology) 

These Labs are located on the Northeast side of 

the  building  over  the  Lower  Level 

Lab/Classroom  spaces  and  look  out  over  the 

new Collision Shop.  These spaces are served by 

both  horizontal  (above‐ceiling)  and  vertical 

(floor‐mounted)  type  unit  ventilators.    All 

spaces except  for  the Electrical  Lab are  cooled 

and  served  by  the  central  chilled water  plant.  

Vertical  units  have  through‐the‐wall  intake 

vents for fresh air, while the above‐ceiling types 

are  ducted  to  roof‐mounted  fresh  air  intake 

vents.   This air  is  then relieved  to  the corridor, 

Page 58: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…

Existing Conditions ǀ 05 

    Carroll County Career & Technology Center ǀ 42     January 10, 2017 

where  a  roof‐mounted  exhaust  fan  draws  the 

air  through  the  corridor  and  relieves  it  to  the 

outside. 

Due to the odors generated in the Cosmetology 

Lab,  two  (2) heat  recovery units were  installed 

above the ceiling to provide additional fresh air 

to the space and dilute/exhaust odors primarily 

created by  chemicals used  in permanent‐wave 

solutions. 

Carpentry Lab 

The Carpentry and Masonry Labs have switched 

from  the  originally  intended  locations.    Other 

modifications  have  also  occurred.   A  new  gas‐

fired  rooftop  heating  and  ventilating  unit was 

installed to provide make‐up air to the space as 

the  original  heating  and  ventilating  unit  were 

already removed.  Electric unit heaters provided 

the  space  with  heat  and  are  now  used  to 

supplement  the heat provided by  the make‐up 

air  system. The dust  collector  is original and  is 

still  functioning;  however,  the  dust  collection 

system  was  recently  replaced.    A  horizontal 

heating and cooling unit ventilator  serves both 

the Carpentry and Masonry Lab Classrooms. 

Masonry Lab 

The  Masonry  Shop,  similar  to  the  Carpentry 

Shop,  was  recently  upgraded  with  a  roof‐

mounted gas‐fired heating and ventilating unit.  

New supply and return air ductwork is tied into 

the  new  rooftop  unit.    The  air  distribution 

system  was  designed  as  a  push‐pull  system 

supplying (pushed) clean air at the corridor end 

of  the space which  is  then  returned  (pulled) at 

the exterior wall through a filter return grille.  A 

dust type collector connected to a canopy hood 

located  over  the mixing  area was  installed  to 

capture  particulate  matter  during  the  mixing 

process. 

Engineering Lab 

Two  (2)  split  Sanyo  type  (ductless  mini‐split 

system)  units  and  the  existing  horizontal 

heating and ventilating unit ventilator serve the 

space. 

Manufacturing & Machine Tech. Lab 

The  Machine  Shop  is  served  by  a  horizontal 

heating  and  ventilating unit  ventilator  and  the 

classroom  is served by a split  fan coil unit with 

remote heat pump.   

Computer Resource Center (CRC) Lab 

An  independent  ductless  split  unit  by  EMI 

Technologies serves this space, which originally, 

was part of the Main Lobby.  An electric cabinet 

heater is located within the room. 

Textiles and Fashion Design Lab 

A  split  fan  coil  unit  by  Trane  serves  the  area.  

The  remote heat pump  is  located on  the  roof.  

Two  (2)  above‐ceiling  unit  ventilators  with 

cooling serve the classroom space.   

CADD Classroom/Lab 

Two (2) vertical (floor‐mounted) unit ventilators 

with cooling serve the space. 

Video Print Production Room 

Two (2) above‐ceiling horizontal style units and 

one  (1)  floor‐mounted  vertical  style  unit 

ventilator with cooling serve the space. 

Computer Technology Lab/Classroom 

An  above‐ceiling  unit  ventilator  with  cooling 

serves  the  classroom,  while  a  floor‐mounted 

split  fan‐coil  unit,  with  roof‐mounted  heat 

pump serves the Tech Lab through an overhead 

distribution system.   

Page 59: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…

Existing Conditions ǀ 05 

    Carroll County Career & Technology Center ǀ 43     January 10, 2017 

Academy of Health Lab Suite 

The  Academy  of  Health  Suite was  originally  a 

resource  center  and  connecting  corridor,  both 

of  which  extended  from  corridor  to  corridor.  

Above‐ceiling  unit  ventilators  were  located 

above  the  northeast  corridor  ceiling  and 

relieved  to  the  corridor  at  the  southeast 

corridor.    The  current  layout  creates multiple 

spaces within this area, yet only minor changes 

to the HVAC System occurred.  Health Suite 101 

is currently served by a ductless split system. 

Commons Area/Student Dining 

The Commons Area  is an open space served by 

six  (6)  horizontal  unit  ventilators  with  cooling 

coils.   Outside  air  is  introduced  into  the  units 

from roof‐mounted gravity vents. 

Kitchen/Culinary Arts Lab 

Similar  to  the  Commons  Area,  three  (3) 

horizontal  unit  ventilators  with  cooling  coils 

serve  the space.   Outside air  is  introduced  into 

the  units  from  roof‐mounted  gravity  vents.  

Roof‐mounted  exhaust  fans  serve  the  kitchen 

hoods and a roof‐mounted tempering unit (108 

kW  electric  heater)  provides  supplemental 

make‐up  air  for  the  kitchen  hood  exhaust 

requirements. 

Culinary  Dining  Room  (“Restaurant”)  and 

Classroom 

Floor‐mounted  heating  and  cooling  unit 

ventilators serve these areas. 

Office/Administration Suite 

A  small  above‐ceiling  self‐contained  heating‐

cooling unit serves the  interior staff area, while 

floor‐mounted  heating‐cooling  fan  coil  units 

serve the perimeter office space. 

Lobby 

The  Lobby  is  heated  and  cooled  by  horizontal 

flush‐mounted  recirculating  air  type  unit 

ventilators  supplemented  by  cabinet  unit 

heaters at the entry door. 

Evaluation 

The  existing  rooftop  units  and  heat  recovery 

units  serving  the  1986  Addition  are  not 

functioning  and/or  not  functioning  properly.  

The  rooftop heating and ventilating units were 

manufactured  by  Bohn, which  is  no  longer  in 

business.    Similarly,  the  heat  recovery  units 

were  manufactured  by  “Temp  Exchanger”, 

which also  is no  longer  in business.   All of  the 

equipment,  including  the  split  systems,  are 

beyond their useful lives and are recommended 

to be replaced. 

The  existing  chilled  water  piping  systems  are 

degrading  and  have  caused  the  need  to  keep 

the  chilled  water  system  circulating  24/7, 

including  throughout  the entire heating season 

when chilled water  is not required. A Spirovent 

air and dirt separator has been  installed  to aid 

in cleaning the system.    It  is our understanding 

that  the  chiller  ices  up, which  is  probably  the 

result  of  fouling  of  the  evaporator  tubes.  

Ultimately,  it  is  recommended  that  the  chiller, 

piping,  cooling  tower,  remote  sump,  and  all 

associated pumps be replaced.  

The existing heating system,  for  the most part, 

remains  as  electric  resistance.    Even  though 

electric  resistance  is  100%  efficient,  it  is 

typically  more  expensive  to  operate.    The 

electric heaters are  located  in equipment  (unit 

ventilators,  fan‐coil  units,  rooftop  units,  wall 

heaters)  that  is  typically original  to  the  time of 

construction.    This  equipment  is  beyond  its 

useful life and is recommended to be replaced. 

Page 60: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…

Existing Conditions ǀ 05 

    Carroll County Career & Technology Center ǀ 44     January 10, 2017 

Based  on  the  age  of  the  terminal  unit 

equipment, controls, ongoing indoor air quality, 

and  thermal  comfort  issues,  age  and  type  of 

equipment,  it  is  recommended  that  the HVAC 

System  and  associated  electric  resistance 

heating units be replaced  in their entirety.   The 

existing  relief air system uses  the corridor as a 

duct, which is a Code violation that needs to be 

corrected.   Most storage rooms have  individual 

exhaust  fans.    There  are many  special  system 

exhaust fans, as well as relief air system exhaust 

fans, which are original and beyond their useful 

lives.    It  is  recommended  that all exhaust  fans 

and special exhaust systems be replaced in their 

entirety.   

 

ELECTRICAL 

Electrical Service and Distribution System 

The  existing  electrical  service  is  the  original 

main  switchboard  consisting  of  a  3000  Amp, 

277/480 volt,  three phase, 4‐wire service.   The 

existing medium voltage transformer  is  located 

near the Greenhouse at the rear of the building.  

BGE  provides  primary  electric  service  to  the 

site.    The  primary  BGE  feeder  serves  both 

Westminster  High  School  and  the  Career  and 

Technology  Center.    A  maximum  load  of  the 

meter  serving  the  School  is  2852  kW,  which 

indicates  that  the  existing  switchboard  cannot 

serve the new loads.  In order to serve the new 

HVAC  loads  and  future  loads,  as  well  as  to 

provide for capacity for the new classrooms, the 

electrical  service  will  be  served  from  a  new 

switchboard  and  will  back  feed  the  existing 

switchboard.   The utility  transformer will need 

to be replaced with a larger transformer. 

Emergency  power  is  provided  by  a  propane 

generator  located  in  a  room next  to  the Main 

Electric  Room.    The  generator  serves  the 

emergency incandescent lights in the stairs. 

Lighting 

Most  of  the  existing  corridors  use  1'  x  4' 

surface‐mounted 1‐lamp fixtures.   Key switches 

are  used  to  control  the  corridor  lights.    Exit 

signs use green letters. 

Fire Alarm System 

The  existing  Fire  Alarm  System  serving  the 

building is a combination of the original Simplex 

Fire  Alarm  System  and  a  recently‐installed 

Edwards  EST2  fire  alarm  panel,  located  in  the 

Main  Electric  Room.    The  Fire  Alarm  System 

uses horns and strobes  located throughout  the 

school  to provide audible and visual alarms.   A 

Communicator  Panel  provides  dialup 

communications  with  the  UL  Monitoring 

Service.  

Security System 

The existing Ademco Security System located in 

the  Health  Suite  protects  the  school  using  a 

combination  of  door  contacts  and  motion 

detectors.    The  System  uses  keypads  located 

throughout  the  school  to  arm  and  disarm  the 

alarm.   A Communicator Panel provides dial‐up 

communications  with  the  UL  Monitoring 

Service.    The  existing  Security  System  is  at  its 

maximum  capacity  and  will  need  to  be 

expanded or replaced. 

Closed  Circuit  Television  (CCTV)  Security 

Camera System 

Currently,  the  school uses  fifteen  (15)  security 

cameras connected to a time‐lapse VCR located 

in the Principal’s Office in the Main Office. 

Page 61: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…

Existing Conditions ǀ 05 

    Carroll County Career & Technology Center ǀ 45     January 10, 2017 

Access Control System 

Currently,  the  school  uses  a  BEST  Access 

Control/ Card Reader System. 

Video Network Cable Television System 

A  coaxial  video  cabling  system  is  provided throughout  the  school.    The  video  system  is powered  by  a  BIDA  video  amplifier,  in  the existing Media Retrieval System,  located  in  the Main Office.  

Master Clocks 

Existing  Master  Clocks  are  connected  to  the 

existing Master Clock / Bell System.   A Rauland 

Time  Control  unit  located  in  the  Main  Office 

provides control of the Master Clock System. 

Voice  Network  –  Telephone  /  Paging  / 

Intercom System 

The  incoming  telephone  service  is  a  50‐pair 

cable  terminating  in  the Generator Room, next 

to the Main Electric Room. The existing Rauland 

Telecenter  Public  Address  Cabinet,  located  in 

the Main Office, will be reused and expanded as 

needed.    The  Telecenter  System  is  in  good 

condition  and  has  capacity  to  service  the  new 

additions.  The  existing PA  System uses  ceiling‐

mounted speakers and call switch. The existing 

Northern  Telecom Norstar Meridian  telephone 

switch in the Storage Room will be re‐used. 

Data Network 

Currently,  there  exists  one  (1)  MDF  (Main 

Office).        The MDF  contains multiple  48  port 

patch panels.  Category 5 data cabling, installed 

around  1999,  is  provided  throughout  the 

school.  Five (5) IDF Rooms exist: 

  1.  Computer Technology 

  2.  Video/Graphic Production 

  3.  Drafting B111 

  4.  Tech Support & Networking 

  5.  Collision Repair Classroom 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 62: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…

Existing Conditions ǀ 05 

    Carroll County Career & Technology Center ǀ 46     January 10, 2017 

EXISTING SITE PLAN 

     

Page 63: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…

Existing Conditions ǀ 05 

    Carroll County Career & Technology Center ǀ 47     January 10, 2017 

              EXISTING UPPER FLOOR PLAN 

 

   

 

 

EXISTING BUILDING AREA:  116,775 GROSS SQUARE FEET 

Page 64: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…

Existing Conditions ǀ 05 

    Carroll County Career & Technology Center ǀ 48     January 10, 2017 

  EXISTING LOWER FLOOR PLAN 

 

Page 65: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…

    Carroll County Career & Technology Center    

 

 

 

 

 

 

 

 

 

 

 

 

CODE ANALYSIS  

Page 66: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…
Page 67: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…

Code Analysis ǀ 06 

    Carroll County Career & Technology Center ǀ 49     January 10, 2017 

Life Safety Code Issues: 

Carroll County Career and Technology Center complied with the building codes enacted at the 

time of original construction and the 1986 addition. However, the school  is not compliant with 

current codes. Renovation of the existing building will require the following items be addressed 

to meet current code requirements.   

Interior doors contain louvers which allow the passage of smoke. Note that this change 

will  require  modifications  to  the  HVAC  system  to  bring  the  building  into  code 

compliance.  

Elevator located within stair tower which is not allowed by code 

 

Stair towers are not fully enclosed with rated construction. 

Storage for culinary program in egress corridor. 

 

 

 

Page 68: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…

Code Analysis ǀ 06 

    Carroll County Career & Technology Center ǀ 50     January 10, 2017 

   

  Accessibility: 

The school does not have the required number of accessible lockers. 

Many doors do not have the required access space to approach the push or the pull side of the door.  

Railings at the stairs and ramps do not meet accessibility requirements.  

 

Ramp to lower floor exceeds slope for an accessible ramp. 

 

Toilet rooms are not accessible.  

Current  carpentry  and masonry  labs  are not ADA  accessible,  as  they  are  several  feet below the circulation corridor and accessed only via stairs. 

Several programs utilize mezzanine  space as  teaching area, which  is not accessible  to students or staff. 

Page 69: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…

    Carroll County Career & Technology Center    

 

 

 

 

 

 

 

 

 

 

 

 

PROPOSED DESIGN OPTIONS  

Page 70: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…
Page 71: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…

Proposed Design Options ǀ 07 

 

    Carroll County Career & Technology Center ǀ 51     January 10, 2017 

 

DESIGN GOALS 

The Study Team refined four proposed design concepts to provide CCPS with a range of  options that  best  serve  Carroll  County  Public  Schools,  Carroll  County  Career  and  Technology  Center faculty and  staff, and  the Community’s best  interest. This  section presents  the  four proposed plan options  in order of  increasing degree of architectural  intervention.   Key advantages and disadvantages are listed for each option along with a corresponding scope of work.  The section concludes with a discussion of mechanical and electrical recommendations that are applicable to all four options.  All of the options proposed herein have been taken into consideration in the development of the cost estimate presented in section 08. 

Option A ‐ Partial Modernization 

Addresses the wait  list needs of the school with a building addition and renovates the existing building without additional expansion.   Existing walls  remain  in place,  limiting program accommodation.  Existing relocatable classrooms remain.  

Modernizes/replaces all major building  systems  to ensure  compliance with all  current building, life safety, energy, and accessibility code requirements.  

Improves  the  interior  environmental  quality  level  and  educational  experience  by providing improved comfort systems, and new finishes. Natural light is added in limited areas of the existing building where possible.  

 

Option B ‐ Modernization 

Renovates  and  expands  the  existing  building  with  5  additions  to  accommodate  the proposed  program  with  improved  adjacencies  between  program  elements.  Existing walls are relocated as needed to accommodate the requirements of the program.  

Provides  a  facility  that  addresses  the  requirements  of  the  proposed  educational program (including wait list) and will support 21st century learning environments. 

Modernizes/replaces all major building  systems  to ensure  compliance with all  current building, life safety, energy, and accessibility code requirements.  

Improves  the  interior  environmental  quality  level  and  educational  experience  by providing natural light, improved comfort systems, and new finishes.  

        

Page 72: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…

Proposed Design Options ǀ 07 

    Carroll County Career & Technology Center ǀ 52     January 10, 2017 

 

Option C ‐ Replacement on Existing Campus 

Creates a replacement building on the existing campus to accommodate the proposed program (including wait list) with improved adjacencies between program elements.  

Reduced scope of additions and renovations. 

Provides new building systems to ensure compliance with all current building, life safety, energy, and accessibility code requirements.  

Improves  the  interior  environmental  quality  level  and  educational  experience  by providing natural light, improved comfort systems, and new finishes.  

Provides new play fields for Westminster High School on the site of the existing building.  

Provides a new Community Media Center adjacent to the school for shared use.  

 

Option D ‐ Replacement on an Undeveloped Site 

Creates a replacement building on an undeveloped site to accommodate the proposed program (including wait list) with improved adjacencies between program elements.  

Provides  a  facility  that  addresses  the  requirements  of  the  proposed  educational program and will support 21st century learning environments. 

Provides new building systems to ensure compliance with all current building, life safety, energy, and accessibility code requirements.  

Improves  the  interior  environmental  quality  level  and  educational  experience  by providing natural light, improved comfort systems, and new finishes.  

 

Alternative Sites 

As  part  of  the  design  option  review  process,  CCPS  directed  HCM  to  review  the  viability  of  locating portions of CCCTC programs at existing CCPS facilities.  HCM reviewed potential spaces at Westminster High  School,  South Carroll High  School, and North Carroll High  School.    In each  case,  space  could be utilized  to  reduce  the  size  of  the  required  additions  or  size  of  a  replacement  facility.    However, renovation costs would be required at similar $/SF capital renovation costs as required to renovate the existing facility to accommodate the relocation of the programs to these spaces. Operational costs (i.e. transportation costs, additional  staffing, utility costs, etc.) also will need  to be accounted  for and will vary significantly between currently occupied facilities and buildings that are not currently in use. Refer to Appendix A for a cost breakdown of work typical for renovation at Westminster High School if some programs  are  relocated  as  an example. The proposed options do not  take  relocation of programs  to other sites into account for purposes of this study.  

 

Page 73: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…

Proposed Design Options ǀ 07 

    Carroll County Career & Technology Center ǀ 53     January 10, 2017 

 

 

 

 

 

Option A:  Partial Modernization 

Partial  Modernization  (Option  A)  includes constructing  a  21,000  sf  addition  that  contains spaces  for  the wait  list programs  indicated  in  the program inventory space summary. Proposed work also  includes  complete  renovation of  the  existing building  to  bring  the  entire  building  into conformance with  current building and  life  safety codes.  Enlargement  of  program  space within  the existing  building  is  not  provided  as  part  of  this partial modernization,  and  life  safety  renovations may  reduce  the  existing  instruction  space  to accommodate  the  modifications.  Relocatable classrooms  will  remain  during  and  after completion  of  the  partial  modernization. Maintaining building occupancy and operation will require a multi‐phase construction process.  

 

Advantages: 

  Building: 

Accommodates the enrollment of wait list programs 

Less overall upfront cost due to reduced scope of additions and renovations 

  Site: 

No loss of parking due to location and size of addition 

No loss of play fields 

Does not negatively impact Westminster High School operations 

Disadvantages: 

  Building: 

Full building program is not addressed, leaving programs with inadequate space by current design standards. 

Shape, location, and quality of spaces to be renovated in place is limited by working within the existing building footprint. 

Least energy efficient option. 

Adjacencies of programs by cluster is not addressed. 

Exterior of building is not updated, so there is limited opportunity to see where the money is being spent. 

Page 74: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…

Proposed Design Options ǀ 07 

    Carroll County Career & Technology Center ǀ 54     January 10, 2017 

Several learning spaces are detached from school building as relocatable classrooms and detached collision repair building will remain. 

Longest construction duration of four options due to renovation of spaces in place in small phases.   

Higher phasing costs due to multiple phases required. 

Longer impact on school operations. 

Access to the loading dock for culinary and food service deliveries is not adequate (existing relocatable classroom blocks access). 

Access to public retail spaces (cosmetology, culinary, textiles/fashion) is poor. 

Dining commons is undersized to accommodate increased student population. 

Potential for programs to be taken off‐line during construction period based on phasing, amount of time needed to renovate the particular space, and the difficulty of relocating programs to temporary space. 

 

Option A 

Anticipated Scope of Work: 

Site: 

Resurface parking lot serving CCCTC. 

Reroute loop road around new addition to maintain traffic flow and provide required fire access. 

Relocate storage shed located at southeast side of building. 

New Stormwater Management roof drainage and new loop road drainage will be provided for the building addition requiring the use of non‐structural best management practices (BMP’s) via an environmental site design (ESD) strategy. 1‐2 separate ESD/SWM facilities anticipated. 

Earthwork for new addition will require importing fill. 

Relocate existing 8” water line around addition serving fire hydrants at this portion of the site. 

Minor storm drain relocation of existing 10” drain located on south side of building. 

Forest Conservation/ Afforestation as required.  

 

Architectural: 

Modernization of Existing Building: 

The  existing  building  will  be  renovated  to  provide  updated  systems  and  finishes.    Minor relocation  of  walls  or  programs  without  expansion  of  spaces  will  be  examined  to  improve program space functionality. 

Existing interior walls to remain will be repaired, prepped, and painted.  

Floor tile and wall base will be replaced. 

Page 75: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…

Proposed Design Options ǀ 07 

    Carroll County Career & Technology Center ǀ 55     January 10, 2017 

Ceiling tile and ceiling grid will be replaced.  

New toilet room fixtures. 

New kitchen equipment.  

All  areas  of  the  building  will  be  made  accessible  in  accordance  with  the  American’s  with Disabilities Act (ADA). 

Exterior windows will be replaced with commercial grade energy efficient models.  

Exterior brick will be repointed. 

 

Addition: 

18,950 square feet will be added to the modernized existing building per the plans. 

A new one‐story addition will be added to house the wait list programs from the Health, Information Technology, and Engineering clusters. 

 

Structural: 

Modernization of Existing Building: 

Minor repairs as required. 

New rooftop mechanical equipment  is anticipated. Strengthening of the existing roof structure and/or introduction of structural steel dunnage for distribution of loads to existing load bearing elements will be examined. 

Façade survey to evaluate need for veneer and lintel repairs. 

Sub slab investigation of cracked floor slabs in areas of presumed settlement. 

 

New Addition: 

Roof shall be 1‐1/2”, 20 gauge galvanized type‐B metal deck on open web joist framing. 

Floor and roof framing are anticipated to be supported on exterior masonry bearing walls and interior structural steel girders and columns. 

Floor slab is anticipated to consist of a 4” thick, normal weight concrete slab‐on‐grade placed on vapor barrier, drainage course and properly prepared sub‐grade. 

Foundations are assumed to be conventional continuous and isolated spread footings.  

 

Kitchen: 

New larger cooler/freezer to serve program needs. 

Install demonstration kitchen station. 

 

Page 76: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…

Proposed Design Options ǀ 07 

    Carroll County Career & Technology Center ǀ 56     January 10, 2017 

Mechanical: 

New HVAC system throughout the entire building and addition including new central plant, new distribution system, and new terminal end units.  Refer to mechanical system recommendations at the end of this section. 

 

Plumbing: 

Replacement of plumbing piping systems.  

New plumbing fixtures that meet ADA requirements and are water‐conserving type.  

Upgraded gas service. 

 

Electrical: 

Upgraded electrical service to 4,000 Amps (currently 3,000 Amp service). 

New electrical distribution system including replaced switchboard. 

New natural gas emergency generator. 

New light fixtures throughout the building.  

New telecommunications systems throughout the building.  

New security system and security camera system. 

 

Page 77: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…

Proposed Design Options ǀ 07 

    Carroll County Career & Technology Center ǀ 57     January 10, 2017 

  OPTION A: Partial Modernization Site Plan 

  

   

Page 78: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…

Proposed Design Options ǀ 07 

    Carroll County Career & Technology Center ǀ 58     January 10, 2017 

  OPTION A: Partial Modernization Upper Floor Plan 

  

    

Page 79: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…

Proposed Design Options ǀ 07 

    Carroll County Career & Technology Center ǀ 59     January 10, 2017 

OPTION A: Partial Modernization Lower Floor Plan 

    

          

Page 80: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…

Proposed Design Options ǀ 07 

    Carroll County Career & Technology Center ǀ 60     January 10, 2017 

 

 

Option B: Modernization 

Modernization  (Option  B)  includes  renovation  of the existing building to bring the entire building into conformance with  current  building  and  life  safety codes  and  reconfiguration  of  the  spaces  to  better accommodate  the  proposed  program.  It  will  also include 91,185  sf  in  additions  to be  in  compliance with  the  proposed  program.    Existing  detached building  for  auto  collision  repair  program  will  be demolished.   Maintaining  building  occupancy  and operation  will  require  a  multi‐phase  construction process. 

 

 

Advantages: 

  Building: 

Accommodates the enrollment of wait list programs. 

Enlarges space sizes to the extent indicated in the full building program. 

Revises adjacencies of programs as indicated in the full building program. 

Improves exterior appearance of the building with new additions. 

Improves energy efficiency of building by locating several programs in additions with energy efficient envelope designs. 

All programs are housed in one building. 

Construction and auto yards are relocated to a more concealed location. 

Create a better quality learning environment.  

  Site: 

Relocatable classrooms are no longer required and can be relocated/demolished as desired. 

No loss of play fields. 

 

Disadvantages: 

  Building: 

Reuse of existing building does offer some limitations on the shape and location of programs. 

Exterior of building is not fully updated, so some portions remain energy inefficient. 

Phased renovation of existing building extends construction time compared to construction of a replacement building on an adjacent site. 

Page 81: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…

Proposed Design Options ǀ 07 

    Carroll County Career & Technology Center ǀ 61     January 10, 2017 

Construction of additions in contact with the existing building will provide some disruption to typical building operations. 

  Site: 

Additions disrupt continuous loop road, which will require changes in operations by CCCTC and Westminster High School.  At WHS, a portion of widened road is requested to resolve the new operations issues. 

Approx. 65 parking spaces are lost due to the additions.  If these parking spaces need to be replaced, a cost will be incurred.  

Page 82: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…

Proposed Design Options ǀ 07 

    Carroll County Career & Technology Center ǀ 62     January 10, 2017 

Option B  

Anticipated Scope of Work: 

Site: 

3‐5 separate ESD/SWM facilities anticipated to treat roof drainage and paved surfaces. 

Demo portion of parking lot serving CCCTC; Resurface remaining portion.  

Create “T” style turnaround for fire trucks where loop road is closed by new building addition. 

Widen access road by one lane to the west of CCCTC. 

Relocate storage shed located at southeast side of building. 

Demo automotive repair building; surrounding area to be resurfaced or made pervious with plantings as determined by stormwater management design. 

Create a connection between existing Westminster High School parking lots north of CCCTC to create a continuous loop. 

Relocate/demolish relocatable classrooms. 

Relocate existing 8” water line around addition serving fire hydrants at this portion of the site. 

Minor storm drain relocation of existing 10” drain located on south side of building. 

Earthwork for southwest addition will require importing fill. 

New Stormwater Management will be provided for the building addition requiring the use of non‐structural best management practices (BMP’s) via an environmental site design (ESD) strategy.  

Forest Conservation/ Afforestation as required.  

 

Architectural: 

Modernization of Existing Building to Remain: 

The existing building will be fully renovated to provide updated systems and finishes and spaces will be reorganized. 

Existing interior walls to remain will be repaired, prepped, and painted.  

Floor tile, wall tile, and wall base will be replaced. 

Ceiling tile and ceiling grid will be replaced.  

New toilet room fixtures. 

New casework.  

Exterior doors, hardware, and frames will be replaced. 

Exterior windows will be replaced with commercial grade energy efficient models. 

Page 83: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…

Proposed Design Options ǀ 07 

    Carroll County Career & Technology Center ǀ 63     January 10, 2017 

All  areas  of  the  building  will  be  made  accessible  in  accordance  with  the  American’s  with Disabilities Act (ADA). 

Exterior brick will be repointed. 

New kitchen equipment. 

 

Addition: 

81,074 square feet will be constructed in five additions to meet the proposed program that cannot be accommodated in the renovated portion of the building. 

 

Structural: 

Modernization of Existing Building: 

Minor repairs as required. 

New rooftop mechanical equipment  is anticipated. Strengthening of the existing roof structure and/or introduction of structural steel dunnage for distribution of loads to existing load bearing elements will be examined. 

Façade survey to evaluate need for veneer and lintel repairs. 

Sub slab investigation of cracked floor slabs in areas of presumed settlement. 

Reinforcement/repouring  of  slabs  as  required where  changing  program  locations  create  new loads on existing floor slabs. 

 

New Additions: 

Roof shall be 1‐1/2”, 20 gauge galvanized type‐B metal deck on open web joist framing. 

Floor and roof framing are anticipated to be supported on exterior masonry bearing walls and interior structural steel girders and columns. 

Floor slab is anticipated to consist of a 4” thick, normal weight concrete slab‐on‐grade placed on vapor barrier, drainage course and properly prepared sub‐grade. 

 

Mechanical: 

New HVAC system throughout the entire building including new central plant, new distribution system, and new terminal end units. Refer to mechanical system recommendations at the end of this section. 

 

Plumbing: 

Replacement of plumbing piping systems.  

New plumbing fixtures that meet ADA requirements and are water‐conserving type.  

Page 84: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…

Proposed Design Options ǀ 07 

    Carroll County Career & Technology Center ǀ 64     January 10, 2017 

Relocation of existing gas service affected by northwest addition. 

 

Electrical: 

Upgraded electrical service to 4,000 Amps (currently 3,000 Amp service). 

New electrical distribution system. 

New emergency generator (if it is determined all optional loads are desired to be connected to the emergency circuit).  

New light fixtures throughout the building.  

New telecommunications systems throughout the building.  

New security system and security camera system. 

Page 85: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…

Proposed Design Options ǀ 07 

    Carroll County Career & Technology Center ǀ 65     January 10, 2017 

  OPTION B: Modernization/ Partial Replacement Site Plan 

 

Page 86: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…

Proposed Design Options ǀ 07 

    Carroll County Career & Technology Center ǀ 66     January 10, 2017 

OPTION B: Modernization/ Partial Replacement Upper Floor Plan 

    

Page 87: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…

Proposed Design Options ǀ 07 

    Carroll County Career & Technology Center ǀ 67     January 10, 2017 

OPTION B: Modernization/ Partial Replacement Lower Floor Plan 

  

Page 88: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…

Proposed Design Options ǀ 07 

    Carroll County Career & Technology Center ǀ 68     January 10, 2017 

Option C: Replacement on Existing Campus 

Replacement (Option C) includes a design of a new two‐story  facility on  the existing  campus  to be  in compliance with  the proposed program,  including square footage and proper spatial and educational relationships.  The  existing  building  will  remain operational  during  construction  of  the  new building  and  will  be  demolished  when  the  new building  is completed. The site design will address traffic patterns, parking, and  replacement athletic fields  at  the  location  of  existing  building  to  be demolished. The Community Media Center will be replaced  in  this  option  to  provide  space  for  the relocated athletic fields and will be constructed as part of the new building. 

 

Advantages: 

  Building: 

Accommodates the enrollment of wait list programs. 

Space sizes designed to the extent indicated in the full building program. 

Creates proper adjacencies of programs as indicated in the full building program. 

Improved exterior appearance of the building. 

Energy efficient building created by locating all programs in new construction with energy efficient envelope designs. 

All programs are housed in one building. 

Construction and auto yards are located in a concealed location. 

Instruction is not interrupted because the existing building remains in operation while the new building is constructed. 

Provides natural daylight to each regularly occupied space.  

Provides ADA accessibility within the building and at all entrances.  

Creates new community media center adjacent to school for shared use. 

  Site: 

Relocatables  are no longer required and can be relocated/demolished as desired. 

Creates new, improved play fields. 

Earthwork does not require fill.  Site is generally balanced. 

 

Page 89: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…

Proposed Design Options ǀ 07 

    Carroll County Career & Technology Center ǀ 69     January 10, 2017 

Disadvantages: 

  Building: 

Cost of demolition of existing building is required.  

  Site: 

Loss of play fields during the construction period.  

Retaining walls and regrading are required to construct new play fields. 

Increased traffic on Hook Road for access to new building.  Traffic studies will be conducted and site will be studied to look at possibility to connect an access drive to new school between Westminster High School and new play fields. 

   

Page 90: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…

Proposed Design Options ǀ 07 

    Carroll County Career & Technology Center ǀ 70     January 10, 2017 

Option C  

Anticipated Scope of Work: 

Site: 

New campus loop road/fire lane including new bus loop. 

New parking lot for approximately 216 vehicles including 14 ADA parking spaces. 

Demolish existing parking lot and portion of loop road for new fields. 

New play field complex at location of existing building. 

New retaining wall along play fields west boundary. 

New Stormwater Management will be provided requiring the use of non‐structural best management practices (BMP’s) via an environmental site design (ESD) strategy.  

Relocatable classrooms will be removed from the site.  

New 8” sanitary sewer (existing will be removed). 

Relocation of sewer line that runs through existing play fields. 

New water line connected to main in Washington Road. 

10‐12 separate ESD/SWM facilities anticipated to treat roof drainage and paved surfaces. 

Forest Conservation/ Afforestation as required. 

 

Architectural: 

New Building: 

A new two‐story building will be constructed per the plans with all new components. 

Demolish existing community media center; Replace with new Community Media Center adjacent to new CCCTC building. 

Existing building is demolished. 

 

Structural: 

New Building: 

Roof shall be 1‐1/2”, 20 gauge galvanized type‐B metal deck on open web joist framing. 

Upper level floor framing is anticipated to consist of 3‐1/4” lightweight concrete slab on 3”, 20 

gauge composite metal deck (6‐1/4” total thickness) on composite structural steel filler beams 

and girders. 

Floor and roof framing are anticipated to be supported on exterior masonry bearing walls and 

interior structural steel girders and columns. 

Page 91: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…

Proposed Design Options ǀ 07 

    Carroll County Career & Technology Center ǀ 71     January 10, 2017 

Lower level slab is anticipated to consist of a 5” thick, normal weight concrete slab‐on‐grade 

placed on vapor barrier, drainage course and properly prepared sub‐grade. 

Foundations are assumed to be conventional continuous and isolated spread footings. 

 

Mechanical: 

New HVAC system including central plant, distribution system, and terminal end units. Refer to mechanical system recommendations at the end of this section. 

 

Plumbing: 

New plumbing piping systems.  

New plumbing fixtures that meet ADA requirements and are water‐conserving type.  

New fire protection system including water storage tank and fire pump. 

New gas service. 

 

Electrical: 

New electrical service. 

New electrical distribution system. 

New emergency generator. 

New light fixtures. 

New fire alarm and security systems.  

New telecommunications systems.  

Page 92: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…

Proposed Design Options ǀ 07 

    Carroll County Career & Technology Center ǀ 72     January 10, 2017 

  OPTION C: New Building Site Plan 

 

  

Page 93: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…

Proposed Design Options ǀ 07 

    Carroll County Career & Technology Center ǀ 73     January 10, 2017 

  OPTION C: New Building First Floor Plan 

    

Page 94: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…

Proposed Design Options ǀ 07 

    Carroll County Career & Technology Center ǀ 74     January 10, 2017 

OPTION C: New Building Second Floor Plan 

 

                

Page 95: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…

Proposed Design Options ǀ 07 

    Carroll County Career & Technology Center ǀ 75     January 10, 2017 

 

Option D: Replacement on an Undeveloped Site 

Replacement Offsite  (Option D)  includes  a design of a new two‐story facility to be in compliance with the  proposed  program,  including  square  footage and  proper  spatial  and  educational  relationships. This  option  will  be  constructed  on  a  site  to  be determined.  The  existing  building  will  remain operational  during  construction  of  the  new building and the building will be vacated when the new building  is completed,  leaving  it available  for future use. The new site design will optimize traffic patterns, parking, and stormwater management at the new site. 

 

Advantages: 

  Building: 

Accommodates the enrollment of wait list programs. 

Space sizes designed to the extent indicated in the full building program. 

Creates proper adjacencies of programs as indicated in the full building program. 

Improved exterior appearance of the building. 

Energy efficient building created by locating all programs in new construction with energy efficient envelope designs. 

All programs are housed in one building. 

Construction and auto yards are located in a concealed location. 

Instruction is not interrupted because the existing building remains in operation while the new building is constructed. 

Provides natural daylight to each regularly occupied space.  

Provides ADA accessibility within the building and at all entrances.  

Existing Community Media Center remains. 

  Site: 

Relocatables are no longer required. 

Existing play fields remain. 

 

Page 96: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…

Proposed Design Options ǀ 07 

    Carroll County Career & Technology Center ǀ 76     January 10, 2017 

Disadvantages: 

  Building: 

CCCTC is no longer on same campus as Westminster High School. 

  

Page 97: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…

Proposed Design Options ǀ 07 

    Carroll County Career & Technology Center ǀ 77     January 10, 2017 

MECHANICAL SYSTEM 

RECOMMENDATIONS 

 

General 

For all options the proposed HVAC Systems is a high 

efficiency  conventional  four‐pipe  Central 

Heating/Cooling Distribution System, serving a four‐

pipe  fan  coil  unit  and/or  air  handling  units  for 

shop/lab  areas.  Four‐pipe  fan‐coil  units  shall  be 

used  in  conjunction  with  a  decoupled  dedicated 

outdoor  air  system  (DOAS)  with  integral  heat 

recovery for ventilation and air requirements.  

The  Office/Administration  Area,  which  functions 

twelve  (12)  months  a  year,  and/or  during  non‐

educational  times  shall  be  zoned  such  that  it  can 

operate  independently from the rest of the school.  

All other areas  shall be  separately  zoned based on 

use and function. Each shop and/or lab area will be 

independently zoned. 

Under Option A  and B  a  complete  replacement of 

the  existing  HVAC  systems  is  recommended.  The 

primary  heating  source  is  recommended  to  be 

changed  from  electric  resistance  to  natural  gas. 

Additionally  under  these  two  (2)  options  a  hybrid 

geothermal,  central  heating  and  cooling  plant  can 

be considered if the geothermal heat exchanger can 

be  located  in  the  existing  play  fields  behind  the 

building. For Option C, a geothermal system will not 

be  feasible  as  a  result  of  insufficient  site  area  to 

locate  the  earth  heat  exchanger.  For  option  D,  a 

geothermal  system may be possible depending on 

the site selected. 

For  all  options,  based  on  the  type  of  facility with 

unique program requirements (Technical Shops and 

Labs)  independent  room  HVAC  type  systems  and 

equipment will be required for most spaces. 

The  Mechanical  Systems  shall  include  all  work 

associated  within  the  building  of  Heating, 

Ventilating, Air Conditioning  (HVAC), and Plumbing 

Systems.    These  systems  shall  extend  to  5  feet 

beyond  the building wall. The Mechanical Systems, 

in concert with the Architectural considerations, are 

intended  to  create  spaces  that  are  flexible, 

functional,  energy  efficient,  and  respond  to  the 

needs of this facility. 

Within the envelope of the new facility, the proper 

heating,  cooling,  ventilation,  air  exchanges,  and 

Automatic  Temperature  Control/Energy 

Management  Systems  shall  be  provided  for  all 

spaces  to  create  the  appropriate  thermal 

environment.  Stairwells shall be provided with heat 

only.    All  areas  shall  be  provided  with  heating, 

ventilation,  and  air  conditioning.    The  HVAC  and 

related  Mechanical  Systems  shall  not  only  be 

functional and responsive to the need, but shall be 

simple,  reliable,  durable, maintainable,  and  easily 

accessible.  The  HVAC  System  utilizes  energy 

conservation  techniques  to  the  greatest  extent 

possible, while maintaining comfortable control.  All 

HVAC  components  shall  be  capable  of  a  complete 

override from the Energy Management System. 

Heating  and  Cooling  Systems  and  their  associated 

controls shall be designed and zoned to enable the 

building  to  operate  at  less  than  full  occupancy 

without conditioning the entire building. 

The  Mechanical  Systems  shall  be  designed  to 

exceed ASHRAE Standard 90.1‐2013  in an effort  to 

achieve LEED Silver Certification. Sustainable design 

guidelines  such  as  ANSI/ASHRAE/USGBC/IES 

Standard  ASHRAE  Advanced  Energy  Design  Guide 

for K‐12 School Buildings shall be resources used to 

exceed  the  minimum  energy  performance 

requirements of ASHRAE 90.1‐2013 

Sub  system  monitoring  of  gas,  electric  (HVAC, 

lighting  plug  loads,  kitchen)  and  water  shall  be 

considered and could be bid as an add alternate. 

Page 98: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…

Proposed Design Options ǀ 07 

    Carroll County Career & Technology Center ǀ 78     January 10, 2017 

The  Mechanical  Systems  including  plumbing 

systems  shall  be  designed  in  accordance  with 

ASHRAE  Standards,  International  Mechanical  and 

Building  Codes,  NFPA,  the  International  Plumbing 

Code,  County  Code  Requirements,  and  IAC 

Standards.   

Heating System 

The  proposed  Heating  System  is  hot  water.    The 

building  shall be heated by means of a Hot Water 

Circulating System servicing hot water heating coils 

located  in  air  handling  units,  fan  coil  units, 

baseboard  radiation, unit heaters,  and  convectors. 

The boiler’s fuel source shall be natural gas. 

Base‐mounted  end  suction  or  horizontal  split  case 

distribution system centrifugal pumps,  located  in a 

mechanical  space,  shall  circulate  the  required 

quantities  of  hot water,  by  piping  systems,  to  air 

handling  units,  fan‐coil  units  and  miscellaneous 

terminal  heating  units.    A  redundant  circulating 

pump shall serve as a back‐up to the lead circulating 

pump. 

The  heating water  loop  shall  be  variable  flow  and 

shall provide the necessary low temperature (140°F 

maximum) hot water to air handling unit coils, unit 

heaters,  fan‐coil  units,  baseboard  radiation,  and 

miscellaneous  terminal heating units.   The heating 

water  pump(s)  shall  utilize  a  variable  frequency 

drive  to  vary  pump  speed  based  on  the  system's 

differential  pressure.  The  system  differential 

pressure operating set point shall be automatically 

reset based on analyzing all control valve positions. 

The    heating water  loop  supply  temperature  shall 

be  reset  based  on  outside  air  temperature.  

Constant  hot water  circulation  by means  of    high 

efficiency  ECM  motor  type  centrifugal  in‐line 

circulating pumps shall provide the necessary freeze 

protection  of  air  handling  unit  preheat  coils.    A 

redundant circulating pump shall serve as a back‐up 

to the lead circulating pumps.   

Heating water pumps shall be trimmed with flexible 

connectors,  suction  diffusers  (strainers  for  in‐line 

pumps),  multipurpose  valves,  isolation  valves, 

pressure gauges and flow meters. 

Generation  equipment  shall  include multiple  high 

efficiency (90%‐95% efficiency) condensing type fire 

tube hot water boilers  (i.e.,  Fulton Endura, AERCO 

Benchmark, Cleaver Brooks Clearfire)  sized equally 

for  the  total heating capacity.     These boilers  shall 

be located in the Boiler Room.   

Water  expansion  and  air  removal  devices  shall  be 

provided  in  the  Primary  Heating  Water  System.  

Water  pressure  regulators  located  downstream  of 

backflow  preventers  shall  provide  the  make‐up 

water  requirements. All makeup water usage  shall 

be metered and monitored through the EMS. 

Chemical Treatment  Systems  shall be provided  for 

the  Hot  Water  Circulating  System.  Hot  Water 

Heating  System  piping  shall  be  Schedule  40  Black 

Steel  and  insulated  in  accordance  with  ASHRAE 

Standards.  The  Heating  System  shall  operate 

automatically  whenever  the  outside  air 

temperatures are 65 degrees or less. 

Cooling System 

The building shall be cooled by means of a Central 

Chiller  Plant with  chilled Water  Circulating  System 

serving  chilled  water  coils  located  in  air  handling 

units  and  fan  coil  units.  Chilled  water  shall  be 

generated  by  two  (2)  primary  high  efficiency, 

variable  speed  compressor(s),  water  cooled 

centrifugal  type  chillers.     The  chillers  shall use an 

environmentally safe refrigerant in accordance with 

The  Clean  Air  Act.  An  additional,  small  capacity 

water cooled heat recovery, heat pump type chiller 

shall  be  considered  to  simultaneously  generate 

chilled  water  and  heating  water  for 

dehumidification  purposes  or  during  moderate 

weather  conditions.  Each  chiller  will  be  provided 

Page 99: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…

Proposed Design Options ǀ 07 

    Carroll County Career & Technology Center ǀ 79     January 10, 2017 

with a variable speed primary chilled water pump to 

track the secondary flow rate. Primary pumps shall 

be base mounted end suction type. 

Secondary  distribution  pumps  shall  be 

base‐mounted horizontal split case centrifugal type, 

located  in the Mechanical Room, shall circulate the 

required  quantities  of  chilled  water,  by  piping 

systems,  to  air  handling  unit  and  fan  coil  unit 

cooling  coils.    A  redundant  circulating  pump  shall 

serve  as  a  back‐up  to  the  lead  circulating  pump.  

The chilled water pump shall utilize a variable speed 

drive and the chilled water plant shall operate as a 

variable  primary  flow  system  to  maintain  a 

minimum  system  differential  pressure  set  point.  

This operating set point shall be automatically reset 

based  on  analyzing  control  valve  positions.  Flow 

meters  for  each  chiller  shall  maintain  minimum 

chilled water flow through the chiller(s). 

The  capacity  and  part  load  performance  of  the 

chiller(s)  shall  be  selected  to  precisely  and 

efficiently  track  the  building  load  based  on  the 

hour‐by‐hour building  load  requirements  and  shall 

be  capable  of  a  high  turn  down  ratio.  Two  (2) 

chillers  shall  be  equal  in  capacity  while  the  third 

heat  pump  chiller  if  used  shall  be  less  in  capacity 

and  sized  for  the  minimum  part  load  condition 

and/or reheat requirement. 

A multiple cell induced air cooling tower associated 

with each of the larger primary chillers shall utilize a 

variable speed drive, ultra‐low sound fans to reject 

heat  to  the atmospheric heat sink. The heat pump 

chiller  shall utilize a plate heat exchanger  so as  to 

have the ability to reject heat to the cooling tower 

or the heating water loop.  A remote sump shall be 

located  in  the mechanical  room  shall  be  provided 

for freeze protection while providing heat rejection 

capability for mechanical cooling whenever outdoor 

air  temperatures are above 50°F during  the winter 

season. A flat plate and frame type heat exchanger 

shall  be  installed  in  the  secondary  loop  (side  car 

arrangement)  to  generate  chilled  water  (water 

economizer) during low outdoor ambient conditions 

when  mechanical  cooling  is  required  within  the 

building.  

Each  chiller  shall  be  provided  with  a  condenser 

water  pump.  Condenser  water  pumps  shall  be 

base‐mounted end  suction centrifugal  type and be 

located in the Mechanical Equipment Room. Chilled 

water  and  condenser  water  pumps  shall  be 

trimmed with flexible connectors, suction diffusers, 

multipurpose  valves,  isolation  valves,  pressure 

gauges, and flow meters. 

Water  expansion  and  air  removal  devices  shall  be 

provided  in  the  Chilled  Water  System.    Water 

pressure  regulators  located  downstream  of 

backflow  preventers  shall  provide  the  make‐up 

water requirements for each system. Makeup water 

usage  for  the chilled water and condenser systems 

shall  be  independently  metered  and  monitored 

through the EMS. Independent Chemical Treatment 

Systems shall be provided for the chilled water and 

condenser systems.   

Chilled water  piping  shall  be welded  Schedule  40 

Black  Steel  and  shall  be  insulated  in  accordance 

with  ASHRAE  Requirements.    Condenser  water 

piping  shall  be  Schedule  40  Galvanized  Steel with 

mechanical couplings.  Condenser water piping shall 

be  insulated.  The  Chiller  System  (i.e.,  mechanical 

cooling)  shall  automatically  operate  whenever 

outside air temperatures are above 50 degrees F. 

Air Distribution Systems 

Classrooms 

A  Four‐Pipe  Fan‐Coil  Unit  System  with  Dedicated 

Outdoor  Air  System  (DOAS)  shall  serve  the  office 

spaces  and  classroom  areas.  Air  handling  systems 

shall  serve  assembly  type  spaces,  (Dining)  and  all 

Technical Shop and Lab spaces. 

Page 100: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…

Proposed Design Options ǀ 07 

    Carroll County Career & Technology Center ǀ 80     January 10, 2017 

Individual  fan‐coil  units  with  ducted  supply  air 

system  to  ceiling  supply  air  diffusers  shall  be 

provided for each room.  These units shall be 100% 

recirculating air type with heating and cooling coils 

(i.e.  4‐pipe)  controlled  to  maintain  the  desired 

indoor temperature conditions (i.e. sensible heating 

and cooling only). 

Heat Recovery Ventilation Air Units  (100% outside 

air) shall be used as part of the Dedicated Outdoor 

Air System (DOAS) to dehumidify, temper and heat 

ventilation  air  to  a neutral  air  temperature  (70°F). 

These units  shall provide  the minimum  amount of 

outside  air  for  ventilation  as  determined  by  the 

requirements set forth by ASHRAE Standard 62, The 

International  Mechanical  Code,  the  Educational 

Specifications and  the makeup air  requirements  to 

maintain  a  slight  positive  building  pressure.  This 

conditioned/tempered  outside  air  shall  be  directly 

injected  into  each  classroom  and/or  office  space.  

Relief air (used outdoor air) shall be brought back to 

the heat recovery unit for energy reclamation via a 

ducted  return  air  system,  then  discharged  to  the 

outside.    Multiple  heat  recovery  devices  inside 

these units (heat wheels, flat plate heat exchangers) 

shall  be  employed  to  provide  the  necessary 

preconditioning  (sensible  and  latent  energy)  and 

free  reheat  (sensible  energy)  of  outside  air. 

Additionally  these  units  shall  be  equipped  with  a 

supply  fan,  exhaust/relief  fan,  filters, 

cooling/dehumidification coil, and heating coil.  The 

heating  and  cooling medium  shall  be  provided  by 

the building’s central cooling and heating plant. 

Tech Shops and Labs 

Independent air handling units shall be provided for 

each  shop or  lab  areas. Air handling  systems  shall 

be  designed  to  provide  the  required  amount  of 

ventilation,  filtration and make up air  required  for 

each unique space. Supplemental unit heaters shall 

be  located  at  overhead  doors.  Heat  recovery  and 

specialized  local  dilution  and  source  capture 

exhaust  systems  shall  be  provided  to  maximize 

indoor air quality. 

Office Administration 

The  Office/Administration  area  shall  be  provided 

with  space  conditioning  by  a  Variable  Refrigerant 

Flow (VRF) heat pump system utilizing an air cooled 

condensing unit with variable speed/inverter driven 

compressors. Ductless  ceiling  cassette  type  indoor 

fan  coil  units  with  independent  thermostatic 

controls are proposed  for each  space. A Dedicated 

Outdoor Air System (DOAS) unit shall be a packaged 

Direct  Expansion  Rooftop  Unit with  a  gas  furnace 

for heat and utilize a heat recovery wheel. 

BUILDING  AUTOMATIC  TEMPERATURE 

CONTROLS/ ENERGY MANAGEMENT SYSTEM 

It  is  recommended  that  the  building  be  provided 

with a BACnet Certified Automation System and be 

tied  into  the  existing  Johnson  Metasys  County 

Energy  Management  System.  It  is  recommended 

that  the  system  have  full  direct  digital  controls, 

including  space  terminal  unit  controls,  which  is 

consistent  with  the  County  Standard.  All  controls 

shall be electric/electronic actuation. All control and 

monitoring  points  shall  be  consistent  with  the 

County’s  current  Standards  and  shall  be  reviewed 

with the Facilities Management Department during 

Design. 

Automatic Temperature Controls shall be capable of 

operating per  the sequence of operation,  including 

when  the Energy Management System  is manually 

overridden. 

The Basic Design Criteria shall be as follows: 

1.  Cooling Mode:  

Outdoor Temperature:    95°F  DB, 78°F WB 

Indoor Temperature:    75°F  DB, 65% RH or less 

Page 101: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…

Proposed Design Options ǀ 07 

    Carroll County Career & Technology Center ǀ 81     January 10, 2017 

   2.  Heating Mode:    Outdoor Temperature:    10°F DB   Indoor Temperature:    70°F DB  3.  Chilled Water System (at 95 deg F Ambient):    44°F Supply Water Temperature   58°F Return Water Temperature  4.  Heating  Water  System  (at  10  deg  F 

Ambient):    140°F Supply Water Temperature   120°F Return Water Temperature  5.  Ventilation Rates (ASHRAE Standard 62):    Classrooms: 

10 CFM per person    .12 CFM per sq. ft.    Offices:   5 CFM per person   .06 CFM per sq. ft.    Shop Areas (minimum):   10 CFM per person   .18 CFM per sq. ft.  

The  building  central  heating  system  shall  be 

energized  to  operate  whenever  outside  air 

temperatures  are  65°F  or  less. When  indexed  on, 

the  distribution pump  shall be  energized  and  vary 

its  flow  through  the  variable  speed  controller  to 

maintain  its  system differential pressure  set‐point. 

The  differential  set  point  shall  automatically  be 

reset  based  on  analyzing  the  positioning  of  all 

heating control valves. 

Through  integral sequencing software by the boiler 

manufacturer the boilers shall be staged in lead‐lag 

and  rotational  fashion  to maintain  system  supply 

water  set‐point.  The  heating  water  temperature 

supply shall be reset (linear type) based on outside 

air temperature. 

The  building  central  chilled water  system  shall  be 

energized  to  operate  whenever  outside  air 

temperatures  are  50  deg  F  or  above.  The  chilled 

water  system  shall  be  variable  flow  where  the 

primary and  secondary  system pumps  shall vary  in 

speed  to maintain  the  system differential pressure 

set point. This set point shall be automatically reset 

based  on  analyzing  all  the  chilled  water  control 

valve positions. A  flow meter  for each  chiller  shall 

control  its  pump  variable  speed  drive  to maintain 

minimum  flow  through  the  chiller(s).  When 

activated,  the  chillers  and  its  associated  chilled 

water pumps shall be energized  in  lead‐lag fashion. 

The cooling tower(s) and condenser water pump(s) 

shall  be  energized when  their  associated  chiller  is 

energized.  The  condenser  water  supply 

temperature  shall  be  reset  based  on  outdoor  air 

wet and dry bulb conditions. 

The  chiller  shall  be  controlled  through  its  internal 

control  panel  to  maintain  discharge  evaporator 

water temperatures. 

For Single Zone Variable Volume Air Handling Units, 

a  room  temperature  sensor  shall  modulate  the 

associated air handling units’ cooling coil valve and 

outside  air  economizer  controls  to  provide  the 

necessary cooling. When the mixed air temperature 

falls below its set point the supply duct temperature 

sensor modulates  the unit’s hot water preheat coil 

valve  to maintain 55°F  temperature off  the  coil.  If 

heat  is  required  by  the  space,  the  space 

temperature  sensor  shall  modulate  the  unit’s 

heating  coil  valve.  Preheat  coil  circulating  pumps 

shall  be  energized  whenever  the  outside  air 

temperature falls below 40°F.   Constant volume air 

handling  units  shall  be  provided  with  a  heat 

recovery  device  to  precondition  the  outside  air 

(sensible  and  latent  heat)  and  a  heat  recovery 

device  with  face  and  bypass  damper  control  to 

Page 102: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…

Proposed Design Options ǀ 07 

    Carroll County Career & Technology Center ǀ 82     January 10, 2017 

provide free reheat  (sensible heat) when operating 

in  a  dehumidification/cooling  mode.  Supply  and 

return  fans  shall  be  provided with  variable  speed 

drives  and  shall  vary  in  fan  speed  to  match  the 

space load. 

All air handling units  shall be provided with  safety 

features  such  as  low  limit  control,  freeze  stat, 

supply  and  return  air  smoke  detectors,  and  high 

static  pressure  sensors. All  air  handling  units  shall 

be provided with energy conservation features such 

as  economizer  cycles,  night  setback,  and morning 

warm‐up cycles of operation. Space carbon dioxide 

sensors  shall  be  used  for  control  of  outdoor  air 

(demand  controlled  ventilation  or  DCV)  for  high 

occupancy spaces. 

Space  relative  humidity  sensors  shall  be  used 

throughout  the  building  and  shall  automatically 

index  the  dehumidification  control  mode  if  its 

maximum set point condition is reached. 

Supply air discharge air temperature set‐points shall 

be  reset  based  on  the  space  within  the  zone 

requiring the greatest cooling. 

Fan‐Coil  Units  shall  be  controlled  by  room 

temperature  sensors. Cooling  coil  and  heating  coil 

control  valves  shall  modulate  to  maintain  room 

temperature set‐point. 

Dedicated  outdoor  air  units  shall  provide  100% 

outside  air  to  individual  spaces.  An  enthalpy 

(sensible and latent heat) heat recovery wheel shall 

pre‐condition  the outside  air  stream. A heating or 

cooling/dehumidification  coil  shall  heat  or  sub‐

dehumidify the outside air stream. When operating 

in  a  dehumidification  mode,  a  reheat  heat 

exchanger  (typically  a  plate  heat  exchanger)  shall 

provide the necessary free reheat (sensible heat) to 

prevent sub‐cooling the spaces while enhancing the 

efficiency  of  the  heat  wheel.  A  face  and  bypass 

damper  control  shall  be  provided  for  the  reheat 

heat recovery unit and a variable speed motor shall 

control the enthalpy heat recovery wheel. The heat 

wheel  shall  be  stopped  during  the  economizer 

outside  air  conditions  and/or  for  frost  control. Air 

flow  measuring  shall  be  utilized  to  monitor  the 

supply, return, relief and outside air systems. 

 

PLUMBING 

General 

A  complete  system  of  plumbing  shall  be  provided 

throughout  the  building  to  comply  with  the 

requirements set forth in the program and installed 

in  strict  accord  with  all  applicable  codes  and 

regulations, including ADA. 

The  plumbing  systems  shall  consist  of  but  not  be 

limited to: 

Domestic Cold Water 

Domestic Hot Water with Recirculation 

Sanitary Drainage and Vent  

Storm  Water  Collection  including  Footing 

Ground Water Collection 

Natural Gas 

Fire Protection 

All plumbing  fixtures shall be  included and shall be 

good  commercial  grade  of  institutional  quality.  

Water  closets  and  urinals  shall  be  flush  valve, 

water‐conserving,  LEED  compliant  type.    Water 

closets  shall  be  floor‐mounted  type.    Faucets  for 

lavatories  shall  be  the  self‐metering  types.  

Handicapped  fixtures  shall  comply  with  ADA 

Requirements.   

 

 

Page 103: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…

Proposed Design Options ǀ 07 

    Carroll County Career & Technology Center ǀ 83     January 10, 2017 

Water Service 

Reuse  of  the  existing  incoming  water  service 

(Option A and B) or a new  incoming water  service 

(Option  C  and  D)  shall  be  required  for  domestic 

water  and  fire  protection  systems.  New  hot  and 

cold  water  shall  be  extended  to  and  serve  the 

fixtures  and  equipment  as  required.    All  domestic 

water piping  shall be  copper  Type  L with wrought 

copper fittings and  lead‐free 95‐5 solder.   All water 

piping  shall  be  insulated  with  the  exception  of 

non‐handicapped  final  branch  run‐outs  for 

connection  to  fixtures/equipment.  Backflow 

preventers and vacuum breakers  shall be provided 

to  prevent  back  siphonage  and  contamination  of 

the  potable  water  system.  Freeze  proof  wall 

hydrants  shall be  located every 150  feet along  the 

building's perimeter.   Hose bibs  in concealed boxes 

shall be  located  in gang toilet rooms, kitchen areas 

which  require  wash‐down,  and  mechanical 

equipment rooms. 

A  minimum  of  two  gas  fired  high 

efficiency/condensing  type hot water heaters  shall 

be strategically located in the First Floor Mechanical 

Room.   A hot water storage tank shall be utilized  if 

required to meet building requirements.  The entire 

building shall receive 140 degree hot water. Fixtures 

requiring 105 degree F hot water shall be equipped 

with  an ASSE  rated  temperature  limiting device. A 

hot  water  recirculating  system  with  in‐line  type 

centrifugal pump shall be utilized. 

Sanitary Drainage 

A  new  sanitary  drainage  system  serving  the  new 

plumbing  fixtures  shall  be  sized  per  the 

requirements of  the American Society of Plumbing 

Engineers,  the  County  Plumbing  Code,  and  the 

International Plumbing Code.   

 

Storm Water Drainage 

A new storm water drain  line shall be brought to a 

point  5'‐0"  from  the  building  exterior wall  (under 

another  Division).    At  this  point  and  under  this 

Division, connection shall be made  to  the drainage 

line  and  same  shall  be  extended  into  the  building 

for distribution.   

The  Storm  Water  System  shall  be  sized  per  the 

requirements of  the American Society of Plumbing 

Engineers, and the International Plumbing Code. 

Gas Service 

A  new  (Option  C  and  D)  or  upgrade  existing  gas 

service  (Option A  and B)  shall be provided  for  the 

domestic hot water  system  requirements,  comfort 

heating  requirements,  kitchen  equipment,  dryers 

and  to  serve  the  natural  gas  fired  emergency 

generator(s). 

Sustainable Design Features 

The  following  are minimum  additional  sustainable 

design  alternatives  which  shall  be  considered  to 

achieve LEED Silver Certification. 

A  rain  water  collection  system  is 

recommended  for  the  play  field  irrigation 

system. 

A  condensate  water  collection  system  is 

recommended  to  serve  as  makeup  water 

for the cooling tower system or be used for 

irrigation if the rain water collection system 

is implemented. 

Metering  and  measurement  with 

verification  plan  is  recommended  to  be 

designed  even  if  it  is  bid  under  an  add 

alternate.  Sub‐meters  shall  be  designed  to 

measure  plug  loads,  lighting  loads,  HVAC 

Page 104: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…

Proposed Design Options ǀ 07 

    Carroll County Career & Technology Center ǀ 84     January 10, 2017 

loads,  kitchen  load, makeup  water  usage, 

domestic  hot water  usage  and  natural  gas 

usage. An enhancement to this option  is to 

include a dashboard system. 

Solar  hot  water  heating  system  or  heat 

pump  is  recommended  to heat or preheat 

domestic hot water.  

 

ELECTRICAL RECOMMENDATIONS 

Electrical Service and Distribution System 

The existing electric service of 3000 amps, 277/480 

volts,  three  phase,  four wires will  be  upgraded  to 

4000  Amps,  277/480  volts.    The  existing  service 

comes in underground to the existing pad‐mounted 

enclosed transformer at the rear of the building.   A 

new electrical room space will be required, separate 

from the mechanical room.     New panelboards will 

be located in dedicated utility rooms. 

The electrical distribution will be at 277/480 volts, 

three  phase,  four  wires  from  a  new  main 

switchboard  to  panelboards  throughout  the 

building.    The  existing  main  switchboard  will  be 

replaced.   Dry type transformers will supply service 

at  120/208  volts,  three  phase,  four  wires  to 

panelboards  located  throughout  the  building.  

Mechanical  equipment  will  be  served  at  277/480 

volts  and  receptacles,  office  equipment  and  the 

lighting will be served at 277/480 volts. 

All receptacles will have stainless steel cover plates.  

All  receptacles  will  have  a  finish  selected  by  the 

Owner.  Panelboards  for  general  lighting  and 

receptacles  and  for  computer  receptacles  will  be 

located  in  all  areas  of  the  new  building  to  serve 

local  loads. Surge Protection Devices  (SPDs) will be 

provided  at  computer  and  life  safety/standby 

panelboards.  The  emergency  generator  will  be 

replaced with a natural gas generator and will need 

to be located outside the building; or a new, larger, 

dedicated generator room will need to be provided. 

Lighting 

Where new  lighting  is  required,  it will be designed 

as follows:   General  lighting will be recessed 2' x 4' 

LED troffers and conform to the  latest energy code 

IECC 2015. Lighting is a critical aspect of the Building 

Design.    The  School will  have  a  variety  of  lighting 

design  criteria  for  each  “vision  task”.    The major 

Lighting Design Criteria will include the following: 

 

LIGHTING TASK 

TARGET 

ILLUMINATION 

LEVELS 

(Foot Candles) 

Classrooms  50.0 

Music Rooms  60.0 

Offices/Administration 

Areas 

40.0 

Work Rooms  40.0 

Toilet Rooms  20.0 

Exterior Pedestrian 

Walkway 

0.6 

Exterior General 

Parking 

0.6 

Exterior Vehicle Lanes  1.0 

 

Exterior  lighting  will  be  provided  to  enhance  the 

security  of  the  building  and  parking  lots.    Lighting 

will be switched or scheduled on‐off by a time clock.  

Site lighting will be high cutoff LED type luminaires.  

Page 105: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…

Proposed Design Options ǀ 07 

    Carroll County Career & Technology Center ǀ 85     January 10, 2017 

All  light pole bases will  extend  24"  above  finished 

grade.   Accent and sign  lighting will be provided  in 

selected  areas.  Site  lighting  will  be  controlled  by 

perimeter  building‐mounted  lights  and  security 

lights  will  be  photocell  controlled.  Emergency 

lighting  will  be  provided  throughout  the  path  of 

egress and in selected areas. LED exit lights with red 

letters will be provided throughout the building.  

Levels of  illumination  shall be as  recommended by 

the  Illuminating  Engineering  Society  of  North 

America  and  ASHRAE  90  Standards.  All  new  light 

switches will be  installed  at 48” AFF  to  the  top of 

device.    New  light  switches  will  be  provided  to 

replace  existing  switches  installed  above  the 

maximum ADA mounting height of 48” AFF.  

Track  lighting will  be  provided  at  selected  display 

areas. Interior corridor night security lighting will be 

provided.   Corridor  lights will be controlled by key‐

type  switches  and  occupancy  sensors.  Classroom 

lights will be controlled by low voltage switches and 

above  ceiling  room  controllers.  Switches will  have 

preset scenes to utilize the versatility of LED fixtures 

and to ensure code compliance. 

Fire Alarm System 

The existing Edwards EST2 Fire Alarm System will be 

expanded with  a  graphic  annunciator  at  the main 

building  entrance  and  an  automatic  dialer will  be 

provided.   The Fire Alarm System will also transmit 

security alarm via the existing Auto‐Dialer. The Fire 

Alarm System will meet all ADA requirements.   The 

Fire Alarm System will be designed  to comply with 

Local Authorities Having Jurisdiction,  IBC 2000, and 

NFPA.  Strobe  devices  will  be  ceiling‐mounted 

wherever  practical  (including  Storage Rooms).  Fire 

Alarm audible device will be voice evacuation  type 

with  pre‐programmed  messages  and  override 

microphone.  The  existing  fire  alarm  panel 

modifications include providing an additional power 

supply  and  FACP  control  module  in  the  existing 

panel.   New  fire alarm power extender panels will 

be provided in each area. 

Security System 

The existing Ademco Security System, located in the 

Main Office, Health Suite, will be  replaced. Motion 

detectors  will  be  located  in  all  new  rooms  with 

perimeter glass.  Door contacts will be located on all 

exterior doors. 

Closed  Circuit  Television  (CCTV)  Security 

Camera System 

The existing Closed Circuit Television Security Camera System and VCR will be replaced with a new IP camera system and Web‐server.    

Access Control 

The existing Best Card Reader System will be reused with door controllers and magnetic stripe card readers provided at selected doors. 

 

Video Network Cable Television System 

A Cable Television System will be provided to serve monitors  in  all  Classrooms,  Administrative Offices, and  other  selected  areas.  The  System  shall  be connected  to an existing  incoming Cable Television System, located in the Main Office. The System shall broadcast/display  time,  date,  programming  and other  information. Main  video  trunk  lines  will  be provided  from  the Main  Office  to  each  new  data closet.  The  Video  System  will  be  wired  for interactive  two‐way distribution and will consist of broad‐band coaxial cabling (RG‐11u and RG‐6u).  All components  reach  as  splitters  and  line  amplifiers will be provided.  

Master Clocks 

New  system  clocks  will  be  provided  in  Common 

Areas / Areas of Assembly and will be connected to 

the existing Telecor Time Clock System.   

Page 106: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…

Proposed Design Options ǀ 07 

    Carroll County Career & Technology Center ǀ 86     January 10, 2017 

Voice  Network  –  Telephone  /  Paging  / 

Intercom 

Paging  speakers  and  intercom  stations  will  be provided  in  selected  areas.    Speakers  will  be provided in all corridors.  All rooms shall have voice sets  and  speakers.  The  System  shall  be  star‐wired and  consist  of  Category  6E,  or  better,  cabling  for both  telephone  and  public  address.  Telephone outlets and cables will be provided  in the following areas:  ●  One (1) telephone outlet in each selected 

room by the door. 

●  Two (2) outlets at each Office and 

Administration Area work station/desk. 

●  One (1) outlet will be provided in other 

selected areas. 

A  bell  tone  system  will  be  provided.    AI  phone system will  be  provided  at  the Main  Entrance  for after‐hours calling of staff. Public Address Speakers will be  located  in hallways and  large group activity areas. The existing Rauland Telecenter  System will be  expanded  to  serve  the  new  areas.   A  100  pair voice backbone will be  installed between  the new IDF’s and the existing MDF, located in Room 110.  

Data Network 

A new  IDF room may be required to serve the newly renovated  spaces.  The  five  (5)  existing  IDF  racks located  throughout  the  school  will  need  to  be relocated due  to  the  renovations. The Data Network will be star‐wired 1000 Base‐T and consist of Category 6E  cabling.    The  System will provide  all  components for a complete operable LAN.  It will provide access to the  System  WAN  and  internet  access  through  T‐1 access to a County Server Site.  A 12‐strand composite fiber optic backbone will be used  to  link  the existing main MDF,  located  in Room 110, with each new  IDF.  Strategically  located  telecommunication  hubs  (IDF Rooms) will limit cabling lengths to 250 linear feet.  

Data  outlet  plates  will  be  conventional  industry standard type plates.  (Custom stainless steel outlet plates  will  not  be  used.)  Data  cable  outlets  and associated  cables will be provided  in  the  following areas:  ●  Four (4) data jacks for students will be 

provided in each classroom.  Student drops 

will be 4’‐0” apart (Two (2) data jacks per 

drop, plus one (1) quad‐receptacle). 

●  Two (2) data jacks for teachers (one front 

and one rear of the classroom). 

●  Two (2) outlets at each office and 

administration area work station/desk. 

●  Storage Rooms (over 100 SF) will be 

provided with a voice and data drop. 

General Communication Systems 

All  Systems  will  be  in  accordance with  the MSDE 

Maryland  Public  School  Standards  for 

Telecommunications Distribution  Systems,  and  the 

Board  of  Education  of  Carroll  County  Technology 

Plan.     Voice, Video,  and Data Distribution will  be 

provided  in  all  areas.    Spaces  excluded  are 

restrooms, custodial closets, etc. 

General Electrical Systems Standards 

All systems and components will be designed in 

accordance with the following:   

    ●  Carroll County Board of Education ‐ Educational Specifications for this project. 

    ●  Carroll County Educational Specifications for Science Laboratories. 

    ●  All applicable national, state, and local requirements. 

    ●  Maryland State Interagency Committee for Public School Construction Standards. 

    ●  Americans with Disabilities Act (ADA) Requirements. 

Page 107: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…

Proposed Design Options ǀ 07 

    Carroll County Career & Technology Center ǀ 87     January 10, 2017 

    ●  American National Standards Institute (ANSI). 

    ●  Institute of Electrical & Electronic Engineers (IEEE). 

    ●  National Electrical Code (NEC), 2002. 

    ●  National Electrical Manufacturer’s Association (NEMA). 

    ●  National Electrical Safety Code (NESC). 

    ●  National Fire Protection Association (NFPA). 

    ●  Underwriters Laboratories (UL). 

    ●  International Building Code (IBC), 2000. 

    ●  Illuminating Engineering Society (IES). 

    ●  American Society of Testing and Materials (ASTM). 

    ●  American Society of Mechanical Engineers (ASME). 

  ●  Maryland Public School Standards for Telecommunications Distribution Systems, 2002. 

  ●  Maryland State Department of Education Science Facilities Design Guidelines, 1994. 

●  Maryland State Department of Education Technology Education Facility Guidelines. 

Page 108: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…
Page 109: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…

    Carroll County Career & Technology Center    

 

 

 

 

 

 

 

 

 

 

 

 

APPENDIX  

Page 110: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…
Page 111: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…

Appendix ǀ 08 

    Carroll County Career & Technology Center ǀ 88     January 10, 2017 

Appendix A:  

Cost Estimate: Options A ‐ D 

   

 

   

Page 112: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…

Appendix ǀ 08 

    Carroll County Career & Technology Center ǀ 89     January 10, 2017 

Cost Estimate: Relocated Programs 

   

 

Page 113: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…

Appendix ǀ 08 

    Carroll County Career & Technology Center ǀ 90     January 10, 2017 

Appendix B: Life Cycle Costs 

Building 35 Year Life Cycle Costs 

MEP SYSTEMS 

Addition/ Renovation Options (Options A and B): 

Under  the  addition/  renovation  building  options,  all  existing  mechanical  systems  will  be  replaced  in  their 

entirety. The conventional 4‐pipe heating and cooling system  includes a new central heating and cooling plant 

served by boilers and air cooled chillers. An alternate approach is to provide a hybrid geothermal system which 

utilizes the earth as its heat exchanger and requires a smaller central plant. The existing building and associated 

building envelope will be less efficient as compared to a new building. Therefore, the mechanical systems will be 

less efficient since these existing physical condition limitations will increase energy consumption by mechanical 

equipment, thus lowering the energy efficiency of the renovation/ addition option when compared to the new 

building option.  

New Building Option (Options C and D): 

Under the new building option, conventional 4‐pipe and geothermal are analyzed.  

Mechanical Life Cycle Costs: 

Annual  energy  costs were  developed  utilizing  computer modeling  for  both  the  new  building  option  and  the 

renovation/ addition options. The annual operating and maintenance costs were then multiplied by 35 years to 

provide a cost analysis  for a 35 year  life span.  In addition, a 5 percent assumed  interest  rate and mechanical 

construction  costs  are  included  in  the  life  cycle  cost  calculation.  A  conventional  4‐pipe  heating  and  cooling 

system was analyzed for all building options.  

Building Maintenance Life Cycle Costs: 

The building maintenance/ replacement costs are the costs to maintain and replace windows, roofs, floor tile, 

paint, carpet, ceramic tile, casework, ceiling tile, doors, window blinds, kitchen equipment, etc. as required over 

the 35 year period. This does not include mechanical costs that are included above. Some of these materials will 

have  a  longer  life  span  than  others  and  that  estimated  useful  life  was  factored  into  the  calculation  for 

replacement.  

Page 114: TECHNOLOGY CENTER FEASIBILITY STUDY · CARROLL COUNTY CAREER & TECHNOLOGY CENTER FEASIBILITY STUDY ... electrical, plumbing, and accessibility deficiencies and needs to ... completed…

Appendix ǀ 08 

    Carroll County Career & Technology Center ǀ 91     January 10, 2017 

Appendix B: Life Cycle Costs 

 

The following is a summary of the 35‐year energy cost calculations.