Techniques to Maximise Oilfields Production In The Republic of South Sudan By: Eng. Salah H. Wahbi Chairman & Founder Wahbi Consulting Services Co. Ltd.

Upload: others

Post on 22-Jul-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Techniques to Maximise Oilfields Production In The ... · • Artificial Lift. Plans to increase Production Rates B) Medium and Long Term Plans (EOR) ... Diagnosis Methods of Excess

Techniques to Maximise Oilfields ProductionIn The Republic of South Sudan

By:Eng. Salah H. WahbiChairman & Founder

Wahbi Consulting Services Co. Ltd.

Page 2: Techniques to Maximise Oilfields Production In The ... · • Artificial Lift. Plans to increase Production Rates B) Medium and Long Term Plans (EOR) ... Diagnosis Methods of Excess

PlanstoincreaseProductionRates

Planstoincreaseproductionratecanbecategorizedintotwomainareas:

A)ShorttermPlans.

A)MediumandLongtermPlans.

Page 3: Techniques to Maximise Oilfields Production In The ... · • Artificial Lift. Plans to increase Production Rates B) Medium and Long Term Plans (EOR) ... Diagnosis Methods of Excess

PlanstoincreaseProductionRatesA)ShortTermPlans(Workover)

Workoveroperationsareusedtosolve:

1. Lowreservoirpermeability.

2. Formationdamage.

3. Waterproduction.

4. Casingdamage.

Page 4: Techniques to Maximise Oilfields Production In The ... · • Artificial Lift. Plans to increase Production Rates B) Medium and Long Term Plans (EOR) ... Diagnosis Methods of Excess

PlanstoincreaseProductionRatesB)MediumandLongTermPlans

Mediumandlongtermplanscanbecategorizedas:

1. IOR(improvedOilRecovery).2. EOR(EnhancedOilRecovery)

Page 5: Techniques to Maximise Oilfields Production In The ... · • Artificial Lift. Plans to increase Production Rates B) Medium and Long Term Plans (EOR) ... Diagnosis Methods of Excess

PlanstoincreaseProductionRatesB)MediumandLongTermPlans(IOR)

IORincludes:• Infillwells.• WaterInjection.• ArtificialLift.

Page 6: Techniques to Maximise Oilfields Production In The ... · • Artificial Lift. Plans to increase Production Rates B) Medium and Long Term Plans (EOR) ... Diagnosis Methods of Excess

PlanstoincreaseProductionRatesB)MediumandLongTermPlans(EOR)

EORisconsideredatertiaryrecoverymethod.Itismainlyafterthemobilityrelationshipbetween

waterandoilEORinclude:a) Polymerflooding.b) Surfactants&alkalineinjection.c) Thermalmethods.d) Miscibleflooding(CO2)

Page 7: Techniques to Maximise Oilfields Production In The ... · • Artificial Lift. Plans to increase Production Rates B) Medium and Long Term Plans (EOR) ... Diagnosis Methods of Excess

A)ShortTermPlans(Workover)

Page 8: Techniques to Maximise Oilfields Production In The ... · • Artificial Lift. Plans to increase Production Rates B) Medium and Long Term Plans (EOR) ... Diagnosis Methods of Excess

SummaryofCommonProblems&WorkoverOperations

Excessive Water

Production

Squeeze & Re-perforating

Water Shut Off by Plugs

Chemical Water Shut Off

Page 9: Techniques to Maximise Oilfields Production In The ... · • Artificial Lift. Plans to increase Production Rates B) Medium and Long Term Plans (EOR) ... Diagnosis Methods of Excess

FACTORSINFLUENCEWATERINFLUXTherearemanyfactorsthatcaninfluencewaterinflux:1]Geological

SizeofstructureanditslocationRelativelythinupperlayerswithlateralvariationThinshalebreakwhichwilleasilyallowchanneling

2]WellLocationUpdip/DownorCrest/Flank

3]DriveMechanismStrongorweakwaterdrive

4]Oil-WaterContactBottomoredgewater

5]ThicknessofNetPay6]OperationalParameters

PressuredrawdownPumpfrequencyChokesize– duringtesting.

7]CompletionintervalStandoffOWC

Page 10: Techniques to Maximise Oilfields Production In The ... · • Artificial Lift. Plans to increase Production Rates B) Medium and Long Term Plans (EOR) ... Diagnosis Methods of Excess

WaterProductionMechanisms

(Curve 1) :- Completion Into Water and theproblemof fresh water resistivity.- Channel behind Casing (weekcurrent behind)(Curve 2) :- CasingLeaks- Channel behindCasing- StimulationOut of Zone- Barrier Breakdown(Curve 3) :- BottomWater- ConingorCresting- ChannelingthroughHighPermeability(Curve 4) :- FractureCommunicationbetweeninjectorandProducer

Page 11: Techniques to Maximise Oilfields Production In The ... · • Artificial Lift. Plans to increase Production Rates B) Medium and Long Term Plans (EOR) ... Diagnosis Methods of Excess

v Excesswaterproductionisaconcerninviewof:

ü ItiscausingwaterhandlingproblemsatFPFsü Watertreatmentanddisposalproblemsü RestrictingflowoflowP.Iintervals

ü OptimizingESPsinviewofchangeinP.Iü Severesandproductionwhichreflectonsandfillandhenceperforation

coveragev Stepstobetakentoarrestthisexcesswaterproductionproblem

ü Asproperdiagnosistoidentifythesourceofexcesswaterproduction:§ Properwellhistoryisakeyelement.§ Samelikethedoctorstartswithaskingthepatientabouthishealthhistory.

ü Aggressivewatershutofftobetakenuptoreducewatercutandincreaseoilproduction.

ExcessWaterProductionConcernsandChallenges

Page 12: Techniques to Maximise Oilfields Production In The ... · • Artificial Lift. Plans to increase Production Rates B) Medium and Long Term Plans (EOR) ... Diagnosis Methods of Excess

ReasonsandRouteCauseofhighwatercutProduction

ü AdverseMobilityratioinsuchfieldslikeBamboo,Heglig &Munga

ü Productionmechanism- ESP&PCPcausedHighdrawdown

ü Bottom&Edgewaterencroachment(MidField)

ü InjectionwaterbreakthroughinUnity(Talih WestField)

ü FlowbehindcasingduetopoorCementationinsomewells(BAM-X,NE-X&NE-Y)…

(Howcanwesolvethis?)

Page 13: Techniques to Maximise Oilfields Production In The ... · • Artificial Lift. Plans to increase Production Rates B) Medium and Long Term Plans (EOR) ... Diagnosis Methods of Excess

OverallWaterCutBehavior

Production Curve - Block 1,2

0.0

10.0

20.0

30.0

40.0

50.0

60.0

70.0

80.0

90.0

100.0

Jun-

99Se

p-99

Dec-

99M

ar-0

0Ju

n-00

Sep-

00De

c-00

Mar

-01

Jun-

01Se

p-01

Dec-

01M

ar-0

2Ju

n-02

Sep-

02De

c-02

Mar

-03

Jun-

03Se

p-03

Dec-

03M

ar-0

4Ju

n-04

Sep-

04De

c-04

Mar

-05

Jun-

05Se

p-05

Dec-

05M

ar-0

6Ju

n-06

Sep-

06De

c-06

Mar

-07

Jun-

07Se

p-07

Dec-

07M

ar-0

8Ju

n-08

Sep-

08De

c-08

Wat

er-C

ut (%

)

Heglig UN Toma-s EL nar Elharr Eltoor Bambo khairat Munga AvargeBack

Page 14: Techniques to Maximise Oilfields Production In The ... · • Artificial Lift. Plans to increase Production Rates B) Medium and Long Term Plans (EOR) ... Diagnosis Methods of Excess

Addnewtechniquetodetermineexcessivewaterproductionmechanismsasseeninpetroleumproductionwellshasbeendevelopedandverified.

log-logplotsofWOR(Water/OilRatio)vs.timeshowdifferentcharacteristictrendsfordifferentmechanisms.

ThetimederivativesofWORwasfoundtobecapableofdifferentiatingwhetherthewellisexpecting

•Waterconing,

•High-permeabilitylayerbreakthrough,

•Nearwellborechannelingand

•LayerConductivity

Fig 5-1 Coning (Numerical SimulationFig 5-2 High Permeability Layer (Numerical Simulation)Fig 5-3 Near Well Bore Flow

The vertical increase at the end (1800 days) is characteristic of a near well bore flow = this is “bad

water” and needs to be treated.

Fig 5-4 Layer Conductivity Good Water

This case WOR and WOR’ increase = layer conductivity = good water.WOR and WOR’ decrease at 3000 days because of an injector shut down in the near area. Note that they resume their increase on the same slopes sometime after when water comes from farther wells.Some sharp increase corresponds to near well bore flow followed by a remedial squeeze treatment

DiagnosisMethodsofExcessWaterProduction

Page 15: Techniques to Maximise Oilfields Production In The ... · • Artificial Lift. Plans to increase Production Rates B) Medium and Long Term Plans (EOR) ... Diagnosis Methods of Excess

In-Jun-99fromZarqa X(2176-2192.5mkb)

Drop in O/Liq due to Press

Start W-Injection IN Nov-01

Oil Dec wc inc-bad w

WELLPERFORMANCEANALYSISUN-X

Page 16: Techniques to Maximise Oilfields Production In The ... · • Artificial Lift. Plans to increase Production Rates B) Medium and Long Term Plans (EOR) ... Diagnosis Methods of Excess

WELLPERFORMANCEANALYSISUN-X

LayerConductivityFromWI-XtoUN-XinZCDistance(695m)

Page 17: Techniques to Maximise Oilfields Production In The ... · • Artificial Lift. Plans to increase Production Rates B) Medium and Long Term Plans (EOR) ... Diagnosis Methods of Excess

PROPOSALACTIONPLANforSEPRATELAYERINJECTIONUN-X

(CURRENT)UN--X

(PROPOSED CHNAGES)

2069 -2074 mkb

2186 - 2198 mkb

2267 - 2275 mkb

Zarqa-A

Zarqa - C

Zarqa - D

2069 -2074 mkb

2186 - 2198 mkb

2267 - 2275 mkb

Zarqa-A

Zarqa - C

Zarqa - D

PLTZone Relat Inj

Rate (%)Zarga A 12.75Zarga C 84.94Zarga D 2.31 Back

Page 18: Techniques to Maximise Oilfields Production In The ... · • Artificial Lift. Plans to increase Production Rates B) Medium and Long Term Plans (EOR) ... Diagnosis Methods of Excess

HighWaterCutDiagnosisMethods (Operation)

v ClassicMethods:

o SwabTest

ü SwabofMultilayerswillTakelongtimeofRig

ü Sometimesmisleading(itisalmostatstaticcondition)

v OtherMethods:

o RunPLT

ü GetReservoirparameters(pressure,BHP,PI)underdynamiccondition

ü PLTconductedEx:(He-X,TAS-X,Munga-X)

Page 19: Techniques to Maximise Oilfields Production In The ... · • Artificial Lift. Plans to increase Production Rates B) Medium and Long Term Plans (EOR) ... Diagnosis Methods of Excess

Heglig -XPLTResult

1) No contribution then single layer completion instead of commingling.

B-1AB-1BB-3AB-3B

B-1AB-1B

B-3BB-3A

Page 20: Techniques to Maximise Oilfields Production In The ... · • Artificial Lift. Plans to increase Production Rates B) Medium and Long Term Plans (EOR) ... Diagnosis Methods of Excess

GeneralWaterShutoftechniques

v ClassicMethods:

o CementSqueeze:

ü Openended tubingSTCEX:MG-X,Y

ü DrillableCementRetainer(DCR)

o WaterShutoffwithDrillableBridgePlug(DBP)EX:HE-X

v OtherTechniques:

ü MechanicalWaterShutoff

ü ChemicalWaterShutoff

ü PlantouseMultiPacker(onprogress)

Page 21: Techniques to Maximise Oilfields Production In The ... · • Artificial Lift. Plans to increase Production Rates B) Medium and Long Term Plans (EOR) ... Diagnosis Methods of Excess

ClassicWaterShutoffTechniques

vCementsqueezeandreperforate:

ØOpenendedtubingSTCandcementretainerDCR:o Successfully implemented atTY-Xon13August2008

o BentiuXlowerwaspermanently cementsqueezed

o BentiuXupperwascementsqueezedandpartiallyre-perforated

o Aradeibawassqueezedcementandtotallyre-perforated

• WellperformancePre/PostWSOjob:

Pre-WSO Post-WSOTY-X Well Schematic

Back

Page 22: Techniques to Maximise Oilfields Production In The ... · • Artificial Lift. Plans to increase Production Rates B) Medium and Long Term Plans (EOR) ... Diagnosis Methods of Excess

ClassicWaterShutoffTechniques

vWatershutoffusingDrillableBridgePlugDBPo Wassuccessfully beingutilizedatHE-XinJuly 2008o BentiulowerwasisolatedwithDBPsetat1731.0

mKB

ü Well performancePre/PostWSOjob:

HE-X Well SchematicPre-WSO Post-WSO

v LessonLearnto Betterdiagnosis&GoodreservoirevaluationwillLeadtohaveanexcellentresultinthere-completion

Back

Page 23: Techniques to Maximise Oilfields Production In The ... · • Artificial Lift. Plans to increase Production Rates B) Medium and Long Term Plans (EOR) ... Diagnosis Methods of Excess

MechanicalWatershutoffwasnotsuccessful

q Thetoolworksbyapplyingdifferentialhydrostaticpressureagainsttheswitches,whicharecalibratedtoopenandthencloseatcertainpressurevalues(24Mpa,18Mpaand12Mpa)

q LimitationofMechanicalWatershutoffTool:

o Thecandidateshouldbe7”casing(availabilityof7”packer).o No.ofproducingzones(three).o Differentialpressuretooperatetoolswitches(onandoff).o Surfacepressuremustnotexceed24.4MPa.(Wellheadpressurelimitation).o Welldepthshouldbemorethan2200mKB.o Sandproduction inducesprematureswitchesfailure.

q 1st TrialEH-X :v Failurecauseswereduetopackerleakageandswitchcheckvalvemalfunction.

q 2nd TrialEN-X:v Sandproduction causedtheswitchestostuckandledtoconfusioninproducingzones

combinationandhencetestresults.

Page 24: Techniques to Maximise Oilfields Production In The ... · • Artificial Lift. Plans to increase Production Rates B) Medium and Long Term Plans (EOR) ... Diagnosis Methods of Excess

MechanicalWSOEquipmentdiagram

EH-X1stTrialToolsDiagram

vLessonLearnt:

oSandpresenceaffectedthetoolswitchesoperation.oThetoolshouldmatchtheapplicationGNPOCwellsnotviseversa.oProvisionoffixableESPtoaccommodatedifferentreservoirscenariosfortestandproduction(i.e.formationpressureandPI).

Back

Page 25: Techniques to Maximise Oilfields Production In The ... · • Artificial Lift. Plans to increase Production Rates B) Medium and Long Term Plans (EOR) ... Diagnosis Methods of Excess

ChemicalWatershutoffTechnique

qThechemicalworksbyapplyingpluggingagent,highconductivityzonescanbeshutoffselectively.

qChemicalWSOchallengeso Chemicalshelflife.o NoorlittleimprovementinoilgainpoststheWSOjob.o Deepstudyshouldbecarriedouttoselectreliablechemicaltype.o Verylimitedcandidatemeetingtheoperationrequirements.o Operationandlogistic.o Effort&longtimeconsumedforpre-jobpreparationandpotablewatersupply.o Itsintensityandinitialgellingtimecanbeadjustedatacertainextentaccordingtothereservoircondition;temp.

o Wellusedtoproduce5712BLPD,407BOPDwith92%WCbeforejobexecution.Ø1st trialHE-X:

v Postjob thewellproduced200BOPDwith84%WCandthegrosswaslimitedtomax.1800 BLPDasperRErecommendation.

v Thewellcontinuedproduction atlowcontrolledrateforsixmonths.v sincenoimprovement inoilgainachieved,REadvisedtorevertbacktothepreviouscondition (currentlythegrossis5159,oil445and91%WC)

Ø2ndtrialHAM-X:vWellusedtoproduce2772BLPD,62BOPDwith98%WCbeforejobexecution.v Thewellwasabandonedafterclassicre-completion job.

Page 26: Techniques to Maximise Oilfields Production In The ... · • Artificial Lift. Plans to increase Production Rates B) Medium and Long Term Plans (EOR) ... Diagnosis Methods of Excess

EquipmentdiagramofChemicalWSO

Water tank 80M3

Water tank 80M3

Water tank40M3

Blending tank 8m3

Cement truck

Cementtruck Wellhea

d

Blending tank40m3

Blending tank 40m3

Blending tank 40m3

4〞Hose2-1/2〞Hose4〞Hoseconnected when need2-1/2〞Hose

Connected when need

2〞1502 hardpipeline

vLessonLearnt:oDeepstudyshouldbecarriedouttoselectreliablechemicaltype.oVerylimitedcandidatemeetingtheoperationrequirements.oItsintensityandinitialgellingtimecanbeadjustedatacertainextentaccordingtothereservoircondition;temp.

Back

Page 27: Techniques to Maximise Oilfields Production In The ... · • Artificial Lift. Plans to increase Production Rates B) Medium and Long Term Plans (EOR) ... Diagnosis Methods of Excess

ProductionPerformanceofHE-XAfter(WOJ)

02,0004,0006,0008,000

10,000

Jan-

08Fe

b-08

Mar

-08

Apr-0

8M

ay-0

8Ju

n-08

Jul-0

8Au

g-08

Sep-

08Oc

t-08

Nov-

08De

c-08

Jan-

09Fe

b-09

Mar

-09

Apr-0

9M

ay-0

9Ju

n-09

Avg WATER_RATE (bwpd) Avg WATER_RATE (bwpd)

Decrease in water production before and after WOJB -3A

B-1A

B -1B

1618 - 1624 mkb

1631 – 1638 mkb

1867 - 1872 mkb

HE-6

B -3B 1875 - 1878 mkb

DBP

0200400600800

1,0001,200

Avg OIL_RATE (bopd) Avg OIL_RATE (bopd)

Improvement in oil production Before and after WOJ

Production from Bentiu-X onlyProduction from Bentiu-X & ardeiba

Page 28: Techniques to Maximise Oilfields Production In The ... · • Artificial Lift. Plans to increase Production Rates B) Medium and Long Term Plans (EOR) ... Diagnosis Methods of Excess

MitigationPlantoDevelopBentiu-X&Bentiu-Y

Mitigation Plan to develop Bentiu-X & Bentiu-Y :Installation of dual ESP can revive production

from Bentiu-3 keeping upper layers un effected

Well PotentialUpper layers= 1035 bopd

Lower layer= 382 bopd

Total= 1473 bopd

Production Tubing

Power cablew/capillary tube

MB Packer

Upper zoneperforations

ESP

Packer

Casing

Lower zoneperforations

Single Production Tubing / Dual ESP System - Annular Flow

ESP

Back

Page 29: Techniques to Maximise Oilfields Production In The ... · • Artificial Lift. Plans to increase Production Rates B) Medium and Long Term Plans (EOR) ... Diagnosis Methods of Excess

Talih XPLTResult

• Ghazal-Xproduced2500bbl/dwater

üAsifwearewastingeffortof injectordaily

• NoContribution fromZargaatpresenceofGahzal,althoughTAS-Xdowndipwellproduced~250bopd

üCompletionStrategytoberevisedfornewwellsandforexistingwellsonopportunitybasis

Page 30: Techniques to Maximise Oilfields Production In The ... · • Artificial Lift. Plans to increase Production Rates B) Medium and Long Term Plans (EOR) ... Diagnosis Methods of Excess

PLTMunga-XResult

B-1AB-1B

B-1C

B-1BinterfereB-1A,

ü Actiontakenisreducingperforationintervalto2meter,decreasedthewaterproduction

ü B-1A

ü B-1B

ü Resultisverysuccessful,

ü sameideaconductedinMunga-Xwithverysuccessfulresult

Page 31: Techniques to Maximise Oilfields Production In The ... · • Artificial Lift. Plans to increase Production Rates B) Medium and Long Term Plans (EOR) ... Diagnosis Methods of Excess

Munga-X Performance after & Recompilation PLT JobClear water production reduced

Page 32: Techniques to Maximise Oilfields Production In The ... · • Artificial Lift. Plans to increase Production Rates B) Medium and Long Term Plans (EOR) ... Diagnosis Methods of Excess

MG-XPerformanceafterRecompbasedonPLTResultofMG-Y

Back

Page 33: Techniques to Maximise Oilfields Production In The ... · • Artificial Lift. Plans to increase Production Rates B) Medium and Long Term Plans (EOR) ... Diagnosis Methods of Excess

Strategyforwardinaddressingwaterproduction

Immediate

Medium Term

Ø ApplicationofY-ToolPLT.PermanentinstallationofY-Toolatkeywellsinablocktoreducecost.

Ø Completionstrategy:

ü singlelayercompletionforfuturewells.

ü ExploratorywellsPerforationintervalshouldbeadjusted&optimizedfarawayfromOWC

Ø ContinueDrillingofHorizontalwellstodelaywaterconing

Ø EstablishRMP,optimizeWaterProductionandenhanceRecoveryFactor.

Ø ApplicationofNewTechnology

ü MultipackerCompletion

ü ElectroTreatment

Ø ChemicalWaterShutOffü Indepthstudyandscreeningcriteriashouldbesetupfor

Mechanicalandchemicalwatershutoff

Long Term

Page 34: Techniques to Maximise Oilfields Production In The ... · • Artificial Lift. Plans to increase Production Rates B) Medium and Long Term Plans (EOR) ... Diagnosis Methods of Excess

MediumandLongTerm(IOR)

Page 35: Techniques to Maximise Oilfields Production In The ... · • Artificial Lift. Plans to increase Production Rates B) Medium and Long Term Plans (EOR) ... Diagnosis Methods of Excess

IOR

IORdrillinghorizontalwells:- reduceswaterconingduereducedrawdowninthe

reservoir.- Longlengthexposedtopayzoneincreaseproduction.- Moreeffectiveinthesandoilformationwithshort

distancetowater.- Horizontalwellsarenowcompletedwithnewmethods

inadditionaltotraditionalopenhole,casedhole,slottedlineorpre-perforatedpipe.

- Smartcompletioninvolvespermanentzonalsolutionwithexternalpackers,downholechoke&otherdeviceforcontrollingtheinflow.

Page 36: Techniques to Maximise Oilfields Production In The ... · • Artificial Lift. Plans to increase Production Rates B) Medium and Long Term Plans (EOR) ... Diagnosis Methods of Excess

IOR

WheredoweuseIORwaterinjection?• Waterinjectionwillnotimproverecoveryinareaof

strongwaterdrive.• Itispossiblewheredepletionisobservedandhas

edgewaterinflux.• Itislessexpensivetodrillwatersourcewellinto

shallowaquiferanddirectlytotheinjectorwithoutfurthertreatmentwhileproducedwaterneedstreatmentunit.

Page 37: Techniques to Maximise Oilfields Production In The ... · • Artificial Lift. Plans to increase Production Rates B) Medium and Long Term Plans (EOR) ... Diagnosis Methods of Excess

IOR(watermanagement)

• Diagnosetheentirewatercycle(reservoir,producers,facilities,injectors).

• Updatedthefielddevelopmentplan.• Identifyworkoveropportunities.• Applysuitabletechnology.

q Producers.q Injectors.q Surface.

Page 38: Techniques to Maximise Oilfields Production In The ... · • Artificial Lift. Plans to increase Production Rates B) Medium and Long Term Plans (EOR) ... Diagnosis Methods of Excess

MediumandLongTerm(EOR)

Page 39: Techniques to Maximise Oilfields Production In The ... · • Artificial Lift. Plans to increase Production Rates B) Medium and Long Term Plans (EOR) ... Diagnosis Methods of Excess

EOR Technology for Heavy Oil

Page 40: Techniques to Maximise Oilfields Production In The ... · • Artificial Lift. Plans to increase Production Rates B) Medium and Long Term Plans (EOR) ... Diagnosis Methods of Excess

Extra heavy oil

Page 41: Techniques to Maximise Oilfields Production In The ... · • Artificial Lift. Plans to increase Production Rates B) Medium and Long Term Plans (EOR) ... Diagnosis Methods of Excess

EOR

Page 42: Techniques to Maximise Oilfields Production In The ... · • Artificial Lift. Plans to increase Production Rates B) Medium and Long Term Plans (EOR) ... Diagnosis Methods of Excess

EOR

Page 43: Techniques to Maximise Oilfields Production In The ... · • Artificial Lift. Plans to increase Production Rates B) Medium and Long Term Plans (EOR) ... Diagnosis Methods of Excess

EOR

Page 44: Techniques to Maximise Oilfields Production In The ... · • Artificial Lift. Plans to increase Production Rates B) Medium and Long Term Plans (EOR) ... Diagnosis Methods of Excess

EOR

Page 45: Techniques to Maximise Oilfields Production In The ... · • Artificial Lift. Plans to increase Production Rates B) Medium and Long Term Plans (EOR) ... Diagnosis Methods of Excess

EOR

Page 46: Techniques to Maximise Oilfields Production In The ... · • Artificial Lift. Plans to increase Production Rates B) Medium and Long Term Plans (EOR) ... Diagnosis Methods of Excess

EOR

Page 47: Techniques to Maximise Oilfields Production In The ... · • Artificial Lift. Plans to increase Production Rates B) Medium and Long Term Plans (EOR) ... Diagnosis Methods of Excess

EOR

Page 48: Techniques to Maximise Oilfields Production In The ... · • Artificial Lift. Plans to increase Production Rates B) Medium and Long Term Plans (EOR) ... Diagnosis Methods of Excess

EOR

Page 49: Techniques to Maximise Oilfields Production In The ... · • Artificial Lift. Plans to increase Production Rates B) Medium and Long Term Plans (EOR) ... Diagnosis Methods of Excess

IOR

Page 50: Techniques to Maximise Oilfields Production In The ... · • Artificial Lift. Plans to increase Production Rates B) Medium and Long Term Plans (EOR) ... Diagnosis Methods of Excess

IOR

Page 51: Techniques to Maximise Oilfields Production In The ... · • Artificial Lift. Plans to increase Production Rates B) Medium and Long Term Plans (EOR) ... Diagnosis Methods of Excess

EOR

Page 52: Techniques to Maximise Oilfields Production In The ... · • Artificial Lift. Plans to increase Production Rates B) Medium and Long Term Plans (EOR) ... Diagnosis Methods of Excess

EOR

Page 53: Techniques to Maximise Oilfields Production In The ... · • Artificial Lift. Plans to increase Production Rates B) Medium and Long Term Plans (EOR) ... Diagnosis Methods of Excess

ConclusionsandRecommendations

v Declineinoilproductionisattributedmainlyduetohighwatercut,Watercutinmaturefieldsisonrisingtrendwhichhasseverenegativeimpacttofieldsreserve(EUR).

v Excesswaterproductionisheadacheforoperatingcompanyandwillcosttimeandmoneybettertoleaveinreservoir.

v Betterdiagnosis,understandingwillleadtosuccessfulremedialaction

v Diagnosticplotswhichwascarriedouttothatwell(UN-X)ProducedhighWCindicatesthishighwatercutmostlyrelatedtolayerConductivity.

v ControlliquidrateforNewwells&WOwells.