technical survey rpt on digital topo base mapping of …

15
2. 1 6285 31F01NWOOO2 2 16295 DARLING 010 TECHNICAL SURVEY REPORT ON DIGITAL TOPOGRAPHIC BASE MAPPING OF STEEP ROCK RESOURCES CLAIMS (EO 647469 - 647470 AND EO 592159 - 592172 Inclusive) DARLING TOWNSHIP, LANARK COUNTY PURPOSE * Digital Topographic Base Map prepared for detailed geologic mapping and core drilling compilation. - * ' " ATTACHMENTS l :25,000 Scale Claims Index Map * * l :2000.Scale 12.5 Meter Contour Interval hardcopy map (Base Mapping Inc.) prepared of entire claim block using l: 18,000 scale color aerial photography obtained October 11, 1995. (Note - this item was submitted in original sets of documentation on November 17, 1995). * l :2000 Scale 12.5 Meter Contour Interval digital map version in DXF format with separate layers (Base Mapping Inc.) prepared of entire claim block using l: 18,000 scale color aerial photography obtained October 11, 1995. (Note - File: STEEPDXF.EXE on two diskettes to be restored to C: AC AD) * List of OPS ground control survey points with coordinates (northing, easting, and elevation and locations). CLAIMS A HOLDER Map was prepared of mining claims (EO 647469 - 647470 AND EO 592159 - 592172 Inclusive) in Darling Township, Lanark County held by Steep Rock Resources Inc. (PO Box 245 Perth,Ontario K7H 3E4 Ph 613-267-5367 Fx 613-267-5408). LOCATION AND ACCESS * The claim block is located in the southwestern corner of Darling Township south of the Indian River and north of Tatlock and Stewarts Hill. * Access for target layout via Old Township Roads as indicated on attached maps at l: 2,000 and l :25,000 scale with location of claims. SUPERVISION * Overall project supervision - coordination and report by: Joel Blumenthal

Upload: others

Post on 02-Jun-2022

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: TECHNICAL SURVEY RPT ON DIGITAL TOPO BASE MAPPING OF …

2. 1 628531F01NWOOO2 2 16295 DARLING 010

TECHNICAL SURVEY REPORT ON DIGITAL TOPOGRAPHIC BASE MAPPING OFSTEEP ROCK RESOURCES CLAIMS

(EO 647469 - 647470 AND EO 592159 - 592172 Inclusive)DARLING TOWNSHIP, LANARK COUNTY

PURPOSE

* Digital Topographic Base Map prepared for detailed geologic mapping and core drilling compilation. - * ' "

ATTACHMENTS

l :25,000 Scale Claims Index Map*

* l :2000.Scale 12.5 Meter Contour Interval hardcopy map (Base Mapping Inc.) prepared of entire claim block using l: 18,000 scale color aerial photography obtained October 11, 1995. (Note - this item was submitted in original sets of documentation on November 17, 1995).

* l :2000 Scale 12.5 Meter Contour Interval digital map version in DXF format withseparate layers (Base Mapping Inc.) prepared of entire claim block using l: 18,000 scale color aerial photography obtained October 11, 1995. (Note - File: STEEPDXF.EXE on two diskettes to be restored to C: AC AD)

* List of OPS ground control survey points with coordinates (northing, easting, and elevation and locations).

CLAIMS A HOLDER

Map was prepared of mining claims (EO 647469 - 647470 AND EO 592159 - 592172 Inclusive) in Darling Township, Lanark County held by Steep Rock Resources Inc. (PO Box 245 Perth,Ontario K7H 3E4 Ph 613-267-5367 Fx 613-267-5408).

LOCATION AND ACCESS

* The claim block is located in the southwestern corner of Darling Township south of the Indian River and north of Tatlock and Stewarts Hill.

* Access for target layout via Old Township Roads as indicated on attached maps at l: 2,000 and l :25,000 scale with location of claims.

SUPERVISION

* Overall project supervision - coordination and report by: Joel Blumenthal

Page 2: TECHNICAL SURVEY RPT ON DIGITAL TOPO BASE MAPPING OF …

Pluess-Staufer Industries Inc. - Geology Department61 Main StreetProctor, Vermont 05765 USAPh 802-770-7155Fx 802-459-2104

Field Supervision by:Randall KingSteep Rock Resources Inc.PO Box 245Perth, Ontario K7H 3E4Ph 6l3-267-5367Fx 613-267-5408

PERSONNEL AND CONTRACTORS

* Target materials and layout and supervision by Steep Rock Resources; Perth, Ontario. September 11-15 and October 5-6, 1995. Contact is Randall King, Quarry Manager.

* Ground Control Field Survey using Global Positioning Satellite technology to establish coordinates for photo control (including post processing, adjustment, and equipment rental) by John Goltz Surveying; Perth, Ontano. September 11-15, 1995. Contact is Stephen A. Tischart, O.L.S.

* Digital topographic mapping by Base Mapping Co. Ltd; Nepean, Ontano. Final map dated November, 1995. Contact is Doug Sadowski, O.L.S. - Photogrammetry.

Report Completed March 19, 1996

Joel Blumenthal Geologist

Page 3: TECHNICAL SURVEY RPT ON DIGITAL TOPO BASE MAPPING OF …

CLAIMS INDEX MAPSTEEP ROCK RESOURCES

DARLING TOWNSHIP, LANARK COUNTYSCALE 1:25,000

(Composite Map from Carleton Place and Clyde Froks l :50,000) v\ i \ i i\ ^s^l tv\W I

Page 4: TECHNICAL SURVEY RPT ON DIGITAL TOPO BASE MAPPING OF …

OPS GROUND CONTROL SURVEY - STEEP ROCK RESOURCES CLAIMS(SEPTEMBER, 1995)

(JOHN GOLTZ SURVEYING INC. )

STATION

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

NORTHING

5005306.565

5005594.832

5003813.049

5004080.239

5003587.943

5003705.822

5005618.520

5005571.083

5005095.635

5005167.230

5002411.352

5002802.424

5004368.799

5004483.951

5004789.223

5004966.238

5002431.147

EASTING

379124.131

379374.653

382257.802

382346.899

380252.391

380300.480

380609.117

380517.294

381026.048

381027.930

381257.246

381121.565

379966.153

380168.388

380522.728

380416.543

383569.126

HEIGHT MSL

216.540

216.434

216.631

224.507

211.601

211.840

184.374

184.475

223.629

229.609

200.083

197.725

205.743

207.539

193.285

193.421

199.452

ZONE

UTM 18

UTM 18

UTM 18

UTM18

UTM 18

UTM 18

UTM 18

UTM 18

UTM 18

UTM18

UTM18

UTM18

UTM18

UTM18

UTM18

UTM18

UTM18

LOCATION

Hydro Line to North

Hydro Line to North

Southeast - Field

Southeast - Field

Central West - Field

Central West - Field

Northeast Corner - Stream

Northeast Corner - Stream

Northeast - Along Road

Northeast Along Road

Northeast of Murray Lake

Northeast of Murray Lake

Kates Lake West Side

Kates Lake East Side

Dunes Lake South Side

Dunes Lake North Side

Northeast of Murray Lake

Page 5: TECHNICAL SURVEY RPT ON DIGITAL TOPO BASE MAPPING OF …

-v-

ISO1.1^-* -i j mi *rrnjTT LIT*

/

EO

•a^r^ j JWML —

:i|1 US' irAi/c

riVUTV

^JfH-He

XKiita

-IJSHH

^UlliO

-itmn

11 o•-zfr

-K)li-M!)^ OJflC./*

EO

-/innjL-

-18SIX3-

3 9 2 l G O 017/JAS

fcsiMnioS* V

l *

J -T*' * CLAIMS TIIAT WORK IS ASSIGNED TO*

\' -Hi

9 Z 1 0 T

to Et

I62S 5

k EO \ ^ i•09210!) \S92I70** N, . — — —— — n * - ^^ xll

NlNGuAN'j;-fc,,,,.--:.,r

THE TOWNSHIP OF

DARLINGCOUNTY OF

LANARK

EO

Roberts Lake

*

0

*

SOUTHERN ONTARIO

MINING DIVISION SCALED- INCH = 4O CHAIN S

DISPOSITION or CHOWN LANDS

- smrAd HK*IIS ONLY _ OWNMT. mcillil OMIT... . . ____ O

LEAK SUH'ACC AMD MWMC HKIIIS ..... H

•iMiii mwus ot*j(... ____ MLKtHCC OF OCCVnAIHW TKIM6S lUCHWAr ..f" J.-— RAILWAYS —— - ————mwt n i.iNi.r. —.— ..— UAHSII on HUSKCG c"'^w M r*1 KA II S ,

?^"VVEO rtV293~^ C1 B•I' N̂jtO v 5 2 1 2 5 6

U EC' " 0-

U 521297

i: Livid jr ; -i : j , :l' '-*[•-i i1 1 ' ij *

Y•-j-

i * o j \.i l ^

PLAN NO.—M. 80OMTAmu

MINISTRY OF NATURAL RESOURCE:MJBVtVS **O MATT**! MANCH

l \

Page 6: TECHNICAL SURVEY RPT ON DIGITAL TOPO BASE MAPPING OF …

Technical Report on Base Mapping ofSteep Rock Resources Darling Township Claims

(EO 647469 - 647470 and EO 592159 - 592172 Inclusive)•*.

(Copy of Map Attached)

Description

l . 2000 Scale 12.5 Meter Contour Interval map (mylar and digital formats) prepared of entire claim block using 1:18,000 scale color aerial photography obtained October 11, 1995.

Gridded map shows lakes, streams, swamps, roads, mining claims by number, and concession/cadastral fabric.

Contractors '̂ . ,.\ \w) *jj)

* Photogrammetry work completed by Base Mapping Co. Ltd; Nepean, Ontario.

* Ground contol survey work completed by John Goltz Surveying; Perth, Ontario.

* Target materials-layout and supervision by Randall King - Steep Rock Resources; Perth, Ontario

Joel Blumenthal Steep Rock Resources Inc. November 17, 1995 PO Box 245

Perth, Ontario K7H 3E4

DEC l 3 199F

MINING UANuS f -i-.*

Page 7: TECHNICAL SURVEY RPT ON DIGITAL TOPO BASE MAPPING OF …

Execute file - will explode file and create

ACAD/Steep.DXF

Open drawing -view extents

STEEP ROCK RESOURCES MAP

To restore files from disc - in DOS

Place first disc in A: drive, change to A: drive

Type

A:Westore (space) a : (space) c :\ACAD\*.*

follow directions

Will get the following file in ACAD directory

Ci/ACAD/STEEPDXF.EXE recycledfecycle

Page 8: TECHNICAL SURVEY RPT ON DIGITAL TOPO BASE MAPPING OF …

MY. -23 95ITHUI 13-03 MINING REC-OFF-SUD

NOV. -22' 95I1EO) 16^02 RECORDING OFFICE TOR

TEL *05 6*0 5881

TEU16 314 3789

P 001 P. 002

MlmsttyofNorthern Developmentand Mfnei

Report of Work Conducted After Recording Claim

MlrtnoOntario

plt^0^frdy^.^^art^^lMtlBfmlaBhte^taBtoft*g^f^afBlsUtolMtt* cafeodon rtttuM be dbacM IB tt* Provind*! IMiWfiw. Mining Umk. Mlntatry of Northern D*nlopitnnt wrf Utm, Fourth Roar. 156 Cttfor Strwt. BuSbuiy. Owto. P36 SAS. tefcitani PCS 870-7384. ^ 1 ^? O O ^*

Instruction*: - Please type or print and eufamft In dupDcate.- Refer to the Mining Act and Regulations to

Recorder.- A separata copy of this form must be conn- Technical reports and maps must Bccompt- A sketch, showing the claims the work is s

31F01NW0002 2 16295 DARLING 900

8TEEF ROCK RESOURCES INC. yA***" K "?U ? C4 PO BOX 245 PERTH. ONTARIO *7H 3*4 *\ l tt - -H

SorjTHftRJl ONTARIOTowwMpMiM DARLIHG TV P

197429 y

61J-267-5367M ^-007lJO*L

Bfon? Front September 4, 1995 To! Uoveaber 15, 1995

Worfc PerformedWork^raup

X

Geoteohniesl SurveyPhysioal Work. Including DflOlnfl

nehflbfftstionOth*r AuthorizMl Went

AsMy*AadgArTMnt from R**erva

Typ.

Base Map Preparation (1:2500 Scale 1:18^000 Scale Aarial Pfcotoeraphv.

DEC 1 3 K)3F

MINING LANDS -^ *-

vith 2.5 M Contour*) Ground Cotttrol Survey

requlrii , ajxd

Targets, and Photogramnacrle Services. Bane Map cover* entire Claio Block AreaAnd ia DleiJiized.

Total Attesonent Work Claimed on the Attached Statement of Costs SNote: The Minister may reject for assessment work credit di or part of the assessment work submitted If the recorded

holder cannot verify expenditures claimed In the statement of costs within 30 days of a request for verification.

Persona and Survey Company Who Perfonned the Work (Give Name and Address of Author ol Report)Nsms

Doug Sadovskl Bftae MAooinjt Co, Ltd.Scephea Tlechart, O.L.S. jftho Gnltz Survevlncr Inc^Randall King Staao Rock leaourcee Inc

AddrMSUalt 37-81 Auriga Drive Nepean. Ontario KZE 7V3Box 388 Perth, Ontario K7H 3G1Box 265 Perth. Ontario K7H 3E4

(•tteoh a acfwdul* If neceuary)

CerHfteatlon of Bcfieflefal Interact * Soo Note No. 1 on rewrM tW*l certify *i u m* Om* ma warn wm* pwrianned, Ih* claims eovtrad In thts work DUB

by ths out*M rveordad hokter

CeriHteetlon of Work Report\

1 Ctrflfy (Mtl htvt it* eomp!*rtan tnd

Nam* and Jo*l

802-

AdAwaf Slum*

A p6rvornl luHJw(0uQ0 of UM tacts •nrMX^Q roport o trvo*NremCv'bfyiifl

P.S.I.

770-7155

Mlfedti

Geology 6— CMNovenber 16,

In mil Wort report, hc^ng pafuiui^d (he **f1( Or wit

1 Mala St, Proctor, Vermont

1995C*rtffi*d By ffiiriiigiiimi ^\

nMt*4 Mitt* during

05765l

X/y

D3A -p-

T

•ndfor after

Page 9: TECHNICAL SURVEY RPT ON DIGITAL TOPO BASE MAPPING OF …

ON

PIO

Ul vONJ

^jNJ

PIO

UlvONJ

^jH—

PI

O

Ul vONJ

-J0

PI0

Ul vONJ

ONVO

PI0

Ul vONJ

ON00

PJ0

Ul VONJ

ON

PIO

UlvONJ

ON

PIO

Ul vONJ

ONUl

PJ0

Ul vONJ

ON

PJ0

Ul vONJ

ONLO

^

p]O

Ul vONJ

ONNJ

Ct

PIO

Ul vONJ

ON

f

PI0

Ul vONJ

ON

0

,...PI0

Ul vONJ

UlvO

a'

PIoON

-J^Jo

1p]oON

-e-ONvO

ifL If

l!S c•3

CO f2*03• 3 1

I

If

l

fs1*!•oS.f*

-co

NJ

COON

V

-CO

OO0O

•GO

COO

•CO

COo^

•CO

00o

•CO

COo^

-cooo o .t-

-coCOo0

-co oo o

-coCO0fe

-GO

co0

-coCOoo

-coco o•C-

•CO

COo^

•CO

000

•CO

COo^

•CO

co o

-coCOoo

-co00o

-coCOoo

•GO

COo

•CO

COo0

•CO

COo

-coCO0o

-coCOo

-coOOoo

•CO

oo o

•co Oo00

•CO

oo o

•CO Oo0o

-GO

00o

•coooo^

-CO

00o

-co00o0

|!||3* 2 ~

Q3 > <

3 *i"

•CO

ON-co^

•GO^

-co*-

-GO^*

•CO

^

•GO4^

•CO

^

-GO*^

-co*-

-GO^*

Mil

-GO*-

DI

IING

^

2F:c,:

-AlML

-co^s.

"'

199

b L. fi

^

r—

;

'•i. " s'

-GO.p~

i

-GO

^

S >

2*ff3 a

"os

C g jr g

||fi

Credits you are claiming in this report may be cut back. In order to minimize the adverse effects of such deletions, please indicate from which claims you wish to priorize the deletion of credits. Please mark (^) one of the following:

1. Q Credits are to be cut back starting with the claim listed last, working backwards.

2. D Credits are to be cut back equally over all claims contained in this report of work.

3. O Credits are to be cut back as priorized on the attached appendix.

In the event that you have not specified your choice of priority, option one will be implemented.

Note 1: Examples of beneficial interest are unrecorded transfers, option agreements, memorandum of agreements, etc., with respect to the mining claims.

Note 2: If work has been performed on patented or leased land, please complete the following:

l ctrlily thai the recorded holder had a beneficial interest in the patented Signature Date or leased land at the time the work was performed

Page 10: TECHNICAL SURVEY RPT ON DIGITAL TOPO BASE MAPPING OF …

Appendix - Specificiation of Credits to be Cutback as Prioritized Below .

Claims to cut back most - EO 647469 EO 647470 EO 592 1 59 EO 592 1 60E0592171 ^

592172 .

Claims to cut back leastEO 592161EO 592162EO 592 1 63EO 592164EO 592165EO 592166EO 592167EO 592168EO 592169EO 592 1 70

Joel BlumenthalNovember 16, 1995 ' — r

DEC l 3 19SE

MINING LANDS rih/

Page 11: TECHNICAL SURVEY RPT ON DIGITAL TOPO BASE MAPPING OF …

Ontario

Ministry olNorthern Developmentand Mines

Ministers du Developpement du Nord el des mines

Statement of Costs for Assessment Credit

fitat des couts aux fins du credit devaluation

Mining Act/Loi sur les mines

Transaction No./N* de transaction

2. 16295Personal information collected on this form is obtained under the authority ot the M ining Act This information will be used to maintain a record and ongoing status of the mining claim(s). Questions about this collection should be directed to the Provincial Manager. Minings Lands, Ministry of Northern Development and Mines. 4th Floor, 159 Cedar Street, Sudbury. Ontario P3E 6A5. telephone (705) 670-7264

Les renseignements personnels contenus dans la prosome formula sont recueillis en vertu de la Lo! sur le* mines et serviront a tenir d jour un registre des concessions minieres Adresser toute quesiton sur la collece de ces renseignemenls au chef provincial des terrains miniers. mimstere du Developpement du Nord et des Mines. 159. rue Cedar, 4e etage, Sudbury (Ontario) P3E 6A5, telephone (705) 670-7264

1. Direct Costs/Couts directs

Type

Wages SalaJres

Contractor's and Consultant's Fees Drolts de ('entrepreneur et de I'expert- consell

Supplies Used Fournltures utilisees

Equipment Rental Location de materiel

Description

Labour Main-d'oeuvreField Supervision Supervision sur le terrain

fl^Pr ial Photos f, M appingGround Con t ro Survey

tPPound Contro Targets

Type

Amount Montan!

3375

3150

34815

37222

3306

Total Direct Costs Total des couts directs

Totals Total global

3525

312037

3306

512,86!

2. Indirect Costs/Couts indirects* * Note: When claiming Rehabilitation work Indirect costs are not

allowable as assessment work.Pour le remboursemenl des travaux de rehabilitation, les couts indirects ne soni pas admissibles en tant que travaux d'evaluation.

Type

Transportation Transport

Food and Lodging Nourrilure et hebergementMobilization and Demobilization Mobilisation et demobilisation

Description

Type

RFPPIWIncv^d vi

DEC 1 3 li

MINIMfi 1 AfMHS -IVIIIillivl t— rAliL/O L

Amount Montan!

^--

gcW V

riANCH

Sub Total of Indirect Costa Total partlel des couts indirects

Amount Allowable (not greater than 20H of Direct Costs) Montan! admissible (n'excedant pas 20 H des couts directs)

Total Value of Assessment Credit Valeur totale du credit (Total of Direct ind Allowable d'evahitfkxi Indirect eoiti) ffoUI d** codti dlracti

Totals Total global

13 flk*

Note: The recorded holder will be required to verify expenditures claimed in this statement of costs within 30 days ot a request for verification If verification is not made, the Minister may reject for assessment work all or part of the assessment work submitted

Note : Le titulaire enregistre sera tenu de verifier les depenses demandees dans le present elat des couts dans les 30 jours suivant une demande a eel effet Si la verification n'est pas effecluee. le ministre peut rejeter tout ou une partie des travaux devaluation presentes.

Filing Discounts Remises pour depot

1 . Work filed within two years of completion is claimed at 10007o of the above Total Value of Assessment Credit.

1 Les travaux deposes dans les deux ans suivant leur achevement sont rembourses a 100 'rt de la valeur totale susmenlionnee du credit d'evaluation.

2. Work filed three, four or five years after completion is claimed at Sflo/fo of the above Total Value of Assessment Credit. See calculations below:

2. Les travaux deposes trois, quatre ou cinq ans apres leur achevement sont rembourses a 50 Ife de la valeur totale du credit d'evaluation susmentionne Voir les calculs ci-dessous.

TotaTvalue ol Assessment Credit Total Assessment Claimed

x 0.50 =Valeur lotale du credit devaluation

x 0,50

Evaluation tolale demandee

Certification Verifying Statement of Costs Attestation de I'etat des couts

J'atteste par la presente

on the accompanying Report of Work form.

l hereby certify: . -.._.. r.. .. r .. -..... .that the amounts shown are as accurate as possible and these costs que les montants indiques sont le plus exact possible et que ceswere incurred while conducting assessment work on the lands shown depenses ont et6 engagees pour effectuer les travaux d'evaluation

~ . . ... . . sur les terrains indiques dans la formule de rapport de travail ci-joint.

l am authorized Et qu'a litre de ^_________________ je suis autorise(titulaire enregistre, representanl, poste occupe dans la compagnie)

a faire cette attestation

Signatu

that as Seninr HP o Insist P.S.I (Recorded HokJer. Agent. Position in Company)

to make this certification

lit l ^LL * Date

li- 1 1^^—i;—-^—^—,—,—— —Nota Dans cette tor^ujle. lorsqu'il designe des personnes. le masculin est utilise au sens neutre

Page 12: TECHNICAL SURVEY RPT ON DIGITAL TOPO BASE MAPPING OF …

16295

Page 13: TECHNICAL SURVEY RPT ON DIGITAL TOPO BASE MAPPING OF …

OntarioMinistry ofNorthern Developmentand Mines

Ministere duDeveloppement du Nord et des Mines

Geoscience Approvals Office 933 Ramsey Lake Road 6th Floor Sudbury, Ontario P3E 6B5

Telephone: (705) 670-5853 Fax: (705) 670-5863

April 04, 1996Our File: 2.16295 Transaction #W9590. 00059

Mining RecorderMinistry of Northern Development St MinesMacDonald Block, Room M2-17900 Bay StreetToronto, OntarioM7A 1C3

Dear Mr. Denomme:

RE: APPROVAL OF NOTICE OF DEFICIENCY ISSUED ON MINING CLAIMS 647469 ET AL. IN DARLING TOWNSHIP

The deficiencies in the original submission have been rectified.

Assessment work credits have been approved as outlined on the original report of work forms for this submission. The credits have been approved under Section 18, Digitized Base Maps (OEM), Mining Act Regulations.

The approval date is April 3 , 1 996. Please indicate this approval on the claim record sheets.

If you have any questions regarding this correspondence, please contact Bruce Gates at (705) 670-5856.

Yours sincerely, ORIGINAL SIGNED BY:

Ron C. Gashinski Senior Manager, Mining Lands Section Mining and Land Management Branch Mines and Minerals Division

Enclosure:

cc: Resident Geologist Tweed, Ontario

j/Assessment Files Library Sudbury, Ontario

Page 14: TECHNICAL SURVEY RPT ON DIGITAL TOPO BASE MAPPING OF …

Bagot Twp. (M.47)

CVJ

XI XII

^1629524

2RECEIVEHDEC 13 1995

Bane Bay

mm LANDS BRAN*

20

733445 l 733444

/r

H f Lownev* ^y ;( ^7^'** nf K^sx *

733 4 77 ----- -

2-lfeHS

692_(S9_ \592I70*#EO VEO"®" ~

92171

(Marble Bluff

J'

' -K— '^--..

VIILanark Twp. (M.3392)

31F01NW0002 2 16295 DARLING

THE TOWNSHIP OF

DARLINGCOUNTY OF

LANARKSOUTHERN ONTARIOMINING DIVISION

SC ALE: 1-^^=40 CHAINS

DISPOSITION OF CROWN LANDSPATENT SURFACE AND MINING RIGHTS...... *

SURFACE RIGHTS ONLY....————— OMINING RIGHTS ONLY __.___^ O

LEASE SURFACE AND MINING RIGHTS—— B SURFACE RIGHTS ONLY____——— H MINING RIGHTS ONLY _______. H

LICENCE OF OCCUPATION ____________ TKINGS HIGHWAYRAILWAYSPOWER LINESMARSH OR MUSKEGMINESROADSIMPROVED ROADSTRAlLS

NOTESThis Map Is Not To Be Used FOR SURVEY PURPOSES.LOT AND CONCESSION LINES SHOWN HEREON ARE PROJECTED FROM THE BEST INFORMATION AVAILABLE. BUT THEIR TRUE POSITION IS NOT GUARANTEED FOR OFFICIAL SURVEY PURPOSES CONSULT THE ORIGINAL SURVEY PLANS AND FIELDNOTES OF RECORD IN THE MINISTRY OF NATURAL RESOURCES

400* Surface Rights Reservation along the shores of all lakes and rivers.

RESERVES

(5) surface rights withdrawn , File. 30640 ® M. N. R. Reserve , File. 55603

SAND and GRAVEL

Gravel , File 33 201 v 2113675

Quarry permit Marble File 30165

" 17924

SOUTHERN ONTARIO MINING DIVISION

THE INFORMATION THAT APPEARS ON THIS MAP HAS BEEN COMPILED FROM VARIOUS SOURCES, AND ACCURACY IS NOT GUARANTEED THOSE WISHING TO STAKE MIN ING CLAIMS SHOULD CON SULT WITH THE MINING RECORDER, MINISTRY OF NORTHERN DEVELOP MENT AND MINES, FOR AD DITIONAL INFORMATION ON THE STATUS O- THE LANDS SHOWN HEREON

PLAN NO.-M. 80ONTARIO

MINISTRY OF NATURAL RESOURCESSURVEYS AND MAPPING BRANCH

Page 15: TECHNICAL SURVEY RPT ON DIGITAL TOPO BASE MAPPING OF …

:s ^

T R VEN -r C Steep Rock Resources Inc Darling Township

K i

EAST ALP

LOT

2000 MAP SCALE l CM -. 20 METRES

HALF

l O

16295,

t e s Lake

Steep Rock Resources Inc.

B k h J W 1& E r\\VERT CAL DATUM [ OON T ^ACT NO

\AD 83 i C&04-S5

CONTOUR INT

2 5 METRE

(DM PhOTO SCALE

l. I80OO

PHO T 0 DATE

OCT H, 1995

DATE AMD PROJECT LCCA

NCVEV6ER

STEEP ROCK RESOURCESDARLING T,VF

31F01NW0002 2 1 6295 DARLING

\//f f S

\ l 7 UNIT 37 - S'AURIGA DRIVE, NEPEAN. ONTARIO K2E TV3 6l3 723-600 FAX 6I3 723-8569