CONSTRUCTION OF RCC BRIDGE AT VILLAGE SAFI ABAD, DISTRICT MARDAN ABSTRACT OF COST Schedule No DESCRIPTION UNIT Qty RATE AMOUNTS (A) APPROACHES ROAD WORK 03-56 Clearing and grubbing 2600.00 22.08 57408 03-58 Compection of natural ground 2600.00 17.17 44642 03-61-c 11580.00 440.32 5098905.6 16-03-a Grannular sub base using pitrun grav 383.25 944.55 361998.79 16-04-b Water bound Macadam base course 383.25 1916.73 734586.7725 16-07 Bituminous tack coat 292.00 51.18 14944.56 16-12-b 14.60 17863.36 260805.056 16-08-c Double surface treatment 657.00 415.59 273042.63 16-08-b Triple surface treatment 1898.00 504.1 956781.80 16-10 949.00 20.01 18989.49 STRUCTURE WORK 03-60-a 1140.00 236.2 269268 06-05-i 144 4443.67 639888 06-05-h 110.40 5227.11 577072.94 ;08-03-d-03 1830.00 4725.67 8647976.1 06-38-b 480.00 406.72 195225.6 06-36-b 960.00 3490.25 3350640 TOTAL 21,502,175.82 (B) BRIDGE WORK 16-25-a M 10.00 6,947.77 69,477.70 M 2 M 2 Formation of embakment from borrow excavation in common material including compaction by power roller M 3 M 3 M 3 M 2 Asphaltic wearing course (asphaltplant hot mix) M 3 M 2 M 2 Scarifaying/ dismentling old road , including removal of debries in one chain NHA spacified. M 2 Structural excavation in common material M 3 Plain concrete 1:4:8 including placing, compacting , finishing & curing. M 3 Plain concrete 1:3:6 including placing, compacting , finishing & curing. M 3 Random rubble masnory in foundation & plinth in cement sand mortor 1:6 M 3 Erection and Removing Form work to concrete in any shape/ position (Vertical). M 2 PCC (1:3:6) in mass concrete less formwork using 40% boulders. M 3 Confirmatory Boring including SPTs, samples, lab tests, bore hole logs & Reports complete in Alluvial Soil.

Upload: rochelleandgello

Post on 20-Jan-2016

32 views

Category:

Documents


4 download

DESCRIPTION

d

TRANSCRIPT

Page 1: Technical Sanction for Safi Abad Bridge New.xlsx

CONSTRUCTION OF RCC BRIDGE AT VILLAGE SAFI ABAD, DISTRICT MARDAN

ABSTRACT OF COST

Schedule No DESCRIPTION UNIT Qty RATE AMOUNTS

(A) APPROACHES

ROAD WORK

03-56 Clearing and grubbing 2600.00 22.08 57408

03-58 Compection of natural ground 2600.00 17.17 44642

03-61-c 11580.00 440.32 5098905.6

16-03-a Grannular sub base using pitrun gravel 383.25 944.55 361998.79

16-04-b Water bound Macadam base course 383.25 1916.73 734586.7725

16-07 Bituminous tack coat 292.00 51.18 14944.56

16-12-b 14.60 17863.36 260805.056

16-08-c Double surface treatment 657.00 415.59 273042.63

16-08-b Triple surface treatment 1898.00 504.1 956781.80

16-10 949.00 20.01 18989.49

STRUCTURE WORK

03-60-a Structural excavation in common material 1140.00 236.2 269268

06-05-i 144 4443.67 639888

06-05-h 110.40 5227.11 577072.94

;08-03-d-03 1830.00 4725.67 8647976.1

06-38-b 480.00 406.72 195225.6

06-36-b 960.00 3490.25 3350640

M2

M2

Formation of embakment from borrow excavation in common material including compaction by power roller

M3

M3

M3

M2

Asphaltic wearing course (asphaltplant hot mix) M3

M2

M2

Scarifaying/ dismentling old road , including removal of debries in one chain NHA spacified.

M2

M3

Plain concrete 1:4:8 including placing, compacting , finishing & curing. M3

Plain concrete 1:3:6 including placing, compacting , finishing & curing. M3

Random rubble masnory in foundation & plinth in cement sand mortor 1:6 M3

Erection and Removing Form work to concrete in any shape/ position (Vertical). M2

PCC (1:3:6) in mass concrete less formwork using 40% boulders. M3

Page 2: Technical Sanction for Safi Abad Bridge New.xlsx

TOTAL 21,502,175.82

(B) BRIDGE WORK

16-25-a M 10.00 6,947.77 69,477.70

16-25-b M 20.00 9,329.66 186,593.20

16-26-d Pile Load test Max Load 400 Tons Job 1.00 485,722.41 485,722.41

16-27-b M 72.00 4,366.80 314,409.60

16-28-b M 153.00 7,145.67 1,093,287.51

06-40-c 176.63 7,222.57 1,275,686.43

03-60-a Structural Excavation in Common Matrial. 27.00 236.20 6,377.40

03-60-c Structural Back fill in common material. 15.00 295.80 4,437.00

06-05-i 17.00 4,443.67 75,542.39

06-06-a-02 73.00 8,319.16 607,298.68

06-06-a-02 10.00 8,319.16 83,191.60

06-06-c-01 78.00 10,857.53 846,887.34

06-06-a-02 80.00 8,319.16 665,532.80

06-06-a-03 54.00 7,480.35 403,938.90

06-06-a-03 19.00 7,480.35 142,126.65

Confirmatory Boring including SPTs, samples, lab tests, bore hole logs & Reports complete in Alluvial Soil.

Confirmatory Boring including SPTs, samples, lab tests, bore hole logs & Reports complete in Gravelly Soil.

Boring for cast in place RCC piles in Alluvial Soils: Dia 760 - 1220 mm

Boring for cast in place RCC piles in Gravely Soils: Dia 760 - 910 mm

Class A3 in piles, 4000 psi on 28 days cylinder test.

M3

M3

M3

Plain Cement Concrete i/e placing, compacting, finishing & curing Ratio 1:4:8. M3

Concrete class A2 (245kgs/sq-cm) Mix ratio (1:1.5:3)in pile caps i/c curing , complete in all respects

M3

Concrete class A2 (245kgs/sq-cm) Mix ratio (1:1.5:3)in pile caps i/c curing , complete in all respects

M3

Concrete 1:1:2 (42 N/sq-mm) in precast deck girder M3

Concrete 1:1.5:3 (28 N/aq-mm) in cast in place deck & diaphragms M3

Concrete 1:2:4 (21 N/sq-mm) in barriers using corduroy finish formwork. M3

Concrete 1:2:4 (21 N/sq-mm) in approch slab. M3

Page 3: Technical Sanction for Safi Abad Bridge New.xlsx

06-07-c Tonn 60.19 118,397.4 7,126,147.84

16-71-a Tonn 6.891 147,530.0 1,016,629.44

16-30-a 172200.00 1.4 242,802.00

16-73-d M 630.00 268.4 169,117.20

16-72-c Each 40.00 7,976.6 319,064.00

16-36 Launch girders in position. M 120.00 1,172.2 140,661.60

16-37 Stressing cables of high tensile steel wire. Nos 40.00 1,274.6 50,984.00

16-38 M 630.00 89.8 56,586.60

16-39 Each 40.00 190.2 7,608.80

16-40 Kg 400.00 115.8 46,332.00

16-55 M 88.00 1,227.0 107,973.36

16-29 Kg 264.00 152.2 40,180.80

TOTAL 15,584,597.24

'(C) ANCILLARY WORKS

16-16-a 10.00 7,765.79 77,657.90

16-18-b 10.00 5,356.59 53,565.90

16-66- a M 103.00 61.50 6,334.50

Supply & fabricate M.S. reinforcement for cement concrete (Hot rolled deformed bars Grade 60

Supply of high tensile pre-stressed concrete steel wire strands grade 270k 0.5" dia packed in standard reeless/weldless coils of two 2000kgs, approximatly binded and wraped in hesscian cloth.

Supply & fix neoprene bearing pads as shown in the drawings. M3

S & F un-galvanized sheath for 10 to 12 wires 0.5" strands cables for concrete girders as shown in the drawings.

Jack anchorage for 10 to 12 wires 0.5" strands (comprising - trumpet stressing blockand wages complete.

Inject cement grout in sheath pipe after stressing.

Cutt off projecting strands from anchorage pockets.

Supply and fixing M.S expension joints assemblies as specified.

Providing & laying PVC services pipes (229 mm diameter) for utilities as per drawings as directed by the Engineer.

Supply fabricate 7 install welded M.S scupper of thickness as per drawings as directed by the Engineer.

Road signs (not exceeding 1 sq-m) without reflection sheets & lettering supply & fixing at site with PCC 1:3:6 upto 3 m depth

M2

Supply & fixing reflective sheets on MS / alluminium road signs etc including lettering High intensity grade.

M2

Pavement markings in non- reflecting thermoplastic paint for 15 cm width

Page 4: Technical Sanction for Safi Abad Bridge New.xlsx

16-19-b-01 Each 20.00 450.93 9,018.60

TOTAL 146,577

GRAND TOTAL (A+B+C) 37,233,350

Supply and fix alluminium alloy studs as per specs medium strip 114x18 mm , 74 beads: uni- direction

Page 5: Technical Sanction for Safi Abad Bridge New.xlsx

ROAD WORK

DESCRIPTION NOLENGTH WIDTH DEPTH Quantity

(M) (M) (M) MKS

1 Clearing and Grubbing

Towards Malakand Road 1 x 1 140.00 10.00 1400.00

Towards Safi Abad Village 1 x 1 120.00 10.00 1200.00

Total 2600.00

2 Natural Ground Compaction

Towards Malakand Road 1 x 1 140.00 10.00 1400.00

Towards Safi Abad Village 1 x 1 120.00 10.00 1200.00

Total 2600.00

3 Formation of Embankement from Borrow excavation in common material

Towards Malakand Road 1 x 1 140.00 10.00 3.00 4200.00

Towards Safi Abad Village 1 x 1 120.00 10.00 3.00 3600.00

Approach Roads 2 x 2 45.00 6.00 3.50 3780.00

Total 11580.00

4 Granular Sub Base course using pit run

Towards Malakand Road 1 x 1 140.00 7.30 0.15 153.30

Towards Safi Abad Village 1 x 1 120.00 7.30 0.15 131.40

Approach Roads 2 x 2 45.00 3.65 0.15 98.55

Total 383.25

5 P/L Water Bound Macadam as specified

SR NO

M2

M2

M2

M2

M2

M2

M3

M3

M3

M3

M3

M3

M3

M3

Page 6: Technical Sanction for Safi Abad Bridge New.xlsx

Towards Malakand Road 1 x 1 140.00 7.30 0.15 153.30

Towards Safi Abad Village 1 x 1 120.00 7.30 0.15 131.40

Approach Roads 2 x 2 45.00 3.65 0.15 98.55

Total 383.25

6 P/L Bituminous Tack Coat

Bridge Portion 1 x 1 40.0 7.30 292.00

Total 292.00

7 Asphaltic wearing course (asphaltplant hot mix)

Bridge Portion 1 x 1 40.0 7.30 0.05 14.60

Total 14.60

8 Double surface treatment

Approach Roads 2 x 2 45.00 3.65 657.00

Total 657.00

9 Triple surface treatment

Towards Malakand Road 1 x 1 140.00 7.30 1022.00

Towards Safi Abad Village 1 x 1 120.00 7.30 876.00

Total 1898.00

10 Scarifaying/ dismentling old road , including removal of debries in one chain NHA spacified.

Towards Malakand Road 1 x 1 140.00 3.65 511.00

Towards Safi Abad Village 1 x 1 120.00 3.65 438.00

Total 949.00

M3

M3

M3

M3

M2

M2

M3

M3

M2

M3

M2

M2

M2

M2

M2

M2

Page 7: Technical Sanction for Safi Abad Bridge New.xlsx

STRUCTURE WORK

DESCRIPTION NOLENGTH WIDTH DEPTH Quantity

(M) (M) (M) MKS

1 Structural Excavation in Common Material

Towards Malakand Road 1 x 1 100.00 3.00 1.00 300.00

Towards Safi Abad Village 2 x 1 80.00 3.00 1.00 480.00

Along Approach Roads 2 x 1 30.00 3.00 2.00 360.00

Total 1140.00

2 Structural Backfill using Common Material

Towards Malakand Road 1 x 1 100.00 1.00 2.00 200.00

Towards Safi Abad Village 2 x 1 80.00 1.00 2.00 320.00

Along Approach Roads 2 x 1 30.00 1.00 2.00 120.00

Total 640.00

3 Plain Cement Concrete incl. placing, compacting, finishing & curing (Ratio 1:4:8).

Towards Malakand Road 1 x 1 100.00 3.00 0.15 45.00

Towards Safi Abad Village 2 x 1 80.00 3.00 0.15 72.00

Along Approach Roads 2 x 1 30.00 3.00 0.15 27.00

Total 144.00

4 Plain Cement Concrete incl. placing, compacting, finishing & curing (Ratio 1:3:6).

PCC Bands

Towards Malakand Road 1 x 1 100.00 2.00 0.15 30.00

Towards Safi Abad Village 2 x 1 80.00 2.00 0.15 48.00

Along Approach Roads 2 x 1 30.00 2.00 0.15 18.00

Coping

Towards Malakand Road 1 x 1 100.00 0.60 0.075 4.50

Towards Safi Abad Village 2 x 1 80.00 0.60 0.075 7.20

Along Approach Roads 2 x 1 30.00 0.60 0.075 2.70

SR NO

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

Page 8: Technical Sanction for Safi Abad Bridge New.xlsx

Total 110.40

5 Random Rubble Masonry in foundation & Plinth in cement, sand mortor:Ratio 1:6

Towards Malakand Road 1 x 1 100.00 1.50 4.000 600.00

Towards Safi Abad Village 2 x 1 80.00 1.50 4.000 960.00

Along Approach Roads 2 x 1 30.00 1.50 3.000 270.00

Total 1830.00

6 Erection and Removing Form work to concrete in any shape/ position (Vertical).

Towards Malakand Road 1 x 1 100.00 1.500 150.00

Towards Safi Abad Village 2 x 1 80.00 1.500 240.00

Along Approach Roads 2 x 1 30.00 1.500 90.00

Total 480.00

7 PCC (1:3:6) in mass concrete less formwork using 40% boulders.

Towards Malakand Road 1 x 1 100.00 2.00 1.500 300.00

Towards Safi Abad Village 2 x 1 80.00 2.00 1.500 480.00

Along Approach Roads 2 x 1 30.00 2.00 1.500 180.00

Total 960.00

M3

M3

M3

M3

M3

M2

M2

M2

M2

M3

M3

M3

M3

Page 9: Technical Sanction for Safi Abad Bridge New.xlsx

DETAIL ESTIMATE

DESCRIPTION NOLENGTH WIDTH DEPTH QUANTITY

(M) (M) (M) MKS

1 Confirmatory boring, SPT samples & lab tests, bore logs and report alluvial soil

2 x 1 5.00 10.00 M

Total 10.00 M

2 Confirmatory boring, SPT samples & lab tests, bore logs and report Gravelly soil

2 x 1 10.00 20.00 M

Total 20.00 M

3 Pile Load testing: Max Load 360-600 Tonne

Load Test 1 x 1 1.00 Job

Total 1.00 Job

4 Boring for cast in place RCC piles in Alluvial Soil for 1000 mm diameter pile

Test Pile 1 x 1 8.00 8.00 M

Abuttement Pile 2 x 4 8.00 64.00 M

Total 72.00 M

5 Boring for cast in place RCC piles in Gravely soil for 1000 mm diameter pile

Test Pile 1 x 1 17.00 17.00 M

Abuttement Pile 2 x 4 17.00 136.00 M

Total 153.00 M

SR NO

Page 10: Technical Sanction for Safi Abad Bridge New.xlsx

6

Test Pile 1 x 0.785 25.0 1.00 1.00 19.63

Abutment Piles 8 x 0.785 25.0 1.00 1.00 157.00

Total 176.63

7 Structural Excavation in Common Matrial.

Abuttment Transom 2 x 1.000 11.0 1.50 0.50 16.50

Total 16.50

8 Structural Back fill in common material.

Behind Transoms 2 x 1.000 11.0 2.50 3.00 165.00

Total 165.00

9 Plain Cement Concrete i/e placing, compacting, finishing & curing Ratio 1:4:8.

Abuttment Transom 2 x 1.000 11.0 1.50 0.15 4.95

Total 4.95

10 Plain Cement Concrete i/e placing, compacting, finishing & curing Ratio 1:4:8.

Abuttment Transom 2 x 1.000 11.0 1.50 0.15 4.95

Total 4.95

P/L PCC Type B with 28 days min cylinderical strength of 280kg/ sq.cm complete in all respect or as directed by the Engr: Incharge.

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

Page 11: Technical Sanction for Safi Abad Bridge New.xlsx

Safi Abad Bridge

Detail of abutment Reinforcement, Grade 60.

S.No Description of Item Work mark

Bar dia

Nos

Length

(mm) (M)

A TRANSOM

1 TRANSOM DISTRIBUTION BARS 101 16 2 x 67 6.6

3 MAIN BAR LOWER PORTION 102 12 2 x 22 9.75

5 TRANSOM MAIN BAR TOP & BOTT 103 25 2 x 20 11.3

6 TRANSOM MAIN BAR (Side Bars) 104 16 2 x 8 9.8

7 DOUBLE BINDERS 105 12 2 x ### 2.75

8 RETAINING BLOCK MAIN BARS 106 12 2 x 24 3.55

9 RETAINING BLOCK DIST BARS 107 16 2 x 28 3.2

10 RETAINING BLOCK (BACK WALL PORTION) 107 a 16 2 x 28 3.2

11 BEARING PLINTH MAIN BAR FOR G1 UM 12 2 x 20 2.15

12 BEARING PLINTH RINGS FOR G1 UM 12 2 x 6 2.35

13 BEARING PLINTH MAIN BAR FOR G2 UM 12 2 X 20 2.25

14 BEARING PLINTH RINGS FOR G2 UM 12 2 X 6 2.35

B BACK WALL

12 MAIN BAR EARTH FACE 108 12 2 X 20 5.15

13 MAIN BAR FAR FACE 109 12 2 X 20 3.75

14 MAIN BAR EARTH FACE VARIABLE 110 12 2 X 48 4.8

15 MAIN BAR FAR FACE VARIABLE 111 12 2 X 48 3.5

16 SIDE DIST BARS EARTH FACE 112 20 2 X 32 4.65

17 CENTRE DIST BARS EARTH FACE 113 12 2 X 16 4.5

Page 12: Technical Sanction for Safi Abad Bridge New.xlsx

18 DIST BARS FAR FACE 114 12 2 X 16 8.3

19 TOP BARS 115 12 2 X 2 9.9

20 CORNER BARS 116 20 2 X 8 3.75

C WING WALL

21 BOTTOM BARS 117 25 2 X 6 9.15

22 DIST U-BARS 118 12 2 X 18 6.85

23 DIST U- BARS (VARIABLE) 119 12 2 X 50 4.5

24 BOTTOM PORTION MAIN BARS (E.F) 120 20 2 X 16 3.25

25 BOTTOM PORTION MAIN BARS (F.F) 121 12 2 X 16 3.25

26 MIDDLE PORTION MAIN BARS (E.F) 122 20 2 X 22 5.15

27 MIDDLE PORTION MAIN BARS (F.F) 123 12 2 X 22 4.7

28 TOP PORTION MAIN BARS (E.F) 124 20 2 X 6 4.95

29 TOP PORTION MAIN BARS (F.F) 125 12 2 X 6 4.95

30 FOOT PATH MAIN BARS (TOP & BOTT) 126 12 2 X 24 4.95

31 FILLET BARS 127 12 2 X 16 1.35

32 FOOT PATH RINGS 128 12 2 X 70 3.85

33 BARRIER BOTT DIS BAR 129 12 2 X 70 2.67

34 BARRIER TOP DIS BAR 130 12 2 X 70 1.7

35 BARRIER MAIN BARS 131 12 2 X 16 4.96

D APPROACH SLAB

36 MAIN BAR BOTTOM 132 12 2 X 50 4.96

37 MAIN BAR TOP 133 12 2 X 50 5.95

38 MAIN BAR CORNER 134 12 2 X 50 2.2

39 DIST BAR 135 12 2 X 43 7.26

Total

Page 13: Technical Sanction for Safi Abad Bridge New.xlsx

Safi Abad Bridge

Detail of abutment Reinforcement, Grade 60.

Total length Unit Weight Total Weight

(M) (Kg/Mtr) Tonnes

TRANSOM

884.4 1.579 1.396

429 0.888 0.381

452 3.854 1.742

156.8 1.579 0.248

737 0.888 0.654

170.4 0.888 0.151

179.2 1.579 0.283

179.2 1.579 0.283

86 0.888 0.076

28.2 0.888 0.025

90 0.888 0.080

28.2 0.888 0.025

BACK WALL

206 0.888 0.183

150 0.888 0.133

460.8 0.888 0.409

336 0.888 0.298

297.6 2.467 0.734

144 0.888 0.128

Page 14: Technical Sanction for Safi Abad Bridge New.xlsx

265.6 0.888 0.236

39.6 0.888 0.035

60 2.467 0.148

WING WALL

109.8 3.854 0.423

246.6 0.888 0.219

450 0.888 0.400

104 2.467 0.257

104 0.888 0.092

226.6 2.467 0.559

206.8 0.888 0.184

59.4 2.467 0.147

59.4 0.888 0.053

237.6 0.888 0.211

43.2 0.888 0.038

539 0.888 0.479

373.8 0.888 0.332

238 0.888 0.211

158.72 0.888 0.141

APPROACH SLAB

496 0.888 0.440

595 0.888 0.528

220 0.888 0.195

624.36 0.888 0.554

13.113

Page 15: Technical Sanction for Safi Abad Bridge New.xlsx

Safi Abad Bridge

Detail of deck slab Reinforcement, Grade 60.

S.No Description of Item Work mark

Bar dia

Nos

Length

(mm) (M)

1 MAIN BAR (BOTT) 1 12 1 x ### 10.11

2 MAIN BAR (TOP) 2 12 1 x ### 10.11

3 TOP (LEFT & RIGHT) MAIN BAR 3 16 1 x ### 2.08

4 TOP CENTERAL MAIN BARS 4 12 1 x ### 1.5

5 DIST BARS (BOTT) 5 12 1 x 88 15.32

6 TOP (BOTH ENDS) DIST BARS 6 12 1 x ### 11.9

7 TOP CENTRAL DIST BARS 7 12 1 x 52 7.5

SAFETY BARRIERS

8 8 10 4 X ### 3.545

9 9 12 4 X ### 1.95

10 10 12 4 X ### 1.62

11 11 10 4 x 15 30

Total

Page 16: Technical Sanction for Safi Abad Bridge New.xlsx

Safi Abad Bridge

Detail of deck slab Reinforcement, Grade 60.

Total length Unit Weight Total Weight

(M) (Kg/Mtr) Tonnes

2042.22 0.888 1.813

1415.4 0.888 1.257

1156.48 1.579 1.826

420 0.888 0.373

1348.16 0.888 1.197

1237.6 0.888 1.099

390 0.888 0.346

SAFETY BARRIERS

2836 0.617 1.75

1560 0.888 1.39

1296 0.888 1.15

1800 0.617 1.11

13.307

Page 17: Technical Sanction for Safi Abad Bridge New.xlsx

Safi Abad Bridge

Detail of Diaphragms Reinforcement, Grade 60.

S.No Description of Item Work mark

Bar dia

Nos

Length

(mm) (M)

EXTERNAL DIAPHRAGMS

1 1 25 2 x 2 9.85

2 2 25 2 x 8 2.735

3 3 25 2 x 4 3.85

4 4 25 2 x 4 3.85

5 5 12 2 x 16 1.21

6 6 12 2 x 16 1.95

7 7 12 2 x 16 1.7

8 8 12 2 x 8 1.95

9 9 10 2 x 36 4.305

INTERNAL DIAPHRAGMS

10 10 25 1 x 2 9.85

11 11 25 1 x 8 2.735

12 12 25 1 X 4 3.85

13 13 25 1 X 4 3.85

14 14 12 1 X 16 1.21

15 15 12 1 X 16 1.95

16 16 12 1 X 16 1.7

17 17 12 1 X 8 1.95

18 18 10 1 X 36 3.755

Page 18: Technical Sanction for Safi Abad Bridge New.xlsx

Total

Page 19: Technical Sanction for Safi Abad Bridge New.xlsx

Safi Abad Bridge

Detail of Diaphragms Reinforcement, Grade 60.

Total length Unit Weight Total Weight

(M) (Kg/Mtr) Tonnes

EXTERNAL DIAPHRAGMS

39.4 3.854 0.152

43.76 3.854 0.169

30.8 3.854 0.119

30.8 3.854 0.119

38.72 0.888 0.034

62.4 0.888 0.055

54.4 0.888 0.048

31.2 0.888 0.028

309.96 0.617 0.191

INTERNAL DIAPHRAGMS

19.7 3.854 0.076

21.88 3.854 0.084

15.4 3.854 0.059

15.4 3.854 0.059

19.36 0.888 0.017

31.2 0.888 0.028

27.2 0.888 0.024

15.6 0.888 0.014

135.18 0.617 0.083

Page 20: Technical Sanction for Safi Abad Bridge New.xlsx

1.360

Page 21: Technical Sanction for Safi Abad Bridge New.xlsx

Safi Abad Bridge

Detail of GIRDER Reinforcement, Grade 60.

S.No Description of Item Work mark

Bar dia

Nos

Length

(mm) (M)

1 MAIN BARS BOTT (BOTH ENDS) 1 16 4 x 8 8.26

2 MAIN BARS BOTT (MID PORTION) 2 16 4 x 4 15

3 MAIN BARS TOP & BOTT (BOTH ENDS) 3 12 4 x 16 8.06

4 MAIN BARS TOP & BOTT (MID PORTION) 4 12 4 x 8 15

5 SKIN REINFORCMENT (BOTH ENDS) 5 12 4 x 16 2.923

6 SKIN REINFORCMENT (BOTH ENDS) 6 12 4 x 16 8.06

7 SKIN REINFORCMENT (MID PORTION) 7 12 4 x 8 15

8 BOTTOM RINGS 8 10 4 x ### 1.862

9 TOP RINGS (MID PORTION) 9 10 4 x 90 1.45

10 BINDERS 10 12 4 x ### 4.34

11 BOTT BINDERS (BOTH ENDS) 11 16 4 x 10 2.952

12 TOP BINDERS (BOTH ENDS) 12 12 4 x 10 2.542

13 BOTT BINDERS (BOTH ENDS) 13 16 4 X 22 4.454

14 14 12 4 X 8 1.6

15 15 12 4 X 8 1.365

16 16 12 4 X ### 0.255

17 17 12 4 X 32 1.67

18 18 16 4 X 8 5.94

19 19 10 4 X 2.1 3.09

Total

Page 22: Technical Sanction for Safi Abad Bridge New.xlsx

Safi Abad Bridge

Detail of GIRDER Reinforcement, Grade 60.

Total length Unit Weight Total Weight

(M) (Kg/Mtr) Tonnes

264.32 1.579 0.417

240 1.579 0.379

515.84 0.888 0.458

480 0.888 0.426

187.072 0.888 0.166

515.84 0.888 0.458

480 0.888 0.426

744.8 0.617 0.459

522 0.617 0.322

2413.04 0.888 2.143

118.08 1.579 0.186

101.68 0.888 0.090

391.952 1.579 0.619

51.2 0.888 0.045

43.68 0.888 0.039

131.58 0.888 0.117

213.76 0.888 0.190

190.08 1.579 0.300

25.956 0.617 0.016

7.257

Page 23: Technical Sanction for Safi Abad Bridge New.xlsx

Ref No. =JCC/SA /B.B.S/001

S.No Description of Item Work markBar dia

Nos Spacing LengthTotal

(mm) Length

A Test Pile

1 Bottom protion 1 25 1 x 12 N.A 12.3 147.6

2 Top Portion 2 25 1 x 12 N.A 12.3 147.6

3 Spiral on laps 3 12 1 x 27 75 2.82 76.14

4 Spiral on bottom portion 4 12 1 x 134 150 2.82 377.88

Total

CONSTRUCTION OF RCC BRIDGE AT VILLAGE SAFI ABAD, DISTRICT MARDAN.

Page 24: Technical Sanction for Safi Abad Bridge New.xlsx

Date of Submission: 22/01/2013

Activity: TEST PILE

Unit Total Weight Shape

Weight

Test Pile

3.854 0.569

3.854 0.569

0.888 0.068

0.888 0.336

1.541

CONSTRUCTION OF RCC BRIDGE AT VILLAGE SAFI ABAD,

Page 25: Technical Sanction for Safi Abad Bridge New.xlsx

Ref No. =JCC/SA /B.B.S/002

S.No Description of Item Work markBar dia

Nos Spacing LengthTotal

(mm) Length

A Working Pile

1 Bottom protion 1 25 8 x 16 N.A 12.3 1574.4

2 Mid Portion 2 25 8 x 16 N.A 12.3 1574.4

3 Top Portion 3 25 8 x 16 N.A 6 768

4 Additional Bars 4 25 8 x 8 N.A 9 576

5 Spiral on laps 5 12 8 x 27 75 2.82 609.12

6 Spiral on bottom portion 6 12 8 x 97 150 2.82 2188.32

7 Spiral on top portion 7 16 8 x 107 75 2.82 2413.92

Total

CONSTRUCTION OF RCC BRIDGE AT VILLAGE SAFI ABAD, DISTRICT MARDAN.

Page 26: Technical Sanction for Safi Abad Bridge New.xlsx

Date of Submission: 09/05/2013

Activity: WORKING PILES

Unit Total Weight Shape

Weight

Working Pile

3.854 6.068

3.854 6.068

3.854 2.960

3.854 2.220

0.888 0.541

0.888 1.943

1.579 3.811

23.611

CONSTRUCTION OF RCC BRIDGE AT VILLAGE SAFI ABAD,

Page 27: Technical Sanction for Safi Abad Bridge New.xlsx

Construction of R.C.C Bridge at Village Safiabad, District Mardan

Steel Detail

S.No Description Qty (Tonn)

1 9 Number of Piles Including Test Pile 25.152

2 13.113

3 Girders 7.257

4 Diaphragms 1.360

5 Deck Slab 13.307

Total 60.188