KING ABDULAZIZ CITY FOR SCIENCE AND TECHNOLOGYGENERAL DIRECTORATE OF FACILITIES AND PROJECTS
Construction of Solar Panel Storage Buildingat KACST Al-Uyaynah Research Station
TECHNICAL REPORTContractor Name: Saad Bin Abdullah Bin Naji Contracting Est.
Date: 09.11.1436 (25.08.2015)____________________________________________________________________________
a. Electrical
Electrical Manhole not yet finished and no cables installed.
KING ABDULAZIZ CITY FOR SCIENCE AND TECHNOLOGYGENERAL DIRECTORATE OF FACILITIES AND PROJECTS
Construction of Solar Panel Storage Buildingat KACST Al-Uyaynah Research Station
TECHNICAL REPORTContractor Name: Saad Bin Abdullah Bin Naji Contracting Est.
Date: 09.11.1436 (25.08.2015)____________________________________________________________________________
Electrical Room , No panelboard and main cable installed
.
Grounding Rod with Bare Copper outside the Building
KING ABDULAZIZ CITY FOR SCIENCE AND TECHNOLOGYGENERAL DIRECTORATE OF FACILITIES AND PROJECTS
Construction of Solar Panel Storage Buildingat KACST Al-Uyaynah Research Station
TECHNICAL REPORTContractor Name: Saad Bin Abdullah Bin Naji Contracting Est.
Date: 09.11.1436 (25.08.2015)____________________________________________________________________________
Disconnecting Switches for ACCU
Electrical Recessed Indoor Luminaire on Mezzanine
KING ABDULAZIZ CITY FOR SCIENCE AND TECHNOLOGYGENERAL DIRECTORATE OF FACILITIES AND PROJECTS
Construction of Solar Panel Storage Buildingat KACST Al-Uyaynah Research Station
TECHNICAL REPORTContractor Name: Saad Bin Abdullah Bin Naji Contracting Est.
Date: 09.11.1436 (25.08.2015)____________________________________________________________________________
Electrical Pendant Highbay Industrial Luminaire Installed on Main Storage Area
Surface Mounted Luminaires in Electrical and Communication Room
KING ABDULAZIZ CITY FOR SCIENCE AND TECHNOLOGYGENERAL DIRECTORATE OF FACILITIES AND PROJECTS
Construction of Solar Panel Storage Buildingat KACST Al-Uyaynah Research Station
TECHNICAL REPORTContractor Name: Saad Bin Abdullah Bin Naji Contracting Est.
Date: 09.11.1436 (25.08.2015)____________________________________________________________________________
Outdoor Luminaire
WC Downlight Luminaire
KING ABDULAZIZ CITY FOR SCIENCE AND TECHNOLOGYGENERAL DIRECTORATE OF FACILITIES AND PROJECTS
Construction of Solar Panel Storage Buildingat KACST Al-Uyaynah Research Station
TECHNICAL REPORTContractor Name: Saad Bin Abdullah Bin Naji Contracting Est.
Date: 09.11.1436 (25.08.2015)____________________________________________________________________________
Pendant Mounted Indoor Luminaire Installed on Loading/Unloading Area
Exit Lights Installed on all Exit Doors
KING ABDULAZIZ CITY FOR SCIENCE AND TECHNOLOGYGENERAL DIRECTORATE OF FACILITIES AND PROJECTS
Construction of Solar Panel Storage Buildingat KACST Al-Uyaynah Research Station
TECHNICAL REPORTContractor Name: Saad Bin Abdullah Bin Naji Contracting Est.
Date: 09.11.1436 (25.08.2015)____________________________________________________________________________
Floor Mounted Socket Installed at Mezzanine
Switches and Sockets
KING ABDULAZIZ CITY FOR SCIENCE AND TECHNOLOGYGENERAL DIRECTORATE OF FACILITIES AND PROJECTS
Construction of Solar Panel Storage Buildingat KACST Al-Uyaynah Research Station
TECHNICAL REPORTContractor Name: Saad Bin Abdullah Bin Naji Contracting Est.
Date: 09.11.1436 (25.08.2015)____________________________________________________________________________
On/Off Pushbutton Switch for Highbay Lightings
Dip Switch
KING ABDULAZIZ CITY FOR SCIENCE AND TECHNOLOGYGENERAL DIRECTORATE OF FACILITIES AND PROJECTS
Construction of Solar Panel Storage Buildingat KACST Al-Uyaynah Research Station
TECHNICAL REPORTContractor Name: Saad Bin Abdullah Bin Naji Contracting Est.
Date: 09.11.1436 (25.08.2015)____________________________________________________________________________
Duplex Socket Outlet at Main Storage Area
380 Volts Industrial Outlet Sample on Site
KING ABDULAZIZ CITY FOR SCIENCE AND TECHNOLOGYGENERAL DIRECTORATE OF FACILITIES AND PROJECTS
Construction of Solar Panel Storage Buildingat KACST Al-Uyaynah Research Station
TECHNICAL REPORTContractor Name: Saad Bin Abdullah Bin Naji Contracting Est.
Date: 09.11.1436 (25.08.2015)____________________________________________________________________________
Wall Mounted Duplex Socket in Rooms
Disconnecting Switch and Push Button for Roll up Shutter
KING ABDULAZIZ CITY FOR SCIENCE AND TECHNOLOGYGENERAL DIRECTORATE OF FACILITIES AND PROJECTS
Construction of Solar Panel Storage Buildingat KACST Al-Uyaynah Research Station
TECHNICAL REPORTContractor Name: Saad Bin Abdullah Bin Naji Contracting Est.
Date: 09.11.1436 (25.08.2015)____________________________________________________________________________