Page 1: Technical Progress Report - philippinecockatoo.org and articles... · Municipal Government of Rizal, Palawan, ... EXECUTIVE SUMMARY ... PCCP Technical Progress Report 2006

In-Situ

Conservation Project

Phase V

Technical Progress Report June June June June –––– December 2006 December 2006 December 2006 December 2006

By

Indira D. L. Widmann, Peter Widmann, Siegfred Diaz and Deborah V. van den Beukel

Puerto Princesa City, Palawan, Philippines March 2007

Page 2: Technical Progress Report - philippinecockatoo.org and articles... · Municipal Government of Rizal, Palawan, ... EXECUTIVE SUMMARY ... PCCP Technical Progress Report 2006

PCCP Technical Progress Report

June - Dec 2006 p.2

PROJECT TECHNICAL REPORT

COUNTRY: PHILIPPINES

PROJECT TITLE: PHILIPPINE COCKATOO CONSERVATION PROGRAM

In-situ Conservation Project Phase V

PROJECT DURATION: June – December 2006

PROJECT SITE: Palawan, Philippines

PROJECT COOPERATORS:

Department of Environment and Natural Resources (DENR) Municipal Government of Narra, Palawan, Philippines Municipal Government of Dumaran, Palawan, Philippines Municipal Government of Rizal, Palawan, Philippines Culasian Barangay Government, Rizal, Palawan, Philippines Local Protected Area Management Committees (LPAMC)

Sagip Katala Movement-Narra Chapter, Inc. (SKM-NC, Inc) Sagip Katala Movement-Dumaran Chapter (SKM-DC) Palawan Council for Sustainable Development (PCSD) Concerned agencies and authorities

BY: KATALA FOUNDATION, INC. INDIRA DAYANG LACERNA-WIDMANN

Development and Operations Manager

PETER WIDMANN Program Leader/Consultant, Conservation Biology

DEBORAH V. van den BEUKEL

Administrative / Information Officer

SIEGFRED H. DIAZ Field Operations Coordinator, Southern Palawan

ADDRESS: Philippine Cockatoo Conservation Program

National Highway, Bgy. San Jose or P.O. Box 390 Puerto Princesa City 5300 Palawan, Philippines Tel/Fax: +63-48-434-7693

WEBSITE: www.philippinecockatoo.org

EMAIL: [email protected] or [email protected]

Page 3: Technical Progress Report - philippinecockatoo.org and articles... · Municipal Government of Rizal, Palawan, ... EXECUTIVE SUMMARY ... PCCP Technical Progress Report 2006

PCCP Technical Progress Report

June - Dec 2006 p.3

TABLE OF CONTENTS

EXECUTIVE SUMMARY ...................................................................................................................................5

ACKNOWLEDGMENTS .....................................................................................................................................9

ACRONYMS........................................................................................................................................................11

LIST OF TABLES, FIGURES AND ANNEXES..............................................................................................12

INTRODUCTION ...............................................................................................................................................13

THE PHILIPPINE COCKATOO CACATUA HAEMATUROPYGIA ................................................................................13 OBJECTIVE OF THE PHILIPPINE COCKATOO CONSERVATION PROGRAM .............................................................13 PROGRAM STRATEGY .........................................................................................................................................13 DELIVERABLES...................................................................................................................................................14

DESCRIPTION OF PROJECT SITES .............................................................................................................16

RASA ISLAND, NARRA, PALAWAN......................................................................................................................16 DUMARAN ISLAND, DUMARAN, PALAWAN ........................................................................................................17 CULASIAN MANAGED RESOURCE PROTECTED AREA (CMRPA), RIZAL, PALAWAN ..........................................18 PATNANUNGAN, POLILLO GROUP OF ISLANDS, QUEZON.....................................................................................19

METHODOLOGIES...........................................................................................................................................20

ACHIEVEMENTS AND RESULTS..................................................................................................................22

OUTPUT 1: STABILIZATION OF THE COCKATOO POPULATION IN RASA ISLAND, PALAWAN, THROUGH CO-

MANAGEMENT OF THE PROTECTED AREA............................................................................................................22 Wardening scheme ........................................................................................................................................22 Capacity building of Protected Area Management Board (PAMB) of RIWS and other key stakeholders ....22 Conservation education (CE)........................................................................................................................23 Alternative Livelihood...................................................................................................................................23 Ecotourism ....................................................................................................................................................23 Constraints and measures taken ...................................................................................................................23

OUTPUT 2. LEGAL AND ACTUAL CONSERVATION OF COCKATOOS AND THEIR HABITATS IN DUMARAN ISLAND,

PALAWAN...........................................................................................................................................................24 Wardening scheme ........................................................................................................................................24 Conservation education ................................................................................................................................24 Legal protection of Omoi Cockatoo Reserve.................................................................................................25 Capacity building..........................................................................................................................................25 Constraints and measures taken ...................................................................................................................26

OUTPUT 3. CONTINUATION OF NEST-PROTECTION SCHEME IN RIZAL, PALAWAN IN 2006, AFTER TERMINATION

OF CEPF FUNDING (FUNDING FROM CEPF REQUESTED FOR 2005).....................................................................28 Nest protection scheme .................................................................................................................................28 Capacity building for local decision-makers and law-enforcers facilitated .................................................29 Conservation education ................................................................................................................................30 CEPF monitoring visit ..................................................................................................................................31 Constraints and measures taken ...................................................................................................................31

OUTPUT 4. RESEARCH AND MONITORING ON DISTRIBUTION, HABITAT REQUIREMENTS AND RESTORATION,

BREEDING AND FEEDING ECOLOGY AND PUBLICATION OF RESULTS....................................................................31 Comprehensive floral inventories in Rasa and Dumaran initiated and phenological research continued...31 Systematic testing of propagation and performance of cockatoo-relevant plant species for habitat

restoration conducted....................................................................................................................................31 Cockatoo population and nest monitoring in project sites continued ...........................................................31 Research on fledgling dispersal and survival conducted ..............................................................................36 Papers submitted for publication to relevant journals..................................................................................36

OUTPUT 5. COCKATOO SURVEYS AND ASSESSMENTS OF POTENTIAL TRANSLOCATION SITES. ............................37 Market survey in Cartimar, Manila ..............................................................................................................38 Constraints and measures taken ...................................................................................................................38

Page 4: Technical Progress Report - philippinecockatoo.org and articles... · Municipal Government of Rizal, Palawan, ... EXECUTIVE SUMMARY ... PCCP Technical Progress Report 2006

PCCP Technical Progress Report

June - Dec 2006 p.4

OUTPUT 6. PREPARATION FOR A BIODIVERSITY CONSERVATION CENTER IN NARRA. ........................................38 Other potential donors contacted..................................................................................................................38

OTHER HIGHLIGHTS......................................................................................................................................38

Other remarkable bird records .....................................................................................................................38 Coral Reef and Evaluation Training for stakeholders ..................................................................................38 Mid-year Planning Workshop .......................................................................................................................39 Seeds of Life Exhibit......................................................................................................................................39 Memorandum of Agreement with PAWB-DENR on Philippine Freshwater Turtles Conservation Program

(PFTCP)........................................................................................................................................................39 2

nd Philippine Birdfest...................................................................................................................................40

Relevant seminars, meetings and workshops organized and attended..........................................................40 MEDIA MILEAGE.................................................................................................................................................41 SUMMARY OF PUBLIC PRESENTATIONS:..............................................................................................................42

IMPLICATIONS FOR FURTHER WORK .....................................................................................................42

EQUIPMENT STATUS REPORT.....................................................................................................................43

PLANNED TARGETS AND ACTIVITIES FOR THE NEXT TWO YEARS OF PROJECT

IMPLEMENTATION .........................................................................................................................................43

LITERATURE .....................................................................................................................................................45

WORKSHEET JUNE – DECEMBER 2006......................................................................................................46

ANNEXES ............................................................................................................................................................54

Page 5: Technical Progress Report - philippinecockatoo.org and articles... · Municipal Government of Rizal, Palawan, ... EXECUTIVE SUMMARY ... PCCP Technical Progress Report 2006

PCCP Technical Progress Report

June - Dec 2006 p.5

EXECUTIVE SUMMARY

Output 1: Stabilization of the cockatoo population Rasa Island, Palawan, through co-management of the protected area.

1. A total of 39 hatchlings were banded this year of which 37 fledged successfully. This is the most productive breeding season since start of the project.

2. Two additional Tagbanua climbers were recruited as volunteer wardens this breeding season.

3. DENR 4-B Regional Executive Director Paragas presided the 3rd regular Protected Area Management Board Meeting of Rasa Island Wildlife Sanctuary in Narra.

4. Focus group discussions in mainland coastal barangays adjacent to Rasa were conducted to heighten awareness of the importance of the Presidential Proclamation declaring Rasa as wildlife sanctuary.

5. The agricultural farming project, a livelihood support to Rasa stakeholders, has revolved its capital in 6th cycle; accommodating 22 member-recipients and able to pay its bookkeeper from its income.

6. Executive Order No. 11, series of 2006 was signed on Dec. 28, 2006 by Mayor Demaala of Narra deputizing the PCCP local volunteers as wildlife wardens.

7. Mr. Emmanuel Alfaro was appointed Protected Area Superintendent (PASu) for RIWS through DENR Regional Special Order No. 06-251.

8. Breeding season workplan for Rasa was approved by the PAMB during its last quarter regular meeting.

9. Regional Technical Director Galleon of DENR-Region 4-B visited Rasa Island in November along with other DENR staff from the province and CENRO.

10. Two prominent national photographers visited Rasa for 2007 calendar projects. 11. Teachers from University of Santo Tomas, Manila and 12 German students

conducted field exposure on Rasa and vicinities in Narra.

Output 2: Legal and actual conservation of cockatoos and their habitats in Dumaran Island, Palawan.

12. A second cockatoo roosting site was located and continuously monitored in Bgy. Bohol in a dense mangrove area.

13. A case is now being filed at the Prosecutor’s Office on the illegal cutting of trees within the Omoi Cockatoo Reserve. Wardens in Dumaran are witnesses to the said charge.

14. Occasional reports of illegal cutting of trees outside the PA are on-going but seemingly influenced politically.

15. The municipality of Dumaran featured the Kalabukay (local name of Phil. Cockatoo) during the province-wide Baragatan Festival where municipal officials were dressed up like cockatoos.

16. The yearly Kalabukay Festival in Dumaran was celebrated in June 13-18, 2006 with exciting activities for different target groups.

17. The 1st meeting of the Local Protected Area Management Committee (LPAMC) of Dumaran took off in early August in full attendance. Monthly TWG meetings were conducted to assess issues and take actions.

18. A proposal to create a critical habitat under RA 9147 or the Wildlife Act was put forward by KF to protect the remaining patches of forests in Dumaran which is outside of the declared PA.

Page 6: Technical Progress Report - philippinecockatoo.org and articles... · Municipal Government of Rizal, Palawan, ... EXECUTIVE SUMMARY ... PCCP Technical Progress Report 2006

PCCP Technical Progress Report

June - Dec 2006 p.6

19. KFI assisted personnel from the NAMRIA – Manila in conducting ground surveys on Dumaran Island in connection with the municipality’s application for converting timberland into A & D lands for titling.

20. Technical backstopping is needed to improve the municipal-initiated Watershed Rehabilitation Project.

21. Around 306 pupils used the resources at the Katala Environmental Education Center (KEEC) within the reporting period while Grades four to six were reached by lectures at the Dumaran Central School.

22. A total of 1,964 seedlings were propagated in the nursery in Dumaran as of November 2006 with 16 different species.

Output 3: Continuation of nest-protection scheme in Rizal, Palawan in 2006, after termination of CEPF funding (funding from CEPF granted for 2005).

23. A total of 81 of the mapped nest trees within the Culasian Managed Resource Protected Area (CMRPA) were occupied in the 2006 breeding season. These nest trees were mostly occupied by hill mynas and blue-naped parrots.

24. There was no breeding record of Philippine cockatoo this year within the PA; however, one breeding pair was reported in the neighboring barangay. Yet, the hatchlings were already poached when it was checked. Nest tree characterization has been completed.

25. The poacher of a known cockatoo nest tree in Bgy. Ransang has been identified and recruited as volunteer to monitor breeding in 2007.

26. Deputation of wildlife wardens was secured through Executive Order No. 10 signed by the municipal mayor on Dec. 29, 2006.

27. The municipality of Rizal has approved adoption of the protected area in Culasian through Municipal resolution 2006-30, making CMRPA the first protected area in the municipality.

28. Two LPAMC meetings in Rizal were conducted where results of the Southern Palawan Anti-Poaching Initiative (SPAPI) were presented.

29. A survey on residents within the CMRPA was conducted for basic information and profile.

30. Monitoring of Illegal wildlife trade originating from Rizal but not from the CMRPA has resulted in confiscation and court charges.

31. Data on traded wildlife species in Palawan including their market value, modes of transport and trade routes were analyzed and will be presented during the Wildlife Conservation Society of the Philippines (WCSP) Annual Conference in Davao.

32. Illegal activities in Culasian prevail because of lack of political will. No immediate action is provided for instance in cases when and where necessary.

33. Post project survey results suggest remarkable changes in levels of awareness and knowledge and behavioral changes that potentially could impact positively to general conservation efforts.

34. In total 7 and 8 school and community visits respectively were conducted within the reporting period. Barangay health workers were also involved in the CE activities.

35. In November, a team from the Critical Ecosystems Partnership Fund (CEPF) conducted a monitoring visit for the SPAPI. The initiative was extended for another year under CEPF funding.

Output 4: Research and monitoring on distribution, habitat requirements and restoration, breeding and feeding ecology and publication of results.

Page 7: Technical Progress Report - philippinecockatoo.org and articles... · Municipal Government of Rizal, Palawan, ... EXECUTIVE SUMMARY ... PCCP Technical Progress Report 2006

PCCP Technical Progress Report

June - Dec 2006 p.7

36. This year’s breeding success of 39 hatchlings on Rasa was the most productive since project implementation. There was sufficient rainfall that secured the food supply for the entire season.

37. In Dumaran, breeding was also successful as reflected in the slight increase of counted cockatoos at the roosting site in Lagen.

38. As predicted, a second roosting site which lies in dense mangrove has been located in Dumaran within the reporting period.

39. The highest individual count in Dumaran (34 birds) since project implementation was gathered on October 2, 2006 in the morning with 27 individuals counted at traditional Lagan roosting area and another 7 individuals counted simultaneously at the new roost site in Bohol.

40. Cockatoo sightings in Polillo meanwhile are increasing as sampling efforts also increased. Four nest trees have been reported from Patnanungan and one from Burdeos. The identified nest tree is Malaikmo (Celtis philippensis Blanco) in Sitio Inusukan, Bgy. Patnanungan Norte (Site 1 in map), Polillo.

41. In Rizal, no cockatoo was reported breeding in the CMRPA but a breeding pair was confirmed in a neighboring barangay. This is now being monitored regularly and barangay officials signaled support on the protection effort.

42. In August, roost count on Rasa reached to 130 birds, the highest number recorded so far.

43. Four fledglings from Rasa were tagged with radio transmitters and were tracked regularly.

44. After fledging, all four birds were tracked in close vicinity to the nest trees with their parents. Later, they joined others in the roosting site and have remained on Rasa within the reporting period. Sightings on the mainland only were observed in October.

45. On June 20, one of the tagged birds were found on forest floor on Rasa; probably preyed upon by a goshawk. The intact transmitter was attached to a nestling which did not fledge yet at that time.

Output 5: Cockatoo surveys and assessments of potential translocation sites.

46. SEP clearance was granted by PCSDS for the translocation project after securing all endorsements from different levels and other prior informed consent certificates. Coordination meetings with partners and stakeholders were conducted.

47. Two MOAs were signed to aide the implementation of the project. This project has linked private organizations and other cause-oriented groups to participate in the 1st ever translocation of the Philippine cockatoos.

48. All administrative protocols and preliminary activities i.e. translocation site set-up, pre-release aviary, zookeeper’s hut, were done before actual transfer of birds.

49. Actual translocation of the birds was done on Nov. 24, 2006. Birds’ general conditions were thoroughly checked by 3 veterinarians on site. Birds were marked, banded and weighed. The first progress report was submitted to concerned agencies and partners.

50. Paul Morris from Chester Zoo assisted the critical initial stages of the translocation project staying at the site with the birds from Nov. 24, 2006 – Feb. 18, 2007.

51. Enumerators’ training was conducted before the pre-project survey. 52. Two workshops were conducted with key stakeholders: keepers’ workshop for local

monitoring team and stakeholders planning workshop. 53. An informal market survey in Cartimar, Manila yielded to one immature cockatoo for

sale at 500US$ a number of blue-naped parrots and hill mynas.

Page 8: Technical Progress Report - philippinecockatoo.org and articles... · Municipal Government of Rizal, Palawan, ... EXECUTIVE SUMMARY ... PCCP Technical Progress Report 2006

PCCP Technical Progress Report

June - Dec 2006 p.8

Output 6: Preparation for a Biodiversity Conservation Center in Narra.

54. SEP clearance for the center was granted by PCSDS. The Initial Environmental Examination (IEE) has been revised for the final issuance of the Environmental Compliance Certificate.

55. Ground breaking activities have been pursued. The quarantine area of the center is almost completed with the shared resources from Shellshock, ZGAP and Hon. Zubiri.

56. The MOA between KFI and PAWB-DENR was signed for the implementation of the Philippine Freshwater Turtle Conservation Program, a major component of the center. The MOA provides the legal basis for the acquisition of freshwater turtles to the center.

Other highlights

57. A total of five Palawan hornbill nests were successfully protected this year. Three from Culasian and two from Dumaran protected areas.

58. Seeds of 13 species of food-providing plants were collected from under hornbill nest trees; regurgitated by females.

59. A brown hawk-owl was recorded breeding on a former cockatoo nest. This is first record for Dumaran.

60. The Coral Reef and Evaluation Training in Narra was completed after a year-long series of activities.

61. A mid-year planning workshop was conducted which was participated by all PCCP staff and KF board during which Dr. Sabine Schoppe, the replacement of Peter Widmann, was introduced.

62. Ms. Janice Tupas was hired to replace outgoing Administration and Information Officer Debbie van den Beukel.

63. SEP clearance was granted by PCSDS for the implementation of the PCCP and other KFI projects in Palawan.

64. “Seeds of Life” exhibit was launched at the Kamarikutan Kape and Art Galleri on October 19, 2006. The exhibit explains the ecology and conservation of seed dispersal using dioramas and project examples.

65. The MOA between KFI and PAWB-DENR was signed for the implementation of the Philippine Freshwater Turtle Conservation Program.

66. PCCP participated during the 2nd Philippine Birdfest organized by the Wild Bird Club of the Philippines on Sept. 22-23, 2006 at Quezon City with fun, games and mascot appearance.

67. Eight public presentations were made within the reporting period. 68. Three articles were published in journals and proceedings. 69. Several meetings/workshops either organized locally or nationally were attended by

PCCP staff. 70. Two solar panels were purchased for the use of the center in Narra. 71. Major repairs and maintenance of M/B Abukay boat, vehicles and equipment were

undertaken within the reporting period. 72. Two cellular phones were purchased to service wildlife wardens on duty in Rizal and

Narra respectively.

Page 9: Technical Progress Report - philippinecockatoo.org and articles... · Municipal Government of Rizal, Palawan, ... EXECUTIVE SUMMARY ... PCCP Technical Progress Report 2006

PCCP Technical Progress Report

June - Dec 2006 p.9

ACKNOWLEDGMENTS

We are grateful to the Loro Parque Fundación (LPF), Tenerife, Spain for incessantly supporting the Philippine Cockatoo Conservation Program and to the Partner Donors: North of England Zoological Society/Zoological Gardens Chester (NEZS), Zoologische Gesellschaft für Arten- und Populationsschutz (ZGAP, incl. Fonds Fuer Bedrohte Papageien and Strunden-Papageien-Stiftung), and Conservation des Espèces et Des Populations Animales (CEPA), for their trust and generous support. Particular thanks to Wolfgang Kiessling, President LPF, Dr David Waugh, Director LPF, Dr. Roger Wilkinson, Head of Conservation and Science, North of England Zoological Society (NEZS)/Zoological Gardens Chester, Roland Wirth, President ZGAP, Dr. Jean-Marc Lernould, President CEPA and Marc Boussekey, European Coordinator of the PCCP and Secretary CEPA and for facilitating the flow of funds, communication and support from Europe.

The PCCP is indebted to the real players of the project: the wardens and volunteers from Narra, Dumaran, Rizal and Polillo for their dedication, hardwork and commitment. Without them, the project would not have reaped the good harvests.

To the ever supportive honorable Mayor of Narra, Mayor Lucena D. Demaala and to all members of the municipal council and officials. Special gratitude goes to LPAMC members, Narra for their vigilance and ready attention on Rasa. Equally worth the gratitude is the support of Dumaran Mayor David G. Aurello. To MPDO Agnes Padul, Engr. John Ponce de Leon, R. Aurello, MENRO Magbanua and to all Dumaraños. And lastly to Rizal Mayor Samson I. Degillo, Ma’am Claire, and to Bgy. Captain Reynaldo B. Ong of Culasian for his cooperation. To all Rizal officials and to Candawaga Capt. Cristopher Gado, Panalingaan Capt. Adbul hamid Mansul, and ABC President Jalil Isani.

We are grateful to the DENR personnel who have facilitated the implementation of this program: CENRO Fernando Tactay, OIC PAWS Chief, Emmanuel Alfaro; CENRO of Roxas, CENRO Ely Nabua of Quezon and PAWS Chief Clarissa Pador. Likewise, we thank Ate Precy, Ate Doray, and Vivian of PENRO Office. Special thanks to Anson, Nemi, Dr. Manila, Josie, Dir. Mundita Lim and Dr. Vitug from the Protected Areas and Wildlife Bureau. To the Regional Executive Director, MIMAROPA Region and PENR Officer.

Also, our deepest gratitude to Hon. Juan Miguel Zubiri for his unrelenting support and to Erwin van den Beukel for his generosity and ready assistance to the project. We also give thanks to Gov. Reyes.

We thank Roland Wirth of ZGAP and to the European Association of Zoos and Aquaria (EAZA) through Kevin Buley of Shellshock for helping us financially in the construction and ground breaking of the Katala Institute for Ecology and Biodiversity Conservation (KIEBC) at Narra, Palawan.

We are very much indebted to Paul Morris, zookeeper from Chester Zoo who spent 3 long months in the translocation site, Lagen Island to observe, monitor and facilitate the release of the translocated birds. Thank you too to Dr. Roger Wilkinson and Dr. Mike Jordan for helping us logistically, and especially for the services of Paul Morris. Thank you as well to KFI President, Juan Miguel Zubiri for his time and support.

Likewise we give thanks to our partners for this translocation project in particular the Ten Knots Development Corporation (TKDC), South East Asian Airlines Inc. (SEAir), Island Transvoyager Inc. (ITI) and El Nido Foundation (ENF) for their generousity and support. Special thanks goes to Mrs. Mariglo Laririt who believed in the project; Ms. Lulu Jaleco of SEAir, and Mr. Alberto Lim, Ms. Leigh Perez, and Mr. Etienne La Brooy of TKDC.

Also, our deepest gratitude to Director Theresa Mundita Lim of DENR, the Philippine Association of Wildlife Veterinarians, Inc. and the Zookeepers Association of the Philippines (ZAP) for their valuable assistance. Particular thanks to Dr. Cristina Georgii, Dr. Emilia Lastica, Dr. Esteven Toledo and Dr. Nielsen Donato.

Likewise special thanks to the Critical Ecosystems Partnership Fund (CEPF) for financing the Southern Palawan Anti-Poaching Initiative especially to Mike Atrigenio and Nancy Ibuna. Also to RARE Center for Tropical Conservation.

Page 10: Technical Progress Report - philippinecockatoo.org and articles... · Municipal Government of Rizal, Palawan, ... EXECUTIVE SUMMARY ... PCCP Technical Progress Report 2006

PCCP Technical Progress Report

June - Dec 2006 p.10

We especially mention and thank CI-Palawan through Jaynee and Ferds Maon for the cooperation and assistance especially on GIS related maps. Special thanks to PCSDS particularly to Malou S., Abigail C., Ding, Jude D., Ted B., and Alex M. for all their generous help.

Thanks as well to PASu Loreto Rodriguez and his staff particularly Raymond Osorio and Mr. Veguilla. We also thank Rene Jay Dela Calzada, Project Manager of WWF-El Nido for his help and cooperation, and to Mr. Edgar Lim for his generosity. Thanks as well to Ms. Irma Marcelo for her kind assistance.

Thanks to Liza Dans, Juan Carlos Gonzales, Enteng, and Mimi Ledesma for facilitating our meeting and trips to Polillo Islands. Special thanks to Liza Dans for her reports and supervision over Edgar. We are grateful to William Oliver too.

Our gratitude to Glesselle Batin, Rommel Cruz, Bojie Cervancia, Sunshine Deang and Mike Plazos for their services and assistance provided to the project.

To all visiting tourists, foreign and local, for the generous donations given to the project. To the Narra Youth Organization for Environmental Conservation (NYOFEC), Katala Conservation Club (KCC) and SKM officers and members.

Page 11: Technical Progress Report - philippinecockatoo.org and articles... · Municipal Government of Rizal, Palawan, ... EXECUTIVE SUMMARY ... PCCP Technical Progress Report 2006

PCCP Technical Progress Report

June - Dec 2006 p.11

ACRONYMS

A & D Alienable and Disposable

CE Conservation Education

CENRO Community Environment and Natural Resources Office(r)

CEPA Conservation des Espèces et Des Populations Animales

CEPF Critical Ecosystems Partnership Fund

CI Conservation International

CIDG Criminal Investigation and Detection Group

CMRPA Culasian Managed Resource Protected Area

DENR Department of Environment and Natural Resources

ECAN Environmentally Critical Areas Network

ECC Environmental Compliance Certificate

IEE Initial Environmental Examination

IUCN International Union for the Conservation of Nature and Natural Resources

KEEC Katala Environmental Education Center

KFI Katala Foundation, Inc.

KIEBC Katala Institute for Ecology and Biodiversity Conservation

LGU Local Government Unit

LPAMC Local Protected Area and Management Committee

LPF Loro Parque Fundación

MENRO Municipal Environment and Natural Resources Officer/Office

MFARMC Municipal Fisheries and Aquatic Resources and Management Council

MOA Memorandum of Agreement

NEB Narra Environmental Board

NIPAS National Integrated Protected Area System

NYOFEC Narra Youth Organization for Environmental Conservation

PA Protected Area

PAMB Protected Area Management Board

PASu Protected Area Superintendent

PAWB Protected Areas and Wildlife Bureau

PAWVI Philippine Association of Wildlife Veterinarians Incorporated

PCCP Philippine Cockatoo Conservation Program

PCSD(S) Palawan Council for Sustainable Development (Staff)

PCTP Philippine Cockatoo Translocation Project

PENRO Provincial Environment and Natural Resources Office

PESP Polillo Ecology Stewardship Project

PFTCP Philippine Freshwater Turtles Conservation Program

PNP Philippine National Police

PWRCC Palawan Wildlife Rescue and Conservation Center

RA 9147 Republic Act 9147 otherwise known as the Wildlife Protection Act

RIWS Rasa Island Wildlife Sanctuary

SDENRO Special Deputy Environment and Natural Resources Officer

SEP Strategic Environmental Plan of Palawan

SPAPI Southern Palawan Anti-Poaching Initiative

WCSP Wildlife Conservation Society of the Philippines

WPU Western Philippines University

ZAP Zookeepers Association of the Philippines

ZGAP Zoologische Gesellschaft für Arten- und Populationsschutz

Page 12: Technical Progress Report - philippinecockatoo.org and articles... · Municipal Government of Rizal, Palawan, ... EXECUTIVE SUMMARY ... PCCP Technical Progress Report 2006

PCCP Technical Progress Report

June - Dec 2006 p.12

LIST OF TABLES, FIGURES AND ANNEXES

LIST OF TABLES

Table 1 Information-Education-Communication campaigns from June-December 2006

Table 2 Banded cockatoo hatchlings on Rasa Island, Narra, Palawan as of August 2006

LIST OF FIGURES

Figure 1. Map of the Philippines indicating sites of the Philippine Cockatoo Conservation Program for comprehensive nest protection: 1. Culasian Managed Resource Protected Area (proposed), Rizal; 2. Rasa Island, Narra; 3. Omoi and Manambaling Cockatoo Reserves, Dumaran; 4. Patnanungan Island, Polillo group of islands,

Quezon. Recent sightings of cockatoos: A) eastern Samar, B) Sulu archipelago.

Figure 2. Vegetation and land-use of Rasa Island, Palawan, Philippines.

Figure 3. Omoi Cockatoo Reserve (left) and Manambaling Cockatoo Reserve (right) cover the last forest patches on Dumaran Island.

Figure 4. Vegetation, land use and boundaries of Culasian Managed Resource Protected Area, Rizal, Palawan.

Figure 5. Vegetation and land use of Patnanungan Island (Hampson et al., 2002). Light green: coconut, dark green: forest, blue: mangrove, orange ricefield, light orange: cornfield, olive: grassland, grey: settlement

Figure 6. Dumaran contingent lead by Mayor Aurello during the Baragatan Festival 2007 in PPC.

Figure 7. “Kataly” the official KF mascot joined another Katala mascot during the Baragatan Festival.

Figure 8. Youth leaders in Dumaran actively participated during lectures.

Figure 9. Map showing the proposed critical habitat connecting the two locally declared protected areas in Dumaran.

Figure 10. Resource mapping with stakeholders of the PA.

Figure 11 Tens of Hill myna, 2 white bellied sea eagles and 1 Philippine cockatoo were seized in September during a raid at a suspected illegal wildlife trader’s house from Rizal, southern Palawan.

Figure 12. Maximum numbers of Philippine cockatoos counted on the mainland opposite Rasa Island on a single day.

Figure 13. Maximum and minimum numbers of Philippine cockatoos counted in the roosting site in Lagan, Dumaran, Palawan.

Figure 14. Location of potential nest trees in Patnanungan, Polillo Islands.

Figure 15. Liza Dans gathers children along potential nest sites for birding and conservation education.

Figure 16. Radio-tracking from the project boat.

Figure 17. Dr. Sabine Schoppe, trainor, helps out trainers in mapping the location for manta tow survey.

Figure 18. Viewers of the Seeds of Life exhibit during the opening ceremonies.

Figure 19. Scenes during the 2nd

Phil. Birdfest in Quezon City, Philippines. A. Kataly, the mascot entertaining the excited children in the crowd; B. GBatin (in pink) at the display booth of KFI; C. DVBeukel with students eagerly waiting for an answer; D. A pupil seriously answering the PCCP activity book; E. A pose with KFI president, Migs Zubiri who attended the festival.

Figure 20. M/B Abukay on a major repair.

Page 13: Technical Progress Report - philippinecockatoo.org and articles... · Municipal Government of Rizal, Palawan, ... EXECUTIVE SUMMARY ... PCCP Technical Progress Report 2006

PCCP Technical Progress Report

June - Dec 2006 p.13

INTRODUCTION

The Philippine cockatoo Cacatua haematuropygia

The Philippine Cockatoo or red-vented cockatoo Cacatua haematuropygia is restricted to lowland forest areas and mangroves in the Philippines. Formerly, it could be found all over the archipelago (Dickinson et al. 1991;). Only in the last decades a rapid decline set in, which brought the species to the brink of extinction (e.g. Boussekey 2000a; Lambert 1994). The reasons for the decline of the populations are (e.g.; Collar et al, 1999; Lambert 1994; Widmann et al. 2001):

• Habitat destruction, particularly in respect of nesting and food providing trees.

• Persecution as crop pest.

• Poaching for pet trade.

• Potential diseases caused by the introduction of captive birds in the range of wild populations.

• Tropical storms and typhoons

Habitat destruction and poaching are the most important factors threatening the Philippine cockatoo.

Rasa Island, our main project site, presently is the area with the worldwide highest natural density of Philippine cockatoo with at least 97 birds on 8.3 km2.

Dumaran Island in northern Palawan holds likely the second-most important cockatoo population in the Palawan Faunal Region, after Rasa. Its mangroves are widely intact, but the lowland forests are heavily degraded.

Culasian in Rizal is one of the main source areas for the illegal wildlife trade in the Philippines. It is outstanding for its still high density of other cavity nesters like hill myna Gracula religiosa or blue-naped parrots Tanygnathus lucionensis which is brought by the abundance of ‘manggis’ Koompassia excelsa, the tallest tree in tropical Asia. Cockatoos are present in low numbers.

Patnanungan Island, Polillo group of islands in Quezon harbors the only known Philippine cockatoo population in the Luzon faunal region.

Aside from Palawan and Polillo, cockatoos have recently (within the last eight years) reliably only being sighted in Samar and in different locations in the Sulu Archipelago (Fig.1).

Objective of the Philippine Cockatoo Conservation Program

Conservation and restoration of the most viable subpopulations of the Philippine cockatoo and their habitats, including associated flora and fauna under involvement of all key stakeholders, resulting in a down-listing of the species from ‘Critical’ to ‘Endangered’ within the next six years.

Program Strategy

The general program strategies are:

• Community-based management of local resources in the framework of Philippine law;

• Capacity-building for local decision-makers to ensure sustainability of the conservation efforts; and,

• Ecosystemic conservation approach with the Philippine cockatoo as flagship species.

Page 14: Technical Progress Report - philippinecockatoo.org and articles... · Municipal Government of Rizal, Palawan, ... EXECUTIVE SUMMARY ... PCCP Technical Progress Report 2006

PCCP Technical Progress Report

June - Dec 2006 p.14

Fig 1. Map of the Philippines indicating sites of the Philippine Cockatoo Conservation Program for comprehensive nest protection: 1. Culasian Managed Resource Protected Area (proposed), Rizal; 2. Rasa Island, Narra; 3. Omoi and Manambaling Cockatoo Reserves, Dumaran; 4. Patnanungan Island, Polillo group of islands, Quezon. Recent sightings of cockatoos: A) eastern Samar, B) Sulu

archipelago.

Deliverables

1. Stabilization of the cockatoo population Rasa Island, Palawan, through co-management of the protected area.

• Warden scheme continued. • Technical support of Local Protected Areas Management Committee (LPAMC) and

Community Environmental Natural Resource Offices (CENRO) continued. • Conservation education with focus on youth and key-stakeholders continued. • Alternative livelihood for key-stakeholders provided. • Lobbying for legal protection of Rasa Island through presidential and/or congressional

proclamation continued. • Networking with other relevant institutions continued.

A

N

2 1

3

4

Luzon

Palawan

B

Page 15: Technical Progress Report - philippinecockatoo.org and articles... · Municipal Government of Rizal, Palawan, ... EXECUTIVE SUMMARY ... PCCP Technical Progress Report 2006

PCCP Technical Progress Report

June - Dec 2006 p.15

2. Legal and actual conservation of cockatoos and their habitats in Dumaran Island, Palawan.

• Warden scheme institutionalized. • Capacity building for local decision makers and law enforcers continued. • Conservation education with focus on youth and key-stakeholders continued (this

component funded by RARE). • Legal protection of Omoi forest patch facilitated. • Alternative livelihood for key-stakeholders provided. • Experimental habitat restoration initiated.

3. Continuation of nest-protection scheme in Rizal, Palawan in 2006, after termination of CEPF funding (funding from CEPF granted for 2005). • Nest protection scheme established. • Conservation priority site identified and local protection facilitated. • Capacity building for local decision-makers and law enforcers facilitated. • Conservation education conducted. • Alternative livelihood provided.

4. Research and monitoring on distribution, habitat requirements and restoration, breeding and feeding ecology and publication of results.

• Comprehensive floral inventories in Rasa and Dumaran initiated and phenological research continued.

• Systematic testing of propagation and performance of cockatoo-relevant plant species for habitat restoration conducted.

• Systematic collection of data on breeding and feeding biology continued. • Cockatoo population and nest monitoring in project sites continued. • Research on fledgling dispersal and survival conducted. • Papers submitted for publication to relevant journals.

5. Cockatoo surveys and assessments of potential translocation sites.

• Survey in El Nido/Calamianes Islands conducted. • Survey in Siargao conducted. • Technical cooperation with Polillo Ecology Stewardship Project in Polillo continued. • Assessment for potential translocation sites continued.

6. Preparation for a Biodiversity Conservation Center in Narra.

• Negotiations with LGU Narra regarding potential site continued. • Potential other donors contacted.

• Feasibility assessed.

Page 16: Technical Progress Report - philippinecockatoo.org and articles... · Municipal Government of Rizal, Palawan, ... EXECUTIVE SUMMARY ... PCCP Technical Progress Report 2006

PCCP Technical Progress Report

June - Dec 2006 p.16

Description of Project Sites

Rasa Island, Narra, Palawan

Rasa is a small coral island of 8.34 km2 area situated in the Sulu Sea, just offshore of the Municipality of Narra, Palawan, Philippines (Fig. 2). About 1.75 km2 are covered with coastal forest, mangrove (5.60 km2), cultivated areas (predominantly coconut; 0.39 km2), 0.60 km2 are barren or sparsely vegetated sand and coral outcrops.

The island is the pilot site of the program since 1998. Key component of this project site is the wardening scheme which involves patrolling and protection of the birds during and outside the breeding season. This scheme has proven to be efficient. It has more than doubled the population of cockatoos on the island over five years (presently ca. 97 birds).

Rasa Island probably holds the highest population density of Philippine cockatoo that remains in the wild. The world population of Philippine cockatoo was estimated to range between 1,000 to 4,000 individuals (Lambert, 1994). More recent estimates put the number of cockatoos remaining in the wild between 870 and 2,300 (Widmann, 2001). About 70 to 75% of this population is probably found in Palawan (Boussekey, 2000b). This makes Rasa a high priority area for the protection of this species.

Moreso, not only Philippine cockatoos live on the island, but a variety of other species, with an unusual high percentage of globally threatened and near-threatened taxa (IUCN 2006), considering the small size of Rasa. Note worthy among the 104 recorded bird species are grey imperial pigeon Ducula pickeringii and Mantanani scops-owl Otus mantananensis. Marine life around Rasa is also diverse with at least three marine turtle species and dugong Dugong dugon recorded.

Fig 2. Vegetation and land-use of Rasa Island, Palawan, Philippines.

Page 17: Technical Progress Report - philippinecockatoo.org and articles... · Municipal Government of Rizal, Palawan, ... EXECUTIVE SUMMARY ... PCCP Technical Progress Report 2006

PCCP Technical Progress Report

June - Dec 2006 p.17

Dumaran Island, Dumaran, Palawan

Dumaran is situated in north-eastern Palawan between 10°22’ and 10°41’N and 119°28’ and 119°55’E. Nine Barangays are situated on Palawan mainland, seven on western Dumaran Island. The island is situated in the Sulu sea and separated by a ca. 7 km wide channel from the mainland.

The terrain on the island is rolling with the highest elevation being only 120m a.s.l. No permanent river systems exist. No lentic waterbodies exist in the municipality.

Dumaran is part of the Laurasian Shelf of northern Palawan (Heaney 1986). The bedrock consists mainly of ultrabasic metamorphites with interspersed limestone possibly of Tertiary origin. Most common soil types are silty clay loams and clay loams in the higher situation and beach sand and hydrosols in the coastal areas, based on estimates of sea levels (Gascoyne et. al. 1979). Dumaran Island is a typical landbridge island (Widmann, 1998) which was connected several times with mainland Palawan during the Pleistocene glaziations.

Fig 3. Omoi Cockatoo Reserve (left) and Manambaling Cockatoo Reserve (right) cover the last forest patches on Dumaran Island.

All natural terrestrial ecosystems in Dumaran are tree-dominated. On Dumaran Island only few small and isolated forest patches remain, none of them larger than 103 ha. The most abundant formation is evergreen and semi-evergreen lowland forest with Ipil Intsia bijuga, Amugis Koordersiodenron pinnatum being emergent tree species of commercial value.

Species inventories from the municipality are still incomplete and systematic surveys just started recently. The only ornithological collection on Dumaran Island was conducted in 1921 (Dickinson et al. 1991). No historic accounts are available for other taxa. Ornithological surveys conducted by Katala Foundation so far yielded 108 species from the island. A prominent species of conservation concern is the Philippine cockatoo, which can be found with a possibly viable population in the mangroves and forest remnants of Dumaran Island, but apparently not anymore on the mainland. The last remaining forest patches are therefore of global conservation concern. This notion is supported by the recent records of other globally threatened species, particularly the Philippine forest turtle Siebenrockiella leytensis.

Other species of conservation concern are Palawan hornbill Anthracoceros marchei, Blue-headed racquet-tail Prioniturus platenae and Palawan pencil-tailed tree-mouse Chiropodomys calamianensis. A yet unidentified shrew species has been caught in one of the last forest patches.

Page 18: Technical Progress Report - philippinecockatoo.org and articles... · Municipal Government of Rizal, Palawan, ... EXECUTIVE SUMMARY ... PCCP Technical Progress Report 2006

PCCP Technical Progress Report

June - Dec 2006 p.18

Main forms of land use nowadays is upland and slash-and-burn agriculture (‘kaingin’), which is still widespread on the island and affects more and more forested areas on steeper slopes on the mainland. Larger parts of the island are covered by grass-and shrub land and dense stands of bamboo as consequence of this practice. Due to lack of water, irrigation systems and level areas, lowland rice cultivation is very restricted. Permanent forms of cultivation are coconut and cashew plantations. Forest and grass fires are common, particularly during the dry season. Fire is not only used to clear areas for cultivation, but also to further growth of fresh grass for pastures. There is a severe shortage of timber and firewood and consequently illegal logging is widespread.

PCCP currently manages three areas on the island: Omoi and Manambaling Cockatoo Reserves (Fig.3) and the traditional roosting site in Lagan.

Culasian Managed Resource Protected Area (CMRPA), Rizal, Palawan

The PA is located in the southern portion of Palawan Island in the municipality of Rizal. It is situated in the coastal plain facing the South China Sea, between the coordinates 8°52’ to 8°47’ N and 117°27’ to 117°31’ E. The PA comprises 1,954 has. with an additional 300 ha. included if the proposal for the protection of a nearby wetland will be approved.

Detailed geological maps for the area are unavailable. General information of the area is derived from the Geological map of the Philippines (Bureau of Mines 1981). Underlying rocks mainly consist of Oligocene, Miocene and Pliocene marine clastics with single limestone reefs of probably the same age. Coves, mangrove flats and estuaries are characterized by Pleistocene alluvial, fluvial and beach deposits, as well as raised coral reefs. Predominating soil types in the area are Sibul clay and Tagburos clay (Anon. s.a.). The former is mostly restricted to the coastal plains and derived from limestone. It is black and plastic, becoming compact when drying up. Tagburos clay is typical in rolling to hilly terrain. It is dark brown and rich in organic matter. The fine texture of this kind of soil prevents water percolation and results in extensive surface run-off during extended periods of precipitation.

CMRPA ranges from sea level to about 140 m a.s.l. south of Culasian proper. The terrain is flat in the narrow coastal area, and rolling to moderately steep in the remaining portions. The two largest forest areas persist north of the highway near Tagbalogo on an isolated moderately steep hill reaching 120 m a.s.l. and a highly fragmented rolling forest area south of the highway from ca. 20 to 140 m a.s.l. near Darapiton, Malutoc, Balingasag and Tuburon.

Two permanent rivers mark the periphery of CMRPA: Culasian River in the north and Arapitan River in the south. Smaller ephemeral creeks and stagnant water bodies can be found inside the area.

The major terrestrial ecosystem in the proposed PA is lowland dipterocarp forest. Unlike most forests in Palawan, canopy heights are very high, often thirty to forty meters, with “apitong” Dipterocarpus grandiflorus, “manggis”’ Koompassia excelsa being the most conspicuous emergent tree species. Other emergents are for example Dipterocarpus gracilis, Dipterocarpus hasselti, Intsia bijuga and Koordersiodendron pinnatum.

Due to security reasons the floral composition of the mangrove area could not be assessed, but Rhizophora spp. and Sonneratia spp. seem to be common. Narrow tidal flats are exposed during low tide, particularly in the estuaries of the two larger rivers.

Level areas are dominated by permanent cultivation, mostly irrigated and rainfed rice paddies, permanent cultivation like coconut and pastures. Patches of shrub- and grassland exist particularly along the National Highway. Shifting cultivation is also most common along the roads, but can frequently be found isolated in forested areas, often on steep slopes.

Page 19: Technical Progress Report - philippinecockatoo.org and articles... · Municipal Government of Rizal, Palawan, ... EXECUTIVE SUMMARY ... PCCP Technical Progress Report 2006

PCCP Technical Progress Report

June - Dec 2006 p.19

Emergent “manggis” and “apitong”, isolated in cultivated areas, indicate nest sites of parrots or hill mynas which are ‘owned’ by a poacher, and therefore were not cut during the area was cultivated.

To date, 133 bird species have been recorded within the proposed CMRPA. Among these are six globally threatened and six near-threatened species (IUCN 2006). Of outstanding conservation concern are particularly the larger tree cavity nesters, like Palawan hornbill Anthracoceros marchei, all three parrot species of Palawan, Philippine cockatoo Cacatua haematuropygia, blue-naped parrot Tanygnathus lucionensis and blue-headed racquet-tail Prioniturus platenae.

Fig 4. Vegetation, land use and boundaries of Culasian Managed Resource Protected Area, Rizal, Palawan.

Patnanungan, Polillo group of islands, Quezon

The Polillo group of islands in Quezon is possibly the last area containing a population of the critically endangered Philippine cockatoo Cacatua haematuropygia, or ‘Kalangay’ as known locally, in the Luzon faunal region (Gonzalez 1997, Collar et al. 1999, Widmann 2001).

Patnanungan Island is mainly covered with secondary vegetation often interspersed with coconuts. The narrow coastal plains in the south and the more extensive ones in the north are transformed into irrigated rice paddies whenever permanent water-flows could be tapped, Higher terrain was transformed into coconut plantations and exceptionally into grassland, due to repeated burning.

Forests, particularly in the northern and central portion of the island, are frequently transformed into slash-and-burn fields. The small diameter classes of cut trees indicate that rotational periods might be shorter than fifteen years. Principal crops planted are corn, cassava, banana and papaya.

Page 20: Technical Progress Report - philippinecockatoo.org and articles... · Municipal Government of Rizal, Palawan, ... EXECUTIVE SUMMARY ... PCCP Technical Progress Report 2006

PCCP Technical Progress Report

June - Dec 2006 p.20

Mangrove exists in protected coves in the north, with representatives of the genera Bruiguiera. Rhizophora, Sonneratia, Avicennia, Ceriops, Nypa fruticans, Heritiera littoralis, among others.

Cockatoos persist in very low numbers. No recent observation contained more than two birds at a time. Habitat is seriously degraded and lack of nest trees might be a limiting factor. Poaching for the pet trade is still ongoing, due to insufficient law enforcement, particularly in remote areas.

Fig 5. Vegetation and land use of Patnanungan Island (Hampson et al., 2002). Light green: coconut, dark green: forest, blue: mangrove, orange ricefield, light orange: cornfield, olive: grassland, grey: settlement

Methodologies

Information on the biology and ecology of the cockatoo is gathered through direct observation. On Rasa and Dumaran, movements of the cockatoos can be best observed from a boat, from beaches or coral outcrops. Very dense vegetation on the island considerably hampers visibility on transect walks or point counts.

Monitoring of the population trend on Rasa and Dumaran is done through counting individuals at a traditional roosting site, which is situated in a mangrove area and can be overlooked from a boat. Counts are conducted monthly before sunset on Rasa and daily on Dumaran. Exceptionally, counts are also conducted during dawn before birds leave the roosting site. Whenever possible, counts on Rasa are conducted under similar weather and light conditions. No roosting sites are known from Culasian and Patnanungan.

The core components of all project sites are wardening schemes, usually employing former poachers. Wardens inspect the nest trees starting end of September. During the breeding season, the nest trees are under permanent surveillance. Trees are climbed and nest holes controlled every ten days during that time. For safety reasons, dead or damaged trees are not climbed. Nest trees are characterized through species identification, tree height, diameter at breast height (DBH), height of nest hole, exposition of nest hole, diameter of hole,

Page 21: Technical Progress Report - philippinecockatoo.org and articles... · Municipal Government of Rizal, Palawan, ... EXECUTIVE SUMMARY ... PCCP Technical Progress Report 2006

PCCP Technical Progress Report

June - Dec 2006 p.21

diameter at base and depth of cavity. The geographic location of each nest tree is taken with the help of a GPS and marked in a map.

Presence or absence and condition of adult birds, eggs, nestlings or nest predators are noted. Nestlings are weighed with Pesola spring balances and banded with aluminum rings bearing the inscription of the Department of Environment and Natural Resources (DENR), and number (e.g. DENR 0030-06).

Volunteers are detailed in monitoring stations at the mainland coasts of Narra within and outside the breeding season. These volunteers record all sightings of cockatoos and other significant wildlife in the area of assignment. Radio telemetry was employed in 2006 to gather data on dispersal and mortality of fledglings from Narra.

Surveys in unknown areas are based on historical sources or recent information. To initially narrow down the searches, non-formal interviews with key informants (poachers, other forest users, barangay officials, school teachers) are conducted. Surveys aim to identify remnant cockatoo populations or areas which are suitable for translocation.

Herbarium collections are made of key plants in cockatoo habitats, particularly food-providing plants, nest and roost trees. The physical structures of cockatoo breeding habitats are characterized through forest profiles. Phenological information on fruiting and flowering of food-providing trees are systematically collected on Rasa.

Restoration of mangrove is conducted on Rasa through transplanting of nursery grown trees. Experimental restoration of lowland forest habitat is done in on Dumaran. Particularly nest- and food-providing plants for cockatoos are systematically tested for their suitability for reforestation.

Composition of remaining bird communities in project and survey sites is assessed using MacKinnon-Lists and, occasionally, mist-netting. Composition of mammal, reptile and amphibian communities in project sites is assessed through direct observations, mist- and harp-netting, live-trapping (Sherman type and locally-made cage type) and pitfall trapping.

To identify potential cooperators for the projects, livelihood needs, and capacities, stakeholder and SWOT analyses are employed. Participatory planning is done through goal-oriented project planning methodology. Alternative livelihood is provided for key-stakeholders of the cockatoo and the PAs, based on the needs assessments.

Conservation education activities employ the PRIDE approach which uses marketing methodologies to galvanize community support for conservation. This uses the Philippine cockatoo as flagship species in order to cultivate and promote pride among local partners. Proven marketing vehicles like billboards, posters, fact sheets, puppet shows, school and community visits, festivals and media participation are used to deliver relevant and compelling conservation messages.

Page 22: Technical Progress Report - philippinecockatoo.org and articles... · Municipal Government of Rizal, Palawan, ... EXECUTIVE SUMMARY ... PCCP Technical Progress Report 2006

PCCP Technical Progress Report

June - Dec 2006 p.22

ACHIEVEMENTS AND RESULTS

Output 1: Stabilization of the cockatoo population in Rasa Island, Palawan, through co-management of the protected area

Wardening scheme

Eight deputized wardens (Regional Special Order No. 011 series of 2006) successfully guarded this year’ breeding season.

So far this is the best breeding season ever! A total of 39 hatchlings were banded yet 37 successfully fledged. Please see Output 4 for more details. In August, assessment of the recent breeding season was conducted. Problems and issues which confronted the wardens while on duty during the whole breeding season were thoroughly discussed. Potential problems were also taken up and activities were outlined to prepare for the next season.

The recruitment of two additional Tagbanua climbers greatly helped this breeding season.

Very limited activities were notably done on the island even among claimants. Probably this is because of the opportunities brought by the mining activity on mainland Narra. However, a fish corral established within the perimeters of Rasa Island Wildlife Sanctuary (RIWS), was reported by wardens in late June. This was dismantled in September based on mutual agreement between the owner and the PAMB.

In preparation for the next breeding season, wardens monitored existing and potential nest trees of occupation and breeding opportunities. One dead nest tree fell in December. Ten new potential nests vulnerable to predators e.g. monitors were flashed with iron sheets. There has been no significant observation on occupation with the artificial nest boxes installed on Rasa.

Further, Executive Order No. 11, series of 2006 was signed on Dec. 28, 2006 by Mayor Demaala of Narra deputizing the PCCP local volunteers as wildlife wardens.

Malunggay planting (ca. 100 malunggay) was done in two of the claimed areas with consent of the owners. Mangrove monitoring and replacement of dead ones was continuously done.

Wardens were also active in the initial activities at the Katala Institute for Ecology and Biodiversity Conservation (KIEBC) e.g. preparation of a tree nursery. They assisted as well in tagging one green turtle stranded on Bgy. Antipuluan coasts in October.

A summary of resource utilization data collected from people entering and exiting Rasa is now available. Between March to December 2006 (45 respondents), the peak season for resource collection on Rasa is after the breeding season (July-September). Most resources collected were: Kuray or crab (40%), sea cucumber (17.8%), honey (11.1%), copra (11.1%), coconut fruits for copra processing (4.4%), fish (2.2%) and bagongon or shells (2.2.%).

Capacity building of Protected Area Management Board (PAMB) of RIWS and other key stakeholders

The PAMB had been instrumental in the operations of the PCCP at Narra. Along with the active cooperation of the CENR Office, issues are acted upon and resolved considerably.

Two regular meetings were conducted within the reporting period. On August 28, 2006, Department of Environment and Natural Resources (DENR) Region 4-B Executive Director, Dir. Vicente S. Paragas presided the 3rd PAMB regular meeting. It was his first to preside the meeting and this was very well attended

Page 23: Technical Progress Report - philippinecockatoo.org and articles... · Municipal Government of Rizal, Palawan, ... EXECUTIVE SUMMARY ... PCCP Technical Progress Report 2006

PCCP Technical Progress Report

June - Dec 2006 p.23

with the Municipal Mayor and a full force from DENR provincial and CENR offices. Among the matters taken were: a) co-chairmanship of Mayor Demaala to the PAMB; b) DENR through the Regional Office will help facilitate discussions with PCSD on the issue of chairmanship; c) manual of operations shall be submitted to Regional Office for legal refinement; d) installation of the Biodiversity Monitoring System (BMS).

The last quarter meeting in December highlighted the following issues: a) designation of Mr. Emmanuel Alfaro as Protected Area Superintendent (PASu) for RIWS through DENR Regional Special Order No. 06-251; b) approval of the breeding season workplan; c) creation of the committee to draft the management plan and d) clearances secured by PCCP for the next two year project implementation.

KFI actively supports the reactivation of the Narra Environmental Board (NEB). Likewise, the initiatives of other key stakeholders e.g. Bgy. Panacan in coming up with a Management Plan for their fish sanctuary and demarcation of sites. This was done in cooperation with the Environmental Legal Assistance Center (ELAC) and the Municipal Agriculture Office (MAO).

Conservation education (CE)

Focus group discussions were conducted in coastal barangays adjacent to Rasa. In Brgys. Antipuluan and Panacan, KF attended regular sessions to expound on importance of RIWS as protected area (Table 1).

Meanwhile, our contract with the local radio station (RN) has ended in June.

Alternative Livelihood

Agricultural Farming Project functions effectively with 22 beneficiaries to date on its 6th cycle. The group’s bookkeeper’s service is paid already from its income.

Ecotourism

There were two prominent visitors within the reporting period, both taking footages of Rasa and the cockatoos for their 2007 calendar projects. Mr. George Tapan, renowned photographer in the Philippines, represented Air Philippines, a local airline and the team from the Philippine National Oil Company (PNOC).

Regional Technical Director Galleon of DENR-Region 4-B visited Rasa Island in November along with other DENR staff from the province and CENRO.

Other visitors include professors from the University of Santo Tomas, Manila with 12 German students for field exposure.

Constraints and measures taken

• The conduct of an assessment of the recent breeding season is always productive. Problems on nest holes, hatchlings and anything that affects the cockatoos are thoroughly analyzed. Options were discussed to arrest similar problems to occur in the next breeding season.

• Apparently, the Municipal Fisheries and Aquatic Resources Management Committee (MFARMC) through Mr. Acalyan issued a certification to Mr. Reci to establish the said fish corral despite its location is within the boundaries of the RIWS. Through the PAMB the operation of the fish corral was dismantled on 15th September 2006.

• The attendance of RED Paragas as presiding officer during the PAMB’s regular meeting was encouraging especially on the decision of retaining the Municipal Mayor of Narra as co-chair of the PAMB. Having a local-based head of the PAMB is

Page 24: Technical Progress Report - philippinecockatoo.org and articles... · Municipal Government of Rizal, Palawan, ... EXECUTIVE SUMMARY ... PCCP Technical Progress Report 2006

PCCP Technical Progress Report

June - Dec 2006 p.24

of greater advantage for the operations of the PA.

• It is hoped though that, since most of the agenda taken during the said PAMB meeting were held in further consultation and referral to regional office of DENR, matters are given priority by the regional office.

• Deputation for wardens from DENR is still pending because of suspension of the process, however Regional office requested for exemption for the cases of PCCP sites.

Output 2. Legal and actual conservation of cockatoos and their habitats in Dumaran Island, Palawan.

Wardening scheme

An illegal cutting activity inside the Omoi Cockatoo Reserve was reported by wardens in June. This was reported to the local DENR office and the police. Investigations were carried and the case is now filed at the Prosecutor’s office in Puerto Princesa City.

Wardens on patrol had verified a possible roosting site in a mangrove area in Bgy. Bohol. However, its proximity to the human settlements might have an impact to the number of roosting birds. Continuous monitoring is being conducted to ascertain the roost site.

Breeding assessment meeting was also conducted to address issues and problems during the season.

Conservation education

The Municipality of Dumaran participated during the Baragatan Festival in Puerto Princesa in June. All municipal officials dressed like Philippine cockatoos paraded and presented a five-minute performance which was contested among municipalities within the province.

Baragatan Festival is celebrated yearly in June with the Provincial Government as major convenor/organizer.

Fig. 6. Dumaran contingent lead by Mayor Aurello during the Baragatan Festival 2007 in PPC. © MPDO, Dumaran

“Kataly”, KF’s official mascot joined the festivities with the municipality’s version of a Philippine cockatoo mascot. This was very well liked by children and adults.

Fig. 7. “Kataly” the official KF mascot joined another Katala mascot during the Baragatan Festival. © MPDO, Dumaran

Kalabukay Festival

The yearly joint celebration of the Kalabukay Festival and Dumaran’s Founding Anniversary took off on June 14. Activities included seminar on Leadership Skills (for youth), lectures, face painting, tree planting, puppet show and an environmental singing contest.

Page 25: Technical Progress Report - philippinecockatoo.org and articles... · Municipal Government of Rizal, Palawan, ... EXECUTIVE SUMMARY ... PCCP Technical Progress Report 2006

PCCP Technical Progress Report

June - Dec 2006 p.25

Fig. 8. Youth leaders in Dumaran actively participated during lectures. © IDLWidmann

At the Katala Environmental Education Center (KEEC), a total of 306 students visited the library within the reporting period while about pupils from Grades four to six were reached by lectures at the Dumaran Central School.

Legal protection of Omoi Cockatoo Reserve

Since the local declaration of the two protected areas in Dumaran, a Local Protected Area Management Committee (LPAMC) was created through municipal ordinance.

The first LPAMC meeting was conducted in August in full attendance. Mayor Aurello presided the said meeting. Peter and Indira presented scientific project results and the results of the pride campaign conducted in the last two years.

Among the highlights of the 1st LPAMC meeting were:

• Orientation on the roles and functions of the LPAMC;

• Designation of official designates to the committee; and

• Creation of the Technical Working Group.

• Introduction of Dr. Schoppe as Co-Program Manager for PCCP 2007-2008.

Considering the small size of the two protected areas, KF proposed for a buffer zone that could potentially be declared as critical habitat under RA 9147 or the Wildlife Act. This proposal could also ensure that forest fragments are retained as such before they are converted alienable and disposable (A & D) by DENR. KFI assisted personnel from the NAMRIA – Manila who conducted ground surveys on Dumaran Island in connection with the municipality’s application for converting timberland into A & D lands for titling.

Monthly meeting of the technical working group of the LPAMC is conducted to assess issues and take actions.

Capacity building

A monitoring visit on the Watershed Project was conducted by PWidmann and SSchoppe. It is very early to assess this municipality-initiated project; however, it is perceptible that technical backstopping on selection of tree species for planting and timing of planting is needed.

KFI Field Officer participated during the Environmentally Critical Areas Network (ECAN) zonal workshop conducted at Bgy. San Juan.

In October, KFI wardens participated in the barangay-wide tree planting activity in Bgy. Sto. Tomas. Seedlings used were from the nursery propagated by wardens and planted at the buffer zone of the Omoi Cockatoo Reserve.

Page 26: Technical Progress Report - philippinecockatoo.org and articles... · Municipal Government of Rizal, Palawan, ... EXECUTIVE SUMMARY ... PCCP Technical Progress Report 2006

PCCP Technical Progress Report

June - Dec 2006 p.26

Fig. 9. Map showing the proposed critical habitat connecting the two locally declared protected areas in Dumaran.

Constraints and measures taken

• The case filed and initiated by local DENR against illegal cutters is one big step ahead. It is hoped that filing the case could somehow serve as a deterrent to similar actions. KFI’s legal counsel is persistently pursuing the case.

• There are still occasional reports on cuttings but there seems to be some political complexity involved in the process.

• The activation of the LPAMC as management and decision making body for the two protected areas is hoped to achieve more milestones in the future provided the committee is

guided on the premise of conservation.

• The proposal for a critical habitat declaration under the Wildlife Act has yet to undergo deliberations. But if approved, this most likely could save a number of standing trees outside the PA which are potential nest trees for the cockatoos and other threatened species. The forest patches are so fragmented that a buffer zone is crucial.

Page 27: Technical Progress Report - philippinecockatoo.org and articles... · Municipal Government of Rizal, Palawan, ... EXECUTIVE SUMMARY ... PCCP Technical Progress Report 2006

PCCP Technical Progress Report

June - Dec 2006 p.27

Table 1. Information-Education-Communication campaigns, Narra, Rizal, Dumaran, Palawan, Philippines, June – December 2006

Date Activities Conducted Location Audience/Persons Attended

06/05/06 Radio guesting on program “Good Morning Narra“ re: World Environment Day celebration

Radyo Natin, Narra All radio listeners

06/05/06 Biodiversity conservation lecture, film showing, environmental games and distribution of EE materials

Bugtong station, Antipuluan

Residents, children Estd. 10 adults and 15 children

06/05/06 Biodiversity conservation lecture, film showing and distribution of EE materials

Matatag II, Panacan, Narra

Residents, estd. 50 adults

06/08/06 Resource mapping and group discussion with claimants and stakeholders of CMRPA

Culasian, Rizal Estd. 25 adults

06/14/06 “Katala at Buhay Kalikasan” radio program re: project progress and future activities

Radio Natin 96.7, Narra

All radio listeners

06/17/06 Katala Fun Day during Dumaran Kalabukay Festival: envi. games, lectures, puppet show, mascot show, film showing, singing contest

Dumaran, Palawan Residents: adults and children

06/17/06 Assisted and guided WPU graduate students and professor during visit and interaction with mainland volunteers and visit to roosting site

Rasa Island and mainland Narra

WPU graduate students and professor

06/18-23/06 Attendance and presentation to Zookeepers Association (ZAP) of the Philippines workshop

SBMA, Olongapo City

ZAP members

07/05/06 “Katala at Buhay Kalikasan” radio program re: wildlife trading and tourism scheme at Rasa

Radyo Natin, Narra All radio listeners

07/19/06 “Katala at Buhay Kalikasan” radio program Radyo Natin, Narra All radio listeners 07/26/06 Last broadcast of “Katala at Buhay Kalikasan” radio

program re: acknowledgement and reminders Radyo Natin, Narra All radio listeners

07/30/06 Distribution of EE materials to different barangay representatives during culmination activity of nutrition month

RVM Gym, Narra Different barangay representatives

08/02/06 Attendance to Bgy. Panacan Council´s session re: presentation of Rasa Island Wildlife Sanctuary

Bgy. Panacan Hall, Narra

Sangguniang Barangay of Panacan

08/21/06 Attendance to Bgy. Antipuluan Council´s session re: PIC for KIEBC center

Bgy. Antipuluan Hall, Narra

Sangguniang Barangay of Antipuluan

08/30/06 Attendance to CI Public Consultation and presentation of CMRPA

So. Darapiton, Panalingaan and So. Proper, Culasian

Residents and stakeholders

09/04/06 Presentation to Bgy. Culasian Council re: PCCP 6th

Phase extension project

Bgy. Culasian, Rizal

Sangguniang Barangay, Culasian

09/06/06 Presentation of PCCP 6th

Phase proposal to Panacan and Sangguniang Bayan Councils

Bgy. Panacan & Mun. Hall, Narra

SB Councils

09/07/06 Attendance to Bgy. Antipuluan session re: presentation of PCCP 6

th Phase proposal

Bgy. Antipuluan, Narra

SB Council

09/22-23/06 Participation to 2nd

Philippine Bird Festival: environmental lecture, games, mascot appearance, distribution of IEC materials

Crossroad 77, Quezon City

Different GO and NGO, students and teachers from different schools

09/29/06 School visit at Palawan State University, NCCRD: Celebration of Science Month re: message for biodiversity conservation

PSU-NCCRD, Narra

Students and teachers

09/29/06 Facilitate mascot appearance during Barangay Antipuluan Fiesta

Bgy. Antipuluan, Narra

Barangay officials and locals

10/09/07 Orientation to students from Western Philippines University re: information on RIWS

PCCP Office, Narra WPU students

10/19/07 Seeds of Life Exhibit Kamarikutan Galeri, PPC

Invited KF and Kamarikutan visitors

Page 28: Technical Progress Report - philippinecockatoo.org and articles... · Municipal Government of Rizal, Palawan, ... EXECUTIVE SUMMARY ... PCCP Technical Progress Report 2006

PCCP Technical Progress Report

June - Dec 2006 p.28

Date Activities Conducted Location Audience/Persons Attended

10/19/06 Press release re: Seeds of Life exhibit www.philippinecockatoo.org

Website visitors

10/27-28/06 Environmental exhibits and games in celebration of Narra Palay Festival

Gymnasium grounds, Narra

General public

11/24/06 Presentation of Philippine Cockatoo Translocation Project

Lagen Island, El Nido

Lagen Island staff, board and visitors

11/29-30/06 Presentation of Philippine Cockatoo Translocation Project during Stakeholders meeting

PASu Office, El Nido

PCTP stakeholders

11/30/06 IEC to Potter’s Place School pupils: lecture, mascot appearance, face painting

Covered Court, El Nido

Potter´s Place pupils and teachers

11/30-12/01/06

Participation to Kulambo Festival re: mascot appearance, environmental games and trivia, face painting, distribution of IEC materials, parade and exhibits

Covered Court, El Nido

General public

12/05-6/06 Lecture and distribution of IEC materials New & Old Culasian Elem. School, Culasian; Candawaga & Sicud Elem. Schools, Candawaga; Rizal

Students and teachers

06-12/06 Lectures at KEEC and school visits Dumaran Elementary pupils at Dumaran Central School

Output 3. Continuation of nest-protection scheme in Rizal, Palawan in 2006, after termination of CEPF funding (funding from CEPF requested for 2005)

Nest protection scheme

A total of 81 of the mapped nest trees were occupied in the 2006 breeding season, mostly by hill mynas (13 nests) and blue-naped parrots (65). Three nest holes were occupied with Palawan hornbills.

Despite cockatoos were observed checking out potential nest holes and cutting twigs in the vicinity, no breeding was recorded this year in the PA. A suspected breeding attempt was reported by wardens however observed a pair around a nest hole which later on got flooded. Upon inspection cockatoo feathers were found inside and a rotten smell was recognized.

However, one breeding pair was reported from a neighbouring barangay. When it was checked by PCCP staff, the nestlings were poached already. The poacher near the nest tree has been identified and is now recruited as volunteer to monitor breeding in 2007. Bgy. Ransang officials had been supportive in the attempts of the KFI to protect this known nest tree which is regularly poached.

In July, the barangay resolution declaring the Culasian Managed Resource Protected Area was adopted at the municipal level under Municipal Resolution No. 2006-30, making it the first protected area in the municipality.

Discussions and GPS demarcation of the adjacent Candawaga Wetland Reserve have been conducted with claimants and barangay officials. It was agreed that the declaration of the area should be pursued as early as possible. There are increasingly interesting bird sightings in the said area.

Page 29: Technical Progress Report - philippinecockatoo.org and articles... · Municipal Government of Rizal, Palawan, ... EXECUTIVE SUMMARY ... PCCP Technical Progress Report 2006

PCCP Technical Progress Report

June - Dec 2006 p.29

Wardens’ daily reports are consolidated (in process). In October, wardens reported mangrove tan barking in Culasian. Consequently, a resolution seeking assistance from concerned agencies and organizations was approved by the barangay council. In two separate occasions, wardens reported illegal cutting of Dipterocarps within the protected area. These were all reported to immediate concerned agencies particularly the barangay captain.

Meanwhile, nesting tree characterization has been completed in December (Annex 1).

Deputation of wildlife wardens was secured through Executive Order No. 10 signed by the municipal mayor on Dec. 29, 2006.

Capacity building for local decision-makers and law-enforcers facilitated

The 1st regular meeting of the Local Protected Area Management Committee (LPAMC) discussed the following agenda:

• Presentation of initial results of the SPAPI project to local counterparts;

• Orientation on the LPAMC’s roles and functions;

• Creation of Technical Working Group; and

• Presentation on Fundraising and Proposal Writing.

Highlights of the 2nd regular meeting in December were:

• Adoption by the municipal council of barangay resolution creating the CMRPA;

• Executive Order deputizing the wardens;

• Endorsement of PCCP in compliance to SEP clearance application; and

• Report on confiscation compiled by the PCCP.

A survey was conducted among residents within the Culasian Managed Resource Protected Area (CMRPA) to determine basic profiles. Resource mapping within the CMRPA was held with residents actively participating in the activity.

Fig. 10. Resource mapping with stakeholders of the PA. © R. Cruz

Aside from monitoring the PA itself, also illegal wildlife trade operations are monitored, and, if possible, apprehended. The largest shipment of birds confiscated originated from Rizal (outside of the PA!) consisted of 140 hill mynas and 63 blue-naped parrots, which were destined for Manila.

The illegal wildlife trade operation which involved the species in Fig. 11 was seized through the collaborative efforts of the KFI and the Criminal Investigation and Detection Group (CIDG) of the PNP. KFI organized the raid after confirming with local informants. Confiscated wildlife was then turned over to the Palawan Wildlife Rescue and Conservation Center (PWRCC).

Page 30: Technical Progress Report - philippinecockatoo.org and articles... · Municipal Government of Rizal, Palawan, ... EXECUTIVE SUMMARY ... PCCP Technical Progress Report 2006

PCCP Technical Progress Report

June - Dec 2006 p.30

Fig. 11. Tens of Hill myna, 2 white bellied sea eagles and 1 Philippine cockatoo were seized in September during a raid at a suspected illegal wildlife trader’s house from Rizal, southern Palawan. © DVvanden Beukel

On another case, 4 hill mynas and 1 cockatoo believed to have originated from the south were confiscated at El Nido. After securing transport permits, KFI staff facilitated turn over of said confiscated wildlife to PWRCC.

A compilation of all confiscated wildlife from 1998-2006 and interviews with illegal wildlife traders is initiated by KFI through the Southern Palawan Anti-Poaching Initiative (SPAPI). Data on traded wildlife species in Palawan including their market value, modes of transport and trade routes are included and will be presented during the Wildlife Conservation Society of the Philippines (WCSP) Annual Conference in April 2007.

Basic literacy initiatives have started to capacitate local partners e.g. wardens particularly on law enforcement.

The nest protection scheme provides incentives to wardens. In addition, small - scale grocery has been operated by wardens to supply basic goods and necessities. The modest capital of five thousand pesos (ca. 100 US$) was provided by the project and it has now circulated in two cycles.

Conservation education

Post project survey suggests remarkable results of the CE campaign in Rizal and potentially could impact positively on the general conservation efforts.

Remarkable results include the following:

Peoples’ perception on importance of wildlife trade issue. Results suggested a 50% points increase (up from 21% in pre project survey) of the general public who said it is very important.

People’s perception on hunting threatening wildlife. A 16% points decrease (down from 17% in pre project survey) who said they “don’t know” when asked if hunting is threatening wildlife.

38% points decrease of the general public said (down from 59% in pre project survey) they have not heard about the Wildlife Act.

Self-reported behaviour. 36% points decrease (down from 50% in pre project survey) of general public who said they have not done anything to prevent hunting/poaching in their place in the past 6 months.

26% points increase (up from 62%) of the general public have cited correct reasons why we have to protect wildlife from hunting/poaching.

Page 31: Technical Progress Report - philippinecockatoo.org and articles... · Municipal Government of Rizal, Palawan, ... EXECUTIVE SUMMARY ... PCCP Technical Progress Report 2006

PCCP Technical Progress Report

June - Dec 2006 p.31

School and community visits, focus group discussions and festival celebrations contributed to these remarkable results.

In total 7 and 8 school and community visits respectively were conducted within the reporting period. This involves two barangays adjacent to target area, Culasian. Apart from these, barangay health workers were also involved in the CE activities. Thanks to the assistance from Hon. Zubiri who donated considerable amount to conduct three-month feeding program for children in target sites. During these feeding activities, interactive lectures on conservation were conducted.

CEPF monitoring visit

In November, a team from the Critical Ecosystems Partnership Fund (CEPF) conducted a monitoring visit for the SPAPI. The KFI was invited to submit a follow up proposal for a year extension of the SPAPI which was approved until June 2007.

Constraints and measures taken

• Despite involving the Philippine Armed Forces, the armed poacher band reported by the wardens is still at large. Since the members are considered dangerous, wardens and staff were advised to avoid areas of their activities.

• Illegal activities in Culasian prevail because of lack of political will. No immediate action is provided for instance in cases where necessary. Wardens lose morale upon knowing that some government officials are involved in these activities.

• Deputation of wildlife wardens from DENR is pending due to suspension of issuance by national order; however exemption is requested. It took

some time to secure relevant documents e.g. birth certificates of wardens because of unavailability of records at the municipal office especially that they are indigenous peoples.

Output 4. Research and monitoring on distribution, habitat requirements and restoration, breeding and feeding ecology and publication of results.

Comprehensive floral inventories in Rasa and Dumaran initiated and phenological research continued

Floral inventory of Rasa is still ongoing and the first pictorial documentary was submitted by the researchers from Western Philippines University (WPU). After completion of Rasa’s inventory, researchers from WPU will conduct inventories in other project sites.

Systematic testing of propagation and performance of cockatoo-relevant plant species for habitat restoration conducted

Performance of trees planted in the experimental plots were routinely measured during the reporting period.

A total of 1,964 seedlings are propagated in the nursery in Dumaran as of November 2006 with 16 species. Five tree species were directly planted in the buffer zone of the Omoi Cockatoo Reserve and continuously monitored.

PCCP-supported reforestation conducted by the Municipality of Dumaran was visited. Seedlings were freshly planted and available planting material was limited. Further backstopping of the activity was requested.

Cockatoo population and nest monitoring in project sites continued

Page 32: Technical Progress Report - philippinecockatoo.org and articles... · Municipal Government of Rizal, Palawan, ... EXECUTIVE SUMMARY ... PCCP Technical Progress Report 2006

PCCP Technical Progress Report

June - Dec 2006 p.32

Rasa

This year’s breeding season was the most productive since the project started in 1998. A total of 39 birds hatched of which 37 fledged successfully (Table 2).

Due to sufficient rain, food supply on Rasa was abundant over the entire breeding season, so that the losses of last year’s breeding failure could be more than compensated.

The good fledging success is also reflected in the counts at the traditional roosting site, which reached 130 cockatoos in August. This is the highest number recorded since start of the project (Annex 2).

Numbers of cockatoos foraging on the mainland were fluctuating widely in the reporting period. Maximum numbers for 2006 are given in Fig. 12.

0

10

20

30

40

50

60

70

80

90

Jan.

06

Feb.

06

Mar.

06

Apr.

06

May.

06

Jun.

06

Jul.

06

Aug.

06

Sep.

06

Oct.

06

Nov.

06

Dec.

06

Month

No

. o

f in

div

idu

als

Fig. 12. Maximum numbers of Philippine cockatoos counted on the mainland opposite Rasa Island on a single day.

Dumaran

The successful breeding season in Dumaran is also reflected in a slight increase of counted cockatoos at the roosting site in Lagan, compared to previous years. In October we recorded the highest count with 27 birds since the start of the project (Figure 13).

The second roosting site lies hidden in a dense mangrove area in Bgy. Bohol at the southern portion of the island. This roosting site was predicted since cockatoo numbers in the original roosting site are fluctuating significantly on a daily basis.

However, mix stands of coconuts within the proximity of the area might pose disturbance to the birds as residents make use of the coconuts.

It is worth to mention that on October 2, 2006, 27 individuals were counted at Lagan roosting area in the morning while another 7 individuals were counted simultaneously at the new roost site in Bohol. This resulted in a total of 34 cockatoos recorded at the same time from Dumaran, the highest number since start of project implementation on site. However, more simultaneous counts have to be conducted.

Page 33: Technical Progress Report - philippinecockatoo.org and articles... · Municipal Government of Rizal, Palawan, ... EXECUTIVE SUMMARY ... PCCP Technical Progress Report 2006

PCCP Technical Progress Report

June - Dec 2006 p.33

0

5

10

15

20

25

30

Jul.0

3

Oct.0

3

Jan.

04

Apr

.04

Jul.0

4

Oct.0

4

Jan.05

Apr

.05

Jul.0

5

Oct.0

5

Jan.06

Apr.0

6

Jul.0

6

Oct. 0

6

Month

No. of in

div

iduals

Maximum Minimum

Fig. 13. Maximum and minimum numbers of Philippine cockatoos counted in the roosting site in Lagan, Dumaran

Rizal

In December, wardens sighted 2 individuals feeding on Bawing-bawing (local name) between 8am to 4pm in Bukana area. More intensive monitoring on cockatoo nest trees is implemented in the area. Please refer to Output 4.

Polillo

Although monitoring remains difficult (due to non-existence of roosting sites), cockatoo records are in the increase. This is partly due to increased sampling efforts by the wardens. Regular observations are not only made in Patnanungan, but also in Burdeos. Though most observations only include one or two birds, credible secondary information includes records with up to five birds seen simultaneously. Dans (in litt. 05/2006) assumes a slight increase of the overall cockatoo population from six to ten individuals.

Four nest trees have been reported from Patnanungan and one from Burdeos.

An identified nest tree Malaikmo (Celtis philippensis Blanco) in Sitio Inusukan, Bgy. Patnanungan Norte (Site 1) is the only established nest tree so far having observed successful breeding opportunity by the warden in-charge in 2004.

Other potential nest grounds in Patnanungan are shown in Fig. 14. In particular, these are Sitio Biyo, Brgy. Kilugan (Site 2); Bundoks Apitong and Aburut in Sitio Cabangan, Brgy Patnanungan Norte (Site 3-1); Sitio Inusukan, Brgy. Patnanungan Norte (Site 1); Kuluong, Brgy. Patnanungan Norte (Site 3-2) and Tibalao, Poblacion, Brgy. Patnanungan Sur (Site 4). Two to six cockatoos were regularly sighted perching on different species; all identified only by local names (Balutang guinto, Balete, Narra). In sites 2 and 3, two forest patches are suspected to house breeding pairs.

Page 34: Technical Progress Report - philippinecockatoo.org and articles... · Municipal Government of Rizal, Palawan, ... EXECUTIVE SUMMARY ... PCCP Technical Progress Report 2006

PCCP Technical Progress Report

June - Dec 2006 p.34

Table 2. Banded cockatoo hatchlings on Rasa Island, Narra, Palawan as of August 2006.

Nesting Tree No.

No. Banded

Ring No. Date of Ringing

Tail (cm)

Weight (g)

Observations upon ringing and important remarks

36

3 DENR 0001-06 DENR 0002-06 DENR 0003-06

05/11 4.0 5.5 6.6

127 327 292

- healthy, with few foods on crop - healthy, with few foods on crop - healthy, with foods on crop

41

3 DENR 0006-06 DENR 0007-06 DENR 0005-06

05/18 3.0 3.0 5.3

236 261 103

- healthy, with few foods on crop, transmitter installed (05/18) found dead (06/20) - healthy, youngest, with few foods on crop - healthy, eldest, with few foods on crop

3

3 DENR 0008-06 DENR 0009-06 DENR 0010-06

05/18 6.8 5.3 4.0

135 141 295

- healthy, eldest, with few foods on crop - healthy, with few foods on crop - healthy, youngest, with few foods on crop

16

3 DENR 0011-06 DENR 0013-06 DENR 0014-06

05/18 6.5 5.0 4.0

174 186 176

- healthy, eldest, with few foods on crop - healthy, with few foods on crop - healthy, youngest, with few foods on crop

38

2 DENR 0015-06 DENR 0016-06

05/24 3.5 3.5

106 305

- healthy, young, with few foods on crop - healthy, old, with few foods on crop; transmitter installed (06/05)

21 t

3 DENR 0017-06 DENR 0018-06 DENR 0019-06

05/24 5.0 3.0 2.1

103 101 306

- healthy, eldest, with few foods on crop - healthy, with few foods on crop; died for unknown cause (06/05) - healthy, youngest, with few foods on crop; transmitter installed (06/05)

07

3 DENR 0020-06 DENR 0023-06 DENR 0040-06

05/26 -do-

05/31

3.5 none 5.5

306 272 330

- healthy, young, with few foods on crop - healthy, old, with few foods on crop - healthy, with foods on crop

06

3 DENR 0024-06 DENR 0025-06 DENR 0027-06

05/26

8.3 7.0 4.5

95 147 284

- healthy, eldest, no food on crop - healthy, with few foods on crop - healthy, youngest, with few foods on crop

39

1 DENR 0028-06 05/26 1.0 223 - healthy, old, with few foods on crop

37

1 DENR 0029-06 05/26 4.5 351 - healthy, old, with many foods on crop

10 2 DENR 0030-06 DENR 0031-06

05/30 7.5 7.0

352 342

- healthy, with few foods on crop - healthy, with few foods on crop

09 3 DENR 0032-06 DENR 0033-06 DENR 0034-06

05/30 6.2 7.3 6.0

270 312 250

- healthy, with few foods on crop - healthy, with few foods on crop - healthy, with few foods on crop

08 3 DENR 0035-06 DENR 0036-06 DENR 0037-06

05/30 10.5 5.0 9.5

290 305 300

- healthy, with few foods on crop, near to fledge - healthy, with few foods on crop - healthy, with few foods on crop

13 1 DENR 0039-06 05/31 5.1 350 - healthy, with few foods on crop 02 3 04-IV-VI blue

XII-VI red XXI-VI yellow

05/31 2.5 1.5

none

338 308 270

- healthy, with few foods on crop, transmitter installed (06/22) - healthy, with few foods on crop - healthy, crop almost full of foods

23 2 VI XL violet VI XLI orange

07/10 8.3 9.4

316 341

- both healthy and with foods on crop - transmitter for telemetry was placed on hatchling no. VI XL violet

Page 35: Technical Progress Report - philippinecockatoo.org and articles... · Municipal Government of Rizal, Palawan, ... EXECUTIVE SUMMARY ... PCCP Technical Progress Report 2006

PCCP Technical Progress Report

June - Dec 2006 p.35

Fig. 14. Location of potential nest trees in Patnanungan, Polillo Islands (Dans, Sept. 2006).

In Burdeos, apparently a cockatoo was sighted last in April 2006. However, Blue- naped parrots Tanygnathus lucionensis were sighted and occasional occurrence of Philippine hanging parrot Loriculus philippensis observed in Bgy. Carlagan. In Nov. 2006, Prof. JC Gonzalez reported sighting of 1 Blue-naped parrot perching on a taluto Pterocarbium tinctorium.

In Brgy. Bato, Panukulan rice farmers reported 5 Philippine cockatoos flying over fields during harvest on November 2006. The farmers said that it has been years since they have seen Philippine cockatoos. The cockatoo were flying from the watershed to Brgy. Lipata.

In Dec. 2006, 2 Blue-naped parrots were sighted in flying from Lipata forests to Panukulan.

Conservation education campaigns were implemented in the areas by L. Dans along with volunteers. Coordination with municipal officials was done. A film team from the Center for Environmental Awareness and Education (CEAE) visited Patnanungan Island to shoot the cockatoos in the wild.

Site 2-1

Site 2-2

Site 3-1 Site 3-2

Site 4

Site 1

Page 36: Technical Progress Report - philippinecockatoo.org and articles... · Municipal Government of Rizal, Palawan, ... EXECUTIVE SUMMARY ... PCCP Technical Progress Report 2006

PCCP Technical Progress Report

June - Dec 2006 p.36

Fig. 15. Liza Dans gathers children along potential nest sites for birding and conservation education. © CEAE

Research on fledgling dispersal and survival conducted

Four fledglings were tagged with radio-transmitters before fledging and were tracked initially daily and subsequently in three-day intervals throughout the complete reporting period.

After fledging, all four tagged birds remained in close vicinity to the nest trees together with their parents. Only later they were also recorded at the roosting site. This explains why an increase of birds at the roosting site is discernable with a delay of two to three weeks after the majority of birds fledged. During the first weeks after fledging, all tagged birds remained on Rasa (Annex 3), although larger flocks of cockatoos were recorded to forage on the mainland.

On June 20 remnants (mostly plucked feathers) of one of the tagged birds were found on the floor of the coastal forest. It is assumed that the bird has been killed by a raptor, most likely a crested goshawk. The transmitter could be retrieved intact and was attached to one of the nestlings which still were not fledged at that time. So the number of effectively radio-tracked birds is five (Annex 4). Hatchlings were tracked on the mainland only from October to December usually in the morning. Most of them remained on Rasa at different locations.

Fig 16. Radio-tracking from the project boat. © P. Widmann

Papers submitted for publication to relevant journals

Two papers were submitted earlier this year as indicated in the last report.

Several PCCP members are co-authors of a paper by Pain et al. (2006). Impacts of protection on nest take and nesting success of parrots in Africa, Asia and Australasia which was published in ‘Animal Conservation’.

Electronic copies as PDF-files are available on request.

Widmann, P. and IDLWidmann 2006. The Philippine Cockatoo Conservation Program (PCCP) from 2004 to 2006, CEPA Philippine Cockatoo Studbook, September, 2006.

Widmann P, Widmann IDL, Diaz SH, van den Beukel DV, Cruz R. 2006. Potentials and limitations of community-based parrot conservation projects – the example of the Philippine Cockatoo Conservation Program. Proceedings of the 6th International Parrot Convention, Tenerife, Spain.

Page 37: Technical Progress Report - philippinecockatoo.org and articles... · Municipal Government of Rizal, Palawan, ... EXECUTIVE SUMMARY ... PCCP Technical Progress Report 2006

PCCP Technical Progress Report

June - Dec 2006 p.37

Output 5. Cockatoo surveys and assessments of potential translocation sites.

After securing all endorsements from the Provincial Government, Protected Area Management Board of El Nido-Taytay Managed Resource Protected Area, local government of El Nido and 3 barangays in El Nido, the PCSDS has granted SEP clearance for the project.

KF initiated several meetings with projects partners to finalize the initial stages of the translocation project. The Memorandum of Agreement (MOA) among KFI and private partners (Ten Knots Development Corporation, Southeast Asian Airlines, Island Transvoyager Inc., El Nido Foundation) was signed. Meanwhile, another MOA was forged between KFI and the Philippine Association of Wildlife Veterinarians Inc. (PAWVI).

Translocation site facility (pre-release aviary, feeding stations, predator silhouettes, zookeeper’s hut, perches, etc) were put up early November. Fred took charge of this together with Doy and Bernito (wardens) and some resort laborers.

The enumerators’ training was conducted in Nov. 21-22 while the pre-project survey started on Nov. 30. All enumerators were locals from El Nido. Coordination meetings on ground were done by Debbie and Glesselle Indira facilitated meetings with partners from Manila and met Paul Morris on the 22nd of Nov. 2006.

Actual transfer of the birds was successfully done on November 24, 2006 to a pre-release aviary, in close cooperation with all project partners and stakeholders. Rommel and Monico Beleg (warden) helped Dr. Georgii during the actual transfer of the birds from Puerto to El Nido.

Directly involved personnel apart from KFI project staff and Lagen resort staff were:

Paul Morris: zookeeper from Chester Zoo. Vast experiences with birds particularly in the management and release of the critically endangered Echo Parakeet Psittacula eques echo;

Cristina Georgii, DVM: DED (German Development Service) Consultant to NFEFI, Bacolod and founding member of the Zookeepers Association of the Philippines (ZAP);

Mundita Theresa S. Lim, DVM: Director, Protected Areas and Wildlife Bureau (PAWB)-DENR, founding member PAWVI;

Mariglo Laririt, Environmental Manager, Ten Knots Development Corporation;

Emilia Lastica, DVM: Coordinator, Flora and Fauna International-Philippine Program, member of ZAP and PAWVI;

Esteven Toledo, DVM: Curator, Ninoy Aquino Parks and Wildlife Center, PAWB-DENR and member, PAWVI; and

Nielsen Donato, DVM: member PAWVI.

Please refer to the 1st progress report on the translocation project (Annex 5) for more details of activities. Paul Morris stayed on Cove 2 Nov. 24, 2006 to February 18, 2007 and was instrumental to the birds’ training before release i.e. weaning from pellets to natural food items, predator control, anti-predator training. Paul was accompanied in the first 3 weeks by SHDiaz and two wardens from Narra took turns for duty.

A keepers’ workshop was conducted on November 27-28 and a stakeholders planning workshop was conducted on the 29th and 30th. Threats to the translocation project were also discussed during the stakeholders’ workshop. Activity planning (Annex 6) was completed to combat top two identified

Page 38: Technical Progress Report - philippinecockatoo.org and articles... · Municipal Government of Rizal, Palawan, ... EXECUTIVE SUMMARY ... PCCP Technical Progress Report 2006

PCCP Technical Progress Report

June - Dec 2006 p.38

threats: (1) conflict with humans and (2) poaching.

Market survey in Cartimar, Manila

On August 17 an informal market survey on illegally traded wildlife with focus on birds and reptiles was conducted in Cartimar. Aside from a number of blue-naped parrots and hill mynas, also one Philippine cockatoo was for sale.

The bird was not on display, but was produced from storage in the back, upon specific request. The price for the bird which was still immature was given at 25,000 PhP (ca. 500 US$).

Constraints and measures taken

• Securing necessary permits is a long and inconsistent process due to overlapping mandates of PCSD and DENR. Frequent follow-up on procedures is necessary.

• Please refer to attached 1st progress report for more.

Output 6. Preparation for a Biodiversity Conservation Center in Narra.

The development plan of the area was validated and inspected by the Palawan Council for Sustainable Development Staff (PCSDS). After securing all endorsements and other prior informed consent certificates, the SEP clearance was issued by the PCSD. The Initial Environmental Examination (IEE) along with other requirements was submitted to DENR Region IV for review and issuance of the Environmental Compliance Certificate (ECC).

Other potential donors contacted

KF received a grant of 10,000 Euro from the European Association of Zoo and Aquaria Shellshock Turtle and Tortoise Conservation Campaign for the Philippine Freshwater Turtle Conservation Project (PFTCP) which is a

major component of the center. Another grant of 2,500 euro was received from ZGAP for the quarantine area. While Hon. Zubiri (Vice-Chair, Committee on Environment, House of Congress) through its Priority Development Assistance Funds appropriated PhP 300,000 (ca. 6,000 US$) for the center.

Please refer to attached report submitted to ZGAP on progress on the center’s work (Annex 7).

Other highlights

Other remarkable bird records

Palawan hornbill Anthracoceros marchei

Wardens protected three and two nests in Culasian and Dumaran respectively, which were all successful.

Seeds of thirteen species of food-providing plants were collected, which were regurgitated by the sealed-in females. This increases considerably the knowledge on the ecology of this little-known hornbill species. Many of the seeds germinated in the nursery and will in future be included in habitat restoration attempts.

Brown hawk-owl Ninox scutulata

First record for Dumaran. Breeding in nest tree formerly occupied by cockatoos.

Coral Reef and Evaluation Training for stakeholders

The training complements the overall goal of the PCCP in as much as it aims to raise awareness of local stakeholders for the need of continuous monitoring of marine resources and to introduce the participants to the methods that allow laymen to do regular assessments based on which the trainees will be able to evaluate the current status and monitor its development over time.

The training was divided into four modules which were conducted in the span of a year. Varied teaching methods

Page 39: Technical Progress Report - philippinecockatoo.org and articles... · Municipal Government of Rizal, Palawan, ... EXECUTIVE SUMMARY ... PCCP Technical Progress Report 2006

PCCP Technical Progress Report

June - Dec 2006 p.39

employed included lecture-discussion, demonstration, problem solving, film showing, actual drills and reporting methods. Complete report is available upon request.

Mid-year Planning Workshop

PCCP conducted the mid-year planning workshop in August to assess progress of the past months and to review plans for the remaining period.

Fig. 17. Dr. Sabine Schoppe, trainor, helps out trainees in mapping the location for

manta tow survey. © RDolorosa.

The issue on personnel change was also undertaken. Dr. Sabine Schoppe, a KF founding board member and successor of P. Widmann, participated actively during the planning.

The meeting included the approval of hiring Ms. Janice Tupas starting September 2006 as replacement of Administrative Officer Deborah V. van den Beukel.

KFI meanwhile submitted to the PCSDS all documents i.e. prior informed consent certificates and endorsements, for its application for extension and issuance of Strategic Environmental Plan (SEP) Clearance.

Seeds of Life Exhibit

The Katala Foundation launched an exhibit called the “Seeds of Life” at the Kamarikutan Kape and Art Galleri from October 19 to November 17, 2006. The exhibit explained the ecology and

conservation of seed dispersal, one ecological process that is taken for granted. It tried to explain the many benefits of eating fruits beside its nutritional value.

Fig. 18 . Viewers of the Seeds of Life exhibit during the opening ceremonies. © PWidmann.

In a research conducted in Aborlan by Peter Widmann, “study revealed that 70% of woody plants in a 10 hectare secondary forest produced fruits which are consumed by animals”. He added that “through the seed-dispersal activity of fruit-eating animals, the diversity of Palawan’s forest can be maintained.”

The exhibit presented concepts in a more interesting manner to help viewers understand better the importance of seed dispersal. Three dioramas were produced while high resolution pictures were laminated in fifteen big panels for easy reading. Thanks to the funding support from the Ford Conservation and Environmental Grants.

A survey was randomly conducted among visitors of the exhibit and results revealed commendable reactions (refer to Annex 8).

Memorandum of Agreement with PAWB-DENR on Philippine Freshwater Turtles Conservation Program (PFTCP)

The MOA between KFI and PAWB-DENR on the Philippine Freshwater Turtle Conservation Program was signed in November 2006. This joint undertaking

Page 40: Technical Progress Report - philippinecockatoo.org and articles... · Municipal Government of Rizal, Palawan, ... EXECUTIVE SUMMARY ... PCCP Technical Progress Report 2006

PCCP Technical Progress Report

June - Dec 2006 p.40

aims to conserve Phil. freshwater turtle populations and habitats, to conduct scientific research on biology and management of these turtles and its habitats and to educate and capacitate stakeholders for its conservation. Through the KIEBC at Narra, these objectives are hoped to be met. This MOA provides the legal basis to obtain confiscated turtles from recognized rescue centers and/or to accommodate otherwise rescued turtles to the center.

2nd Philippine Birdfest

PCCP participated during the 2nd Philippine Birdfest organized by the Wild Bird Club of the Philippines on Sept. 22-23, 2006. PCCP Information Officer, Debbie V. van den Beukel gave a lecture to a mix group of students from Metro Manila. KFI put up a booth which was well appreciated by attending participants and viewers. Children enjoyed the games organized and had fun with “Kataly”, the mascot who was very famous during the festival. KFI participants were DV Beukel and GBatin.

Relevant seminars, meetings and workshops organized and attended

• Participatory Mapping inside Protected Area, Culasian, Rizal, June 8, 2006.

• Zookeepers Workshop, Olongapo City, June 18-23, 2006.

• Mangrove Forest Mgt. Issues and Opportunities, sponsored by PCSD, Irawan, Puerto Princesa, June 19, 2006.

• ECAN Reconstitution Workshop, Narra, Palawan, July 3. 2006.

• ECAN / NEB Meeting, Narra, Palawan, July 27 & Sept. 7, 2006.

• Meeting sponsored by Conservation International for Mt. Mantalingahan Protected Area, Puerto Princesa City, Aug. 4, 2006.

• UNDP-SGP Networking and Linkage Building Meeting, Puerto Princesa City, Aug. 16, 2006.

• ECAN Mapping Workshop, Dumaran, Palawan, Aug. 17, 2006.

• Zookeepers Workshop, Puerto Princesa City, August 31-September 1, 2006.

• Meeting on Reconstitution of Palawan GIS Network, September 7, 2006.

• Meeting with WWF-Deutschland, Frankfurt, Germany. September 12-13, 2006.

• ECAN Zonal Workshop, Bgy. San Juan, Dumaran, Sept. 21, 2006.

• 2nd Philippine Birdfest, Quezon City, Sept. 22-23, 2007.

• 6th International Parrot Conference, Tenerife, Canary Island, Spain, Sept. 26-30, 2006.

• Resource Management Planning Workshop for Bgy. Panacan Marine Sanctuaries, Panacan, Narra, Sept. 28-29, 2006.

• LPF Project Partners Meeting, Tenerife, Canary Island, Spain, Oct. 1, 2006.

• European Zoos and Aquaria Association Annual Conference, Madrid, Spain, Oct. 2-4, 2006.

• Mt. Mantalingahan Protected Area Planning Workshop, Oct. 5, 2006.

• “Seeds of Life” Exhibit, Kamarikutan Kape and Art Gallery, Puerto Princesa City, Oct. 19-Nov. 17, 2006.

• Keepers’ Workshop, El Nido, Palawan, Nov. 27-28, 2006.

Page 41: Technical Progress Report - philippinecockatoo.org and articles... · Municipal Government of Rizal, Palawan, ... EXECUTIVE SUMMARY ... PCCP Technical Progress Report 2006

PCCP Technical Progress Report

June - Dec 2006 p.41

• Stakeholders Planning and Workshop, El Nido, Palawan, Nov. 29-30, 2006.

• CEPF Workshop, Cebu City, Nov. 25-29, 2006.

• CI Partners Meeting, Puerto Princesa City, Palawan, Dec. 12, 2006.

• Palawan GIS Network Meeting, Puerto Princesa City, Palawan, Dec. 13, 2006.

Media mileage

Philippine Cockatoo Translocation Project (press release), www.philippinecockatoo.org

Learning the benefits of eating fruits: An exhibit on the ecology and conservation of seed dispersal (press release) www.philippinecockatoo.org

Kulambo Festival, El Nido, Palawan, Dec. 1-3, 2006. (mascot appearance, face painting on birds, parade, exhibit and distribution of information materials)

Fig. 19. Scenes during the 2nd

Phil. Birdfest in Quezon City, Philippines. A. Kataly, the mascot entertaining the excited children in the crowd; B. GBatin (in pink) at the display booth of KFI; C. DVBeukel with students eagerly waiting for an answer; D. A pupil seriously answering the PCCP activity book; E. A pose with KFI president, Migs Zubiri who attended the festival. © EvandenBeukel

A B

C D

E

Page 42: Technical Progress Report - philippinecockatoo.org and articles... · Municipal Government of Rizal, Palawan, ... EXECUTIVE SUMMARY ... PCCP Technical Progress Report 2006

PCCP Technical Progress Report

June - Dec 2006 p.42

Two articles about the seeds of life exhibit were published in two separate local broadsheets.

Summary of public presentations:

• Powerpoint presentation on “Fundraising and Proposal Writing: Learning the basic and practical tips. Presented to LPAMC Rizal, June 26, 2006.

• Powerpoint presentation on “Saving the Katala”. Presented during the Zookeepers Workshop, Olongapo City, June 18-23, 2006.

• Powerpoint presentation on “Translocation of Philippine Cockatoos to Lagen Island, El Nido”, El Nido PAMB, Palawan, July 13, 2006.

• Presentation of translocation project to Sangguniang Bayan of El Nido, El Nido, Palawan, Aug. 16, 2006.

• Powerpoint presentation on “How to save a very rare cockatoo species: experiences from the Philippine Cockatoo Conservation Program”, WWF-Deutschland, Frankfurt, Germany, Sept. 13, 2006.

• Powerpoint presentation on “Potentials and Limitations of Community-based Parrot Conservation Projects: The example of the Philippine Cockatoo Conservation Program”, 6th International Parrot Conference, Tenerife, Spain, Sept. 28, 2006.

• Powerpoint presentation on “The Philippine Cockatoo Conservation Program: an in-situ approach for parrot conservation in the Philippines”, EAZA Conference, Parrot TAG, Madrid, Spain, Oct. 3, 2006.

• Powerpoint presentation on “Translocation of Philippine Cockatoos to Lagen Island, El Nido”, Palawan Tourism Council, Puerto Princesa City, Nov. 17, 2006 & at Lagen Resort during the soft launching of the PCTP, Nov. 24, 2006.

Implications for further work

• The Rasa success serves as model to other project sites. As more people know and experience Rasa, the more mobilized local partners are i.e. local government of Narra, wildlife warden. Hence, strategies are replicated in other sites and cross visits to Rasa are encouraged.

• The translocation project poses so many challenges from the start e.g. securing permits, coordination with partners. However, initial reports as of this reporting period support that birds in aviary are easily able to switch to natural food available on site.

• Tameness and affinity of the birds to humans is most challenging and certainly will pose problems once birds are released.

• Birds’ reaction to predators was very good, always wary of raptors overhead and reaction to raptor silhouette caused extreme panic. Natural predation remains a risk.

Page 43: Technical Progress Report - philippinecockatoo.org and articles... · Municipal Government of Rizal, Palawan, ... EXECUTIVE SUMMARY ... PCCP Technical Progress Report 2006

PCCP Technical Progress Report

June - Dec 2006 p.43

• To reduce if not avoid human-bird interaction in the future, the center in Narra is prepared to quarantine rescued cockatoos for translocation. However, partners and concerned authorities must commit to engage in immediate decisions in order not to compromise the birds.

Equipment status report

Major repairs and maintenance were undergone within the reporting period. The Abukay boat had two major accidents within the reporting period which required overhauling of engines and repairs of the hull and keel. Immediate inventory of equipment and supplies on the Abukay boat was done after the two major accidents.

Motor vehicles i.e. tricycle and car likewise underwent regular maintenance and workshop visits.

Meanwhile, two solar panels were purchased to be used for the quarantine section of the center in Narra.

Handheld radios are old and expensive to repair. Instead, project invested on providing one cellphone per site for wardens on duty for easier communication.

Regular inventory of all equipment is conducted by field offices.

Fig. 20. M/B Abukay on a major repair. ©

JTupas.

Planned targets and activities for the next two years of project implementation

Objective 1: Conservation of cockatoo population on Rasa Island, Narra continued

• Continue wardening scheme. • Assist and capacitate Protected

Areas Management Board in the management of the Philippine Cockatoo and Rasa Island Wildlife Sanctuary.

• Conduct conservation education for stakeholders.

• Lobby for protection of Rasa Wildlife Sanctuary under congressional proclamation.

• Assist in ongoing livelihood projects.

Objective 2: Conservation of cockatoo population on Dumaran Island, Dumaran continued

• Continue wardening scheme. • Assist and capacitate Local

Protected Areas Management Committee in the management of the Philippine cockatoo, as well as Omoi and Manambaling Cockatoo Reserve.

• Conduct conservation education for stakeholders.

• Assist in ongoing livelihood projects and municipal reforestation projects.

• Lobby for declaration as “Critical Habitat” (under RA 9147) for the two protected areas, nest sites, buffer zones and corridors in Dumaran.

Objective 3: Conservation of cockatoo population in Culasian Managed Resource Protected Area, Rizal continued

• Continue wardening scheme. • Assist and capacitate local

Protected Areas Management Committee in the management of the Philippine cockatoo and

Page 44: Technical Progress Report - philippinecockatoo.org and articles... · Municipal Government of Rizal, Palawan, ... EXECUTIVE SUMMARY ... PCCP Technical Progress Report 2006

PCCP Technical Progress Report

June - Dec 2006 p.44

Culasian Managed Resource Protected Area.

• Conduct conservation education for stakeholders.

• Provide alternative livelihood for key-stakeholders of the protected area.

• Support integration in NIPAS through CI.

Objective 4: Research on conservation-related topics on biology of Philippine cockatoo conducted

• Systematically collect information on breeding, feeding biology and population dynamics of Philippine cockatoo.

• Further develop mechanisms for translocation of Philippine cockatoos and implement, if need arises.

• Assist wardening scheme in Patnanungan in cooperation with the Polillo Ecology Stewardship Project.

• Continue floristic assessments of Rasa and Dumaran.

• Continue experimental habitat restoration in Dumaran and monitoring of existing plots in Rasa and Dumaran.

• Conduct survey in Calamianes in cooperation with FFI.

• Continue faunal inventories in protected areas of Rizal and Dumaran.

Objective 5: Katala Institute for Ecology and Biodiversity Conservation further developed

• Continue development of quarantine area to accommodate rescued cockatoos from Rasa.

• Continue landscaping with native species propagated in the Katala nursery.

• Continue submitting proposals to other potential donors.

Page 45: Technical Progress Report - philippinecockatoo.org and articles... · Municipal Government of Rizal, Palawan, ... EXECUTIVE SUMMARY ... PCCP Technical Progress Report 2006

PCCP Technical Progress Report

June - Dec 2006 p.45

LITERATURE

Boussekey, M. 2000a: European studbook for the Red-vented cockatoo (Cacatua haematuropygia). St. Martin La Plaine, France. 53pp.

Boussekey, M., 2000b: An integrated approach to the conservation of the Philippine cockatoo or Red-vented cockatoo Cacatua haematuropygia. Int. Zoo Yb. (2000) 137-146.

Collar, N.J., N.A.D. Mallari, B.R. Tabaranza, Jr., 1999: Threatened birds of the Philippines. The Haribon Foundation/BirdLife International, Manila, Philippines. 559pp.

Dans, F. G., V. Yngente & E. Abaňo, 2005. Philippine cockatoo monitoring, Patnnungan, Quezon Province. Unpubl. Report of Polillo Islands Biodiversity Foundation, Inc. 7pp.

Dans, F. G., V. Yngente & E. Abaňo, 2006. Philippine cockatoo monitoring, Patnnungan, Quezon Province. Unpubl. Report of Polillo Islands Biodiversity Foundation, Inc. 11pp.

Dickinson, E.C., R. S. Kennedy & K.C. Parkes, 1991: The birds of the Philippines. B.O.U. check-list no. 12. British Ornithologists’ Union, Tring, UK. 507pp.

Gascoyne, M., G.J. Benjamin, & H.P. Scjwarz, 1979: Sea-level lowering during the Illinoian glaciation: evidence from a Bahama “blue hole” – Science 205:806-808.

Gonzalez, J.C.T. 1997. The ecology and distribution of the birds in the Polillo Islands, Philippines. Unpubl. M.Sc. thesis. 134pp.

Hampson, K., D. Bennett, P. Alviola, T. Clements, C. Galley, M. V. Hilario, M. Ledesma, M. A. Manuba, A. Pulumbarit, M.A. Reyes, E.L.B. Rico & S. Walker 2002. Wildlife and conservation in the Polillo Islands. CD-rom.

Heaney, L.R., 1986: Biogeography of mammals in southeast Asia: Estimates of rates of colonization extinction and speciation – Biological Journal of the Linnaen Society 28:127-165.

IUCN 2006. The IUCN 2006 red list of threatened species. www.redlist.org.

Lambert, Frank. 1994: The Status of the Philippine cockatoo Cacatua haematuropygia in Palawan and the Sulu Islands, Philippines. IUCN Species Survival Commission. IUCN, Gland, Switzerland and Cambridge, UK.

Widmann, P. 1998: A Guide to the ecosystems of Palawan. Times Editions, Singapore.

Widmann, P. 2001: Distribution and status of the Philippine cockatoo Cacatua haematuropygia in the wild. Unpubl. review and discussion paper. 32pp.

Widmann, P., I. D. Lacerna & S.H. Diaz, 2001. Biology and conservation of the Philippine cockatoo (Cacatua haematuropygia) on Rasa Island, Palawan, Philippines. Proceedings of the 10

th Annual

symposium and scientific meeting of the Wildlife Conservation Society of the Philippines, April 2001, Silliman University, Dumaguete City, Philippines.

Page 46: Technical Progress Report - philippinecockatoo.org and articles... · Municipal Government of Rizal, Palawan, ... EXECUTIVE SUMMARY ... PCCP Technical Progress Report 2006

PCCP Technical Progress Report

June - Dec 2006 p.46

Worksheet June – December 2006 KEY PROJECT ACTIVITIES DATE INVOLVED PERSON(S)

Rizal trip re: breeding season 2006 updates June 1-4, 06 RC Official trip: Mla: Meetings with Dr. Lim (PAWB), Hon. Zubiri, PAWVI & office purchases June 3-5, 2006 PW, IDLW Nursery maintenance and monitoring June-Dec, 06 MP, wardens Experimental plot monitoring, Dumaran June-Dec, 06 MP, wardens Bagging of wildlings (15 Taulili) June 2, 2006 MP, wardens Bagging of 41 taulili seedlings June 3, 2006 MP, wardens 5th remittance and meeting with R. Deig re: agri. Project June 3, 2006 DV Radio guesting at Radyo Natin Narra on the program “Good Morning Narra” re: celebration of World Environment Day

June 5, 2006 DV, RC, SHD

Biodiversity conservation lecture, film showing, environmental games and distribution of EE materials at Bugtong Station, Bgy. Antipuluan, Narra

June 5, 2006 DV, RC

Biodiversity conservation lecture, film showing and distribution of EE materials at Purok Matatag II, Bgy. Panacan, Narra

June 5, 2006 DV, RC

Installation of radio collar for telemetry to hatchlings with ring no. DENR 0019-06 from nest 21 and 0016-06 from nest 38

June 5, 2006 PW, SHD, wardens, E. Alfaro

Narra staff meeting June 5, 2006 PW, DV, RC, SHD Acquire Katala boat registration from MARINA June 6, 2006 GB Mainland cockatoo monitoring June 6, 2006 PW, SHD Visit to KIEBC center June 6, 2006 SHD, PW Meeting with Capt. Ong re: socio-econ. survey at Culasian June 6, 2006 DV, RC Assisted photographer George Tapan re Rasa visit June 7-9, 06 SHD, PW Visit Candawaga wetland June 7, 2006 RC, DV Socio-economic survey on residents inside Culasian Managed Protected Area (CMRPA) June 7-9, 2006 DV, RC Meeting with SPAPI wardens re: work assignment June 7, 2006 RC, DV CMPRA resource mapping and meeting with claimants and stakeholders at Culasian June 8, 2006 DV, RC Preparation PTPR June-Sept 2006 June 8-12, 06 IDLW Fixing of new billboard in front of municipal hall June 11, 2006 MP, wardens Inventory of materials on Abukay boat June 13, 2006 RC Meeting with Vice Amiral Danga June 13, 2006 IDLW, PW 3rd Kalabukay Festival, Dumaran, Palawan June 13-18,06 KF Staff Meeting with Intelligence Officer of Western Command re: armed group in Bgy. Culasian June 13, 2006 RC, SHD Calamianes Project Meeting with involved staff June 14, 2006 PW, IDLW Narra office staff meeting re: schedule on telemetry study June 14, 2006 SHD, DV, RC and BC Leadership workshop for KCC members, Dumaran June 14-15, 2006 GB, SD, MP “Katala at Buhay Kalikasan” radio program re: progress and future activities June 14, 2006 DV, RC Confirmation of roosting at Bugsuk Island thru CENRO Bataraza June 15, 2006 IDLW Meeting with PASu Rodriguez, El Nido re: translocation June 15, 2006 IDLW, PW Meeting with Narra wardens re: work assignment and updates June 16, 2006 SHD Katala Fun Day during Dumaran Kalabukay Festival: envi. Games, lectures, puppet show, mascot show, film showing, singing contest

June 17, 2006 IDLW, DV, PW, GB, Dumaran staff

Assisted and guided WPU graduate students during visit and interaction with mainland volunteers and visit roost site

June 17, 2006 SHD, wardens

Attendance and presentation to Zookeepers Association of the Philippines workshop at SBMA, Olongapo City

June 18-23, 2006 RC, MB

Attendance to PCSDS workshop “Mangrove Forest Management-Issues & Opportunities” June 19, 2006 GB Conduct survey on Kalabukay Festival June 19-23, 2006 SD Trip to Rizal re: preparations for LPAMC meeting June 21, 2006 DV Check illegally cut trees at Sitio Camaya, Poblacion June 21, 2006 MP, wardens Tree planting with wardens at the buffer zone June 21-22,06 MP, wardens Facilitation of Calamianes documents for SEP issuance June 21-25,06 IDLW, GB Measuring of plants at experimental plots June 22, 2006 MP Monthly cockatoo count June 23, 2006 SHD, wardens Procurement of statement of accounts from Hotels re: WCSP expenses June 23, 2006 GB Assist staff from CENRO Roxas re: investigate illegally cut down trees in Sitio Camaya, June 24-25, 2006 MP, wardens 1st Rizal LPAMC meeting and Orientation on Proposal Writing at SB Session Hall, Rizal June 26, 2006 PW, IDLW, DV, RC Meeting with I. and P. Widmann re: telemetry study June 26, 2006 BC, SD, DV Monthly cockatoo count June 27, 2006 SHD, wardens Check Bgy. Bohol re: possible roosting site June 27, 2006 MP, wardens Rizal trip re: salary disbursement and nest verification June 27-29,06 RC Meeting with R. Deig re: agri. farming financial report June 28, 2006 DV Monitoring in Manambaling area June 28, 2006 MP, wardens Report writing: SPAPI Progress Report October-March 2006 June 28-29,06 DV

Page 47: Technical Progress Report - philippinecockatoo.org and articles... · Municipal Government of Rizal, Palawan, ... EXECUTIVE SUMMARY ... PCCP Technical Progress Report 2006

PCCP Technical Progress Report

June - Dec 2006 p.47

Coordination with Mayor L. Demaala re: fish corral of Mr. Reci established at Rasa June 29, 2006 SHD, wardens Official trip to Mla: Congress meeting, office purchases, exhibit printers, medical suppl. June 29-Jul 2, 2006 IDLW, PW Narra wardens meeting re: work assignment and updates June 30, 2006 SHD, DV Preparation of PTPR Jan-May 2006 June 2006 IDLW, PW Assistance to visitors from PNOC to roosting site July 1, 2006 SHD, Danny V. School visit re: Lecture on the Philippine cockatoo July 1, 2006 SD Coordination with concerned agencies & operatives re: illegal transport of 2 Hill myna on passenger of CBL 2121 and coordination to operatives

July 3-5, 2006 DV, IDLW

Attendance to ECAN Reconstitution Workshop July 3, 2006 SHD Facilitate request for PAMB Office, Narra July 4, 2006 SHD, DV “Katala at Buhay Kalikasan” radio program re: wildlife trading and Rasa tourism scheme July 5, 2006 DV, SHD Create database for Northern Palawan surveys under BP July 6-8, 2006 DV Encoding Kalabukay Festival survey questionnaires July 6-12, 2006 GB Facilitate activities at KIEBC Center July 7-9, 2006 SHD School visit re: lecture on the Rasa Island July 7-9, 2006 SD Meeting with Vice Admiral Danga July 7, 2006 IDLW, PW Submit PTPR July 2006 to May 2007 at Provincial Capitol July 7, 2006 GB Meeting with wardens re: activities for the month of July July 8, 2006 MP Facilitate re: Rasa Island´s flora inventory by L. Sopsop July 9, 2006 DV Check new roosting site in Bohol July 10, 2006 MP, wardens Banding of hatchlings from nest 23 and installation of radio collar for telemetry to hatchling with ring no. VI-XL violet

July 10, 2006 SHD, wardens, E. Alfaro

Received report re: 1 Hill myna on passenger of CBL 5036 and coordination to operatives and DENR-CENRO, Quezon

July 11, 2006 DV, RC

Assessment of cockatoo nest trees in Rasa Island July 11-13, 06 SHD, wardens Received report re: 4 Blue-naped parrot on passenger of CBL 4021 and informed I. Widmann for coordination to operatives, suspect arrested

July 12, 2006 DV

Bagging of 15 amugis and 7 betad July 12, 2006 MP, wardens Meeting with Kamarikutan (venue for exhibition) owners July 12, 2006 IDLW, PW Coordination to PWRCC re: verify turn-over of confiscated 4 Blue-naped parrots July 12, 2006 RC, DV Presentation to PAMB El Nido re translocation July 12-14, 06 PW Coordination with Dr. Donato on reported cockatoo trade July 13, 2006 IDLW Preparation of tracking map for telemetry study July 14, 2006 DV, BC Encoding Dumaran Socio-economic survey July 14, 2006 GB School visit re: Lecture on basic environmental principles July 14-16, 06 SD Assessment of Mantanani scops owl nest in Rasa Island July 15, 2006 SHD, wardens Visit agricultural bodega and nursery at Malinao II July 16, 2006 SHD Narra wardens meeting re: work assignment July 17, 2006 SHD, DV Roving in and around PA and collect wildlings July 18, 2006 MP, wardens Facilitation of PDAF funds for Narra July 18, 2006 IDLW “Katala at Buhay Kalikasan” radio program July 19, 2006 SHD, RC SEP clearance application at PCSD re: translocation of 10 rescued cockatoos July 19, 2006 GB Staff Meeting with P. and I. Widmann re: updates July 19, 2006 PW, IDLW, DV Preparations for panels for Seeds of Life exhibit: with carpenters July 20, 2006 PW, IDLW Check roosting site at Bgy. Bohol and get GPS reading July 20, 2006 MP, wardens Meeting with accountant July 20, 2006 IDLW Meeting with PCSDS Research Team re translocation needs July 21, 2006 PW, IDLW Communication to Bgy. Panacan Captain and PNP Narra re: PAMB requirements July 21, 2006 DV Referred with Dr. Lim (PAWB) Dumaran’s A & D application July 21, 2006 IDLW School visit re: Lecture on basic environmental principles July 21-23, 06 SD Bagging of 40 narra seedlings and repair seed box July 22, 2006 MP, wardens Finalization of breeding season 2006 reports for assessment July 24, 2006 DV Canvass materials for Seeds of Life exhibition July 24, 2006 IDLW, PW Facilitate KIEBC Center zoning clearance from MENRO July 24-26, 06 DV Rizal trip: livelihood supplies of wardens and meeting, nest verification in Bgy. Ransang July 25-31, 2006 RC Received Rizal Municipal Resolution No. 2006-30 July 25, 2006 RC Last broadcast of “Katala at Buhay Kalikasan” radio program July 26, 2006 DV, SHD Coordination to E. Alfaro of DENR-CENRO Narra re: revised IPAF guidelines July 26, 2006 DV Attendance to ECAN/NEB meeting at Narra SB Session Hall July 27, 2006 SHD Distribute invitation re: 1st LPAMC Meeting July 28, 2006 MP Assistance and communication re: resolve conflict with Capt. R. Ong of Culasian, Rizal July 28-30, 2006 DV Measuring of plants at experimental plots July 29, 2006 MP Monthly cockatoo count July 29 & 30, 2006 SHD, D. Villaruz Salary disbursement and fix billboard near the wharf July 30, 2006 MP, wardens Meeting with accountant July 31, 2006 IDLW Meeting with Narra wardens re: updates and work July 31, 2006 SHD, DV

Page 48: Technical Progress Report - philippinecockatoo.org and articles... · Municipal Government of Rizal, Palawan, ... EXECUTIVE SUMMARY ... PCCP Technical Progress Report 2006

PCCP Technical Progress Report

June - Dec 2006 p.48

Encoding Dumaran Socio economic survey July 31, 2006 GB Communication to R. Ubani of DENR-PENRO re: PAMB requirements and Batac case July 31, 2006 DV Visit and coordination of Provincial Tourism Office staff re: Rasa Island visitors data July 31, 2006 DV Meeting with P. and I. Widmann re: work performance July 31, 2006 SHD Facilitation of requirements for KFI SEC registration update July-Sept 06 IDLW, GB Trip to Dumaran Aug. 1, 2006 IDLW, PW, SS 1st Dumaran LPAMC Meeting Aug. 2, 2006 IDLW, PW, MP, SD, SS Attendance to Bgy. Panacan Council´s session re: presentation of RIWS Aug. 2, 2006 SHD, E. Alfaro, DV, RC Check watershed project in Dumaran Aug. 3, 2006 KF staff and LGU Dumaran Zonal Planning Workshop Aug. 3-4, 2006 IDLW Follow-up PAMB requirements to PNP and PCSD Aug. 3, 2006 DV Monitoring visit to experimental plot Aug. 3, 2006 PW, SS, wardens Assist wardens in the issuance of birth certificates Aug. 3, 2006 DV Attendance to meeting with Conservation International Philippines re: Mt. Mantalingahan as proposed protected area

Aug. 4, 2006 DV

KF Mid-Year Planning Workshop at Skylight Apartelle Aug. 7, 2006 KF staff Meeting with PASu Rodrigues, El Nido Aug. 7, 2006 IDLW, PW, SHD Communication to Provincial Prosecutor´s Office re: A. Jakarya case against R.A. 9147 Aug. 8, 2006 DV Assist Roxas Chief PAWS re: joint affidavit on illegally cut down trees in So. Camaya Aug. 8, 2006 MP Encode timetable for August to December 2006 Aug. 8, 2006 GB Meeting with CPA R. Ramos re: SKM renewal to SEC Aug. 8, 2006 DV Assistance to visitors from Philippine National Oil Company for pictorial at roosting site Aug. 8, 2006 SHD Attend needs re: accidental sinking of Abukay boat Aug. 8, 2006 SHD, DV, RC, BC Request map at CI re: Proposed critical habitat in Dumaran Aug. 9, 2006 GB Facilitate repair of Abukay boat Aug. 9-10, 06 SHD, Danny Communication to applicants for Field Administration Officer re: schedule of interview Aug. 10-11, 2006 DV Monitoring at Bohol roosting site Aug. 10, 2006 MP, wardens Cockatoo count Aug. 13, 2006 SHD, wardens Narra PCCP/KF staff meeting re: schedule of telemetry Aug. 14, 2006 SHD, DV, RC, BC Facilitate SPAPI MOA notarization Aug. 14, 2006 DV Meeting with wardens re: work assignment and updates Aug. 14, 2006 SHD, DV Facilitate issuance of Mayor´s Permit for telemetry study Aug. 15, 2006 DV Coordination to Capt. E. Lagrada of Bgy. Antipuluan re: PIC for KIEBC Center Aug. 15, 2006 DV Travel to El Nido, Palawan re: presentation of translocation proposal to SB Aug. 15-18, 2006 SHD KFI Board Meeting with Pres. Zubiri Aug. 16, 2006 IDLW, PW Attendance to UNDP-SGP Networking and Linkage Building Aug. 16, 2006 DV Bagging of seedlings (24 amugis and 8 betad) Aug. 16, 2006 MP, wardens Attendance to ECAN mapping workshop Aug. 17, 2006 MP Meeting with translocation partners: TKDC, SEAIR, ITI, ENF Aug. 17 & 20, 2006 IDLW, PW Encode LPAMC minutes Aug. 18, 2006 GB Survey at Cartimar, Manila Aug. 18, 2006 PW, IDLW Visit to CI Office, CEPF M. Atrigenio and N. Ibuna Aug. 18, 2006 PW, IDLW Ground truthing of forest patches at Sitio Luyang, Dumaran Aug. 18-20, 2006 MP, wardens Survey at Hill 394, Subic Aug. 21, 2006 PW, IDLW Facilitate needs re: Rasa Island´s flora inventory by L. Sopsop Aug. 20, 2006 DV Bagged 28 ipil, 6 narra and 12 amugis seedlings Aug. 21, 2006 MP, wardens Attendance to Bgy. Antipuluan Council´s session re: PIC for KIEBC center Aug. 21, 2006 DV, SHD Meeting with R. Deig re: updates on Agricultural Farming Project Aug. 22, 2006 DV Follow up ECAN map of Rasa at PCSD Aug. 22, 2006 GB Survey at Bulalakaw area Aug. 23, 2006 MP, wardens Submission of FORD 1st progress report Aug. 23, 2006 IDLW, PW Assistance to L. Dangis and M. Batac re: requirements for wardens deputation Aug. 23, 2006 DV Facilitate repair of wardens campsite at Rasa Island Aug. 23-25, 06 SHD, wardens Drafting of report for Convention of Biological Diversity secretariat as requested by DENR-PAWB

Aug. 23, 29-30, 2006 DV

Purchase additional supplies for agricultural store Aug. 24, 2006 DV, R. Deig Facilitation and submission of PICs and other documents for translocation for SEP clearance issuance

Aug. 24, 2006 GB

Communication to Provincial Prosecutor´s Office re: A. Jakarya case against R.A. 9147 Aug. 25, 2006 DV Coordination to CI Public Consultation team re: discussion with SPAPI project Aug. 26, 2006 RC Breeding season 2006 assessment and meeting with wardens Aug. 27, 2006 KF/PCCP Narra staff,

wardens SPAPI wardens meeting and salary disbursement Aug. 27, 2006 RC, warden Inventory of SPAPI garden tools and implements Aug. 27, 2006 RC SPAPI livelihood store inventory Aug. 27, 2006 RC Interview of applicants for Field Administration Officer Aug. 28, 2006 KF Board

Page 49: Technical Progress Report - philippinecockatoo.org and articles... · Municipal Government of Rizal, Palawan, ... EXECUTIVE SUMMARY ... PCCP Technical Progress Report 2006

PCCP Technical Progress Report

June - Dec 2006 p.49

Assistance to CRM researcher Koki Seki from Hiroshima University, Japan Aug. 28, 2006 KF Board Protected Area Management Board for RIWS 3rd regular meeting Aug. 28, 2006 KF Board Nest verification at So. Balingasag, Bgy. Culasian, Rizal Aug. 28, 2006 RC, SPAPI wardens Measuring of plants at experimental plot Aug. 29, 2006 MP Facilitate issuance of SPAPI wardens requirements for birth certificates and coordination to Rizal Municipal Civil Registrar

Aug. 29, 2006 RC

Follow up schedule of Technical Working Group (TWG) meeting Aug. 29, 2006 MP Meeting with PWRCC officials re: turtle project Aug. 29, 2006 PW, IDLW, SS Attendance to CI Public Consultation in So. Darapiton, Panalingaan and So. Proper, Culasian re: proposed Mantalingahan PA

Aug. 30, 2006 RC

Monthly cockatoo count Aug. 30, 2006 SHD, warden Meeting with SOLAR shell officials Aug. 30, 2006 IDLW, PW Attendance to Zookeepers´ Association of the Philippines Workshop at PWRCC, PPC Aug. 31-Sep. 1, 2006 SHD, MB Salary disbursement and wardens meeting re: possible agenda for TWG 1st meeting Aug. 31, 2006 MP, wardens Preparations for PCCP Proposal 2007-2008 Aug. 2006 PW, IDLW MOA revisions and other supporting docs for translocation Aug. 2006 IDLW, PW Meeting with Dr. Mundita Lim (PAWB) in Puerto Aug. 31, 2006 IDLW, PW, SS Meeting with Dr. C. Georgii and Kevin from Australia Sept. 1, 2007 IDLW, PW, SS Assistance to CRM researcher Koki Seki from Hiroshima University, Japan Sep. 1, 2006 DV Lay-out tarpauline for Bird festival exhibit Sep. 1, 2006 GB Meeting with barangay officials re: PIC and barangay endorsement for 6th Phase extension of PCCP from Sto. Tomas, San Juan and Poblacion, Dumaran

Sep. 1-2, 2006 MP

Meeting with CRM researcher Koki Seki from Hiroshima University, Japan re: RIWS marine sanctuary

Sep. 1, 2006 SHD

Nest tree visit and coordination to nest tree caretaker at Ransang, Rizal Sep. 2, 2006 RC, wardens Meeting with wardens and Capt. Ong Sep. 2, 2006 SHD, DV Distribution of SPAPI MOA Sep. 3, 2006 RC School visit Grade IV, Grades 1-2 Sep. 4-5, 2006 SD Follow up field offices re: PIC’s, endorsements and other requirements for SEP clearance Sep. 4, 2006 GB Presentation to Bgy. Culasian Council re: PCCP 6th Phase extension project Sep. 4, 2006 RC Meeting with Bgy. Antipuluan Captain E. Lagrada re: signing of PIC Sep. 4, 2006 DV, SHD Meeting with Bgy.Panacan Captain M. Guyos re: PIC Sep. 5, 2006 DV, SHD Communicate with CIDG for confiscation at Rizal Sep. 5, 2006 DV, RC, IDLW Meeting with Dr. Sabine Schoppe Sep. 5, 2006 PW, IDLW Meeting with I. Widmann re: instruction, attendance to Bird Festival, finances Sep. 5, 2006 DV Draft program for ‘Seeds of Life’ exhibit Sep. 6, 2006 GB Presentation of PCCP 6th Phase proposal to Panacan and Sangguniang Bayan Councils Sep. 6, 2006 SHD School visit re: Review Modules 1 and 2 – Grade VI Sep. 6, 2006 SD Surveillance, confiscation and documentation of 107 Hill myna, 2 White-bellied sea eagle and 1 Philippine cockatoo at Bgy. Punta Baja, Rizal with CIDG, PNP-Rizal

Sep. 6, 2006 RC

Sumission of PAMB members requirements to PAW Office, PENRO Sep. 6, 2006 DV Documentation of confiscated 97 Hill myna (10 died of transporting according to CIDG), 2 White-bellied sea eagle and 1 Philippine cockatoo at CIDG Office, PPC

Sep. 6, 2006 DV

Collate, photocopy and process notarization of PIC re: SEP Clearance requirements for KIEBC and 6th Phase extension

Sep. 7, 2006 GB

Official business Manila Sep. 7-9, 2006 IDLW, PW PIC signed and endorsement made by the Malinao Tagbanua Council Sep. 7, 2006 PASu, DV, SHD Attendance to ECAN/NEB meeting Sep. 7, 2006 SHD Attend meeting with Conservation International re: Reconstitution Palawan GI Network Sep. 7, 2006 RC Revision of SPAPI PA map and nesting tree GIS Sep. 7-8, 2006 RC Meeting at PAWB-DENR, Q.C. Sep. 8, 2006 IDLW, PW Meetings with printer for exhibit Sep. 8-9, 2006 IDLW, PW Attendance to Bgy. Antipuluan session re: presentation of PCCP 6th Phase proposal Sep. 10, 2006 SHD Travel to Puerto with staff from CENRO-Roxas re: submit affidavits on illegall logging activity in Sitio Camaya at Provincial Prosecutors Office

Sep. 10-11, 2006 MP, 3 SDENRO

Official trip to Germany, Tenerife and Madrid, Spain Sep. 10-Oct. 10, 2006 PW, IDLW Demarcation of RIWS marine sanctuary with Bgy. Panacan Council, DA and ELAC Sep. 11, 2006 SHD, RC Submit documents to PCSD re: KIEBC & PCCP Extension; Follow up Rasa ECAN map at GIS –PCSD

Sep. 11, 2006 GB

School visit Grades 4 & 6 Sep. 11-13, 06 SD Meeting with WWF-Deutschland; Presentation of PCCP to WWF-Germany; Press conference at WWF

Sep. 12-13, 2006 PW, IDLW

Follow-up case on wildlife trading in Rizal to concerned agencies Sep. 12-30,2006 RC Attendance to PCSD committee hearing re: SEP clearance for translocation project Sep. 13, 2006 SHD, GB, MB Dinner meeting with Hans Kuchta, GTZ Sep. 13, 2006 PW, IDLW Visit at Rasa Island and dialogue with NCIP Sep. 14, 2006 SHD, RC, PASu Monitor possible roosting site in Bohol Sep. 14-16, 06 MP, wardens

Page 50: Technical Progress Report - philippinecockatoo.org and articles... · Municipal Government of Rizal, Palawan, ... EXECUTIVE SUMMARY ... PCCP Technical Progress Report 2006

PCCP Technical Progress Report

June - Dec 2006 p.50

Meeting with NCIP personnel and IP’s in Malinao Sep. 14, 2006 SHD, RC, PASu Meeting with CIM-Germany Sep. 14, 2006 PW, IDLW Dismantling of illegal fish corral at RIWS Sep. 16, 2006 SHD, E.Alfaro & wardens Received SB-Rizal resolution endorsing PCCP’s 6th Phase Extension in Rizal Sep. 16, 2006 RC Follow up watershed rehabilitation and restoration progress reports at MENRO Office Sep. 18, 2006 MP Follow up endorsement from Bgy. Sto. Tomas Sep. 18, 2006 SD Wardens’ meeting: reports, assignments and payrolls Sep. 18, 2006 SHD, JT, & PASu Purchase and pack materials for bird festival exhibit Sep. 19, 2006 GB Roving and GPS reading at Bulalakaw area Sep. 20, 2006 MP, wardens Attendance to ECAN Zonal Workshop at Bgy. San Juan Sep. 21, 2006 MP GPS coordinates of RIWS Marine Sanctuary for CI GIS Sep. 21, 2006 RC Facilitate mascot dry cleaning at Sining Laya, Manila Sep. 19-21, 2006 DV, GB School visit at Bohol Elementary School Sep. 22, 2006 MP, SD Participation to 2nd Philippine Bird Festival: environmental lecture, games, mascot appearance, distribution of IEC materials

Sep. 22-23, 2006 DV, GB

Official trip to Tenerife and Madrid, Spain: International Parrot Conference and EAZA Meeting

Sep. 22-Oct. 5, 2006 PW, IDLW

School visit re: Lecture on pollution – Grade 4 Sep. 25, 2006 SD Follow up SEP application at PCSD and inquire about NCIP issues Sep. 25, 2006 GB Meeting with Accountant re: SEC requirements Sep. 25, 2006 GB School visit Grades 4 & 6 Sep. 26-27, 2006 SD Monthly cockatoo count Sep. 26, 2006 SHD, warden Roving in and around PA with wardens Sep. 26-27, 2006 MP, wardens Narra KF staff meeting at PCCP Office Sep. 27, 2006 KF staff Presentation of PCCP, Tenerife, Spain Sep. 28, 2006 PW Meetings with partners and linkages during the conference Sep. 28-30, 2006 PW,IDLW Attendance to PCSD Council Meeting re: SEP clearance for translocation Project Sep. 28, 2006 SHD, GB TWG Meeting with wardens Sep. 29-30, 2006 MP Resource Management Planning Workshop for Barangay Panacan Marine Sanctuaries Sep. 28-29, 2006 RC, JT, SHD School visit at Palawan State University, NCCRD: Celebration of Science Month Sep. 29, 2006 SHD, RC, JT Mascot appearance during Barangay Antipuluan Fiesta Sep. 29, 2006 SHD, RC, JT Meeting with Capt. R. Ong re: feeding program Sep. 29, 2006 DV Securing of PIC, resolution and endorsements for 6th Phase Extension of PCCP (Narra, Rizal, Dumaran projects) and KIEBC project

Sep.-Oct. 06 KF staff

Incorporation of changes to IRR from PAMB members Sep.-Oct. 06 DV, JT Facilitate KIEBC works, reports, supplies, and finances Sep.-Dec. 06 SHD, DV, JT Interview and collection of data re: wildlife trade Sep.-Dec. 06 RC Meeting with LFP board and other project implementors Oct. 1, 2006 PW, IDLW School visits re: recitation on Seven environmental principles – Grade 4 & 5 Oct. 2-3, 2006 SD Follow up SEP application at PCSD and GIS to incorporate trails in Rasa ECAN map Oct. 3, 2006 GB Attendance to EAZA Meeting; Presentation of PCCP to Parrot TAG Oct. 2-4, 2006 IDLW, PW Meeting with M. Jordan re P. Morris for translocation Oct. 3, 2006 PW, IDLW Meeting with Dr. Wilkinson, Chester and R. Wirth, ZGAP Oct. 3, 2006 PW, IDLW School visit – Grade 6 Oct. 4, 2006 SD Attendance to CI Workshop at Legend Hotel, PPC re: formulation of IPAP of proposed Mantalingahan PA

Oct. 5, 2006 RC

Preparations for seed of life exhibit Oct. 6, 2006 GB Coordination with P02 Licerio, CIDG re: case of the apprehended wildlife trader in Rizal Oct. 6, 2006 RC, DV & JT Birding at old Trident mining site Oct. 7, 2006 RC and JT Narra KF staff meeting at PCCP Office Oct. 9, 2006 KF staff School visits Grades 4-5-6 Oct. 9-11, 06 SD RIWS visit of students from Western Philippines University Oct. 9, 2006 DV, JT, RC, & SHD Assistance to German students and UST Professors’ visit Oct. 12, 2006 SHD, RC, DV, & JT Coordination with PCSD, Ford Foundation and Mayor Demaala re: attendance to exhibit Oct. 12, 2006 GB Meeting with Dr. Lim, PAWB; printer; Hon. Zubiri and N. Ibuna, CEPF Oct. 12, 2006 IDLW, PW Tagging of Green turtle at Bugtong station, Bgy. Antipuluan Oct. 12, 2006 SHD, PASu Replace some mangium trees at experimental plot Oct. 13, 2006 MP, wardens Meeting with wardens Oct. 14, 2006 MP Facilitate fabrication of aviary extension for translocation Oct. 15-Nov. 7, 2006 SHD Participate in tree planting activity at Bgy. Sto. Tomas Oct. 15, 2006 MP, wardens Wardens meeting Oct. 16, 2006 SHD & wardens Preparations for seeds of life exhibit (printing & delivery of program, tarpaulins, others Oct. 16-18, 2006 GB, IDLW, PW, DV Opening of Seeds of Life Exhibit at Kamarikutan Galeri Oct. 19, 2006 KF staff Writing of press release re: Seeds of Life exhibit Oct. 19, 2006 IDLW, DV Seeds of Life Exhibit – Kamarikutan Galeri Oct. 19-Nov 17, 2006 KF Preparation of materials for IEC and Narra Palay Festival Oct. 20, 2006 DV, JT, & RC

Page 51: Technical Progress Report - philippinecockatoo.org and articles... · Municipal Government of Rizal, Palawan, ... EXECUTIVE SUMMARY ... PCCP Technical Progress Report 2006

PCCP Technical Progress Report

June - Dec 2006 p.51

Staff Meeting with I. Widmann Oct. 20, 2006 All staff Encoding evaluation forms on exhibit Oct. 20, 2006 GB Securing of certificate for KIEBC construction Oct. 23, 2006 DV & JT GPS reading at So. Bulalakaw area Oct. 23, 2006 MP, wardens Submit letter to Sangguniang Panlalawigan re: endorsement for KIEBC & PCCP extension Oct. 23, 2006 GB Meeting in PCSD re: evaluation team – KIEBC inspection Oct. 23, 2006 GB MOA with TKDC partners on translocation revised Oct. 23, 2006 IDLW, PW Coordination for translocation activities with PAWB, and other partners Oct. 23-25, 2006 IDLW, PW Proposal writing for CEPF extension Oct. 2006 PW, IDLW Ground truthing at So. Baing, Tanglibo area Oct. 24-25, 06 MP, wardens PCSDS ocular inspection in KIEBC Oct. 25, 2006 DV, RC, SHD, JT Participation to the formulation of policy for Panacan Marine Sanctuary Oct. 25, 2006 BC & Danilo V. Inventory of KFI office equipment Oct. 26, 2006 DV and JT Assistance to office visitor J. Jones re: info on RIWS trip Oct. 26, 2006 DV, SHD Recieved SEP Clearance re: Translocation Project Oct. 27, 2006 GB Conducted FGD at Omoi area Oct. 27, 2006 SD, MP Meeting with I. and P. Widmann and visit at KIEBC site Oct. 27, 2006 KF Narra staff Meeting with cooperators from Dumaran Oct. 27, 2006 IDLW Preparation for vegetable gardening re: plowing Oct. 28, 2006 MP, wardens Meeting with wardens: assignment of duties Oct. 30, 2006 SHD & wardens Preparations for El Nido trip re: translocation Oct - Nov, 06 GB, IDLW, SHD Get Socio economic profile at Bgy. Sto. Tomas Oct. 30, 2006 SD Confirmation at Narra Treasury re: PDAF Funds Oct. 27, 2006 JT Conduct environmental exhibits and games in celebration of Narra Palay Festival Oct. 27-28, 2006 DV, JT, RC Preparation of Initial Environment Examination (IEE) for KIEBC Oct. 2006 DV and JT Writing of module for PA management Oct.-Dec. 06 DV PTPR June-Sept 06 submission; car check up Oct. 2006 IDLW TWG Meeting with wardens re: tasking Nov. 2, 2006 MP Meeting with PASu Rodriguez of El Nido Nov. 2, 2006 IDLW, GB Procurement of requirements for deputation Nov. 2006 MP, wardens SPAPI wardens meeting Nov. 2, 2006 RC Focus group discussion with residents near Candiz area Nov. 3, 2006 MP, SD Attendance to Bgy. Culasian Council meeting re: proposed Mantalingahan PA map by MENRO staff

Nov. 3, 2006 RC

Attendance to SB Narra Session re: presentation and approval of resolutions for endorsement of KF projects

Nov. 3, 2006 DV

Ocular inspection at KIEBC, inspection of fabrication of aviary and inventory of materials Nov. 5 & 7, 06 JT, DV and SHD Updating equipment borrower’s card Nov. 6, 2006 JT Attend Bgy. San Juan Session re: Bgy. Endorsement for PCCP extension – Approved and signed by the Bgy. Council

Nov. 6, 2006 MP

Discussion with Rizal PNP re: wildlife trading and tanbark issue Nov. 6, 2006 RC Coordination with Dr. Lim, PAWB re translocation and blood samples of cockatoos; coordination with TKDC, Hon. Zubiri on translocation schedules

Nov. 6-8, 2006 IDLW

School visits re: Web of life activity – Grade 4, 5 6 Nov. 6-8, 2006 SD Accompany NAMRIA personnel re: ground truthing Nov. 7, 2006 MP Travel to El Nido, facilitate setting of facilities for translocation project and assist zookeeper P. Morris re: translocation activities

Nov. 8-Dec. 15, 2006 SHD, BB, LA

6th Remittance of SKM Agri-store project, meeting with R. Deig and purchase of agri. Products for Bodega

Nov. 9, 2006 DV

Assistance to DENR RTDirector Galleon and other DENR staff in visiting RIWS and marine sanctuary

Nov. 9, 2006 RC, DV, JT, & wardens

Coordination with PCTP partners Nov. 9-30, 06 IDLW Submit documents to RED re: Narra wardens deputation Nov. 10, 2006 GB Setting of aviary and other facilities in the translocation site Nov. 10-14, 06 SHD, LA, & BB Meeting with WPU students Nov. 10, 2006 IDLW Check experimental plots, replace dead trees on plots 6 and 7 Nov. 11, 2006 MP, wardens Meeting with NAMRIA personnel re: Dumaran forests Nov. 11, 2006 IDLW School visits re: Grades 4 & 5 Nov. 13-14, 06 SD CEPF evaluation and assessment of Culasian Managed Resource and Protected Area Nov. 13-14, 06 RC, JT, DV Attend Sangguniang Panlalawigan Session re: KIEBC & PCCP 6th Phase extension Nov. 14, 2006 IDLW, GB Meeting with Culasian Barangay Health Workers re: Feeding Program Nov. 14, 2006 RC and JT Rizal wardens meeting: discussion of activities Nov. 14, 2006 RC and JT Meeting with PBCF (A. Mallari and Dave) Nov. 14, 2006 IDLW Birding at the proposed Candawaga Wetland Reserve Nov. 14, 2006 RC and JT School visit – Grade 6 Nov. 15, 2006 SD Preparation of agri. store monitoring report Nov. 15, 2006 DV Facilitate requirements for insurance from Aborlan Nov. 15-16, 06 DV, AD

Page 52: Technical Progress Report - philippinecockatoo.org and articles... · Municipal Government of Rizal, Palawan, ... EXECUTIVE SUMMARY ... PCCP Technical Progress Report 2006

PCCP Technical Progress Report

June - Dec 2006 p.52

Wardens meeting: scheduled activities tackled Nov. 16, 2006 DV, SHD Submitted BP updates Nov. 16, 2006 IDLW Presentation of PCTP before Palawan Tourism Council Nov. 17, 2006 IDLW Dismantling seeds of life exhibit Nov. 17, 2006 KF staff Staff meeting: assignments and tasks Nov. 18, 2006 KF staff Check demofarm and nursery Nov. 18, 2006 Mike Editing of recorded cockatoo calls Nov. 19, 2006 DV, JT & RC Preparations for El Nido trip Nov. 19, 2006 DV, GB, JT Travel to El Nido re: translocation activities Nov. 20, 2006 DV, GB, BB, LA Meeting with PASu staff R. Osorio re: participation to Kulambo festival Nov. 20, 2006 DV, GB School visits Grades 4, 5 & 6 Nov. 20-22, 06 SD Coordination with M. Laririt, Lagen re: translocation plans and activities Nov. 20, 2006 DV, GB Check and verify reports of Mr. Edwin Palay re: observed cockatoo roosts on Taulili tree in So. Kasipulo – sighted 7 cockatoos on Taulili trees

Nov. 20, 2006 MP

Assistance to C. Georgii in transporting cockatoos to El Nido Nov. 20-24, 06 RC and MB Collection and sending of seeds for cockatoos in Lagen Nov. 21, 2006 JT, BC, & wardens Roving in and around PA Nov. 21, 2006 MP, wardens Meeting PAWB re: MOA on Freshwater turtles Nov. 21, 2006 IDLW Meeting with El Nido Foundation staff re: enumerators and Kulambo Festival activities Nov. 21, 2006 DV, GB Purchasing & delivery of goods for Feeding Program in Rizal Nov. 21 & 24, 2006 JT, BC & Capt. Ong Arrival of Paul Morris (zookeeper from Chester Zoo) Nov. 22, 2006 IDLW Visitation to volunteer stations Nov. 22 & 28, 2006 JT, BC, & wardens Cockatoo monitoring in Edwin Palay area, So. Kasipulo Nov. 22-23, 06 MP Arrange catering services for workshops Nov. 22, 2006 GB Testing of Abukay boat and monthly cockatoo count Nov. 23, 2006 JT, BC, & wardens Orientation and meeting with enumerators for El Nido Pre-project survey Nov. 23, 2006 GB, DV Meeting with Hon. Zubiri and Dr. Lastica with P. Morris Nov. 23, 2006 IDLW Transport of 10 cockatoos to El Nido for translocation Nov. 24, 2006 C. Georgii Flight to El Nido of partners for PCTP Nov. 24, 2006 IDLW, partners Presentation of PCTP to partners at Lagen Island Resort; meeting with all partners (soft launching of project)

Nov. 24, 2006 IDLW, DV, GB, partners

Assistance and documentation re: transport of 10 cockatoos for translocation Nov. 24-25, 2006 DV, SHD,& wardens Monitoring of translocated birds at Cove 2, Lagen Island Nov. 24-27, 06 IDLW CEPF Workshop in Cebu City, Phils. Nov. 25-29, 06 RC Follow-up on inclusion of RIWS to CLWUP Nov. 27, 2006 JT Forest assessment, herbarium collection and mapping in Cove 2, Lagen Island Nov. 27-28, 2006 SHD Keepers’ Workshop at PAO Office, El Nido Nov. 27-28, 06 IDLW, DV, GB Facilitate turn-over of rescued 4 mynas and 1 cockatoo to PWRCC Nov. 27-Dec. 2, 2006 DV Checking at KIEBC and nursery site Nov. 28, 2006 JT & wardens Verified reported chain saw operation in So. Kasipulo Nov. 28, 2006 MP Received DENR Regional Special Order # 06-251: Designation of PASu for RIWS Nov. 29, 2006 JT Setting of traps at translocation site Nov. 29, 2006 SHD Stakeholders meeting for PCTP Nov. 29-30, 06 IDLW, DV, GB Conduct of IEC to Potter’s Place School, El Nido pupils Nov. 30, 2006 DV, GB Attendance to TWG meeting Nov. 30, 2006 MP, wardens, SD Monthly cockatoo count Nov. 30, 2006 JT, BC & wardens Participation to Kulambo Festival re: mascot appearance, environmental games and trivia, face painting, distribution of IEC materials, parade and exhibits

Dec. 1, 2006 IDLW, DV, GB

Compilation of wildlife turn-over and confiscation reports from 1998-2006 Nov.-Dec. 2006 RC RIWS Wardens and volunteers meeting: submission of reports, tasking, and payrolls Dec. 1, 2006 JT Monitoring at Cove 2 Dec. 2, 2006 IDLW Aviary enrichment, herbarium collection, operation of predator silhouette, monitoring of traps at Cove 2, Lagen Island, El Nido

Dec. 2 -14, 2006 SHD

Back to PPC; turn-over of 4 Hill myna and 1 Katala to PWRCC Dec. 3, 2006 IDLW, DV, GB Process visa extension Paul Morris at Bureau of Immigration Dec. 4, 2006 GB School visit Grades 4, 5 & 6 Dec. 4-6, 2006 SD School visits in Rizal: Biodiversity conservation lecture and distribution of IEC materials (New Culasin Elem. School, Candawaga Elem. School, Sicud Elem. School and Old Culasin Elem. School)

Dec. 5-7, 2006 DV, RC & JT

Check Bohol roosting site Dec. 6-8, 2006 MP 2nd LPAMC meeting in Rizal Dec. 7, 2006 IDLW, DV, RC, JT & wardens Meeting with SPAPI wardens: work assignments Dec. 7, 2006 IW, DV, RC, JT & wardens Arrival of Dr. Sabine Schoppe Dec. 9, 2006 IDLW School visits Grades 4, 5 & 6 Dec. 11-13, 06 SD Submission of FORD report Dec. 11, 2006 IDLW Monthly cockatoo count Dec. 12, 2006 BC & wardens Meeting with Dr. Schoppe Dec. 12/16, 06 IDLW

Page 53: Technical Progress Report - philippinecockatoo.org and articles... · Municipal Government of Rizal, Palawan, ... EXECUTIVE SUMMARY ... PCCP Technical Progress Report 2006

PCCP Technical Progress Report

June - Dec 2006 p.53

CI partners meeting Dec. 12, 2006 IDLW Facilitate signing of 2007 Breeding Season Workplan Dec. 12-27, 06 IDLW, DV, JT Palawan Geographic Information Network meeting at PPC Dec. 13, 2006 RC Coordination with PENRO re: PAMB requirements Dec. 13-14, 06 DV Monitoring of translocated cockatoos at Cove 2, Lagen Island, El Nido Nov. 24-Dec. 13, 06 SHD Bank transactions with Dr. Schoppe on KFI accounts; car check up Dec. 14, 2006 IDLW, SS 4th RIWS PAMB Meeting Dec. 14, 2006 DV, JT, RC, JC, & wardens Secured SP resolution endorsing KIEBC and PCCP Dec. 14, 2006 GB Narra staff meeting and visit to KIEBC site Dec. 15, 2006 KF staff Attend PCSD Council Meeting re: SEP clearance Dec. 15, 2006 GB Wardens meeting:submission of reports, and activities in preparation for breeding season Dec. 16, 2006 SHD, JT, DV & wardens Physical & program preparation for KF Christmas Party Dec. 16-22, 2006 DV, JT, & BC Meeting with PAWB; Hon. Zubiri at Congress Dec. 18-18, 06 IDLW Rizal trip: paper trails and meeting with wardens Dec. 19-22, 06 RC Assistance to PSU students visit to RIWS Dec. 21-22, 06 DV, JT, & wardens Article on PCTP submitted to Palawan Destination mag Dec. 22, 2006 IDLW Coordination with PCTP partners / updates Dec. 22-23, 06 IDLW Katala Foundation 2006 Christmas Party Dec. 23, 2006 KF family KF staff meeting Dec. 23, 2006 KF staff Narra and Rizal wardens meeting: payrolls, activities in preparation for breeding season and application for Philhealth insurance

Dec. 23 & 24, 2006 DV, JT, SHD, RC and wardens

Agri-project reporting Dec. 26, 2006 DV Checking and repair of Abukay boat Dec. 26-31, 2006 DV, SHD, Ja & wardens Meeting with Operations Manager: financial matters & tasking Dec. 27, 2006 DV Purchasing of communication equipments for RIWS and SPAPI wardens Dec. 28, 2006 DV Received E.O. # 11, Series of 2006: RIWS wardens deputation Dec. 28, 2006 IDLW and JT Narra Office cleaning and physical arrangement Dec. 28, 2006 JT and BC Progress reporting of KIEBC project Dec. 29, 2006 DV and JT Financial reporting, coding and posting of receipts for SPAPI Dec. 2006 DV Monitoring of translocated birds at Cove 2 Lagen Island Nov. 24-Dec 2006 Paul Morris Assistance to PAMB routinary works: paper trais and documents June-Dec. 2006 DV and JT Rizal and Narra office administrative and operational functions June-Dec. 2006 DV, RC JT, IDLW Wardens concerns: reports, assignments and payrolls June-Dec. 2006 SHD, DV, JT Tracking of cockatoos for telemetry study in Rasa Island and mainland Narra June-Dec. 2006 BC, SHD, EB Caring of rescued cockatoos from Rasa Island June-Nov. 06 SHD, wardens Facilitate paper trails and NYOFEC activities June-Dec. 06 DV, RC Bookkeeping and official errands June-Dec. 06 GB, IDLW Issuance of certificate of search at Rasa Island , Narra June-Dec. 06 Wardens Monitoring and data gathering on wildlife and nesting trees at Rasa Island, Narra, Dumaran Island and Culasian, Rizal

June-Dec. 2006 SHD, MP, RC, wardens,

KEEC Library operations and maintenance June-Dec. 06 IDLW, SD Monitoring and patrolling at Rasa Island and mainland coasts of Narra June-Dec. 2006 Volunteers, wardens Monitoring and patrolling at Omoi & Manambaling Cockatoo Reserves, Dumaran June-Dec. 2006 MP, Wardens Administrative and operational functions of the office June-Dec. 06 IDLW, PW, DV Field operations and management June-Dec. 06 PW, IDLW Planning and overseeing of KIEBC works; documentation and preparation of progress reports

Aug.-Dec. 2006 SHD, DV, JT & wardens

Page 54: Technical Progress Report - philippinecockatoo.org and articles... · Municipal Government of Rizal, Palawan, ... EXECUTIVE SUMMARY ... PCCP Technical Progress Report 2006

PCCP Technical Progress Report

June - Dec 2006 p.54

ANNEXES

Annex 1 SOUTHERN PALAWAN ANTI-POACHING INITIATIVE: Characteristics of nesting trees, Culasian Managed Resource Protected Area (CMRPA), Culasian, Rizal, Palawan

Annex 2 Individuals of Philippine cockatoos counted on the traditional roosting site on Rasa Island, Palawan, Philippines.

Annex 3 Example for tracking map of Philippine cockatoo fledglings on Rasa, Palawan, Philippines.

Annex 4 Data and highlights of telemetry tracking

Annex 5 1st Progress report of the Philippine Cockatoo Translocation Project (PCTP)

Annex 6 Activity Plans for the Philippine Cockatoo Translocation Project. Completed during the Stakeholders meeting in El Nido, Palawan, November 29-30, 2006.

Annex 7 Final Report for ZGAP on KIEBC

Annex 8 Final Report for FORD on Seeds of Life Exhibit

Page 55: Technical Progress Report - philippinecockatoo.org and articles... · Municipal Government of Rizal, Palawan, ... EXECUTIVE SUMMARY ... PCCP Technical Progress Report 2006

Annex 2: Individuals of Philippine cockatoos counted on the traditional roosting site on Rasa Island, Palawan, Philippines

0

20

40

60

80

100

120

140

Jul.

'98

Nov

. '98

Mar

. '99

Jul.

'99

Nov

. '99

Mar

. '00

Jul.

'00

Nov

. '00

Mar

. '01

Jul.

'01

Nov

. '01

Mar

'02

Jul.'0

2N

ov.'0

2M

ar.'0

3Ju

l.'03

Nov

.'03

Mar

.'04

Jul.'0

4N

ov.'0

4M

ar.'0

5Ju

l. '0

5N

ov. '

05M

ar.'0

6Ju

l.'06

Nov

. '06

Month

No

. o

f in

div

idu

als

Page 56: Technical Progress Report - philippinecockatoo.org and articles... · Municipal Government of Rizal, Palawan, ... EXECUTIVE SUMMARY ... PCCP Technical Progress Report 2006

Annex 3 Example for tracking map of Philippine cockatoo fledglings on Rasa, Palawan, Philippines.

- Frequency 1 (F1) – nest 41 - Frequency 2 (F2) – nest 21

- Frequency 3 (F3) – nest 38

- Frequency 4 (F4) – nest 2

- Frequency 5 (F5) – nest 23

Updated by: Jehson M. Cervancia

Page 57: Technical Progress Report - philippinecockatoo.org and articles... · Municipal Government of Rizal, Palawan, ... EXECUTIVE SUMMARY ... PCCP Technical Progress Report 2006

Annex 4 Data and highlights of telemetry tracking, Breeding Season 2006, Rasa Island, Narra, Palawan

Code Fequency No.

Nest No.

Ring No. Date of Ringing Date of Transmitter Installation

Important Remarks

F1 159.082 41 DENR 0006-06 May 18, 2006 May 18, 2006 *found dead, doubted eaten by osprey, transmitter recovered, scattered feathers on the ground documented (06/20/06)

F2 159.101 21 DENR 0019-06 May 24, 2006 June 05, 2006 *tracking on going F3 159.121 38 DENR 0016-06 May 24, 2006 June 05, 2006 *with yellow colored ring as marker for telemetry,

tracking on going F4 159.183 2 04-IV-VI blue May 31, 2006 June 22, 2006 *with violet colored ring as marker for telemetry,

tracking on going F5 159.082 23 VI-XL violet July 10, 2006 July 10, 2006 *transmitter from F1 installed, monitoring/checking

on going, hatchling still inside nest hole (07/16/06)

HIGHLIGHTS OF TELEMETRY TRACKING

Date Code Location Important Remarks

09 F1 Roost on Bogo tree near Nest 41 Fledged 15 F3 Fledged 19 F3 Tracked inside coastal forest near Nest 2 20 F1 Found dead inside coastal forest near Nest 41 Transmitter recovered from F1 22 F4 Installed transmitter to 1 cockatoo hatchling at Nest 2 Transmitter installed to F4 23 F2, F3 Tracked at roosting site F2, F3 first tracked at roosting site 25 F3 Tracked between Nest 3 and Nest 41 26 F3 Tracked at Kabaguan area

June 2006

28 F4 Did not tracked at Nest 2 Fledged 04 F3 Tracked near Nest 38 06 F2, F3, F4 Tracked at roosting site F4 frist tracked at roosting site 07 F2 Tracked at Pelayo, Dapdap and mangrove area F4 Tracked at Pelayo and Dapdap area

08 F4 Tracked at mangrove area 10 F5 Installed transmitter to 1 cockatoo hatchling at Nest 23 Transmitter installed 16 F5 Tracked on tidal flat near Nest 23 Fledged 17 F5 Tracked inside coastal forest F2 Tracked at Reynaldo Deig area

July

20 F5 Tracked at Favila and Villarias area

Page 58: Technical Progress Report - philippinecockatoo.org and articles... · Municipal Government of Rizal, Palawan, ... EXECUTIVE SUMMARY ... PCCP Technical Progress Report 2006

PCCP Technical Progress Report

June - Dec 2006 p.58

22 F5 Tracked at mangroves beas Nest 23 24 F4 Tracked near Nest 41 27 F3, F4 Tracked near restoration zone 28 F5 Tracked at roosting site F5 reached roosting site 10 F2 Tracked at trail near Nest 26 17 F5 Tracked near Nest 7 F2 Tracked at trail going to campsite

25 F5 Tracked at Alisto mangrove area Last tracking of F5, doubted to have drowned F2 Tracked at S. Deig coconut plantation

August

31 F4 Tracked at trail near Nest 26 September 20 F4 Tracked inside coastal forest near Nest 41

14 F2 Tracked at coconut plantation near Marcelo area F2 reached mainland 26 F2 AM – tracked at Marcelo area

October

PM – tracked at trail near campsite 02 F3, F4 Tracked near Nest 2 04 F2 Tracked at coconut plantation near Bliss/Damayan Road 09 F3 Tracked at Bliss/Damayan coconut plantation area F3 reached mainland F2 Tracked at Marcelo area F4 Tracked inside coastal forest near Nest 4

11 F2, F3, F4 Tracked at roosting site

November

14 F2, F3 Tracked at Marcelo area F2, F3 together in mainland 12 F2, F3, F4 Tracked at roosting site 13 F2, F3 Tracked at Marcelo area and Bliss Damayan respectively 14 F2 Tracked at Marcelo area

December

F3 Tracked at Damayan 15 F4, F3 Both tracked near nest no. 2 20 No hatchlings tracked but 16 cockatoos crossing to

mainland observed

03 F3 Tracked near Nest 38 F3 was last tracked, doubted the battery drained 08 F4 Tracked near Potential Nest 1 18 F2, F4 Tracked at roosting site

January 2007

29 F2, F4 Tracked at roosting site F2, F4 remain

Page 59: Technical Progress Report - philippinecockatoo.org and articles... · Municipal Government of Rizal, Palawan, ... EXECUTIVE SUMMARY ... PCCP Technical Progress Report 2006

PCCP Technical Progress Report

June - Dec 2006 p.59

Annex 6 Activity Plans for the Philippine Cockatoo Translocation Project. Completed during the Stakeholders meeting in El Nido, Palawan, November 29-30, 2006.

Threat/ Issue

Activities Time Frame Target Audience

Responsibility Resources needed

Community visits during Bgy. Assembly meeting and film showing

February to March 2007

Bgy. Council, community and poachers

Katala Foundation, LGU, DepEd, WWF

Visual aids, Hand-outs, Modules and commentary sheets

School visit / Lecture

February 2007

Elementary schools (Grade 4-6) of target bgys, High School, Resort Staff.

DepEd, Partner Agencies, TKDC

Visual aids, modules, Ballpen, MOA with DepEd

Stage play/s – training (Edong Magpayo)

March 2007 during town Fiesta

Community Raymond Osorio of PAO, Grace of Tourism Office, KFI and DepEd

Training materials, trainor, performers

Distribution of leaflets, brochures

December to January 2007

Tourist Katala Foundation, partner agencies

On the spot painting contest

March 2007 during town Fiesta

High school students

PAO, LGU, and KFI

Prizes, materials needed (crayons, illustration boards, pencils and etc)

Conflic

t w

ith h

um

an

Calendar January 2007

Community KFI Text, Pictures

Page 60: Technical Progress Report - philippinecockatoo.org and articles... · Municipal Government of Rizal, Palawan, ... EXECUTIVE SUMMARY ... PCCP Technical Progress Report 2006

PCCP Technical Progress Report

June - Dec 2006 p.60

Threat/ Issue

Activities Time Frame Target Audience

Responsibility Resources needed

IEC December to July 2007

Schools of target barangay (Grade 4-6 for elementary and all levels for high school)

KFI, WWF, ENF, DepEd, PAO, LGU and WPU, and PSU

Tarpauline, brochures, posters and etc., food and transportation expenses

Film showing (audio/video)

March to July 2007

Community KFI, ENF, LGU and PAO

Video documentation of El Nido and Philippine Cockatoo Translocation Project

IEC caravan in cooperation with ENF

December 2006 to July 2007

Community KFI, ENF, LGU and PAO

Tarpauline, brochures, posters and etc., food and transportation expenses

Poach

ing

Law enforcement “ Market denial” / SI

December 2006 to July 2007

Police, WWF, PAO and other concerned agencies

ENELEC, PAO, LGU

Funds / logistics