Technical presentation

Index1. The group. Companies.2. Services.3. Work sectors.4. Resources. Human and material.5. Projects. > Thermal solar > Photovoltaic > Boiler-making and assembly > Other industries _ Gas pipelines and oil pipelines _ Tubes and hoses _ Water industry _ Maintenance

6. Innovation.7. Principal clients.8. Curriculum.9. Contact.

FERGON Group

quality solutions

The groupCreated in 1999 by professionals equipped with a long experience within the sector and with more than 40 years of impeccable work, the group FERGON is characterized for its stability, growth and its constant evolution. This certainty is the result of the technical and human values that are the principal asset of our firms.

Quality, exactitude, personalized solutions and service that advances, adapting the new technologies in order to optimize the resources.

We feel passion for our work. We build up the confidence.

In order to propose a direct service and making available the mobility of our professionals and materials within the different zones and sectors we cover, the holding FERGON owns three brands; three specialized firms within the domain of the industrial services. The capacity of coordination, the long range of solutions and the coordination between the firms of the group is converted into a perfect cycle of industrial service activities and the new activities of renewable energies.

Calderería y Montajes, Fergon SL, Thermosolaires & Rénovations, SARL and Fergon Succursal Maroc. Three resources for reliable solutions.

FERGON Group

FERGON Group

Our firms

Calderería y Montajes FERGON, S.L. Created in 1999, it is the mother so-ciety of it, and due to its geographical area and its requirements of the professional specialization, the rest of the brands of the group emerged. Constituted by competent professionals, of a process of more than 40 years within the sector it covers, FERGON SL. offers one of the longest ran-ges in the market of industrial solutions on all levels. Development, fabrica-tion, assembly and maintenance of projects -turnkey- with the best gua-rantees of quality and success certificates.

Fergon Succursal Maroc. It is the branch of Calderería y Montajes Fergon, S.L., created and located strategically in Ouarzazate to offer expert indus-trial services of the parent company exclusively to Morocco. Established in 2013, the Fergon branch Maroc, S.L., relies on an investment in human and material resources which supports the development and the flawless execution of any type of industrial projects in the Kingdom of Morocco.

FERGON Group

Our firms

Thermosolaires & Rénovations S.A.R.L. It is the subsidiary of the group, with headquarters in Casablanca, Morocco. Established by the shareholders of the Group FERGON in 2014, it is a clear bet on the promotion and the investment of resources in industrial and energy projects in the countries where the group is already working successfully. In order to provide a more dynamic and direct service in the area, T&R represents the expe-rience in industrial solutions of the holding FERGON, with its specialty in development, installation and maintenance of thermo solar photovoltaic energy systems.

we are in

The FERGON group is clearly distinguishable by its extensive offer of tech-nical solutions and custom production, by its professional service and by the accuracy in the manufacturing and assembly time. We manufacture all kinds of metal parts, individually or in series. We design and develop in-dustrial projects and installations. We manufacture, install and offer a subse-quent management service and technical maintenance adapted to the needs of our customers.

> Design, development and technical consulting for industrial projects.> Solar energy.> Manufacturing of metal parts. Boiler-making.> Industrial assemblies.> Maintenance and technical management of installations.

Services

FERGON Group

Work sectorsThe group works for many and different sectors of business, such as the custom manufacturing of unique pieces or even the complete assembly of different industrial installations. The company also has different areas of specialization available, as is the case of the solar thermal and energy industry where FERGON stands out markedly at the national and interna-tional level.

> Thermal solar> Photovoltaic> Electric> Thermal> Desalination> Tubes and hoses> Water industry> Biodiesel> Engineering> Construction> Cement manufacture> Shipowners> Petrochemistry> Gas pipelines and oil pipelines> Food industry> Marble, natural stone and aggregates> Research, development and innovation

FERGON Group

FERGON Group

Humanresources

ValuesThe FERGON human team, combined with the material resources of the company, forms the main assets of the group, appreciated for its great ability, experience and know-how.

Our group is divided into several departments, with around 180 emplo-yees, about 60 of which are in Morocco.

Sales - MarketingA highly qualified department to provide effective and customized solu-tions - is responsible for the coordination and management of projects, as well as client assistance throughout the process.

Technique and DevelopmentTop-level engineers design, adapt and perform the most effective solu-tions for each situation. They develop the complete projects, and provi-de advice about the most appropriate improvements and adaptations.

FERGON Group

Humanresources

ValuesProduction Composed of teams of highly skilled professionals - >Welders certified for different welding processes > Boilermakers >Textile mechanics >Welders and piping installers > Assembly specialists > Technicians.

Quality, Safety and Environment It handles the demanding requests of quality, safety and respect for the environment throughout the different manufacturing and assembly pro-cesses. It guarantees the quality of the product; it controls the effective management of resources while reducing waste. The team of technicians ensures the fulfillment and the updating of the regulation with regard to the quality, the safety and the environment.

FERGON Group

Materialresources

MaterialsThe Group FERGON has more than 3,000 m2 of installations, facilities, equipment and machinery necessary for the development assuring suc-cess in any project, as well in Spain as in Morocco.

Machines available in Morocco. Quantity and description:

1 = TOWER CRANE COMANSA 5L4010 Nº 12978 WITH ACCESSORIES 1 = TELESCOPIC FORKLIFT CARRIER CARUS 40.17 TC1 = TELESCOPIC FORKLIFT CARRIER JCB 535 – 125A1 = ELECTRICITY GENERATOR WITH WACKER LIGHT TOWER1 = ELECTRICITY GENERATOR HIMOINSA 130KVA1 = ELECTRICITY GENERATOR INTERNACO 105 KVA1 = ELECTRICITY GENERATOR MARCA CABRAND (E1S1323079)8 = ELECTRICITY GENERATOR SMALL FORMAT 1 = ELECTRICITY GENERATOR BRAND IVECO SPA DE 40KVA (757913)12 = WELDING MACHINE LINCOLN 27010 = WELDING MACHINE LINCOLN 3508 = WELDING MACHINE LINCOLN 4051 = ELECTRIC TRACTOR (ELECTRIC TRACTOR)2 = HEAD - WELDING MACHINE SUPPORT1 = FORK LIFT CARRIER CATERPILLAR

FERGON Group

Materialresources

Quantity and description:

1 1 = COMPRESSOR3 = COMPRESSOR OF 270 LITERS BRAND NUAIR (149324)1 = MANUAL TUBE CUTTER6 = DUMPER AUSA 150 D2 = ELECTRICAL DISCHARGE MACHINE LORCH3 = ORBITAL WELDING DEVICE (HEAD +GENERATOR)7 = TIG WELDING DEVICE1 = TUPE PLATFORM DUMPER AUSA # 20791 = TUPE PLATFORM DUMPER AUSA # 20891 = TUPE PLATFORM DUMPER AUSA # 301661 = TUPE PLATFORM DUMPER AUSA # 312394 = ELEVATOR 1 = FREEZER ORBYTAL1 = TRAILER FOR ELECTRICITY GENERATOR1 = TUBE TRAILER1 = SAW A RUBAN FAT - 2701 = SAW A RUBAN SABY 4501 = MAGNETIC DRILL 1 = ILLUMINATION TOWER PRAMAC1 = TRACTOR SAME SILVER2 = WELDING VARIATOR1 = ELECTRICITY GENERATOR HIMOINSA 60 KVA WITH ADMINISTRATOR AND GENERATOR1 = ELECTRICITY GENERATOR HIMOINSA 35 KVA WITH ADMINISTRATOR AND GENERATOR 1 = LIGHT CHASSIS TOWER4 = CONTAINER1 = TRUCK4 = VAN

FERGON Group

Materialresources

FERGON Group

Projets

ExactitudeWe detail, as a result, some projects carried out by FERGON, where, in some cases, our group continues to supervise and manage the mainte-nance of the systems.

The group FERGON through its subsidiaries in Morocco, Thermosolaires Renovations, SARL and the Fergon branch in Morocco has carried out assembly and welding works of pipes at the thermal solar plant NOOR-I, for the consortium ACCIONA - SENER - TSK, both being specialized in the sector of thermal solar power plants, of hybrid thermal solar energy and thermal solar energy.

FERGON Group

Projets

Distinguished work:

> Manufacturing of boiler-making parts for oil hoses.> Manufacturing of structures, foundation circles, for salt reservoirs.> Manufacturing of fixed points.> Manufacturing and assembly of refrigeration tubes.> Manufacturing and supply of tubes.> Manufacturing and assembly of HCE tubes.> Manufacturing and assembly of coupling tubes (HCE tube, Swivel, Crossover and interconnections).> Repairs of tubes and Bypass tubes.> Support and accessibility structures.> Bending and painting of liners.> Marketing work.> R&D projects.

Thermo-solar plants

renewable

1. On-site assembly of HCE tubes. NOOR I2. Welding of HCE tubes. NOOR I3. Pipelines NOOR I

FERGON Group

Thermo solar

1. Detail of HCE tube in thermo solar.2. Foundation circles for salt reservoirs. Extresol.3. Welding of HCE tubes.4. Swivel joints assembled in solar cells NOOR I - Morocco.

FERGON Group

Thermo solar

1. Salt reservoir zone and solar cell installations. Andasol.2. Refrigeration tubes.3. Details of the refrigeration tubes.4. Fixed points.

FERGON Group

Thermo solar

1. Solar panel farm.2. Detailed view of the panel below.3. Solar panels on the roof of a building.4. Solar panels installed on the wall of a building.

FERGON Group

Photovoltaic

FERGON Group

Projets

The FERGON group is a specialist in the manufacturing of all types of parts for boiler-making for the industry.

FERGON makes parts with special measures, following prior designs or plans designed by its team of engineers, in order to adapt them to the needs of the client.

The holding company takes care of the planning, execution, assembly and installation of boiler-making parts and industrial systems after their manufacturinge. T&R has qualified, certified and specialized personnel in different assembly techniques.

Boiler-making and industrial assemblies

industrial solutions

FERGON Group

Projets

The group manufactures:

> Silos.> Reservoirs.> Hoppers.> Sieves.> Filters.> Industrial pipework systems.> Support structures.> Conveyor belts.> Parts for oil supply pipes.> Foundation structures for reservoirs.> Pipe clamps.> Bending of parts.> Pneumatic transport.

Another one of its services is industrial repairs.

Always ensuring the fulfillment of regulations with regard to safety, quality and the environment, and the accuracy and accomplishment of our goals, the FERGON group is one of the holdings that give priority to the confidence of the customer.

Boiler-making and industrial assemblies

1. and 2. Bed bunker.3. Silo.4. Silo roof.

Boiler-making and industrial assemblies

FERGON Group

1. Structures for silos.2. Silos on structures.3. Installation for the slack storage.4. Installation for truck loading.

Boiler-making and industrial assemblies

FERGON Group

1. Grinding hopper.2. Installations for aggregates.3. Multi-silo hoppers for the classification of aggregates.4. Hoppers for the classification of aggregates.

Boiler-making and industrial assemblies

FERGON Group

1. Silo removal.2. Silo damage and structures.3. Ferrule for solar towers.4. Pipe cutting.

Boiler-making and industrial assemblies

FERGON Group

1. Tubes for gas pipelines.2. Tubes for thermal power plants.3. High platforms for thermal power plants (dimension + 40,000 m).4. Parts for boiler-making.

Boiler-making and industrial assemblies

FERGON Group

FERGON Group

Projets

The FERGON group develops, manufactures and installs parts for diffe-rent industrial sectors, as is the case for the Food, Petrochemical, Gas Pipelines, Oil Pipelines, tube and water pipe industries.

As an additional service the group also offers the maintenance of parts, assemblies and industrial installations.

Other industrial services and innovations

other industries

Gas pipelines and oil pipelines

1. Principal line of the pre-aligned natural gas pipes. Huércal - Overa, Guadix - Andalusia - Spain.2. Tube bending.3. Tube welding.4. Tube alignment and welding.

FERGON Group

Tubes and hoses

1. Tube Bypass welding of expansion reservoirs.2. Pre-manufacturing of Bypass tubes for expansion reservoirs.3. Weldolet detail.4. Weldolet welding detail.

FERGON Group

Water industry

1. Installation of the desalinization plant in Almeria - Spain.2. Purification plant.3. Water connection node in the street.4. Filter for the purification plant.

FERGON Group

1. Industrial maintenance.2. Technical assistance and revision of the systems and installations.3. Work at height for ENDESA.4. Supervision and maintenance of gas pipelines MEDGAZ.

Maintenance

FERGON Group

FERGON Group

Innovation

The FERGON group was regarded as pioneer of various installation and service techniques in the sector, which are evident thanks to its strong bet on innovation.

Orbital TIG Welding> Adaptation of this technology for its application in the prefabrication of HCE tubes of the cylinder-parabolic reflectors for thermal power plants.> Refrigeration and filtration of the air for the ensemble generator and the head of the orbital welding systems. OBJECTIVE > Use in solar cells (under adverse conditions: wind, dirt, etc.)

The union of HCE pipes was traditionally made using a manual TIG welding (Tungsten Inert gas). At FERGON we have developed this technique so that the quality of the final work clearly increases.

Advantages of the automatic orbital welding> It produces high quality welding coils.> None or very low scrap percentage.> The unions are obtained with a high resistance and an important meta-llurgical purity.> Good surface finish.> Welding cost reduction of to 30%.> It is perfect for a responsible welding such as in the case of employees in the energy, nuclear, chemical, aerospace, food and biotechnology in-dustry, among others.

Software The group, in order to enhance, optimize and guarantee the quality of its processes, has created specific software for the control of the traceability of all the projects that the enterprise carries out.

Innovation

FERGON Group

1. and 2. HCE tubes. Traditional use of manual TIG welding for the union.3. and 4. Objective. To adapt the orbital welding to this type of unions.

FERGON Group

Clients

These are companies which have deposited their confidence in the FER-GON group for developing their projects and which, nowadays, are still customers who make use of our different assistance, maintenance and repair services.

> SENER> MEDGAZ> ENDESA> GRUPO COBRA (ACS)> ELECNOR> ACCIONA> FERROVIAL> HOLCIM> S&B INDUSTRIAL MINERAL SPAIN > GRUPO COSENTINO> AAF INTERNATIONAL> MAGALDI POWER> F J SUCESORES> DLR> CIEMAT> GRUPO TSK> ACCIONA MAROC> CSPvalue

principal clients

FERGON Group

Curriculum

Throughout the professional process of the FERGON group, we can clearly distinguish the following work and projects.

/// BOILER-MAKING AND ASSEMBLY WORK

MEDGAZ (RECEPTION TERMINAL OF THE GAS PIPELINE ALGERIA-SPAIN)The pre-manufacturing of tubes for the reception terminal of the gas pipeli-ne of Medgaz (Algeria-Spain).Client: Técnicas ReunidasYear: 2008 Amount: 585.000 €

DESALINATION CAMPO DALIASManufacturing and delivery of painted metal structure, castings and sup-port structures. Client: AQUAMEDYear: 2009 Amount: 693.200 €

HOLCIMManufacturing, installation and assembly of 2 silos of 1500 m3 for the loading of the railway for Benahadux, and the manufacturing, installation and assembly of a silo of 1500 m3 for Mengibar.Client: HolcimYear: 2003/2004 Amount: 1.858.302 €

GAS PIPELINE HUÉRCAL-OVERA - GUADIXInstallation of 45 km of piping for a gas pipeline in the south of Spain. Client: ACCIONAYear: 2013/2014 Amount: 1.382.000 €

BÉTONS DOMINGO GIMÉNEZAssembly of a cement machine at the harbor of Motril.Client: Bétons Domingo GiménezYear: 2007 Amount: 388.227 €

main projets

FERGON Group

Curriculum

ENDESAConception, manufacturing and assembly of an installation for lag storage in the GROUPES I and II. The marketing of the Group II desulphurization unit. Client: ENDESAYear: 2008 Amount: 378.230 €

COSENTINOModification of the installations at SILESTONE 0.Client: Grupo COSENTINOYear: 2013 Amount: 279.415 €

OMYA CLARIANAExpansion of the calcium carbonate grinding unit at Purchena. Installation and Assembly of the calcium carbonate grinding unit at Darro.Client: Omya ClarianaYear: 2006/2007 Amount: 342.830 €

MAGALDI POWERManufacturing, delivery and assembly of the installation for the collection and transport of the lag at the ENDESA Thermal Power Plant at Carboneras.Client: Magaldi PowerYear: 2006 Amount: 234.668 €

/// THERMAL SOLAR WORK

C.T. ANDASOL 1 / ANDASOL 2

> Manufacturing and assembly of foundation circles for salt reservoirs for ther-mal storage.> Pre-manufacturing in the workshop and assembly on-site of the HCE tubes.> Manufacturing of fixed points.> Bending and covering of Liners.> Maintenance of solar cells.Client: COBRA / SENERYear: 2006/ 2007 Amount: 2.525.115 €

FERGON Group

Curriculum

C.T. EXTRESOL 1 / C.T. EXTRESOL 2

> > Manufacturing and assembly of foundation circles for salt reservoirs for thermal storage.> Bending and covering of the Liners.Client: COBRA / SENERYear: 2008 Amount: 515.524 €

C.T. LA DEHESA

> > Pre-manufacturing in the workshop and assembly on-site of the HCE tubes. Client: SAMCAYear: 2009 Amount: 873.240 €

C.T. Valle 1 / C.T. Valle 2

> Manufacturing and assembly of foundation circles for salt reservoirs for thermal storage.> Pre-manufacturing in the workshop and assembly on-site of the HCE tubes.> Assembly of Swivels.> Manufacturing and assembly of water circulation aerial tubes (carbon steel) for the refrigeration of the condenser.> Bending and covering of the Liners.> Manufacturing and supply of solar cell supports.> Manufacturing and supply of the Reinforced Clamping Yoke.> Start-up works.Client: COBRA / SENERYear: 2009/2010 Amount: 2.720.352 €

C.T. ASTE 1A

> Pre-manufacturing in the workshop and assembly on-site of the HCE tu-bes.> Manufacturing and assembly of Swivels.> Bending and covering of the Liners.> Manufacturing and supply of the Reinforced Clamping Yoke.Client: ELECNORYear: 2011 Amount: 1.458.312 €

FERGON Group

Curriculum

NOOR I

Welding and assembly of piping within a solar panel farm.Client: ACCIONA / SENER / TSKYear: 2014/2015 Amount: 7.105.508 €

C.T. MORÓN

> > Pre-manufacturing and assembly of HCE tubes.Client: ACCIONAYear: 2011 Amount: 989.704 €

C.T. ORELLANA

> Bending and covering of the Liners.> Manufacturing and supply of the Reinforced Clamping Yoke.Client: SENERYear: 2011 Amount: 85.642 €

C.T. SOLUZ-GUZMAN

> Bending and covering of the Liners.> Manufacturing and supply of the Reinforced Clamping Yoke.Client: SENERYear: 2011 Amount: 83.109 €

C.T. TERMOSOL 1 / C.T. TERMOSOL 2

> Bending and covering of the Liners.> Manufacturing and supply of the Reinforced Clamping Yoke.> Pre-manufacturing in the workshop and assembly on-site of the HCE tubes.Client: Florida PowerYear: 2012 Amount: 1.948.602 €

FERGON Group

Curriculum

C.T. LA AFRICANA

> Bending and covering of the Liners.> Manufacturing and supply of the Reinforced Clamping Yoke.> Pre-manufacturing and assembly of coupling tubes (HCE tube, Crosso-vers, Interconnections and Swivels).Client: SENERYear: 2012 Amount: 2.887.380 €

CIEMAT-PLATEFORME SOLAIRE D’ALMERIA> Participation in the Prometeo project.> Participation in the Kontas project for DLR.> Participation in the GDV project for DLR.> Restructuring of the DISS project for CIEMAT.Client: CIEMAT / DLR / IBERDROLAYear: 2011/2012 Amount: 528.640 €

/// AGRI-FOODSTUFFS

FJ SÁNCHEZ Y SUCESORES> Manufacturing and installation of reservoirs.> Vapor installation.Client: FJ Sánches y SucesoresYear: 2011/2012 Amount: 279.323 €

/// PETROCHEMICAL

FJ SÁNCHEZ Y SUCESORES> Vapor installation.> Gas-oil installation.Client: FJ Sánches y SucesoresYear: 2012/2013 Amount: 387.412 €

FERGON Group

Curriculum

/// MAINTENANCE AND REPAIR WORK

UPT Almería et TP CarbonerasShutdown maintenance of the plant maintenance, manufacturing and provision of access structures. Client: ENDESA GENERACIÓNYear: 2010/2011/2012/2013 Amount: 872.610 €

RECEPTION TERMINAL OF THE GAS PIPELINE ALGERIA-SPAINMaintenance of the operating and control installations.Client: MEDGAZYears: 2010/2011/2012/2013/2014 Amount: 1.697.681 €

S&B MINERALSMaintenance and repair work of the perlite factory.Client: S&B MineralsYears: 2008/2009/2010/2011/2012/2013/2014 Amount: 627.853 €

FERGON Group

Contact

Fergon Morocco Fergon Succursal Maroc

N° 140 Hay Al Mohammadi Ouarzazate

T. + 212 621 499 446T. +34 607 857 492

e-mail: [email protected]

Fergon Calderería y Montajes Main offices

Pol. Ind. La JuaidaC/ Sierra La Contraviesa, 58

04240 Viator - Almería - EspañaT. +34 950 305 181F. +34 950 305 182

e-mail: [email protected]

T&RThermosolaires & Rénovations

131, Boulevard d’AnfaRésidence Azur

11ème Étage, Bureau nº 11BCasablanca - Maroc

T. + 212 621 391 [email protected]

www.therenma.com